| S.No. | District | Agency | All Complains | Pending Complains | Close Complains |
|---|---|---|---|---|---|
| Total | 71897 | 17694 | 54203 | ||
| 1 | Agra | Megha | 638 | 136 | 502 |
| U.P.Jal Nigam | 169 | 40 | 129 | ||
| Total | 807 | 176 | 631 | ||
| 2 | Aligarh | ION EXCHANGE | 232 | 17 | 215 |
| JMC - Lakshmi (JV) | 142 | 3 | 139 | ||
| U.P.Jal Nigam | 59 | 0 | 59 | ||
| PNC-SPML-JV | 644 | 27 | 617 | ||
| Total | 1077 | 47 | 1030 | ||
| 3 | Ambedkar Nagar | Welspun Kaveri Infraprojects JV | 210 | 85 | 125 |
| U.P.Jal Nigam | 64 | 38 | 26 | ||
| Vindhya-GAJA (JV) | 1263 | 419 | 844 | ||
| Total | 1537 | 542 | 995 | ||
| 4 | Amethi | Vindhya-GAJA (JV) | 461 | 83 | 378 |
| U.P.Jal Nigam | 61 | 15 | 46 | ||
| Gayatri Projects LTD | 378 | 83 | 295 | ||
| Welspun Kaveri Infraprojects JV | 208 | 37 | 171 | ||
| Total | 1108 | 218 | 890 | ||
| 5 | Amroha | LC INFRA | 1 | 1 | 0 |
| U.P.Jal Nigam | 36 | 4 | 32 | ||
| SPML Infra | 154 | 8 | 146 | ||
| OMIL-JWIL (JV) | 342 | 99 | 243 | ||
| Total | 533 | 112 | 421 | ||
| 6 | Auraiya | GVPR | 537 | 244 | 293 |
| U.P.Jal Nigam | 57 | 14 | 43 | ||
| Indian Hume Pipe | 119 | 14 | 105 | ||
| Total | 713 | 272 | 441 | ||
| 7 | Ayodhya | UNIVERSAL MEP | 466 | 37 | 429 |
| Vindhya-GAJA (JV) | 70 | 12 | 58 | ||
| VSA | 411 | 196 | 215 | ||
| Gayatri Projects LTD | 37 | 15 | 22 | ||
| U.P.Jal Nigam | 41 | 10 | 31 | ||
| Total | 1025 | 270 | 755 | ||
| 8 | Azamgarh | VIKRAN-VPRPL (JV) | 86 | 55 | 31 |
| M/s Sudhakara Infratech Pvt. Ltd | 405 | 98 | 307 | ||
| GA INFRA - BABA (JV) | 146 | 34 | 112 | ||
| LC INFRA | 370 | 136 | 234 | ||
| GAJA - SGIPL (JV) | 120 | 90 | 30 | ||
| U.P.Jal Nigam | 96 | 26 | 70 | ||
| SIEPL – BRCCPL (JV) / SKYLARK | 117 | 95 | 22 | ||
| ECO PROTECTION ENGINEER | 138 | 71 | 67 | ||
| Total | 1478 | 605 | 873 | ||
| 9 | Baghpat | LC INFRA | 287 | 75 | 212 |
| U.P.Jal Nigam | 121 | 23 | 98 | ||
| Total | 408 | 98 | 310 | ||
| 10 | Bahraich | PNC-SPML-JV | 375 | 101 | 274 |
| U.P.Jal Nigam | 248 | 87 | 161 | ||
| GA INFRA-VPL | 86 | 27 | 59 | ||
| Total | 709 | 215 | 494 | ||
| 11 | Ballia | Larsen & Toubro Ltd | 257 | 77 | 180 |
| GAJA - GAIPL JV | 197 | 56 | 141 | ||
| Eagle Infra- Sudhakara Infra JV | 108 | 31 | 77 | ||
