| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20024072 | Sarai Madansingh Urf Chanti single village water supply scheme | LP-59 | No | No | No | No | No | No | No | No | No | No | No | No | No | The OHT is constructed with in 100 mtr range from Pond | |||||||||||||
| 2 | 8388580 | Babahan Kuseyan Gram Panchayat | LP-405 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | ZN / AL Tank found leakage | ||||||||||||
| 3 | 8362702 | BANI GRAM PANCHAYAT WATER SUPPLY SCHEME | LP-398 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | ZN / AL Tank found leakage | ||||||||||||
| 4 | 8362461 | BHOPAT PUR GRAM PANCHAYAT WATER SUPLY SCHEME | LP-397 | No | No | No | No | No | Yes | Yes | No | No | No | No | No | No | Resolved | Resolved | The alignment of the inlet and outlet pipes for the water tank is not vertical it needs immediate correction to ensure they are properly aligned. | |||||||||||
| 5 | 20057152 | Devkali multi village water supply scheme | LP-236 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | It has been observed that cracks have been found in the top surface of OHT raft. | ||||||||||||
| 6 | 20023951 | Dewariya MVS scheme | LP-230 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the foundation of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 7 | 20100451 | KAITHWAL WATER SUPPLY SCHEME | LP-465 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rainwater has accumulated on the raft of the overhead tank (OHT). This water can seep into the foundation, potentially causing excessive settlement. | ||||||||||||
| 8 | 8361287 | LILAPUR KLA GRAM PNACHAYAT WATER SUPPLY SCHEME | 8361287/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the Foundation of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 9 | 20094827 | RAMNAGER-MIRAPUR-CHANDERPUR URF BUSMAHUA WATER SUPPLY SCHEME | LP-390 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | As per drawing overlapping should be maintained 46 D (552 mm) while overlapped found only 275 mm at site. | ||||||||||||
| 10 | 8361286 | SEMRA MULTI VILLAGES WATER SUPPLY SCHEME | LP-82 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | During the site inspection of OHT, it was found that water is entering from the upper section, which could lead to leakage or seepage issues. | ||||||||||||
| 11 | 20088072 | CHANDRAWAT URF POORE MATADIN_SARAI SULTAN URF MAKHDOO WATER SUPPLY SCHEME | LP-300 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | as per visual inspection crack has been observed on the OHT's H - frame beam. | ||||||||||||
| 12 | 8360352 | JAMHA GRAM PANCHAYAT WATER SUPPLY SCHEME | LP-536 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Shear link has not been bent at 135 degree and not bounded to the bottom reinforcement properly. | ||||||||||||
| 13 | 8360642 | SARAI MADAN MULTI VILLAGES WATER SUPPLY SCHEME | LP-25 | No | No | No | No | No | Yes | Yes | No | No | No | No | No | No | Resolved | Resolved | Leakage has been found in ZA tank | |||||||||||
| 14 | 20085207 | SARAIDATTE WATER SUPPLY SCHEME | LP-370 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | as per visual inspection crack has been observed on H - frame's column and it may be propagate during loading condition. | ||||||||||||
| 15 | 20065320 | Tejpur multi village water supply scheme | LP-211 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | OHT Raft upto beam top bar is not binding straight C/C as per drawing. Rusted steel bar is being used on the site. Rust should be cleaned before casting. | ||||||||||||
| 16 | 20034830 | Arhani Single Village Water Supply Scheme | LP-240 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | Resolved | According to the Design and Drawing with DPR (BOQ) 125 KL 12 M capacity OHT has been constructed instead of 125 KL 14 M. But due to change in location and change in design and drawing, the level of the OHT has gone down also. The place where the tank should be given is from the road level or it is given from the GL. | ||||||||||||
| 17 | 20034917 | Bahupur Multi Village Water Supply Scheme | LP-157 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 18 | 20097469 | BANPURAWA SARAIPITHA WATER SUPPLY SCHEME | LP-216 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | crack has been observed in The column of OHT. Diagonal crack has been observed at the surface of H-frame beam of OHT. | ||||||||||||
| 19 | 20038865 | Bibipur Multi Village Water Supply Scheme | LP-53 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 20 | 20034925 | Gaharpur Dhobaha Single Village Water Supply Scheme | LP-441 | Yes | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Resolved | Steel bars has been exposed on the surface of OHT raft and honeycomb also observed. | |||||||||||
| 21 | 20034759 | Jaraon SIngle Village water supply scheme | LP-206 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 22 | 20100313 | KALANA WATER SUPPLY SCHEME | LP-228 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the foundation of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 23 | 20100331 | KESHAW RAIPUR WATER SUPPLY SCHEME | LP-209 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | The water filled has been found in OHT bottom surface area. Due to this settelment may be happen in future | ||||||||||||
