Project Completion Certificate (Ground Water)
Scheme ID: 8011637 Name of Scheme: Mahadev GOV No. of Villages: 258 No. of Habitation Covered: 352
Total Population Covered: 441005 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Jun-2022 Actual Date of Completion (Capex): 31-Dec-2023
Intake
Dia./Height (In Mtr.) Capacity (In MLD) Location Latitude Longitude
12.00 47.4 Lahraon 24.91213797 82.2686485
WTP
Capacity (In MLD) Location Latitude Longitude
44.00 Naraina Kalan 24.90950668 82.35866534
CWR's
Sno. Str. Capacity (In KL) Location Latitude Longitude
1 CWR -1 4000.00 Naraina Kalan 24.90950668 82.35866534
2 CWR -2 3200.00 Khaira Kalan 24.94589365 82.38289591
3 CWR -3 800.00 Lakhaniya 24.99453761 82.3924836
4 CWR -4 300.00 Patulki 25.02531425 82.38258526
5 CWR -5 1500.00 Barkachha 24.94112948 82.42291364
6 CWR -6 1200.00 Kothi 25.00386314 82.46890929
7 MBR 950.00 Pandaypur 25.05019399 82.47792887
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 HSC Pump -1 387/67 Intake Well 24.91213797 82.2686485
2 HSC Pump -2 653/39 WTP 24.90950668 82.35866534
3 HSC Pump -3 82/110 WTP 24.90950668 82.35866534
4 HSC Pump -4 312/51 CWR-1 24.94589365 82.38289591
5 HSC Pump -5 312/68 CWR-1 24.94589365 82.38289591
6 HSC Pump -6 146/62 CWR-2 24.99453761 82.3924836
7 HSC Pump -7 110/61 CWR-3 25.02531425 82.38258526
8 HSC Pump -8 284/70 CWR-4 24.94112948 82.42291364
9 HSC Pump -9 244/58 CWR-5 25.00386314 82.46890929
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ESR- 1 400/18 Rajapur 25.05849696 82.46062635
2 ESR- 1A 350/18 Tulshi 25.03232135 82.41842532
3 ESR-2 500/20 Ranibari 25.05493924 82.35801548
4 ESR-3 250/12 Kenuhi Mafi-2 25.03026975 82.31298917
5 ESR-3A 650/20 Patehara Raja 24.99966592 82.33299576
6 ESR-4 650/18 Semari kalan 24.95317598 82.30350448
7 ESR-4A 550/20 Tilwa No-1 24.93146138 82.32186483
8 ESR-5 450/20 Gopalpur 24.97525423 82.33767166
9 ESR-6 400/18 Khaira Kala 24.94587021 82.37258888
10 ESR-6A 400/13 Pachokhar 24.92536812 82.37050194
11 ESR-7 250/18 Jamuhara 24.88475829 82.42507136
12 ESR-7A 350/20 Rujhauli 24.89963554 82.39615989
13 ESR-8 225/16 Kolkam Kalan 24.95973631 82.46066596
14 ESR-8A 350/20 Gadbad 24.95357825 82.43711243
15 ESR-8B 400/20 Purakashi Nath 24.94088483 82.41107074
16 ESR-9 350/18 Jaikar khurd 24.99941888 82.42115998
17 ESR-9A 400/15 Dubar Kala 24.97470853 82.39460281
18 ESR-10 400/20 Kalwari Kalan 25.04872011 82.46979072
19 ESR-11 350/20 Kothi 25.00386314 82.46890929
20 ESR-11A 225/20 Turkaha 25.04970779 82.53520967
21 ESR-12 350/12 Charkhai 25.08818067 82.45488779
22 ESR-13 225/20 Parasia 25.11967947 82.49513112
23 ESR-14 550/18 Sadi Bankat 25.11956111 82.52787558
24 ESR-15 350/20 Bokaria 25.08161619 82.51134051
25 ESR-16 700/20 Padara Maunash 25.10139735 82.58185962
Raw Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.)
1 DI pipe Class K-9 700 12.54
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K9 150.00 33.32
2 DI/K9 200.00 24.75
3 DI/K9 250.00 8.11
4 DI/K9 300.00 8.52
5 DI/K9 350.00 5.73
6 DI/K9 400.00 14.85
7 DI/K9 450.00 6.14
8 DI/K9 500.00 5.44
9 DI/K9 700.00 5.59
10 DI/K7 150.00 6.24
11 DI/K7 200.00 8.25
12 DI/K7 250.00 9.08
13 DI/K7 350.00 2.73
14 DI/K7 400.00 5.70
15 DI/K7 450.00 1.06
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 GI(Medium) 50.00 372.61
2 GI(Medium) 65.00 122.49
3 GI(Medium) 80.00 56.10
4 HDPE PN-6 63.00 399.43
5 HDPE PN-6 75.00 48.98
6 HDPE PN-6 90.00 21.90
7 HDPE PN-6 110.00 33.11
8 HDPE PN-6 140.00 14.69
9 HDPE PN-6 160.00 24.65
10 HDPE PN-6 180.00 7.02
11 HDPE PN-6 200.00 16.89
12 DI/K7 100.00 64.18
13 DI/K7 150.00 54.81
14 DI/K7 200.00 39.23
15 DI/K7 250.00 34.89
16 DI/K7 300.00 8.55
17 DI/K7 350.00 0.72
Other Details
272.00
272.27
272.27
31-Mar-2024
20-Dec-2024