| S.No. | District | Agency | All Complains | Pending Complains | Close Complains |
|---|---|---|---|---|---|
| Total | 71404 | 18193 | 53211 | ||
| 1 | Agra | Megha | 633 | 141 | 492 |
| U.P.Jal Nigam | 169 | 57 | 112 | ||
| Total | 802 | 198 | 604 | ||
| 2 | Aligarh | ION EXCHANGE | 232 | 21 | 211 |
| JMC - Lakshmi (JV) | 141 | 3 | 138 | ||
| U.P.Jal Nigam | 59 | 2 | 57 | ||
| PNC-SPML-JV | 639 | 23 | 616 | ||
| Total | 1071 | 49 | 1022 | ||
| 3 | Ambedkar Nagar | Welspun Kaveri Infraprojects JV | 206 | 81 | 125 |
| U.P.Jal Nigam | 64 | 38 | 26 | ||
| Vindhya-GAJA (JV) | 1243 | 399 | 844 | ||
| Total | 1513 | 518 | 995 | ||
| 4 | Amethi | Vindhya-GAJA (JV) | 460 | 82 | 378 |
| U.P.Jal Nigam | 60 | 14 | 46 | ||
| Gayatri Projects LTD | 375 | 80 | 295 | ||
| Welspun Kaveri Infraprojects JV | 206 | 35 | 171 | ||
| Total | 1101 | 211 | 890 | ||
| 5 | Amroha | LC INFRA | 1 | 1 | 0 |
| U.P.Jal Nigam | 35 | 3 | 32 | ||
| SPML Infra | 154 | 9 | 145 | ||
| OMIL-JWIL (JV) | 342 | 99 | 243 | ||
| Total | 532 | 112 | 420 | ||
| 6 | Auraiya | GVPR | 535 | 242 | 293 |
| U.P.Jal Nigam | 57 | 14 | 43 | ||
| Indian Hume Pipe | 119 | 14 | 105 | ||
| Total | 711 | 270 | 441 | ||
| 7 | Ayodhya | UNIVERSAL MEP | 466 | 38 | 428 |
| Vindhya-GAJA (JV) | 70 | 42 | 28 | ||
| VSA | 409 | 194 | 215 | ||
| Gayatri Projects LTD | 37 | 15 | 22 | ||
| U.P.Jal Nigam | 41 | 10 | 31 | ||
| Total | 1023 | 299 | 724 | ||
| 8 | Azamgarh | VIKRAN-VPRPL (JV) | 86 | 56 | 30 |
| M/s Sudhakara Infratech Pvt. Ltd | 404 | 100 | 304 | ||
| GA INFRA - BABA (JV) | 144 | 32 | 112 | ||
| LC INFRA | 368 | 138 | 230 | ||
| GAJA - SGIPL (JV) | 120 | 90 | 30 | ||
| U.P.Jal Nigam | 96 | 26 | 70 | ||
| SIEPL – BRCCPL (JV) / SKYLARK | 115 | 93 | 22 | ||
| ECO PROTECTION ENGINEER | 136 | 69 | 67 | ||
| Total | 1469 | 604 | 865 | ||
| 9 | Baghpat | LC INFRA | 285 | 73 | 212 |
| U.P.Jal Nigam | 121 | 23 | 98 | ||
| Total | 406 | 96 | 310 | ||
| 10 | Bahraich | PNC-SPML-JV | 373 | 103 | 270 |
| U.P.Jal Nigam | 247 | 86 | 161 | ||
| GA INFRA-VPL | 86 | 27 | 59 | ||
| Total | 706 | 216 | 490 | ||
| 11 | Ballia | Larsen & Toubro Ltd | 257 | 77 | 180 |
| GAJA - GAIPL JV | 197 | 56 | 141 | ||
| Eagle Infra- Sudhakara Infra JV | 108 | 31 | 77 | ||
