Agency-wise Major/critical Ncs at OHT

S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 8386677 Jogiakol water supply scheme 8386677/01 No Yes No No No No No No No No No No No OHT Column has been observed massively out of vertical alignment.
2 20010944 jabraila biskhore 20010944/01 No No No Yes No No No No No No No No No Step of the OHT staircase is broken, exposing the reinforcement bars.
3 8386658 NANDAPAR G.P. WATER SUPPLY SCHEME 8386658/01 No No No No No No Yes No No No No No No Resolved Rusted reinforcement are being used at site without any treatment to prevent rusting of reinforcement used for OHT construction.
4 20011948 BHAGWANPUR BHAKRA TIWARI 20011948/01 No No No No No No Yes No No No No No No Resolved Curing of constructed concrete is not done at site. Concrete should be cured for a minimum period after getting placed at construction site.
5 20013788 DADWA CHATUR 20013788/01 No No No No No No Yes No No No No No No Resolved Cutouts which made in OHT slab for Inlet pipes are of larger size more than required and after pipe fittings these cutouts are not repaired.
6 8386690 Jungal Mathia Water Supply Scheme 8386690/01 No No No No No No Yes No No No No No No Resolved Crack has been observed at OHT roof base slab level & also leakages found at that portion.
7 20016881 SULTANEE JJM 20016881/01 No No No No No No Yes No No No No No No Resolved Undulation has been observed in the OHT column.
8 8359755 Tendua Khurd Water Supply Scheme 8359755/01 No No No No No No Yes No No No No No No Resolved OHT column Reinforcement has been found Rusted
9 8388491 Basdila Water Supply Scheme 8388491/01 No No No No No No Yes No No No No No No Resolved Sagging has been observed in the tie beam 1 of OHT.
10 20020493 DEVKAHIYA,DEVIPUR 20020493/01 No Yes No No No No No No No No No No No Resolved OHT TB - 1has not found in proper Alignment.
11 20011784 PARSIYA TIWARI 20011784/01 No No No No No No Yes No No No No No No Resolved Proper curing arrangements was not done at site.
12 20066704 MAHARAJGANJ JJM 20066704/01 No No No No No No Yes No No No No No No Resolved Rusted bar used in the OHT column.
13 8359754 Langri Golaria water supply scheme 8359754/01 No No No No No No Yes No No No No No No Resolved Shear key has not been provided in the OHT Column.
14 20011696 Pipari 20011696/01 No No No No No No Yes No No No No No No Resolved PCC for raft foundation has not done properly. PCC found damaged before casting of Raft.
15 8386756 Gaur Ganj Water Supply Scheme 8386756/01 No No No No No No Yes No No No No No No Resolved Cement sand and aggregate ratio is not as per specification.
16 8360845 DHOBAULI GAHARWAR 8360845/01 Yes No No No No No No No No No No No No Resolved Honeycomb is observed on OHT column finishing is also not proper.
17 20101649 Jangal Dumri No-2 Water Supply Scheme 20101649/01 No No No No No No Yes No No No No No No Resolved Rusted Steel bars used at OHT Column.
18 20011724 JAYANTIPUR 20011724/01 No No No No No No Yes No No No No No No Resolved M-30 concrete has not been used in the OHT slab
19 20091805 Naraharpur Water Supply Scheme 20091805/01 No No No No No No Yes No No No No No No Resolved The overlapping length of OHT foundation circumferential reinforcement bar has found Short as 250 mm on site. In the foundation ring beam of OHT the Top main bars are not tied properly with it's stirrups The development length of vertical reinforcement of columns at the bottom of the foundation beam are not tied properly in equal spacing and middle 2 bars of both side are bundled in foundation ring beam, it should be embossed in raft radial bars with equa
20 8359760 Devipur, Water Supply Scheme 8359760/01 No No No No No No Yes No No No No No No Resolved Reinforcement was found visible in OHT brace beam.
21 20097153 Thakurpur no-2 water supply sysytem 20097153/01 No No No No No No Yes No No No No No No Resolved Shear key has not been provided during column casting of OHT.
