Sno. |
District |
Agency |
Scheme Id |
Scheme Name |
T/W |
Pump |
OHT |
DistributedSystem |
IntakeWell |
RawWaterRisinMain |
WTP |
CWR |
OtherCWR |
RoadCutting |
Man Power |
TW Plain Pipe Size |
TW Plain Pipe Depth |
TW Strainer Size |
TW Strainer Depth |
TW Column Pipe Size |
TW Column Pipe Depth |
TW Compressor(Hour) |
TW OP Unit(Hour) |
Pump Discharge(LPM) |
Pump Head(MTR) |
OHT Type |
OHT Capacity(KL) |
OHT Staging Height(MTR) |
OHT DIK9 Length(MTR) |
OHT DIK9 Size(MM) |
OHT DIK7 Length(MTR) |
OHT DIK7 Size(MM) |
OHT MS Pipe Length(MTR) |
OHT MS Pipe Size(MM) |
OHT HDPE Length(MTR) |
OHT HDPE Size(MM) |
Intake Capacity(KL) |
Intake Well PUMP |
DS Propose DIK9 Length |
DS Propose DIK9 Size |
DS Propose DIK7 Length |
DS Propose DIK7 Size |
DS Propose MS Length |
DS Propose MS Size |
DS Propose HDPE Length |
DS Propose HDPE Size |
DS Propose GI Length |
DS Propose GI Size |
DS Progress DIK9 Length |
DS Progress DIK9 Size |
DS Progress DIK7 Length |
DS Progress DIK7 Size |
DS Progress MS Length |
DS Progress MS Size |
DS Progress HDPE Length |
DS Progress HDPE Size |
DS Progress GI Length |
DS Progress GI Size |
DS Final DIK9 Length |
DS Final DIK9 Size |
DS Final DIK7 Length |
DS Final DIK7 Size |
DS Final MS Length |
DS Final MS Size |
DS Final HDPE Length |
DS Final HDPE Size |
DS Final GI Length |
DS Final GI Size |
RW Propose DIK9 Length |
RW Propose DIK9 Size |
RW Propose DIK7 Length |
RW Propose DIK7 Size |
RW Propose MS Length |
RW Propose MS Size |
RW Progress DIK9 Length |
RW Progress DIK9 Size |
RW Progress DIK7 Length |
RW Progress DIK7 Size |
RW Progress MS Length |
RW Progress MS Size |
RW Final DIK9 Length |
RW Final DIK9 Size |
RW Final DIK7 Length |
RW Final DIK7 Size |
RW Final MS Length |
RW Final MS Size |
WTP Capacity |
WTP No Of Filler Beds |
WTP Sludge Near Nala |
WTP Sludge Private Land |
WTP Sludge Water Course |
WTP Sludge Others |
WTP Sludge Govt Land |
CWR Capacity |
CWR Pump |
Other CWR Capacity |
Other Pump |
RC Bitumen Dismantle |
RC Bitumen Restored |
RC CC Dismantle |
RC CC Restored |
RC Interlocking Dismantle |
RC Interlocking Restored |
RC Brick On Edge Dismantle |
RC Brick On Edge Restored |
Propose MASON Man Hour |
Propose PLUMBER Man Hour |
Propose ELECTRICIAN Man Hour |
Propose FITTER Man Hour |
Propose UNSKILLED Man Hour |
Propose MOTOR MECHANIC Man Hour |
Propose PUMP OPERATOR Man Hour |
Progress MASON Man Hour |
Progress PLUMBER Man Hour |
Progress ELECTRICIAN Man Hour |
Progress FITTER Man Hour |
Progress UNSKILLED Man Hour |
Progress MOTOR MECHANIC Man Hour |
Progress PUMP OPERATOR Man Hour |
Final Executed MASON Man Hour |
Final Executed PLUMBER Man Hour |
Final Executed ELECTRICIAN Man Hour |
Final Executed FITTER Man Hour |
Final Executed UNSKILLED Man Hour |
Final Executed MOTOR MECHANIC Man Hour |
Final Executed PUMP OPERATOR Man Hour |
1 |
Amethi |
WELSPUN |
20012683 |
Songara Water Supply Scheme |
Size/DIA(MM) | Depth(MTR) |
---|
300.00 | 72.38 | 150.00 | 271.39 |
|
Size/DIA(MM) | Depth(MTR) |
---|
150.00 | 24.09 |
|
Size/DIA(MM) | Depth(MTR) |
---|
80.00 | 60.00 |
|
59.00 |
99.00 |
600.00 |
0.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
© Copyright 2020 Jal Jeevan Mission - Uttar Pradesh | Design & Developed By SigmaIT Software Designers Pvt. Ltd