| S.No | District Name | Block Name | Panchayat Name | Village Name | IMIS Village Code | Unit Serial | Unit Type | Parameter | Status | Work Started | Work Completed | Handed Over | Overall Remark | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Work Started Status | Start Date | Remark |
Commission Status | Commissioning Date | Remark |
Handed Over Status | Handed Over Date | |||||||||||
| 1 | Mathura | Pharah | Bhaderua | Birona | 396676 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | Completed | Pending | ||||||
| 2 | Mathura | Pharah | Bhaderua | Birona | 396676 | U2 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 01-Aug-2026 | Work Started | Completed | 20-Aug-2026 | Commissioned | Pending | ||
| 3 | Mathura | Pharah | Dhana Teja | Dhana Teja | 396621 | U1 | TTSP | Saline | Major Repairable | Completed | Completed | Pending | ||||||
| 4 | Mathura | Pharah | Dhana Teja | Dhana Teja | 396621 | U2 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 18-Jul-2026 | Work Started | Completed | 19-Jul-2026 | Commissioned | Pending | ||
| 5 | Mathura | Baldeo | Akos Bangar | Akos Bangar | 396690 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | Completed | Pending | ||||||
| 6 | Mathura | Mathura | Arhera | Arhera | 396555 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | Completed | Pending | ||||||
| 7 | Mathura | Mathura | CHHATIKARA | CHHATIKARA | 396544 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 10-Jul-2026 | WIP | Completed | 12-Jul-2026 | Pending | |||
| 8 | Mathura | NAUJHEEL | AHAMADPUR | AHAMADPUR | 396253 | U1 | TTSP | Fluoride | Major Repairable | Completed | 25-Jul-2026 | Work Started | Completed | 18-Aug-2026 | Commisssioned | Pending | ||
| 9 | Mathura | Raya | Baltikari | Baltikari | 396414 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | Completed | Pending | ||||||
| 10 | Mathura | Govardhan | Malhu | Malhu | 396511 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 12-Jul-2026 | WIP | Completed | 13-Jul-2026 | Pending | |||
| 11 | Mathura | Govardhan | Malhu | Malhu | 396511 | U2 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 16-Jul-2026 | Work Started | Completed | 18-Jul-2026 | Commissioned | Pending | ||
| 12 | Mathura | Chhata | Chandauri | Chandauri | 396126 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 21-Jun-2026 | WIP | Completed | 24-Jun-2026 | Water Supply Started | Pending | ||
| 13 | Mathura | Mat | IROLI GUJAR BANGAR | IROLI GUJAR BANGAR | 396366 | U1 | TTSP | Fluoride | Minor Repairable(Partial Functional) | Completed | 20-Jul-2026 | Work Started | Completed | 21-Jul-2026 | Commissioned | Pending | ||
| 14 | Mathura | Raya | Thok Kamal | Thok Kamal | 396466 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 20-Jul-2026 | Work Started | Completed | 21-Jul-2026 | Commissioned | Pending | ||
| 15 | Mathura | Pharah | SHAHJADPUR GUJAR | SHAHJADPUR GUJAR | 396681 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 18-Jul-2026 | Work Started | Completed | 22-Jul-2026 | Commissioned | Pending | ||
| 16 | Mathura | Raya | Choorahansi | Choorahansi | 396445 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 18-Jul-2026 | Work Started | Completed | 22-Jul-2026 | Commissioned | Pending | ||
| 17 | Mathura | Raya | Choorahansi | Choorahansi | 396445 | U2 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 23-Jul-2026 | Work Started | Completed | 25-Jul-2026 | Commissioned | Pending | ||
| 18 | Mathura | Nandgaon | Rithaura | Rithaura | 396087 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 20-Jun-2026 | WIP | Completed | 25-Jun-2026 | Water Supply Started | Pending | ||
| 19 | Mathura | Chhata | SHAHPUR BANGAR | SHAHPUR BANGAR | 396103 | U1 | TTSP | Saline | Major Repairable | Completed | 16-Jul-2026 | Work Started | Completed | 20-Jul-2026 | Commissioned | Pending | ||
