All 6 nos. OHT is now showing connected to SCADA integration portal that was in problem mode. all data is visible and verified by UNIPRO .
2 nos. OHTs are not showing connected on SCADA portal because of technical issue so data is not punched and issue is resolved till tomorrow and 3 OHTs are showing less then 75% water supply due to this issue. Water supply is resumed tomorrow as per by UNIPRO PM.
3 no. OHTs are shown less then 75&% water supply, one OHT is shown more then 150% water supply yesterday and overall water supply shown 122.58% because of calibration issue.