Project Completion Certificate (Ground Water)
Scheme ID: 8282154 Name of Scheme: Manikpur GOV No. of Villages: 63 No. of Habitation Covered: 63
Total Population Covered: 66250 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 04-Dec-2022 Actual Date of Completion (Capex): 15-May-2025
Intake
Dia./Height (In Mtr.) Capacity (In MLD) Location Latitude Longitude
6/26 13.77 LATIFPUR 24.975778 83.030084
WTP
Capacity (In MLD) Location Latitude Longitude
11 LATIFPUR 24.986686 83.016567
CWR's
Sno. Str. Capacity (In KL) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 HSE PUMP 1 3090/49 LATIFPUR 24.975778 83.030084
2 HSE PUMP 2 3090/49 LATIFPUR 24.975778 83.030084
3 HSE PUMP 3 3090/49 LATIFPUR 24.975778 83.030084
4 HSE PUMP 4 1622/31 LATIFPUR 24.986686 83.016567
5 HSE PUMP 5 1622/31 LATIFPUR 24.986686 83.016567
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ESR 1 500/22 CHAK LATHIA 25.07034 83.115711
2 ESR 2 450/15 JAFARABAD 25.071551 83.077061
3 ESR 3 400/20 DOHRI 25.057432 83.051743
4 ESR 4 400/20 KANCHANPUR 25.036351 83.045988
5 ESR 5 650/20 LATIFPUR 24.986686 83.016567
Raw Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.)
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 157.049
2 HDPE 75 2.212
3 HDPE 90 1.403
4 DI 100 17.597
5 DI 150 14.098
6 DI 200 9.932
7 DI 250 16.614
8 DI 300 9.532
9 DI 400 4.105
10 DI 500 6.361
11 DI K9 200 0.030
12 DI K9 400 2.032
Other Details
53.46
54.79
0.00
13-Feb-2025
15-Feb-2025