| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20042888 | KOILSA GP wss | 20042888/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | The column reinforcement has been cut from the top surface, there is no space found on the column for lap length joint. all the column reinforcement spread top surface. | |||||||||||||
| 2 | 20057803 | GHUGHSA GP wss | 20057803/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | Staircase is not constructed as per drawing. Only 1.4 m head space is available between 1st and 2nd tie beam. | |||||||||||||
| 3 | 20039749 | PADRI GP WSS | 20039749/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 4 | 20058293 | TELIYA DEEH | 20058293/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1. It has observed that OHT slab concreting was planned on 28.03.2025 and approx. 25% portion was casted without information through RFI and telephonically. 2. Also it has noticed that before OHT slab casting there was no reinforcement inspection conducted in the presence of JAN NIGAM/TPIA representative. 3. And also there was no material test conducted for OHT slab before casting. | |||||||||||||
| 5 | 20024421 | BARDIYA LOHAR | 20024421/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | Steel bars to binding OHT TB3 not provided as per drawing. | |||||||||||||
| 6 | 20073524 | ANDA GP wss | 20073524/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1. Many shear key damaged and repaired by mortar and also cracks observed. 2. Beams also repaired with 50 mm approx. with mortar. 3. Precast Column verticality not in plumb there is approx. 10-20mm deviation in verticality at site. 4. Many steps of Precast staircase damaged. 5. Dummy holes and dowel bars fixed with repaired mortar also observed cracks on the repaired portion of the dowel bar. 6. Curing is not done on joints/Connections of each component filled by GP-2. This will cover by gunny bag. | |||||||||||||
| 7 | 20062852 | BHITHA KALA GP wss | 20062852/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1. Precast OHT work is carried out and found that cracked beam placed on the OHT erection which will fail when load occurs on the tank. 2. Beam column joint/Connection is improper filling of GP-2 has been done. 3. Curing is not done on joints/Connections of each component filled by GP-2. This will cover by gunny bag/Curing compound. | |||||||||||||
| 8 | 20058880 | BASHWA GP wss | 20058880/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | OHT stair case work not done properly. | |||||||||||||
| 9 | 20073363 | DEURA GP wss | 20073363/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | OHT Walkway slab work is not executed as per drawing.. In the last flight, the walkway was not mentioned in the drawing. As a result, while ascending the staircase, the walkway slab causes a head clearance issue. | |||||||||||||
| 10 | 20037771 | MAHSIN GP wss | 20037771/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Regarding OHT walkway slab honeycomb | |||||||||||||
| 11 | 20090593 | ATHDEORA GP wss | 20090593/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | 1. OHT raft casted before 3 month ago and work has stopped. 2. Now OHT raft fully submerged in water and column reinforcement is being rusted. | |||||||||||||
| 12 | 20061311 | DAULAT CHAK GP wss | 20061311/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | 1. Column casting has been carried out without RFI approval for two columns up to TB1 level. 2. Two cast columns are not in plumb, and a 25 mm deviation has been observed. 3. Lapping has been provided in the non-lapping zone in all four columns and the stair column. 4. OHT columns below the first brace beam have been found diagonally out by 30 mm. 5. Lapping for the OHT staircase column has not been provided as per the approved drawing. | |||||||||||||
| 13 | 20074568 | PUNAI JAPTI & BELWARAJA GP wss | 20074568/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | OHT staircase Dowel bar missing in column | |||||||||||||
| 14 | 20037725 | Baheria GP wss | 20037725/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | OHT staircase damaged | |||||||||||||
| 15 | 20075847 | RAIKWAR GP wss | 20075847/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | 1- Honeycomb in staircase 2- Steps of staircase broken 3- Concrete spall on OHT walkway | |||||||||||||
| 16 | 20042417 | BHADAWAL KALA GP wss | 20042417/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1. During raft concrete pouring, it was observed that the needle vibrator was not used as per the technical specifications, resulting in improper compaction of the concrete. 2. It was observed that the beam shuttering work was incomplete; however, beam concrete casting was still being carried out. 3. During raft concrete casting, the required slope was not maintained. | |||||||||||||
| 17 | 20074501 | GAUR GP wss | 20074501/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Honeycomb found on overall the OHT | |||||||||||||
| 18 | 20063913 | CHHAPIYA LUTAWAN GP wss | 20063913/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | 1. Many staircase columns found damaged and repaired by mortar and also cracks observed. 2. Honeycomb found on the column with improper shape of shear key hole. 3. Curing is not done on joints/Connections of each component filled by GP-2. This will cover by gunny bag. | |||||||||||||
| 19 | 20061457 | NANDUPUR & FARDA GP wss | 20061457/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | OHT brace beam found cracked. Staircase & OHT column connecting beam found cracked. Staircase step size near each brace beam not found as per drawing. | |||||||||||||
| 20 | 20024133 | GANDHARIYA GAJRAJ GP WSSS | 20024133/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | 1. OHT pouring work has done without RFI. 2. There is deviation in one column cross sectional area which is 40 mm inwards, which not meets IS 456:2000 Clause11.1- Deviation from specified dimensions of the cross-section of column and beam +12 mm, -6 mm. 3. Severe Honeycomb on OHT Column as well as braces. 4. It seems that vibrator not used near junction of TB2. 5. One of column is diagonally out by more than 100 mm. | |||||||||||||
| 21 | 20050180 | MEHNAUNA GP WSS | 20050180/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | OHT staire case work not done properly | |||||||||||||
| 22 | 20018099 | BADHYA LAL SINGH | 20018099/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 23 | 8360523 | Bhelwal GP WSS | 8360523/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 24 | 20018214 | RANIPUR GP WSS 2 | 20018214/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 25 | 20016766 | DUHWA GP WSS | 20016766/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | OHT Brace beam and column not aling with centreline | ||||||||||||
| 26 | 20026470 | BADANI GP WSS | 20026470/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 27 | 20018714 | NAGAHRA | 20018714/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 28 | 20023751 | MARAN GP WSS | 20023751/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 29 | 20019906 | HATWA GP WSS | 20019906/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 30 | 20023702 | REVLI GP WSS | 20023702/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 31 | 20037990 | KHADARA GP WSS | 20037990/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 32 | 20019939 | BHARU GP WSS | 20019939/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 33 | 20017763 | BARADIYA KUNWAR GP WSS | 20017763/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 34 | 20024608 | MAHULANI BUZURG GP WSS | 20024608/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 35 | 20036989 | BAGHI URF BENIPUR GP WSS | 20036989/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 36 | 20024796 | SABDEIYA KALA GP WSS | 20024796/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 37 | 20037103 | AMAYIPAAR GP WSS | 20037103/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | |||||||||||||
| 38 | 20037119 | SHAHPUR GP WSS | 20037119/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 39 | 20024255 | RAUNA KALA GP WSS | 20024255/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||
| 40 | 20020084 | SARVANPUR PANDEY GP WSS | 20020084/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | |||||||||||||