1 |
Fatehpur |
Power Mech Projects Ltd |
20066460 |
AMENA |
395/ED/Phase-3/2022-23/ IV Date 09-02-2023 |
2 |
Fatehpur |
Power Mech Projects Ltd |
20066433 |
CHAKHATA |
395/ED/Phase-3/2022-23/ IV Date 09-02-2023 |
3 |
Fatehpur |
Power Mech Projects Ltd |
20066472 |
1.Besadi |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
4 |
Fatehpur |
Power Mech Projects Ltd |
20075485 |
1.BUDAWA |
395/ED/Phase-3/2022-23/ IV Date 09-02-2023 |
5 |
Fatehpur |
Power Mech Projects Ltd |
20079047 |
1.KUNDEYRAMPUR 2. MEDHAPATI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
6 |
Fatehpur |
Power Mech Projects Ltd |
20079023 |
1.MADOKIPUR 2.SAI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
7 |
Fatehpur |
Power Mech Projects Ltd |
20079148 |
1.MANSOORPUR |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
8 |
Fatehpur |
Power Mech Projects Ltd |
20075563 |
1.RARI BUJURG &ALIYABAD |
395/ED/Phase-3/2022-23/ IV Date 09-02-2023 |
9 |
Fatehpur |
Power Mech Projects Ltd |
20079149 |
1.SAHABAJPUR |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
10 |
Fatehpur |
Power Mech Projects Ltd |
20062929 |
ABDULLAPUR GHURI |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
11 |
Fatehpur |
Power Mech Projects Ltd |
20097762 |
ACHINTPUR PITAI |
1057/ED/PH-3/2023-24/XXI |
12 |
Fatehpur |
Power Mech Projects Ltd |
20102047 |
ADAWAL RO |
1011/ED/PH-3/2023-24/XVI |
13 |
Fatehpur |
Power Mech Projects Ltd |
20079024 |
ADHAULI |
517/ED/PHASE-3/2022-23/V |
14 |
Fatehpur |
Power Mech Projects Ltd |
20081179 |
AHEBA |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
15 |
Fatehpur |
Power Mech Projects Ltd |
20097449 |
AHINDA |
1069/ED/PH-3/2023-24/XXII |
16 |
Fatehpur |
Power Mech Projects Ltd |
20079032 |
AHMADGANJ TIHAR |
517/ED/PHASE-3/2022-23/V |
17 |
Fatehpur |
Power Mech Projects Ltd |
20089315 |
AJAMPUR GADWA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
18 |
Fatehpur |
Power Mech Projects Ltd |
20095816 |
AJARAULI |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
19 |
Fatehpur |
Power Mech Projects Ltd |
20097720 |
AJDUPUR |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
20 |
Fatehpur |
Power Mech Projects Ltd |
20062599 |
AJMATPUR |
222/ED/Phase -3/2022-23/I Date-28-11-2022 |
21 |
Fatehpur |
Power Mech Projects Ltd |
20078858 |
Ajnai |
517/ED/PHASE-3/2022-23/V |
22 |
Fatehpur |
Power Mech Projects Ltd |
20089241 |
Akbarabad |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
23 |
Fatehpur |
Power Mech Projects Ltd |
20106721 |
AKBARPUR NASIRPUR |
1019/ED/PH-3/2023-24/XVII |
24 |
Fatehpur |
Power Mech Projects Ltd |
20074520 |
AKILPUR AIRAYON |
340/ED/PHASE-3/2022-23/II 27.01.2023 |
25 |
Fatehpur |
Power Mech Projects Ltd |
20079097 |
ALAMGANJ Gram Panchayat Water Supply Scheme |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
26 |
Fatehpur |
Power Mech Projects Ltd |
20097495 |
ALAMPUR GAURIYA |
978/ED/PH-3/2023-24/XIII DT.14-08-2023 |
27 |
Fatehpur |
Power Mech Projects Ltd |
20062836 |
ALDADPUR |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
28 |
Fatehpur |
Power Mech Projects Ltd |
20043840 |
Alipur |
222/ED/Phase -3/2022-23/I Date-28-11-2022 |
29 |
Fatehpur |
Power Mech Projects Ltd |
20095164 |
ALLIPUR |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
30 |
Fatehpur |
Power Mech Projects Ltd |
20097763 |
AMBI, HARI RAMPUR KAITHOLA |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
31 |
Fatehpur |
Power Mech Projects Ltd |
20085931 |
AMBI/OBI |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
32 |
Fatehpur |
Power Mech Projects Ltd |
20100814 |
AMILIHA PAL |
1019/ED/PH-3/2023-24/XVII |
33 |
Fatehpur |
Power Mech Projects Ltd |
20079116 |
AMOURA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
34 |
Fatehpur |
Power Mech Projects Ltd |
20097498 |
AND MAW |
1011/ED/PH-3/2023-24/XVI |
35 |
Fatehpur |
Power Mech Projects Ltd |
20106718 |
ANDMAU GRAM PANCHAYAT WATER SUPPLY SCHEME |
1019/ED/PH-3/2023-24/XVII |
36 |
Fatehpur |
Power Mech Projects Ltd |
20102034 |
Anjana Bhairo |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
37 |
Fatehpur |
Power Mech Projects Ltd |
20095819 |
ANJANA KABIR |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
38 |
Fatehpur |
Power Mech Projects Ltd |
20095168 |
AODHERA |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
39 |
Fatehpur |
Power Mech Projects Ltd |
20100813 |
Aoreai |
1032/ED/PH-3/2023-24/XIX |
40 |
Fatehpur |
Power Mech Projects Ltd |
20079099 |
ARAGAL & DAMODARPUR &BHAURAJPUR |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
41 |
Fatehpur |
Power Mech Projects Ltd |
20079154 |
ARAIPUR & NANDAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
42 |
Fatehpur |
Power Mech Projects Ltd |
20095172 |
ARAMPUR,BASAI |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
43 |
Fatehpur |
Power Mech Projects Ltd |
20089228 |
ASHAPUR |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
44 |
Fatehpur |
Power Mech Projects Ltd |
20067832 |
ASNI JJM |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
45 |
Fatehpur |
Power Mech Projects Ltd |
20062831 |
ASTA JJM |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
46 |
Fatehpur |
Power Mech Projects Ltd |
20078974 |
ASWA BAXPUR |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
47 |
Fatehpur |
Power Mech Projects Ltd |
20097499 |
ATRAHA |
1011/ED/PH-3/2023-24/XVI |
48 |
Fatehpur |
Power Mech Projects Ltd |
20079105 |
AURA NISPHI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
49 |
Fatehpur |
Power Mech Projects Ltd |
20078833 |
Aurahma |
513/ED/PHASE-3/2022-23/V 06.03.2023 |
50 |
Fatehpur |
Power Mech Projects Ltd |
20066451 |
BABAI |
395/ED/Phase-3/2022-23/ IV Date 09-02-2023 |
51 |
Fatehpur |
Power Mech Projects Ltd |
20043887 |
Badahar |
222/ED/Phase -3/2022-23/I Date-28-11-2022 |
52 |
Fatehpur |
Power Mech Projects Ltd |
20095824 |
BADALPUR |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
53 |
Fatehpur |
Power Mech Projects Ltd |
20075544 |
BAGBADSHAHI |
395/ED/Phase-3/2022-23/ IV Date 09-02-2023 |
54 |
Fatehpur |
Power Mech Projects Ltd |
20089236 |