| 24 | 20058700 | Khirjipur and Makadumpur Multi Village water Supply Scheme | LP-261 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has accumulated on the backfill soil of HOT. Water will seep into the foundation and cause excessive settled. | ||||||||||||
| 25 | 20017790 | KIRAON VILLAGE WATER SUPPLY SCHEME | LP-208 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Lap length of steel bar has been found 450 mm however as per drawing 570 mm. C/C spacing of shear stirrups have been found 210 mm however as per drawing 150 mm. | ||||||||||||
| 26 | 20024453 | Kundanpur Multi Village Water Supply Scheme | LP-244 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 27 | 20065456 | Mavaiya Hindubani Multi Village water supply scheme | LP-259 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 28 | 20089052 | PARAWA WATER SUPPLY SCHEME | LP-223 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 29 | 20024459 | Pipri Amadbhadoh Multi VIllage Water Supply Scheme | 20024459/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | The water filled has been found in OHT bottom surface. | ||||||||||||
| 30 | 20095031 | PURE SADA BHAMA_MAHARAJPUR WATER SUPPLY SCHEME | LP-270 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Severe honeycomb has been observed at the pedestal and plinth beam of OHT. Kindly conduct NDT test to ensure their strength or reconstruct it if found unsatisfactory results. | ||||||||||||
| 31 | 20023950 | Shripur village water supply scheme | LP-130 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rusted reinforcement MS steel has been found on Raft foundation. Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 32 | 20086751 | THARIYA_NIMI WATER SUPPLY SCHEME | LP-279 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 33 | 20085538 | VANPURWA PARATIPUR_MAHAJANA WATER SUPPLY SCHEME | LP-446 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | The water filled in the OHT bottom surface area. | ||||||||||||
| 34 | 20026262 | Yasinpur (Pasiyapur) Multi Village Water Supply Scheme | 20026262/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the foundation of OHT. Water will seepage inside the foundation and cause excessive settlement. Work has been stopped for many days due to this steel bars are getting rusted. | ||||||||||||
| 35 | 20023402 | Awasanpur single village water supply scheme | LP-304 | No | Yes | No | No | No | No | No | No | Yes | No | No | No | No | Resolved | Resolved | The alignment of 2nd lift column has not been found properly vertical. Dismantle the column and reconstruct it. | |||||||||||
| 36 | 20097292 | BALA WATER SUPPLY SCHEME | LP-323 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 37 | 20085284 | DUBAKI KURD WATER SUPPLY SCHEME | LP-68 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 38 | 20024652 | Gondaura Bilari Multi Village Water Supply Scheme | LP-301 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 39 | 20023399 | Harchandpur mukti village water supply scheme | LP-65 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 40 | 20021069 | Jagua Sodha village water supply scheme | LP-11 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | The Zink aluminium tank nuts and bolt have not tightened properly. | ||||||||||||
| 41 | 20094972 | JHIRHARI_BAGAHA WATER SUPPLY SCHEME | LP-333 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 42 | 8360728 | KISHUNIPUR GRAM PANCHAYAT MULTI VILLAGESWATER SUPPLY SCHEME | 8360728/01 | Yes | Yes | No | No | No | No | No | No | Yes | No | Yes | No | No | Resolved | Resolved | Resolved | Resolved | After visiting the site, a Honeycomb Structure has been found in OHT Column. The alignment of column no.3rd above first brace beam has been found misaligned. Dismantle the column and reconstruct it again. | |||||||||
| 43 | 20064807 | Pure Gobai and Chhini Gram Panchayat MVS | LP-359 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. Steel bars are submerged in the water. | ||||||||||||
| 44 | 20085277 | PURE MATHURADAS WATER SUPPLY SCHEME | LP-360 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 45 | 20086760 | SIDHAWAR HARIPUR WATER SUPPLY SCHEME | LP-312 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 46 | 20018236 | SUARA VILLAGE WATER SUPPLY SCHEME | LP-15 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | The leakage has been found form the DI pipeing in the OHT | ||||||||||||
| 47 | 20024657 | Arjunpur & Bujha Multi Village Water Supply Scheme | LP-193 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Various cracks has been developed on the top surface of the secondary beam of OHT. Kindly rectify it or replace. | ||||||||||||
