Agency-wise Major/critical Ncs at OHT

S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20035982 BASULI WATER SUPPLY SCHEME 20035982/01 Yes No No Yes No No Yes No No No No No No There is a gap between the columns and the bottom slab. Reinforcement has been found Exposed condition in OHT top ring Beam. Honeycomb has been found in OHT top ring Beam. Reinforcement is visible at the bottom of flat slab
2 20086616 HARMANDIR KHURD VILLAGE WSS 20086616/01 No No No No No No Yes No No No No Yes No Additional reinforcement not available for further casting of the OHT column.
3 20057167 BARAHARA BISHAMBHARPUR Water Supply Scheme 20057167/01 No Yes No Yes No No Yes No No No No No No Resolved 1. Column above 3rd brace beam not find in plumb (issue resolved) 2. 4th lift staircase found tilted outer side. 3. Reinforcement is visible in OHT 3rd brace beam due to improper cover block. 4. Reinforcement is visible under OHT 5th stair case .
4 20097109 AGYA G.P. Water Supply Scheme 20097109/01 Yes No No Yes No No Yes No No No No No No Resolved Resolved 1. Honeycomb has been observed in last flight staircase. 2. Steel are visible and honeycomb found in last staircase landing. 3. Bulging has been observed in bottom ring beam.
5 20086825 RITHIYA PADARI WSS 20086825/01 No Yes No Yes No No Yes No No No Yes No No Resolved 1. OHT 3rd lift column is not in alignment. (Not resolved). 2. Steel are visible in OHT 7th flight staircase.(Compliance not received 3. OHT 2nd brace beam found in damaged condition.
6 20068701 BODNA WATER SUPPLY SCHEME 20068701/01 Yes No No Yes No No No No No No No No No Resolved Resolved 1. Reinforcement has been found in Exposed condition as cover block has not provided properly in OHT walkway. 2. Honeycomb has found in OHT walkway . 3. Reinforcement has found visible condition in OHT Bottom ring Beam. 4. Honeycomb has found in OHT Bottom ring Beam.
7 20050250 SINGHORWA & ARAJI MAHUWA Gram Panchayat Water Supply Scheme 20050250/01 No No No No No No Yes No No No No No No Resolved Rusted steel used in OHT 1st lift column.
8 20086662 Hanuman Garhiya GP Water Supply Scheme 20086662/01 No No No Yes No No No No No No No No No Reinforcement is visible at the junction of 2nd landing of OHT staircase column and brace beam .
9 20061323 Sirsiya & Bankatiya water supply scheme 20061323/01 Yes Yes No No No No Yes No No No No No No Resolved Resolved Resolved 1. Column is not in alignment. 2. Honeycomb is found in ESR second lift column. 3. Junction of 3rd brace column and brace beam depth is not maintained by TKC.
10 20055667 Bishunpur Gabarua & Laxmipur Shiwala Water supply scheme 20055667/01 Yes No No Yes No No No No No No No No No Resolved Resolved 1. Steel is visible in OHT slab. 2. Honeycombing found in OHT balcony slab.
11 20101637 KOHADWAL WSS 20101637/01 Yes Yes No No No No No No No No No No No Resolved Resolved 1. Junction of brace and columns is not in alignment. 2. Junction of brace and columns is not in alignment in 2nd brace beam. 3. Honeycomb is observed in second brace beam.
12 20110452 NAKSA BAKSA WATER SUPPLY SCHEME 20110452/01 Yes Yes No No No No No No No No No No No Resolved Resolved 1. Honeycombing is observed in 3rd brace beam. 2. Alignment of column is not vertically straight.
13 20097100 PAKARIYAR BUZURG W/S Scheme 20097100/01 Yes No No No No Yes No No No No No No No Resolved Resolved 1. Honeycomb is found in OHT column 2. Zn Al Tank is elevated above the bottom slab and it is not proper aligned. 3. The zinc OHT liner is popping out under the sheet near the balcony.
14 20054917 Belsar water supply scheme 20054917/01 Yes No No No No No No No No No No No No Resolved Honeycomb has been found in OHT column and required finishing.