| U.P.Jal Nigam | 140 | 45 | 95 | ||
| Total | 702 | 209 | 493 | ||
| 12 | Balrampur | Larsen & Toubro Ltd | 152 | 53 | 99 |
| Dara- Eco Protection (JV) | 299 | 90 | 209 | ||
| U.P.Jal Nigam | 69 | 11 | 58 | ||
| Total | 520 | 154 | 366 | ||
| 13 | Banda | NCC Ltd. | 1592 | 148 | 1444 |
| U.P.Jal Nigam | 301 | 91 | 210 | ||
| Larsen & Toubro Ltd | 984 | 215 | 769 | ||
| Total | 2877 | 454 | 2423 | ||
| 14 | Barabanki | Gayatri Projects LTD | 46 | 18 | 28 |
| PNC-SPML-JV | 551 | 221 | 330 | ||
| Megha | 606 | 384 | 222 | ||
| Vindhya-GAJA (JV) | 46 | 20 | 26 | ||
| U.P.Jal Nigam | 182 | 56 | 126 | ||
| VSA | 85 | 44 | 41 | ||
| Total | 1516 | 743 | 773 | ||
| 15 | Bareilly | U.P.Jal Nigam | 43 | 3 | 40 |
| NCC Ltd. | 1293 | 256 | 1037 | ||
| Total | 1336 | 259 | 1077 | ||
| 16 | Basti | U.P.Jal Nigam | 257 | 90 | 167 |
| VSA | 115 | 22 | 93 | ||
| JAKSON - VISHVARAJ (JV) | 95 | 20 | 75 | ||
| Megha | 671 | 161 | 510 | ||
| Total | 1138 | 293 | 845 | ||
| 17 | Bijnor | Vindhya-GAJA (JV) | 855 | 162 | 693 |
| U.P.Jal Nigam | 134 | 5 | 129 | ||
| LC INFRA | 431 | 76 | 355 | ||
| Total | 1420 | 243 | 1177 | ||
| 18 | Budaun | NCC Ltd. | 2 | 1 | 1 |
| U.P.Jal Nigam | 30 | 0 | 30 | ||
| PNC-SPML-JV | 1055 | 27 | 1028 | ||
| Total | 1087 | 28 | 1059 | ||
| 19 | Bulandshahr | Power Mech Projects Ltd | 143 | 25 | 118 |
| JMC - Lakshmi (JV) | 207 | 46 | 161 | ||
| U.P.Jal Nigam | 56 | 11 | 45 | ||
| Welspun Kaveri Infraprojects JV | 159 | 30 | 129 | ||
| Total | 565 | 112 | 453 | ||
| 20 | Chandauli | ION EXCHANGE | 361 | 12 | 349 |
| HFCL- JWIL (JV) | 113 | 17 | 96 | ||
| U.P.Jal Nigam | 59 | 4 | 55 | ||
| VSA | 257 | 6 | 251 | ||
| GA INFRA - BABA (JV) | 256 | 27 | 229 | ||
| East India Udhyog- Kaveri JV | 33 | 0 | 33 | ||
| Total | 1079 | 66 | 1013 | ||
| 21 | Chitrakoot | GVPR | 119 | 20 | 99 |
| Larsen & Toubro Ltd | 530 | 108 | 422 | ||
| U.P.Jal Nigam | 184 | 69 | 115 | ||
| Total | 833 | 197 | 636 | ||
| 22 | Deoria | LC INFRA | 217 | 41 | 176 |
| Rithwik-Koya (JV) | 89 | 22 | 67 | ||
| U.P.Jal Nigam | 196 | 72 | 124 | ||
| Gayatri Projects LTD | 109 | 27 | 82 | ||
| UNIVERSAL MEP | 39 | 15 | 24 | ||
| Total | 650 | 177 | 473 | ||
| 23 | Etah | JMC - Lakshmi (JV) | 111 | 27 | 84 |
