S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20092850 BISHUNAPUR RAMNAGAR 20092850/01 Yes No No No No No No No No No No No No 1- Major honeycombing is visible in the overhead tank's 2nd and 3rd brace beam junction and steel are visible at junction. 2- Over Head tank work stopped for a long time.
2 20089731 MANIHAR TARA 20089731/01 Yes No No No No No No No No No No No No Honeycombing has been observed in the first brace and column of the overhead tank, indicating poor compaction and inferior quality of concrete. These deficiencies may reduce the structural strength and durability of the overhead tank, and immediate corrective measures are required.
3 20092764 BARGADAHA 20092764/01 Yes No No No No No No No No No No No No the paint finishing is not correct, plinth protection is creak, second brace has been minor honeycombs.
4 20097262 BAHORWA 20097262/01 Yes No No No No No No No No No No No No Honeycomb are seen column abouve 3rd and 2nd brace the junction of staire case and oht column finishing is very poor quality.
5 20097256 SONBARSA 20097256/01 No No No No No No No No No No No No No 1. Miner honeycomb are visible in over Head tank stairs and poor workmanship observed. 2. Over Head tank column and brace Finishing work required
6 20097264 DIKRA 20097264/01 Yes No No No No No No No No No No No No 1. Honeycombing has been observed in the second brace of the OHT, where the reinforcement steel is exposed. 2. Similar honeycombing is also observed in the column, with reinforcement steel visible. 3. These deficiencies indicate poor concrete compaction and inadequate cover, which may adversely affect the structural strength and durability of the OHT.
7 20088918 BELHA RAGHAV 20088918/01 Yes No No No No No No No No No No No No 1. Honeycomb are visible in 3rd brace and bottom ring beam and finishing work required in top slab of over Head tank
8 20097282 PARAS RAMPUR_ BISUNAPUR 20097282/01 No Yes No No No No No No No No No No No 1. Brace beams and Column of OHT show noticeable misalignment..
9 20100192 GANDHI 20100192/01 No No No Yes No No No No No No No No No 1. The project was halted for some time and vertical reinforcement bars of all five columns were cut from the bottom may leads to structure durability & stability failures.
10 20093092 JAGRAWAL GARHI 20093092/01 No No No Yes No No No No No No No No No 1. The project was halted for some time and vertical reinforcement bars of all five columns were cut from the bottom may leads to structure durability & stability failures.
11 20088895 GODARI 20088895/01 No No No Yes No No No No No No No No No 1. The project was halted for some time and vertical reinforcement bars of columns were cut from the bottom may leads to structure durability & stability failures.
12 20089758 ETAUNJHA_BARAIPUR 20089758/01 No No No Yes No No No No No No No No No 1. The steel is rusted,ensure that all rusted steel reinforcement is propley cleaned or repleced prior to further work . 2. No concreting or febrication shall proceed until corrective action are taken.
13 20088951 SHAHPUR PURE SHIVDIN 20088951/01 No No No Yes No No No No No No No No No 1.Reinforcement has been cut and stolen from the column of OHT due to stoppage of construction activities at site more than 6 month ago. 2-Reinforcement bars have been correded.
14 20088901 RANIPUR QUAZI 20088901/01 No No No Yes No No No No No No No No No 1. The project was halted for some time and vertical reinforcement bars of columns were cut from the bottom may leads to structure durability & stability failures.
15 20097241 HEMPUR 20097241/01 No No No Yes No No No No No No No No No 1. Water has been accumulating in the OHT campus for the past 12 months due to lack of soil backfiJling inside the campus and absence of a proper drainage system. 2. This prolonged waterlogging can weaken the soil, affect foundation stability, cause corrosion of metal components, damage concrete surfaces, and reduce the durability of the structure, even though all OHT works-including Fu ll staging-have been completed. 3. lt is observed that staircases reinforcement steel cut/removed from the waist slab, tread and riser and landing ancho rage.
16 20088952 TANDUWA RATANPUR 20088952/01 No No No Yes No No No No No No No No No 1- lt is observed that staircases R/F steel cut/removed from the waist slab, tread and riser and landing. a nchorage. 2- !t is obserr.,ed that Cracks are seen in boundar;, wall. 3- Over Head tank column 3rd brace brace steel was rusted due to No work ongoing in the last 1year. 4 Due to the prolonged suspension of construction, activities steel Found Corroded which may affect the durability & stability of the structure.
17 20088899 KATHA 20088899/01 No No No Yes No No No No No No No No No 1. The steel is rusted,ensure that all rusted steel reinforcement is propley cleaned or repleced prior to further work . 2. No concreting or febrication shall proceed until corrective action are taken.
18 20093299 GANGAPUR_SENAURA TARAI 20093299/01 No No No Yes No No No No No No No No No 1. The sieel rusted in the Column up to 13t brace beam ofthe overhead tank. 2- Due to the prolonged suspension of construction activities steel Found Corroded which may affect the durability & stability ofthe structure.