BAHADURPUR |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
55 |
Fatehpur |
Power Mech Projects Ltd |
20100799 |
BAHADURPUR |
1020/ED/PH-3/2023-24/XVIII |
56 |
Fatehpur |
Power Mech Projects Ltd |
20043841 |
Baharoli |
222/ED/Phase -3/2022-23/I Date-28-11-2022 |
57 |
Fatehpur |
Power Mech Projects Ltd |
20067813 |
BAHUWA RURAL |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
58 |
Fatehpur |
Power Mech Projects Ltd |
20067823 |
BAIJANI |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
59 |
Fatehpur |
Power Mech Projects Ltd |
20061486 |
BAIRA GADHIWA |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
60 |
Fatehpur |
Power Mech Projects Ltd |
20068380 |
BAKANDHA |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
61 |
Fatehpur |
Power Mech Projects Ltd |
20067816 |
BANARSHI |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
62 |
Fatehpur |
Power Mech Projects Ltd |
20079053 |
BANIYANI GRAM PANCHAYAT WATER SUPPLY SCHEME |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
63 |
Fatehpur |
Power Mech Projects Ltd |
20089213 |
BANTHARA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
64 |
Fatehpur |
Power Mech Projects Ltd |
20079127 |
BARA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
65 |
Fatehpur |
Power Mech Projects Ltd |
20099434 |
BARAGAON |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
66 |
Fatehpur |
Power Mech Projects Ltd |
20095835 |
BARAHATA |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
67 |
Fatehpur |
Power Mech Projects Ltd |
20062954 |
BARAI KHURD |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
68 |
Fatehpur |
Power Mech Projects Ltd |
20097775 |
BARAICHA |
978/ED/PH-3/2023-24/XIII DT.14-08-2023 |
69 |
Fatehpur |
Power Mech Projects Ltd |
20102049 |
BARAICHI |
1011/ED/PH-3/2023-24/XVI DT: 21.09.23 |
70 |
Fatehpur |
Power Mech Projects Ltd |
20097451 |
BARANPUR |
1011/ED/PH-3/2023-24/XVI |
71 |
Fatehpur |
Power Mech Projects Ltd |
20097777 |
BARAR,GAZIPUR |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
72 |
Fatehpur |
Power Mech Projects Ltd |
20067824 |
BARAUHA |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
73 |
Fatehpur |
Power Mech Projects Ltd |
20078935 |
BARAULIA, LOGHAURA |
517/ED/PHASE-3/2022-23/V |
74 |
Fatehpur |
Power Mech Projects Ltd |
20043842 |
Baraura |
222/ED/Phase -3/2022-23/I Date-28-11-2022 |
75 |
Fatehpur |
Power Mech Projects Ltd |
20097242 |
BARDARA |
1005/ED/PHASE-3/2023-24/XV |
76 |
Fatehpur |
Power Mech Projects Ltd |
20079065 |
BARETERKHURD GRAM PANCHAYAT WATER SUPPLY SCHEME |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
77 |
Fatehpur |
Power Mech Projects Ltd |
20043895 |
Barethar Bujurg |
222/ED/Phase -3/2022-23/I Date-28-11-2022 |
78 |
Fatehpur |
Power Mech Projects Ltd |
20079106 |
BARHAT |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
79 |
Fatehpur |
Power Mech Projects Ltd |
20074569 |
BARKATPUR |
340/ED/PHASE-3/2022-23/II 27.01.2023 |
80 |
Fatehpur |
Power Mech Projects Ltd |
20097505 |
BAROUN |
1020/ED/PH-3/2023-24/XVIII |
81 |
Fatehpur |
Power Mech Projects Ltd |
20085893 |
BASAWAN KHERA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
82 |
Fatehpur |
Power Mech Projects Ltd |
20079087 |
BASFRA Gram Panchayat Water Supply Scheme |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
83 |
Fatehpur |
Power Mech Projects Ltd |
20097933 |
BASVA&GURSANDI |
1019/ED/PH-3/2023-24/XVII DT: 26.09.23 |
84 |
Fatehpur |
Power Mech Projects Ltd |
20043915 |
Beekampur |
222/ED/Phase -3/2022-23/I Date-28-11-2022 |
85 |
Fatehpur |
Power Mech Projects Ltd |
20089223 |
BEHATA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
86 |
Fatehpur |
Power Mech Projects Ltd |
20089371 |
BEHTAKHURD |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
87 |
Fatehpur |
Power Mech Projects Ltd |
20079101 |
BENU |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
88 |
Fatehpur |
Power Mech Projects Ltd |
20078984 |
BERUAI &JAMALAMAW |
704/ED/PHASE-3/2023-24/VIII Date-05-04-2023 |
89 |
Fatehpur |
Power Mech Projects Ltd |
20062821 |
BETI SADAT |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
90 |
Fatehpur |
Power Mech Projects Ltd |
20097721 |
BHADAUHA ,CHANDPUR |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
91 |
Fatehpur |
Power Mech Projects Ltd |
20079002 |
Bhairwa |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
92 |
Fatehpur |
Power Mech Projects Ltd |
20079103 |
Bharat Pur Gram Panchayat Water Supply Scheme |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
93 |
Fatehpur |
Power Mech Projects Ltd |
20079132 |
BHARSA AND MANPUR GP |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
94 |
Fatehpur |
Power Mech Projects Ltd |
20078992 |
BHAULI,LAOGAV,CHAK KAJIPUR |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
95 |
Fatehpur |
Power Mech Projects Ltd |
20079137 |
BHIKAMPUR AND TENDULI LAKHIPUR GP |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
96 |
Fatehpur |
Power Mech Projects Ltd |
20074518 |
BHOGALPUR |
340/ED/PHASE-3/2022-23/II |
97 |
Fatehpur |
Power Mech Projects Ltd |
20079100 |
Bighanpur Gram Panchayat Water Supply Scheme |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
98 |
Fatehpur |
Power Mech Projects Ltd |
20089216 |
BIJURI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
99 |
Fatehpur |
Power Mech Projects Ltd |
20092332 |
BINDOUR 2.JAFARGANJ |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
100 |
Fatehpur |
Power Mech Projects Ltd |
20089332 |
BIRNAI RANUPUR |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
101 |
Fatehpur |
Power Mech Projects Ltd |
20073294 |
CHACHINDA |
340/ED/PHASE-3/2022-23/II 27.01.2023 |
102 |
Fatehpur |
Power Mech Projects Ltd |
20078862 |
Chaimalpur |
517/ED/PHASE-3/2022-23/V |
103 |
Fatehpur |
Power Mech Projects Ltd |
20078946 |
CHAK BAKARPUR, DANDWA |
517/ED/PHASE-3/2022-23/V |
104 |
Fatehpur |
Power Mech Projects Ltd |
20067821 |
CHAK BARARI |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
105 |
Fatehpur |
Power Mech Projects Ltd |
20068199 |
CHAK ETAILI |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
106 |
Fatehpur |