22 20097635 CHARI,DEVRAR BABU &GOCHARAN Water Supply Scheme 20097635/01 No No No No No No Yes No No No No No No Resolved Thickness of PCC before raft foundation found 50 mm only, however as per drawing it should be 75mm. Rings of Column has not been provided properly. Bent has not been done as per specification.
23 20011384 BAIJU DIHA 20011384/01 No No No Yes No No No No No No No No No Resolved Reinforcement of OHT column is left open without any precautions which will lead to corrosion and rusting.
24 20011962 Rautainia Sardar 20011962/01 No Yes No No No No No No No No No No No Resolved OHT stair Column has not been found in proper Alignment.
25 20011661 AMKOL 20011661/01 No Yes No No No No No No No No No No No Resolved OHT stair Column has not been found in proper Alignment.
26 8386686 Bhatganwa 8386686/01 No No No No No No Yes No No No No No No Resolved Rusted Reinforcement bar has been found stacked at site, and it has been left in direct contact with soil.
27 20011828 Bigahi 20011828/01 No No No No No No Yes No No No No No No Resolved Edge of the brace beam has been found damage condition at some places.
28 20011943 Bhitaha 20011943/01 No No No No No Yes No No No No No No No Resolved Gap (approximate 50 mm) has been found between ZnAl and OHT slab.
29 20011944 Jagdishpur urf Mahi 20011944/01 No No No Yes No No No No No No No No No Resolved Exposed steel reinforcement has been observed in the OHT slab.
30 20020522 RANIDEEH 20020522/01 Yes No No No No No Yes No No No No No No Resolved Resolved Gaps have been found at the junction of the column and the OHT top ring beam at multiple places. After deshuttering, honeycombing was found at the junction of the OHT ring beam and column.
31 8362894 HARPUR WATER SUPPLY SCHEMS 8362894/01 No No No No No Yes No No No No No No No Resolved Zink tank PVC liner has been found not properly fixed. Gap approximate 50 mm has been found between oht slab and ZnAl tank wall sheet. The oht upper surface of slab has undulations due to which ZnAl tank nut bolt fixing could not be done properly
32 20066910 Raghunathpur JJM 20066910/01 No No No Yes No No Yes No No No No No No Resolved Resolved OHT walkway slab thickness found not having uniform thickness across its periphery. As per visual observation OHT walkway slab have lesser thickness at some location than the required to be casted. It may lead to failure on the application of load. Reinforcement are visible and exposed to direct environment in the bottom of the OHT top slab casted due to improper shuttering and non-application of cover block during the casting.
33 20099806 Barhi Water Supply Scheme 20099806/01 Yes No No No No No No No No No No No No Resolved Due to improper shuttering and poor casting, reinforcement is visible at the junction of the brace beam and column, and honeycombing has been found in the OHT column.
34 20019817 Kolhua & Mathia water supply scheme 20019817/01 No Yes No No No No No No No No No No No Resolved OHT column not found in proper Alignment.
35 20101651 Brahmpur Water Supply Scheme 20101651/01 No Yes No No No No No No No No No No No Resolved Column of OHT was not found in Proper Alignment.
36 8386649 AKOLHEE G.P. WATER SUPPLY SCHEME 8386649/01 No No No No No No Yes No No No No No No Resolved Crack has been observed in OHT Slab.
37 20097158 Chilbilwa Water sUPPLY sYSTEM 20097158/01 No No No Yes No No No No No No No No No Resolved In 1st casted tie Beam of OHT, steel reinforcement found exposed to the atmosphere due to non fixing of proper cover to reinforced bar.
38 20066957 JANGAL SARIAYA BELWARIA JJM 20066957/01 No Yes No No No No No No No No No No No Resolved Column is not properly aligned vertically.
39 20011802 KANAYEEL 20011802/01 No No No No No No Yes No No No No No No Resolved Cracks found at the junction of beam and column of OHT.
40 20020449 Bhakurha 20020449/01 No No No No Yes No Yes No No No No No No Resolved Resolved Rusted steel has been used in the OHT raft foundation work The angle hook bends have not been provided as per drawing.
