S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20077353 PURAINA VILLAGE WATER SUPPLY 20077353/01 Yes No No No No No No No No No No No No Major honeycomb found at ground level brace beam. The joint between column and beam become porous and void can be seen in it. Work has been stopped for more than six months so steel becomes rusty. Rectification required immediately.
2 20069443 Pureybux Water Supply 20069443/01 No Yes No No No No No No No No No No No Two columns are found vertically misaligned white checking the vertical plumb. The effective diameter of both columns has been varying due to inappropriate chipping at mid-section .This is very poor workmanship case. There are many honeycombs in OHT. Reassessment of structural integrity on both column by experience structural engineer. Dismantle & reconstruct the column if rcasscssment failed.
3 20077388 BHARATPUR GRINT WATER SUPPLY 20077388/01 Yes No No No No No No No No No No No No Significant honeycombing has been observed on the underside of the first brace beam and Columns. Column misalignment is noted at the junction of the second brace level. Extensive repair work is visible in several casted components. • It is recommended to dismantle the misaligned columns at the junction of the second brace level and perform Non-Destructive Testing (NDT) on each structural component up to this level. • Grout the OHT with concrete after applying Epoxy bonding agent to maintain the proper bonding between old and new concrete OHT.
4 20077428 UDAIPUR KHAIRAHNIA Water Supply 20077428/01 Yes No No No No No No No No No No No No Found major Honeycomb in cone wall, Balcony bottom side. Apron /elinttr protection of pump house found damaged. Rectified immediately & conduct NDT post rectification from a reputed government Engineering college in presence of TPI/UPJN. Dismantle and reconstruct again as per approve drawing.
5 20075870 Tengnahiamankot Water Supply 20075870/01 No No No No No No Yes No No No No No No Major Leakage is detected in the OHT which shows poor workmanship during construction. The tank is constructed in flood prone area and water compound is likely to submerged in flood, despite this risks, plinth protection work has not yet been initiated. recommended to Fully drain the tank and do the rectification as per lS standard in presence of TPI & jal Nigam. After rectification of leakage engage a qualified structural engineer to assess the severity of the leak and identify underlying causes and later conduct water tightness report in. It is recommended to complete the Plinth protection of OHT & also create small embankments or bunds around the tank perimeter as a temporary flood bar.
6 20069143 Mahua Ibrahim Water Supply 20069143/01 No Yes No No No No No No No No No No No Barce beam above second brace is found misaligned as per drawing centre out. The one column above third brace beam is found misaligned.
7 20034012 Garib Nagar Gram Panchayat Water Supply Scheme 20034012/01 Yes No No No No No No No No No No No No Honeycomb is found at various portion of OHT i.e. Ring beam staircase and junction of staircase and column. the crack develops at staircase.
8 20102664 LAKSMANPUR DHARAMPUR WATER SUPPLY SCHEME 20102664/01 Yes No No No No No No No No No No No No Major Honecomb found at column.
9 20075937 Rehra Water Supply 20075937/01 No No No Yes No No No No No No No No No Steel is rusted at second brace level. Dowel bar at GL level are cut of cut of one column.
10 20069159 Jeetpur Water Supply 20069159/01 No No No Yes No No No No No No No No No Honeycomb is observed in third brace column junction, resulting in exposed reinforcement steel, which may compromise the structural performance. also 4th and 8th flite of staircase are tilted.
11 20079000 KALINAGER GRIANT WATER SUPPLY 20079000/01 No No No Yes No No No No No No No No No 1. Rusted steel is found in OHT column.
12 20039370 KUSBHAURA VILLAGE WATER SUPPLY SCHEME 20039370/01 Yes No No No No No Yes No No No No No No Honeycombing is observed in bottom side of conical wall of OHT indicating improper vibration & poor workmanship.
13 20101999 BALAHA WATER SUPPLY SCHEME 20101999/01 Yes Yes No No No No No No No No No No No Two columns are misaligned & major honeycomb found brace.
14 20066673 Gaydeeh Water Supply 20066673/01 Yes Yes No No No No No No No No No No No 1. Two columns are found vertically misaligned. 2. Major honeycombs are found in various spots. 3.The brace beam & column are not constructed monolithically.
15 20075899 Lakhanipur Water Supply 20075899/01 No No No Yes No No No No No No No No No The work has been stopped for a year, so the reinforcement of the column is rusted.
16 20077440 BADGAU WATER SUPPLY 20077440/01 No No No No No No Yes No No No No No No The depth of OHT for foundation PCC work not maintained as per drawing. Recommendations: PCC depth for OHT foundation is not as per approved drawing and requires correction. TKC shall dismantle the incorrect PCC and re cast it to the specified depth after joint inspection.
17 20077582 PAIGAPUR & LALAJOT GRAM PANCHAYAT WATER SUPPLY 20077582/01 Yes No No No No No No No No No No No No 1.Major honeycombing found at Three Columns showing poor quality at that section becomes section week. 2. Some serious honeycomb also appears at 1st brace beam 2nd brace Beam. 3. The Steel is badly rusted and stored in site. 4. The dowel steel of staircase has been cut.
