| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 8386677 | Jogiakol water supply scheme | 8386677/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | OHT Column has been observed massively out of vertical alignment. | |||||||||||||
| 2 | 20010944 | jabraila biskhore | 20010944/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Step of the OHT staircase is broken, exposing the reinforcement bars. | |||||||||||||
| 3 | 8386658 | NANDAPAR G.P. WATER SUPPLY SCHEME | 8386658/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rusted reinforcement are being used at site without any treatment to prevent rusting of reinforcement used for OHT construction. | ||||||||||||
| 4 | 20011948 | BHAGWANPUR BHAKRA TIWARI | 20011948/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Curing of constructed concrete is not done at site. Concrete should be cured for a minimum period after getting placed at construction site. | ||||||||||||
| 5 | 20013788 | DADWA CHATUR | 20013788/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Cutouts which made in OHT slab for Inlet pipes are of larger size more than required and after pipe fittings these cutouts are not repaired. | ||||||||||||
| 6 | 8386690 | Jungal Mathia Water Supply Scheme | 8386690/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Crack has been observed at OHT roof base slab level & also leakages found at that portion. | ||||||||||||
| 7 | 20016881 | SULTANEE JJM | 20016881/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Undulation has been observed in the OHT column. | ||||||||||||
| 8 | 8359755 | Tendua Khurd Water Supply Scheme | 8359755/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | OHT column Reinforcement has been found Rusted | ||||||||||||
| 9 | 8388491 | Basdila Water Supply Scheme | 8388491/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Sagging has been observed in the tie beam 1 of OHT. | ||||||||||||
| 10 | 20020493 | DEVKAHIYA,DEVIPUR | 20020493/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | OHT TB - 1has not found in proper Alignment. | ||||||||||||
| 11 | 20011784 | PARSIYA TIWARI | 20011784/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Proper curing arrangements was not done at site. | ||||||||||||
| 12 | 20066704 | MAHARAJGANJ JJM | 20066704/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rusted bar used in the OHT column. | ||||||||||||
| 13 | 8359754 | Langri Golaria water supply scheme | 8359754/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Shear key has not been provided in the OHT Column. | ||||||||||||
| 14 | 20011696 | Pipari | 20011696/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | PCC for raft foundation has not done properly. PCC found damaged before casting of Raft. | ||||||||||||
| 15 | 8386756 | Gaur Ganj Water Supply Scheme | 8386756/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Cement sand and aggregate ratio is not as per specification. | ||||||||||||
| 16 | 8360845 | DHOBAULI GAHARWAR | 8360845/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Honeycomb is observed on OHT column finishing is also not proper. | ||||||||||||
| 17 | 20101649 | Jangal Dumri No-2 Water Supply Scheme | 20101649/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rusted Steel bars used at OHT Column. | ||||||||||||
| 18 | 20011724 | JAYANTIPUR | 20011724/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | M-30 concrete has not been used in the OHT slab | ||||||||||||
| 19 | 20091805 | Naraharpur Water Supply Scheme | 20091805/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | The overlapping length of OHT foundation circumferential reinforcement bar has found Short as 250 mm on site. In the foundation ring beam of OHT the Top main bars are not tied properly with it's stirrups The development length of vertical reinforcement of columns at the bottom of the foundation beam are not tied properly in equal spacing and middle 2 bars of both side are bundled in foundation ring beam, it should be embossed in raft radial bars with equa | ||||||||||||
| 20 | 8359760 | Devipur, Water Supply Scheme | 8359760/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Reinforcement was found visible in OHT brace beam. | ||||||||||||
| 21 | 20097153 | Thakurpur no-2 water supply sysytem | 20097153/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Shear key has not been provided during column casting of OHT. | ||||||||||||
| 22 | 20097635 | CHARI,DEVRAR BABU &GOCHARAN Water Supply Scheme | 20097635/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Thickness of PCC before raft foundation found 50 mm only, however as per drawing it should be 75mm. Rings of Column has not been provided properly. Bent has not been done as per specification. | ||||||||||||
