| 1 | 8361251 | Baijpur | 8361251/01 | HLS , Chlorine Analyzer , Turbidity Analyzer and inlet flow meter, Pressure Transmitter are showing false reading and automation system has been installed but calibration has not been done. will be rectified/calibrated till 16.09.2025 | Data is In-Correct | 16-09-2025 11:27 AM | 04-09-2025 11:27 AM |
| 8361251/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 30-09-2025 10:45 AM | 18-09-2025 10:45 AM | |||
| 8361251/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 13-10-2025 09:01 AM | 03-10-2025 01:58 PM | |||
| 8361251/01 | All equipment actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 25-10-2025 09:05 AM | 15-10-2025 03:06 PM | |||
| 8361251/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 10-11-2025 09:38 AM | 28-10-2025 03:38 PM | |||
| 2 | 20021236 | Bangarh Pipri Water Supply Scheme | 20021236/01 | HLS , Chlorine Analyzer , Turbidity Analyzer and inlet flow meter, Pressure Transmitter are showing false reading and automation system has been installed but calibration has not been done. will be rectified/calibrated till 16.09.2025 | Data is In-Correct | 16-09-2025 10:30 AM | 04-09-2025 11:31 AM |
| 20021236/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 30-09-2025 09:48 AM | 18-09-2025 10:49 AM | |||
| 20021236/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 13-10-2025 10:01 AM | 03-10-2025 01:59 PM | |||
| 20021236/01 | All equipment actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 25-10-2025 09:48 AM | 15-10-2025 03:09 PM | |||
| 20021236/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 10-11-2025 10:38 AM | 28-10-2025 03:39 PM | |||
| 3 | 20069280 | Banse Dila Water Supply | 20069280/01 | HLS , Chlorine Analyzer , Turbidity Analyzer and inlet flow meter, Pressure Transmitter are showing false reading and automation system has been installed but calibration has not been done. will be rectified/calibrated till 16.09.2025 | Data is In-Correct | 16-09-2025 11:36 AM | 04-09-2025 12:36 PM |
| 20069280/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 30-09-2025 11:04 AM | 18-09-2025 10:53 AM | |||
| 20069280/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 13-10-2025 11:00 AM | 03-10-2025 02:00 PM | |||
| 20069280/01 | All equipment actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 25-10-2025 10:10 AM | 15-10-2025 03:11 PM | |||
| 20069280/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 10-11-2025 11:39 AM | 28-10-2025 03:39 PM | |||
| 4 | 20016390 | Chulhabhari water supply scheme | 20016390/01 | HLS , Chlorine Analyzer , Turbidity Analyzer and inlet flow meter, Pressure Transmitter are showing false reading and automation system has been installed but calibration has not been done. will be rectified/calibrated till 15.09.2025 | Data is In-Correct | 15-09-2025 12:37 PM | 04-09-2025 12:37 PM |
| 20016390/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 30-09-2025 01:54 PM | 18-09-2025 10:55 AM | |||
| 20016390/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 13-10-2025 11:49 AM | 03-10-2025 02:01 PM | |||
| 20016390/01 | All equipment actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 25-10-2025 10:14 AM | 15-10-2025 03:12 PM | |||
| 20016390/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 10-11-2025 11:40 AM | 28-10-2025 03:40 PM | |||
| 5 | 20021201 | Dulhin Dih Water Supply Scheme | 20021201/01 | HLS , Chlorine Analyzer , Turbidity Analyzer and inlet flow meter, Pressure Transmitter are showing false reading and automation system has been installed but calibration has not been done. will be rectified/calibrated till 16.09.2025 | Data is In-Correct | 16-09-2025 12:47 PM | 04-09-2025 12:48 PM |
| 20021201/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 30-09-2025 02:59 PM | 18-09-2025 10:59 AM | |||
| 20021201/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 13-10-2025 02:05 PM | 03-10-2025 02:06 PM | |||
| 20021201/01 | All equipment actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 25-10-2025 10:25 AM | 15-10-2025 03:14 PM | |||
| 20021201/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 10-11-2025 12:41 PM | 28-10-2025 03:41 PM | |||
| 6 | 20019344 | Jamuni Kalan water supply scheme | 20019344/01 | HLS , Chlorine Analyzer , Turbidity Analyzer and inlet flow meter, Pressure Transmitter are showing false reading and automation system has been installed but calibration has not been done. will be rectified/calibrated till 15.09.2025 | Data is In-Correct | 15-09-2025 01:49 PM | 04-09-2025 12:49 PM |
| 20019344/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 29-09-2025 11:00 AM | 18-09-2025 11:01 AM | |||
| 20019344/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 10-10-2025 09:18 AM | 30-09-2025 02:18 PM | |||
| 20019344/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 21-10-2025 09:49 AM | 13-10-2025 04:49 PM | |||
| 20019344/01 | All equipment actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 25-10-2025 10:58 AM | 15-10-2025 03:16 PM | |||
| 20019344/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 10-11-2025 01:42 PM | 28-10-2025 03:42 PM | |||
| 7 | 20016392 | Luchuiya water supply scheme | 20016392/01 | HLS , Chlorine Analyzer , Turbidity Analyzer and inlet flow meter, Pressure Transmitter are showing false reading and automation system has been installed but calibration has not been done. will be rectified/calibrated till 16.09.2025 | Data is In-Correct | 16-09-2025 12:53 PM | 04-09-2025 12:53 PM |
| 20016392/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 29-09-2025 01:02 PM | 18-09-2025 11:02 AM | |||
| 20016392/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 10-10-2025 10:18 AM | 30-09-2025 02:19 PM | |||
| 20016392/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 21-10-2025 10:51 AM | 13-10-2025 04:51 PM | |||
| 20016392/01 | All equipment actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 25-10-2025 11:23 AM | 15-10-2025 03:18 PM | |||
| 20016392/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 10-11-2025 01:42 PM | 28-10-2025 03:43 PM | |||
| 8 | 20024835 | Orajhar Water Supply Scheme | 20024835/01 | All equipment's actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 13-10-2025 02:07 PM | 03-10-2025 02:07 PM |
| 20024835/01 | All equipment actual data not shown on portal so that automation integration verification is pending. | Data is In-Correct | 25-10-2025 11:31 AM | 15-10-2025 03:31 PM | |||