| 48 | 20020791 | Barai Harakh Water Supply Scheme | LP-503 | Yes | No | No | Yes | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Resolved | Cracks have been started developing in the four columns of OHT. It may be due to lack of curing and environmental effects. Kindly rectify it as soon as possible. Poor workmanship has been observed in the concrete work of 1st lift column. Steel bar shown after casting. kindly do needful action to rectify this. Honeycombing has been found in OHT beam lintel casting work. Honeycombing has been found in OHT beam lintel casting work. Poor quality of 10 mm aggregate has been stacked at site for construction of OHT members. Kindly remove this material from site. Oversized and poor quality of 20 mm coarse aggregate has stacked at site for construction of OHT members. kindly remove these materials from site immediately. steel bars of OHT column have been affected by corrosion. Flaky and elongated aggregates has been stacked at site for concreting of OHT staging work. NC was raised but compliance has not been done. Construction work has been stopped for more than three months. Due to which, Steel bars are getting rusted. Two column of OHT at plinth level has been observed bulged. cover was not maintained at the column. 40 mm cover should have been provided to the steel bar. Kindly dismantle the columns and reconstruct properly. | ||||||||||
| 49 | 20025873 | Dahiyawan single multi village scheme | LP-149 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | Leakage has been occurred from ZA tank of OHT. Take corrective action immediately. | ||||||||||||
| 50 | 20023057 | Girdharpur Gondawa village water supply scheme | LP-147 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | rain water has been accumulated inside the trench of Raft. Settlement may occur and cause of severe damaged. Kindly remove water and fill it immediately. | ||||||||||||
| 51 | 20092099 | JADOPUR WATER SUPPLY SCHEME | LP-337 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | A Crack has been observed on the precast H- Frame. | ||||||||||||
| 52 | 20088578 | KAMALPUR_FATEHPUR TA. SHAHABPUR WATER SUPPLY SCHEME | LP-338 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Honeycomb has been observed at the junction of the 2nd lift column and beam. And also after removal of form work finishing was not done. | ||||||||||||
| 53 | 20065199 | Kasturipur Multi Village Water Supply Scheme | LP-191 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Alignment of the pedestal of OHT have not been observed properly. Dowel bars have not been placed concentrically. it may results eccentric load distribution and may collapsed. Take appropriate action immediately before erection work of precast members. Two Pedestal of OHT has not casted in proper alignment and also one of them has bulged. Cracks have been started developing on the 1st brace precast column of OHT. Kindly take corrective action regarding this. | ||||||||||||
| 54 | 20024071 | Sarai Bharat urf Holagarh single village water supply scheme | LP-100 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated inside the trench of Raft. It may cause excessive settlement of soil. Hair line cracks have been observed on the surface of H frame of OHT. | ||||||||||||
| 55 | 20097472 | SARAI SAHEB WATER SUPPLY SCHEME | LP-60 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the foundation of OHT. It may cause settlement of foundation. | ||||||||||||
| 56 | 20065728 | Sultanpur jaisingh Multi village water supply scheme | LP-178 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the foundation of OHT. It may cause settlement of foundation. | ||||||||||||
| 57 | 20024054 | Bhagesar Dehli Multi village water supply scheme | LP-241 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 58 | 20100407 | BHATHERAWA WATER SUPPLY SCHEME | LP-72 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 59 | 20094976 | DANDO_MACHAHAR URF PURWA WATER SUPPLY SCHEME | LP-350 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Steel bars of OHT raft are getting rusted. reinforcement of raft has been completed but casting work has been pending for more than one month. | ||||||||||||
| 60 | 20024505 | Harrai Multi village water supply scheme | LP-425 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | honeycombs has been observed in the column of OHT, the compaction of the concrete mass by capturing air gaps and preventing honeycomb should be done during concrete casting Ref. IS 456:200 Clause 13.3.1. | ||||||||||||
| 61 | 20037187 | Kaithi Single Village Water Supply Scheme | LP-110 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | The shear links have been provided inclined (which cannot contribute against shear resistance). The Shear link should be vertical as per approved design & drawing also Refer of IS 456:2000 Clause-26.2.2.4 (b). c/c spacing of Shear stirrups have not been provided uniformly as per drawing. and also the hooks of shear stirrups should be provided staggerd to eachother. Kindly rectify it before casting. The development length of steel bar should be provided inside to main bar of columns so that proper cover will maintain to the column. steel bar has been found rusted. Kindly clean it by sand paper before casting. | ||||||||||||
| 62 | 20097350 | MAGHUWA WATER SUPPLY SCHEME | LP-469 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Crack has been observed in H frame beam of OHT. | ||||||||||||
| 63 | 20024517 | Nindauri Narayana Multi Village Water Supply Scheme | LP-166 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Main top bars spacing has been found 170mm c/c at many places, as per drawing main bar should be 150mm c/c on site. | ||||||||||||
