S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20042888 KOILSA GP wss 20042888/01 No No No Yes No No No No No No No No No The column reinforcement has been cut from the top surface, there is no space found on the column for lap length joint. all the column reinforcement spread top surface.
2 20057803 GHUGHSA GP wss 20057803/01 No No No No Yes No No No No No No No No Staircase is not constructed as per drawing. Only 1.4 m head space is available between 1st and 2nd tie beam.
3 20039749 PADRI GP WSS 20039749/01 Yes No No No No No No No No No No No No
4 20058293 TELIYA DEEH 20058293/01 No No No No No No Yes No No No No No No 1. It has observed that OHT slab concreting was planned on 28.03.2025 and approx. 25% portion was casted without information through RFI and telephonically. 2. Also it has noticed that before OHT slab casting there was no reinforcement inspection conducted in the presence of JAN NIGAM/TPIA representative. 3. And also there was no material test conducted for OHT slab before casting.
5 20024421 BARDIYA LOHAR 20024421/01 No No No No Yes No No No No No No No No Steel bars to binding OHT TB3 not provided as per drawing.
6 20073524 ANDA GP wss 20073524/01 No No No No No No Yes No No No No No No 1. Many shear key damaged and repaired by mortar and also cracks observed. 2. Beams also repaired with 50 mm approx. with mortar. 3. Precast Column verticality not in plumb there is approx. 10-20mm deviation in verticality at site. 4. Many steps of Precast staircase damaged. 5. Dummy holes and dowel bars fixed with repaired mortar also observed cracks on the repaired portion of the dowel bar. 6. Curing is not done on joints/Connections of each component filled by GP-2. This will cover by gunny bag.
7 20062852 BHITHA KALA GP wss 20062852/01 No No No No No No Yes No No No No No No 1. Precast OHT work is carried out and found that cracked beam placed on the OHT erection which will fail when load occurs on the tank. 2. Beam column joint/Connection is improper filling of GP-2 has been done. 3. Curing is not done on joints/Connections of each component filled by GP-2. This will cover by gunny bag/Curing compound.
8 20058880 BASHWA GP wss 20058880/01 No No No No Yes No No No No No No No No OHT stair case work not done properly.
9 20073363 DEURA GP wss 20073363/01 No No No No Yes No No No No No No No No OHT Walkway slab work is not executed as per drawing.. In the last flight, the walkway was not mentioned in the drawing. As a result, while ascending the staircase, the walkway slab causes a head clearance issue.
10 20037771 MAHSIN GP wss 20037771/01 Yes No No No No No No No No No No No No Regarding OHT walkway slab honeycomb
11 20090593 ATHDEORA GP wss 20090593/01 No No No Yes No No No No No No No No No 1. OHT raft casted before 3 month ago and work has stopped. 2. Now OHT raft fully submerged in water and column reinforcement is being rusted.
12 20061311 DAULAT CHAK GP wss 20061311/01 No No No No Yes No No No No No No No No 1. Column casting has been carried out without RFI approval for two columns up to TB1 level. 2. Two cast columns are not in plumb, and a 25 mm deviation has been observed. 3. Lapping has been provided in the non-lapping zone in all four columns and the stair column. 4. OHT columns below the first brace beam have been found diagonally out by 30 mm. 5. Lapping for the OHT staircase column has not been provided as per the approved drawing.
13 20074568 PUNAI JAPTI & BELWARAJA GP wss 20074568/01 No No No No Yes No No No No No No No No OHT staircase Dowel bar missing in column
14 20037725 Baheria GP wss 20037725/01 Yes No No No No No No No No No No No No OHT staircase damaged
15 20075847 RAIKWAR GP wss 20075847/01 Yes No No No No No No No No No No No No 1- Honeycomb in staircase 2- Steps of staircase broken 3- Concrete spall on OHT walkway
16 20042417 BHADAWAL KALA GP wss 20042417/01 No No No No No No Yes No No No No No No 1. During raft concrete pouring, it was observed that the needle vibrator was not used as per the technical specifications, resulting in improper compaction of the concrete. 2. It was observed that the beam shuttering work was incomplete; however, beam concrete casting was still being carried out. 3. During raft concrete casting, the required slope was not maintained.
