| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 8359217 | AHMADPUR DEWARIYA TUBEWELL | P2FBD122 | No | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Tank not placed at the centre of ring beam & not in plumb. | ||||||||||||
| 2 | 8359212 | ALUPUR IKDARIYA W/S SCHEME | P2FBD121 | No | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Rusted nut bolt, Tank not placed at the centre of ring beam. | ||||||||||||
| 3 | 8359203 | BIDAIL W/S SCHEME | P2FBD120 | No | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Improper drilling in hold down bracket, rusted nut bolt & Tank not placed at the centre of ring beam. | ||||||||||||
| 4 | 20019920 | Karamchand Pur W/S Scheme | P2FBD134 | No | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Tank not placed centre of ring beam and hold down bracket not vertically. | ||||||||||||
| 5 | 20019514 | Patti Khurd | P2FBD22 | No | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Resolved | OHT Column not found in center line. | |||||||||||
| 6 | 8359330 | MUNDGAON W/S SCHEME | P2FBD06 | No | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | BBS Not provided before casting 2nd brace beam. | ||||||||||||
| 7 | 20018313 | BIBIPUR W/S Scheme | P2FBD133 | No | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Flange nut bolt used where as required washer nut bolt & improper levelling. | ||||||||||||
| 8 | 20016714 | Danmandi kamalganj W/S scheme | P2FBD132 | No | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Tank not vertically alignment & used of lower grade nut bolt. | ||||||||||||
| 9 | 20076663 | Sultanpur Palnapur & Bhagipur Umrah W/S scheme | P2FBD205 | No | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Flange nut bolt used where as required washer nut bolt & improper levelling & rusted nut bolt. | ||||||||||||
| 10 | 8359185 | ISHEPUR W/S SCHEME | P2FBD117 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Gap Between slab & sheet, Improper centering of ring beam. | |||||||||||||
| 11 | 8359220 | NAGARIYA W/S SCHEME | P2FBD123 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Leakage in bottom of tank & installed corrugated sheet. | |||||||||||||
| 12 | 8359176 | UGARPUR SULTANPATTI W/S SCHEME | P2FBD114 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Installation of DI outlet pipe incorrect way & improper centering of tank on ring beam. | |||||||||||||
| 13 | 20020879 | Bhartamau W/S Scheme | P2FBD136 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Tank not placed centre of ring beam, Improper levelling. | |||||||||||||
| 14 | 20038913 | Katrauli Patti w/s scheme | P2FBD143 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Nut bolt rusted, Tank not placed centre of ring beam. | |||||||||||||
| 15 | 20093607 | NAULI SVS | P2FBD86 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Tank not placed centre of ring beam and hold down bracket not vertically. | |||||||||||||
| 16 | 20019511 | Ramapur Dabir W/S Scheme | P2FBD56 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Honeycombing was found in the OHT second brace beam and the second brace above the first lift column also some places. | |||||||||||||
| 17 | 8359178 | RANUKHERA W/S SCHEME | P2FBD115 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Rusted nut bolt & gap between slab and sheet. | |||||||||||||
| 18 | 20023686 | Santoshpur W/S Scheme | P2FBD90 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Z Truss assembly roof arrangement sheet used in 2.6 mm instead of minimum required 3mm & Tank not vertically. | |||||||||||||
| 19 | 20018367 | Allabal Pur W/S Scheme | P2FBD18 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Hold down bracket not installed vertically, Majority of nut bolt used in assembly Werd found to be rusted. | |||||||||||||
| 20 | 20023193 | BEHTA GIPING W/S Scheme | P2FBD139 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Tank not placed centre of ring beam, Improper levelling. | |||||||||||||
| 21 | 20023823 | Daudpur Majra Nandasa | P2FBD30 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Majority of nut bolt rusted and tank not vertically. | |||||||||||||
