All 6 nos. OHT is now showing connected to SCADA integration portal that was in problem mode. all data is visible and verified by UNIPRO .
2 nos. OHTs are not showing connected on SCADA portal because of technical issue so data is not punched and issue is resolved till tomorrow and 3 OHTs are showing less then 75% water supply due to this issue. Water supply is resumed tomorrow as per by UNIPRO PM.
01 no OHT is shown less 75% and 07 no of OHT is shown more then 150% but overall water supply shown 169% . All OHTs and CWRs are connected to SACDA.