| 20 | Mathura | Chhata | SHAHPUR BANGAR | SHAHPUR BANGAR | 396103 | U2 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 10-Jun-2026 | WIP | Completed | 13-Jun-2026 | Water Supply Started | Pending | ||
| 21 | Mathura | Chhata | Karahari | Karahari | 396119 | U1 | TTSP | Saline | Major Repairable | Completed | 16-Jul-2026 | Work Started | Completed | 22-Jul-2026 | Commissioned | Pending | ||
| 22 | Mathura | Baldeo | Radoi | Radoi | 396750 | U1 | TTSP | Saline | Major Repairable | Completed | 14-Jul-2026 | Work Started | Completed | 19-Jul-2026 | Commissioned | Pending | ||
| 23 | Mathura | Raya | Kakrari | Kakrari | 396435 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 17-Jun-2025 | WIP | Completed | 20-Jun-2026 | Water Supply Started | Pending | ||
| 24 | Mathura | Pharah | Jhurawai | Jhurawai | 396656 | U1 | TTSP | Saline | Major Repairable | Completed | 02-Aug-2026 | Work Started | Completed | 07-Aug-2026 | Commissioned | Completed | 09-Aug-2026 | |
| 25 | Mathura | Pharah | Jhurawai | Jhurawai | 396656 | U2 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 17-Jul-2026 | Work Started | Completed | 20-Jul-2026 | Commissioned | Pending | ||
| 26 | Mathura | Pharah | Jamalpur | Mirpur | 396649 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 17-Jul-2026 | Work Started | Completed | 19-Jul-2026 | Commissioned | Pending | ||
| 27 | Mathura | Nandgaon | Hathiya | Hathiya | 396098 | U1 | TTSP | Saline | Major Repairable | Completed | 17-Jul-2026 | Work Started | Completed | 17-Aug-2026 | Commissioned | Pending | ||
| 28 | Mathura | Nandgaon | Garhi Barwari | Garhi Barwari | 396060 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | Completed | Pending | ||||||
| 29 | Mathura | Pharah | Nagla Hirday Nurullapur | Nagla Hirday Nurullapur | 396645 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 15-Dec-2026 | Work Started | Completed | 20-Jul-2026 | Commissioned | Pending | ||
| 30 | Mathura | Pharah | Nagla Hirday Nurullapur | Nagla Hirday Nurullapur | 396645 | U2 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 18-Jul-2026 | Work Started | Completed | 21-Jul-2026 | Commissioned | Pending | ||
| 31 | Mathura | NAUJHEEL | DILU PATTI | DILU PATTI | 396250 | U1 | TTSP | Fluoride | Minor Repairable(Partial Functional) | Completed | 10-Jun-2026 | WIP | Completed | 12-Jun-2026 | Water Supply Started | Pending | ||
| 32 | Mathura | Govardhan | Phondar | Phondar | 396520 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 15-Jul-2026 | Work Started | Completed | 20-Jul-2026 | Commissioned | Pending | ||
| 33 | Mathura | Choumunha | Jawali | Jawali | 396203 | U1 | TTSP | Saline | Major Repairable | Completed | 16-Jul-2026 | Work Started | Completed | 21-Jul-2026 | Commissioned | Pending | ||
| 34 | Mathura | Chhata | Bahata Bangar | Bahata Bangar | 396146 | U1 | TTSP | Saline | Major Repairable | Completed | 25-Jul-2026 | Work Started | Completed | 02-Aug-2026 | Commissioned | Completed | 04-Aug-2026 | |
| 35 | Mathura | Govardhan | Lalpur | Lalpur | 396521 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 17-Jul-2026 | Work Started | Completed | 22-Jul-2026 | Commissioned | Pending | ||
| 36 | Mathura | Mathura | Phenchari | Phenchari | 396556 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 17-Jul-2026 | Work Started | Completed | 21-Jul-2026 | Commissioned | Pending | ||
| 37 | Mathura | Raya | Koyal | Koyal | 396442 | U1 | TTSP | Saline | Major Repairable | Completed | 21-Jul-2026 | Work Started | Completed | 22-Jul-2026 | Commissioned | Pending | ||
| 38 | Mathura | Raya | Koyal | Koyal | 396442 | U2 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | Completed | Pending | ||||||
| 39 | Mathura | Pharah | Jamalpur | Jamalpur | 396648 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 16-Jul-2026 | Work Started | Completed | 21-Jul-2026 | Commissioned | Pending | ||
