1 |
Amethi |
Vindhya-GAJA (JV) |
20065213 |
RAI DAY PUR G.P WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
2 |
Amethi |
Vindhya-GAJA (JV) |
20065131 |
Alampur & Agresare Water Supply Scheme |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
3 |
Amethi |
Vindhya-GAJA (JV) |
20068427 |
AMAYEMAFI & SHAHARI WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
4 |
Amethi |
Vindhya-GAJA (JV) |
20085692 |
ANI BAIJAL WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
5 |
Amethi |
Vindhya-GAJA (JV) |
20085680 |
ARGWAN & SAKRAWA WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
6 |
Amethi |
Vindhya-GAJA (JV) |
20068386 |
ASHIPUR WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
7 |
Amethi |
Vindhya-GAJA (JV) |
20066626 |
ASNI1 WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
8 |
Amethi |
Vindhya-GAJA (JV) |
20066413 |
babu pur Sharia water supply Scheme |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
9 |
Amethi |
Vindhya-GAJA (JV) |
20098332 |
BABUPUR Water Supply Scheme |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
10 |
Amethi |
Vindhya-GAJA (JV) |
20065721 |
BADAGAON WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
11 |
Amethi |
Vindhya-GAJA (JV) |
20066484 |
BADALGARH & BAKHTWARNAGAR WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
12 |
Amethi |
Vindhya-GAJA (JV) |
20068452 |
BADHAULI & MUDUPUR UMRAULA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
13 |
Amethi |
Vindhya-GAJA (JV) |
20068412 |
BADLA PUR & MADAULI WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
14 |
Amethi |
Vindhya-GAJA (JV) |
20085662 |
BAGAHI WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
15 |
Amethi |
Vindhya-GAJA (JV) |
20065203 |
Bahadurpur & Dhema Water Supply Scheme |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
16 |
Amethi |
Vindhya-GAJA (JV) |
20066592 |
BAHARPUR WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
17 |
Amethi |
Vindhya-GAJA (JV) |
20068313 |
BAHORAKHA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
18 |
Amethi |
Vindhya-GAJA (JV) |
20066485 |
BANBHARIYA WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
19 |
Amethi |
Vindhya-GAJA (JV) |
20098342 |
BANDOIYA Water Supply Scheme |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
20 |
Amethi |
Vindhya-GAJA (JV) |
20068014 |
BANIYAPUR, LONIA PUR, RAIPUR PHUL WARI Water supply scheme |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
21 |
Amethi |
Vindhya-GAJA (JV) |
20070861 |
BARRA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
22 |
Amethi |
Vindhya-GAJA (JV) |
20066536 |
BARSANDA WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
23 |
Amethi |
Vindhya-GAJA (JV) |
20085694 |
BASAIKPUR WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
24 |
Amethi |
Vindhya-GAJA (JV) |
20070853 |
BASANTPUR WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
25 |
Amethi |
Vindhya-GAJA (JV) |
20085686 |
BEHTA MURTAJAPUR WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
26 |
Amethi |
Vindhya-GAJA (JV) |
20085691 |
BELKHAUR WATER SUPPLY SCHEME |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
27 |
Amethi |
Vindhya-GAJA (JV) |
20068303 |
BENIPUR & PARSAWAN WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
28 |
Amethi |
Vindhya-GAJA (JV) |
20066531 |
BESARWA&PURE MANIMANOHAR VILLAGE WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
29 |
Amethi |
Vindhya-GAJA (JV) |
20065789 |
BHADDAUR,CHANDI PUR & RANJITPUR WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
30 |
Amethi |
Vindhya-GAJA (JV) |
20066540 |
BHADMER VILLAGE WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
31 |
Amethi |
Vindhya-GAJA (JV) |
20068402 |
BHAGIPUR WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
32 |
Amethi |
Vindhya-GAJA (JV) |
20065787 |
BHANAULI & MUSAFIRKHANA DEHAT URF GUNAIYA WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
33 |
Amethi |
Vindhya-GAJA (JV) |
20068389 |