| 64 | 20032123 | Pach Dewra Village Water Supply Scheme | LP-104 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Spacing of top main bar has been found 180 mm instead of the 150 mm as per drawing. | ||||||||||||
| 65 | 20038857 | Purani Multi Village Water supply scheme | LP-69 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | 25 mm cover block has been used instead of 50 mm at the side face of the raft. shear link has not been bound properly in the raft. Alignment of 32 mm bar has not been found properly. Rectify it before casting of raft. | ||||||||||||
| 66 | 20093239 | ROKARI WATER SUPPLY SCHEME | LP-180 | Yes | No | No | No | No | No | No | No | No | No | Yes | No | No | Resolved | Resolved | Honeycomb has been found in the side face of OHT raft foundation. | |||||||||||
| 67 | 20092562 | Sonai Water Supply Scheme | LP-463 | No | No | No | No | No | No | Yes | No | No | No | Yes | No | No | Resolved | Resolved | Rusted bar observed at the piling site. Anti-correcive treatment before casting work required. | |||||||||||
| 68 | 20100426 | AKBARPUR MIRZAPUR WATER SUPPLY SCHEME | 20100426/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 69 | 20097698 | FOOL NAGAR_BISOUNA WATER SUPPLY SCHEME | 20097698/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Crack has been found at the surface of slab of OHT. | ||||||||||||
| 70 | 20057185 | Iguwa Urf Kathgawan Multi Village Water Supply Scheme | LP-190 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the foundation of OHT. It may cause settlement of foundation. | ||||||||||||
| 71 | 20058922 | Judapur Jhinhar Urf Bariboj multi village water supply scheme | LP-114 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Level of PCC of OHT foundation has not been found properly. This should be rectified immediately before preparation of Raft reinforcement. Level of PCC base should be correct for uniformly load distribution. | ||||||||||||
| 72 | 20097482 | KURESER UPERHER WATER SUPPLY SCHEME | LP-117 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rainwater has been accumulated over the Backfilled soil of OHT foundation. Kindly ensure proper Backfilling so that water cannot be accummulate. Otherwise it may seepage inside the foundation and causes uneven settlement. Crack has been observed on the surface of 1st H-frame brace. This crack has been observed more than 0.3 mm. | ||||||||||||
| 73 | 8360336 | MARUFPUR GRAM PANCHAYAT WATER SUPPLY SCHEME | 8360336/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated inside the Raft trench. Steel bar is getting rusted due to poor working condition. Kindly drain out the water and make proper arrangement for plinth beam reinforcement. | ||||||||||||
| 74 | 8360337 | MENDARA GRAM PANCHAYAT WATER SUPPLY SCHEME | LP-134 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | The shear links of the raft are not properly connected to the bottom reinforcement and the shear links are also not tied vertically. This has already been mentioned in the RFI. | ||||||||||||
| 75 | 20097384 | MERAPUR TALUKA AMAHADPUR WATER SUPPLY SCHEME | 20097384/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Cracks has been started developing in the 1st lift column of OHT. Kindly take corrective action regarding this issues. | ||||||||||||
| 76 | 20094506 | PEER DALLU_HUSENPUR WATER SUPPLY SCHEME | LP-325 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Shear links of raft have not been bounded properly to the bottom reinforcement. And also shear links have observed inclined instead of vertical. Mud has been accumulated on the surface of pcc and bottom steel bar is getting rusted. Kindly take corrective action. | ||||||||||||
| 77 | 20100458 | ANTAR SAMDARIYA (PEERI) WATER SUPPLY SCHEME | LP-548 | No | No | No | No | No | No | Yes | No | No | No | Yes | No | No | Resolved | Incomplete concrete construction had been done on the raft foundation. Dismantle the complete raft and reconstruct it properly by using fresh steel bars. | ||||||||||||
| 78 | 20095003 | BARAHA-NIRAUNDHA WATER SUPPLY SCHEME | LP-458 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Crack has been observed at brace beam of OHT | ||||||||||||
| 79 | 20023961 | Dhondhari MVS water supply scheme | LP-346 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Water has been accumulated over raft of OHT please remove immediately. | ||||||||||||
| 80 | 20065447 | Kuaan Multo village Water supply scheme | LP-456 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Water has been filled in the trench of OHT foundation. It will Leeds excessive settlement. Remove water and complete substructure work. | ||||||||||||
| 81 | 8360333 | LAKHRAWAN GRAM PANCHAYAT WATER SUPPLY SCHEME | LP-108 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Shear stirrups has not been provided properly. | ||||||||||||
| 82 | 20097355 | MAGHIGAWA WATER SUPPLY SCHEME | LP-121 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Diagonal shear crack has been developed at the side face of H -frame beam of OHT. | ||||||||||||