| 23 | 20011384 | BAIJU DIHA | 20011384/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Reinforcement of OHT column is left open without any precautions which will lead to corrosion and rusting. | ||||||||||||
| 24 | 20011962 | Rautainia Sardar | 20011962/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | OHT stair Column has not been found in proper Alignment. | ||||||||||||
| 25 | 20011661 | AMKOL | 20011661/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | OHT stair Column has not been found in proper Alignment. | ||||||||||||
| 26 | 8386686 | Bhatganwa | 8386686/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rusted Reinforcement bar has been found stacked at site, and it has been left in direct contact with soil. | ||||||||||||
| 27 | 20011828 | Bigahi | 20011828/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Edge of the brace beam has been found damage condition at some places. | ||||||||||||
| 28 | 20011943 | Bhitaha | 20011943/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | Gap (approximate 50 mm) has been found between ZnAl and OHT slab. | ||||||||||||
| 29 | 20011944 | Jagdishpur urf Mahi | 20011944/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Exposed steel reinforcement has been observed in the OHT slab. | ||||||||||||
| 30 | 20020522 | RANIDEEH | 20020522/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Gaps have been found at the junction of the column and the OHT top ring beam at multiple places. After deshuttering, honeycombing was found at the junction of the OHT ring beam and column. | |||||||||||
| 31 | 8362894 | HARPUR WATER SUPPLY SCHEMS | 8362894/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | Zink tank PVC liner has been found not properly fixed. Gap approximate 50 mm has been found between oht slab and ZnAl tank wall sheet. The oht upper surface of slab has undulations due to which ZnAl tank nut bolt fixing could not be done properly | ||||||||||||
| 32 | 20066910 | Raghunathpur JJM | 20066910/01 | No | No | No | Yes | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | OHT walkway slab thickness found not having uniform thickness across its periphery. As per visual observation OHT walkway slab have lesser thickness at some location than the required to be casted. It may lead to failure on the application of load. Reinforcement are visible and exposed to direct environment in the bottom of the OHT top slab casted due to improper shuttering and non-application of cover block during the casting. | |||||||||||
| 33 | 20099806 | Barhi Water Supply Scheme | 20099806/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Due to improper shuttering and poor casting, reinforcement is visible at the junction of the brace beam and column, and honeycombing has been found in the OHT column. | ||||||||||||
| 34 | 20019817 | Kolhua & Mathia water supply scheme | 20019817/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | OHT column not found in proper Alignment. | ||||||||||||
| 35 | 20101651 | Brahmpur Water Supply Scheme | 20101651/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | Column of OHT was not found in Proper Alignment. | ||||||||||||
| 36 | 8386649 | AKOLHEE G.P. WATER SUPPLY SCHEME | 8386649/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Crack has been observed in OHT Slab. | ||||||||||||
| 37 | 20097158 | Chilbilwa Water sUPPLY sYSTEM | 20097158/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | In 1st casted tie Beam of OHT, steel reinforcement found exposed to the atmosphere due to non fixing of proper cover to reinforced bar. | ||||||||||||
| 38 | 20066957 | JANGAL SARIAYA BELWARIA JJM | 20066957/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | Column is not properly aligned vertically. | ||||||||||||
| 39 | 20011802 | KANAYEEL | 20011802/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Cracks found at the junction of beam and column of OHT. | ||||||||||||
| 40 | 20020449 | Bhakurha | 20020449/01 | No | No | No | No | Yes | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Rusted steel has been used in the OHT raft foundation work The angle hook bends have not been provided as per drawing. | |||||||||||
| 41 | 20011691 | Chhitauna | 20011691/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | column in OHT Between TB1 and TB2 is found twisted and not aligned properly | ||||||||||||