18 20078178 PIPRA DURGA NAGER WATER SUPPLY 20078178/01 No No No No No No Yes No No No No No No The OHT foundation is found in waterlogged condition for more than one year. The steel is found rusted.
19 20091554 BADHARI WATER SUPPLY 20091554/01 No No No No No No Yes No No No No No No 1.OHT work is stopped & no hard barricading till now. 2.Area of OHT tank is waterlogged. 3.Pump House footing backfilling are needed. 4.ISMB not Installed Till now. 5.Earthing Chamber is not constructed. 6.Crack Seen in Boundary wall . 7.Gate are ruste.
20 20102010 GAJPUR GRINT WATER SUPPLY SCHEME 20102010/01 No No No Yes No No No No No No No No No 1.OHT 2nd brace beam de-shuttering has not been done for a long time. 2.Vertical reinforcement of the column is rusted. 3. Honeycombing is seen in the staircase. 4. Staircase reinforcement is rusted. 5. Work has been stopped for a long time. 6. Safety precautions are required. 7. Boundary wall gate is rusted, and the wicket gate is misaligned. 8. Drainage is damaged and the campus is fully covered with grass. 9. One side of the boundary wall is misaligned. 10. Painting is still pending. 11.Pump house bypass V notch is not as per the drawing. 12.Plinth protection is damaged. 13 Extra reinforcement in the chajja has not been removed.
21 20077494 VAIBHEET GRAM PANCHAYAT WATER SUPPLY 20077494/01 No No No No No No Yes No No No No No No The thickness of the column was reduced due to chipping of concrete to remove the dowel bar for the staircase. The surface has become porous and weak throughout the section. The column and brace beam are not properly connected with adequate bonding. The concrete is not monolithic between these parts, and both structural elements have detached from each other. These components should have been cast at the same time.
22 20077576 BARAHAYA BHAISAHI & PURAINA BULAND GRAM PANCHAYAT WATER SUPPLY 20077576/01 No No No No No No Yes No No No No No No The construction of the balcony is not in level, and honeycombing has been found in the staircase.
23 20038743 CHANDAPUR VILLAGE WATER SUPPLY SCHEME 20038743/01 No No Yes Yes No No No No No No No No No During site visit one column of overhead tank is found misaligned.
24 20069151 Lilwa Water Supply 20069151/01 No No No No No No Yes No No No No No No The concrete casting of the balcony was not done continuously at the time of concreting and was left abandoned at two places. The section is not monolithic and has become weak. The steel in the non-casted section of this balcony is also rusted.
25 20081951 MANKAPUR & BANJARIA WATER SUPPLY 20081951/01 No No No No Yes No No No No No No No No 1. The concrete has been chipped at junction joint of Dowel bar left for reinforcement to depth of 20 mm to 30 mm and taken height up to 400 mm resulting in the decreasing of column size. This influences the structural Stability of OHT. The effective size of columns is reduced. 2. The joint of Brace beam and column is not made proper and monolithic
26 20077433 SISWA WATER SUPPLY 20077433/01 No No No No Yes No No No No No No No No The work has been stopped for more than one year. The steel gets rusted badly. The Vertical steel is bent outward and in scattered way.
27 20069189 Malda Water Supply 20069189/01 No No No No Yes No No No No No No No No 1.The concrete has been chipped at junction joint of Staircase supported beam and column up to depth of 20 mm to 30 mm resulting in the decreasing of column size. This influences the structural Stability of OHT. The effective size of columns is reduced. 2.The joint of Brace beam and column is not made proper and monolithic Beam is not connected with column and act as separate part.
28 20039349 HARNAHWA PARSIYA VILLAGE WATER SUPPLY SCHEME 20039349/01 No No No No No No Yes No No No No No No 1. Waterlogging around the foundation of an overhead water tank can severely compromise its structural integrity and stability by reducing the soil's load-bearing capacity, promoting uneven settlement, and causing corrosion of the steel reinforcement inside the Column and foundation. 2.The DE shuttering of balcony has not done so far this had probably influenced the chance of Proper curing. The DE shuttering is pending for Six months. The work has been stopped for more than Eight months.
29 20079056 LAXMI NAGAR & SHANKERPUR KALAN WATER SUPPLY 20079056/01 No No No No Yes No No No No No No No No 1.The concrete has been chipped at junction joint of Staircase supported beam and column up to depth of 20 mm to 30 mm and taken height up to 200mm resulting in the decreasing of column size. This influences the structural Stability of OHT. The effective size of columns is reduced. 2.The joint of Brace beam and column is not made proper and monolithic Beam is not connected with column and acts as separate part 3.The Crack is observed at all landing of Staircase means the deflection has been started due to non-bonding of supported beam and column to each other 4. One of the Brace Beam is not linear in shape It is rebounded.