17 20074501 GAUR GP wss 20074501/01 Yes No No No No No No No No No No No No Honeycomb found on overall the OHT
18 20063913 CHHAPIYA LUTAWAN GP wss 20063913/01 Yes No No No No No No No No No No No No 1. Many staircase columns found damaged and repaired by mortar and also cracks observed. 2. Honeycomb found on the column with improper shape of shear key hole. 3. Curing is not done on joints/Connections of each component filled by GP-2. This will cover by gunny bag.
19 20061457 NANDUPUR & FARDA GP wss 20061457/01 No No No No No No Yes No No No No No No OHT brace beam found cracked. Staircase & OHT column connecting beam found cracked. Staircase step size near each brace beam not found as per drawing.
20 20024133 GANDHARIYA GAJRAJ GP WSSS 20024133/01 No No No No Yes No No No No No No No No 1. OHT pouring work has done without RFI. 2. There is deviation in one column cross sectional area which is 40 mm inwards, which not meets IS 456:2000 Clause11.1- Deviation from specified dimensions of the cross-section of column and beam +12 mm, -6 mm. 3. Severe Honeycomb on OHT Column as well as braces. 4. It seems that vibrator not used near junction of TB2. 5. One of column is diagonally out by more than 100 mm.
21 20050180 MEHNAUNA GP WSS 20050180/01 No No No No Yes No No No No No No No No OHT staire case work not done properly
22 20018099 BADHYA LAL SINGH 20018099/01 No No No No No No Yes No No No No No No Resolved
23 8360523 Bhelwal GP WSS 8360523/01 Yes No No No No No No No No No No No No Resolved
24 20018214 RANIPUR GP WSS 2 20018214/01 Yes No No No No No No No No No No No No Resolved
25 20016766 DUHWA GP WSS 20016766/01 No Yes No No No No No No No No No No No Resolved OHT Brace beam and column not aling with centreline
26 20026470 BADANI GP WSS 20026470/01 No No No No No No Yes No No No No No No Resolved
27 20018714 NAGAHRA 20018714/01 No No No No No No Yes No No No No No No Resolved
28 20023751 MARAN GP WSS 20023751/01 No No No No No No Yes No No No No No No Resolved
29 20019906 HATWA GP WSS 20019906/01 No No No No No No Yes No No No No No No Resolved
30 20023702 REVLI GP WSS 20023702/01 Yes No No No No No No No No No No No No Resolved
31 20037990 KHADARA GP WSS 20037990/01 Yes No No No No No No No No No No No No Resolved
32 20019939 BHARU GP WSS 20019939/01 No No No No No No Yes No No No No No No Resolved
33 20017763 BARADIYA KUNWAR GP WSS 20017763/01 No No No No No No Yes No No No No No No Resolved
34 20024608 MAHULANI BUZURG GP WSS 20024608/01 No No No No No No Yes No No No No No No Resolved
35 20036989 BAGHI URF BENIPUR GP WSS 20036989/01 No No No No No No Yes No No No No No No Resolved
36 20024796 SABDEIYA KALA GP WSS 20024796/01 No No No No No No Yes No No No No No No Resolved
37 20037103 AMAYIPAAR GP WSS 20037103/01 No No No No No No Yes No No No No No No Resolved
38 20037119 SHAHPUR GP WSS 20037119/01 Yes No No No No No No No No No No No No Resolved
39 20024255 RAUNA KALA GP WSS 20024255/01 No No Yes No No No No No No No No No No Resolved
40 20020084 SARVANPUR PANDEY GP WSS 20020084/01 Yes No No No No No No No No No No No No Resolved