| Power Mech Projects Ltd | 317 | 67 | 250 | ||
| U.P.Jal Nigam | 65 | 27 | 38 | ||
| ION EXCHANGE | 25 | 7 | 18 | ||
| Total | 518 | 128 | 390 | ||
| 24 | Etawah | OMIL-JWIL (JV) | 265 | 107 | 158 |
| U.P.Jal Nigam | 109 | 17 | 92 | ||
| Indian Hume Pipe | 135 | 37 | 98 | ||
| Total | 509 | 161 | 348 | ||
| 25 | Farrukhabad | GVPR | 500 | 132 | 368 |
| Vindhya-GAJA (JV) | 337 | 83 | 254 | ||
| U.P.Jal Nigam | 122 | 35 | 87 | ||
| Total | 959 | 250 | 709 | ||
| 26 | Fatehpur | GA INFRA - BABA (JV) | 87 | 41 | 46 |
| U.P.Jal Nigam | 119 | 38 | 81 | ||
| Gayatri Projects LTD | 243 | 79 | 164 | ||
| Power Mech Projects Ltd | 657 | 364 | 293 | ||
| Total | 1106 | 522 | 584 | ||
| 27 | Firozabad | U.P.Jal Nigam | 68 | 0 | 68 |
| Larsen & Toubro Ltd | 278 | 13 | 265 | ||
| Total | 346 | 13 | 333 | ||
| 28 | Gautam Buddha Nagar | LC INFRA | 94 | 27 | 67 |
| U.P.Jal Nigam | 12 | 1 | 11 | ||
| Total | 106 | 28 | 78 | ||
| 29 | Ghaziabad | LC INFRA | 157 | 32 | 125 |
| U.P.Jal Nigam | 33 | 0 | 33 | ||
| Total | 190 | 32 | 158 | ||
| 30 | Ghazipur | HFCL- JWIL (JV) | 372 | 45 | 327 |
| Larsen & Toubro Ltd | 254 | 79 | 175 | ||
| VSA | 273 | 75 | 198 | ||
| U.P.Jal Nigam | 428 | 92 | 336 | ||
| Total | 1327 | 291 | 1036 | ||
| 31 | Gonda | U.P.Jal Nigam | 215 | 56 | 159 |
| KLSR - RAYS (JV) | 133 | 45 | 88 | ||
| Larsen & Toubro Ltd | 618 | 218 | 400 | ||
| Total | 966 | 319 | 647 | ||
| 32 | Gorakhpur | NCC Ltd. | 593 | 141 | 452 |
| Rithwik-Koya (JV) | 163 | 14 | 149 | ||
| U.P.Jal Nigam | 410 | 102 | 308 | ||
| Total | 1166 | 257 | 909 | ||
| 33 | Hamirpur | PNC-SPML-JV | 682 | 172 | 510 |
| U.P.Jal Nigam | 555 | 272 | 283 | ||
| JWIL | 642 | 159 | 483 | ||
| Total | 1879 | 603 | 1276 | ||
| 34 | Hapur | U.P.Jal Nigam | 85 | 0 | 85 |
| LC INFRA | 230 | 3 | 227 | ||
| Total | 315 | 3 | 312 | ||
| 35 | Hardoi | NCC Ltd. | 1672 | 211 | 1461 |
| U.P.Jal Nigam | 40 | 4 | 36 | ||
| Total | 1712 | 215 | 1497 | ||
| 36 | Hathras | ION EXCHANGE | 94 | 50 | 44 |
| BGCCPL-Ramky (JV) | 284 | 115 | 169 | ||
| U.P.Jal Nigam | 32 | 13 | 19 | ||
| Total | 410 | 178 | 232 | ||
| 37 | Jalaun | BGCCPL-Ramky (JV) | 641 | 282 | 359 |
| U.P.Jal Nigam | 164 | 31 | 133 | ||
| GVPR | 210 | 99 | 111 | ||
| Total | 1015 | 412 | 603 | ||
