| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20035982 | BASULI WATER SUPPLY SCHEME | 20035982/01 | Yes | No | No | Yes | No | No | Yes | No | No | No | No | No | No | There is a gap between the columns and the bottom slab. Reinforcement has been found Exposed condition in OHT top ring Beam. Honeycomb has been found in OHT top ring Beam. Reinforcement is visible at the bottom of flat slab | |||||||||||||
| 2 | 20086616 | HARMANDIR KHURD VILLAGE WSS | 20086616/01 | No | No | No | No | No | No | Yes | No | No | No | No | Yes | No | Additional reinforcement not available for further casting of the OHT column. | |||||||||||||
| 3 | 20057167 | BARAHARA BISHAMBHARPUR Water Supply Scheme | 20057167/01 | No | Yes | No | Yes | No | No | Yes | No | No | No | No | No | No | Resolved | 1. Column above 3rd brace beam not find in plumb (issue resolved) 2. 4th lift staircase found tilted outer side. 3. Reinforcement is visible in OHT 3rd brace beam due to improper cover block. 4. Reinforcement is visible under OHT 5th stair case . | ||||||||||||
| 4 | 20097109 | AGYA G.P. Water Supply Scheme | 20097109/01 | Yes | No | No | Yes | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | 1. Honeycomb has been observed in last flight staircase. 2. Steel are visible and honeycomb found in last staircase landing. 3. Bulging has been observed in bottom ring beam. | |||||||||||
| 5 | 20086825 | RITHIYA PADARI WSS | 20086825/01 | No | Yes | No | Yes | No | No | Yes | No | No | No | Yes | No | No | Resolved | 1. OHT 3rd lift column is not in alignment. (Not resolved). 2. Steel are visible in OHT 7th flight staircase.(Compliance not received 3. OHT 2nd brace beam found in damaged condition. | ||||||||||||
| 6 | 20068701 | BODNA WATER SUPPLY SCHEME | 20068701/01 | Yes | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Resolved | 1. Reinforcement has been found in Exposed condition as cover block has not provided properly in OHT walkway. 2. Honeycomb has found in OHT walkway . 3. Reinforcement has found visible condition in OHT Bottom ring Beam. 4. Honeycomb has found in OHT Bottom ring Beam. | |||||||||||
| 7 | 20050250 | SINGHORWA & ARAJI MAHUWA Gram Panchayat Water Supply Scheme | 20050250/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rusted steel used in OHT 1st lift column. | ||||||||||||
| 8 | 20086662 | Hanuman Garhiya GP Water Supply Scheme | 20086662/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Reinforcement is visible at the junction of 2nd landing of OHT staircase column and brace beam . | |||||||||||||
| 9 | 20061323 | Sirsiya & Bankatiya water supply scheme | 20061323/01 | Yes | Yes | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Resolved | Resolved | 1. Column is not in alignment. 2. Honeycomb is found in ESR second lift column. 3. Junction of 3rd brace column and brace beam depth is not maintained by TKC. | ||||||||||
| 10 | 20055667 | Bishunpur Gabarua & Laxmipur Shiwala Water supply scheme | 20055667/01 | Yes | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Resolved | 1. Steel is visible in OHT slab. 2. Honeycombing found in OHT balcony slab. | |||||||||||
| 11 | 20101637 | KOHADWAL WSS | 20101637/01 | Yes | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | Resolved | 1. Junction of brace and columns is not in alignment. 2. Junction of brace and columns is not in alignment in 2nd brace beam. 3. Honeycomb is observed in second brace beam. | |||||||||||
| 12 | 20110452 | NAKSA BAKSA WATER SUPPLY SCHEME | 20110452/01 | Yes | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | Resolved | 1. Honeycombing is observed in 3rd brace beam. 2. Alignment of column is not vertically straight. | |||||||||||
| 13 | 20097100 | PAKARIYAR BUZURG W/S Scheme | 20097100/01 | Yes | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | Resolved | 1. Honeycomb is found in OHT column 2. Zn Al Tank is elevated above the bottom slab and it is not proper aligned. 3. The zinc OHT liner is popping out under the sheet near the balcony. | |||||||||||
| 14 | 20054917 | Belsar water supply scheme | 20054917/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Honeycomb has been found in OHT column and required finishing. | ||||||||||||
| 15 | 20101642 | ANDHYA WSS | 20101642/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | Column of ESR is not in alignment. | ||||||||||||
