Project Completion Certificate (Ground Water)
Scheme ID: 8010072 Name of Scheme: Lagaon GOV No. of Villages: 52 No. of Habitation Covered: 52
Total Population Covered: 137385 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 15-Nov-2024
Intake
Dia./Height (In Mtr.) Capacity (In MLD) Location Latitude Longitude
NA 22.5 KALAPAHAD 24.752547 78.284934
WTP
Capacity (In MLD) Location Latitude Longitude
15 15 24.752547 78.284934
CWR's
Sno. Str. Capacity (In KL) Location Latitude Longitude
1 1 1400 KALAPAHAD 24.752547 78.284934
2 2 200 LAGAON 24.812919 78.276267
3 3 200 NAUHARKHURD 24.843786 78.26194
4 4 200 IKALGUWAN 24.86313 78.226714
5 5 200 TORIYA 24.77571 78.332838
6 6 200 BUCHA 24.811562 78.373835
7 7 200 BAJNO 24.84444 78.379814
8 8 200 ADWAHA 24.846866 78.41506015
9 9 200 ANDHER 24.807053 78.424107
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 4.049/41m ± 10% KALAPAHAD 24.752547 78.284934
2 VT Pump -2 0.264/ 25m ± 10% KALAPAHAD 24.752547 78.284934
3 VT Pump -3 2.427/ 45m ± 10% KALAPAHAD 24.752547 78.284934
4 VT Pump -4 4.583/ 30m ± 10% KALAPAHAD 24.752547 78.284934
5 VT Pump -5 0.427/ 23m ± 10% LAGAON 24.812919 78.276267
6 VT Pump -6 2.021/ 42m ± 10% LAGAON 24.812919 78.276267
7 VT Pump -7 0.427/ 23m ± 10% NAUHARKHURD 24.843786 78.26194
8 VT Pump -8 1.073/ 31m ± 10% NAUHARKHURD 24.843786 78.26194
9 VT Pump -9 0.524/78m ± 10% NAUHARKHURD 24.843786 78.26194
10 VT Pump -10 0.647/25m ± 10% IKALGUWAN 24.86313 78.226714
11 VT Pump -11 0.422/ 28m ± 10% IKALGUWAN 24.86313 78.226714
12 VT Pump -12 1.130/ 30m ± 10% TORIYA 24.77571 78.332838
13 VT Pump -13 3.448/34m ± 10% TORIYA 24.77571 78.332838
14 VT Pump -14 0.776/29m ± 10% BUCHA 24.811562 78.373835
15 VT Pump -15 1.118/61m ± 10% BUCHA 24.811562 78.373835
16 VT Pump -16 1.554/42m ± 10% BUCHA 24.811562 78.373835
17 VT Pump -17 0.267/25m ± 10% BAJNO 24.84444 78.379814
18 VT Pump -18 0.851/ 63m ± 10% BAJNO 24.84444 78.379814
19 VT Pump -19 0.454/31m ± 10% ADWAHA 24.846866 78.41506015
20 VT Pump -20 1.100/ 75m ± 10% ADWAHA 24.846866 78.41506015
21 VT Pump -21 0.403/ 22m ± 10% ANDHER 24.807053 78.424107
22 VT Pump -22 0.698/62m ± 10% ANDHER 24.807053 78.424107
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 KL/ 12M Lagaon 24.812919 78.276267
2 OHT-2 225 KL/ 12M Nahurkhurd 24.843786 78.26194
3 OHT-3 275 KL / 20 M Ikalguwan 24.86313 78.226714
4 OHT-4 175 KL/ 20 M Panchora 24.88352 78.229286
5 OHT-5 225 KL/ 18 M Vinekamafi 24.868092 78.321955
6 OHT-6 350 KL/ 20 M Raipur 24.884204 78.39958
7 OHT-7 125 KL/ 16 M Bajano 24.84444 78.379814
8 OHT-8 350 KL/ 18 M Bucha 24.811562 78.373835
9 OHT-9 500 KL/ 18 M Toriya 24.77571 78.332838
10 OHT-10 300 KL/ 16 M Kargan 24.777346 78.401955
11 OHT-11 175 KL/ 12 M Andher 24.807053 78.424107
12 OHT-12 200 KL/ 20 M Adwaha 24.846866 78.4150602
13 OHT-13 125 KL/ 14 M Kalapahad 24.752547 78.284934
Raw Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.)
1 DUCTILE IRON / K9 500 4.618
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DUCTILE IRON / K9 100 0.275
2 DUCTILE IRON / K9 125 15.636
3 DUCTILE IRON / K9 150 32.416
4 DUCTILE IRON / K9 200 18.830
5 DUCTILE IRON / K9 250 12.625
6 DUCTILE IRON / K9 300 8.591
7 DUCTILE IRON / K9 350 7.317
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DUCTILE IRON / K7 100 16.1415
2 DUCTILE IRON / K7 150 12.276
3 DUCTILE IRON / K7 200 17.0694
4 DUCTILE IRON / K7 300 14.042
5 DUCTILE IRON / K7 350 8.255
6 HDPE/PN-8 63 42.04
7 HDPE/PN-8 75 53.070
8 HDPE/PN-8 90 32.606
9 HDPE/PN-8 110 37.322
10 HDPE/PN-8 125 6.769
11 HDPE/PN-8 140 2.055
12 HDPE/PN-8 160 0.232
13 HDPE/PN-8 180 8.7200
14 HDPE/PN-8 200 14.015
15 GI Pipe (Medium) 50 8.507
16 GI Pipe (Medium) 65 2.409
17 GI Pipe (Medium) 80 0.429
Other Details
127.92
135.75
135.75
30-Nov-2024
01-Dec-2024