30 20078109 BARAON WATER SUPPLY 20078109/01 Yes No No No No No No No No No No No No 1. The major and very serious honeycombing is found at four columns at the foundation level. This serious honeycombing is a serious quality violation and results in weakening of the structure at this section. The honeycombing is also found on the conical wall, balcony, and brace beam at various sections. 2. The concrete has been chipped at the junction joint of the staircase-supported beam and column up to a depth of 30 mm to 40 mm and a height of up to 200 mm, resulting in a decrease of the column size. This influences the structural stability of the OHT. The effective size of the column is reduced. 3. The joint of the brace beam and column is not made properly and is not monolithic. The beam is not connected with the column and acts as a separate part. A continuous line of cracks is observed at all landings of the staircase, which means deflection has started due to non-bonding of the supported beam and column with each other. 4. The OHT is completely in a dangerous position and seriously needs remedies for these defects.
31 20033991 VISRAMPUR VILLAGE WATER SUPPLY SCHEME 20033991/01 Yes No No No No No No No No No No No No Honeycombing and cracks are seen on the column of the OHT.
32 20034011 Sonepur Dhutkhwa Gram Panchayat Water Supply Scheme 20034011/01 Yes No No No No No No No No No No No No 1. Honeycombing is seen on column, brace and joints. 2. Boundary wall alignment is not proper.
33 20075442 Baluwa Balui Water Supply 20075442/01 Yes No No No No No No No No No No No No The Column and brace beam is not properly connected with proper bonding. Major honeycombing found at three Columns showing poor quality of work at that portion hence the section could be weak . Some serious honeycomb also appears at 1st brace beam 2nd brace Beam. The dowel steel of staircase has been cut .
34 20098459 BANGAWA WATER SUPPLY SCHEME 20098459/01 Yes No No No No No No No No No No No No Reinforcement steel of OHT column is rusted due to work stoppage & direct exposure to environment.
35 20079022 CHOUHATTER KALAN WATER SUPPLY 20079022/01 Yes No No No No No No No No No No No No The steel of overhead tank’s (OHT) column has been at the GL Level causing insufficient lap length of reinforcement
36 20035190 HASAUPUR VILLAGE WATER SUPPLY SCHEME 20035190/01 No No No Yes No No No No No No No No No The reinforcement vertical bars (steel) are being cut at the edge of the column by some people, affecting the overlap length. Ensure that the TKC dismantles the column to a sufficient depth to achieve the effective overlap length of the vertical steel bars, so that the strength of the overhead tank is not compromised.
37 20089755 MUJAINNA & MUJHAINI WATER SUPPLY 20089755/01 No No No Yes No No No No No No No No No Reinforcement steel of OHT column is bend & rusted due to work stoppage and direct exposure to environment.
38 20069186 Mohanpur Dayalideeh Water Supply 20069186/01 No No No Yes No No No No No No No No No Reinforcement are rusted due to work stopped for long time & exposure to environment .
39 20075809 Sisai Water Supply 20075809/01 No No No No No No Yes No No No No No No 1. The joint between the brace beam and the column was not found to be bonded properly & Crack is seen in it . The beam is not connected with the column and acts as a separate part, due to this cracks have been appered at two landings of the staircase, indicating that deflection has started. 2.The plinth protection has not been carried out so far, and the appurtenances have not been done properly.
40 20035193 JAMBODEEP VILLAGE WATER SUPPLY SCHEME 20035193/01 No No No No Yes No No No No No No No No 1. The Dimension of 1st brace beam shows deviation from drawing . Brace beam width is found 220 mm to 230 mm .5 mm tolrence is allowed but above than this is needed to reassess the stablity of OHT. 2.The Staircase has been started drifting(Seprating) due to deflection arises in the joints.As the jointing is not proper and monolythic. The Crack appears in the staircase. The gap is also generated between column and staircase supported beam
41 20077587 KHAJURIA & SINGHWAPUR GRAM PANCHAYAT WATER SUPPLY 20077587/01 No No No No No No Yes No No No No No No The deshuttering of the conical wall balcony has not been done even after more than six to seven months since the concrete was casted. This has affected the chances of proper curing and adequate exposure to the outer atmosphere, so the proper strength could be affected.
42 20033988 GULARIHA VILLAGE WATER SUPPLY SCHEME 20033988/01 No No No Yes No No No No No No No No No The Thickness of column is reduced due to chipping of concrete to remove the dowel bar for staircase. the dowel steel of staircase has been cut.
43 20075700 Gaura Tirkauliya Water Supply 20075700/01 No No No Yes No No No No No No No No No 1. The Staircase has been started seprating with column due to deflection arises in the Joints. As the jointing is not proper and monolythic.The Crack appears in the Staircase. 2.The sign of Leakage is seems to be appear at vertical pipe joints of oht
44 20039489 SANJHWAL PREMNAGAR VILLAGE WATER SUPPLY SCHEME 20039489/01 Yes No No No No No No No No No No No No Major honeycombing found at one Columns showing poor quality at that section becomes section weak . Some serious honeycomb also appears at 1st brace beam 2nd brace Beam.
