Agency-wise Major/critical Ncs at OHT

S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 8362906 BAKEWAR BUJURG 8362906/01 No Yes No No No No No No No No No No No Vertical alignment and orientation of one of the column is not proper after 1st brace(Alignment/ verticality issue recommended for Total station method or Dismantle)
2 20000746 Musarfa WSS Scheme 20000746/01 No No No No No No Yes No No No No No No Resolved In OHT brace beam severe crack has been observed. Kindly conduct NDT test of this member and rectify it.(NDT test performed on dated 16.07.2025. result found satisfactory)
3 20026275 MALAKA 20026275/01 No No No No No No Yes No No No No No No Seepage has been observed from the bottom dome of over head tank.
4 20033606 Ojhi Kharagsenpur 20033606/01 Yes Yes No Yes Yes No No No No No No No No 1.Shape of Column has not been found as per drawing.(recommendation for reconstruct as per design and drawing) 2.Steel bars have been exposed at the bottom surface of top ring beam. 3.Undulation has been found at the cylindrical wall . And also not observed vertically aligned.(recommended repairing & dismantle) 4.Steel bars have been exposed at the junction point of conical wall and cantilever beam for staircase.(recommended for NDT test after repairing/dismantle) 5.Hollow space observed between the beam and landing slab of staircase. While should have been casted together.(recommended for NDT test after repairing/dismantle) 6.Steel bars have been exposed at the bottom surface of walkway.(recommended for NDT test after repairing/dismantle)
5 20058666 ALAMPUR,MATHURAPUR 20058666/01 No Yes No No No No Yes No No No No No No Resolved Resolved 1.It has been observed that cylindrical wall of OHT not aligned properly during site visit.(Alignment checked and found ok) 2.Water seepage has been occurred from the conical dome.(surface sealing and water proofing)
6 20061187 Kudwari 20061187/01 Yes No No No No No Yes No No No No No No Resolved 1.Honeycomb has been found in many places of bottom dome. which is not acceptable as per IS code 456:2000(NDT test conducted on dated 16.08.2025. found satisfactory) 2.Crack has been developed at the top surface of staircase landing.
7 20061197 Bahera sadat 20061197/01 No No No Yes No No No No No No No No No Resolved Steel bar exposed and concrete pouring was not done properly at the junction of walkway slab and column.(NDT test has been performed)
8 20063827 KHEIRAI 20063827/01 No No No No Yes No No No No No No No No Resolved The overlap has not been provided by TKC as per approved drawing at top of bottom ring beam of OHT at site. It should be provide at mid span of beam as per approved drawing. ( overlap has been provided as per approved drawing at top of bottom ring beam of OHT)
9 20063840 Tani water supply scheme 20063840/01 No No No No Yes No No No No No No No No Steel bars has been cut at face of column which were left for staircase reinforcement. It is difficult to provide another steel bars. Take corrective action regarding this issues.(Recommended dismantling/ Rebaring of steel/ coupling of steel bar.)
10 20101120 Saray Udai 20101120/01 No No No No Yes No No No No No No No No Steel bars of OHT staircase at plinth level have been cut. It is difficult to provide steel bars with proper development length. It's suggested to TKC representative kindly take corrective action.(Recommended Rebaring of steel/ coupling of steel bar.)
11 20016855 BAVANRA 20016855/01 No Yes No No No No No No Yes No No Yes No it has been observed that the verticality of column below 2nd brace beam has not been found properly at site.
12 20026703 DAVATPUR 20026703/01 No Yes No No No No No No No No No No No Resolved Sagging has been observed in the first brace beam of OHT.
13 20063860 DHAMINA 20063860/01 No No No No Yes No No No Yes No No Yes No Resolved Resolved Resolved Distance b/w column to column not found equal for every column.(All column of OHT dismantled)
14 20026697 PAHARDPUR 20026697/01 No No No No No No No No No No No No No
15 8360138 Sarsai Buzurg 8360138/01 No No No No Yes No No No No No No No No Reinforcement of beam has not been overlapped at corner joint of the beam.
16 8360197 Narauli Khurd 8360197/01 No Yes No No No No No No No No No No No Resolved As per visual inspection it has come to our notice that the verticality of Over Head Tank is improper. TKC is instructed to take necessary steps in this regard.(by plumbing verticality check found ok)
17 8360213 Chakheri 8360213/01 No No No No Yes No No No No No No No No Many numbers of steel bars of column of OHT has been cut at plinth level . It is difficult to provide steel bar with proper development length . Take corrective action regarding this and dont do further work on OHT before rectification of this critical issue.(Recommended dismantling)
18 8361237 Jagannathpur 8361237/01 No Yes No No No No No No Yes No No Yes No 3rd lift column above 2nd brace beam was found tilted. Dismantle the column and reconstruct it properly.(Recommended for dismantle last lift of column)
19 20026270 FATEHPUR MATIYA 20026270/01 No No Yes No No No No No No No No No No Resolved The compressive strength test of concrete cube of bottom dome at 28 days has been found failed as per Cl. 16.1 IS 456 : 2000. Kindly conduct NDT test as per guideline.( NDT test has been performed)
20 8360134 Samerahta 8360134/01 No No No Yes No No No No No No No No No Steel bars have been exposed and severe honeycomb has been developed in the bottom dome of OHT.