15 20101642 ANDHYA WSS 20101642/01 No Yes No No No No No No No No No No No Resolved Column of ESR is not in alignment.
16 20055725 Amodha & Pokharbhinda water supply scheme 20055725/01 No Yes No No No No No No No No No No No Resolved The Starter constructed is not aligned with OHT Column.
17 20066259 Basantpur water supply scheme 20066259/01 No Yes No No No No No No No No No No No Resolved Intersection of junction of brace beam and column is not in alignment
18 20057873 BHAGWANPUR URF BHULNA Water Supply Scheme 20057873/01 No Yes No No No No No No No No No No No Resolved Alignment of column is not linear.
19 20096173 Bharwaliya Water Supply scheme 20096173/01 No Yes No No No No No No No No No No No Resolved 1st Brace Beam is not aligned at the junction of 1st Brace and Column.
20 20086848 BARGADWA VILLAGE WSS 20086848/01 No Yes No No No No No No No No No No No Resolved 2nd lift column is not in proper alignment.
21 20095045 BASHIYA BUJURG VILLAGE WSS 20095045/01 Yes No No No No No No No No No No No No Resolved Honeycomb is found in raft .
22 20057540 BABHNI KHURD & BABHNI BUJURG Water Supply Scheme 20057540/01 No No No Yes No No No No No No No No No Resolved Steel is visible in OHT 2nd brace beam.
23 20066297 Bargadwa Ramsahai & Semrahani water supply scheme 20066297/01 No No No No No Yes No No No No No No No Resolved Zincalume Tank is elevated above the bottom slab and this is not according to DPR.
24 20068385 DHUSWAKALA & BOKAVA WATER SUPPLY SCHEME 20068385/01 No Yes No No No No No No No No No No No Resolved Column above 3rd brace beam not found in plumb.
25 20057205 DASHRATH PUR Water Supply Scheme 20057205/01 No Yes No No No No No No No No No No No Resolved G.B.B. and Column is not in alignment.
26 20061052 Dhangari Munderi water supply scheme 20061052/01 No Yes No No No No No No No No No No No Resolved 1. Alignment of 1st column and Brace at at junction is not in plumb. 2. Junction of 1st Brace Beam and 2nd lift column is not found in alignment.
27 20093808 JHAGPAR VILLAGE WSS 20093808/01 No No No No No No Yes No No No No No No Resolved OHT staircase Handrail post found in damage condition.
28 20057246 HARAIYA RAGHUVIR Water Supply Scheme 20057246/01 No No No Yes No No No No No No No No No Resolved Steel is visible in OHT stair case cantilever beam.
29 20094378 KOILA DAND W/S SCHEME 20094378/01 Yes No No No No No No No No No No No No Resolved Honey combing found in OHT column above ground beam.
30 20057774 LORHIYA Water Supply Scheme 20057774/01 No No No No No No Yes No No No No No No Resolved Shear key has not been provided above GL in 1st lift of brace column.
31 20057651 KASHTKHAERA & EAKDAGAWA Water Supply Scheme 20057651/01 No No No Yes No No No No No No No No No Resolved Steel is visible in OHT ring beam due to honey combing.
32 20054751 Khanpur Water supply scheme 20054751/01 No No No No No No Yes No No No No No No Resolved OHT column and tie beam Junction is not Properly casted due to improper shuttering.
33 20060897 Matiyariya water supply scheme 20060897/01 No Yes No No No No No No No No No No No Resolved Third brace beam is not in alignment.
34 20035960 NAUNIA WATER SUPPLY SCHEME 20035960/01 No No No Yes No No No No No No No No No Resolved Reinforcement is visible in OHT 2nd brace beam due to improper cover block.
35 20035956 ORWALIA WATER SUPPLY SCHEME 20035956/01 No Yes No No No No No No No No No No No Resolved No proper shuttering done for the OHT column above junction of first brace beam as no proper alignment found at the junction .
36 20050214 NARAYANPUR Gram Panchayat Water Supply Scheme 20050214/01 No No No No No No Yes No No No No No No Resolved Rusted steel used in OHT 1st lift Column.
37 20057292 Newas Pokhar water supply scheme 20057292/01 No No No No Yes No No No No No No No No Dimensions of brace beam is not as per drawing.
