S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20029207 BABHANI LAGARI GP WSS 20029207/01 No No No No No No Yes No No No No No No Precast OHT dowel bar used different size of Bar.
2 20023232 MAHUI GP WSS 20023232/01 No No No No No No Yes No No No No No No Construction of OHT Stair case trade and riser size issue
3 20021622 Kudi 20021622/01 No No No No No No Yes No No No No No No Construction of OHT staircase 5th & 6th landing not as per drawing(Width and Alignment ) issue.
4 20075254 LUCHUYA GP WSS 20075254/01 Yes No No No No No No No No No No No No Honeycomb found due to poor formwork and poor concrete compaction in Stair case.
5 20015996 BASAUNI 20015996/01 No No Yes No No No No No No No No No No Resolved OHT column first lift cube failure 7 - days.and Cube has been tested on 28 days result found satisfactory
6 20021620 Dokam amya 20021620/01 No No Yes No No No No No No No No No No Resolved cube failure of 1st and 2nd Brace beam and After NDT test Conducted result found satisfactory.
7 20016001 Badahar Ghat 20016001/01 No No No No No No Yes No No No No No No Resolved Rectification done Removing the Rusted steel of Raft and rest of steel used iron oxide before casting.
8 20075136 PARSOHAN GP WSS 20075136/01 No No Yes No No No No No No No No No No Resolved Concrete cube failed of OHT ring beam and cross beam below slab 28 days of testing and After NDT result found satisfactory.
9 20015987 Shivpati Nagar 20015987/01 No No Yes No No No No No No No No No No Resolved 28 Days cube compressive strength test has been done & found satisfactory.
10 20036638 KAPIYA MISHRA GP WSS 20036638/01 No No Yes No No No No No No No No No No Resolved Rebound hammer test done in 1st BB lift found satisfactory.
11 20075133 HISANUDDIN PUR WSS 20075133/01 No No Yes No No No No No No No No No No Resolved Concrete Cube failed of OHT raft and Plinth beam of 28bday and after NDT test result found satisfactory .
12 20023361 CHANNAR GADDI GP WSS 20023361/01 No No Yes No No No No No No No No No No Resolved Rebound hammer test done in col 1st lift found satisfactory.
13 20022651 MAJHARI 20022651/01 No No Yes No No No No No No No No No No Resolved OHTcol 1st lift and raft cube failure of 28- days. and After NDT Test result found Satisfactory.
14 20016002 Dewra Bazar 20016002/01 No No Yes No No No No No No No No No No Resolved OHT raft NDT has been done and test result found satisfactory
15 20017615 Lamui Tall GP Water supply scheme 20017615/01 No No Yes No No No No No No No No No No Resolved NDT test & result found satisfied.
16 20059873 PADARIYA GP WSS 20059873/01 No No Yes No No No No No No No No No No Resolved NDT test & result found satisfied.
17 20036610 TIWARIPUR EAST GP WSS 20036610/01 No No Yes No No No No No No No No No No Resolved Raft NDT test & result found satisfied.
18 20075271 DUBAI AND MUJDIH GP WSS 20075271/01 No No No No No No Yes No No No No No No Resolved Comlun provide lap as per drawing within lapzone
19 20074947 Ahiroli padri wss 20074947/01 No No No No No No Yes No No No No No No Resolved reinforcement and layout as per drawing
20 20075242 JAGDISHPUR GRANT GP WSS 20075242/01 Yes No No No No No No No No No No No No Resolved Repairing done honeycombing area
21 20021816 BABHNI 20021816/01 Yes No No No No No No No No No No No No Resolved OHT 1st Brace beam and column above 1st brace beam Repairing done with injection grouting.
22 20023430 SOHASA SUMALI GP WSS 20023430/01 No No No No No No Yes No No No No No No Resolved OHT slab finishing with chipping and plastering work is done
23 20075102 HASAUDI AVSANPUR GP WSS 20075102/01 No No Yes No No No No No No No No No No Resolved NDT Test is conducted result found satisfactory .
24 20021743 Tanuhar Urf Khalilwaliya 20021743/01 No No Yes No No No No No No No No No No Resolved OHT slab conducted NDT test & result found satisfied.
25 20023331 SANGRAM PUR GP WSS 20023331/01 No No Yes No No No No No No No No No No Resolved OHT 1st Brace Conducted NDT test & result found satisfied.
26 20075247 MAJHAWAN KALA GP WSS 20075247/01 No No Yes No No No No No No No No No No Resolved OHT 3rd lift column above 2nd brace beam conducted NDT test & result found satisfied.
27 20021713 Jahda Musthakam 20021713/01 No No No No No Yes No No No No No No No Resolved Water leak rectified and provide anode bag completed
28 20021823 Mahua Pathak 20021823/01 No No Yes No No No No No No No No No No Resolved NDT test & result found satisfied.
29 20012549 Para Nankar G.P. Water Supply Scheme 20012549/01 No No Yes No No No No No No No No No No Resolved OHT Raft Conducted NDT test & result found satisfied.
30 20096407 DEKHARI GP WSS 20096407/01 Yes No No No No No No No No No No No No OHT 1st brace Honeycomb found.
31 8362767 POKHAR BHITWA GP WSS 8362767/01 Yes No No No No No No No No No No No No Regarding Honeycomb in OHT ring beam
32 20021827 BASAWANPAKAR URF MADRAHIYA 20021827/01 No No No No No Yes No No No No No No No Gap found between slab and tank Slab is not in level Bolt not tighten proper.
33 20020496 Teknaar WS scheme 20020496/01 Yes No No No No No No No No No No No No Honeycomb at 2nd brace meam.
34 20075207 SEMRIYAON GP WSS 20075207/01 No No Yes No No No No No No No No No No OHT slab 28 days cube test is not found satisfactory. NDT is recommended.
35 20096892 ROINHAWA GROUP OF GP WSS 20096892/01 No No No No No Yes No No No No No No No Gap found between slab and tank Slab is not in level
36 8362951 BARGO GP WATER SUPPLY SCHEME 8362951/01 No No No No No No Yes No No No No No No 1. During site visit it is found that staircase dowel bar is cut. 2. Site is situated at low land area. It is advised to prefer boundary wall and pump house drawing in column beam. It is advised to TKC rectify the work
37 8362151 HATHIWAD TAAL GP WSS 8362151/01 No No No No Yes No No No No No No No No Column lapping zone and alignment issue