| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20059136 | BANJARAHA BUZURG & SAKARPAR | 20059136/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Slab and beam leveling is not done properly | |||||||||||||
| 2 | 20021616 | KAPIYA BUKNIHA GRANT | 20021616/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Railing fixing is not done properly it damage, Finishing and panting work is poor. ,Crack found in Balcony area need proper rectification and Rising main pipe hole is not grouted. | |||||||||||||
| 3 | 20021597 | PIPRAKANUNGO WATER SUPPLY SCHEME | 20021597/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Erection of OHT precast column not in plumb. | |||||||||||||
| 4 | 20059120 | AKLOHI & SIRSIYA CHAUBEY GP WSS | 20059120/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rectify the railling column as per drawing replace it with MS angle section | ||||||||||||
| 5 | 20059209 | PANANI WSS | 20059209/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | Rectify the railing column as per drawing replaced with MS angle section. | ||||||||||||
| 6 | 20099584 | GAURA GADH WSS | 20099584/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | OHT 5th lift column cube test result was failed of 7days and Conducted NDT (Rebound Hammer test and UPV ) test has been performed and result found satisfactory. | ||||||||||||
| 7 | 20099659 | ITWA BAKSI & PIPRI BUJURG & SUHEELWA WSS | 20099659/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Concrete cube (M-30) of OHT Column 2nd lift 7 days and column 1st lift does not gain its target compressive strength on 28 days of testing after performed NDT test & result found satisfied. | ||||||||||||
| 8 | 20075728 | MADARAHNA URF DATTPUR GP WSS | 20075728/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Concrete Cube (OHT Raft) and column 1st lift and 2nd lift above GL does not gain its required strength in 28 days AND After NDT and core cutting test done & found satisfied. | ||||||||||||
| 9 | 20075548 | PAT KHAULI MAUFI AND KHAKHARAON GP WSS | 20075548/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Concrete Cube (OHT Raft) and column 2nd lift does not gain its required strength in 28 day and After NDT & core cutting test done & found satisfied. | ||||||||||||
| 10 | 20059200 | MUDILI WSS | 20059200/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | OHT Honeycomb found at 2nd lift column beam junction and Rectify with NDT( Rebound Hammer test ) Performed test result found satisfied . | ||||||||||||
| 11 | 20021574 | MAHADEVA KHURD WSS | 20021574/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Concrete cube of OHT column 4th lift does not gain its target compressive strength on 28 days of testing and After performed NDT test & result found satisfied. | ||||||||||||
| 12 | 20059013 | MAANPUR GP WSS | 20059013/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | During site visit it is found that OHT reinforcement bar is cut from concrete surface | |||||||||||||
| 13 | 20059025 | MALHWAR GP WSS | 20059025/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | 1. Raft Ring Beam concrete had been executed without RFI Approval, and Quality is not assured. | |||||||||||||
| 14 | 20058968 | KURTHI DIHA AND PIPRA GADDI GP WSS | S.Nagar-48 | No | No | No | No | Yes | No | No | No | No | No | No | No | No | OHT all Column steel missing at ground level. Dismantle all columns & Brace beam, provide the lap as per drawing/design. | |||||||||||||
| 15 | 20099656 | BELWA LAGUNHI WSS | 20099656/01 | No | No | Yes | No | No | No | No | No | No | No | No | No | No | Resolved | Cube testing of OHT top dome (M-30 Grade) 28 days result failed and Honeycomb found in OHT bottom dome. Rectified With NDT test result found Satisfied . | ||||||||||||
| 16 | 20058968 | KURTHI DIHA AND PIPRA GADDI GP WSS | 20058968/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | OHT all Column steel missing at ground level. Dismantle all columns & Brace beam, provide the lap as per drawing/design. | |||||||||||||