Power Mech Projects Ltd |
20078999 |
CHAK ITAULI&SARULI |
517/ED/PHASE-3/2022-23/V 06.03.2023 |
107 |
Fatehpur |
Power Mech Projects Ltd |
20078841 |
Chak Kori Sadad |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
108 |
Fatehpur |
Power Mech Projects Ltd |
20095776 |
CHAK RASULABAD |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
109 |
Fatehpur |
Power Mech Projects Ltd |
20097779 |
CHAK SHAHPIRPUR |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
110 |
Fatehpur |
Power Mech Projects Ltd |
20043952 |
Chakmada |
222/ED/Phase -3/2022-23/I Date-28-11-2022 |
111 |
Fatehpur |
Power Mech Projects Ltd |
20061391 |
CHANDIPUR |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
112 |
Fatehpur |
Power Mech Projects Ltd |
20092339 |
CHANDPUR |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
113 |
Fatehpur |
Power Mech Projects Ltd |
20081191 |
CHHEWKA |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
114 |
Fatehpur |
Power Mech Projects Ltd |
20044149 |
Chhichha |
222/ED/Phase -3/2022-23/I Date-28-11-2022 |
115 |
Fatehpur |
Power Mech Projects Ltd |
20097540 |
CHHICHHINI |
1020/ED/PH-3/2023-24/XVIII |
116 |
Fatehpur |
Power Mech Projects Ltd |
20100812 |
Chhitampur |
1011/ED/PH-3/2023-24/XVI |
117 |
Fatehpur |
Power Mech Projects Ltd |
20079112 |
CHILLI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
118 |
Fatehpur |
Power Mech Projects Ltd |
20044162 |
Churaman Kheda |
222/ED/phase-3/2022-23/1 Date-28/11/2022 |
119 |
Fatehpur |
Power Mech Projects Ltd |
20089220 |
DANDA AMAULI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
120 |
Fatehpur |
Power Mech Projects Ltd |
20097508 |
DANIYALPUR |
1020/ED/PH-3/2023-24/XVIII |
121 |
Fatehpur |
Power Mech Projects Ltd |
20092349 |
DAPSAURA |
562/ED/Phase-3/2022-23/VI Date-14/03/202 |
122 |
Fatehpur |
Power Mech Projects Ltd |
20079081 |
DARIYABAD |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
123 |
Fatehpur |
Power Mech Projects Ltd |
20079118 |
DARIYAPUR CHEDIYA AND RAMPUR |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
124 |
Fatehpur |
Power Mech Projects Ltd |
20044170 |
Darveshpur |
222/ED/phase-3/2022-23/1 Date-28/11/2022 |
125 |
Fatehpur |
Power Mech Projects Ltd |
20097510 |
DASAULI |
1020/ED/PH-3/2023-24/XVIII |
126 |
Fatehpur |
Power Mech Projects Ltd |
20106717 |
DATTAULI GRAM PANCHAYAT WATER SUPPLY SCHEME |
1019/ED/PH-3/2023-24/XVII DT: 26.09.23 |
127 |
Fatehpur |
Power Mech Projects Ltd |
20074571 |
DAVRAR |
340/ED/PHASE-3/2022-23/II |
128 |
Fatehpur |
Power Mech Projects Ltd |
20085926 |
Dehuli,PICHHULI |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
129 |
Fatehpur |
Power Mech Projects Ltd |
20089336 |
DEOCHALI 2.BIJAULI |
562/ED/Phase-3/2022-23/VI Date-14/03/202 |
130 |
Fatehpur |
Power Mech Projects Ltd |
20079139 |
DEORI BUJURG |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
131 |
Fatehpur |
Power Mech Projects Ltd |
20067828 |
DEVGAON |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
132 |
Fatehpur |
Power Mech Projects Ltd |
20095778 |
DEVLAN |
1020/ED/PH-3/2023-24/XVIII |
133 |
Fatehpur |
Power Mech Projects Ltd |
20075525 |
DEVMAI |
395/ED/Phase-3/2022-23/ IV Date 09-02-2023 |
134 |
Fatehpur |
Power Mech Projects Ltd |
20097453 |
DEWARA |
1019/ED/PH-3/2023-24/XVII |
135 |
Fatehpur |
Power Mech Projects Ltd |
20079064 |
DHAMNAKHURD &KOTHAVAKHARIYA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
136 |
Fatehpur |
Power Mech Projects Ltd |
20079098 |
dhanemau |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
137 |
Fatehpur |
Power Mech Projects Ltd |
20089227 |
DHAOURAHARA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
138 |
Fatehpur |
Power Mech Projects Ltd |
20097512 |
DHARAMPUR SATO |
1032/ED/PH-3/2023-24/XIX |
139 |
Fatehpur |
Power Mech Projects Ltd |
20089936 |
DHARAUTALALPUR 2. KHURMABAD |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
140 |
Fatehpur |
Power Mech Projects Ltd |
20102035 |
DHARMGADPUR |
1011/ED/PH-3/2023-24/XVI DT: 21.09.23 |
141 |
Fatehpur |
Power Mech Projects Ltd |
20068183 |
DHODHIYAHI, BHAIRAMPUR |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
142 |
Fatehpur |
Power Mech Projects Ltd |
20092344 |
DIGHARUA |
562/ED/Phase-3/2022-23/VI Date-14/03/202 |
143 |
Fatehpur |
Power Mech Projects Ltd |
20078950 |
DUBAULI JALALPUR |
517/ED/PHASE-3/2022-23/V |
144 |
Fatehpur |
Power Mech Projects Ltd |
20061332 |
DULAPUR |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
145 |
Fatehpur |
Power Mech Projects Ltd |
20097455 |
EKDALA |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
146 |
Fatehpur |
Power Mech Projects Ltd |
20089214 |
FAREEDPUR |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
147 |
Fatehpur |
Power Mech Projects Ltd |
20078995 |
FARIDABAD TIKRI, PAIGAMBARPUR BAKRI |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
148 |
Fatehpur |
Power Mech Projects Ltd |
20097487 |
FARIDPUR |
1020/ED/PH-3/2023-24/XVIII |
149 |
Fatehpur |
Power Mech Projects Ltd |
20061512 |
FARSI |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
150 |
Fatehpur |
Power Mech Projects Ltd |
20068204 |
FULWAMAU, MANIPUR |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
151 |
Fatehpur |
Power Mech Projects Ltd |
20074515 |
FURA |
340/ED/PHASE-3/2022-23/II 27.01.2023 |
152 |
Fatehpur |
Power Mech Projects Ltd |
20078956 |
GADHIVA MAJHGAWAN, GURUWAL |
517/ED/PHASE-3/2022-23/V |
153 |
Fatehpur |
Power Mech Projects Ltd |
20044189 |
Gajaipur |
222/ED/phase-3/2022-23/1 Date-28/11/2022 |
154 |
Fatehpur |
Power Mech Projects Ltd |
20079121 |
GARI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
155 |
Fatehpur |
Power Mech Projects Ltd |
20089212 |
GAURA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
156 |
Fatehpur |
Power Mech Projects Ltd |
20097782 |
GAURA |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
157 |
Fatehpur |
Power Mech Projects Ltd |
20068330 |
GAURA CHURIYARA |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
158 |
Fatehpur |
Power Mech Projects Ltd |
20097810 |
GAURI , KESHOPUR MALAHIA |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
