| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20063288 | Amatamau & Rausinghpur Water Supply Scheme | 20063288/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | ||||||||||||||
| 2 | 20097237 | BAHERA JJM SCHEME | 20097237/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | During inspection, the OHT structure was found to be in "poor condition," showing signs of potential honeycombing, cracks, or inadequate concrete strength. | |||||||||||||
| 3 | 20097554 | BAHORANPUR JJM SCHEME | 20097554/01 | No | Yes | No | Yes | No | No | Yes | No | No | No | No | No | No | Wooden pieces embedded between OHT Column and Tie beam junction. | |||||||||||||
| 4 | 20064808 | Barhaiya & Narni Water Supply Scheme | 20064808/01 | No | Yes | No | No | Yes | No | No | No | No | No | No | No | No | ||||||||||||||
| 5 | 20016529 | Dhakiya | 20016529/01 | Yes | Yes | No | Yes | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 6 | 20099533 | Jalalpur Water Supply Scheme | 20099533/01 | No | No | No | Yes | Yes | No | No | No | No | No | No | No | No | ||||||||||||||
| 7 | 20016437 | LALPUR | 20016437/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 8 | 20058199 | Mirzapur | 20058199/01 | Yes | Yes | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 9 | 20019545 | Mohammadpur Kala | 20019545/01 | No | Yes | No | No | No | No | Yes | No | No | No | No | No | No | Visible structural crack seen in staircase at the column junction, indicating potential weakness | |||||||||||||
| 10 | 20099980 | MOHARAVA JJM SCHEME | 20099980/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | Yes | Water logging has been observed on the OHT raft, which may adversely affect the durability and strength of the raft foundation if not addressed. | |||||||||||||
| 11 | 20084373 | REWAN WATER SUPPLY SCHEME | 20084373/01 | No | Yes | No | No | Yes | No | Yes | No | No | No | No | No | No | 1-The bend pipes have been installed in the vertical pipeline, which is not permitted. The pipe should be installed in a straight vertical alignment. The existing bend arrangement may cause water pressure and flow issues. 2-Gaps have been observed around the pipe penetration in the OHT slab, which is not acceptable. This may lead to leakage and deterioration of the slab. | |||||||||||||
| 12 | 20011890 | RUSTAM NAGAR | 20011890/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 13 | 20016440 | Seharu Khera | 20016440/01 | Yes | No | No | Yes | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 14 | 20019570 | SUKAIPUR | 20019570/01 | No | Yes | No | No | Yes | No | Yes | No | No | No | No | No | No | 1-Visible structural crack seen in OHT walkway slab top surface & staircase last flight bottom surface area, indicating potential weakness. 2-OHT painting work has not been carried out properly. Uneven paint application and poor surface finish have been observed at various locations. 3-The bend pipes have been installed in the vertical pipeline, which is not permitted. The pipe should be installed in a straight vertical alignment. The existing bend arrangement may cause water pressure and flow issues. | |||||||||||||
| 15 | 20099950 | SUREPARA & DATOONI JJM SCHEME | 20099950/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 16 | 20066216 | Urdauli Water Supply Scheme | 20066216/01 | Yes | No | No | Yes | No | No | Yes | No | No | No | No | No | No | Water logging has been observed on the OHT raft, which may adversely affect the durability and strength of the raft foundation if not addressed | |||||||||||||
| 17 | 20019538 | Anogi | 20019538/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | ||||||||||||||
| 18 | 20058411 | Bahlol Nagar | 20058411/01 | No | Yes | No | No | Yes | No | No | No | No | No | No | No | No | ||||||||||||||
| 19 | 20065163 | Banehra Birbal & Bhethra Madho Water Supply Scheme | 20065163/01 | No | Yes | No | No | No | No | Yes | No | No | No | No | No | No | Visible structural crack seen in staircase above 1st brace beam at the column junction, indicating potential weakness. | |||||||||||||
| 20 | 20097354 | AKHATYARPUR JJM SCHEME | 20097354/01 | Yes | No | No | Yes | Yes | No | No | No | No | No | No | No | No | ||||||||||||||
| 21 | 20098440 | BARKHERIA JJM SCHEME | 20098440/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 22 | 20019558 | Barwi Baruwa | 20019558/01 | Yes | Yes | No | Yes | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 23 | 20063292 | Chaupariya & Fattepur Multi Village Scheme | 20063292/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 24 | 20016453 | MIRZAPUR DAXINI | 20016453/01 | No | Yes | No | No | No | No | No | No | No | Yes | No | No | No | OHT remains unsafe even after third-party (IIT) evaluation and is not fit for service. | |||||||||||||
| 25 | 20099958 | CHANDAULI JJM SCHEME | 20099958/01 | No | Yes | No | No | No | No | No | No | No | Yes | No | No | No | OHT remains unsafe even after third-party (IIT) evaluation and is not fit for service. | |||||||||||||
| 26 | 20098427 | THANAPATTI JJM SCHEME | 20098427/01 | No | Yes | No | No | No | No | No | No | No | Yes | No | No | No | OHT remains unsafe even after third-party (IIT) evaluation and is not fit for service. | |||||||||||||
| 27 | 20065918 | Ladilapur | 20065918/01 | Yes | No | No | Yes | No | No | No | No | No | Yes | No | No | No | OHT structure is unsatisfactory based on UPV results. | |||||||||||||