The Most Recent Data Received from Automation, Organized Date-Wise
Sno. Scheme Id Scheme Name Date Pump Status Automation Auto Mode Water Demand () Water Supply () Overall Production water () Ground Water Depth(AVG)() Pump Running Hour() Solar mode Pump run solar mode today() First Chlorine Tank Second Chlorine Tank Chlorine() OHT High Level () OHT Low Level () OHT Level () Pressure Turbidity() Voltage RN
1 20092702 minapur 21-Nov-2025 Off Manual 84.00 65.72 24267.91 22.36 2h:30m On 12h:0m Full Full 0.28 4.27 0.30 2.95 0.00 0.00 0.00