45 20033944 RAGHAVPUR VILLAGE WATER SUPPLY SCHEME 20033944/01 No No No No No No Yes No No No No No No 1.The honeycomb structure in the columns of the elevated reservoir has been concealed with plaster. However, the presence of honeycomb in the columns is a serious quality defect. During the inspection, it was also found that a staircase had collapsed and been rebuilt. Honeycombing was also found in the bottom dome and the conical wall. 2.The size of the brace beams was also found to be smaller than specified drawing 3.The joint of Brace beam and column is not made proper and monolythic. 4.The Beam is not connected with column and act as seprate part. 5.The Crack is observed at landing of Staircase means the deflection has been started due to non bonding of supported beam and column to each other
46 20076328 DHAMPUR & KAMDA WATER SUPPLY 20076328/01 Yes No No No No No No No No No No No No 1.Honeycombing is observed in the bottom dome of OHT indicating the improper compaction during concreting. 2. The boundary wall is broken
47 20096969 MAKUNAHWA WATER SUPPLY 20096969/01 No No No Yes No No No No No No No No No The Reinforcement steel has rusted due to the prolonged stoppage of work, and honeycombing is observed on the column brace. Repair work is also seen on the column.
48 20098423 KISHUNPUR GRINT WATER SUPPLY SCHEME 20098423/01 No No No No No No Yes No No No No No No De shuttering of Conical wall has not done after pasiing six months after Conctrete so this influences the chance of proper exposure to outer atomosphere.
49 20069457 Bhagwanpur Grint 20069457/01 No No No No No No Yes No No No No No No Severe honeycombing observed in the staircase RCC memebers, indicating poor compaction & inadequate concreting quality.
50 20076262 PALAPUR WATER SUPPLY 20076262/01 No No No Yes No No No No No No No No No OHT staircase reonforcement is severly rusted & IT clearly indicates that no construction activity has been carried out for a long time.This is a serious quality & durability issue.
51 20088756 ARNAHAWA & DHANGHATA WATER SUPPLY 20088756/01 No Yes No No No No No No No No No No No Two column seems to be vertically misaligned in very first glance .The extent of misalignment is to investigate further with total station. The concrete has been chipped at junction point of stair case supported beam & column upto 50 mm to 60 mm at two coloumn at two column at 80 mm to 100 mm at bottom poiint of coulmn which is sign of danger .The chipping is done upto height upto 200 mm resulting the decreasing of coloumn size at the section . The joint of brace beam and column is not made proper and monolithic. The beam is not connected with the column and acts as a separate part. - Cracks are observed at all landings of the staircase, which means deflection has started due to non-bonding of the supported beam and column. This indicates the staircase is in a dangerous position. Deflection has already begun in the staircase. - The de-shuttering of the conical wall and staircase has not been done after completion of concrete casting for one year. The same condition continues for one year, which affects proper curing and exposure to the outer atmosphere needed for strength. Proper strength could not be achieved. The work has been stopped for more than one year.
52 20077423 Sirahia Water Supply 20077423/01 Yes No No No No No No No No No No No No 1.Multiple number of major honeycombing is found at columns, Brace beam and the Ground beam. The surface at junction point of column and brace beam become porous and Weak at the section.There are some section in column and Brace beam having voids and porous surface.The Standard practices as per IS 456 2000 and IS 6461 Should be adapted to rectify and perform UVP test to detect structural integrity and durablity of member.2.The Column and Brace beam is not properly well connected with proper bonding.The Concrete is not monolytic between these part.both structural part got detached with each other.This should be casted in same time.3.The vertical reinforcement above second brace beam has been found rusted badly due to continious exposure of outer weather.The anti corrosive treatment should be used as per IS 9077- 1979 with proper methodology .4.The Dowel bar of Staircase supported beam is not having sufficient overlap length to get connected with steel reinforcement used in staircase supported beam and staggered overlapping should be implemented.
53 20092658 CHIRRAIYA VILLAGE WATER SUPPLY SCHEME 20092658/01 No No No No No No Yes No No No No No No During the inspection of OHT top dome casting at chirriya ,the aggregate was found mixed with soil & Kankar which may reduce the concrete strength. The cement had also lumps indicating moisture in cement which will reduce binding capacity .such meterials do not meet standard specificatios & will affect the tank's overall strength.
54 20067587 Khameria Alahadat Water Supply 20067587/01 No No No No No No Yes No No No No No No • 1.Cement Slurry marks observed on OHT column surface, indicating leakage of cement paste due to improper water cement ratio or poor workmanship. As per IS 456:2000, Cl. 13.2.4 concrete should be compacted properly during placing to eliminate voids and honeycombing. 2-Gap noticed at bottom side of 1st brace beam and its adjacent column, showing improper concreting (poor workmanship) and lack of bonding (IS 456:2000, Cl. 13.2.4 & Cl. 16.3)Hence it is recommended to clean the joint thoroughly, fill gap with non shrink grout/epoxy mortar, and ensure concreting as per approved methodology. 3. Repair work is visible at several beam and column junctions, indicating previous defects in concreting such as slurry leakage, gaps, or honeycombing. Hence it is recommended to conduct the NDT (Non-Destructive Test) test for reassurance of strength at repaired portions. 4. Major honeycombing is found on brace beam of OHT.
