The Most Recent Data Received from Automation, Organized Date-Wise
Sno. Scheme Id Scheme Name Date Pump Status Automation Auto Mode Water Demand () Water Supply () Overall Production water () Ground Water Depth(AVG)() Pump Running Hour() Solar mode Pump run solar mode today() First Chlorine Tank Second Chlorine Tank Chlorine() OHT High Level () OHT Low Level () OHT Level () Pressure Turbidity() Voltage RN
1 20025874 Pakari Single Village Water Supply Scheme 12-Jun-2026 On Manual 110.00 37.21 37.21 1.66 0h:0m Off 0h:0m Full Full 0.00 1.96 1.62 0.48
2 20025874 Pakari Single Village Water Supply Scheme 11-Jun-2026 On Manual 110.00 33.21 33.21 164.80 0h:0m Off 0h:0m Full Full 0.00 3.57 1.04 0.48
3 20025874 Pakari Single Village Water Supply Scheme 02-Jun-2026 On Manual 110.00 22.60 22.60 5.90 0h:0m Off 0h:0m Full Full 0.00 2.37 1.46 0.49
4 20025874 Pakari Single Village Water Supply Scheme 01-Jun-2026 Off Auto 110.00 0.00 0.00 164.80 0h:0m Off 0h:0m Full Full 0.00 3.57 0.00 0.00