| 38 | Jaunpur | Welspun Kaveri Infraprojects JV | 364 | 225 | 139 |
| AFCONS | 967 | 511 | 456 | ||
| U.P.Jal Nigam | 66 | 25 | 41 | ||
| Total | 1397 | 761 | 636 | ||
| 39 | Jhansi | U.P.Jal Nigam | 242 | 111 | 131 |
| DARA ENGINEERING | 144 | 0 | 144 | ||
| Indian Hume Pipe | 253 | 6 | 247 | ||
| Unipro | 149 | 0 | 149 | ||
| NCC Ltd. | 468 | 38 | 430 | ||
| BGCCPL-Ramky (JV) | 446 | 205 | 241 | ||
| Total | 1702 | 360 | 1342 | ||
| 40 | Kannauj | VSA | 207 | 92 | 115 |
| GVPR | 464 | 73 | 391 | ||
| U.P.Jal Nigam | 174 | 69 | 105 | ||
| Total | 845 | 234 | 611 | ||
| 41 | Kanpur Dehat | VSA | 328 | 81 | 247 |
| Indian Hume Pipe | 323 | 30 | 293 | ||
| U.P.Jal Nigam | 52 | 9 | 43 | ||
| Vindhya-GAJA (JV) | 28 | 5 | 23 | ||
| GVPR | 403 | 138 | 265 | ||
| Total | 1134 | 263 | 871 | ||
| 42 | Kanpur Nagar | U.P.Jal Nigam | 124 | 1 | 123 |
| VSA | 159 | 18 | 141 | ||
| Vindhya-GAJA (JV) | 336 | 91 | 245 | ||
| Total | 619 | 110 | 509 | ||
| 43 | Kasganj | PNC-SPML-JV | 308 | 137 | 171 |
| U.P.Jal Nigam | 18 | 7 | 11 | ||
| ION EXCHANGE | 7 | 3 | 4 | ||
| Total | 333 | 147 | 186 | ||
| 44 | Kaushambi | U.P.Jal Nigam | 45 | 12 | 33 |
| GA INFRA - BABA (JV) | 379 | 162 | 217 | ||
| JMC - Lakshmi (JV) | 320 | 124 | 196 | ||
| Total | 744 | 298 | 446 | ||
| 45 | Kushi Nagar | NCC Ltd. | 533 | 238 | 295 |
| U.P.Jal Nigam | 348 | 132 | 216 | ||
| Total | 881 | 370 | 511 | ||
| 46 | Lakhimpur Kheri | NCC Ltd. | 678 | 307 | 371 |
| Vindhya-GAJA (JV) | 203 | 65 | 138 | ||
| U.P.Jal Nigam | 135 | 12 | 123 | ||
| Total | 1016 | 384 | 632 | ||
| 47 | Lalitpur | U.P.Jal Nigam | 169 | 79 | 90 |
| M/s Sudhakara Infratech Pvt. Ltd | 599 | 164 | 435 | ||
| JMC-JWIL (JV) | 487 | 110 | 377 | ||
| Brija Banco Pvt. Ltd | 43 | 24 | 19 | ||
| Banko Ganga | 35 | 6 | 29 | ||
| DARA ENGINEERING | 279 | 90 | 189 | ||
| Total | 1612 | 473 | 1139 | ||
| 48 | Lucknow | U.P.Jal Nigam | 42 | 15 | 27 |
| NCC Ltd. | 1003 | 69 | 934 | ||
| Total | 1045 | 84 | 961 | ||
| 49 | Maharajganj | U.P.Jal Nigam | 75 | 10 | 65 |
| JMC - Lakshmi (JV) | 125 | 60 | 65 | ||
| Rithwik-Koya (JV) | 143 | 87 | 56 | ||
| Total | 343 | 157 | 186 | ||
| 50 | Mahoba | Larsen & Toubro Ltd | 234 | 18 | 216 |
| SLC-SMC (JV) | 422 | 95 | 327 | ||