55 20035194 Jamunahi Gram Panchayat Water Supply Scheme 20035194/01 No No No No No No Yes No No No No No No 1. The Staircase supported beam and Column is not connected with bonding since Both are casted in different time zone even after column has achieved its full strength. The non-bonding of both member (Beam and Column) A Continuous hair line crack has been observed due to deflection in Landing of Staircase and Balcony of OHT. 2. The Previously, the attempt to repair the crack has done but not with proper methodology. Only a thin layer of mortar has been applied on it. Once deflection has started, it requires professional assessment and treatment 3. The Support Pedestal of Duck foot bend is made up of Brick block, but it should be made of Concrete. There is gap of 20 30 mm between pedestal and Pipe duck foot. Recommendations: 1. The Rectification should be done for as per approved methodology and conduct UVP Test to check Structural strength of mentioned portion of OHT.
56 20066614 Overi Deeh Water Supply 20066614/01 No No No No No No Yes No No No No No No During inspection, considerable moisture was observed on the lower surface of bottom dome of OHT tank. The sign of Seepage spot indicated the possible availability of voids at bottom dome at pipe joints Beam joints. slow leakage of water through the concrete structure, cracks, or pipe joints, often caused by inadequate waterproofing, structural deterioration, or excessive pressure. This condition leads to both immediate structural issues and long-term maintenance problems
57 20033985 GOOMAFATMAJOTE VILLAGE WATER SUPPLY SCHEME 20033985/01 No No No No No No Yes No No No No No No A small but significant hair line crack is observed in landing of stair case. The stair case supported beam clooumn is not connected with bonding since both are casted in different time zone even after coumn has achieved itrs full strength.The non bonding of both member (Beam & Coulmn) a continous hair line crack has been observed .Due to deflection ,The hair line crack has also been obsevered at balcony.The possible reason of this crack arises due to possible cold joint between two concrete joint of staircase & Coloumn.
58 20069001 Madhya Nagar Water Supply 20069001/01 No No No No No No Yes No No No No No No 1.The Sign of cold joint is observed at the junction of the staircase supporting beam and RCC column of the OHT. The joint line is visibly distinguishable, indicating discontinuity in concreting between the cantilever beam and column. This condition may have occurred due to interruption in concrete placement or improper surface preparation before subsequent concreting. At the time of inspection, no exposed reinforcement or major spalling was noticed; however, the presence of a cold joint may reduce bond strength and durability of the structural connection if left untreated. 2.The RCC column surface shows visible horizontal hairline cracks on the external plaster/painted finish. The cracks appear to be non-structural in nature, likely due to shrinkage of plaster, thermal variation, or improper curing. 3.The Lightening arresterstrip is fixed with clamp drilled into column of OHT. drilling into an RCC column to fix a lightning arrester (LA) strip is generally not allowed and is strongly discouraged. Most structural codes and good engineering practice (including IS 456 & IS 2309 principles) prohibit damaging structural members for service fixings
59 20075932 Devari Khera Water Supply 20075932/01 No No No No No No Yes No No No No No No • Observation point :- 1- It is observed that the vertical pipe is not properly clamped or supported to the RCC column. Absence of clamps/support may lead to pipe movement, vibration, and long-term damage or failure.2- A visible crack is seems to appear at first glance at the junction of the RCC column and staircase. needed to investigate further with closed view. This indicates poor bonding, differential movement, or improper construction joint treatment.
60 20069329 Dhandhara Water Supply 20069329/01 No No No No Yes No No No No No No No No .Multiple Structural cracking was observed in the balcony area of the overhead tank during inspection.Total 4 numbers transverse crack has been observed at different location in balcony which can be clearly seen from upper and lower side.The overhead tank balcony slab shows signs of cracking, which may affect durability if left unattended.The observed cracking shall be evaluated with reference to IS 456:2000 and IS 3370 (Part 1–4):2009. Necessary repair and rehabilitation measures may be carried out as per IS 16375:2020.2.The MS ladder is not welded properly with Insert plate fixed with concrete.The Fixing is to be done properly.3.The Lightening arrester strip is fixed with clamp drilled into column of OHT. drilling into an RCC column to fix a lightning arrester (LA) strip is generally not allowed and is strongly discouraged. Most structural codes and good engineering practice (including IS 456 & IS 2309 principles) prohibit damaging structural members for service fixings.RCC columns are primary load-bearing members of the structure; any drilling, chasing, or cutting into these columns for fixing lightning arrester strips is not recommended as it may affect structural integrity.4.The pipeline the supporting concrete blocks (pedestals) provided on both sides of the pipe show visible cracking, indicating inadequate concrete strength
61 20066709 Nayanager Bisunpur water Supply 20066709/01 No No No No No No Yes No No No No No No During site inspection of the Over Head Tank (OHT), the following defects and quality issues were observed:Concrete surface deterioration and damp patches were observed on the soffit of the slab, indicating poor quality concrete, honeycombing, or water seepage.Leakage / dampness marks and algae growth were noticed on the slab surface, which indicates water percolation and inadequate waterproofing.At locations near MS ladder fixing points, the concrete edges were found to be damaged and uneven, suggesting improper detailing and poor compaction during concreting.Rust stains and corrosion signs were observed at the base of MS ladder supports, indicating lack of proper anti-corrosive treatment and insufficient embedment protection.Concrete finishing was found to be unsatisfactory, with visible surface irregularities, which may affect durability and service life of the structure.
