Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20087341 MAHUWARI KHAS W/S SCHEME 20087341/01 No No No No No No Yes No No No No No No Resolved TPI Observation- Rusted steel was used during the raft casting works, which compromises the durability and structural integrity of the foundation and must be addressed immediately.
2 8359521 DARAULI GRAM PANCHAYAT WATER SUPPLY SCHEME 8359521/01 No No No No No No No Yes No No No No No Resolved NABL Certified LAB SBC report had been submitted
3 20038941 Sarahula W/S SCHEME 20038941/01 No No No No No No No Yes No No No No No Resolved NABL Certified LAB SBC report had been submitted
4 20082962 KAITHWALI W/S SCHEME No No No No No No No Yes No No No No No Resolved NABL Certified LAB SBC report had been submitted
5 20082962 KAITHWALI W/S SCHEME 20082962/01 No No No No No No No Yes No No No No No Resolved NABL Certified LAB SBC report had been submitted
6 20017053 SARAI SARIF W/S SCHEME 20017053/01 No No No No No No No Yes No No No No No Resolved NABL Certified LAB SBC report had been submitted
7 20082806 SURHARPUR HARICHARAN W/S SCHEME 20082806/01 No No No No No No No Yes No No No No No Resolved NABL Certified LAB SBC report had been submitted
8 8362890 ALIPUR BANGAWAN GRAM PANCHAYAT WATER SUPPLY SCHEME 8362890/01 No No No Yes No No No No No No No No No Resolved anti-rust chemical provided
9 20016953 BASIPUR URF PIYARI_NINDOPUR W/S SCHEME 20016953/01 No No No No No No Yes No No No No No No Resolved Anti-rust spray done by TKC
10 20017049 RAMPUR PATARI W/S SCHEME No No No No No No Yes No No No Yes No No Resolved Resolved Sand Test Report Provided
11 20017018 Kasera Pokhara W/S SCHEME 20017018/01 No No No No No No Yes No No No No No No Resolved 1. Test Report Provided by TKC.
12 20058342 Karmahari W/S SCHEME 20058342/01 No No No No No No Yes No No No No No No Resolved Sand Test Report Provided By TKC.
13 8361270 SISORA GRAM PANCHAYAT WATER SUPPLY SCHEME 8361270/01 No No No No No No Yes No No No No No No Resolved Vibrator provided after instruction of TPIA.
14 20079186 MAHADEWA W/S SCHEME (L&T) 20079186/01 No No No No No No Yes No No No No No No Resolved After instruction compliance done
15 20100580 MIRANPUR SAKKA W/S SCHEME 20100580/01 No No No Yes No No Yes No No No No No No Resolved Resolved 2. Panel Changed By TKC. 3. Panel changed By TKC 4. Leakage Rectified
16 20017071 RANJITPUR W/S SCHEME 20017071/01 No Yes No No No No No No No No No No No Resolved 1. Panel Changed By TKC. 2. Panel Changed By TKC.
17 20017003 CHAUKIYA KHAS W/S SCHEME 20017003/01 No No No No No No Yes No No No No No No Resolved 1. Anti-Rust Chemical coated by TKC
18 20097078 BALASARI W/S SCHEME 20097078/01 No No No No No No No No No No No No No Observation- 1. During site inspection, it was observed that proper cover blocks were not used in the Overhead Tank (OHT) Raft reinforcement. The reinforcement bars were found resting directly on the shuttering or with inadequate/inconsistent cover, which is not incorrect. Rectified-.Cover Block Provided after instruction
19 20013797 MUHAMMADPUR T CHAUDHARI AZMAL W/S SCHEME 20013797/01 No No No No No No Yes No No No No No No Resolved 1. Dewatering Done after Instruction By TPIA
20 20016984 SAURABH W/S SCHEME 20016984/01 No No No No No No Yes No No No No No No Resolved 1. During the site inspection, rusted and corroded steel bars were observed to be used for the reinforcement of OHT (Overhead Tank) columns. 2. Stirrup spacing not maintain. 3. Tin sheet was used in place of steel foam work/wooden foam wok at the junction. Due to this, this steel sheet has penetrated into concrete and the size of the beam has also been reduced. Rectify Status- 1. Not Rectified 2. Stirrups Maintain after instruction given to TKC. 3. After instruction Proper shuttering used By TKC.
