| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20101347 | Bagahwa GP WSS | 20101347/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Regarding OHT staircase is not as per drawing.Height of staircase riser is increased and no of flight is decreased | |||||||||||||
| 2 | 20093075 | MANJHARIA GP WSS | 20093075/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Concerte cube does not gain its target compressive strength on 28 days of testing. | |||||||||||||
| 3 | 20093989 | NEUSA AND JIWA GP WSS | 20093989/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Concrete Cube does not gain its required strength in 28 days | |||||||||||||
| 4 | 20094025 | SEKHUI AND DADWAR BHATT GP WSS | 20094025/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Concrete Cube does not gain its required strength in 28 days OHT Plinth Beam . | |||||||||||||
| 5 | 20096686 | CHECHARAF BUJURG GP WSS | 20096686/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Concrete Cube does not gain its required strength in 28 days OHT Raft | |||||||||||||
| 6 | 20101818 | Jogibari GP WSS | 20101818/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | OHT work has not going on from last few months .OHT column steel is cut by someone at site. | |||||||||||||
| 7 | 20096827 | AHADI GP WSS | 20096827/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1.Column steel is rusted, bend and cover with soil .Need cleaning before further casting. 2.OHT work has not going on from last few months .OHT column steel is cut by someone at site. It is advised to provide proper lap length by dismantling the column up to a certain length and use chemical adhesive before further concreting | |||||||||||||
| 8 | 20101921 | Dhobaha mustakham GP WSS | 20101921/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Regarding maximum nos of bar are curtailed from column of OHT at GL | |||||||||||||
| 9 | 20096599 | MADUKAR PUR GP WSS | 20096599/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | OHT raft half casted still now, complete it. and Use the iron oxide before casting. | |||||||||||||
| 10 | 20096821 | AMAUNA TIWARI AND BHALUKONI JAPATI GP WSS | 20096821/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rectify the OHT PCC work as per drawing & Checked the SBC report & found result satisfactory | ||||||||||||
| 11 | 20092969 | BASTHA GP WSS | 20092969/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | OHT Raft conducted Core cutting & result found satisfied. | ||||||||||||
| 12 | 20096600 | Patani Jungle | 20096600/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Loose material has been removed and cube result tested at 28 day found satisfactory. | ||||||||||||
| 13 | 20096825 | TILGADIYA BUJURG GP WSS | 20096825/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT (Rebound hammer and Ultrasonic pulse velocity test ) on that member has been done and result found satisfactory .(OHT 3rd Brace) | ||||||||||||
| 14 | 20096339 | PIPRA CHHANGAT GP WSS | 20096339/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | OHT 3rd Brace Done NDT test and result found satisfied. | ||||||||||||
| 15 | 20076612 | FUTUKA HARBANSSHAHPUR GP WSS | 20076612/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Concrete cube of OHT 1st lift column above 1st brace Done NDT test and result found satisfied. | ||||||||||||
| 16 | 20096760 | CHETIA GP WSS | 20096760/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Concrete cube of 3rd and 4th flight of staircase Done with NDT test and result found satisfied. | ||||||||||||
| 17 | 20094098 | SIHORWA GP WSSS | 20094098/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Replace the damaged steel | ||||||||||||
| 18 | 20096613 | DASIA GP WSS | 20096613/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Rectification has been done by increasing the depth by re excavation of OHT foundation | |||||||||||
| 19 | 20094181 | DHANDHARA | 20094181/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Replace rusted steel of OHT, Raft Steel binding work | ||||||||||||
| 20 | 20097020 | BHATGAWA GP WSS | 20097020/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Replace rusted steel of OHT, Raft beam Steel binding work | ||||||||||||
| 21 | 20093878 | LEDAWA GP WSS | 20093878/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Done NDT test and result found satisfied.1st lift column above slab level | ||||||||||||
| 22 | 20076707 | GOLHAURA MUSTKAM AND PARSA STATION GP WSS | 20076707/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | OHT cube 2nd lift column up to 1st Brace Done NDT test and result found satisfied. | ||||||||||||
| 23 | 20101845 | Gaya Ghat GP WSS | 20101845/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | stair case 5th landing cube test Done NDT test and result found satisfied. | ||||||||||||
| 24 | 20096688 | PARSA GP WSS | 20096688/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT (Rebound hammer and Ultrasonic pulse velocity test ) on that mamber has been done and result found satisfactory | ||||||||||||
| 25 | 20096740 | HARI JOT GP WSS | 20096740/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT (Rebound hammer and Ultrasonic pulse velocity test ) on that member has been done and result found satisfactory | ||||||||||||