| 42 | 8360936 | Dumari Water Supply Scheme | 8360936/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | OHT Tie beam 1 has not been found properly aligned. | ||||||||||||
| 43 | 20011539 | Karmha | 20011539/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | OHT Stair case Column was not found in proper Alignment. | ||||||||||||
| 44 | 20011967 | Parusrampur | 20011967/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | OHT column is not aligned properly . | ||||||||||||
| 45 | 20011513 | Maniram | 20011513/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | OHT Column was not found in proper Alignment. | |||||||||||||
| 46 | 20019860 | Narawali Water Supply scheme | 20019860/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Heavy honeycomb found on the OHT column and beam. | ||||||||||||
| 47 | 20020270 | CHAKKAN MOHAMMAD | 20020270/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | PCC work was not found to be done prior to the casting of the OHT foundation. | ||||||||||||
| 48 | 20097195 | Jonhiya & Mahupar Khas Water Supply System | 20097195/01 | No | No | No | No | Yes | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Fine aggregate stocked at site is not found as per specification. PCC work has not been done properly. | |||||||||||
| 49 | 20011608 | BETUA URF CHANAU | 20011608/01 | No | No | No | No | Yes | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Varying cross-section and unfinished surfaces found in the OHT tie beams. During site visit it was observed that OHT Ties beam cross –section was not as per drawing. | |||||||||||
| 50 | 8360536 | Siyarampur Water Supply Scheme | 8360536/01 | Yes | Yes | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Resolved | OHT column was not found in the proper alignment Honeycomb has been found in the OHT brace beam. Proper cover has not been provided during column casting, and broken edges have been observed on the column. | ||||||||||
| 51 | 20020535 | Jangle Chhatradhari | 20020535/01 | No | Yes | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | OHT column was not found in straight alignment. Junction of column and tie bean not casted properly as gap found between Column and tie Beam -1. it should be rectified immediately. | |||||||||||
| 52 | 20066968 | Gajpur jjm | 20066968/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Alignment & spacing of stirrups of foundation ring beam is not done properly. Reinforcement bars of foundation & beam should be binded properly at every bar connection. Spacing of foundation radial bars also not maintained properly. Columns vertical reinforcement are not properly supported with horizontal tie bar to provide support for maintaining the alignment of column during concrete casting. | ||||||||||||
| 53 | 20011700 | Karhi | 20011700/01 | No | Yes | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | OHT stair Column has not been found in proper Alignment. Cracks have been found at multiple location in OHT staircase precast steps. | |||||||||||
| 54 | 20094577 | Raiganj WATER SUPPLY SCHEME | 20094577/01 | No | Yes | No | No | Yes | No | Yes | No | No | No | Yes | No | No | Resolved | Improper shuttering done at junction of the central OHT column and brace beams which results in misalignment of the column. Two of OHT brace beam observed in sagging position it primarily appeared as due to improper shuttering and casting. OHT walkway slab thickness found not having uniform thickness across its periphery. Reinforcement has been used in the OHT column work was not as per drawing. | ||||||||||||
| 55 | 20099398 | GOpalpur Urf J block water Supply System | 20099398/01 | No | Yes | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Rusting of the reinforcement has been found on the plinth beam. OHT column is not properly casted in Plumb, which will directly create disturbance to the Load distribution system of OHT structure which can cause structure Failure in Future in Extreme conditions like Earthquake or Excess dead loads. | |||||||||||
| 56 | 20019863 | KHIRIDAD WATER SUPPLY SCHEME | 20019863/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | The reinforcement bars provided for the column have been cut off at the foundation beam level. Reinforcement of ring beam column found missing during inspection | ||||||||||||
| 57 | 20011538 | Harpur | 20011538/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | OHT column is not in plumb. | ||||||||||||
| 58 | 8363584 | Retrofitting of Rampur Gopalpur water supply scheme | 8363584/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | Column of OHT has not been found in proper plumb. | ||||||||||||