| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20059187 | Khanpur Urf Birbhanpur WATER SUPPLY SCHEME | 20059187/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | The alignment of one column was not found in plumb. | |||||||||||||
| 2 | 20070441 | DARIGAPUR WATER SUPPLY Merge SCHEME | 20070441/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Significant honeycombing has been found on the OHT structure | |||||||||||||
| 3 | 20078815 | BAIRAMPUR WATER SUPPLY MERGE SCHEME | 20078815/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | lt has been observed that the column above 1st brace beams have undergone extensive repairs and are misaligned. | |||||||||||||
| 4 | 20069346 | ONAIY JANGAL WATER SUPPLY SCHEME | 20069346/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | lt has been observed that the column above 1't brace beams have undergone extensive repairs and are misaligned. | |||||||||||||
| 5 | 20059703 | RAJAPUR CHAK BIBI WATER SUPPLY SCHEME | 20059703/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Significant honeycombing has been observed in the OHT Column and Cracks were found in the column, and it appears to have been repaired. Additionally, the column size does not match the dimensions shown in the drawing. | |||||||||||||
| 6 | 20065908 | THULWASA Water Supply Scheme | 20065908/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Significant honeycombing has been observed in the OHT Beam & Stair. | |||||||||||||
| 7 | 20067268 | SEWALPUR WATER SUPPLY SCHEME | 20067268/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Steel reinforcement is exposed at the bottom of the OHT 3rd brace beam, and honeycombing is also observed in the concrete, which may affect durability and structural performance. | |||||||||||||
| 8 | 20065980 | HARDI Water Supply Scheme | 20065980/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Due to prolonged stoppage of work and the presence of a nearby high-tension electrical line, rusting has been observed on the reinforcement of the OHT columns. This condition poses both quality and safety concerns | |||||||||||||
| 9 | 20078774 | KRISHNAPUR TALA WATER SUPPLY SCHEME | 20078774/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | From visual inspection,2 nos of columns appears to be misaligned. | |||||||||||||
| 10 | 20069484 | KEWALPUR MAFI WATER SUPPLY MERGE SCHEME | 20069484/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | From visual inspection, the column appears to be misaligned. The change in its profile and the eccentricity near the beam connection suggest that the column may not be perfectly vertical or centered. | |||||||||||||
| 11 | 20074530 | GODWARA Water Supply Scheme | 20074530/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Leakage was observed on the Zn-Al tank, and seepage was also noticed on the slab of the Overhead Tank. | |||||||||||||
| 12 | 20067405 | JASUALI WATER SUPPLY SCHEME | 20067405/01 | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Reinforcement bars are exposed in slab and slab beam. | |||||||||||||