| 40 | Mathura | Baldeo | Nagla Bali | Nagla Bali | 396760 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 22-Jul-2026 | Work Started | Completed | 25-Jul-2026 | Commissioned | Pending | ||
| 41 | Mathura | Mathura | Samaspur | Samaspur | 396602 | U1 | TTSP | Saline | Major Repairable | Completed | 28-Jul-2026 | WIP | Completed | 02-Aug-2026 | Commissioned | Pending | ||
| 42 | Mathura | Mathura | Nagla Kasi | Nagla Kasi | 396603 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 24-Jul-2026 | Work Started | Completed | 26-Jul-2026 | Commissioned | Pending | ||
| 43 | Mathura | Mathura | Mukhrai | Mukhrai | 396538 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 23-Jul-2026 | Work Started | Completed | 25-Jul-2026 | Commissioned | Pending | ||
| 44 | Mathura | Mat | Piri | Piri | 396354 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 05-Jul-2026 | Work Started | Completed | 02-Aug-2026 | Commissioned | Pending | ||
| 45 | Mathura | Mathura | Badhauta | Badhauta | 396530 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 22-Jul-2026 | Work Started | Completed | 25-Jul-2026 | Commissioned | Pending | ||
| 46 | Mathura | Baldeo | Nera Bangar | Nera Bangar | 396768 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | Completed | Pending | ||||||
| 47 | Mathura | Govardhan | SAUNSA | SONSA | 396483 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 22-Jul-2026 | Work Started | Completed | 26-Jul-2026 | Commissioned | Pending | ||
| 48 | Mathura | NAUJHEEL | LAMTAURI | LAMTAURI | 396266 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 25-Jul-2026 | Work Started | Completed | 02-Aug-2026 | Commissioned | Completed | 03-Aug-2026 | |
| 49 | Mathura | Choumunha | Bhartiya | Bhartiya | 396173 | U1 | TTSP | Saline | Major Repairable | Completed | 01-Aug-2026 | Work Started | Completed | 07-Aug-2026 | Commissioned | Completed | 08-Aug-2026 | |
| 50 | Mathura | Pharah | Pingari | Pingari | 396651 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 27-Jul-2026 | Work Started | Completed | 17-Aug-2026 | Commissioned | Completed | 20-Aug-2026 | |
| 51 | Mathura | Chhata | Majhoi Bangar | Majhoi Bangar | 396131 | U1 | TTSP | Saline | Major Repairable | Completed | 01-Sep-2026 | Work Started | Completed | 05-Sep-2026 | Commissioned | Completed | 07-Sep-2026 | |
| 52 | Mathura | Chhata | Majhoi Bangar | Majhoi Bangar | 396131 | U2 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 14-Jul-2026 | Work Started | Completed | 25-Jul-2026 | Commissioned | Completed | 01-Sep-2026 | |
| 53 | Mathura | Raya | SARUA JANGALI | NAGLA JANGALI | 396473 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 16-Jul-2026 | Work Started | Completed | 22-Jul-2026 | Commissioned | Completed | 01-Aug-2026 | |
| 54 | Mathura | Raya | Birhana | Birhana | 396418 | U1 | TTSP | Fluoride | Minor Repairable(Partial Functional) | Completed | 01-Aug-2026 | Work Started | Completed | 12-Aug-2026 | Commissioned | Completed | 17-Aug-2026 | |
| 55 | Mathura | NAUJHEEL | NABIPUR | NABIPUR | 396286 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 02-Jun-2026 | Work Started | Completed | 20-Jun-2026 | Commissioned | Completed | 25-Jun-2026 | |
| 56 | Mathura | Choumunha | Tarauli Janubi | Tarauli Janubi | 396185 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 12-Jun-2026 | WIP | Completed | 16-Jun-2026 | Water Supply Started | Pending | ||
| 57 | Mathura | Pharah | Koh | Koh | 396664 | U1 | TTSP | Saline | Major Repairable | Completed | 31-Jul-2026 | Work Started | Completed | 10-Aug-2026 | Commissioned | Completed | 13-Aug-2026 | |
| 58 | Mathura | NAUJHEEL | PAL KHERA | PAL KHERA | 396320 | U1 | TTSP | Fluoride | Major Repairable | Completed | 17-Jun-2026 | WIP | Completed | 21-Jun-2026 | Water Supply Started | Pending | ||