| 26 | 20096703 | AKOLHIYA GP WSS | 20096703/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT (Rebound hammer and Ultrasonic pulse velocity test ) on that member has been done and result found satisfactory | ||||||||||||
| 27 | 20094406 | KARAHIA SAGHAN GP WSS | 20094406/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT (Rebound hammer and Ultrasonic pulse velocity test ) on that member has been done and result found satisfactory | ||||||||||||
| 28 | 20101843 | Rudrauliya Bujurg GP WSS | 20101843/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT (Rebound hammer and Ultrasonic pulse velocity test ) on that member has been done and result found satisfactory | ||||||||||||
| 29 | 20102124 | BALUA GP WSS | 20102124/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT (Rebound hammer and Ultrasonic pulse velocity test ) on that member(2nd 4th and 5th lift stair) has been done and result found satisfactory. | ||||||||||||
| 30 | 20101822 | Pipra Ramlal GP WSS | 20101822/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT (Rebound hammer and Ultrasonic pulse velocity test ) on that member(Pump House slab) has been done and result found satisfactory | ||||||||||||
| 31 | 20076474 | MANIKAURA FIRST AND PIPRA PANDET GP WSS | 20076474/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT (Rebound hammer and Ultrasonic pulse velocity test ) on that member(1st Brace) has been done and result found satisfactory | ||||||||||||
| 32 | 20096571 | RASOOLPUR GP WSS | 20096571/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT (Rebound hammer and Ultrasonic pulse velocity test ) on that member has been done and result found satisfactory | ||||||||||||
| 33 | 20096605 | KANWAR GP WSS | 20096605/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT (Rebound hammer and Ultrasonic pulse velocity test ) on that member(1st Brace)has been done and result found satisfactory | ||||||||||||
| 34 | 20076416 | CHAURASI AND JAGMOHANI GP WSS | 20076416/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | Rechecking and repair leakage of Zinc Alum tank . | ||||||||||||
| 35 | 20076751 | KAPIYA SHUKLA GP WSS | 20076751/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rectified the reinforcement lap work as per drawing and use foam to close gap | ||||||||||||
| 36 | 20076667 | MAHADEWA LALA GP WSS | 20076667/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | dismantling the column and provided lap length | ||||||||||||
| 37 | 20094389 | MAHADEWA KURMI AND BUZURG GP WSS | 20094389/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT (Rebound hammer and Ultrasonic pulse velocity test ) on that member(6th Flight Stair) has been done and result found satisfactory | ||||||||||||
| 38 | 20096642 | Badurgahna GP WSS | 20096642/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT (Rebound hammer and Ultrasonic pulse velocity test ) on that member(OHT1st lift column above 2nd brace) has been done and result found satisfactory | ||||||||||||
| 39 | 20076714 | BARDAHI NANKAR GP WSS | 20076714/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT (Rebound hammer and Ultrasonic pulse velocity test ) on that member(OHT 5th landing staircase) has been done and result found satisfactory | ||||||||||||
| 40 | 20096756 | SUPA RAJA AND BHAGAUTA PUR NORTH GP WSS | 20096756/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT (Rebound hammer and Ultrasonic pulse velocity test ) on that member (1't lift column above 1st brace beam) has been done and result found satisfactory | ||||||||||||
| 41 | 20076643 | TIGHARA GP WSS | 20076643/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT (Rebound hammer and Ultrasonic pulse velocity test ) on that member has been done and result found satisfactory | ||||||||||||
| 42 | 20093980 | TENUA GP WSS | 20093980/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Done NDT test and result found satisfied. | ||||||||||||
| 43 | 20096566 | AURAHWA GP WSS | 20096566/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Replace the reinforcement as per drawing | ||||||||||||
| 44 | 20093971 | NAGWA GP WSS | 20093971/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | NDT (Rebound hammer and Ultrasonic pulse velocity test ) on that member has been done and result found satisfactory | ||||||||||||
| 45 | 20094058 | KAT BANDH GP WSS | 20094058/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Regarding OHT column steel cutting and provide proper lap before casting. | |||||||||||||
| 46 | 20093066 | SEHUDA GP WSS | 20093066/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | 1. During inspection found that zinc alum tank Nut and bolt not properly tightened, leading to a loose connection at the bracket. 2. It is also observed grouting has not done. | |||||||||||||
| 47 | 20094261 | BARAGO GP WSS | 20094261/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1. During site visit it is found that staircase dowel bar is cut by unknown person. 2. Site is situated at low land area. | |||||||||||||
| 48 | 20097023 | BANKATA SECOND GP WSS | 20097023/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | OHT 1st brace above 1st lift column Done NDT test and result found satisfied. and Honeycombing Use GP2 material for repairing | ||||||||||||