Follow us on for latest updates.    |    To Lodge Complaint Call On 18001212164   or   visit   www.jalsamadhan.in

RWS Raised Issues

District-wise pending issue details
← Back to Summary
📍
District
Sonbhadra
Issue Type
Village Internal Works
#
Total Pending Issues
5

Issue Details

5 Records
S.No. District Agency Scheme ID Scheme Name OHT Code Village ID Village Name Issue Type Remark Issue Date
1 Sonbhadra Larsen & Toubro Ltd 8182027 Panari GOV OHT0002 479995 PANARI Village Internal Works In Amarsota Panari , Villagers have damage the Air Valve and PRV and open the bolts , causing water leakage and disruption of the water supply 09-03-2026
2 Sonbhadra Larsen & Toubro Ltd 8175086 Amawar GOV OHT005 480835 Pakari Village Internal Works Damage to DI 200mm K7 Node No.(AV 09-AV10) Distribution Main Further, the Distribution line of DI 200mm K-7 to Jampani Distribution (Pakari) Village has been severely damaged due to excavation activities undertaken by the Irrigation Department for canal construction along the same alignment. Multiple sections have been disturbed, with pipes displaced or discarded. Based on inspection, the damage is attributable to the bucket teeth of backhoe/excavators deployed during excavation 13-02-2026
3 Sonbhadra Larsen & Toubro Ltd 8175086 Amawar GOV OHT005 480833 Jam Pani Village Internal Works Damage to DI 450mm K9 Raising Main Further, the Raising Main line of DI 450mm K9 (WTP to GLR-1) Jampani Pump House has been severely damaged due to excavation activities undertaken by the Irrigation Department for canal construction along the same alignment. Multiple sections have been disturbed, with pipes displaced or discarded. Based on inspection, the damage is attributable to the bucket teeth of backhoe/excavators deployed during excavation. 02-02-2026
4 Sonbhadra Larsen & Toubro Ltd 8175086 Amawar GOV OHT004 480858 Joru Khar Village Internal Works Damage to DI 250mm K9 Pipeline (Jorukhar Zone) Approximately 12 meters of DI 250mm K9 pipeline (Chainage: Jampani to Jorukhar) laid in Jorukhar Village has been severely damaged due to excavation activities undertaken by the Irrigation Department for canal construction along the same alignment. Multiple sections have been disturbed, with pipes displaced or discarded. Based on inspection, the damage is attributable to the bucket teeth of backhoe/excavators deployed during excavation. 01-11-2025
5 Sonbhadra Larsen & Toubro Ltd 8175086 Amawar GOV OHT001 480909 Amawar Village Internal Works Damage to DI 350mm K9 Rising Main (WTP to Bagharu GLR-02) Further, the Rising Main line of DI 350mm K9 from WTP to Bagharu GLR-02 has been significantly damaged due to excavation activities executed by the UPPCL Department for pole erection. The contractor engaged by UPPCL carried out drilling without prior intimation or approval, thereby violating standard coordination protocols. The contractor has refused to undertake repairs, which is unacceptable. 05-09-2025
No matching records found.