159 |
Fatehpur |
Power Mech Projects Ltd |
20079125 |
GAURI AND KHANDE DEWAR |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
160 |
Fatehpur |
Power Mech Projects Ltd |
20079163 |
GAURIAURA GRAM PANCHAYAT WATER SUPPLY SCHEME |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
161 |
Fatehpur |
Power Mech Projects Ltd |
20097459 |
GEDURI |
1011/ED/PH-3/2023-24/XVI |
162 |
Fatehpur |
Power Mech Projects Ltd |
20100806 |
GHANGHAOL |
1011/ED/PH-3/2023-24/XVI |
163 |
Fatehpur |
Power Mech Projects Ltd |
20043843 |
Ghanshayampur |
222/ED/phase-3/2022-23/1 Date-28/11/2022 |
164 |
Fatehpur |
Power Mech Projects Ltd |
20097460 |
GHARWASIPUR |
978/ED/PH-3/2023-24/XIII DT.14-08-2023 |
165 |
Fatehpur |
Power Mech Projects Ltd |
20097813 |
GHURI BUJURG |
1057/ED/PH-3/2023-24/XXI DT: 24.01.24 |
166 |
Fatehpur |
Power Mech Projects Ltd |
20075503 |
GOHARARI |
395/ED/Phase-3/2022-23/ IV Date 09-02-2023 |
167 |
Fatehpur |
Power Mech Projects Ltd |
20092360 |
Gopalpur & Hasanapur |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
168 |
Fatehpur |
Power Mech Projects Ltd |
20085880 |
GOPALPUR GHAGORA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
169 |
Fatehpur |
Power Mech Projects Ltd |
20078957 |
GOPALPUR TELHAI, GANGA RAMPUR |
517/ED/PHASE-3/2022-23/V |
170 |
Fatehpur |
Power Mech Projects Ltd |
20061452 |
GOVARDHANPUR |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
171 |
Fatehpur |
Power Mech Projects Ltd |
20089317 |
GOVINDPUR BILARI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
172 |
Fatehpur |
Power Mech Projects Ltd |
20095838 |
GOVINDPUR&GHOSHI |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
173 |
Fatehpur |
Power Mech Projects Ltd |
20079004 |
GUARGAULA |
517/ED/PHASE-3/2022-23/V |
174 |
Fatehpur |
Power Mech Projects Ltd |
20078953 |
GUASPUR |
1019/ED/PH-3/2023-24/XVII |
175 |
Fatehpur |
Power Mech Projects Ltd |
20097513 |
GUDAURA |
1069/ED/PH-3/2023-24/XXII |
176 |
Fatehpur |
Power Mech Projects Ltd |
20079055 |
HAFIJPUR HARKARAN |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
177 |
Fatehpur |
Power Mech Projects Ltd |
20079077 |
HAJIPUR AND RAHASUPUR |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
178 |
Fatehpur |
Power Mech Projects Ltd |
20044197 |
Hardauli |
222/ED/phase-3/2022-23/1 Date-28/11/2022 |
179 |
Fatehpur |
Power Mech Projects Ltd |
20097462 |
HARDOAN |
1019/ED/PH-3/2023-24/XVII |
180 |
Fatehpur |
Power Mech Projects Ltd |
20068281 |
HARIRAMPUR,HARIYAPUR |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
181 |
Fatehpur |
Power Mech Projects Ltd |
20097465 |
HARNAWA |
1020/ED/PH-3/2023-24/XVIII |
182 |
Fatehpur |
Power Mech Projects Ltd |
20079120 |
HASANAPUR |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
183 |
Fatehpur |
Power Mech Projects Ltd |
20081155 |
HASANPUR |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
184 |
Fatehpur |
Power Mech Projects Ltd |
20079151 |
HASANPUR DEORI & PANDEYPUR GRAM PANCHAYAT WATER SUPPLY SCHEME |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
185 |
Fatehpur |
Power Mech Projects Ltd |
20097818 |
HASIMPUR MADEPUR |
1020/ED/PH-3/2023-24/XVIII |
186 |
Fatehpur |
Power Mech Projects Ltd |
20097515 |
HASWA |
1011/ED/PH-3/2023-24/XVI |
187 |
Fatehpur |
Power Mech Projects Ltd |
20079086 |
HIMMATPUR AND UMARKOLA KHURMA NAGAR |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
188 |
Fatehpur |
Power Mech Projects Ltd |
20100815 |
IRADADPUR DHARMGADPUR |
978/ED/PH-3/2023-24/XIII DT.14-08-2023 |
189 |
Fatehpur |
Power Mech Projects Ltd |
20079007 |
IRADATPUR CHATURBHUJPUR |
517/ED/PHASE-3/2022-23/V |
190 |
Fatehpur |
Power Mech Projects Ltd |
20078966 |
ISHAKPUR,IMADPUR |
517/ED/PHASE-3/2022-23/V |
191 |
Fatehpur |
Power Mech Projects Ltd |
20079021 |
ISHEPUR |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
192 |
Fatehpur |
Power Mech Projects Ltd |
20078929 |
ISKURI |
517/ED/PHASE-3/2022-23/V |
193 |
Fatehpur |
Power Mech Projects Ltd |
20079035 |
ITOLIPUR |
517/ED/PHASE-3/2022-23/V |
194 |
Fatehpur |
Power Mech Projects Ltd |
20079084 |
ITRORA PILKHINI Gram Panchayat Water Supply Schem |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
195 |
Fatehpur |
Power Mech Projects Ltd |
20079146 |
JAGDISHPUR BAKEVAR & LALAWAKSARA GRAM PANCHAYAT WATER SUPPLY SCHEME |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
196 |
Fatehpur |
Power Mech Projects Ltd |
20079017 |
JAGJIVANPUR |
517/ED/PHASE-3/2022-23/V 06.03.2023 |
197 |
Fatehpur |
Power Mech Projects Ltd |
20074519 |
JAHANGIR NAGAR |
340/ED/PHASE-3/2022-23/II 27.01.2023 |
198 |
Fatehpur |
Power Mech Projects Ltd |
20089346 |
JAJAMOIYA |
562/ED/Phase-3/2022-23/VI Date-14/03/202 |
199 |
Fatehpur |
Power Mech Projects Ltd |
20068192 |
JAKHMI, DHARUPUR |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
200 |
Fatehpur |
Power Mech Projects Ltd |
20089225 |
JAMAROULI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
201 |
Fatehpur |
Power Mech Projects Ltd |
20102046 |
JAMRAWAN |
1072/ED/PH-3/2023-24/XXIII |
202 |
Fatehpur |
Power Mech Projects Ltd |
20043844 |
Janta |
222/ED/phase-3/2022-23/1 Date-28/11/2022 |
203 |
Fatehpur |
Power Mech Projects Ltd |
20089321 |
JARA |
562/ED/Phase-3/2022-23/VI Date-14/03/202 |
204 |
Fatehpur |
Power Mech Projects Ltd |
20062845 |
JHAU MEDNIPUR |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
205 |
Fatehpur |
Power Mech Projects Ltd |
20089231 |
JIGANI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
206 |
Fatehpur |
Power Mech Projects Ltd |
20061345 |
JINDPUR |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
207 |
Fatehpur |
Power Mech Projects Ltd |
20079042 |
JOGAPUR |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
208 |
Fatehpur |
Power Mech Projects Ltd |
20089367 |
JONIHA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
209 |
Fatehpur |
Power Mech Projects Ltd |
20061281 |
Jukara Gram Panchayat Water Supply Scheme |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
210 |
Fatehpur |
Power Mech Projects Ltd |
20068348 |
KADHERWA |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
211 |
Fatehpur |