| 16 | 20055725 | Amodha & Pokharbhinda water supply scheme | 20055725/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | The Starter constructed is not aligned with OHT Column. | ||||||||||||
| 17 | 20066259 | Basantpur water supply scheme | 20066259/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | Intersection of junction of brace beam and column is not in alignment | ||||||||||||
| 18 | 20057873 | BHAGWANPUR URF BHULNA Water Supply Scheme | 20057873/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | Alignment of column is not linear. | ||||||||||||
| 19 | 20096173 | Bharwaliya Water Supply scheme | 20096173/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | 1st Brace Beam is not aligned at the junction of 1st Brace and Column. | ||||||||||||
| 20 | 20086848 | BARGADWA VILLAGE WSS | 20086848/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | 2nd lift column is not in proper alignment. | ||||||||||||
| 21 | 20095045 | BASHIYA BUJURG VILLAGE WSS | 20095045/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Honeycomb is found in raft . | ||||||||||||
| 22 | 20057540 | BABHNI KHURD & BABHNI BUJURG Water Supply Scheme | 20057540/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Steel is visible in OHT 2nd brace beam. | ||||||||||||
| 23 | 20066297 | Bargadwa Ramsahai & Semrahani water supply scheme | 20066297/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | Zincalume Tank is elevated above the bottom slab and this is not according to DPR. | ||||||||||||
| 24 | 20068385 | DHUSWAKALA & BOKAVA WATER SUPPLY SCHEME | 20068385/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | Column above 3rd brace beam not found in plumb. | ||||||||||||
| 25 | 20057205 | DASHRATH PUR Water Supply Scheme | 20057205/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | G.B.B. and Column is not in alignment. | ||||||||||||
| 26 | 20061052 | Dhangari Munderi water supply scheme | 20061052/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | 1. Alignment of 1st column and Brace at at junction is not in plumb. 2. Junction of 1st Brace Beam and 2nd lift column is not found in alignment. | ||||||||||||
| 27 | 20093808 | JHAGPAR VILLAGE WSS | 20093808/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | OHT staircase Handrail post found in damage condition. | ||||||||||||
| 28 | 20057246 | HARAIYA RAGHUVIR Water Supply Scheme | 20057246/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Steel is visible in OHT stair case cantilever beam. | ||||||||||||
| 29 | 20094378 | KOILA DAND W/S SCHEME | 20094378/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Honey combing found in OHT column above ground beam. | ||||||||||||
| 30 | 20057774 | LORHIYA Water Supply Scheme | 20057774/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Shear key has not been provided above GL in 1st lift of brace column. | ||||||||||||
| 31 | 20057651 | KASHTKHAERA & EAKDAGAWA Water Supply Scheme | 20057651/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Steel is visible in OHT ring beam due to honey combing. | ||||||||||||
| 32 | 20054751 | Khanpur Water supply scheme | 20054751/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | OHT column and tie beam Junction is not Properly casted due to improper shuttering. | ||||||||||||
| 33 | 20060897 | Matiyariya water supply scheme | 20060897/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | Third brace beam is not in alignment. | ||||||||||||
| 34 | 20035960 | NAUNIA WATER SUPPLY SCHEME | 20035960/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Reinforcement is visible in OHT 2nd brace beam due to improper cover block. | ||||||||||||
| 35 | 20035956 | ORWALIA WATER SUPPLY SCHEME | 20035956/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | No proper shuttering done for the OHT column above junction of first brace beam as no proper alignment found at the junction . | ||||||||||||
| 36 | 20050214 | NARAYANPUR Gram Panchayat Water Supply Scheme | 20050214/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rusted steel used in OHT 1st lift Column. | ||||||||||||
| 37 | 20057292 | Newas Pokhar water supply scheme | 20057292/01 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | Dimensions of brace beam is not as per drawing. | |||||||||||||