62 20078123 AILARA 20078123/01 Yes No No No No No No No No No No No No OHT 3rd Flight Staircase seen honeycomb is observed due to improper compaction of concrete. Recommendations:
63 20088766 DEORIA MAINAHA & CHITI WATER SUPPLY 20088766/01 No No No No No No Yes No No No No No No During the site inspection that unapproved cement was used for the concreting works of the Overhead Tank (OHT). The cement used was not in accordance with the approved mix design, which is a serious quality non-compliance. Further, it was noted that concrete cube samples were not cast during the concreting of OHT columns; the compressive strength of concrete could not be verified, violating standard quality control procedures. Additionally, the quality of aggregates used was found to be unsatisfactory, with visible impurities and non-uniform grading, which may adversely affect the strength, durability, and long-term performance of the structure.
64 20076256 MAHILA WATER SUPPLY 20076256/01 No Yes No No No No No No No No No No No Two columns seem to be vertically misaligned at first glance. The extent of misalignment is to be investigated further with a total station... . A Cold joint developed between the staircase and the column resulted into Hanging of staircase .The whole staircase is at verge of collapse.A major deflection has developed for staircase . The joint of the brace beam and column is not made properly and monolithic.The Beam is not connected to the column and acts as separate part . The deshuttering of the conical wall staircase and staircase has not done after passing one year after concreting. The Same position continues for one year, so this influences the chance of Proper curing and proper exposure to the outer atmosphere and provide strength. the proper strength could not be achieved. The work has been stopped for more than one year
65 20067642 Imilia Banghusara Water Supply 20067642/01 No No No No No No Yes No No No No No No 1.The Base slab has been drilled purposelessly across it at multiple points .A one place , Due to drilling the hairline crack has been developed.2.The Nut bolts are rusted due to seasonal exposure.This influences the strength of fastening Corrosion occurring in the small, tight spaces between the bolt, nut, and tank panel, where moisture can accumulate and oxygen cannot circulate3.The staircase is not fixed with concrete it is' only kept on beam and base slab nor fastened in slab.4.The Over-tightening or incorrect bolt size are appears at Zinc alum tank at multiple points6.The Silicon covering has not applied on some Bolts for tightening
66 20069153 Sekhapur Water Supply 20069153/01 No No No No No No Yes No No No No No No A small but significant hairline crack is observed in the landing of the staircase. The Staircase supported beam and Column is not connected with bonding since both were cast in different time zone even after the column has achieved its full strength. The non-bonding of both members (Beam and Column). A Contious hair line crack has been observed A drill has been done in the balcony for a strip of lightning arrester,but it is a wrong practice.The steel is exposed in this concrete breaking, but still it is not repaired. The Strip of Lightning arrester is not clamped properly. lt is hanging from the balcony
67 20069162 Sanjhwal Water Supply 20069162/01 No No No Yes No No No No No No No No No Some steel has been cut from the edge of the column. The Column should be dismantled to the lapping length as per the approved methodology. lmplementation of the above methodology should be in accordance with lS 16772 and lS 446. The steel gets rusted badly. The Vertical steel is bent outward. This needs the straightening of steel to a vertical Line and also require Anti corrosive treatment. The Proper chemical treatment of anti-corrosive treatment is recommended to be used with proper methodology. This treatment includes cathodic protection, which shields steel structures, reinforcement bars, and machinery in harsh, humid, or maritime environments. Anti-corrosive treatment of steel in lndla ls prlmarlly governed by BIS codes: 15 9077:L979 for reinforcing steel in concret
68 20078132 CHAUHATTAR KHURD & RAHMARWA WATER SUPPLY 20078132/01 No No No No No No Yes No No No No No No There was no Workers/ Labours & material available on site., Poor workmanship was observed., The two column is vertically misaligned. The Honeycomb is seen in junction of column
69 20069444 Baram Water Supply 20069444/01 No No No No No No Yes No No No No No No Leakage is observed at three points where the inlet and outlet pipes are inserted into the tank wall. Leakage is observed at three points where the inlet and outlet pipes are inserted into the tank wall
70 20067272 Babhan Purwa Water Supply 20067272/01 No No No No No No Yes No No No No No No The chipping of the column has been done, resulting in the decrease of Diameter of OHT. This creates a nominal diameter, which is dangerous.
71 20069420 Sonpur Water Supply 20069420/01 No No No Yes No No No No No No No No No Overlapping of the reinforcement bars was not given as per the design & drawings. The Steel are bent at the edge of the column, and all vertical overlap is provided at the same section of the column, which is not accepted. The steel is also badly rusted.
72 20088758 BELHA & BENIJOT WATER SUPPLY 20088758/01 Yes No No No No No No No No No No No No The major and serious honeycomb is found at the tie beam and column
73 20069166 Hasnapur Water Supply 20069166/01 No No No No Yes No No No No No No No No The Brace beam is not constructed as perthe drawing. The Brace beam is dislocated from the center.
