| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20015920 | SHIKARI CHAURA PWS | 20015920/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Honeycombs found in second brace beam of oht, Finishing of column is not proper, Honeycombs obesrved at bottam of flat slab. | |||||||||||||
| 2 | 20030437 | NEWARIYA PWS | 20030437/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Honeycombing has been observed at multiple locations in the first brace beam. Poor finishing quality is noted in several columns and beams. Additionally, heavy rusting has been observed on the MS staircase of the OHT. Rectification should be done as per methodology provided by SWSM letter No: 2070/W-17(Sitapur)/2025-26/6531/Tech-16 dated:17/09/2025 | |||||||||||||
| 3 | 20024393 | BHITHAURA RAM SAHAY AND KALYANPUR PWS | 20024393/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Honeycombing has been observed at the 1st brace of the OHT (Overhead Water Tank). This indicates improper compaction of concrete during casting, resulting in voids and exposed aggregates. Such defects can adversely affect the structural strength and long-term durability of the member. Proper repair and treatment are required to restore the integrity of the structure. | |||||||||||||
| 4 | 20024159 | HUSAINPUR KHURUHRI | 20024159/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | 1. Leakage obervation in zinc- Alumn Tank. | |||||||||||||
| 5 | 20015701 | DHARAMPUR PWS | 20015701/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | 1. Leakage observed at the bottom joint of the zinc-aluminium tank, near the base ring. 2. No water is being supplied from tank from 6 months instead of that direct water is being supplied. | |||||||||||||
| 6 | 20024502 | Khaliput pur_ Satrahi PWS | 20024502/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | 1. Leakage obervation in zinc- Alumn Tank. | |||||||||||||
| 7 | 20056176 | CHANDRKHA BUJURG PWS | 20056176/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | 1. Cracks have been observed at several locations in the grouting, indicating poor workmanship and inadequate compaction. 2. In addition, honeycombing has been observed in the pedestal beam, which indicates improper placement of concrete and insufficient vibration during concreting. 3. These deficiencies may adversely affect the structural strength and durability of the pedestal beam. | |||||||||||||
| 8 | 20034600 | LALPUR MAHRI | 20034600/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | 1. Leakage observed at the bottom joint of the zinc-aluminium tank, near the base ring. | |||||||||||||
| 9 | 20015733 | KATAR PWS | 20015733/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | 1. The precast Overhead Water Tank (OHT) work has been completed; however, leakage is observed in the tank, indicating possible defects in joints, sealing, or waterproofing. 2. Holes are observed in the support beams and braces, 3. These issues can affect the structural durability and serviceability of the OHT and require immediate inspection and necessary repair measures. | |||||||||||||
| 10 | 20015328 | AKARA PWS | 20015328/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | 1. The precast overhead water tank structure work is completed; however, leakage has been observed in the zinc–aluminium water tank, indicating possible joint/seal failure.Holes are visible in each column and brace, which may affect structural durability and require immediate inspection and rectification. 2. Cracks have been observed in the grouting, which can lead to water seepage and reduction in structural strength. | |||||||||||||
| 11 | 20014946 | AURAIYA TIKAI PWS | 20014946/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | 1. Grouting cracks have been observed at multiple locations. 2. These cracks indicate improper grouting and may lead to water seepage, reduction in bond strength, and long-term deterioration of the structure. 3. Immediate repair and re-grouting with suitable materials are required to prevent further damage and ensure structural durability. | |||||||||||||
| 12 | 20024537 | Sachauli_Piprahawa ranjeetpur PWS | 20024537/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | 1. Plants growth has been observed around the Zincalume tank, indicating poor maintenance.Cracks have also been observed in the grouting at the joints of the precast elements of OHT, which may affect structural integrity and durability. 2. Rusting has been observed at staircase and ladder and bulging has been observed in zink alumn sheet. | |||||||||||||
| 13 | 20015335 | BARDEHRA PWS | 20015335/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | 1. Water accumulation has been observed in the structure/site area. 2. Continuous water stagnation may reduce the soil bearing capacity and can create a safety hazard.The earthing of the lightning arrester is damaged/disconnected. 3. This may cause failure of the lightning protection system and can pose a serious risk to the structure and equipment during lightning strikes. | |||||||||||||
| 14 | 20024404 | AKBARPUR | 20024404/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | 1. Plant growth has been observed in zink alumn tank, Rusting has been observed in staircase. 2. Water level indicator and Ladder was found damage. | |||||||||||||
