| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20099003 | HUSENIPURWA RISIA (VPL) PWS | 20099003/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | *The columns are vertically not aligned, deviating from the specified standards | |||||||||||||
| 2 | 20099016 | NAWAPATTI CHITAURA (VPL) MVS PWS | 20099016/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | The improper shuttering has led to alignment issues between the columns and brace beams. | |||||||||||||
| 3 | 20093234 | UDHARANA SARAHDI VISHESWARGANJ (VPL) PWS | 20093234/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | *Certain vertical reinforcement bars of the column have been cut and appear to have been stolen. | |||||||||||||
| 4 | 20101738 | MOTIPUR MIHIPURWA (VPL) PWS | 20101738/01 | Yes | Yes | No | No | No | No | No | No | No | No | No | No | No | *Honeycomb is observed in column and brace beam. *Column is not vertically aligned and section is not properly casted. *Center to center distance between two columns has 30-40 mm variation from drawing. | |||||||||||||
| 5 | 20092859 | MOHANAPUR GANGAPUR MIHIPURWA (VPL) PWS | 20092859/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | *Due to prolonged suspension of work, all reinforcement steel in the column of the OHT structure has become rusted from continuous exposure without any protective covering. | |||||||||||||
| 6 | 20098992 | JHALA MIHIPURWA (VPL) PWS | 20098992/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | *Dimensional error in one of Brace beam not as per approved drawing. | |||||||||||||
| 7 | 20093179 | PIPARI MAFI SHIVPUR (VPL) PWS | 20093179/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | *All column is not vertically aligned. | |||||||||||||
| 8 | 20099013 | TIKUAPARA SHIVPUR (VPL) PWS | 20099013/01 | No | No | No | No | Yes | No | Yes | No | No | No | No | No | No | *Concrete pouring is being caried out directly on the ground. *Slump of concrete is not as desired and even slump cone is also not provided at site. | |||||||||||||
| 9 | 20099005 | KARNIYA RISIA (VPL) PWS | 20099005/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | *Few vertical columns steel is chopped at GL level. | |||||||||||||
| 10 | 20098948 | NIBIYASHAH MOHAMMADPUR BALAHA (VPL) PWS | 20098948/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | *Few vertical columns steel chopped at GL level . | |||||||||||||
| 11 | 20098950 | TULSIPUR BALAHA (VPL) PWS | 20098950/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | *Few vertical columns steel chopped at GL level . | |||||||||||||
| 12 | 20092705 | MADHUBAN BALAHA (VPL) PWS | 20092705/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | *staircase waist slab thickness not as per approved drawing. | |||||||||||||
| 13 | 20101733 | NAGAR CHITTAURA (VPL) PWS | 20101733/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | *1st staircase cantilever beam reinforcement cut from column. | |||||||||||||
| 14 | 20093332 | BARAI BILASA CHITAURA (VPL) MVS PWS | 20093332/01 | Yes | No | Yes | No | No | No | No | No | No | No | No | No | No | *Cube failed of 28 days of 1st lift column above 2nd brace. | |||||||||||||
| 15 | 20099788 | PARSA RAMPUR PHAKARPUR (VPL) PWS | 20099788/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | *Ring beam alignment not as per approved drawing, ring beam found in zig zig manner. | |||||||||||||
| 16 | 20092931 | BAMIYARI PAKHARPUR (VPL) PWS | 20092931/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | *Dimensional error in OHT staircase. | |||||||||||||
| 17 | 20099780 | TAJA KHODAI CHITTAURA (VPL) PWS | 20099780/01 | Yes | Yes | No | No | No | No | No | No | No | No | No | No | No | *Misalignment of column above 3rd brace and honeycomb in columns. *Honeycomb is OHT column. | |||||||||||||
| 18 | 20093315 | JAMNUHA NAUBASTA NAWABGANJ (VPL) MVS PWS | 20093315/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | *Deviation in brace beam, not constructed as per approved drawing. | |||||||||||||
| 19 | 20093320 | AMWA TETARPUR PHAKHARPUR (VPL) MVS PWS | 20093320/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | *Regarding poor surface finishing of OHT air voids seams at few places. | |||||||||||||
| 20 | 20093190 | MANIKPUR BAGHAULI SHIVPUR (VPL) PWS | 20093190/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | *Regarding rusting of Beam steel at GL level beam . | |||||||||||||
| 21 | 20093210 | GANIYAPUR TEJWAPUR (VPL) PWS | 20093210/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | *Regarding top ring beam has executed in deviation from the approved drawing. | |||||||||||||
| 22 | 20093285 | KAHARAI KAISARGANJ (VPL) MVS PWS | 20093285/01 | No | Yes | No | Yes | Yes | No | No | No | No | No | No | No | No | *Columns are not vertically aligned. *Rusting in exposed steel from column. | |||||||||||||
| 23 | 20098995 | SEMRAHANA MIHIPURWA (VPL) PWS | 20098995/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | *Regarding improper finishing work and finishing of Zinc alum tank erection work. | |||||||||||||
| 24 | 20092866 | AYODHYA GAON MIHIPURWA (VPL) PWS | 20092866/01 | Yes | No | No | Yes | Yes | No | Yes | No | No | No | No | No | No | *Dimensional error in all Brace beam not as per approved drawing. *Rusted reinforcement steel found at full stagging possible due to long delay in casting. *Minor honeycomb is brace column junction due to poor compaction due to concreting. | |||||||||||||
| 25 | 20098996 | PEERNASARUDDIN NAWABGANJ (VPL) PWS | 20098996/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | *Regarding misalignment in GL brace and minor honeycomb in column brace junctions. | |||||||||||||
| 26 | 20099010 | UCHWA PURAINA CHITTAURA (VPL) PWS | 20099010/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | *HONEYCOMB IS OBSERVED IN STAIRCASE SLAB . | |||||||||||||
| 27 | 20099007 | MAJHAUBWA VISHESWARGANJ (VPL) PWS | 20099007/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | Resolved | Brace steel lapping length is not as per IS standard | ||||||||||||