Agency-wise Major/critical Ncs at OHT

S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20059136 BANJARAHA BUZURG & SAKARPAR 20059136/01 No No No No No No Yes No No No No No No Slab and beam leveling is not done properly
2 20021616 KAPIYA BUKNIHA GRANT 20021616/01 No No No No No No Yes No No No No No No Railing fixing is not done properly it damage, Finishing and panting work is poor. ,Crack found in Balcony area need proper rectification and Rising main pipe hole is not grouted.
3 20021597 PIPRAKANUNGO WATER SUPPLY SCHEME 20021597/01 No Yes No No No No No No No No No No No Erection of OHT precast column not in plumb.
4 20059120 AKLOHI & SIRSIYA CHAUBEY GP WSS 20059120/01 No No No No No No Yes No No No No No No Resolved Rectify the railling column as per drawing replace it with MS angle section
5 20059209 PANANI WSS 20059209/01 No No No No No No Yes No No No No No No Resolved Rectify the railing column as per drawing replaced with MS angle section.
6 20099584 GAURA GADH WSS 20099584/01 No No Yes No No No No No No No No No No Resolved OHT 5th lift column cube test result was failed of 7days and Conducted NDT (Rebound Hammer test and UPV ) test has been performed and result found satisfactory.
7 20099659 ITWA BAKSI & PIPRI BUJURG & SUHEELWA WSS 20099659/01 No No Yes No No No No No No No No No No Resolved Concrete cube (M-30) of OHT Column 2nd lift 7 days and column 1st lift does not gain its target compressive strength on 28 days of testing after performed NDT test & result found satisfied.
8 20075728 MADARAHNA URF DATTPUR GP WSS 20075728/01 No No Yes No No No No No No No No No No Resolved Concrete Cube (OHT Raft) and column 1st lift and 2nd lift above GL does not gain its required strength in 28 days AND After NDT and core cutting test done & found satisfied.
9 20075548 PAT KHAULI MAUFI AND KHAKHARAON GP WSS 20075548/01 No No Yes No No No No No No No No No No Resolved Concrete Cube (OHT Raft) and column 2nd lift does not gain its required strength in 28 day and After NDT & core cutting test done & found satisfied.
10 20059200 MUDILI WSS 20059200/01 Yes No No No No No No No No No No No No Resolved OHT Honeycomb found at 2nd lift column beam junction and Rectify with NDT( Rebound Hammer test ) Performed test result found satisfied .
11 20021574 MAHADEVA KHURD WSS 20021574/01 No No Yes No No No No No No No No No No Resolved Concrete cube of OHT column 4th lift does not gain its target compressive strength on 28 days of testing and After performed NDT test & result found satisfied.
12 20059013 MAANPUR GP WSS 20059013/01 No No No No No No Yes No No No No No No During site visit it is found that OHT reinforcement bar is cut from concrete surface
13 20059025 MALHWAR GP WSS 20059025/01 No No No No No No Yes No No No No No No 1. Raft Ring Beam concrete had been executed without RFI Approval, and Quality is not assured.
14 20058968 KURTHI DIHA AND PIPRA GADDI GP WSS S.Nagar-48 No No No No Yes No No No No No No No No OHT all Column steel missing at ground level. Dismantle all columns & Brace beam, provide the lap as per drawing/design.
15 20099656 BELWA LAGUNHI WSS 20099656/01 No No Yes No No No No No No No No No No Resolved Cube testing of OHT top dome (M-30 Grade) 28 days result failed and Honeycomb found in OHT bottom dome. Rectified With NDT test result found Satisfied .
16 20058968 KURTHI DIHA AND PIPRA GADDI GP WSS 20058968/01 No No No No No No Yes No No No No No No OHT all Column steel missing at ground level. Dismantle all columns & Brace beam, provide the lap as per drawing/design.