| 83 | 20089047 | MAHI WATER SUPPLY SCHEME | LP-549 | No | No | No | No | No | No | Yes | No | No | No | Yes | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 84 | 20024228 | Panwari single village water supply scheme | LP-459 | No | No | No | No | No | No | Yes | No | No | No | Yes | No | No | Resolved | Resolved | Rain water has been accumulated over the foundation of OHT. Water will seepage inside the foundation and cause excessive settlement. | |||||||||||
| 85 | 20024230 | Pawar single village water supply scheme | LP-377 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the foundation of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 86 | 20086817 | SEHRA WATER SUPPLY SCHEME | LP-345 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 87 | 20059076 | Semri Multi Village Water Supply Scheme | 20059076/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the raft of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 88 | 20065904 | BISHAMBHERPUR GRAM PANCHAYAT Multi village scheme | LP-48 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the foundation of OHT. It may cause settlement of foundation. | ||||||||||||
| 89 | 20065316 | Gadiyani single village water supply scheme | LP-51 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Water has been accumulated over the Backfilled soil of the OHT foundation. | ||||||||||||
| 90 | 20021112 | Jamkhuri village water supply scheme | LP-55 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the foundation of OHT. It may cause settlement of foundation. | ||||||||||||
| 91 | 20059214 | Kathwer Perwaizpur Multi Village Water Supply Scheme | LP-265 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Precast Slab panel of OHT has been found damaged at site. Kindly do not use this panel during erection. Various cracks have been observed on Pre-cast H-frame (1st lift). Kindly replace this H-frame. | ||||||||||||
| 92 | 20024766 | Mahraunda Single Village Water Supply Scheme | LP-388 | No | No | No | No | No | No | No | No | No | No | No | No | No | Rain water has been accumulated over the foundation of OHT. It may cause settlement of foundation. Rein water has been collected in the pit of raft. Steel bars are submerged in the water due to this bars are getting rusted. Remove it immediately and start reinforcement work of raft foundation. | |||||||||||||
| 93 | 20049449 | Mani Umarpur multi village water supply scheme | LP-85 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Water has been accumulated over the raft surface. | ||||||||||||
| 94 | 20025911 | Purkhipur village water supply scheme | LP-171 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Water has been accumulated over the Backfilled soil of the OHT foundation. | ||||||||||||
| 95 | 20022329 | Ramnagar Gansiari village water supply scheme | LP-283 | No | No | No | No | No | No | Yes | No | No | No | Yes | No | No | Resolved | Resolved | Pedestal steel bars of OHT have been severely rusted due to rain water and mud accumulation over the raft. | |||||||||||
| 96 | 20021699 | Sarai Atan urf Naugira MVS water supply scheme | LP-74 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rusted steel bar has been found for reinforcement of plinth beam and pedestal. Pilling depth above NGL less than 500mm | ||||||||||||
| 97 | 20038803 | Sultanpur Khas Single Village Water Supply Scheme | LP-129 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the foundation of OHT. It may cause settlement of foundation. | ||||||||||||
| 98 | 8360804 | Akdala Gram Panchayat Multi Villages Water Suply Scheme | LP-290 | No | Yes | No | No | No | No | No | No | Yes | No | No | No | No | Resolved | Resolved | Due to water logging on the foundation surface of the OHT, there may be a lot of problems in the future in case of Precast Structure. The alignment of the column in the OHT is not properly. Brace Beam has been found cracks. | |||||||||||
| 99 | 20059239 | Balkaranpur mai Kasarwae Multi Village Water Supply Scheme | LP-160 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Crack has been observed on the surface of H-frame of OHT. | ||||||||||||
| 100 | 20097340 | CHAK MOHAMD URF POORESOOD WATER SUPPLY SCHEME | LP-513 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Water has been accumulated over the foundation of OHT. It may causes uneven settlement of foundation. | ||||||||||||
| 101 | 8362687 | CHAQ SEKH AHMED URF KUSEHTA | LP-317 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Development length of Main bar (32 mm dia.) of pedestal has not been provided properly. Ref. IS 456 It has been observed 32 mm dia. bar directly placed on PCC surface. | ||||||||||||
| 102 | 8362549 | DHOKARI GRAM PANCHAYAT WATER SUPPLY SCHEME | LP-292 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Water has been accumulated over the foundation of OHT. It may causes uneven settlement of foundation. | ||||||||||||
| 103 | 20059248 | Herbhanpur multi village water supply scheme | LP-316 | No | Yes | No | No | No | No | No | No | No | No | Yes | No | No | Resolved | Resolved | as per visual inspection miss alignment has been observed on the H- frame's column & proper finishing also not done. Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. Crack has been observed at the side surface of primary beam of OHT. | |||||||||||
