| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20097218 | Bhawanpur Water Supply Scheme | 20097218/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | The alignment of all columns has been found deviated from prior column. Kindly instruct TKC to dismantle all the columns and reconstruct again properly to ensure the structural integrity. | |||||||||||||
| 2 | 20064781 | Bahorikpur Water Supply Scheme | 20064781/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Severe crack has been developed at the mid of precast column of OHT. Take corrective action immediately. | |||||||||||||
| 3 | 20032577 | Diyawa & Keotali Multi Gram Panchayat Water Supply Scheme | 20032577/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | 3rd lift vertical wall of OHT has been found damaged after casting work. | |||||||||||||
| 4 | 20052851 | Praanpur Gram Panchayat Water Supply Scheme | 20052851/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Leakage has been occurred from the ZA tank. | |||||||||||||
| 5 | 20067249 | Shivpurkhurd Gram Panchayat Water Supply Scheme | 20067249/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Alignment of column has not been observed properly and grouting work was not done properly | |||||||||||||
| 6 | 20053006 | Chaukhandpureanti Gram Panchayat | 20053006/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Staircase railing and stand post of the OHT has been found damaged. | |||||||||||||
| 7 | 20052870 | Ramaipur Gram Panchayat Water Supply Scheme | 20052870/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | The 3 columns of the overhead tank are found 70 mm out from the center. Rectification should be done before casting. | |||||||||||||
| 8 | 20101405 | Derhari | 20101405/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Grouting work was not properly filled between two pre-cast column of OVER HEAD TANK. | ||||||||||||
| 9 | 20063143 | LATTARA WATER SUPPLY SCHEME | 20063143/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | It has been observed steel tank Nut bolt fixing work was not found properly | ||||||||||||
| 10 | 20051922 | Sekhpur Asik Gram Panchayat Water Supply Scheme | 20051922/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | It has been observed steel tank nut- Bolting fixing work not done properly. | ||||||||||||
| 11 | 20052983 | Pure Parmeshwar Gram Panchayat Water Supply Scheme | 20052983/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Crack has been observed in the staircase column at ground level. | ||||||||||||
| 12 | 20063712 | Bhaedpur Water Supply Scheme | 20063712/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Steel bar has been exposed in the some staircase panel. | ||||||||||||
| 13 | 20023621 | BASAULI GRAM PANCHAYAT WATER SUPPLY SCHEME | 20023621/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Steel has been exposed in the some steps of staircase. | ||||||||||||
| 14 | 20097121 | Goi Water supply scheme | 20097121/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Steel bar has been exposed at the bottom surface of precast slab panel of OVER HEAD TANK. | ||||||||||||
| 15 | 20058368 | Belha Gram Panchayat Water Supply Scheme | 20058368/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Spacing of shear stirrups has not been maintained as per drawing in the column. | ||||||||||||
| 16 | 20026949 | PEDARIYA GRAM PANCHAYAT WATER SUPPLY SCHEME | 20026949/01 | No | Yes | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | 1. Shuttering was not done properly for the concreting of OVER HEAD TANK brace beam and column. The alignment of column and brace beam has not been found properly. - 2. Steel bars of column have been getting rusted. Work has been stopped for more than 3 month. | |||||||||||
| 17 | 20067765 | Antamau Gram Panchayat Water Supply Scheme | 20067765/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | 1. Staircase column has been found damaged at the ground level - 2. It has been observed that, OVER HEAD TANK staircase grouting work was not done properly at site. | |||||||||||
| 18 | 20067027 | Lauli Pokhta Khan Water Supply Scheme | 20067027/01 | Yes | Yes | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Resolved | 1 Beam of staircase has been found severely cracked and damaged. Corrective action should be taken immediately - 2. Installation of precast staircase with column has not been done properly. - 3. Staircase grouting work was not done properly between the steps. | ||||||||||
| 19 | 20067445 | Chintamanipur & Andevari Multiple Gram Panchayat Water Supply Scheme | 20067445/01 | Yes | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Resolved | 1. structural crack observed in OVER HEAD TANK staircase step. - 2. steel bar has been exposed on the top of the precast step of OVER HEAD TANK staircase - 3. Crack has been developed in OVER HEAD TANK staircase step due to stand post installation | |||||||||||
| 20 | 20063030 | MARHA WATER SUPPLY SCHEME | 20063030/01 | Yes | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Resolved | 1. Steel bar has been exposed at the bottom of OVER HEAD TANK slab. - 2. Crack has been observed in the OVER HEAD TANK staircase column. - 3. Poor concreting work has been observed in the Beam of staircase. Steel bars has been exposed | |||||||||||
| 21 | 20023634 | KOHRAOV GRAM PANCHAYAT WATER SUPPLY SCHEME | 20023634/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | OHT steel tank has been erected out of center line of OHT slab. Due to this uneven pressure distribution may be occurred. | ||||||||||||
| 22 | 20023523 | BHADAUSI & RAMPUR PRAAN GRAM PANCHAYAT WATER SUPPLY SCHEME | 20023523/01 | No | Yes | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | 1. Precast panels of staircase have not been fixed properly. The alignment of the column after panels fixing has been observed misaligned - 2. Poor concrete casting work was done in the construction of the precast staircase steps. Remove these members from site. | ||||||||||||