Power Mech Projects Ltd |
20079122 |
KAHIJARA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
212 |
Fatehpur |
Power Mech Projects Ltd |
20079114 |
KAKORA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
213 |
Fatehpur |
Power Mech Projects Ltd |
20043845 |
Kalana |
222/ED/phase-3/2022-23/1 date-28/11/2022 |
214 |
Fatehpur |
Power Mech Projects Ltd |
20061537 |
KANDHI |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
215 |
Fatehpur |
Power Mech Projects Ltd |
20097517 |
KANDHIYA |
1020/ED/PH-3/2023-24/XVIII |
216 |
Fatehpur |
Power Mech Projects Ltd |
20095847 |
KAPILMAIYKE KISHUNPUR KAPILE, MANGALPUR TAKAULI |
1005/ED/PHASE-3/2023-24/XV |
217 |
Fatehpur |
Power Mech Projects Ltd |
20095781 |
KARAMCHANDPUR SANDA |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
218 |
Fatehpur |
Power Mech Projects Ltd |
20044209 |
Karchalpur |
222/ED/phase-3/2022-23/1 Date-28/11/2022 |
219 |
Fatehpur |
Power Mech Projects Ltd |
20097820 |
KARHIYA |
1020/ED/PH-3/2023-24/XVIII |
220 |
Fatehpur |
Power Mech Projects Ltd |
20097723 |
KARIYAMAU & RAMPUR |
1072/ED/PH-3/2023-24/XXIII |
221 |
Fatehpur |
Power Mech Projects Ltd |
20102050 |
KASERUWA |
1057/ED/PH-3/2023-24/XXI DT: 24.01.24 |
222 |
Fatehpur |
Power Mech Projects Ltd |
20095783 |
KASHIMPUR AKHOPUR |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
223 |
Fatehpur |
Power Mech Projects Ltd |
20068179 |
KASIYAPUR BIBI HAT, SUDHAVA |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
224 |
Fatehpur |
Power Mech Projects Ltd |
20079008 |
KASRAON |
517/ED/PHASE-3/2022-23/V |
225 |
Fatehpur |
Power Mech Projects Ltd |
20089354 |
Kaudiya |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
226 |
Fatehpur |
Power Mech Projects Ltd |
20095785 |
KESHAVPUR |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
227 |
Fatehpur |
Power Mech Projects Ltd |
20068375 |
KESURWA |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
228 |
Fatehpur |
Power Mech Projects Ltd |
20079117 |
KEWAI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
229 |
Fatehpur |
Power Mech Projects Ltd |
20043846 |
Khadara |
222/ED/phase-3/2022-23/1 Date-28/11/2022 |
230 |
Fatehpur |
Power Mech Projects Ltd |
20089931 |
KHAIRABAD |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
231 |
Fatehpur |
Power Mech Projects Ltd |
20097492 |
KHAKHARERU |
1019/ED/PH-3/2023-24/XVII |
232 |
Fatehpur |
Power Mech Projects Ltd |
20097927 |
KHASMAU & BRAMANPUR |
1019/ED/PH-3/2023-24/XVII |
233 |
Fatehpur |
Power Mech Projects Ltd |
20068406 |
KHATAULI, KORARI |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
234 |
Fatehpur |
Power Mech Projects Ltd |
20097822 |
KHAWAJIPUR SEMRAIYA |
1011/ED/PH-3/2023-24/XVI |
235 |
Fatehpur |
Power Mech Projects Ltd |
20095866 |
KHEOKHARI&BEYOTI |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
236 |
Fatehpur |
Power Mech Projects Ltd |
20097244 |
KHUNTA |
1005/ED/PHASE-3/2023-24/XV |
237 |
Fatehpur |
Power Mech Projects Ltd |
20097520 |
KISHUNPUR |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
238 |
Fatehpur |
Power Mech Projects Ltd |
20078990 |
KISHUNPUR CHIRAI, HARDASPUR GERIYA |
517/ED/PHASE-3/2022-23/V |
239 |
Fatehpur |
Power Mech Projects Ltd |
20095789 |
KISHUNPUR KAPILI |
1005/ED/PHASE-3/2023-24/XV |
240 |
Fatehpur |
Power Mech Projects Ltd |
20100809 |
KODAR |
1020/ED/PH-3/2023-24/XVIII |
241 |
Fatehpur |
Power Mech Projects Ltd |
20097727 |
KODARWAR ,TAUARA |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
242 |
Fatehpur |
Power Mech Projects Ltd |
20095791 |
KODHAI |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
243 |
Fatehpur |
Power Mech Projects Ltd |
20061544 |
KORAI |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
244 |
Fatehpur |
Power Mech Projects Ltd |
20066466 |
KORWAN |
395/ED/Phase-3/2022-23/ IV Date 09-02-2023 |
245 |
Fatehpur |
Power Mech Projects Ltd |
20078961 |
KULLI |
517/ED/PHASE-3/2022-23/V |
246 |
Fatehpur |
Power Mech Projects Ltd |
20067827 |
KURUSTI KALA |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
247 |
Fatehpur |
Power Mech Projects Ltd |
20085872 |
LAKHANKHEDA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
248 |
Fatehpur |
Power Mech Projects Ltd |
20100810 |
LAKHMIPUR |
978/ED/PH-3/2023-24/XIII DT.14-08-2023 |
249 |
Fatehpur |
Power Mech Projects Ltd |
20100787 |
LALAULI |
1020/ED/PH-3/2023-24/XVIII |
250 |
Fatehpur |
Power Mech Projects Ltd |
20095891 |
LALIPUR |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
251 |
Fatehpur |
Power Mech Projects Ltd |
20062910 |
LALPUR |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
252 |
Fatehpur |
Power Mech Projects Ltd |
20074554 |
LAUKIYAPUR |
340/ED/PHASE-3/2022-23/II |
253 |
Fatehpur |
Power Mech Projects Ltd |
20102036 |
LILRA |
1011/ED/PH-3/2023-24/XVI |
254 |
Fatehpur |
Power Mech Projects Ltd |
20079130 |
MADARI AND KULKHEDA GP |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
255 |
Fatehpur |
Power Mech Projects Ltd |
20062880 |
MADARIPUR KALAN |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
256 |
Fatehpur |
Power Mech Projects Ltd |
20097522 |
MADAULI |
978/ED/PH-3/2023-24/XIII DT.14-08-2023 |
257 |
Fatehpur |
Power Mech Projects Ltd |
20079124 |
MADURI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
258 |
Fatehpur |
Power Mech Projects Ltd |
20097523 |
MAHAWATPUR ASHAT |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
259 |
Fatehpur |
Power Mech Projects Ltd |
20097475 |
MAHESHPUR |
978/ED/PH-3/2023-24/XIII DT.14-08-2023 |
260 |
Fatehpur |
Power Mech Projects Ltd |
20067819 |
MAHNA |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
261 |
Fatehpur |
Power Mech Projects Ltd |
20075517 |
MAHRHA |
395/ED/Phase-3/2022-23/ IV Date 09-02-2023 |
262 |
Fatehpur |
Power Mech Projects Ltd |
20079063 |
MAKARANDPUR GRAM PANCHAYAT WATER SUPPLY SCHEME |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
263 |
Fatehpur |
Power Mech Projects Ltd |
20043847 |
Malwan |
222/ED/phase-3/2022-23/1 Date-28/11/2022 |
264 |
Fatehpur |
Power Mech Projects Ltd |
20079037 |
MAMREJPUR&REWARI KHURD |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