| 104 | 20059260 | Jagdev urf barethi, Manethu and Umari Maitatehara multi village water supply scheme | LP-282 | Yes | No | No | No | No | No | No | No | No | No | Yes | No | No | Resolved | Resolved | as per visual inspection honeycomb has been observed at joint of the OHT column. | |||||||||||
| 105 | 20024647 | Kasarawe May Chakoliya Village Water Supply Scheme | LP-481 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Corners of Brace Beam has been found damaged and Finishing & Grouting of H frame has not been done properly. | ||||||||||||
| 106 | 20094943 | LILHAT WATER SUPPLY SCHEME | LP-483 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | Leakage has been found in ZA tank from past 15 days. resolved | ||||||||||||
| 107 | 20097336 | MOHAMADABAD URF MIALWAN WATER SUPPLY SCHEME | LP-529 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | as per visual inspection Multiple cracks has been observed on the OHT H - frame beam. | ||||||||||||
| 108 | 20023946 | Mubarakpur Multi VIllage Water Supply Scheme | LP-484 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | Leakage has been found in ZA tank from past 20 days. | ||||||||||||
| 109 | 20024775 | Sauraha Single Village Water Supply Scheme | LP-22 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Water logging on the foundation surface of the OHT, there may be Settlement occur in future | ||||||||||||
| 110 | 8360818 | SHEFKHANPUR MAI CHAQSALIKMULTI VILLAGES WATER SUPPLY SCHEME | LP-61 | No | No | No | No | No | Yes | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfill soil of overhead tank. Water will seepage inside the foundation and cause excessive settlement. Crack has been observed on the surface of h-frame of OHT. | ||||||||||||
| 111 | 20065703 | Basana Khas- Jamua Multi Village water supply scheme | LP-86 | No | No | No | No | No | No | Yes | No | No | No | Yes | No | No | Resolved | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | |||||||||||
| 112 | 20024364 | Chhatauna Multi Village WaterSupply Scheme | LP-185 | No | No | No | No | No | No | Yes | No | No | No | Yes | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 113 | 20087124 | DALAPATPUR_BARIYARI WATER SUPPLY SCHEME | LP-176 | No | No | No | No | No | No | Yes | No | No | No | Yes | No | No | Resolved | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | |||||||||||
| 114 | 20024371 | Khanpur Dandi single village water supply scheme | LP-140 | No | No | No | No | No | No | Yes | No | No | No | Yes | No | No | Resolved | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | |||||||||||
| 115 | 20097668 | PURE VIKARAM SHAH WATER SUPPLY SCHEME | LP-440 | No | No | No | No | No | No | Yes | No | No | No | Yes | No | No | Resolved | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | |||||||||||
| 116 | 20023942 | Rastipur village water supply scheme | LP-109 | No | No | No | No | No | No | Yes | No | No | No | Yes | No | No | Resolved | Resolved | Rain water has been accumulated over the backfill soil of over head tank. Water will seepage inside the foundation and cause excessive settlement. | |||||||||||
| 117 | 20030599 | Sadarepur Multi Village Water Supply Scheme | LP-447 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 118 | 20025876 | Sarai Mamarej Single village water supply scheme | LP-67 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | The OHT column(C5) has been found cracked. | ||||||||||||
| 119 | 20085524 | SEMARI WATER SUPPLY SCHEME | LP-431 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 120 | 20065834 | Sewana-Golawa gram panchayat water supply scheme | LP-37 | No | No | No | No | No | No | Yes | No | No | No | Yes | No | No | Resolved | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | |||||||||||
| 121 | 20065890 | Thanapur-Thata Multi village Water Supply Scheme | LP-31 | No | No | No | No | No | No | Yes | No | No | No | Yes | No | No | Resolved | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | |||||||||||
| 122 | 20086875 | UGAPUR WATER SUPPLY SCHEME | LP-383 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Crack was not repaired properly by using specified material. Crack has been started developing again on the side surface of H-frame of OHT. | ||||||||||||
| 123 | 20092567 | Ahirai Water Supply Scheme | LP-372 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Water logging may occurred on foundation of OHT. There may be settlement occur in future. | ||||||||||||
| 124 | 20085518 | BAGAI KHURD WATER SUPPLY SCHEME | LP-534 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | In the upper reinforcement the bars rods have completely rusted and soil has settled on the surface, it needs to be completely removed and rectified before casting. | ||||||||||||
| 125 | 20077760 | KANAUJA KHURD_KANAUJA KLA_JAFERPUR URF BABUGANJ WATER SUPPLY SCHEME | LP-308 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | The top main bar of OHT slab reinforcement work found not verical at site Overlapping should be maintain 46 dia of bar as per drawing instead of 320 to 350 mm at site. | ||||||||||||