| 22 | 20023680 | Bhagaura W/S scheme | P2FBD71 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Flange nut bolt used whereas required washer nut bolt. | |||||||||||||
| 23 | 20023266 | Dullamai W/S Scheme | P2FBD25 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Majority of nut bolt rusted and tank not vertically. | |||||||||||||
| 24 | 20023669 | Kutubuddinpur W/S scheme | P2FBD70 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Flange nut bolt used whereas required washer nut bolt & improper levelling. | |||||||||||||
| 25 | 20023243 | Silsanda W/S Scheme | P2FBD63 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | DI pipe load in tank vertically downward. | |||||||||||||
| 26 | 20076280 | Kanjhiyana mvs | P2FBD147 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Improper levelling, Flange nut bolt used whereas required washer nut bolt. | |||||||||||||
| 27 | 8359376 | KUNDANGANESHPUR W/S SCHEME | P2FBD144 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Rusted nut bolts & Improper levelling. | |||||||||||||
| 28 | 20092874 | Jhaua MVS | P2FBD104 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Excessive rust has developed on the reinforcement in Raft. | ||||||||||||
| 29 | 8388557 | DEVRANPUR GADIYA W/S SCHEME | P2FBD129 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | 7th Flight Staircase Work done Without Raising RFI | ||||||||||||
| 30 | 20023282 | Lodhipur W/S Scheme | P2FBD182 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube fail of OHT bottom slab required Ultrasonic Pulse Velocity. | ||||||||||||
| 31 | 20074354 | BAHORA SVS | P2FBD167 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | concrete pouring in 1st brace beam and found 20 mm aggregate with mixing unapproved materials. | ||||||||||||
| 32 | 20076393 | Moosa khiriya w/s scheme | P2FBD154 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | 10mm aggregate with mixing unwanted material available at site during Raft concrete work. | ||||||||||||
| 33 | 8388559 | NAGLA KEWAL WS SCHEME | P2FBD208 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Substandard Quality of material are being used in OHT slab | ||||||||||||
| 34 | 8360724 | ISHAPUR W/S SCHEME | P2FBD127 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | This is a serious lapse in site safety and quality control procedures, as proper inspection is essential before concreting. | ||||||||||||
| 35 | 20024456 | Hansapur Gouraipur | P2FBD188 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube fail UPV test TB-3 & Above TB-3 Column. | ||||||||||||
| 36 | 20092660 | Sikandarpur Tihaiya MVS | P2FBD200 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube fail of column above 2nd Brace Beam. | ||||||||||||
| 37 | 20038840 | Shadnagar w/s scheme | P2FBD191 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube fail Slab of Zincalume tank. | ||||||||||||
| 38 | 20092317 | Bilsari MVS | P2FBD195 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Zi-Al slab (Bilsari ) cube not available in lab during testing required NDT Test. | ||||||||||||
| 39 | 20038943 | Faridpur Multi V w/s scheme | P2FBD74 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | 1st Brace beam cube not available in lab during testing required NDT test. | ||||||||||||
| 40 | 20023298 | Nadaura W/S Scheme | P2FBD27 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Honeycomb found in 3rd brace beam. | ||||||||||||
| 41 | 20092323 | Mahmudpur Achla & Kandhrapur MVS | P2FBD148 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Honeycomb Found in column above 1st brace Beam. | ||||||||||||
| 42 | 20023203 | Mahmadganj W/S Scheme | P2FBD212 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | Resolved | 20mm Extra bar not provided in OHT bottom reinforcement . | ||||||||||||
| 43 | 8359281 | BARARIKH W/S SCHEME | P2FBD03 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Honeycomb in 2nd brace above 1st lift Column. | ||||||||||||
| 44 | 20023248 | Sahab Ganj W/S Scheme | P2FBD64 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Honeycomb found 1st lift column. | ||||||||||||