BHARETHA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
34 |
Amethi |
Vindhya-GAJA (JV) |
20085677 |
BHATGAWAN WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
35 |
Amethi |
Vindhya-GAJA (JV) |
20085661 |
BHATMAU & ANKARA WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
36 |
Amethi |
Vindhya-GAJA (JV) |
20066663 |
BHAUSINGH PUR WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
37 |
Amethi |
Vindhya-GAJA (JV) |
20068394 |
BHAVAPUR WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
38 |
Amethi |
Vindhya-GAJA (JV) |
20066561 |
BHELAI KALAN VILLAGE WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
39 |
Amethi |
Vindhya-GAJA (JV) |
20073347 |
BHEWYI WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
40 |
Amethi |
Vindhya-GAJA (JV) |
20065177 |
BHIKHIPUR &RAMBAKSHGARH WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
41 |
Amethi |
Vindhya-GAJA (JV) |
20066634 |
BHIKHIPUR WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
42 |
Amethi |
Vindhya-GAJA (JV) |
20070874 |
BHIMI WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
43 |
Amethi |
Vindhya-GAJA (JV) |
20070881 |
BIKHANPUR WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
44 |
Amethi |
Vindhya-GAJA (JV) |
20085683 |
CHANDAIPUR WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
45 |
Amethi |
Vindhya-GAJA (JV) |
20065796 |
CHATURBHUJ PUR &MOCHWA WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
46 |
Amethi |
Vindhya-GAJA (JV) |
20100644 |
CHEERA & TRISUNDI WATER SUPPLY SCHEME |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
47 |
Amethi |
Vindhya-GAJA (JV) |
20100649 |
CHITAI PUR WATER SUPPLY SCHEME |
961/ED/Phase-3/2023-24/VII Dt- 25-07-2023 |
48 |
Amethi |
Vindhya-GAJA (JV) |
20065196 |
DAKKHIN GAON KYAR, DHANESHA RAJPUT WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
49 |
Amethi |
Vindhya-GAJA (JV) |
20094251 |
DARKHA & LOHARTH & TALA Water Supply Scheme |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
50 |
Amethi |
Vindhya-GAJA (JV) |
20065173 |
Dasai pur & Mochwa Water Supply Scheme |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
51 |
Amethi |
Vindhya-GAJA (JV) |
20068042 |
DAULATPUR NISURA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
52 |
Amethi |
Vindhya-GAJA (JV) |
20065155 |
DEHRA & RAJAPUR KOHARA WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
53 |
Amethi |
Vindhya-GAJA (JV) |
20066623 |
DHORHANPUR WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
54 |
Amethi |
Vindhya-GAJA (JV) |
20066576 |
DHOYEN VILLAGE WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
55 |
Amethi |
Vindhya-GAJA (JV) |
20068346 |
EKSARA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
56 |
Amethi |
Vindhya-GAJA (JV) |
20066470 |
GADRIYA DIH WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
57 |
Amethi |
Vindhya-GAJA (JV) |
20070878 |
GAIMAU WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
58 |
Amethi |
Vindhya-GAJA (JV) |
20068067 |
GANGAULI & GHAGUGHAR WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
59 |
Amethi |
Vindhya-GAJA (JV) |
20098319 |
GANGERWA & SALPUR Water Supply Scheme |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
60 |
Amethi |
Vindhya-GAJA (JV) |
20101973 |
GARHA MAFI WATER SUPPLY SCHEME |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
61 |
Amethi |
Vindhya-GAJA (JV) |
20068335 |
GARTHOLIYA & LOHANG PUR WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
62 |
Amethi |
Vindhya-GAJA (JV) |
20101949 |
GHORHA WATER SUPPLY SCHEME |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
63 |
Amethi |
Vindhya-GAJA (JV) |
20085667 |
GORIYABAD &PURE CHITA WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
64 |
Amethi |
Vindhya-GAJA (JV) |
20068435 |
GORKHAPUR & HIMMATGARH WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
65 |
Amethi |
Vindhya-GAJA (JV) |
20101946 |
GUDUR WATER SUPPLY SCHEME |
961/ED/Phase-3/2023-24/VII Dt- 25-07-2023 |
66 |
Amethi |
Vindhya-GAJA (JV) |
20085663 |