| 59 | Mathura | NAUJHEEL | TILAK GARHI | TILAK GARHI | 396265 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 01-Aug-2026 | Work Started | Completed | 18-Aug-2026 | Commissioned | Completed | 25-Aug-2026 | |
| 60 | Mathura | Mathura | Baburi Sharqi | Baburi Sharqi | 396592 | U1 | TTSP | Saline | Major Repairable | Completed | 10-Aug-2026 | Work Started | Completed | 23-Aug-2026 | Commissioned | Completed | 27-Aug-2026 | |
| 61 | Mathura | NAUJHEEL | EKHU | EKHU | 396257 | U1 | TTSP | Fluoride | Minor Repairable(Partial Functional) | Completed | 22-Jul-2026 | Work Started | Completed | 20-Aug-2026 | Commissioned | Completed | 27-Aug-2026 | |
| 62 | Mathura | Govardhan | MAGAURRA | MAGORRA | 396522 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 01-Jul-2026 | Work Started | Completed | 03-Aug-2026 | Commissioned | Pending | ||
| 63 | Mathura | Chhata | Phalain | Phalain | 396122 | U1 | TTSP | Saline | Major Repairable | Completed | 09-Aug-2026 | Work Started | Completed | 30-Aug-2026 | Commissioned | Completed | 03-Sep-2026 | |
| 64 | Mathura | NAUJHEEL | BADANPUR | BADANPUR | 396274 | U1 | TTSP | Saline | Major Repairable | Completed | 02-Aug-2026 | WIP | Completed | 07-Aug-2026 | Commissioned | Completed | 08-Aug-2026 | |
| 65 | Mathura | Baldeo | Khanpur | Khanpur | 396728 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | Completed | Pending | ||||||
| 66 | Mathura | Pharah | Mirzapur Brahmnan | Mirzapur Brahmnan | 396638 | U1 | TTSP | Saline | Major Repairable | Completed | 02-Aug-2026 | Work Started | Completed | 13-Aug-2026 | Commissioned | Completed | 23-Aug-2026 | |
| 67 | Mathura | Pharah | Nagla Abua | Nagla Abua | 396673 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 02-Aug-2026 | WIP | Completed | 08-Aug-2026 | Commissioned | Completed | 09-Aug-2026 | |
| 68 | Mathura | Pharah | Parkham | Parkham | 396650 | U1 | TTSP | Fluoride | Minor Repairable(Partial Functional) | Completed | 02-Aug-2026 | WIP | Completed | 09-Aug-2026 | Commissioned | Completed | 10-Aug-2026 | |
| 69 | Mathura | NAUJHEEL | RAIPUR BANGER | RAIPUR BANGER | 396258 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 01-Aug-2026 | WIP | Completed | 05-Aug-2026 | Commissioned | Completed | 07-Aug-2026 | |
| 70 | Mathura | Raya | Pirsuwa | Pirsuwa | 396437 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 18-Jun-2026 | WIP | Completed | 21-Jun-2026 | Water Supply Started | Pending | ||
| 71 | Mathura | Raya | Pirsuwa | Pirsuwa | 396437 | U2 | TTSP | Saline | Major Repairable | Completed | 02-Aug-2026 | WIP | Completed | 08-Aug-2026 | Commissioned | Completed | 09-Aug-2026 | |
| 72 | Mathura | Raya | Kharwa | Kharwa | 396443 | U1 | TTSP | Saline | Major Repairable | Completed | 01-Aug-2026 | Work Started | Completed | 07-Aug-2026 | Commissioned | Completed | 08-Aug-2026 | |
| 73 | Mathura | Pharah | Nagla Hirday Nurullapur | Karanpur | 396647 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 03-Aug-2026 | Work Started | Completed | 17-Aug-2026 | Commissioned | Completed | 20-Aug-2026 | |
| 74 | Mathura | Baldeo | Angai | Angai | 396696 | U1 | TTSP | Saline | Major Repairable | Completed | 03-Aug-2026 | Work Started | Completed | 20-Aug-2026 | Commissioned | Pending | ||
| 75 | Mathura | Baldeo | Chholi | Chholi | 396709 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 05-Aug-2026 | Work Started | Completed | 20-Aug-2026 | Commissioned | Completed | 22-Aug-2026 | |
| 76 | Mathura | Baldeo | Chholi | Chholi | 396709 | U2 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 02-Aug-2026 | Work Started | Completed | 12-Aug-2026 | Commissioned | Pending | ||
| 77 | Mathura | Pharah | SALEMPUR FARAH | SALEMPUR FARAH | 396635 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 28-Jul-2026 | Work Started | Completed | 12-Aug-2026 | Commissioned | Pending | ||