| U.P.Jal Nigam | 140 | 45 | 95 | ||
| Total | 702 | 209 | 493 | ||
| 12 | Balrampur | Larsen & Toubro Ltd | 152 | 53 | 99 |
| U.P.Jal Nigam | 69 | 11 | 58 | ||
| Dara- Eco Protection (JV) | 299 | 90 | 209 | ||
| Total | 520 | 154 | 366 | ||
| 13 | Banda | NCC Ltd. | 1608 | 150 | 1458 |
| U.P.Jal Nigam | 304 | 87 | 217 | ||
| Larsen & Toubro Ltd | 1004 | 234 | 770 | ||
| Total | 2916 | 471 | 2445 | ||
| 14 | Barabanki | Gayatri Projects LTD | 47 | 19 | 28 |
| PNC-SPML-JV | 554 | 209 | 345 | ||
| Megha | 610 | 382 | 228 | ||
| Vindhya-GAJA (JV) | 47 | 20 | 27 | ||
| U.P.Jal Nigam | 183 | 49 | 134 | ||
| VSA | 85 | 44 | 41 | ||
| Total | 1526 | 723 | 803 | ||
| 15 | Bareilly | U.P.Jal Nigam | 43 | 3 | 40 |
| NCC Ltd. | 1298 | 246 | 1052 | ||
| Total | 1341 | 249 | 1092 | ||
| 16 | Basti | U.P.Jal Nigam | 257 | 90 | 167 |
| VSA | 115 | 22 | 93 | ||
| JAKSON - VISHVARAJ (JV) | 95 | 20 | 75 | ||
| Megha | 673 | 163 | 510 | ||
| Total | 1140 | 295 | 845 | ||
| 17 | Bijnor | Vindhya-GAJA (JV) | 857 | 162 | 695 |
| U.P.Jal Nigam | 135 | 6 | 129 | ||
| LC INFRA | 434 | 79 | 355 | ||
| Total | 1426 | 247 | 1179 | ||
| 18 | Budaun | NCC Ltd. | 2 | 1 | 1 |
| U.P.Jal Nigam | 30 | 0 | 30 | ||
| PNC-SPML-JV | 1058 | 27 | 1031 | ||
| Total | 1090 | 28 | 1062 | ||
| 19 | Bulandshahr | Power Mech Projects Ltd | 145 | 27 | 118 |
| JMC - Lakshmi (JV) | 207 | 46 | 161 | ||
| U.P.Jal Nigam | 56 | 11 | 45 | ||
| Welspun Kaveri Infraprojects JV | 159 | 30 | 129 | ||
| Total | 567 | 114 | 453 | ||
| 20 | Chandauli | ION EXCHANGE | 363 | 14 | 349 |
| HFCL- JWIL (JV) | 113 | 17 | 96 | ||
| U.P.Jal Nigam | 59 | 4 | 55 | ||
| VSA | 257 | 2 | 255 | ||
| GA INFRA - BABA (JV) | 256 | 27 | 229 | ||
| East India Udhyog- Kaveri JV | 33 | 0 | 33 | ||
| Total | 1081 | 64 | 1017 | ||
| 21 | Chitrakoot | GVPR | 120 | 13 | 107 |
| Larsen & Toubro Ltd | 539 | 116 | 423 | ||
| U.P.Jal Nigam | 186 | 68 | 118 | ||
| Total | 845 | 197 | 648 | ||
| 22 | Deoria | LC INFRA | 220 | 44 | 176 |
| Rithwik-Koya (JV) | 90 | 23 | 67 | ||
| U.P.Jal Nigam | 197 | 73 | 124 | ||
| Gayatri Projects LTD | 110 | 28 | 82 | ||
| UNIVERSAL MEP | 40 | 16 | 24 | ||
| Total | 657 | 184 | 473 | ||
| 23 | Etah | JMC - Lakshmi (JV) | 113 | 29 | 84 |