| JMC-JWIL (JV) | 342 | 23 | 319 | ||
| U.P.Jal Nigam | 93 | 26 | 67 | ||
| N.K. Gupta & K.B. Gupta Contractors | 96 | 20 | 76 | ||
| Total | 1187 | 182 | 1005 | ||
| 51 | Mainpuri | NCC Ltd. | 534 | 149 | 385 |
| U.P.Jal Nigam | 14 | 6 | 8 | ||
| Total | 548 | 155 | 393 | ||
| 52 | Mathura | U.P.Jal Nigam | 58 | 0 | 58 |
| NCC-APCO JV | 289 | 51 | 238 | ||
| Total | 347 | 51 | 296 | ||
| 53 | Mau | GA INFRA-VPL | 252 | 21 | 231 |
| U.P.Jal Nigam | 117 | 1 | 116 | ||
| KLSR - RAYS (JV) | 92 | 29 | 63 | ||
| LC INFRA | 220 | 6 | 214 | ||
| Total | 681 | 57 | 624 | ||
| 54 | Meerut | Power Mech Projects Ltd | 603 | 160 | 443 |
| U.P.Jal Nigam | 92 | 10 | 82 | ||
| Total | 695 | 170 | 525 | ||
| 55 | Mirzapur | NCC Ltd. | 459 | 18 | 441 |
| Multiurban | 45 | 2 | 43 | ||
| Ramky baba | 435 | 107 | 328 | ||
| GVPR | 155 | 19 | 136 | ||
| U.P.Jal Nigam | 176 | 65 | 111 | ||
| GA INFRA | 855 | 93 | 762 | ||
| Megha | 577 | 16 | 561 | ||
| Total | 2702 | 320 | 2382 | ||
| 56 | Moradabad | NKG-PRIMUS (JV) | 425 | 136 | 289 |
| LC INFRA | 273 | 94 | 179 | ||
| U.P.Jal Nigam | 37 | 1 | 36 | ||
| Total | 735 | 231 | 504 | ||
| 57 | Muzaffarnagar | NKG-PRIMUS (JV) | 96 | 28 | 68 |
| U.P.Jal Nigam | 204 | 6 | 198 | ||
| Gayatri Projects LTD | 79 | 7 | 72 | ||
| JMC - Lakshmi (JV) | 323 | 43 | 280 | ||
| Total | 702 | 84 | 618 | ||
| 58 | Pilibhit | U.P.Jal Nigam | 60 | 7 | 53 |
| VISHVARAJ | 234 | 4 | 230 | ||
| PNC-SPML-JV | 309 | 96 | 213 | ||
| Total | 603 | 107 | 496 | ||
| 59 | Pratapgarh | JMC - Lakshmi (JV) | 120 | 44 | 76 |
| Power Mech Projects Ltd | 214 | 105 | 109 | ||
| U.P.Jal Nigam | 96 | 33 | 63 | ||
| Total | 430 | 182 | 248 | ||
| 60 | Prayagraj | VPRPL | 107 | 16 | 91 |
| U.P.Jal Nigam | 595 | 234 | 361 | ||
| GAJA - GAIPL JV | 206 | 39 | 167 | ||
| Larsen & Toubro Ltd | 1191 | 64 | 1127 | ||
| Total | 2099 | 353 | 1746 | ||
| 61 | Raebareli | Vindhya-GAJA (JV) | 255 | 159 | 96 |
| U.P.Jal Nigam | 291 | 184 | 107 | ||
| NCC Ltd. | 484 | 258 | 226 | ||
| Total | 1030 | 601 | 429 | ||
| 62 | Rampur | SPML Infra | 157 | 15 | 142 |
| OMIL-JWIL (JV) | 207 | 30 | 177 | ||
| U.P.Jal Nigam | 50 | 5 | 45 | ||
| LC INFRA | 6 | 2 | 4 | ||
| NKG-PRIMUS (JV) | 116 | 39 | 77 | ||
| Total | 536 | 91 | 445 | ||