| 23 | 20027060 | Sangrampur Gram Panchayat Water Supply Scheme | 20027060/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Expired date cement has been used for construction of OHT column. Cement has been found set also. Kindly dismantle the column as reconstruct it properly. | ||||||||||||
| 24 | 20032389 | Pithanapur Gram Panchayat Water Supply Scheme | 20032389/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Water logging has been occurred inside the OHT Foundation trench. | ||||||||||||
| 25 | 20032443 | Jayachandrapur Gram Panchayat Water Supply Scheme | 20032443/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | There is a major crack in the slab beam of the pre-cast overhead tank. | ||||||||||||
| 26 | 20057765 | JHINGUR GRAM PANCHYAT WATER SUPPLY SCHEME | 20057765/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | The height of the bottom of the balcony from the top of the bottom ring beam has found 1660 mm. whereas as per drawing it should be 1750 mm. | ||||||||||||
| 27 | 20058077 | Dharahra & Dhanepur Mutliple Gram Panchayat Water Supply Scheme | 20058077/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Precast staircase step has been found cracked. | ||||||||||||
| 28 | 20062726 | RAMPUR BELA | 20062726/01 | Yes | No | No | Yes | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Resolved | 1. Poor workmanship has been observed in the construction of OVER HEAD TANK staircase. Steel bars have been exposed and severe honeycomb developed. - 2. Steel bars have been exposed at the bottom of staircase and honeycomb developed - 3. Cover was not maintained properly in the precast steps construction as per given in the drawing. Steel bars have been found exposed. | ||||||||||
| 29 | 20062983 | BADSHAHPUR WATER SUPPLY SCHEME | 20062983/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cubes has not been sent to the lab for testing, it was found at the site | ||||||||||||
| 30 | 20063003 | HARIKHPURA WATER SUPPLY SCHEME | 20063003/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Grouting work was not carried out properly between the precast members of OHT | ||||||||||||
| 31 | 20067159 | Amarpur Gram Panchayat Water Supply Scheme | 20067159/01 | Yes | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | 1. cracks have been observed in OVER HEAD TANK column. - 2. The lap length of column steel bar has been found 450 mm. Where as it should have been 600 mm. - 3. Precast steps have not been casted properly in the precast yard. Cover was not provided to the steel bar. | |||||||||||
| 32 | 20063185 | DAFRA WATER SUPPLY SCHEME | 20063185/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | Leakage has been occurred from ZA tank | ||||||||||||
| 33 | 20064076 | Ragauli Water Supply Scheme | 20064076/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Grouting has not been done between the precast steps. Gaps are seen clearly between steps. | ||||||||||||
| 34 | 20064748 | Purebhika & raigarh water supply svheme | 20064748/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Grouting work was not done between two precast column of OHT. Gap has been clearly seen after erection. | ||||||||||||
| 35 | 20066808 | Raiypur Gram Panchayat Water Supply Scheme | 20066808/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | The landing beam of the 5th flight staircase of the overhead tank is coming out of column. And the landing beam was not casted during concrete pouring. This is significantly affecting the supporting strength of the staircase. Please fix this. | ||||||||||||
| 36 | 20066939 | Rajapur Kala Gram Panchayat Water Supply Scheme | 20066939/01 | No | No | No | Yes | No | Yes | No | No | No | No | No | No | No | Resolved | Resolved | 1. Steel bars have been exposed at the bottom surface of OHT Slab. It has been cleared that cover block was not provided during placement of steel bars. - 2. Leakage has been found due to some screws not being properly fitted in the ZA cylindrical wall. | |||||||||||
| 37 | 20067016 | Ramgarh Banohi Gram Panchayat Water Supply Scheme | 20067016/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | Leakage has been occurred from the ZA tank | ||||||||||||
| 38 | 20067020 | Bhudiyaur Gram Panchayat Water Supply Scheme | 20067020/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Cracks have been developed at the joint of precast column. | ||||||||||||
| 39 | 20074057 | Sarkhailpur water supply scheme | 20074057/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | 1. The formwork of plinth beam has not been found in proper alignment - 2. The horizontal alignment of brace beam has been observed bulged/misaligned. | ||||||||||||
| 40 | 20087376 | Kamoliveer Bhanpur Water Supply Scheme | 20087376/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Water logging has been occurred over the foundation of a pre-cast overhead tank. | ||||||||||||
| 41 | 20089695 | Kabirpur Water Supply Scheme | 20089695/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | Leakage has been occurred from the ZA tank. | ||||||||||||
| 42 | 20096957 | Dharaulimufrid & Chanduadih Water Supply Scheme | 20096957/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | Water logging has been found at the ground level of OHT. Bamboo scaffolding may be collapsed due to water logging. | |||||||||||||
| 43 | 20096960 | Hosiyapur Water Supply Scheme | 20096960/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Steel bar has been exposed at the bottom surface of OVER HEAD TANK precast slab. | ||||||||||||
| 44 | 20101463 | Raigarh Gram Panchayat Water Supply Scheme | 20101463/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Grouting has not been done properly between the joint of precast columns. | ||||||||||||