| Power Mech Projects Ltd | 317 | 67 | 250 | ||
| U.P.Jal Nigam | 65 | 27 | 38 | ||
| ION EXCHANGE | 26 | 8 | 18 | ||
| Total | 521 | 131 | 390 | ||
| 24 | Etawah | OMIL-JWIL (JV) | 267 | 109 | 158 |
| U.P.Jal Nigam | 109 | 17 | 92 | ||
| Indian Hume Pipe | 136 | 38 | 98 | ||
| Total | 512 | 164 | 348 | ||
| 25 | Farrukhabad | GVPR | 509 | 141 | 368 |
| Vindhya-GAJA (JV) | 341 | 87 | 254 | ||
| U.P.Jal Nigam | 122 | 35 | 87 | ||
| Total | 972 | 263 | 709 | ||
| 26 | Fatehpur | GA INFRA - BABA (JV) | 87 | 41 | 46 |
| U.P.Jal Nigam | 120 | 39 | 81 | ||
| Gayatri Projects LTD | 244 | 80 | 164 | ||
| Power Mech Projects Ltd | 659 | 366 | 293 | ||
| Total | 1110 | 526 | 584 | ||
| 27 | Firozabad | U.P.Jal Nigam | 68 | 0 | 68 |
| Larsen & Toubro Ltd | 281 | 16 | 265 | ||
| Total | 349 | 16 | 333 | ||
| 28 | Gautam Buddha Nagar | LC INFRA | 94 | 27 | 67 |
| U.P.Jal Nigam | 12 | 1 | 11 | ||
| Total | 106 | 28 | 78 | ||
| 29 | Ghaziabad | LC INFRA | 157 | 25 | 132 |
| U.P.Jal Nigam | 33 | 0 | 33 | ||
| Total | 190 | 25 | 165 | ||
| 30 | Ghazipur | HFCL- JWIL (JV) | 372 | 42 | 330 |
| Larsen & Toubro Ltd | 257 | 82 | 175 | ||
| VSA | 273 | 67 | 206 | ||
| U.P.Jal Nigam | 433 | 90 | 343 | ||
| Total | 1335 | 281 | 1054 | ||
| 31 | Gonda | U.P.Jal Nigam | 215 | 56 | 159 |
| KLSR - RAYS (JV) | 133 | 45 | 88 | ||
| Larsen & Toubro Ltd | 618 | 218 | 400 | ||
| Total | 966 | 319 | 647 | ||
| 32 | Gorakhpur | Rithwik-Koya (JV) | 163 | 14 | 149 |
| NCC Ltd. | 602 | 150 | 452 | ||
| U.P.Jal Nigam | 415 | 107 | 308 | ||
| Total | 1180 | 271 | 909 | ||
| 33 | Hamirpur | PNC-SPML-JV | 702 | 184 | 518 |
| U.P.Jal Nigam | 560 | 277 | 283 | ||
| JWIL | 649 | 157 | 492 | ||
| Total | 1911 | 618 | 1293 | ||
| 34 | Hapur | U.P.Jal Nigam | 86 | 1 | 85 |
| LC INFRA | 232 | 5 | 227 | ||
| Total | 318 | 6 | 312 | ||
| 35 | Hardoi | NCC Ltd. | 1681 | 177 | 1504 |
| U.P.Jal Nigam | 40 | 4 | 36 | ||
| Total | 1721 | 181 | 1540 | ||
| 36 | Hathras | ION EXCHANGE | 94 | 50 | 44 |
| BGCCPL-Ramky (JV) | 285 | 114 | 171 | ||
| U.P.Jal Nigam | 32 | 13 | 19 | ||
| Total | 411 | 177 | 234 | ||
| 37 | Jalaun | BGCCPL-Ramky (JV) | 645 | 272 | 373 |
| U.P.Jal Nigam | 164 | 26 | 138 | ||
| GVPR | 210 | 97 | 113 | ||
| Total | 1019 | 395 | 624 | ||
