| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20101892 | Bhurepur PWS | 20101892/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | Yes | The cube test result for the final flight staircase of the OHT has been found to be failed. Also, the OHT of this scheme is located near the pond. | |||||||||||||
| 2 | 20100464 | Babarpur Dehat PWS | 20100464/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Minor misalignment was observed in one column located. | ||||||||||||
| 3 | 20084725 | Turkpur Phaphoond PWS | 20084725/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test failure observed in the OHT structure; NDT was conducted for the 2nd lift column above the 2st brace. | ||||||||||||
| 4 | 20039855 | Sondhemau PWS | 20039855/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test failure observed in the OHT structure; NDT was conducted for the 2nd lift column above GL. | ||||||||||||
| 5 | 20034858 | khanpur phaphund | 20034858/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | honeycombing After rectification NDT was conducted for column blow of 1st brace beam, 2nd brace beam and bottom dome. | ||||||||||||
| 6 | 20084705 | Auton PWS | 20084705/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | honeycombing After rectification NDT was conducted for the column above1st brace beam and 2nd brace. | ||||||||||||
| 7 | 20065627 | Bhadsiya & bamrauliya | 20065627/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | 7-day cube test failed. | ||||||||||||
| 8 | 20040104 | Aampur PWS | 20040104/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the bottom dome was found below acceptance criteria; NDT was conducted. | ||||||||||||
| 9 | 20087932 | Mani kothi khash PWS | 20087932/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure and NDT of 3rd flight staircase of OHT. | ||||||||||||
| 10 | 20041697 | Kalabhoj | 20041697/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure and NDT of 1st flight staircase of OHT. | ||||||||||||
| 11 | 20025457 | JAMUHA PWS | 20025457/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure and NDT of final flight staircase of OHT. | ||||||||||||
| 12 | 20093483 | Sahbajpur bidhuna PWS | 20093483/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure in OHT; NDT conducted for 3nd lift column above 2nd brace. | ||||||||||||
| 13 | 20095107 | Sanwaliya PWS | 20095107/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure in OHT; NDT conducted for 1st lift column above 3rd brace. | ||||||||||||
| 14 | 20099278 | Puranpur & Manikpur | 20099278/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure in OHT; NDT conducted for 1st lift column above 2nd brace. | ||||||||||||
| 15 | 20091164 | Sarai pratham PWS | 20091164/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Cube mould not available at site; NDT conducted for OHT container wall. | ||||||||||||
| 16 | 20088700 | Kurshi PWS | 20088700/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure and NDT of 3rd flight staircase of OHT | ||||||||||||
| 17 | 20064337 | Rampur Khash PWS | 20064337/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the top dome was found below acceptance criteria. NDT was conducted | ||||||||||||
| 18 | 20091158 | Dahiyapur PWS | 20091158/01 | Yes | No | No | No | No | No | No | No | Yes | No | No | No | No | Resolved | Resolved | Columns of the OHT structure above GL were dismantled due to major honeycombing observed in all columns. | |||||||||||
| 19 | 20099164 | Barau PWS | 20099164/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure and NDT of the 3nd brace of the OHT. | ||||||||||||
| 20 | 20087935 | Punawar PWS | 20087935/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure in OHT; NDT conducted of final lift column above 3rd brace. | ||||||||||||
| 21 | 20091156 | Bhartaul | 20091156/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure in OHT; NDT conducted of 1st lift column above 1st brace. | ||||||||||||
| 22 | 20093726 | Bhadaura PWS | 20093726/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the bottom dome was found below acceptance criteria; NDT was conducted. | ||||||||||||
| 23 | 20093474 | Barbatpur & juhikha | 20093474/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the top dome was found below acceptance criteria. NDT was conducted. | ||||||||||||
| 24 | 20065298 | Nagla simar PWS | 20065298/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the container wall 1st was found below acceptance criteria. NDT was conducted. | ||||||||||||
| 25 | 20076359 | Dalel Nagar PWS | 20076359/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the container wall 1st lift was found below acceptance criteria. NDT was conducted. | ||||||||||||
| 26 | 20084702 | Nurabad khash PWS | 20084702/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the bottom dome was found below acceptance criteria. NDT was conducted. | ||||||||||||
| 27 | 20089664 | Barmupur PWS | 20089664/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the top dome was found below acceptance criteria. NDT was conducted. | ||||||||||||
| 28 | 20093727 | Baraua PWS | 20093727/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure in OHT; NDT conducted for 1st lift column above Raft beam. | ||||||||||||
| 29 | 20093432 | Malhausi | 20093432/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure in OHT; NDT conducted for 1st lift column above 2nd brace. | ||||||||||||
| 30 | 20084717 | Gauri ganga prasad | 20084717/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the top dome was found below acceptance criteria. NDT was conducted. | ||||||||||||