265 |
Fatehpur |
Power Mech Projects Ltd |
20092312 |
MANDRAV |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
266 |
Fatehpur |
Power Mech Projects Ltd |
20102043 |
MANJHANPUR |
1011/ED/PH-3/2023-24/XVI |
267 |
Fatehpur |
Power Mech Projects Ltd |
20074567 |
MANJHKHOR |
340/ED/PHASE-3/2022-23/II 27.01.2023 |
268 |
Fatehpur |
Power Mech Projects Ltd |
20078949 |
MANJHTENI |
517/ED/PHASE-3/2022-23/V |
269 |
Fatehpur |
Power Mech Projects Ltd |
20095799 |
MANJHUPUR |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
270 |
Fatehpur |
Power Mech Projects Ltd |
20074564 |
MANJIHL GAON |
340/ED/PHASE-3/2022-23/II 27.01.2023 |
271 |
Fatehpur |
Power Mech Projects Ltd |
20062905 |
MANLAW |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
272 |
Fatehpur |
Power Mech Projects Ltd |
20081133 |
MATHAEIYAPUR, SAMDA SAHODARPUR |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
273 |
Fatehpur |
Power Mech Projects Ltd |
20097749 |
MAVAIYA , GADHI |
1020/ED/PH-3/2023-24/XVIII |
274 |
Fatehpur |
Power Mech Projects Ltd |
20089218 |
MAWAI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
275 |
Fatehpur |
Power Mech Projects Ltd |
20061493 |
MAWAI |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
276 |
Fatehpur |
Power Mech Projects Ltd |
20079059 |
MAWAIYA GUNEER GRAM PANCHAYAT WATER SUPPLY SCHEME |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
277 |
Fatehpur |
Power Mech Projects Ltd |
20085883 |
MEHDIYA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
278 |
Fatehpur |
Power Mech Projects Ltd |
20068211 |
MEVLI, RASOOLPUR |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
279 |
Fatehpur |
Power Mech Projects Ltd |
20061714 |
MICHKIMAY RAHIMAPUR |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
280 |
Fatehpur |
Power Mech Projects Ltd |
20079031 |
MIRZAPUR MAKRANDPUR |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
281 |
Fatehpur |
Power Mech Projects Ltd |
20068325 |
MIRZAPUR TALUKE JAMRAWAN |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
282 |
Fatehpur |
Power Mech Projects Ltd |
20078964 |
MIRZAPUR, NAHYAIA |
517/ED/PHASE-3/2022-23/V |
283 |
Fatehpur |
Power Mech Projects Ltd |
20097490 |
MISA |
1011/ED/PH-3/2023-24/XVI |
284 |
Fatehpur |
Power Mech Projects Ltd |
20043849 |
Missi |
222/ED/phase-3/2022-23/1 Date-28/11/2022 |
285 |
Fatehpur |
Power Mech Projects Ltd |
20062896 |
MOHAMMADPUR NABADA |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
286 |
Fatehpur |
Power Mech Projects Ltd |
20061707 |
MOHANKHERA |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
287 |
Fatehpur |
Power Mech Projects Ltd |
20081170 |
MOHMMDIPUR |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
288 |
Fatehpur |
Power Mech Projects Ltd |
20079093 |
MOUHARI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
289 |
Fatehpur |
Power Mech Projects Ltd |
20074573 |
MUBARAKPUR,GARIYABICHHIYAWAN |
340/ED/PHASE-3/2022-23/II 27.01.2023 |
290 |
Fatehpur |
Power Mech Projects Ltd |
20097524 |
MURAWAN |
1032/ED/PH-3/2023-24/XIX |
291 |
Fatehpur |
Power Mech Projects Ltd |
20095801 |
MUTTAUR |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
292 |
Fatehpur |
Power Mech Projects Ltd |
20061378 |
NAHAR KHOR |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
293 |
Fatehpur |
Power Mech Projects Ltd |
20097844 |
NAKSARA & ROSHANPUR TEKARI |
978/ED/PH-3/2023-24/XIII DT.14-08-2023 |
294 |
Fatehpur |
Power Mech Projects Ltd |
20079069 |
NAMA MAU GRAM PANCHAYAT WATER SUPPLY SCHEME |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
295 |
Fatehpur |
Power Mech Projects Ltd |
20079161 |
NARAICHA GRAM PANCHAYAT WATER SUPPLY SCHEME |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
296 |
Fatehpur |
Power Mech Projects Ltd |
20097476 |
NARAINI |
1020/ED/PH-3/2023-24/XVIII |
297 |
Fatehpur |
Power Mech Projects Ltd |
20078968 |
NARAULI, KHEMKARANPUR BASAI |
517/ED/PHASE-3/2022-23/V |
298 |
Fatehpur |
Power Mech Projects Ltd |
20089347 |
NASESNIYA 2.JALALPUR NYORI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
299 |
Fatehpur |
Power Mech Projects Ltd |
20074559 |
NASIRPUR |
340/ED/PHASE-3/2022-23/II |
300 |
Fatehpur |
Power Mech Projects Ltd |
20061400 |
NAUGAON |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
301 |
Fatehpur |
Power Mech Projects Ltd |
20079071 |
NIRKHI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
302 |
Fatehpur |
Power Mech Projects Ltd |
20068318 |
OJHAPUR |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
303 |
Fatehpur |
Power Mech Projects Ltd |
20043850 |
Okhara Kuwarpur |
222/ED/phase-3/2022-23/1 Date-28/11/2022 |
304 |
Fatehpur |
Power Mech Projects Ltd |
20097849 |
OTI |
1020/ED/PH-3/2023-24/XVIII |
305 |
Fatehpur |
Power Mech Projects Ltd |
20106722 |
PADRI NBIPUR |
1069/ED/PH-3/2023-24/XXII |
306 |
Fatehpur |
Power Mech Projects Ltd |
20044241 |
Paharipur |
222/ED/phase-3/2022-23/1 Date-28/11/2022 |
307 |
Fatehpur |
Power Mech Projects Ltd |
20099435 |
PAHARPUR |
978/ED/PH-3/2023-24/XIII DT.14-08-2023 |
308 |
Fatehpur |
Power Mech Projects Ltd |
20079135 |
PAHARPUR BATIGAVA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
309 |
Fatehpur |
Power Mech Projects Ltd |
20079145 |
PAHUR & RAMPUR GRAM PANCHAYAT WATER SUPPLY SCHEME |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
310 |
Fatehpur |
Power Mech Projects Ltd |
20079039 |
PAI |
517/ED/PHASE-3/2022-23/V |
311 |
Fatehpur |
Power Mech Projects Ltd |
20061356 |
PAINA KHURD |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
312 |
Fatehpur |
Power Mech Projects Ltd |
20074517 |
PALIA BUZURG |
340/ED/PHASE-3/2022-23/II 27.01.2023 |
313 |
Fatehpur |
Power Mech Projects Ltd |
20089310 |
PANERUA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
314 |
Fatehpur |
Power Mech Projects Ltd |
20079094 |
PARADAN Gram Panchayat Water Supply Scheme |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
315 |
Fatehpur |
Power Mech Projects Ltd |
20079058 |
PARADHANAI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
316 |
Fatehpur |
Power Mech Projects Ltd |
20068267 |