| 126 | 20097329 | ROODAPUR WATER SUPPLY SCHEME | LP-36 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfill soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 127 | 20093463 | DADUPUR_DHUDEHRI_BENIPUR WATER SUPPLY SCHEME | LP-524 | No | No | No | No | No | No | Yes | No | No | No | Yes | No | No | Resolved | Resolved | Water logging has been occurred over the foundation of OHT. Steel bars have been submerged in the water and getting ruated. | |||||||||||
| 128 | 20024448 | JALALPUR KASBA VILLAGE WATER SUPPLY SCHEME | LP-416 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Severe Honeycomb has been observed on the side face of raft foundation. | ||||||||||||
| 129 | 20065841 | Maharupur gram panchayat multi village water supply scheme | LP-551 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Severe Honeycomb has been observed on the side face of raft foundation. Main bar (16 mm) has been placed above distribution bar (12 mm) in the reinforcement of raft. Kindly rectify it immediately as per drawing. Rainwater has accumulated on the raft of the overhead tank (OHT). This water can seep into the foundation, potentially causing excessive settlement. | |||||||||||
| 130 | 20061107 | Parsottampur multi village water supply scheme | LP-328 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | As per the visual inspection corner of the First (H frame) found the crack of the corner side. | ||||||||||||
| 131 | 20095001 | SADIA BARAUNA_PATTIRAM WATER SUPPLY SCHEME | 20095001/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Plinth beam of OHT has been damaged due to this steel bars have been exposed at damaged place. | ||||||||||||
| 132 | 20046779 | Samodhipur Single Village Water Supply Scheme | LP-522 | Yes | No | No | No | No | No | No | No | No | No | Yes | No | No | Resolved | |||||||||||||
| 133 | 20089045 | BALKARANPUR WATER SUPPLY SCHEME | LP-03 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Crack has been observed on the surface of OHT first lift H-frame. Kindly take corrective action regarding this. And also conduct NDT test on cracked members to ensure their strength. Various cracks has been observed on the surface first lift H-frame brace. These cracks may propogate after loading condition. So take corrective action regarding this. | ||||||||||||
| 134 | 20094932 | BANKAT WATER SUPPLY SCHEME | LP-424 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated inside the OHT foundation trench. it may causes execive settlement of soil. kindly Backfill it immediately. | ||||||||||||
| 135 | 20066051 | Judapur Dandu Water Supply Scheme | LP-382 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated inside the OHT foundation trench. It may causes execive settlement of soil. Kindly Backfilled the foundation trench immediately. | ||||||||||||
| 136 | 20065219 | Lakanpur Multi Village Water Supply Scheme | 20065219/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Cracks have been observed in the precast H-frame. | ||||||||||||
| 137 | 20065829 | Mohammadpur naugawan water supply scheme | LP-02 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Water has been accumulated over the Backfilled soil of raft. column steel bar also submerged in the water. Column steel bar is getting rusted due to work stopped for more than a month. | ||||||||||||
| 138 | 8360798 | NARAINPUR GRAM PANCHAYAT WATER SUPPLY SCHEME | LP-01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | ||||||||||||||
| 139 | 20089027 | Saraichandrabhan urf Samaspur WATER SUPPLY SCHEME | LP-07 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated inside the foundation of OHT. It may cause excessive settlement of soil below the foundation. Kindly complete piping work and do proper Backfilling immediately then construct an apron. Crack has observed in the plinth protection of the OHT. | ||||||||||||
| 140 | 20064973 | Sarailalkhatoon urf Sheogarh Water Supply Scheme | LP-08 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Cracks has been started developing in the 1st lift column of OHT. Kindly take corrective action regarding this issues. | ||||||||||||
| 141 | 20095009 | BEDAULI TAPPA CHAURASI_ KHANPUR WATER SUPPLY SCHEME | LP-407 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 142 | 20100315 | BAGAHA_CHAUKI MAI ARAZAI PANASA UPERHAR WATER SUPPLY SCHEME | LP-410 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 143 | 20086852 | BARI WATER SUPPLY SCHEME | LP-371 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 144 | 8362570 | BASUPUR GRAM PANCHAYAT WATER SUPLY SCHEME | LP-277 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | The main bar spacing has been found 140 mm c/c however it should be 100 mm c/c as per drawing. | ||||||||||||
| 145 | 20023506 | Anjana single village water supply scheme | LP-217 | Yes | Yes | No | No | No | No | No | No | Yes | No | No | No | No | Resolved | Resolved | Resolved | misAlignment of column of OHT is found. Honeycomb has been found in the columns and beams of Oht | ||||||||||
