Project Completion Certificate (Ground Water)
Scheme ID: 8153309 Name of Scheme: Gothaura GOV No. of Villages: 142 No. of Habitation Covered: 199
Total Population Covered: 201878 Base Year: 2021 Intermediate Year: 2036 Design Year: 2051
Date of Completion (As per Contract): 17-Jun-2022 Actual Date of Completion (Capex): 31-Aug-2024
Intake
Dia./Height (In Mtr.) Capacity (In MLD) Location Latitude Longitude
12/25.6 96.6 Jangal Mahal 25.0824078 82.9479711
WTP
Capacity (In MLD) Location Latitude Longitude
34 Kukuhipur 25.087348 83.029999
CWR's
Sno. Str. Capacity (In KL) Location Latitude Longitude
1 CWR 1 2600 Bhuilikhas 25.095747 83.046423
2 CWR 2 2300 Hasauli 25.121624 83.081132
3 CWR 3 400 Bhabhaura 25.125416 83.108141
4 CWR 4 1800 Madara 25.176629 83.080642
5 CWR 5 1200 Bahuar 25.17827 83.121325
6 CWR 6 800 Kaimarasulpur 25.187993 83.080725
7 CWR 7 500 Gorakhpur Mafi 25.216179 83.064691
8 WTP CWR 2800 Kukuhipur 25.087094 83.030232
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP at Intake well,3(2+1) 581.76/28 jungle Mahal 25.0824078 82.9479711
2 VT Pump at WTP,3(2+1) 523.62/13 Kukuhipur 25.087348 83.029999
3 HSC pump at CWR-1,5(3w+2s) 471.84/22,103.56/32 Bhuilikhash 25.095747 83.046423
4 VT pump at CWR-2,6(3w+3s) 295.44/23, 124.32/18, 108.48/31 Hasauli 25.121624 83.081132
5 HSC pump at CWR-3,4(2w+2s) 50.82/47, 73.44/38 Bhabhaura 25.125416 83.108141
6 HSC pump at CWR-4,6(3w+3s) 129.72/41, 107.82/45, 473.4/19 Madra 25.176629 83.080642
7 VT pump at CWR-5,8(4w+4s) 49.86/33, 70.74/31, 52.98/61, 300.3/22 Bahuar 25.16827 83.121325
8 HSC pump at CWR-6,4(2w+2s) 125.58/37, 131.94/19 Kaimarashulpur 25.187993 83.080725
9 HSC pump at CWR-7,4(2w+2s) 78.12,39, 96.54/43 Gorkhpur Mafi 25.216179 83.064691
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ESR 1 550/18 Puraini 25.235035 83.045248
2 ESR 2 700/18 Karhat 25.213942 83.051057
3 ESR 3 900/25 Kaimarasulpur 25.188471 83.080677
4 ESR 4 400/12 Yusufpur 25.17678599 83.15480746
5 ESR 5 500/15 Jagdishpur 25.144507 83.141044
6 ESR 6 350/20 Bahuar 25.168145 83.120842
7 ESR 7 900/18 Semara 25.15525 83.082186
8 ESR 8 750/18 Dedhauna 25.142792 83.058491
9 ESR 9 3350/25 Gauri 25.134326 83.115357
10 ESR 10 550/18 Mudhauwa 25.120855 83.0974817
11 ESR 11 750/18 Hasauli 25.120707 83.081821
12 ESR 12 750/18 Bhuilikhas 25.095757 83.046521
Raw Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.)
1 DI/K-9 700 16.05
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Ductile Iron/ K-9 600 11980
2 Ductile Iron/ K-9 500 7370
3 Ductile Iron/ K-9 450 4880
4 Ductile Iron/ K-9 350 5475
5 Ductile Iron/ K-9 300 4010
6 Ductile Iron/ K-9 250 15205
7 Ductile Iron/ K-9 200 15630
8 Ductile Iron/ K-9 150 8715
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Ductile Iron/ K-7 100 40164
2 Ductile Iron/ K-7 150 57365
3 Ductile Iron/ K-7 200 32787
4 Ductile Iron/ K-7 250 16942
5 Ductile Iron/ K-7 300 7666
6 Ductile Iron/ K-7 350 7684
7 HDPE 110 362
8 HDPE 125 190
9 HDPE 140 1264
10 HDPE 160 1439
11 HDPE 90 44766
12 HDPE 75 95453
13 HDPE 63 327147
Other Details
526.62
200.77
200.77
31-Oct-2024
01-Apr-2025