GUNGWACHH&KAMASIN MATHIYA WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
67 |
Amethi |
Vindhya-GAJA (JV) |
20070865 |
HARGAON WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
68 |
Amethi |
Vindhya-GAJA (JV) |
20065697 |
HARIHARPUR & SORAON WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
69 |
Amethi |
Vindhya-GAJA (JV) |
20068003 |
HARKARNPUR & HERUA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
70 |
Amethi |
Vindhya-GAJA (JV) |
20066566 |
HARKHU MAU WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
71 |
Amethi |
Vindhya-GAJA (JV) |
20066570 |
ITAURI & BHAIRO PUR VILLAGE WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
72 |
Amethi |
Vindhya-GAJA (JV) |
20066469 |
ITRAUR & TETARPUR& HASAWA SUKHANPUR WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
73 |
Amethi |
Vindhya-GAJA (JV) |
20085669 |
JADISHPUR & GAURIPUR & BASUPUR WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
74 |
Amethi |
Vindhya-GAJA (JV) |
20068074 |
JAMUARI & PURE MOHAMMAD NEWAJ WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
75 |
Amethi |
Vindhya-GAJA (JV) |
20066597 |
JARAUTA VILLAGE WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
76 |
Amethi |
Vindhya-GAJA (JV) |
20101941 |
JETHAUNA WATER SUPPLY SCHEME |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
77 |
Amethi |
Vindhya-GAJA (JV) |
20101945 |
JETHU MAWAI WATER SUPPLY SCHEME |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
78 |
Amethi |
Vindhya-GAJA (JV) |
20068000 |
JUTHIPUR & BAHORIKPUR WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
79 |
Amethi |
Vindhya-GAJA (JV) |
20096903 |
KAKVA & BIYASIYA WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
80 |
Amethi |
Vindhya-GAJA (JV) |
20068372 |
KANAK SINGHPUR & KORARI HEERSHAH WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
81 |
Amethi |
Vindhya-GAJA (JV) |
20066620 |
KANKOO PUR WATE SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
82 |
Amethi |
Vindhya-GAJA (JV) |
20070858 |
KANOO WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
83 |
Amethi |
Vindhya-GAJA (JV) |
20065165 |
KAPURIPUR Water Supply Scheme |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
84 |
Amethi |
Vindhya-GAJA (JV) |
20066590 |
KASARA&PATAPUR VILLAGE WATER SUPLLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
85 |
Amethi |
Vindhya-GAJA (JV) |
20065138 |
KASTHUNI PASCHIM & MAJHGAWAN & TIKRA BAIJNATH WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
86 |
Amethi |
Vindhya-GAJA (JV) |
20068063 |
KASTHUNI PURAB WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
87 |
Amethi |
Vindhya-GAJA (JV) |
20068077 |
KHAJHA & REWRA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
88 |
Amethi |
Vindhya-GAJA (JV) |
20098324 |
KHAJURI & KUSI TALI Water Supply Scheme |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
89 |
Amethi |
Vindhya-GAJA (JV) |
20070883 |
KHARA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
90 |
Amethi |
Vindhya-GAJA (JV) |
20094257 |
KHARGI PUR & PIPER PUR Water Supply Scheme |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
91 |
Amethi |
Vindhya-GAJA (JV) |
20066551 |
KHEMMAU WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
92 |
Amethi |
Vindhya-GAJA (JV) |
20068082 |
KISHUNI WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
93 |
Amethi |
Vindhya-GAJA (JV) |
20070877 |
KITIYAWAN WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
94 |
Amethi |
Vindhya-GAJA (JV) |
20070889 |
KOHRA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
95 |
Amethi |
Vindhya-GAJA (JV) |
20070864 |
KOILARA MUBARAKPUR WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
96 |
Amethi |
Vindhya-GAJA (JV) |
20067982 |
KOORA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
97 |
Amethi |
Vindhya-GAJA (JV) |
20070871 |
KORARI GIRDHAR SHAH WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
98 |
Amethi |
Vindhya-GAJA (JV) |
20066549 |