74 20069273 Aidha Water Supply 20069273/01 Yes No No No No No No No No No No No No Honeycombing and voids are observed at beam-column and slab junctions. Concrete surface at soffit and edges is uneven with visible aggregates, indicating improper compaction and finishing. Minor cracks and gaps are also noticed around openings. These defects may affect durability and may lead to reinforcement corrosion and seepage in future.2.Opening left in the bottom dome for pipeline insertion is observed. Edges of the opening are rough and finishing is not proper. Minor honeycombing and surface irregularities are visible around the opening area, which may lead to leakage and durability issues if not properly treated.Recommendation:All honeycombed and loose concrete shall be removed and repaired using approved polymer modified repair mortar/micro-concrete after proper surface preparation. Voids around openings shall be sealed with non-shrink grout. Surface finishing shall be corrected and proper curing ensured. Future concreting work shall be carried out with adequate vibration and quality control as per lS 456:2000 (Clause 13 - Workmanship, lnspection & Testing) and durability provisions of lS 3370 (Part 1 & 2) - Code of Practice for Concrete Structures for Storage of Liquids.
75 20033956 Banghusari Gram Panchayat Water Supply Scheme 20033956/01 No No No No No No Yes No No No No No No Brownish water streak marks are visible along crack lines, indicating seepage through the dome slab. This may lead to durability issues if not treated. The clear signs of leakage as well as seepage in certain areas (Lower surface of Bottom dome, Ring beam and Balcony ) of the OHT tank through pores of wall which indicates the presence of voids inside the concrete walls and slab caused by inadequate waterproofing, structural deterioration, or excessive pressure. This condition leads to both immediate structural issues and long-term maintenance problems. Maintenance of water-retaining structures. The primary code governing these structures is lS 3370, which ensures watertightness, durability, and safety2.Cracks are observed along panelfioint lines which may be due to shrinkage or improper joint treatment. significant hair line crack is observed in joint of staircase beam and Column. The cold joint developed between the Staircase supported beam and Column .Both are not connected with bonding since Both are casted in different time zone even after column has achieved its full strength. The non bonding of both member (Beam and Column) A Continues hair line crack has been observed on Landing of staircase 3.The Mesh Jali has not provided at Top of Dome.4.Plinth Protection of OHT has not done so far5.Localized peeling and surface damage of plaster/paint observed at some locations.5.The supported pedestal is made of Brick but should be made of concrete.
76 20075669 Ganwariya Water Supply 20075669/01 No No No No No No Yes No No No No No No There are clear signs of leakage as well as seepage in certain areas (Lower surface of Bottom dome, Ring beam and Balcony ) of the OHT tank through the pores of the wall, which indicates the presence of voids inside the concrete walls and slab caused by inadequate waterproofing, structural deterioration, or excessive pressure. This condition leads to both immediate structural issues and long-term maintenance problems. maintenance of water-retaining structures. The primary code governing these structures is lS 3370, which ensures watertightness, durability, and safety. A small but significant hairline crack is observed in the landing of the staircase. The cold joint developed between the Staircase supported beam and Column. Both are not connected with bonding since both are cast in different time zones even afterthe column has achieved its full strength. The non-bonding of both members (Beam and Column). A Continuous hair line crack has been observed.3.The Lightening arrester has not been installed at the OHT top4. Plinth Protection of OHT has not been constructed.
77 20079045 PIPRA RAM WATER SUPPLY 20079045/01 Yes No No No No No No No No No No No No major honeycombing observed at several locations in brace beams and columns of oht. The dowel bar of the staircase has been cut from the edge. Vertical steel of columns is badly rusted
78 20035191 JAGDEVA VILLAGE WATER SUPPLY SCHEME 20035191/01 No No No No No No Yes No No No No No No Seepage and damp patches are observed on the conical wall surface. The affected area shows visible moisture marks, discoloration, and signs of water ingress, indicating possible leakage through construction joints, micro-cracks, or porous concrete.
79 20069137 Majhauli Water Supply 20069137/01 No No No No No No Yes No No No No No No Poor workmanship was observed in the OHT structure, specifically in the column brace, bottom dome, and staircase. The column brace shows signs of inadequate finishing and possible misalignment, while the bottom dome reflects irregular construction quality with uneven surfaces. Similarly, the staircase attached to the OHT has been executed with poor workmanship, displaying improper detailing and lack of uniformity. Overall, the quality of work in these components does not meet the expected standards and requires immediate rectification to ensure structural safety and durability.
80 20100498 Chawai Bujurg Water Supply Scheme 20100498/01 No No No No No No Yes No No No No No No Seepage is occurring from the bottom dome as well as from the vertical DI column, indicating poor workmanship and lack of proper waterproofing. • The boundary wall gate has not been installed. Campus development work remains incomplete, drainage work has progressed only up to excavation, and painting of the boundary wall has not been carried out. • Construction of the Pump House, Bypass Chamber, and installation of MS Girders are still pending. • Construction of the Pump House, Bypass Chamber, and installation of MS Girders are still pending. • Grouting work is only 30% complete. In several locations, MDPE pipes are visible on the surface, which should be completed at earliest • Water supply has not yet reached all habitations.
