Agency-wise Major/critical Ncs at OHT

S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20096561 RUDAULI PWS 20096561/001 No No Yes No No No No No No No No No No Resolved Cube test of the top dome was found below acceptance criteria. NDT was conducted.
2 20014587 BAKHARIYA PWS 20014587/001 No No No No No No Yes No No No No No No Resolved Final staircase of the precast OHT was replaced due to crack development
3 20056125 Nandgaon PWS 20056125/001 No No No No No No Yes No No No No No No Resolved Misalignment was observed in the 4th flight staircase of the OHT.
4 20033773 Jarhuliya PWS 20033773/001 No No No No No No Yes No No No No No No Resolved Cracks were observed in the staircase portion of the OHT structure.”
5 8362627 Niyamatpur bihari 8362627/001 No No Yes No No No No No No No No No No Resolved Cube test results of the 3rd brace beam were found below the acceptance criteria; therefore, NDT was conducted
6 8361893 SHIVPUR 8361893/001 No No Yes No No No No No No No No No No Resolved “Cube test results of column above 1st brace beam were found below the acceptance criteria; therefore, NDT was conducted
7 20055680 Burhanpur PWS 20055680/001 No No Yes No No No No No No No No No No Resolved Cube test results of 1st lift column above 2nd brace beam were found below the acceptance criteria; therefore, NDT was conducted
8 20055688 Dhorera PWS 20055688/001 No No No No No No Yes No No No No No No Resolved Minor honeycombing was observed in the Bottom Dome and Container Wall. After rectification, NDT was conducted.
9 20014865 BASHAI PWS 20014865/001 No No No No No No Yes No No No No No No Resolved Seepage was observed in the OHT structure.
10 20014533 narttampur pws 20014533/001 No No No No No No Yes No No No No No No Resolved Minor misalignment was observed in one column located above the 2nd brace beam of the OHT structure.
11 20022745 Kaithawa Water Supply Schem 20022745/001 No No No No No No Yes No No No No No No Resolved Seepage was observed in the OHT structure.