| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20082426 | RO- GAURIDIH GRAM PANCHAYAT WATER SUPPLY SCHEME | 20082426/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 2 | 20015922 | KHALISA WATER SUPPLY SCHEME | 20015922/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | The site was found waterlogged during inspection near the Overhead Tank work area | ||||||||||||
| 3 | 20013905 | MAURBOJH, GP-WATER SUPPLY SCHEME | 20013905/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Raft casting of the overhead tank is complete, but proper curing is not being done | ||||||||||||
| 4 | 20082421 | RO - DHANAULI RAMPUR GRAM PANCHAYAT WATER SUPPLY SCHEME | 20082421/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Waterlogging was found at the Overhead Tank foundation | ||||||||||||
| 5 | 20010908 | majhawara GP Water Supply Scheme | 20010908/01 | No | No | No | No | No | No | No | No | Yes | No | No | No | No | Resolved | The Overhead Tank work area was found completely waterlogged during inspection | ||||||||||||
| 6 | 20021117 | AUDEDIH WATER SUPPLY SCHEME | 20021117/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 7 | 20023545 | RAINI WATER SUPPLY SCHEME | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | ||||||||||||||
| 8 | 20013929 | KHALISPUR, GP-WATER SUPPLY SCHEME | 20013929/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 9 | 20085223 | RO SAKARA GRAM PANCHAYAT WATER SUPPLY SCHEME | 20085223/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 10 | 20064785 | Tajpur Patila Village Water Supply Scheme | 20064785/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Rectify | ||||||||||||
| 11 | 20044591 | Khargiliya WATER SUPPLY SCHEME | 20044591/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Honeycomb found in column of Over Head Tank work.-Rectify | ||||||||||||
| 12 | 20082913 | HATHANI GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME | 20082913/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Honeycomb found in column of Over Head Tank work.-Rectified | ||||||||||||
| 13 | 8389121 | BILAUJHA | 8389121/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | OHT column reinforcement bars have been left stacked at ground level, where rainwater accumulates, resulting in corrosion of the reinforcement due to prolonged exposure to moisture. | |||||||||||||
| 14 | 20064517 | Muhammadpur Barhia Gram Panchayat Water Supply Scheme | 20064517/01 | No | No | No | Yes | No | Yes | No | No | No | No | No | No | No | 1-Water accumulation has been observed in the excavated area surrounding the OHT raft foundation, indicating inadequate dewatering and site drainage arrangements. 2-The reinforcement bars of the raft foundation have been cut prematurely. the continuity of reinforcement between the foundation and the superstructure is critical. Cutting the main reinforcement destroys the structural bonding and load-transfer mechanism. | |||||||||||||
| 15 | 20082314 | JAMALPUR GRAM PANCHAYAT WATER SUPPLY SCHEME | 20082314/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Severe honeycombing observed in oht column and brace. | |||||||||||||