PARETHI , SHYAMPUR |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
317 |
Fatehpur |
Power Mech Projects Ltd |
20102042 |
PARI NARWA |
1057/ED/PH-3/2023-24/XXI DT: 24.01.24 |
318 |
Fatehpur |
Power Mech Projects Ltd |
20106720 |
PARSEDHA |
1019/ED/PH-3/2023-24/XVII |
319 |
Fatehpur |
Power Mech Projects Ltd |
20100805 |
PATTISHAH |
1069/ED/PH-3/2023-24/XXII |
320 |
Fatehpur |
Power Mech Projects Ltd |
20106719 |
PAULI Gadhawa GRAM PANCHAYAT WATER SUPPLY SCHEME |
1019/ED/PH-3/2023-24/XVII |
321 |
Fatehpur |
Power Mech Projects Ltd |
20062932 |
PILKHINI |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
322 |
Fatehpur |
Power Mech Projects Ltd |
20079085 |
PIPOURI &BHEWELI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
323 |
Fatehpur |
Power Mech Projects Ltd |
20079142 |
PRATAPPUR GRAM PANCHAYAT WATER SUPPLY SCHEME |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
324 |
Fatehpur |
Power Mech Projects Ltd |
20097866 |
PURMAI |
1019/ED/PH-3/2023-24/XVII |
325 |
Fatehpur |
Power Mech Projects Ltd |
20097879 |
RAHALLAPUR |
978/ED/PH-3/2023-24/XIII DT.14-08-2023 |
326 |
Fatehpur |
Power Mech Projects Ltd |
20061443 |
RAHMAT DAULATPUR |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
327 |
Fatehpur |
Power Mech Projects Ltd |
20074521 |
RAICHANDRAPUR |
340/ED/PHASE-3/2022-23/II 27.01.2023 |
328 |
Fatehpur |
Power Mech Projects Ltd |
20097544 |
RAIPUR BHASRAULI |
1019/ED/PH-3/2023-24/XVII |
329 |
Fatehpur |
Power Mech Projects Ltd |
20097892 |
RAKSHAPAL&DARIYAMAU |
1019/ED/PH-3/2023-24/XVII |
330 |
Fatehpur |
Power Mech Projects Ltd |
20097525 |
RAMNAGAR KAUHAN |
1020/ED/PH-3/2023-24/XVIII |
331 |
Fatehpur |
Power Mech Projects Ltd |
20066428 |
Rampur Bakewar, Saray Bakewar & Saray Mahmoodpur |
395/ED/Phase-3/2022-23/ IV Date 09-02-2023 |
332 |
Fatehpur |
Power Mech Projects Ltd |
20089222 |
RAMPUR HUSAINA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
333 |
Fatehpur |
Power Mech Projects Ltd |
20079140 |
RAMPUR KURMI GRAM PANCHAYAT WATER SUPPLY SCHEME |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
334 |
Fatehpur |
Power Mech Projects Ltd |
20100786 |
RAMPUR THARIYANW |
1032/ED/PH-3/2023-24/XIX |
335 |
Fatehpur |
Power Mech Projects Ltd |
20097835 |
RAMWA PANTHUWA |
1032/ED/PH-3/2023-24/XIX |
336 |
Fatehpur |
Power Mech Projects Ltd |
20079073 |
RANA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
337 |
Fatehpur |
Power Mech Projects Ltd |
20074524 |
RANIPUR BAHERA |
340/ED/PHASE-3/2022-23/II 27.01.2023 |
338 |
Fatehpur |
Power Mech Projects Ltd |
20089339 |
RANMASTPUR |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
339 |
Fatehpur |
Power Mech Projects Ltd |
20068391 |
RARA JJM |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
340 |
Fatehpur |
Power Mech Projects Ltd |
20097530 |
RARI |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
341 |
Fatehpur |
Power Mech Projects Ltd |
20089207 |
RARI KHURD |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
342 |
Fatehpur |
Power Mech Projects Ltd |
20095897 |
Rasoolpur & Jagatpur |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
343 |
Fatehpur |
Power Mech Projects Ltd |
20100819 |
RASULPUR |
978/ED/PH-3/2023-24/XIII DT.14-08-2023 |
344 |
Fatehpur |
Power Mech Projects Ltd |
20097751 |
Rasulpur Mamaiya |
1020/ED/PH-3/2023-24/XVIII |
345 |
Fatehpur |
Power Mech Projects Ltd |
20097478 |
RASULPUR URF VAISAPUR |
1032/ED/PH-3/2023-24/XIX |
346 |
Fatehpur |
Power Mech Projects Ltd |
20066457 |
RAWARI BUJURG |
395/ED/Phase-3/2022-23/ IV |
347 |
Fatehpur |
Power Mech Projects Ltd |
20089217 |
RAWATPUR KOTIYA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
348 |
Fatehpur |
Power Mech Projects Ltd |
20085900 |
REWARI |
395/ED/Phase-3/2022-23/ IV Date 09-02-2023 |
349 |
Fatehpur |
Power Mech Projects Ltd |
20097479 |
REY |
1020/ED/PH-3/2023-24/XVIII |
350 |
Fatehpur |
Power Mech Projects Ltd |
20095902 |
RIDHWA |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
351 |
Fatehpur |
Power Mech Projects Ltd |
20061322 |
SAIBSI & UMARPUR |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
352 |
Fatehpur |
Power Mech Projects Ltd |
20097753 |
SAIDPUR BHURAHI& mahimapur |
978/ED/PH-3/2023-24/XIII DT.14-08-2023 |
353 |
Fatehpur |
Power Mech Projects Ltd |
20079015 |
Sakhiyanwa |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
354 |
Fatehpur |
Power Mech Projects Ltd |
20062887 |
SALEIYABAD |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
355 |
Fatehpur |
Power Mech Projects Ltd |
20089325 |
SALEMANPUR KANAIRA |
562/ED/Phase-3/2022-23/VI Date-14/03/202 |
356 |
Fatehpur |
Power Mech Projects Ltd |
20102037 |
SALEMPUR |
1011/ED/PH-3/2023-24/XVI |
357 |
Fatehpur |
Power Mech Projects Ltd |
20099437 |
SALEMPUR GOLI |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
358 |
Fatehpur |
Power Mech Projects Ltd |
20078954 |
SALVAN |
517/ED/PHASE-3/2022-23/V |
359 |
Fatehpur |
Power Mech Projects Ltd |
20075493 |
SAMASPUR |
395/ED/Phase-3/2022-23/ IV Date 09-02-2023 |
360 |
Fatehpur |
Power Mech Projects Ltd |
20068400 |
SAMIYANA, CHURIYANI |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
361 |
Fatehpur |
Power Mech Projects Ltd |
20061503 |
SAMOURA |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
362 |
Fatehpur |
Power Mech Projects Ltd |
20078977 |
SAMRAHA, ABDULLAPUR WAKER |
517/ED/PHASE-3/2022-23/V |
363 |
Fatehpur |
Power Mech Projects Ltd |
20078994 |
SANGAW &CHAK NATHANPUR |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
364 |
Fatehpur |
Power Mech Projects Ltd |
20095909 |
SANGRAMPUR,BHAKRANA |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
365 |
Fatehpur |
Power Mech Projects Ltd |
20092320 |
SARAHANBUJURG |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
366 |
Fatehpur |
Power Mech Projects Ltd |
20097248 |
SARAHANKHURD |
1005/ED/PHASE-3/2023-24/XV |
367 |
Fatehpur |
Power Mech Projects Ltd |
20068309 |
SARAI DADIRA |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
368 |
Fatehpur |
Power Mech Projects Ltd |
20097755 |
SARAI IDRISH & LADLEPUR |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
369 |
Fatehpur |