| 38 | Jaunpur | Welspun Kaveri Infraprojects JV | 368 | 229 | 139 |
| AFCONS | 974 | 518 | 456 | ||
| U.P.Jal Nigam | 66 | 25 | 41 | ||
| Total | 1408 | 772 | 636 | ||
| 39 | Jhansi | Indian Hume Pipe | 255 | 6 | 249 |
| U.P.Jal Nigam | 247 | 111 | 136 | ||
| Unipro | 149 | 0 | 149 | ||
| DARA ENGINEERING | 144 | 0 | 144 | ||
| NCC Ltd. | 471 | 37 | 434 | ||
| BGCCPL-Ramky (JV) | 449 | 199 | 250 | ||
| Total | 1715 | 353 | 1362 | ||
| 40 | Kannauj | VSA | 209 | 94 | 115 |
| GVPR | 471 | 80 | 391 | ||
| U.P.Jal Nigam | 179 | 74 | 105 | ||
| Total | 859 | 248 | 611 | ||
| 41 | Kanpur Dehat | Indian Hume Pipe | 326 | 25 | 301 |
| VSA | 333 | 84 | 249 | ||
| U.P.Jal Nigam | 52 | 9 | 43 | ||
| GVPR | 404 | 117 | 287 | ||
| Vindhya-GAJA (JV) | 30 | 7 | 23 | ||
| Total | 1145 | 242 | 903 | ||
| 42 | Kanpur Nagar | U.P.Jal Nigam | 125 | 2 | 123 |
| VSA | 159 | 18 | 141 | ||
| Vindhya-GAJA (JV) | 340 | 95 | 245 | ||
| Total | 624 | 115 | 509 | ||
| 43 | Kasganj | PNC-SPML-JV | 309 | 138 | 171 |
| U.P.Jal Nigam | 18 | 7 | 11 | ||
| ION EXCHANGE | 7 | 3 | 4 | ||
| Total | 334 | 148 | 186 | ||
| 44 | Kaushambi | U.P.Jal Nigam | 46 | 12 | 34 |
| GA INFRA - BABA (JV) | 383 | 126 | 257 | ||
| JMC - Lakshmi (JV) | 323 | 106 | 217 | ||
| Total | 752 | 244 | 508 | ||
| 45 | Kushi Nagar | NCC Ltd. | 536 | 241 | 295 |
| U.P.Jal Nigam | 348 | 132 | 216 | ||
| Total | 884 | 373 | 511 | ||
| 46 | Lakhimpur Kheri | NCC Ltd. | 686 | 277 | 409 |
| Vindhya-GAJA (JV) | 203 | 65 | 138 | ||
| U.P.Jal Nigam | 136 | 13 | 123 | ||
| Total | 1025 | 355 | 670 | ||
| 47 | Lalitpur | U.P.Jal Nigam | 169 | 79 | 90 |
| M/s Sudhakara Infratech Pvt. Ltd | 601 | 146 | 455 | ||
| JMC-JWIL (JV) | 488 | 96 | 392 | ||
| Brija Banco Pvt. Ltd | 43 | 17 | 26 | ||
| Banko Ganga | 35 | 3 | 32 | ||
| DARA ENGINEERING | 280 | 84 | 196 | ||
| Total | 1616 | 425 | 1191 | ||
| 48 | Lucknow | U.P.Jal Nigam | 42 | 15 | 27 |
| NCC Ltd. | 1010 | 41 | 969 | ||
| Total | 1052 | 56 | 996 | ||
| 49 | Maharajganj | U.P.Jal Nigam | 76 | 11 | 65 |
| Rithwik-Koya (JV) | 143 | 87 | 56 | ||
| JMC - Lakshmi (JV) | 125 | 60 | 65 | ||
| Total | 344 | 158 | 186 | ||
| 50 | Mahoba | Larsen & Toubro Ltd | 235 | 15 | 220 |
| SLC-SMC (JV) | 425 | 91 | 334 | ||