| 78 | Mathura | Raya | Surraka | Surraka | 396439 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 22-Jul-2026 | Work Started | Completed | 26-Jul-2026 | Commissioned | Completed | 28-Jul-2026 | |
| 79 | Mathura | NAUJHEEL | BAGHARRA | BAGHARRA | 396303 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 25-Jul-2026 | Work Started | Completed | 28-Jul-2026 | Commissioned | Completed | 29-Jul-2026 | |
| 80 | Mathura | Mat | Mat Mula Bangar | Mat Mula Bangar | 396323 | U1 | TTSP | Saline | Major Repairable | Completed | 28-Jul-2026 | Work Started | Completed | 04-Aug-2026 | Commissioned | Pending | ||
| 81 | Mathura | Govardhan | Kunjera | Kunjera | 396488 | U1 | TTSP | Saline | Major Repairable | Completed | 23-Jul-2026 | Work Started | Completed | 26-Jul-2026 | Commissioned | Completed | 28-Jul-2026 | |
| 82 | Mathura | Govardhan | Kunjera | Kunjera | 396488 | U2 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 22-Jul-2026 | Work Started | Completed | 25-Jul-2026 | Commissioned | Completed | 28-Jul-2026 | |
| 83 | Mathura | Mat | Bijoli Banger | Bijoli Banger | 396367 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 22-Jul-2026 | Work Started | Completed | 26-Jul-2026 | Commissioned | Completed | 28-Jul-2026 | |
| 84 | Mathura | NAUJHEEL | HASANPUR | HASANPUR | 396254 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 26-Jun-2026 | WIP | Completed | 30-Jun-2026 | Water Supply Started | Pending | ||
| 85 | Mathura | Mat | Naseeti | Naseeti | 396358 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Pending | Pending | Pending | फर्म द्वारा क्रिस्टल पर मीडिया उपलब्ध नहीं कराई गई है, जिसके कारण कार्य में विलंब हो रहा है। फर्म द्वारा दिनांक 05.11.2026 तक कार्य पूर्ण करने हेतु कार्ययोजना प्रस्तुत की गई है। | |||||
| 86 | Mathura | Raya | BYONHI | BYOHAI | 396413 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 23-Jul-2026 | Work Started | Completed | 05-Aug-2026 | Commissiong | Pending | ||
| 87 | Mathura | Pharah | Koh | Jodhpur | 396665 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 22-Jul-2026 | Work Started | Completed | 10-Aug-2026 | Commissioned | Pending | ||
| 88 | Mathura | Baldeo | Daulatpur | Daulatpur | 396757 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 13-Aug-2026 | Work Started | Completed | 28-Aug-2026 | Commissioned | Pending | ||
| 89 | Mathura | Mat | Bahadin | Bahadin | 396339 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | Completed | 24-Jul-2026 | Commissioned | Completed | 24-Jul-2026 | |||
| 90 | Mathura | Govardhan | NAINU PATTI | NAINUPATTI | 396517 | U1 | TTSP | Saline | Major Repairable | Completed | 23-Jul-2026 | Work Started | Completed | 28-Jul-2026 | Commissioned | Completed | 01-Aug-2026 | |
| 91 | Mathura | Govardhan | NAINU PATTI | NAINUPATTI | 396517 | U2 | TTSP | Saline | Major Repairable | Completed | 22-Jul-2026 | WIP | Completed | 27-Jul-2026 | Commissioned | Pending | ||
| 92 | Mathura | Baldeo | Alipur | Alipur | 396721 | U1 | TTSP | Saline | Major Repairable | Completed | 20-Jul-2026 | Work Started | Completed | 01-Aug-2026 | Commissioned | Completed | 02-Aug-2026 | |
| 93 | Mathura | Baldeo | Nagla Gukhrauli | Nagla Gukhrauli | 396767 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 14-Jul-2026 | Work Started | Completed | 01-Aug-2026 | Commissioned | Completed | 02-Aug-2026 | |
| 94 | Mathura | Pharah | Bisu | Bisu | 396630 | U1 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 16-Jul-2026 | Work Started | Completed | 21-Jul-2026 | Commissioned | Completed | 22-Jul-2026 | |
| 95 | Mathura | Pharah | Bisu | Bisu | 396630 | U2 | TTSP | Saline | Minor Repairable(Partial Functional) | Completed | 23-Jul-2026 | Work Started | Completed | 24-Jul-2026 | Commissoned | Pending | ||