Project Completion Certificate (Ground Water)
Scheme ID: 8134922 Name of Scheme: Dhoora Balabehat GOV No. of Villages: 58 No. of Habitation Covered: 58
Total Population Covered: 60262 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Mar-2024 Actual Date of Completion (Capex): 10-Mar-2025
Intake
Dia./Height (In Mtr.) Capacity (In MLD) Location Latitude Longitude
NA 15 DHOJRI 24.469974 78.27854
WTP
Capacity (In MLD) Location Latitude Longitude
10 DHOORA 24.4513977 78.3117447
CWR's
Sno. Str. Capacity (In KL) Location Latitude Longitude
1 CWR -1 900 KL AT WTP DHORRA 24.4513977 78.3117447
2 CWR -2 100 KL MUDARI 24.364969 78.380914
3 CWR -3 100 KL BALABEHAT 24.315634 78.423954
4 CWR -4 100 KL DUNGRIYA 24.437675 78.411815
5 CWR -5 100 KL CHANDERA 24.463569 78.434806
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 2717/86m ± 10% AT INTAKE DHOJRI 24.469974 78.27854
2 VT Pump 2717/86m ± 10% AT INTAKE DHOJRI 24.469974 78.27854
3 VT Pump 2717/86m ± 10% AT INTAKE DHOJRI 24.469974 78.27854
4 VT Pump 2717/86m ± 10% AT INTAKE DHOJRI 24.469974 78.27854
5 VT Pump 1183/27m ± 10% DHORRA 24.4513977 78.3117447
6 VT Pump 1183/27m ± 10% DHORRA 24.4513977 78.3117447
7 VT Pump 467/39m ± 10% DHORRA 24.4513977 78.3117447
8 VT Pump 467/39m ± 10% DHORRA 24.4513977 78.3117447
9 VT Pump 1733/14m ± 10% DHORRA 24.4513977 78.3117447
10 VT Pump 1733/14m ± 10% DHORRA 24.4513977 78.3117447
11 VT Pump 317/35m ± 10% MUDARI 24.364969 78.380914
12 VT Pump 317/35m ± 10% MUDARI 24.364969 78.380914
13 VT Pump 1417/34m ± 10% MUDARI 24.364969 78.380914
14 VT Pump 1417/34m ± 10% MUDARI 24.364969 78.380914
15 VT Pump 833/34m ± 10% BALABEHAT 24.315634 78.423954
16 VT Pump 833/34m ± 10% BALABEHAT 24.315634 78.423954
17 VT Pump 600/45m ± 10% BALABEHAT 24.315634 78.423954
18 VT Pump 600/45m ± 10% BALABEHAT 24.315634 78.423954
19 VT Pump 1800/81m ± 10% DHORRA 24.4513977 78.3117447
20 VT Pump 1800/81m ± 10% DHORRA 24.4513977 78.3117447
21 VT Pump 483/25m ± 10% DUNGRIYA 24.437675 78.411815
22 VT Pump 483/25m ± 10% DUNGRIYA 24.437675 78.411815
23 VT Pump 467/50m ± 10% DUNGRIYA 24.437675 78.411815
24 VT Pump 467/50m ± 10% DUNGRIYA 24.437675 78.411815
25 VT Pump 567/17m ± 10% DUNGRIYA 24.437675 78.411815
26 VT Pump 567/17m ± 10% DUNGRIYA 24.437675 78.411815
27 VT Pump 233/25m ± 10% KANPURA 24.463569 78.434806
28 VT Pump 233/25m ± 10% KANPURA 24.463569 78.434806
29 VT Pump 350/40m ± 10% KANPURA 24.463569 78.434806
30 VT Pump 350/40m ± 10% KANPURA 24.463569 78.434806
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 400 KL/ 12M DHORRA24.4513977 24.4513977 78.3117447
2 OHT-2 150 KL/ 16M RAMPURA 24.505798 78.28056
3 OHT-3 100 KL /22 M MUDARI 24.364969 78.380914
4 OHT-4 300 KL/ 22 M BALABEHAT 24.315634 78.423954
5 OHT-5 100 KL/ 14 M PATHARI 24.295145 78.401124
6 OHT-6 125 KL/ 14 M SEMARA 24.309598 78.390277
7 OHT-7 175 KL/ 12 M DUNGRIYA 24.437675 78.411815
8 OHT-8 100 KL/ 16 M SIMARDHA 24.500989 78.39094
9 OHT-9 175 KL/ 12 M PATHARAI 24.381816 78.473764
10 OHT-10 100 KL/ 12 M CHANDERA 24.463569 78.434806
11 OHT-11 125 KL/ 22 M THAGARI 24.488654 78.45105
Raw Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.)
1 DUCTILE IRON / K9 400 4.189
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DUCTILE IRON / K9 100 3.25
2 DUCTILE IRON / K9 150 46.492
3 DUCTILE IRON / K9 250 37.999
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/PN-8 63 119.382
2 HDPE/PN-8 75 14.021
3 HDPE/PN-8 90 14.739
4 HDPE/PN-8 110 27.211
5 HDPE/PN-8 125 1.078
6 HDPE/PN-8 140 1.056
7 HDPE/PN-8 160 14.994
8 HDPE/PN-8 180 33.785
9 HDPE/PN-8 200 4.812
Other Details
343.27
392.53
129.20
12-Mar-2024
04-Dec-2025