Project Completion Certificate (Ground Water)
Scheme ID: 8152518 Name of Scheme: Talar GOV No. of Villages: 87 No. of Habitation Covered: 170
Total Population Covered: 132511 Base Year: 2021 Intermediate Year: 2036 Design Year: 2051
Date of Completion (As per Contract): 11-Dec-2022 Actual Date of Completion (Capex): 10-Aug-2024
Intake
Dia./Height (In Mtr.) Capacity (In MLD) Location Latitude Longitude
12/13.05 27.46 Jangle Mahal 24.906593 83.052079
WTP
Capacity (In MLD) Location Latitude Longitude
23 Talar 24.8973320 82.9714419
CWR's
Sno. Str. Capacity (In KL) Location Latitude Longitude
1 CWR-1 400 Khatkariya 24.906415 82.938601
2 CWR-2 1700 Chaukhara 24.896115 82.891026
3 CWR-3 1550 Darwan 24.897426 82.849585
4 CWR-4 300 Dadra 24.8653122 82.8396875
5 CWR-5 1100 Baghuda 24.8941262 82.7832219
6 CWR-6 300 Dadra Mu Rampur 24.9032025 82.7709146
7 WTP CWR 2300 Talar 24.8973320 82.9714419
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump at Intake Well, 5 (3w+2s) 4490/44 Jungle Mahal 24.906593 83.052079
2 VT Pump at WTP, 3 (2w+1S) 6066/41 Talar 24.8973320 82.9714419
3 HSC Pump at CWR-1, 6 (1w+1s) 494/69, 783/74, 766/76 Khakariya 24.906415 82.938601
4 HSC Pump at CWr-2, 5 (1w+1s) 4536/14, 1007/30 Chaukhada 24.896115 82.891026
5 HSC Pump at CWr-3, 6 (1w+1s) 2017/25, 5750/18, 1319/29 Darwan 24.897426 82.849585
6 HSC Pump at CWR-4, 4 (1w+1s) 814/75, 1166/34 Dadra 24.8653122 82.8396875
7 HSC Pump at CWR-5, 8 (1w+1s) 1952/15, 1107/41, 1732/33, 953/29 Bhagauda 24.8941262 82.7832219
8 HSC Pump at CWR-6, 4 (1w+1s) 1467/32, 485/19 Dadra Mu. Rampur 24.9032025 82.7709146
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ESR-1 350/12 Chitbishram 24.863171 82.956189
2 ESR-2 350/25 Semra Barho 24.8745409 82.9197527
3 ESR-3 350/18 Choukhara 24.896328 82.891
4 ESR-4 275/18 Khamariya 24.8645097 82.9016354
5 ESR-5 275/25 Kon 24.8507742 82.8748626
6 ESR-6 400/22 Dadra 24.8653043 82.8400405
7 ESR-7 500/20 Baghuda 24.8796369 82.7824290
8 ESR-8 325/18 Raikari 24.8566499 82.7632730
9 ESR-9 500/12 Raikari 24.8566499 82.7632730
10 ESR-10 300/18 Dadra Mu. Rampur 24.9041701 82.799135
11 ESR-11 400/20 Lalpur 24.9326118 82.7323374
12 ESR-12 450/16 Dadra Mu Rampur 24.8981363 82.7759247
13 ESR-13 75/25 Sarso 24.9373916 82.8145863
14 ESR-14 400/18 Patar 24.9513063 82.7853499
15 ESR-15 450/16 Darwan 24.897426 82.849585
Raw Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.)
1 Ductile Iron – K9 600 5.110
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Ductile Iron – K9 600 5.360
2 Ductile Iron – K9 500 15.830
3 Ductile Iron – K9 400 10.125
4 Ductile Iron – K9 250 17.527
5 Ductile Iron – K9 200 15.425
6 Ductile Iron – K7 200 18.010
7 Ductile Iron – K9 150 29.342
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Ductile Iron – K7 300 1.474
2 Ductile Iron – K7 250 35.770
3 Ductile Iron – K7 150 5.438
4 Hdpe 200 33.144
5 Hdpe 160 69.336
6 Hdpe 110 99.348
7 Hdpe 90 79.158
8 Hdpe 75 166.699
9 Hdpe 63 415.557
Other Details
167.98
165.68
165.68
31-Oct-2024
01-Nov-2024