Agency-wise Major/critical Ncs at OHT

S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20091940 USUR KURHWA,MAJHAUA GRAM PANCHAYAT WATER SUPPLY SCHEME 20091940/01 Yes No No No No No No No No No No No No Honey combing was observed at the junction point of third brace beam and column of OHT
2 20099063 Khetapur Siwan Water supply Scheme 20099063/01 No No No No No Yes No No No No No No No 1.Gap has been found between vertical wall of aluminum sheet and OHT slab surface. 2.Gap found between hold down bracket and OHT slab surface. 3.Hold down bracket is not properly anchored with OHT slab