KOTWA & BHADSANA VILLAGE WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
99 |
Amethi |
Vindhya-GAJA (JV) |
20098331 |
KOTWA Water Supply Scheme |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
100 |
Amethi |
Vindhya-GAJA (JV) |
20085690 |
KOTWAR MAU WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
101 |
Amethi |
Vindhya-GAJA (JV) |
20094144 |
KUSUMBHI & JAGATPUR Water Supply Scheme |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
102 |
Amethi |
Vindhya-GAJA (JV) |
20068022 |
LAHNA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
103 |
Amethi |
Vindhya-GAJA (JV) |
20066372 |
LAKHANAIPUR WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
104 |
Amethi |
Vindhya-GAJA (JV) |
20101948 |
LAUKAPUR WATER SUPPLY SCHEME |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
105 |
Amethi |
Vindhya-GAJA (JV) |
20068989 |
LIHI WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
106 |
Amethi |
Vindhya-GAJA (JV) |
20067978 |
MADHUPUR KHADRI & GANGAPUR WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
107 |
Amethi |
Vindhya-GAJA (JV) |
20096996 |
Maharaj pur & Agahar Water Supply Scheme |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
108 |
Amethi |
Vindhya-GAJA (JV) |
20101981 |
MAHAUNA PASHCHIM WATER SUPPLY SCHEME |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
109 |
Amethi |
Vindhya-GAJA (JV) |
20098316 |
MAHAUNA PURAB & SARIYA PAIJAD Water Supply Scheme |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
110 |
Amethi |
Vindhya-GAJA (JV) |
20100650 |
MAHESH PUR WATER SUPPLY SCHEME |
961/ED/Phase-3/2023-24/VII Dt- 25-07-2023 |
111 |
Amethi |
Vindhya-GAJA (JV) |
20102399 |
MAHMADPUR WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
112 |
Amethi |
Vindhya-GAJA (JV) |
20094282 |
MAKHDUM KALAN & BHANDARA SHEKHPUR & Muhiuddin pur Water Supply Scheme |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
113 |
Amethi |
Vindhya-GAJA (JV) |
20068356 |
MANADAWA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
114 |
Amethi |
Vindhya-GAJA (JV) |
20070886 |
MANDERIKA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
115 |
Amethi |
Vindhya-GAJA (JV) |
20097507 |
MANGRA & MAVAIYA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
116 |
Amethi |
Vindhya-GAJA (JV) |
20066548 |
MANJH GAON WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
117 |
Amethi |
Vindhya-GAJA (JV) |
20068328 |
MATHA BHUSUNDA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
118 |
Amethi |
Vindhya-GAJA (JV) |
20085697 |
MATIYARI KALAN WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
119 |
Amethi |
Vindhya-GAJA (JV) |
20098330 |
Mira Mau Water Supply Scheme |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
120 |
Amethi |
Vindhya-GAJA (JV) |
20106665 |
MIRAPUR WATER SUPPLY SCHEME |
961/ED/Phase-3/2023-24/VII Dt- 25-07-2023 |
121 |
Amethi |
Vindhya-GAJA (JV) |
20068079 |
NADI & JODIL MAU & KISHUNI WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
122 |
Amethi |
Vindhya-GAJA (JV) |
20085675 |
NAINAHAH VARTALI WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
123 |
Amethi |
Vindhya-GAJA (JV) |
20098344 |
NANDAUR Water Supply scheme |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
124 |
Amethi |
Vindhya-GAJA (JV) |
20065078 |
NARAINI Water Supply Scheme |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
125 |
Amethi |
Vindhya-GAJA (JV) |
20085678 |
NARAULI & ROSHANI KHURD WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
126 |
Amethi |
Vindhya-GAJA (JV) |
20068981 |
NARHARPUR WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
127 |
Amethi |
Vindhya-GAJA (JV) |
20067995 |
NEWADA KANNO WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
128 |
Amethi |
Vindhya-GAJA (JV) |
20085670 |
NEWADA KISUNPUR GARH WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
129 |
Amethi |
Vindhya-GAJA (JV) |
20067969 |
NIHAL GARH SAIDA PATTI WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
130 |
Amethi |
Vindhya-GAJA (JV) |
20066603 |