| 38 | 20061202 | Pipraich urf Panchrukhiya & Patkhauli water supply scheme | 20061202/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Crack is observed in ESR column below the ground beam. | ||||||||||||
| 39 | 20101633 | PIPRA NARAYAN WSS | 20101633/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Spacing of reinforcement bars in the OHT bottom slab is not as per drawing. | ||||||||||||
| 40 | 20008303 | Sinhuli Parsa GRAM PANCHAYAT WATER SUPPLY SCHEME | 20008303/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Junction box is not provided properly. | ||||||||||||
| 41 | 20094580 | PARSACHAK GOBRHI VILLAGE W/S SCHEME | 20094580/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Honeycomb is found in OHT column | ||||||||||||
| 42 | 20086736 | Sidhave GP Water Supply Scheme | 20086736/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Honeycomb has been found in OHT raft foundation. | ||||||||||||
| 43 | 20054908 | Rajmandir Water supply scheme | 20054908/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | Alignment not done properly at junction. | ||||||||||||
| 44 | 20055722 | Shitlapur Water supply scheme | 20055722/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | Reinforcement is visible in brace beam. | ||||||||||||
| 45 | 20061355 | Unti & Bargadwa water supply scheme | 20061355/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | Column of ESR is not in alignment. | ||||||||||||
| 46 | 20086752 | Rampurwa GP Water Supply Scheme | 20086752/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Water logging found in OHT raft during casting. | ||||||||||||
| 47 | 20095078 | TARAINI AND BABHANI AND PIPRAHIYA MULTI VILLEGE WATER SUPPLY SCHEME | 20095078/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | The OHT ground beam is not in alignment. | ||||||||||||
| 48 | 20095090 | RAJWAL MADRAHA VILLAGE W/S SCHEME | 20095090/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | Honeycomb is found in second lift column above first brace. | ||||||||||||
| 49 | 20069291 | VIJAYPUR WATER SUPPLY SCHEME | 20069291/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | OHT 3rd lift column not in alignment. | ||||||||||||
| 50 | 20068291 | SISWABABU WATER SUPPLY SCHEME | 20068291/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Steel projection has not been left for further casting of column. | ||||||||||||
| 51 | 20061266 | Semra Maharaj & Karmaha Buzurg water supply scheme | 20061266/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Reinforcement are visible in OHT 1st brace beam. | |||||||||||||
| 52 | 20076394 | Sonari Khas water supply scheme | 20076394/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | OHT Staircase 3rd landing beam is tilted as per visual inspection. | ||||||||||||
| 53 | 20086793 | Burhadih Kalan GP Water Supply Scheme | 20086793/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | Beam column junction is not aligned properly. | ||||||||||||
| 54 | 20059620 | PADRI KHURD AND MISHRAULIYA Water Supply Scheme | 20059620/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Shear key has been not provided above GL in 1st lift of column. | ||||||||||||
| 55 | 20095533 | MADHAVAPUR & MOHADDINPUR Multi villages W/S Scheme | 20095533/01 | No | Yes | No | No | No | No | No | No | No | No | Yes | No | No | During the site inspection it was found column is not in plumb as par visual inspection. | |||||||||||||
| 56 | 20057489 | BAIRWA JUNGLE Water Supply Scheme | 20057489/01 | Yes | No | No | Yes | No | No | No | No | Yes | No | No | No | No | Steel is visible in OHT 1st brace beam above lift column. Honeycomb found in OHT 1st brace beam above first lift column. | |||||||||||||
| 57 | 20068411 | Bargadva Bishunpur WATER SUPPLY SCHEME | 20068411/01 | No | Yes | No | No | No | No | Yes | No | No | Yes | No | Yes | No | 1. Column is not in plumb. Column is heavily deflected from its original position. 2. All columns of OHT are not in proper alignment. 3. Visual inspection revealed that the OHT column was not in alignment. 4. At Tie beam damage detected during site visit. Note- Demolition work is going on 80% done and 20% WIP | |||||||||||||
| 58 | 20067524 | Mathaniya water supply scheme | 20067524/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||