| 31 | 20088690 | Udaipur PWS | 20088690/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the container wall was found below acceptance criteria. NDT was conducted. | ||||||||||||
| 32 | 20091159 | Lohiyapur PWS | 20091159/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the container wall 1st lift was found below acceptance criteria. NDT was conducted. | ||||||||||||
| 33 | 20084698 | Lahtoria PWS | 20084698/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the bottom dome was found below acceptance criteria. NDT was conducted. | ||||||||||||
| 34 | 20091122 | Kakrahi | 20091122/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Cube mould not available at site; NDT conducted for OHT bottom dome. | ||||||||||||
| 35 | 20095133 | Umarsana PWS | 20095133/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Cube mould not available at site; NDT conducted of 6th flight staircase of OHT. | ||||||||||||
| 36 | 20065288 | Piparpur PWS | 20065288/01 | No | No | Yes | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Cube mould not available at site; therefore, NDT was conducted for the OHT bottom dome. Also, due to cube failure, NDT was conducted for the 6th flight staircase of the OHT. | |||||||||||
| 37 | 20064338 | Rawat pur& Shivpur PWS | 20064338/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the container wall was found below acceptance criteria; NDT was conducted. | ||||||||||||
| 38 | 20041740 | Siryawa | 20041740/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the bottom dome was found below acceptance criteria; NDT was conducted. | ||||||||||||
| 39 | 20089653 | Walidadpur PWS | 20089653/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure and NDT of final flight staircase of OHT. | ||||||||||||
| 40 | 20091180 | Bharrapur PWS | 20091180/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the bottom dome was found below acceptance criteria; NDT was conducted. | ||||||||||||
| 41 | 20089657 | Ajuapur PWS | 20089657/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the bottom dome was found below acceptance criteria; NDT was conducted. | ||||||||||||
| 42 | 20091176 | Sarai Tadawa | 20091176/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the bottom dome was found below acceptance criteria; NDT was conducted. | ||||||||||||
| 43 | 20099287 | Birpur PWS | 20099287/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test results of the 1st brace beam were found below the acceptance criteria; therefore, NDT was conducted. | ||||||||||||
| 44 | 20041737 | RURUA PHAPHUND PWS | 20041737/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure and NDT of 1st and 2nd flight staircase of OHT. | ||||||||||||
| 45 | 20065264 | Antol PWS | 20065264/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the container wall 2nd lift was found below acceptance criteria; NDT was conducted. | ||||||||||||
| 46 | 20099280 | Ghasara PWS | 20099280/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the container wall 2nd lift was found below acceptance criteria; NDT was conducted. | ||||||||||||
| 47 | 20084724 | Jalalpur phaphund PWS | 20084724/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure in OHT; NDT conducted for 1st lift column above 2nd brace. | ||||||||||||
| 48 | 20091138 | Dakhnai PWS | 20091138/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the container wall 2nd lift was found below acceptance criteria; NDT was conducted. | ||||||||||||
| 49 | 20084711 | Chandauli PWS | 20084711/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure and NDT of 3rd flight staircase of OHT. | ||||||||||||
| 50 | 20099286 | Iqbal pur PWS | 20099286/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the container wall 1st lift was found below acceptance criteria; NDT was conducted. | ||||||||||||
| 51 | 20065255 | Ballpur Rajpur | 20065255/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the bottom dome was found below acceptance criteria; NDT was conducted. | ||||||||||||
| 52 | 20065633 | Chapta PWS | 20065633/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the top dome was found below acceptance criteria; NDT was conducted. | ||||||||||||
| 53 | 20091172 | Bighepur PWS | 20091172/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure and NDT of final flight staircase of OHT. | ||||||||||||
| 54 | 20091149 | Bailipur PWS | 20091149/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | Resolved | The rise, tread, and slab thickness of the 4th and 5th flight staircases of the OHT were not as per the drawing. The rectification work has been carried out. | ||||||||||||
| 55 | 20084720 | Alipur & Puttha PWS | 20084720/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | The 7th flight staircase of the OHT was cast without steel checking. Although the RFI was raised, by the time the inspection team reached the site, the casting work was almost completed. NDT (Rebound Hammer & UPV) has been done. | ||||||||||||
| 56 | 20039871 | Murainaram Dutt PWS | 20039871/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube failure in OHT; NDT conducted for 2nd lift column above 1st brace. | ||||||||||||
| 57 | 20038717 | SLLAHPUR | 20038717/01 | Yes | No | No | Yes | No | No | No | No | Yes | No | No | No | No | Resolved | Resolved | Resolved | The bottom dome was dismantled due to major honeycombing and exposed reinforcement. | ||||||||||
| 58 | 20100460 | Alpi PWS | 20100460/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube test of the top dome was found below acceptance criteria. NDT was conducted. | ||||||||||||