PALI WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
131 |
Amethi |
Vindhya-GAJA (JV) |
20085687 |
PANDIRI WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
132 |
Amethi |
Vindhya-GAJA (JV) |
20071083 |
PANHAUNA & RAMGANJ WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
133 |
Amethi |
Vindhya-GAJA (JV) |
20065222 |
Paniyar Water Supply Scheme |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
134 |
Amethi |
Vindhya-GAJA (JV) |
20068036 |
PARASRAM WATER SUPLLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
135 |
Amethi |
Vindhya-GAJA (JV) |
20068382 |
PARSOYIA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
136 |
Amethi |
Vindhya-GAJA (JV) |
20067986 |
PASCHCHIM TILOI & CHINGAHI WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
137 |
Amethi |
Vindhya-GAJA (JV) |
20066644 |
PUNN PUR WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
138 |
Amethi |
Vindhya-GAJA (JV) |
20098338 |
PURAB DWARA Water Supply Scheme |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
139 |
Amethi |
Vindhya-GAJA (JV) |
20085699 |
PURAB GAON WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
140 |
Amethi |
Vindhya-GAJA (JV) |
20085666 |
PURAB GAURA & KATARI WATER SUPPLY SCHEME |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
141 |
Amethi |
Vindhya-GAJA (JV) |
20100642 |
PURE EBADULLA WATER SUPPLY SCHEME |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
142 |
Amethi |
Vindhya-GAJA (JV) |
20098321 |
PURE MIHIB SHAH Water Supply Scheme |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
143 |
Amethi |
Vindhya-GAJA (JV) |
20067991 |
PURE PAHAL WAN WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
144 |
Amethi |
Vindhya-GAJA (JV) |
20101947 |
PURE SOHRAT SINGH WATER SUPPLY SCHEME |
961/ED/Phase-3/2023-24/VII Dt- 25-07-2023 |
145 |
Amethi |
Vindhya-GAJA (JV) |
20085665 |
PUREPARWANI & JAKHASHIVPUR & NIZAMUDDINPUR WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
146 |
Amethi |
Vindhya-GAJA (JV) |
20098329 |
RADHI PUR Water Supply Scheme |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
147 |
Amethi |
Vindhya-GAJA (JV) |
20085668 |
RAM GARH & GADEHRI WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
148 |
Amethi |
Vindhya-GAJA (JV) |
20098326 |
RAMCHANDRA PUR Water Supply Scheme |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
149 |
Amethi |
Vindhya-GAJA (JV) |
20065715 |
RAMPUR NAURANGABAD WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
150 |
Amethi |
Vindhya-GAJA (JV) |
20101979 |
RAMSHAHNAUPUR WATER SUPPLY SCHEME |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
151 |
Amethi |
Vindhya-GAJA (JV) |
20085664 |
RAMSHAHPUR & CHANDAUKI WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
152 |
Amethi |
Vindhya-GAJA (JV) |
20094171 |
RASULPUR & URWA Water Supply Scheme |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
153 |
Amethi |
Vindhya-GAJA (JV) |
20065189 |
REBHA & MAHSO WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
154 |
Amethi |
Vindhya-GAJA (JV) |
20100651 |
RESI WATER SUPPLY SCHEME |
961/ED/Phase-3/2023-24/VII Dt- 25-07-2023 |
155 |
Amethi |
Vindhya-GAJA (JV) |
20066492 |
RUDAULI & BARNA MUBARAKPUR WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
156 |
Amethi |
Vindhya-GAJA (JV) |
20085696 |
SAITHA WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
157 |
Amethi |
Vindhya-GAJA (JV) |
20085684 |
SAMBHAWA WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
158 |
Amethi |
Vindhya-GAJA (JV) |
20068050 |
SANAHA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
159 |
Amethi |
Vindhya-GAJA (JV) |
20068296 |
SANGAPUR & DAHIYWAN WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
160 |
Amethi |
Vindhya-GAJA (JV) |
20068350 |
SANGRAMPUR & GOOJIPUR WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
161 |
Amethi |
Vindhya-GAJA (JV) |
20070873 |
SANSARPUR WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
162 |
Amethi |
Vindhya-GAJA (JV) |
20085682 |