21 8361266 DHARAWAN GRAM PANCHAYAT WATER SUPPLY SCHEME 8361266/01 No No No No No No Yes No No No No No No Resolved Observation- 1. During site inspection, it was found that cover blocks were either missing, inadequately placed, or not aligned properly in both the floor slab and beam areas. This is a direct violation of standard construction practices and IS 456:2000 guidelines which 2. Rusted steel was used in the OHT slab casting reinforcement work works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Rectified 1. Cover block provided after instruction. 2. Anti-Rust Chemical photo provided.
22 20017049 RAMPUR PATARI W/S SCHEME 20017049/01 No No No No No No Yes No No No No No No Resolved Observation- 1. During the inspection of the OHT (Overhead Tank) column reinforcement work, it was critically observed that the proper binding of ring hooks at 135 degrees was not provided as per standard detailing requirements. Rectification Status- Rectified 1. Hooks provide of 135 degree after instruction.
23 20088976 PAHARPUR KHURD & BHADAURA W/S SCHEME 20088976/01 No No No No No No Yes No No No No No No Resolved Observation- 1. Rusted steel bars were used for the OHT reinforcement work. 2. Spacing of steel bar not as per drawing. Rectification Status- Rectified 1. Anti-rust Chemical Photo Provided. 2. Spacing rectified after instruction
24 20017024 JOGA MUSAHIB W/S SCHEME 20017024/01 No No No No No No Yes No No No No No No Resolved Observation- 1. During site inspection, it was observed that rusted and corroded steel bars were used for the reinforcement of the OHT pile column. Rectification Status- Rectified 1. Rectified by Welding of Column reinforcement.
25 8359522 DEVAITHA GRAM PANCHAYAT WATER SUPPLY SCHEME 8359522/01 No No No No No No Yes No No No No No No Observation- 1. OHT raft has been found submerged in water for a long time. 2. During site inspection, it was observed that the reinforcement steel used in the OHT raft column was in rusted condition. Rectification Status- Rectified Observation- 1. Dewatering done after instruction. 2. Not Rectified
26 20058440 Aalapur W/S SCHEME 20058440/01 No No No No No No Yes No No No No No No Resolved Observation- 1. During the site inspection pedestal steel found open and rusted...Repairing should as per methodology. Rectification Status- Rectified 1. Rectified By Grouting and injecting Method.
27 20088809 BHAWAR KOL & LOCHIN W/S SCHEME 20088809/01 No No No No No No Yes No No No No No No Resolved Observation- 1. It has been observed during site inspection that the reinforcement hooks were not bent to 135 degrees as per the standard specifications in multiple structural elements (e.g., columns, beams, pedestals). The deviation from the prescribed hook angle violation Rectification Status- Rectified 1. Hooks bent at 135 degree after instruction.
28 20017073 SARAI GOKUL W/S SCHEME 20017073/01 No No No No No No Yes No No No No No No Resolved Observation- 1. It has been observed during site inspection that the reinforcement hooks were not bent to 135 degrees as per the standard specifications in multiple structural elements (e.g., columns, beams, pedestals). The deviation from the prescribed hook angle violation. 2. Spacing of Slab Steel Bars Not as per Approved Drawing Rectification Status- Rectified 1. Hooks bent 135 degree after instruction. 2. After instruction spacing of Bar rectified.
29 20097115 PACHARASI W/S SCHEME 20097115/01 No No No No No No Yes No No No No No No Resolved Observation- 1. Leakage found in OHT DI jointing. Rectification Status- Rectified 1. Leakage Rectified and water is running now.