19 20092879 AMARAHWA 20092879/01 No No No Yes No No No No No No No No No 1- lt is observed that staircases reinforcement steel cut/removed from the waist slab, tread and riser and landing anchorage. 2- Over Head tank work stopped in the last year and stajrs steel and 3rd brace above cotumn steelwas found rusted at site.
20 20093100 TITIHIRIRA 20093100/01 No No No Yes No No No No No No No No No 1- Miner honeycomb found in stairs and over Head tank 3rd brace above column steel rusted. 2- Over Head tank work stopped for a long time. 3-lt is observed that Column above 3rd brace and staircase steel rusted found at site.
21 20097263 MAHADEWA 20097263/01 No No No Yes No No No No No No No No No 1. The work has been suspended for a prolonged period. 2. Due to prolonged exposure and lack of protective measures, corrosion of the reinforcement steel has been observed in the columns and staircase members.
22 20088914 RAJAPUR RANI 20088914/01 No No No Yes No No No No No No No No No 1. over Head tank column steel was fully rusted due to work stopped since Long time and one stairs steel cutting.
23 20092940 MANWARIYA BOJHA 20092940/01 No No No Yes No No No No No No No No No 1. The reinforcement above the GL at the staircase has been cut, and the steel is completely rusted. 2. In the cylindrical wall, the first lift casting was done a long time ago, but the second lift casting has not yet been carried out. 3. The exposed steel reinforcement is heavily rusted.
24 20097126 Tilakpur W/S 20097126/01 No No No No No No No No No No No No No 1.The project was halted for some time and vertical reinlorcement bars of all five columns were cut from the bottom may leads to structure durability & stability failures.
25 20088892 DIKAULI 20088892/01 No No No No No No No No Yes No No No No 1. Leake observed in bottom dome RRC water tank.
26 20088912 TULSIPUR 20088912/01 No No No No No Yes No No No No No No No 1. Regarding Leakage has been observed at multiple locations in the overhead tank, indicating inadequate waterproofing and poor workmanship.
27 20097287 ACHARAURA SHAHPURA_ ASNI 20097287/01 No No No No No No No No Yes No No No No 1. Seepage has been observed in the bottom dome of the Overhead Water Tank .
28 20089749 LUXMANPUR GORPURWA_GANESHPUR 20089749/01 No No No No No No No No Yes No No No No 1. Seepage in observed in over Head tank bottom dome and poor workmanship observed in brace junction and finishing work required in 2nd brace.
29 20088935 MAHDEIYA 20088935/01 No No No No No No No No Yes No No No No 1. Critically Water leakage has been observed from several points in bottom dome of OHT it is recommended kindly fill water in tank after rectification work and DI pipe also leakaging.
30 20093247 RAMPUR_LAKSHAMANPUR GANGAPUR 20093247/01 Yes No No No No No No No Yes No No No No 1. The bottom dome beams of the OHT have honeycombing, and it has been several days since the last flight ofthe staircase was costed, but the de-suturing has not been done yet.
31 20100189 KHAIRY TARAI 20100189/01 No No No Yes No No Yes No No No No No No 1. The project was halted for some time and vertical reinforcement bars of all five columns were cut from the bottom and water logging is under OHT.
32 20088924 CHAINPUR 20088924/01 No Yes No No No No No No No No No No No 1. Proper plumb check along with Jal Nigam, also reminded several times verbally to get the availability of Heavy Plumb so to check the exact variation of all columns.
33 20088948 SAMHAR PURAWA 20088948/01 No No No Yes No No No No No No No No No 1. The project was halted for some time and vertical reinforcement bars of all five columns were cut from the bottom may leads to structure durability & stability failures.
34 20097324 RAMNAGAR CHIRADIH 20097324/01 No No No Yes No No No No No No No No No 1. The project was halted for some time and vertical reinforcement bars of all five columns were cut from the bottom may leads to structure durability & stability failures.