| 63 | Saharanpur | GA INFRA - BABA (JV) | 205 | 60 | 145 |
| U.P.Jal Nigam | 120 | 25 | 95 | ||
| Gayatri Projects LTD | 129 | 54 | 75 | ||
| NKG-PRIMUS (JV) | 222 | 82 | 140 | ||
| Total | 676 | 221 | 455 | ||
| 64 | Sambhal | SPML Infra | 193 | 63 | 130 |
| LC INFRA | 27 | 19 | 8 | ||
| U.P.Jal Nigam | 27 | 4 | 23 | ||
| NKG-PRIMUS (JV) | 374 | 155 | 219 | ||
| Total | 621 | 241 | 380 | ||
| 65 | Sant Kabeer Nagar | JAKSON - VISHVARAJ (JV) | 274 | 203 | 71 |
| Megha | 174 | 32 | 142 | ||
| U.P.Jal Nigam | 138 | 49 | 89 | ||
| Total | 586 | 284 | 302 | ||
| 66 | Sant Ravidas Nagar | U.P.Jal Nigam | 58 | 13 | 45 |
| Welspun Kaveri Infraprojects JV | 543 | 161 | 382 | ||
| GA INFRA - BABA (JV) | 281 | 103 | 178 | ||
| Total | 882 | 277 | 605 | ||
| 67 | Shahjahanpur | NCC Ltd. | 2019 | 302 | 1717 |
| U.P.Jal Nigam | 29 | 2 | 27 | ||
| Total | 2048 | 304 | 1744 | ||
| 68 | Shamli | U.P.Jal Nigam | 118 | 34 | 84 |
| Gayatri Projects LTD | 64 | 25 | 39 | ||
| JMC - Lakshmi (JV) | 287 | 101 | 186 | ||
| Total | 469 | 160 | 309 | ||
| 69 | Shravasti | U.P.Jal Nigam | 25 | 1 | 24 |
| Larsen & Toubro Ltd | 139 | 48 | 91 | ||
| GA INFRA-VPL | 105 | 81 | 24 | ||
| Total | 269 | 130 | 139 | ||
| 70 | Siddharth Nagar | JAKSON - VISHVARAJ (JV) | 110 | 46 | 64 |
| Megha | 81 | 29 | 52 | ||
| VSA | 36 | 8 | 28 | ||
| U.P.Jal Nigam | 81 | 5 | 76 | ||
| Total | 308 | 88 | 220 | ||
| 71 | Sitapur | Larsen & Toubro Ltd | 475 | 64 | 411 |
| NCC Ltd. | 1190 | 352 | 838 | ||
| U.P.Jal Nigam | 72 | 24 | 48 | ||
| Total | 1737 | 440 | 1297 | ||
| 72 | Sonbhadra | U.P.Jal Nigam | 94 | 39 | 55 |
| GVPR | 291 | 32 | 259 | ||
| Larsen & Toubro Ltd | 142 | 54 | 88 | ||
| VPRPL | 423 | 69 | 354 | ||
| Jain Const. | 25 | 11 | 14 | ||
| NCC Ltd. | 475 | 11 | 464 | ||
| Total | 1450 | 216 | 1234 | ||
| 73 | Sultanpur | Vindhya-GAJA (JV) | 464 | 217 | 247 |
| Gayatri Projects LTD | 35 | 8 | 27 | ||
| U.P.Jal Nigam | 72 | 17 | 55 | ||
| UNIVERSAL MEP | 231 | 87 | 144 | ||
| Total | 802 | 329 | 473 | ||
| 74 | Unnao | U.P.Jal Nigam | 32 | 0 | 32 |
| Megha | 419 | 1 | 418 | ||
| Total | 451 | 1 | 450 | ||
| 75 | Varanasi | Larsen & Toubro Ltd | 1334 | 302 | 1032 |
| U.P.Jal Nigam | 224 | 55 | 169 | ||
| Total | 1558 | 357 | 1201 | ||