41 20011691 Chhitauna 20011691/01 No Yes No No No No No No No No No No No Resolved column in OHT Between TB1 and TB2 is found twisted and not aligned properly
42 8360936 Dumari Water Supply Scheme 8360936/01 No Yes No No No No No No No No No No No Resolved OHT Tie beam 1 has not been found properly aligned.
43 20011539 Karmha 20011539/01 No Yes No No No No No No No No No No No Resolved OHT Stair case Column was not found in proper Alignment.
44 20011967 Parusrampur 20011967/01 No Yes No No No No No No No No No No No Resolved OHT column is not aligned properly .
45 20011513 Maniram 20011513/01 No No No No No No No No No No No No No OHT Column was not found in proper Alignment.
46 20019860 Narawali Water Supply scheme 20019860/01 Yes No No No No No No No No No No No No Resolved Heavy honeycomb found on the OHT column and beam.
47 20020270 CHAKKAN MOHAMMAD 20020270/01 No No No No No No Yes No No No No No No Resolved PCC work was not found to be done prior to the casting of the OHT foundation.
48 20097195 Jonhiya & Mahupar Khas Water Supply System 20097195/01 No No No No Yes No Yes No No No No No No Resolved Resolved Fine aggregate stocked at site is not found as per specification. PCC work has not been done properly.
49 20011608 BETUA URF CHANAU 20011608/01 No No No No Yes No Yes No No No No No No Resolved Resolved Varying cross-section and unfinished surfaces found in the OHT tie beams. During site visit it was observed that OHT Ties beam cross –section was not as per drawing.
50 8360536 Siyarampur Water Supply Scheme 8360536/01 Yes Yes No No No No Yes No No No No No No Resolved Resolved Resolved OHT column was not found in the proper alignment Honeycomb has been found in the OHT brace beam. Proper cover has not been provided during column casting, and broken edges have been observed on the column.
51 20020535 Jangle Chhatradhari 20020535/01 No Yes No No No No Yes No No No No No No Resolved Resolved OHT column was not found in straight alignment. Junction of column and tie bean not casted properly as gap found between Column and tie Beam -1. it should be rectified immediately.
52 20066968 Gajpur jjm 20066968/01 No No No No No No Yes No No No No No No Resolved Alignment & spacing of stirrups of foundation ring beam is not done properly. Reinforcement bars of foundation & beam should be binded properly at every bar connection. Spacing of foundation radial bars also not maintained properly. Columns vertical reinforcement are not properly supported with horizontal tie bar to provide support for maintaining the alignment of column during concrete casting.
53 20011700 Karhi 20011700/01 No Yes No No No No Yes No No No No No No Resolved Resolved OHT stair Column has not been found in proper Alignment. Cracks have been found at multiple location in OHT staircase precast steps.
54 20094577 Raiganj WATER SUPPLY SCHEME 20094577/01 No Yes No No Yes No Yes No No No Yes No No Resolved Improper shuttering done at junction of the central OHT column and brace beams which results in misalignment of the column. Two of OHT brace beam observed in sagging position it primarily appeared as due to improper shuttering and casting. OHT walkway slab thickness found not having uniform thickness across its periphery. Reinforcement has been used in the OHT column work was not as per drawing.
55 20099398 GOpalpur Urf J block water Supply System 20099398/01 No Yes No No No No Yes No No No No No No Resolved Resolved Rusting of the reinforcement has been found on the plinth beam. OHT column is not properly casted in Plumb, which will directly create disturbance to the Load distribution system of OHT structure which can cause structure Failure in Future in Extreme conditions like Earthquake or Excess dead loads.
56 20019863 KHIRIDAD WATER SUPPLY SCHEME 20019863/01 No No No No No No Yes No No No No No No Resolved The reinforcement bars provided for the column have been cut off at the foundation beam level. Reinforcement of ring beam column found missing during inspection
57 20011538 Harpur 20011538/01 No Yes No No No No No No No No No No No Resolved OHT column is not in plumb.
58 8363584 Retrofitting of Rampur Gopalpur water supply scheme 8363584/01 No Yes No No No No No No No No No No No Resolved Column of OHT has not been found in proper plumb.