Agency-wise Major/critical Ncs at OHT

S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20067796 KAROONDI 20067796/01 No No No No Yes No No No No No No No Yes PCC - Depth not as per approved drawing. Work is done Ground level.
2 20067475 HASANPUR ABABAKPUR 20067475/01 No No No No Yes No No No No No No No No Inappropriate construction of Stair case of OHT, Trade/riser and landing beam reinforcement not binding properly.
3 20066753 Randol 20066753/01 No No No No No No No Yes No No No No Yes Excavation depth for foundation work is not as per drawing. As per SBC report determine depth minimum 2.5 While observed depth 2.1 from NGL.
4 20068116 Chatharsali 20068116/01 Yes No No No No No No No No Yes No No Yes Regarding – Alignment of OHT brace beam, cracks developed in OHT first brace at junction and honeycomb found in column at staging height.
5 20083723 Jayantipur Must. 20083723/01 No Yes No No Yes No No No No Yes No No No Regarding OHT column not in plumb from column above 3rd brace & Work executed without approved drawing. During Inspection OHT are not in plumb.
6 20099511 Fatehpur kalan & Chohadpur kalan Zone 4 20099511/01 No No No No No Yes No No No No No No No Zinc Alum Tank not placed as per drawing.
7 20067739 BAHHEDI GHOGU 20067739/01 No No No No Yes No No No Yes No No No No Inappropriate Size of staircase of OHT and not in level.