| 146 | 20036740 | Saraibirsingh single village water supply scheme | LP-200 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 147 | 8360657 | Ghamaha | LP-41 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 148 | 20065759 | Chakiya Girdh Kot Gram Panchayat Water Supply Scheme | LP-57 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 149 | 20024816 | Pach Deora Multi Village Water Supply Scheme | LP-163 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 150 | 20097347 | JOGAPUR WATER SUPPLY SCHEME | 20097347/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 151 | 20023940 | Sanraidasu urf Haripur village water supply scheme | LP-521 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 152 | 8388576 | Abhae Pur Gram Panchayat Water Suply Scheme | LP-415 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 153 | 8388597 | Sarai Todermal Urf Dandupur | LP-245 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 154 | 8361124 | Sari Patti Gram Panchayat Water Suply Scheme | LP-258 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 155 | 20021043 | Yaseenpur urf Karnayeepur | LP-255 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 156 | 20017145 | HARIRAM PATTI URF KATNAE MULTI VILLAGE WATER SUPPLY SCHEME | LP-95 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 157 | 8361150 | MURADPUR URF KHADIRPUR GRAM PANCHAYAT WATER SUPPLY SCHEME | LP-367 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 158 | 20024814 | Katiyahi hasanpur Korari Village Water Supply Scheme | LP-314 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 159 | 20065869 | Hasanpur Mai Chak Mansoor Water Supply Scheme | LP-284 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 160 | 20088559 | ATANPUR WATER SUPPLY SCHEME | 20088559/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 161 | 20095070 | MEERAKPUR_FAJLABAD URF KALOOPUR WATER SUPPLY SCHEME | LP-243 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 162 | 20065210 | Hasimpur Chabalapur Water Suppl scheme | LP-394 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 163 | 20100386 | BHIKHAMPUR MADWARA WATER SUPPLY SCHEME | 20100386/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 164 | 20095061 | KUSWAN_MARDANPUR WATER SUPPLY SCHEME | 20095061/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 165 | 8360330 | DHARI GRAM PANCHAYAT WATER SUPPLY SCHEME | 8360330/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 166 | 20023965 | kulmai Single Villaeg water supply scheme | LP-280 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 167 | 20038822 | Ikauni Single Village Water Supply Scheme | LP-457 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 168 | 20023748 | Akodha village water supply scheme | LP-344 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 169 | 20024501 | Hanthi Gani and Umari Ta Purva Multi Village Water Supply Scheme | 20024501/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 170 | 20065894 | bhabhikhar_gonthi water supply scheme | LP-375 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 171 | 20077759 | BARI BAJAHIYA WATER SUPPLY SCHEME | LP-349 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 172 | 20085483 | BARGOHANA KHURD WATER SUPPLY SCHEME | LP-539 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 173 | 20095046 | PURWA KHAS_CHHARIBANA WATER SUPPLY SCHEME | LP-445 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 174 | 20038811 | Ubhari Single Village Water Supply Scheme | LP-442 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 175 | 20087132 | MENARA WATER SUPPLY SCHEME | 20087132/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 176 | 20100439 | AKORA WATER SUPPLY SCHEME | LP-449 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 177 | 20100435 | PATTI NATH RAI WATER SUPPLY SCHEME | 20100435/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 178 | 20017007 | MADHOPUR SIYA DIH MULTI VILLAGE WATER SUPPLY SCHME | LP-205 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||
| 179 | 20065756 | Gobindpur Tawara Gram Panchayat Water Supply | LP-188 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | cracks have been observed on the top surface of precast slab of OHT. Cracks have been observed over the pedestal of oht. | ||||||||||||
| 180 | 20094983 | BARASWAL_GADHWAKALA WATER SUPPLY SCHEME | LP-355 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Water has been accumulated over the foundation of OHT. It may causes uneven settlement of foundation. | ||||||||||||
| 181 | 20023959 | Balapur MVS water supply schemer | LP-389 | No | No | No | No | No | Yes | No | No | No | No | Yes | No | No | Leakage has been occurred from the Zinc aluminium tank. | |||||||||||||
| 182 | 20097672 | BASDAIYA WATER SUPPLY SCHEME | LP-19 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the foundation of OHT. It may cause settlement of foundation. | ||||||||||||
| 183 | 20024060 | Birsinghpur urf Alipur single village water supply scheme | LP-47 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Water has been accumulated just beside the raft foundation. It may cause settlement of foundation. | ||||||||||||
| 184 | 20076845 | BIGAHIYA WATER SUPPLY SCHEME | LP-526 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Crack has been observed in the 1st braced beam of OHT. | ||||||||||||
| 185 | 20065452 | Chaukatha tivariyan and Akhtariya multi village water supply scheme | LP-131 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rain water has been accumulated over the backfilled soil of OHT. Water will seepage inside the foundation and cause excessive settlement. | ||||||||||||