Power Mech Projects Ltd |
20097900 |
SARAI KHALIS |
1020/ED/PH-3/2023-24/XVIII |
370 |
Fatehpur |
Power Mech Projects Ltd |
20044301 |
Sarai Langar |
222/ED/phase-3/2022-23/1 Date-28/11/2022 |
371 |
Fatehpur |
Power Mech Projects Ltd |
20089230 |
SARAKANDI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
372 |
Fatehpur |
Power Mech Projects Ltd |
20078978 |
SARAULI |
517/ED/PHASE-3/2022-23/V |
373 |
Fatehpur |
Power Mech Projects Ltd |
20097905 |
Saray Mohan Salempur |
1011/ED/PH-3/2023-24/XVI |
374 |
Fatehpur |
Power Mech Projects Ltd |
20089204 |
SARAYDHARAMPUR |
562/ED/Phase-3/2022-23/VI Date-14/03/202 |
375 |
Fatehpur |
Power Mech Projects Ltd |
20044317 |
Sardarpur |
222/ED/phase-3/2022-23/1 Date-28/11/2022 |
376 |
Fatehpur |
Power Mech Projects Ltd |
20102045 |
SARKANDI |
1072/ED/PH-3/2023-24/XXIII |
377 |
Fatehpur |
Power Mech Projects Ltd |
20102039 |
SARWAL |
1011/ED/PH-3/2023-24/XVI |
378 |
Fatehpur |
Power Mech Projects Ltd |
20089243 |
SATHIGAVA |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
379 |
Fatehpur |
Power Mech Projects Ltd |
20097832 |
SATO JOGA |
1032/ED/PH-3/2023-24/XIX |
380 |
Fatehpur |
Power Mech Projects Ltd |
20097536 |
SATO PEET |
1011/ED/PH-3/2023-24/XVI |
381 |
Fatehpur |
Power Mech Projects Ltd |
20097254 |
SELAVAN |
1005/ED/PHASE-3/2023-24/XV |
382 |
Fatehpur |
Power Mech Projects Ltd |
20095915 |
SEMARI |
1020/ED/PH-3/2023-24/XVIII |
383 |
Fatehpur |
Power Mech Projects Ltd |
20097759 |
SEMRA |
1057/ED/PH-3/2023-24/XXI DT: 24.01.24 |
384 |
Fatehpur |
Power Mech Projects Ltd |
20102048 |
Semra Manapur |
1032/ED/PH-3/2023-24/XIX |
385 |
Fatehpur |
Power Mech Projects Ltd |
20097483 |
SEVRAMAU |
1020/ED/PH-3/2023-24/XVIII |
386 |
Fatehpur |
Power Mech Projects Ltd |
20100816 |
SHAHIPUR |
1011/ED/PH-3/2023-24/XVI |
387 |
Fatehpur |
Power Mech Projects Ltd |
20074525 |
SHAHJAHANPUR SALRAHA |
340/ED/PHASE-3/2022-23/II 27.01.2023 |
388 |
Fatehpur |
Power Mech Projects Ltd |
20102044 |
SHAHPUR HARDASPUR |
1011/ED/PH-3/2023-24/XV |
389 |
Fatehpur |
Power Mech Projects Ltd |
20097251 |
SHIVARI |
1005/ED/PHASE-3/2023-24/XV |
390 |
Fatehpur |
Power Mech Projects Ltd |
20079109 |
Shivpuri Gram Panchayat Water Supply Scheme |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
391 |
Fatehpur |
Power Mech Projects Ltd |
20095919 |
SIHARI PATTI |
978/ED/PH-3/2023-24/XIII DT.14-08-2023 |
392 |
Fatehpur |
Power Mech Projects Ltd |
20092328 |
SIJOULI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
393 |
Fatehpur |
Power Mech Projects Ltd |
20089352 |
SIKANDARPUR |
562/ED/Phase-3/2022-23/VI Date-14/03/202 |
394 |
Fatehpur |
Power Mech Projects Ltd |
20095806 |
SILIMI GARAHWA |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
395 |
Fatehpur |
Power Mech Projects Ltd |
20061302 |
Singhaw Gram Panchayat Water Supply Scheme |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
396 |
Fatehpur |
Power Mech Projects Ltd |
20100789 |
SITHAURA |
1019/ED/PH-3/2023-24/XVII |
397 |
Fatehpur |
Power Mech Projects Ltd |
20074532 |
SOHADMAU |
340/ED/PHASE-3/2022-23/II 27.01.2023 |
398 |
Fatehpur |
Power Mech Projects Ltd |
20097910 |
SONHI |
1011/ED/PH-3/2023-24/XVI |
399 |
Fatehpur |
Power Mech Projects Ltd |
20075581 |
Souh &Chintapur |
395/ED/Phase-3/2022-23/ IV Date 09-02-2023 |
400 |
Fatehpur |
Power Mech Projects Ltd |
20100803 |
SUDANPUR |
978/ED/PH-3/2023-24/XIII DT.14-08-2023 |
401 |
Fatehpur |
Power Mech Projects Ltd |
20074575 |
SUJANIPUR,TILAKPUR |
340/ED/PHASE-3/2022-23/II |
402 |
Fatehpur |
Power Mech Projects Ltd |
20074522 |
SUJARAHI |
340/ED/PHASE-3/2022-23/II 27.01.2023 |
403 |
Fatehpur |
Power Mech Projects Ltd |
20045365 |
Sujawalpur & Kansahi |
222/ED/phase-3/2022-23/1 Date-28/11/2022 |
404 |
Fatehpur |
Power Mech Projects Ltd |
20079110 |
SULTANGARH |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
405 |
Fatehpur |
Power Mech Projects Ltd |
20097537 |
SULTANPUR SATO |
1011/ED/PH-3/2023-24/XVI |
406 |
Fatehpur |
Power Mech Projects Ltd |
20061317 |
Suswan Bujurg Gram Panchayat Water Supply Scheme |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
407 |
Fatehpur |
Power Mech Projects Ltd |
20074562 |
TAKIPUR |
340/ED/PHASE-3/2022-23/II 27.01.2023 |
408 |
Fatehpur |
Power Mech Projects Ltd |
20078965 |
TASAHI KHURD |
517/ED/PHASE-3/2022-23/V |
409 |
Fatehpur |
Power Mech Projects Ltd |
20079001 |
TEE SEE |
704/ED/PHASE-3/2023-24/VIII /05-04-2023 |
410 |
Fatehpur |
Power Mech Projects Ltd |
20097916 |
TEKSARI BUJURG |
1020/ED/PH-3/2023-24/XVIII |
411 |
Fatehpur |
Power Mech Projects Ltd |
20074516 |
TENDUA |
340/ED/PHASE-3/2022-23/II 27.01.2023 |
412 |
Fatehpur |
Power Mech Projects Ltd |
20066443 |
TENDULI & RAJIPUR |
395/ED/Phase-3/2022-23/ IV Date 09-02-2023 |
413 |
Fatehpur |
Power Mech Projects Ltd |
20097484 |
TEUJA |
978/ED/PH-3/2023-24/XIII DT.14-08-2023 |
414 |
Fatehpur |
Power Mech Projects Ltd |
20061712 |
TIKAR |
259/ED/PHASE-3/2022-23/II 23DEC-2022 |
415 |
Fatehpur |
Power Mech Projects Ltd |
20079048 |
TIKARI MANOUTI |
562/ED/Phase-3/2022-23/VI Date-14/03/2023 |
416 |
Fatehpur |
Power Mech Projects Ltd |
20097920 |
TRILOCHANPUR |
1072/ED/PH-3/2023-24/XXIII |
417 |
Fatehpur |
Power Mech Projects Ltd |
20097485 |
UMARA |
831/ED/PHASE-3/2023-24/X 15.05.2023 |
418 |
Fatehpur |
Power Mech Projects Ltd |
20075718 |
UMARAULI & KALYANPUR |
395/ED/Phase-3/2022-23/ IV Date 09-02-2023 |
419 |
Fatehpur |
Power Mech Projects Ltd |
20043855 |
Umarghana |
222/ED/phase-3/2022-23/1 Date-28/11/2022 |
420 |
Fatehpur |
Power Mech Projects Ltd |
20102041 |
UMRA |
1011/ED/PH-3/2023-24/XVI |
421 |
Fatehpur |
Power Mech Projects Ltd |
20067826 |
UMRI JJM |
572/ED/PHASE-3/2022-23/VII 16,MARCH-2023 |
422 |
Fatehpur |
Power Mech Projects Ltd |
20100795 |
URAULI |
1020/ED/PH-3/2023-24/XVIII |
423 |
Fatehpur |
Power Mech Projects Ltd |
20097538 |
VIJAYEPUR |
1019/ED/PH-3/2023-24/XVII |
424 |
Fatehpur |
Power Mech Projects Ltd |
20100818 |
YOHAN |
978/ED/PH-3/2023-24/XIII DT.14-08-2023 |
425 |
Fatehpur |
Power Mech Projects Ltd |
20089206 |
ZAFARPUR SITHARRA |
562/ED/Phase-3/2022-23/VI Date-14/03/202 |