| 15 | 20056173 | EKDAGVA SV PWS | 20056173/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | 1. Hole has been observed in one of the braces of the OHT precast structure for transportation and Installation. 2. This may affect the structural strength and stability of the brace. 3.Immediate inspection and necessary repair are recommended to prevent further deterioration and ensure structural safety. | |||||||||||||
| 16 | 20024038 | JAUGARH PWS | 20024038/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | 1. At jointing of hold down breckets nut bolting was found not fully tight with sheet, Seepage was found from bottom of oht surafce, 2. Safety net was found not fixed with slab at inlete and outlet of OHT. | |||||||||||||
| 17 | 20056004 | ASANAHARIYA SV PWS | 20056004/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1. Water has been accumulating in the OHT campus for the past 6 months due to lack of soil backfilling inside the campus and absence of a proper drainage system. This prolonged waterlogging can weaken the soil, affect foundation stability, cause corrosion of metal componentS, damage concrete surfaces, and reduce the durability of the structure, even though all OHT works-includinB zinc-aluminium tank installation, Di piping, railings, and painting-have been completed. | |||||||||||||
| 18 | 20024552 | KHAIRA KALA PWS | 20024552/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1. it was observed that the staircase erected does not comply with the technical specifications. | |||||||||||||
| 19 | 20055931 | PRAHLADA_VISHUNAPUR MV PWS | 20055931/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1. The grouting of precast OHT slab has been developed multiple cracked leading of loss of watertightness, consequently active water seepage and dripping have been obesrvation on the underside of slab. | |||||||||||||
| 20 | 20016558 | KAKANDHU PWS | 20016558/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1. The precast overhead tank work has been completed. 2. A hole/opening is observed at the first brace, which may affect structural integrity and requires proper sealing/rectification. 3. Cracks are observed in the plinth protection, indicating possible shrinkage, improper curing, or workmanship issues. 4. The painting work has been found spoiled, with poor surface finish, indicating inadequate surface preparation and substandard workmanship. Rectification and repainting are required as per specifications. | |||||||||||||
| 21 | 20024452 | Ghorma Parsiya PWS | 20024452/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1. At several locations at the junction of the OHT slab support beam and column, pieces of gunny bag were found embedded in the concrete, indicating poor workmanship and improper shuttering practices. 2. In addition, honeycombing was observed in the 2nd brace, which indicates that the concrete was not properly compacted during casting. 3. These defects may adversely affect the structural strength and durability of the OHT. | |||||||||||||
| 22 | 20024454 | Gujarwara_Rampur Kodari PWS | 20024454/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1. the plinth beam of the OHT, the steel reinforcement is visibly exposed, which indicates poor workmanship. 3. Due to exposure to moisture and environmental conditions, the reinforcement has started corroding. This may adversely affect the structural integrity. | |||||||||||||
| 23 | 20024556 | Bagahi_Dakahi PWS | 20024556/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1. The staircase that has been insyis place abovythe second brace which has not been installed as per specification.ot was observed that plinth of OHT work is not started, 2. Zn-Al tank installation still pending. | |||||||||||||
| 24 | 20024237 | BAIDAURA PWS | 20024237/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | 1. Leakage obervation in zinc- Alumn Tank. Letter no LTCD/WET/SWSM/2025-26/678 Dated: 14.01.2026 1. At jointing of hold down breckets nut bolting was found not fully tight with sheet, Seepage was found from bottom of oht surafce. 2. Safety net was found not fixed with slab at inlete and outlet of OHT. Letter no LTCD/WET/SWSM/2025-26/608 Dated: 06.08.2025 | ||||||||||||
| 25 | 20055992 | PIPRI MV PWS | 20055992/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | 1. Hold dowun bracket fixing not proper with slab in some place , nut bolting was found not fully tight in some place. LTCD/WET/SWSM/2025-26/609 Dated: 06.08-.2025 | ||||||||||||
| 26 | 20024455 | Kodri Digar_Kolabhr Majgawn PWS | 20024455/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | 1. The project was halted for long time and reinforcement bars have been corroded which may leads to structure durability & stability failures. LTCD/WET/SWSM/2025/596 Date: 16-Jul-2025 | ||||||||||||
| 27 | 20030142 | PARAS RAMPUR PWS | 20030142/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | 1. The project was halted for long time and reinforcement bars have been corroded which may leads to structure durability & stability failures. LTCD/WET/SWSM/2025/595 Date: 15-Jul-2025 | ||||||||||||