| JMC-JWIL (JV) | 353 | 32 | 321 | ||
| N.K. Gupta & K.B. Gupta Contractors | 97 | 16 | 81 | ||
| U.P.Jal Nigam | 94 | 5 | 89 | ||
| Total | 1204 | 159 | 1045 | ||
| 51 | Mainpuri | NCC Ltd. | 538 | 153 | 385 |
| U.P.Jal Nigam | 14 | 6 | 8 | ||
| Total | 552 | 159 | 393 | ||
| 52 | Mathura | U.P.Jal Nigam | 58 | 0 | 58 |
| NCC-APCO JV | 289 | 51 | 238 | ||
| Total | 347 | 51 | 296 | ||
| 53 | Mau | GA INFRA-VPL | 252 | 21 | 231 |
| KLSR - RAYS (JV) | 92 | 29 | 63 | ||
| U.P.Jal Nigam | 118 | 2 | 116 | ||
| LC INFRA | 220 | 1 | 219 | ||
| Total | 682 | 53 | 629 | ||
| 54 | Meerut | Power Mech Projects Ltd | 607 | 152 | 455 |
| U.P.Jal Nigam | 92 | 10 | 82 | ||
| Total | 699 | 162 | 537 | ||
| 55 | Mirzapur | NCC Ltd. | 463 | 22 | 441 |
| Ramky baba | 437 | 109 | 328 | ||
| Multiurban | 45 | 2 | 43 | ||
| GVPR | 156 | 20 | 136 | ||
| U.P.Jal Nigam | 176 | 65 | 111 | ||
| Megha | 583 | 22 | 561 | ||
| GA INFRA | 863 | 101 | 762 | ||
| Total | 2723 | 341 | 2382 | ||
| 56 | Moradabad | NKG-PRIMUS (JV) | 427 | 124 | 303 |
| LC INFRA | 274 | 79 | 195 | ||
| U.P.Jal Nigam | 37 | 0 | 37 | ||
| Total | 738 | 203 | 535 | ||
| 57 | Muzaffarnagar | NKG-PRIMUS (JV) | 97 | 29 | 68 |
| U.P.Jal Nigam | 204 | 6 | 198 | ||
| Gayatri Projects LTD | 79 | 7 | 72 | ||
| JMC - Lakshmi (JV) | 325 | 45 | 280 | ||
| Total | 705 | 87 | 618 | ||
| 58 | Pilibhit | U.P.Jal Nigam | 60 | 7 | 53 |
| VISHVARAJ | 234 | 4 | 230 | ||
| PNC-SPML-JV | 309 | 96 | 213 | ||
| Total | 603 | 107 | 496 | ||
| 59 | Pratapgarh | JMC - Lakshmi (JV) | 123 | 47 | 76 |
| Power Mech Projects Ltd | 215 | 106 | 109 | ||
| U.P.Jal Nigam | 98 | 35 | 63 | ||
| Total | 436 | 188 | 248 | ||
| 60 | Prayagraj | VPRPL | 109 | 18 | 91 |
| U.P.Jal Nigam | 596 | 235 | 361 | ||
| GAJA - GAIPL JV | 207 | 40 | 167 | ||
| Larsen & Toubro Ltd | 1201 | 74 | 1127 | ||
| Total | 2113 | 367 | 1746 | ||
| 61 | Raebareli | Vindhya-GAJA (JV) | 258 | 162 | 96 |
| U.P.Jal Nigam | 294 | 187 | 107 | ||
| NCC Ltd. | 485 | 202 | 283 | ||
| Total | 1037 | 551 | 486 | ||
| 62 | Rampur | SPML Infra | 158 | 9 | 149 |
| OMIL-JWIL (JV) | 208 | 24 | 184 | ||
| U.P.Jal Nigam | 50 | 5 | 45 | ||
| LC INFRA | 6 | 2 | 4 | ||
| NKG-PRIMUS (JV) | 116 | 39 | 77 | ||
| Total | 538 | 79 | 459 | ||
