Data Received from Automation, Organized Time-Wise
Sno. Scheme Id Scheme Name Date Pump Status Automation Auto Mode Overall Production water () Today Water Production () Ground Water Depth(AVG)() Pump Running Hour() Solar Mode Pump Run Solar Mode Today() First Chlorine Tank Second Chlorine Tank Chlorine() OHT Level () Pressure Turbidity() Voltage RN
1 20087250 UPATAPAR BASGAON & MATHIYA ZAPTI MAPHI WATER SUPPLY SCHEME 20-Jul-2026 11:10:00 AM Off Auto 0.00 0.00 15.00 0.00 On 0.00 Empty Empty 0.00 3.12 0.00 0.00 0.00