SARAI BARWAND SINGH & BEHTA WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
163 |
Amethi |
Vindhya-GAJA (JV) |
20067964 |
SARAIYA BADGAON & MISHRAULI WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
164 |
Amethi |
Vindhya-GAJA (JV) |
20065217 |
SARESAR, SIRYARI WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
165 |
Amethi |
Vindhya-GAJA (JV) |
20070856 |
SARIYA DUBAAN WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
166 |
Amethi |
Vindhya-GAJA (JV) |
20101976 |
SARRIYA KANNO WATER SUPPLY SCHEME |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
167 |
Amethi |
Vindhya-GAJA (JV) |
20098328 |
SARRIYA Water Supply Scheme |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
168 |
Amethi |
Vindhya-GAJA (JV) |
20071127 |
SARWANPUR & KEHRAUNA & KATRAPHOOL KUNWAR WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
169 |
Amethi |
Vindhya-GAJA (JV) |
20066500 |
SAUNA WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
170 |
Amethi |
Vindhya-GAJA (JV) |
20066503 |
SEMRAUTA VILLAGE WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
171 |
Amethi |
Vindhya-GAJA (JV) |
20070869 |
SENDURWA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
172 |
Amethi |
Vindhya-GAJA (JV) |
20068011 |
SHAHPUR & BALBHADDARPUR WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
173 |
Amethi |
Vindhya-GAJA (JV) |
20068223 |
SHAHPUR RESH & TIKRI VILLAGE WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
174 |
Amethi |
Vindhya-GAJA (JV) |
20098341 |
SHUKUL PUR Water Supply Scheme |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
175 |
Amethi |
Vindhya-GAJA (JV) |
20065071 |
SINGHPUR WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
176 |
Amethi |
Vindhya-GAJA (JV) |
20101943 |
SINGTHEE WATER SUPPLY SCHEME |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
177 |
Amethi |
Vindhya-GAJA (JV) |
20065731 |
SONARI KALAN & AMTAHI WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
178 |
Amethi |
Vindhya-GAJA (JV) |
20067972 |
SONARI KANOO WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
179 |
Amethi |
Vindhya-GAJA (JV) |
20068027 |
SONARI WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
180 |
Amethi |
Vindhya-GAJA (JV) |
20068288 |
SURATGARH &AJABGARH WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
181 |
Amethi |
Vindhya-GAJA (JV) |
20094163 |
TANDA & BECHU GARH Water Supply Scheme |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
182 |
Amethi |
Vindhya-GAJA (JV) |
20068083 |
TARA PUR WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
183 |
Amethi |
Vindhya-GAJA (JV) |
20066593 |
TENDUA WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
184 |
Amethi |
Vindhya-GAJA (JV) |
20098333 |
TENWASI Water Supply Scheme |
961/ED/Phase-3/2023-24/VII Dt- 25-07-2023 |
185 |
Amethi |
Vindhya-GAJA (JV) |
20085700 |
THENGHA WATER SUPPLY SCHEME |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
186 |
Amethi |
Vindhya-GAJA (JV) |
20098346 |
Tikariya Water Supply Scheme |
931/ED/Phase-3/2023-24/VI Dt- 04-07-2023 |
187 |
Amethi |
Vindhya-GAJA (JV) |
20065208 |
TRILOK PUR, VASDEVPUR Water Supply Scheme |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |
188 |
Amethi |
Vindhya-GAJA (JV) |
20094266 |
UMARPUR GANPATTI & NUAWAN Water Supply Scheme |
796/ED/Phase-3/2023-24/V Dt- 29-04-2023 |
189 |
Amethi |
Vindhya-GAJA (JV) |
20066580 |
URER MAU WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
190 |
Amethi |
Vindhya-GAJA (JV) |
20068046 |
USKA WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
191 |
Amethi |
Vindhya-GAJA (JV) |
20068460 |
UTELWA & KAMRAULI WATER SUPPLY SCHEME |
626/ED/PHASE-3/2022-23/III Dt-23-03-2023 |
192 |
Amethi |
Vindhya-GAJA (JV) |
20066641 |
UTTARGAON WATER SUPPLY SCHEME |
288/ED/Phase-3/2022-23/I Dt - 06-01-2023 |
193 |
Amethi |
Vindhya-GAJA (JV) |
20065148 |
VISHAMBHER PATTI &SATHIN &MUHIUDDINPUR (I1-HEB.) WATER SUPPLY SCHEME |
427/ED/Phase-3/2022-23/II Dt-17-02-2023 |