30 20058449 Chandpur W/S SCHEME 20058449/01 No Yes No No No No No No No No No No No Observation- 1. Undulation (wavy or uneven surface) has been observed on the OHT (Overhead Tank) column. This indicates poor workmanship or deviation during shuttering and concreting. Rectification Status- Not Rectified
31 20017026 TARAW W/S SCHEME 20017026/01 No No No No Yes No Yes No No No No No No Resolved Resolved Observation- 1. Rusted steel was used in the OHT Raft column casting works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. 2. The Plain Cement Concrete (PCC) layer has disintegrated, with loose and unbound aggregates, indicating a serious quality failure in material mixing, placement, or curing. This compromises the structural base meant to uniformly distribute loads and support. 3. The hooks of reinforcement bars in the pedestal are not bent at 135° as per standard specifications. Instead, they appear to be either straight or bent at a lesser angle. 4. The bottom cover provided is only 25mm instead of the required 50mm as per structural specifications. Additionally, bricks are being used as cover blocks, which is an unacceptable practice. 5. During inspection, it was observed that the steel reinforcement in the raft foundation is not maintained at a uniform level, which is not as per structural and construction standards. This level variation can lead to improper concrete cover, misalignment. Rectification Status- Rectified 1. Rectified(Photo related to anti rust provided by TKC 2. Rectified by Finishing. 3. Bar Bent at 135 degree after instruction. 4. Cover changed after instruction. 5. Unformity of raft is maintained during casting of raft by Concrete.
32 20088804 KAROYI W/S SCHEME 20088804/01 No No No No No No Yes No No No No No No Resolved Observation- 2. Rusted steel was used in the OHT Raft foundation casting works. This compromises the bonding between concrete and steel and poses a serious risk to structural integrity and durability. Rectification Status- Rectified 1. Anti-Rust Chemical Provided.
33 8359514 ARILLA GRAM PANCHAYAT WATER SUPPLY SCHEME 8359514/01 No No No No No No Yes No No No No No No Resolved Observation: 1. OHT Plint protection has been found crack at many places. Corrective Action taken: Rectification has been done as per approved methodology.
34 20097744 CHAK MAHATAB W/S SCHEME 20097744/01 No No No No No No Yes No No No No No No Resolved Observation: 1. Proper bending of OHT column ring hook at 135 degree was not provided Corrective Action taken: OHT Column Rings hook has been bend at 135 degree as per IS code/as per drawing.
35 20092075 ASAICHANDPUR W/S SCHEME 20092075/01 No No No No No No Yes No No No No No No Resolved Observation: OHT raft found steel rusted. Corrective Action taken: Rust removed by sand paper & rust removal Paint.
36 20088799 JAMEEN MUNDRABHA W/S SCHEME 20088799/01 No No No No No No No No No No No No No Observation- Proper Dressing with Compaction is required in OHT Excavation for PCC work.
37 20100569 MALIKPURA W/S SCHEME 20100569/01 No No No No No No No No No No No No No
38 20100583 GOPALPUR W/S SCHEME 20100583/01 No No No No No No No No No No No No No
39 8361268 KUSUMHI KALAN GRAM PANCHAYAT WATER SUPPLY SCHEMEH 8361268/01 No No No No No No No No No No No No No
40 20100574 MADHUBAN MU. YUSUFPUR W/S SCHEME 20100574/01 No No No No No No No No No No No No No
41 20017197 Rampur Jiwan W/S SCHEME 20017197/01 No No No No No No No No No No No No No
42 20082944 MANIHARI KHAS W/S SCHEME 20082944/01 No No No No No No No No No No No No No
43 20098513 SAHABPUR W/S SCHEME 20098513/01 No No No No No No No No No No No No No
44 20088597 MATUK PUR W/S SCHEME 20088597/01 No No No No No No No No No No No No No
45 20017037 MUSTAFABAD W/S SCHEME 20017037/01 No No No No No No No No No No No No No