Agency-wise Major/critical Ncs at OHT

S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20092785 Firozpur WS 20092785/01 No No No No No No Yes No No No No No No Resolved
2 20093632 Nasartha WS 20093632/01 No No No No No No Yes No No No No No No Resolved
3 20092676 Sudaw WS 20092676/01 No No No No Yes No No No No No No No No Resolved
4 20096777 Khuchama WS 20096777/01 No No No No No No Yes No No No No No No Resolved
5 20092657 Majhawar Khas WS 20092657/01 No No No No No No No No No No Yes No No Resolved
6 20101471 Rampur WS 20101471/01 No No No No No No Yes No No No No No No The slab was broken to facilitate the installation of the DI pipe. However, the necessary grouting and sealing around the pipe have not been carried out. As a result, the structural integrity of the slab remains compromised, and the area is susceptible to water leakage and potential deterioration.
7 20095077 Deori Kalan WS 20095077/01 No No No No No No No No No No No No No As per IS 456:2000 and standard structural engineering specifications, lapping in top main reinforcement bars should not be placed near support zones / column junctions where maximum negative bending moment occurs. Lapping must be provided at or near mid-span.
8 20093640 Pandi WS 20093640/01 No No No No No No No No No No No No No Chipping has been observed in the OHT column, resulting in a reduction in its cross-sectional diameter. This may compromise the structural integrity and load-carrying capacity of the column.