38 20061202 Pipraich urf Panchrukhiya & Patkhauli water supply scheme 20061202/01 No No No No No No Yes No No No No No No Resolved Crack is observed in ESR column below the ground beam.
39 20101633 PIPRA NARAYAN WSS 20101633/01 No No No No No No Yes No No No No No No Resolved Spacing of reinforcement bars in the OHT bottom slab is not as per drawing.
40 20008303 Sinhuli Parsa GRAM PANCHAYAT WATER SUPPLY SCHEME 20008303/01 No No No No No No Yes No No No No No No Resolved Junction box is not provided properly.
41 20094580 PARSACHAK GOBRHI VILLAGE W/S SCHEME 20094580/01 Yes No No No No No No No No No No No No Resolved Honeycomb is found in OHT column
42 20086736 Sidhave GP Water Supply Scheme 20086736/01 Yes No No No No No No No No No No No No Resolved Honeycomb has been found in OHT raft foundation.
43 20054908 Rajmandir Water supply scheme 20054908/01 No Yes No No No No No No No No No No No Resolved Alignment not done properly at junction.
44 20055722 Shitlapur Water supply scheme 20055722/01 No No No Yes No No No No No No No No No Resolved Reinforcement is visible in brace beam.
45 20061355 Unti & Bargadwa water supply scheme 20061355/01 No Yes No No No No No No No No No No No Resolved Column of ESR is not in alignment.
46 20086752 Rampurwa GP Water Supply Scheme 20086752/01 No No No No No No Yes No No No No No No Resolved Water logging found in OHT raft during casting.
47 20095078 TARAINI AND BABHANI AND PIPRAHIYA MULTI VILLEGE WATER SUPPLY SCHEME 20095078/01 No Yes No No No No No No No No No No No Resolved The OHT ground beam is not in alignment.
48 20095090 RAJWAL MADRAHA VILLAGE W/S SCHEME 20095090/01 Yes No No No No No No No No No No No No Resolved Honeycomb is found in second lift column above first brace.
49 20069291 VIJAYPUR WATER SUPPLY SCHEME 20069291/01 No Yes No No No No No No No No No No No Resolved OHT 3rd lift column not in alignment.
50 20068291 SISWABABU WATER SUPPLY SCHEME 20068291/01 No No No No No No Yes No No No No No No Resolved Steel projection has not been left for further casting of column.
51 20061266 Semra Maharaj & Karmaha Buzurg water supply scheme 20061266/01 No No No Yes No No No No No No No No No Reinforcement are visible in OHT 1st brace beam.
52 20076394 Sonari Khas water supply scheme 20076394/01 No No No No No No Yes No No No No No No Resolved OHT Staircase 3rd landing beam is tilted as per visual inspection.
53 20086793 Burhadih Kalan GP Water Supply Scheme 20086793/01 No Yes No No No No No No No No No No No Resolved Beam column junction is not aligned properly.
54 20059620 PADRI KHURD AND MISHRAULIYA Water Supply Scheme 20059620/01 No No No No No No Yes No No No No No No Resolved Shear key has been not provided above GL in 1st lift of column.
55 20095533 MADHAVAPUR & MOHADDINPUR Multi villages W/S Scheme 20095533/01 No Yes No No No No No No No No Yes No No During the site inspection it was found column is not in plumb as par visual inspection.
56 20057489 BAIRWA JUNGLE Water Supply Scheme 20057489/01 Yes No No Yes No No No No Yes No No No No Steel is visible in OHT 1st brace beam above lift column. Honeycomb found in OHT 1st brace beam above first lift column.
57 20068411 Bargadva Bishunpur WATER SUPPLY SCHEME 20068411/01 No Yes No No No No Yes No No Yes No Yes No 1. Column is not in plumb. Column is heavily deflected from its original position. 2. All columns of OHT are not in proper alignment. 3. Visual inspection revealed that the OHT column was not in alignment. 4. At Tie beam damage detected during site visit. Note- Demolition work is going on 80% done and 20% WIP
58 20067524 Mathaniya water supply scheme 20067524/01 No No No No No No No No No No No No No