81 20035196 Nand Nagar Thatiya Gram Panchayat Water Supply Scheme 20035196/01 Yes Yes No No No No No No No No No No No 1. The Two columns are misaligned and not in vertical symmetry. 2. The serious honeycomb is shown in the column. 3.The dowel steel of staircase has been cut. 4.The steel is exposed at column phase.
82 20069430 Shiva Nagar Water Supply 20069430/01 Yes Yes No No No No No No No No No No No Honey & Repairs found atvmany places of Brace Beam & Coloumn. Needed immidiate rectification. An NC was raised on 18.06.2025 for major honeycombing observed at several locations in brace beams and columns of the OHT.However, the contractor carried out painting over the affected areas without rectifying the defects or closing the NC.Painting without proper repair conceals honeycombing and adversely affects the structural integrity and durability.
83 20077497 MAHADEV HARIHARNAGAR VILLAGE WATER SUPPLY 20077497/01 No Yes No No Yes No No No No No No No No Thickness of coloumn is reduced due to chipping of concrete to remove the dowel bar of staircase . Recommended to Reassesment of Structural integriry on both coloumn by experienced Structure. The Column above brace beam has been erected in a very bad manner
84 20078201 KAMDI WATER SUPPLY 20078201/01 Yes Yes No No No No No No No No No No No Two veritical columns are misaligned. Major Honeycomb found in Brace Beam 1-& Brace Beam -2. NDT Test to ensure the quality of work.
85 20069150 Koeliha Water Supply 20069150/01 No No No Yes No No No No No No No No No 1. Sufficient Lap Length is not available at third brace level. 2. At the third brace level of the OHT, the reinforcement steel does not have sufficient lap length as required design standards.
86 20039427 NANDAURI VILLAGE WATER SUPPLY SCHEME 20039427/01 Yes No No No No No Yes No No No No No No 1.OHT finishing is not done clearly. 2.Last flight of Beam is cracked . 3.Satir Hand railing post not finshed properly. 4. seepage is seen bottoom of OHT which shows compation of concrete is not done properly which cause structural weakening & Leakage. Honeycombing and rough concrete surface were observed at the bottom dome and balcony area. Improper compaction and inadequate vibration are suspected. This may affect durability and expose reinforcement to corrosion. Recommendation: Remove loose particles and carry out proper polymer-modified mortar repair as per standard repair procedure. 2. The Hairline crack is found at the interface of the column and the staircase beam as a result of Cold Joint / Construction Joint Improperly Treated. Visible joint line and uneven finishing at slab–beam/column junction. Joint treatment appears inadequate.
87 20066575 Amrahwa Water Supply 20066575/01 No No No No No No Yes No No No No No No The chipping of the column is being done to remove the dowel bar, but forthe removalof the dowel bar, the chipping is done. The column is being broken down to a considerable depth to expose the dowel bars, which is incorrect. By the time the staircase is constructed, the column will have gained its full strength, preventing proper bonding between the two. This led to the crack in the staircase. Already The TKC has instructed to construct the staircase simultaneously with column concrete, but both construction is being done with a wide intervalof time, so lt lead to the weakening of the concrete. Again and again, this practice is being implemented by agency Dara- Eco protection The chipping of the column is being done to remove the dowel bar, but forthe removalof the dowel bar, the chipping is done. The column is being broken down to a considerable depth to expose the dowel bars,' which is incorrect. By the time the staircase is constructed, the column will have gained its full strength, preventing proper bonding between the two. This led to the crack in the staircase. Already The TKC has instructed to construct the staircase simultaneously with column concrete, but both construction is being done with a wide intervalof time, so lt lead to the weakening of the concrete. Again and again, this practice is being implemented by agency Dara- Eco protection
88 20069176 Bhithauri Water Supply 20069176/01 No No No Yes No No No No No No No No No Steel is rusted as the work stopped since more than seven months need anti corrosive treatment before resuming the work. OHT work completed up to ground level, and reinforcement steel left exposed to the atmosphere which has caused rusting to exposed reinforcement. Major honeycombing observed in the casted beam concrete due to inadequate compaction hence it is recommended to repair honeycombed beam areas by epoxy grouting or micro concrete as per IS 456:2000, ensuring proper compaction and vibration in future concreting & for Reassurance of strength NDT is recommended. 04 nos reinforcement bar left for column casting are cut at GL level hence sufficient lap length would not be achieved.
89 20079014 BALAPUR WATER SUPPLY 20079014/01 No No No Yes No No Yes No No No No No No During inspection of the OHT, it was observed that, for extracting dowel bars, columns were chipped more than 25 mm resulting in exposure of vertical reinforcement and reduction of the effective cross-section, compromising the structural strength of columns, at the GL level dowel bar has been cut, which is not in accordance with IS 456:2000 The observations are as follows 1.The construction of OHT has completed upto Top Dome 80% work has been completed 2.stair work are pending 3.The piping arrangement is Pending 4.The joint between two consecutive lift of concrete wall is found non proper and monolythic between staircase support beam and column is not made properly monolythic 5.The steel of staircase support beam has been cut sufficient overlap length of steel is need to ensure 6.The concrete is left abandoned without leaving proper construction joint.The surface become rough and porous.