35 20092891 DARE KUIEYA 20092891/01 No No No No No No No No Yes No No No No Resolved 1. seepage observed in OHT bottom dome. पत्रांक संख्या: 1670 / VPL /HYD/SBT/2026-27 दिनांक: 02/05/2026
36 20092973 IMALIYA KARANPUR 20092973/01 No No No No No No No No Yes No No No No Resolved 1. seepage observed in OHT bottom dome पत्रांक संख्या: 1669 / VPL /HYD/SBT/2026-27 दिनांक: 02/05/2026
37 20074376 KHAJUHA JHUNJHUNIA 20074376/01 Yes No No No No No No No No No No No No Resolved During inspection, honeycombing was observed at various flights of the staircase of the Overhead Tank (OHT), indicating inadequate concrete compaction and poor workmanship. Water logging was also noticed due to insufficient drainage, which may lead to durability issues. Additionally, one of the second braces was found to be executed with improper dimensions and is not in conformity with the approved drawings and design specifications also minor honeycomb at junction of column and ringbeam. पत्रांक संख्या: 1679 / VPL /HYD/SBT/2026-27 दिनांक: 06/05/26
38 20074379 MAKSRIHVA 20074379/01 Yes No No No No No No No No No No No No Resolved 1. Major Honeycomb was observed in the columns and braces of the overhead tank in Hariharpur Rani Gram Panchayat block, and the first brace has suffered minor damage. 2. Poor workmanship was also observed in several areas of the overhead tank. पत्रांक संख्या: 1678 / VPL /HYD/SBT/2026-27 दिनांक: 06/05/26
39 20088900 RAMNAGARA 20088900/01 No No No No No No Yes No No No No No No Resolved 1. Raft casting of the OHT is in progress, and the concrete is being mixed using a manual mixture machine instead of weight batcher mixing machine. Also, the vibrator is not being operated properly. पत्रांक संख्या: 1668 / VPL /HYD/SBT/2026-27 दिनांक: 02/05/2026
40 20089740 DAHAVER KALAN_BHOJPUR 20089740/01 Yes No No No No No No No No No No No No 1.Major Honeycomb observed during site visit in 1st brace beam.
41 20092698 PURUSHOTTOMPUR 20092698/01 No No No No No No No No Yes No No No No 1. Leakage/seepage observed in OHT bottom dome.
42 20093115 HARIHARPUR MAHRAJ NAGAR 20093115/01 Yes Yes No No No No No No No No No No No 1. Second breace beam is not alignment,finshing of staire is very poor quality, 2. Honeycomb has been found at Top dome.
43 20074445 RAMWAPUR 20074445/01 No No No No No No Yes No No No No No No 1. Cover blocks are not placed properly. 2. Proper safety not maintained by the manpower at site. 3. PPE kit are not available for manpower at site. 4. Weight batcher are not available at site., 5. Vibrator & compaction not done properly & Cube mould was not available on site as per requirement.
44 20097302 MADRAHVA_ BELHARI 20097302/01 No Yes No No No No No No Yes No No No No 1. Brace beams of OHT show noticeable misalignment. Cracks have been observed in the platform of stairs.
45 20092885 SONPUR KALAN 20092885/01 No No No Yes No No No No No No No No No Resolved 1. OHT work has been completed up to GL level. However, the work has been stopped for a long period. Due to prolonged stoppage of work, rusting has been observed on the reinforcement steel of columns above GL level. पत्रांक संख्या: 1662 VPL /HYD/SBT/2026-27 दिनांक: 28/04/2026
46 20074373 KAKARDARI 20074373/01 No No No Yes No No No No No No No No No Resolved 1. OHT Work is stopped from last 22 months after attending column up to 1 brace beam level. Due to the prolonged suspension of construction activities column steel Found Corroded which may affect the durability & stability of the structure. 2. The main reinforcement in the OHT column has not been lapped as specified within the designated lapping zone according to the approved design and drawings. पत्रांक संख्या: 1649 / VPL /HYD/SBT/2026-27 दिनांक: 23/04/2026
47 20093189 MANSUKHA_KALYANPUR 20093189/01 No No No Yes No No No No No No No No No Resolved 1. Due to the prolonged suspension of construction activities steel found Corroded which may affect the durability& stability of the structure. पत्रांक संख्या: 1327/ VPL /HYD/SBT/2025-26 दिनांक: 20/11/2025
48 20088929 MOHMMADPUR RAJA 20088929/01 No No No No No No No No Yes No No No No Resolved 1. Critically Water leakage has been observed from several points in bottom dome of OHT. पत्रांक संख्या: 1630 / VPL /HYD/SBT/2026-27 दिनांक: 15/04/2026
49 20097280 TENDWA MAHANT 20097280/01 Yes No No Yes No No No No No No No No No 1. Staircase steel found rusted and minor honeycomb found in balcony slab. पत्रांक संख्या: 1631 / VPL /HYD/SBT/2026-27 दिनांक: 15/04/2026
50 20074370 JANKI NAGAR 20074370/01 No No No No No No Yes No No No No No No Resolved 1. Plinth protection is being constructed for the OHT, in which PPC cement is being used. 2. The bricks for the side drain at the plinth level are being laid without conducting any tests. पत्रांक संख्या: 1556 / VPL /HYD/SBT/2025-26 दिनांक: 27/02/2026
51 20093343 BHIKHPUR TARAI_BENI DIHUA 20093343/01 Yes No Yes No No No No No No No No No No Resolved 1. Honeycombing has appeared in several sections of the bottom ring beam, and in many places, the stirrups of the ring beam are fully exposed; this condition could potentially compromise the structural integrity of the bottom ring beam in the future. 2. Please ensure that this work is rectified as a matter of utmost urgency. 1. Cube Test failed for Column above 2nd Brace Beam (28 Days) during compressive strength test in GP-Bhikpur Tarai पत्रांक संख्या: 1085 / VPL /HYD/SBT/2025-26 दिनांक: 23/07/2025