Agency-wise Major/critical Ncs at OHT

S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20059540 RAMPUR SANATH JJM 20059540/01 No No No No No No Yes No No No No No No OHT walkway slab not having uniform thickness across its periphery
2 20098554 KAITHWALIA JJM 20098554/01 No No No No No No Yes No No No No No No Steps of the OHT staircase are majorly cracked.
3 8156897 Kauriram GOV water supply scheme 8156897/01 No No No Yes No No No No No No Yes No No Vibration not done properly due to which gap observed at joint if TB2 & column where reinforcement is visible.
4 20054051 ESLAMPURJJM 20054051/01 No No No No No No Yes No No No No No No Resolved OHT slab edge protection was not provided to avoid fall of any person from the height.
5 20059413 MATIARI GP JJM 20059413/01 No Yes No No No No No No No No No No No Resolved Alignment of OHT column was not found in plumb.
6 20059495 BIRAR &BHASKA JJM 20059495/01 No No No No Yes No No No No No No No No Resolved Construction of bed blocks in 1:2:4 PCC with cement, coarse sand and approved stone grit is not done as per design/drawing.
7 20054027 BASDEELA RAUSAR JJM 20054027/01 Yes No No No No No No No No No No No No Resolved Honeycomb was observed in the OHT column.
8 20034246 UNCH GAON GP 20034246/01 No No No No No No Yes No No No No No No Resolved Cover Block is not used in the OHT work.
9 20034248 KHORTHA 20034248/01 No No No No Yes No No No No No No No No Resolved Column Stirrups hooks has not been bend as per drawing.
10 20050330 HarpurJJM 20050330/01 No No No No No No Yes No No No No No No Resolved Beam column junction at one location above ground level is not proper.
11 20085210 BHALUHI JJM 20085210/01 No No No No No No Yes No No No No No No Resolved Alignment of main reinforcement has not been done properly; Reinforcements should be placed between equal distance.
12 20050354 Saharauli JJM 20050354/01 No No No No No No Yes No No No No No No Resolved Rusted reinforcement is used in the OHT work.
13 20050827 KUNDWA BARI JJM 20050827/01 No No No No No No Yes No No No No No No Resolved Reinforcement bars of foundation & beam should be binded properly at every bar connection.
14 20053708 POKHARBHINDA URF CHAKDAHA JJM 20053708/01 No No No No No No Yes No No No No No No Resolved Rusted steel bar used in OHT Work.
15 20053719 BHAIRWA ABADI SAKHANI JJM 20053719/01 No No No No No No Yes No No No No No No Resolved Highly Rusted bars used in OHT work.
16 20034232 BHUIDHARPUR GP 20034232/01 No No No No No No Yes No No No No No No Resolved Highly Rusted Reinforcement bars used in OHT work.
17 20034249 PARMESHWARPUR2 GP 20034249/01 No No No No No No Yes No No No No No No Resolved Rusted steel has been used in the OHT work.
18 20091464 RAMPUR OF KHORABAR JJM 20091464/01 No No No Yes No No No No No No No No No Resolved Exposed reinforcement found after casting; Proper cover has not been provided during casting.
19 20059427 TELAURA GPJJM 20059427/01 Yes No No No No No No No No No No No No Resolved Honeycomb has been found in first lift column of over head tank.
20 20099890 AMARI JJM 20099890/01 No No No No No No Yes No No No No No No Resolved Rusted steel has been used in the OHT work.
21 20034234 NOORUDDIN CHAK GP 20034234/01 No No No No No No Yes No No No No No No Resolved Water logging has been found in OHT Excavation area.
22 20093685 CHAKTELHNA JJM 20093685/01 No Yes No No Yes No No No No No No No No Resolved Resolved The concrete used in OHT raft casting is not as per design mix. OHT raft beam shuttering not done properly as alignment of the beam found improper.
23 20054072 BAREEPUR JJM 20054072/01 Yes No No No No No No No No No No No No Resolved Honeycomb has been found in the column of OHT.
24 20093665 MISHRAULI JJM 20093665/01 No Yes No Yes No No No No No No No No No Resolved Resolved Column has not been found in plumb bob. OHT work has been stopped for an extended period, resulting in the reinforcement being exposed to rust.
25 20034229 SARHARI GP 20034229/01 No No No No No No Yes No No No No No No Resolved OHT raft work is in progress without the execution of PCC work.
26 20054080 DEIDIHAJJM 20054080/01 No Yes No No No No No No No No No No No Resolved OHT stair Column has not been found in proper Alignment.
27 20053768 AMWAJJM 20053768/01 Yes No No Yes No No No No No No No No No Resolved Steel bar clear seen in the OHT bottom dome. Exposed reinforcement and honeycombing have been observed in the GL brace beam.
28 8386586 Bistauli 8386586/01 No Yes No Yes No No Yes No No No No No No Resolved Resolved Resolved Rusted steel bar used in OHT work. OHT stair column not found in proper alignment. Vibration not done properly due to which gap observed at joint if TB2 & column where reinforcement are visible.
29 20088179 BHATHAT JJM 20088179/01 No Yes No No Yes No Yes No No No No No No Resolved Resolved Alignment of Column is not as per drawing/specification. Cube test result of M-25 grade 07 days of 3rd Column of OHT has been found failed as per IS specification Seepage found in OHT bottom dome.
30 20066880 TULSI DEI & BANKATI BUZURG JJM SCHEME 20066880/01 Yes No No No Yes No Yes No No No No No No Resolved Resolved Resolved Leakage has been found in OHT bottom slab and conical wall. Honeycomb has been observed between first Conical wall and Second Conical wall of Overhead tank. Bent reinforcement has been used for column casting work.
31 20034241 HEMDHAPUR GP 20034241/01 No Yes No No No No Yes No No No No No No Resolved Resolved Columns vertical reinforcement are not properly supported with horizontal tie bar to provide support for maintaining the alignment of column during concrete casting. Rusting of the reinforcement has been found on the plinth beam.