| 45 | 20023856 | BHIDAUR W/S SCHEME | P2FBD91 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Honeycomb found 1st Brace | ||||||||||||
| 46 | 20023277 | Mahrupur Bijal W/S Scheme | P2FBD140 | Yes | No | No | No | No | No | No | No | Yes | No | No | No | No | Resolved | Resolved | Major Honeycomb in 2nd brace beam. | |||||||||||
| 47 | 20096551 | GADANPURA CHAIN MVS | P2FBD94 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Hold down bracket not installed vertically & Improper levelling and Tank not vertically align. | |||||||||||||
| 48 | 8359381 | PANJU KHIRIYA W/S SCHEME | P2FBD126 | Yes | No | No | No | No | No | No | No | Yes | No | No | No | No | Resolved | Resolved | Honeycombing was found on the conical wall of the OHT . | |||||||||||
| 49 | 20038848 | Hisampur W/S scheme | P2FBD142 | No | No | No | Yes | No | No | No | No | Yes | No | No | No | No | Resolved | Resolved | Severe honeycombing and reinforcement exposure noticed at the bottom surface of the 2nd and 3rd brace beams. | |||||||||||
| 50 | 20023170 | Sharfabad W/S Scheme | P2FBD138 | Yes | No | No | No | No | No | No | No | Yes | No | No | No | No | Resolved | Resolved | Above the 3rd brace at the 2nd lift columns (04 Nos.), honeycombing repair executed using cement paste is unacceptable and has resulted in surface cracking. . | |||||||||||
| 51 | 20023286 | Karhiyoli W/S Scheme | P2FBD66 | No | No | No | Yes | No | No | No | No | Yes | No | No | No | No | Resolved | Resolved | Honeycombing and reinforcement exposure observed in one of the columns above the 2nd brace level. | |||||||||||
| 52 | 20023534 | Kuiyadhir W/S Scheme | P2FBD89 | No | No | No | Yes | No | No | No | No | Yes | No | No | No | No | Resolved | Resolved | Major Honeycombing in Brace Beam, Column-Beam junction & Exposed Reinforcement Steel | |||||||||||
| 53 | 8359188 | HAIDARPUR | P2FBD118 | No | No | No | Yes | No | No | No | No | Yes | No | No | No | No | Resolved | Resolved | A major gap has been observed between the bottom slab ring beam & reinforcement exposure and Major Honeycomb on 3rd Brace Beam. | |||||||||||
| 54 | 8359324 | KHETALPUR SORIYA W/S SCHEME | P2FBD176 | No | No | No | Yes | No | No | No | No | Yes | No | No | No | No | Resolved | Resolved | Inadequate Concrete Cover in One Colum & Exposuer and Corrosion of Reinforcement, Shear key. | |||||||||||
| 55 | 20074314 | SULTANGANJ KHARETA SVS | P2FBD98 | No | No | No | No | Yes | No | No | No | Yes | No | No | No | No | Resolved | Resolved | Raft beam casting without RFI & Found beam width 400-420 mm while required 500 mm as pe Approved drawing. | |||||||||||
| 56 | 20018373 | Jiyouna W/S Scheme | P2FBD54 | No | No | No | No | Yes | No | No | No | Yes | No | No | No | No | Resolved | Resolved | OHT slab, PPC cement was used in the concrete instead of OPC-43 grade cement. | |||||||||||
| 57 | 20076419 | Kuiyan Sant w/s scheme | P2FBD110 | No | No | No | No | Yes | No | No | No | Yes | No | No | No | No | Resolved | Resolved | Beam width less than Approved drawing. | |||||||||||
| 58 | 20020108 | Usmanganj W/S Scheme | P2FBD135 | No | Yes | No | No | No | No | No | No | Yes | No | No | No | No | Resolved | Resolved | The staircase was found tilted to one side and Beams (SB1) for the 1st and 2nd staircase landings have been placed along the face of the column instead of at the centerline of the column. | |||||||||||
| 59 | 20023238 | Ambar Pur W/S Scheme | P2FBD213 | Yes | No | No | No | No | No | No | No | Yes | No | No | No | No | Honeycombing was found in the OHT second brace beam and the second brace above the first lift column also some places. | |||||||||||||
| 60 | 20097756 | Chachoopur Jatpura MVS | P2FBD227 | Yes | Yes | No | No | No | No | No | No | No | No | No | No | No | Honeycomb 3rd & 4th brace beam, column misaligned above 1st brace. | |||||||||||||
| 61 | 20023290 | Antar W/S scheme | P2FBD214 | No | Yes | No | No | Yes | No | No | No | No | No | No | No | No | Dowel bars have not been provided for the staircase reinforcement anchorage, Misaligned column above 3rd brace. | |||||||||||||