| 63 | Saharanpur | GA INFRA - BABA (JV) | 208 | 42 | 166 |
| U.P.Jal Nigam | 121 | 19 | 102 | ||
| Gayatri Projects LTD | 130 | 55 | 75 | ||
| NKG-PRIMUS (JV) | 222 | 54 | 168 | ||
| Total | 681 | 170 | 511 | ||
| 64 | Sambhal | SPML Infra | 193 | 48 | 145 |
| LC INFRA | 27 | 19 | 8 | ||
| U.P.Jal Nigam | 27 | 4 | 23 | ||
| NKG-PRIMUS (JV) | 376 | 157 | 219 | ||
| Total | 623 | 228 | 395 | ||
| 65 | Sant Kabeer Nagar | JAKSON - VISHVARAJ (JV) | 275 | 204 | 71 |
| Megha | 174 | 32 | 142 | ||
| U.P.Jal Nigam | 138 | 49 | 89 | ||
| Total | 587 | 285 | 302 | ||
| 66 | Sant Ravidas Nagar | U.P.Jal Nigam | 58 | 13 | 45 |
| Welspun Kaveri Infraprojects JV | 543 | 161 | 382 | ||
| GA INFRA - BABA (JV) | 283 | 105 | 178 | ||
| Total | 884 | 279 | 605 | ||
| 67 | Shahjahanpur | NCC Ltd. | 2027 | 292 | 1735 |
| U.P.Jal Nigam | 29 | 2 | 27 | ||
| Total | 2056 | 294 | 1762 | ||
| 68 | Shamli | U.P.Jal Nigam | 118 | 34 | 84 |
| Gayatri Projects LTD | 64 | 25 | 39 | ||
| JMC - Lakshmi (JV) | 288 | 102 | 186 | ||
| Total | 470 | 161 | 309 | ||
| 69 | Shravasti | U.P.Jal Nigam | 25 | 1 | 24 |
| Larsen & Toubro Ltd | 139 | 48 | 91 | ||
| GA INFRA-VPL | 105 | 81 | 24 | ||
| Total | 269 | 130 | 139 | ||
| 70 | Siddharth Nagar | JAKSON - VISHVARAJ (JV) | 110 | 46 | 64 |
| Megha | 81 | 23 | 58 | ||
| VSA | 36 | 6 | 30 | ||
| U.P.Jal Nigam | 82 | 3 | 79 | ||
| Total | 309 | 78 | 231 | ||
| 71 | Sitapur | Larsen & Toubro Ltd | 476 | 35 | 441 |
| NCC Ltd. | 1204 | 217 | 987 | ||
| U.P.Jal Nigam | 73 | 12 | 61 | ||
| Total | 1753 | 264 | 1489 | ||
| 72 | Sonbhadra | U.P.Jal Nigam | 94 | 39 | 55 |
| GVPR | 297 | 38 | 259 | ||
| Larsen & Toubro Ltd | 144 | 56 | 88 | ||
| VPRPL | 432 | 78 | 354 | ||
| Jain Const. | 25 | 11 | 14 | ||
| NCC Ltd. | 477 | 13 | 464 | ||
| Total | 1469 | 235 | 1234 | ||
| 73 | Sultanpur | Vindhya-GAJA (JV) | 467 | 220 | 247 |
| Gayatri Projects LTD | 35 | 8 | 27 | ||
| U.P.Jal Nigam | 72 | 17 | 55 | ||
| UNIVERSAL MEP | 238 | 94 | 144 | ||
| Total | 812 | 339 | 473 | ||
| 74 | Unnao | U.P.Jal Nigam | 34 | 2 | 32 |
| Megha | 419 | 1 | 418 | ||
| Total | 453 | 3 | 450 | ||
| 75 | Varanasi | Larsen & Toubro Ltd | 1345 | 293 | 1052 |
| U.P.Jal Nigam | 224 | 48 | 176 | ||
| Total | 1569 | 341 | 1228 | ||