Agency-wise Major/critical Ncs at OHT

S.No. Scheme ID Scheme Name OHT Code Non-Compliance Compliance(Current Status)
Description
Major Honey Comb Alignment Cube Test Exposure Deviation Tank Observation Other SBC Issue Demolish Partially Demolish Fully Under Examination Serious Observation Water Body Compliance Major Honey Comb Compliance Alignment Compliance Cube Test Compliance Exposure Compliance Deviation Compliance Tank Compliance Other Compliance SBC Issue Compliance Demolish Partially Compliance Demolish Fully Compliance Under Examination Compliance Serious Observation Compliance Water Body
1 20015084 GANDAPPA W/S SCHEME 20015084/01 No No No No No No Yes No No No No No No OHT GL Level column Reinforcement theft and cut , hence dismantling of column required
2 20089933 GOVINDPUR KIRAT REORGANISATION W/S SCHEME (VSA) No No No Yes No No No No No No No No No Resolved TPI Observation- The column is damaged, and the reinforcement is exposed, which may compromise the structural strength and durability of the column. The joints between the plinth beam and column have been improperly filled. Incompletely filled joints may reduce the structure. Rectification Status- Rectified Observation- Reinforcement is exposed for construction of stairs. Joints filled and repaired.
3 20083032 NAWALI REORGANISATION W/S SCHEME (VSA) 20083032/01 No No No No No No Yes No No No No No No Resolved 1. Observation- Bleeding and segregation were observed in the concrete due to excessive water content in the cement concrete mix. This can adversely affect the strength, durability, and overall quality of the structure. Rectification Status- Rectified Observation- After instruction proper concrete mixing done during casting.
4 20097103 BALAPUR REORGANISATION W/S SCHEME (VSA) 20097103/01 No No No No No No No No Yes No No No No Resolved TPI Observation- A significant structural cracks have been identified on the plinth beam of the OHT, which requires immediate assessment and rectification. Rectification Status- Rectified Observation- Hairline crack rectified by grouting.
5 20015819 DAHENDU W/S SCHEME 20015819/01 No No No No No No Yes No No No No No No Resolved TPI Observation- The reinforcement provided in the bracing beam is not as per the approved drawing. As per the drawing, the required bracing beam depth is 240 mm; however, only 200 mm was found during checking. Rectification Status- Rectified Observation- After instruction shuttering of beam rectified before casting.
6 20015619 GATHIA W/S SCHEME 20015619/01 No No No No No No Yes No No No No No No Resolved TPI Observation- Rusted steel reinforcement was used in the column, which may affect the bond strength with concrete and compromise the structural integrity. Rectification Status- Rectified Observation- Reinforcement is coated with anti-rust chemical/cement slurry after instruction.
7 20017706 ARAJI ORASAN W/S SCHEME 20017706/01 Yes No No No No No No No No No No No No Resolved TPI Observation- Honeycombing was observed in the OHT column, indicating poor compaction during concrete placement. Cover of the column not as per drawing. Rectification Status- Rectified Observation- Honeycombing Rectified before upper column casting
8 20015550 CHHATTARPUR W/S SCHEME 20015550/01 No No No No No No Yes No No No No No No Resolved TPI Observation- Rusted reinforcement bars were used in the raft reinforcement work, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- Reinforcement is coated with cement slurry after instruction.
9 20083032 NAWALI REORGANISATION W/S SCHEME (VSA) 20083032/01/TW2 No No No No No No Yes No No No No No No Resolved TPI Observation- Rusted reinforcement bars were used in 2nd brace beam of OHT, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- Reinforcement is coated with cement slurry after instruction.
10 20086820 RAMPUR SIDHAUNA REORGANISATION W/S SCHEME (VSA) 20086820/01 Yes No No No No No No No No No No No No Resolved TPI Observation- Honeycombing was observed in the OHT column, indicating poor compaction during concrete placement. Rectification Status- Rectified Observation- Honeycombing rectified by Cement grouting Finishing.
11 20015840 CHAK MOLANA KHIJIR W/S SCHEME 20015840/01 No No No No No No Yes No No No No No No Resolved TPI Observation- Rusted reinforcement bars were used in column of OHT, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- Stirrups bar changed after instruction.
12 20015446 SUKHPURA W/S SCHEME 20015446/01 No No No No No No Yes No No No No No No Resolved TPI Observation- Rusted reinforcement bars were used in column of OHT, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- Reinforcement is coated with cement slurry after instruction.
13 20015398 LAHURAPUR W/S SCHEME 20015398/01 No Yes No No No No No No No No No No No Resolved TPI Observation- The columns of the OHT were found to be misaligned during inspection, with noticeable undulations indicating deviation from the vertical alignment as per the approved. Rectification Status- Rectified Observation- 4mm Variation found in Column after re-verification.
14 20094974 DEOKALI REORGANISATION W/S SCHEME (VSA) 20094974/01 Yes No No No No No No No No No No No No Resolved TPI Observation- Honeycombing was observed in brace beam of OHT, indicating poor compaction during concrete placement. Cracks has been observed on the column of OHT. Rectification Status- Rectified Observation- Honeycombing rectified after by finishing.
15 20017704 GAURA W/S SCHEME 20017704/01 Yes No No No No No No No No No No No No Resolved TPI Observation- Honeycombing was observed in junction of column and beam, indicating poor compaction during concrete placement. Rectification Status- Rectified Observation- Honeycombing rectified by finishing.
16 20015065 PATAR W/S SCHEME 20015065/01 No Yes No No No No No No No No No No No Resolved TPI Observation- The OHT column is not plumb; a deviation of 35 mm from top to bottom was observed during inspection, indicating misalignment from the vertical axis. Rectification Status- Rectified Observation- Rectification done by dismantling of column about 40mm.
17 20015367 MUBARAKPUR JUGUNU W/S SCHEME 20015367/01 No No No No No No Yes No No No No No No Resolved TPI Observation- Bulging has been observed in the plinth beam, and the beam is not aligned as per the specified layout, indicating a deviation from the approved structural design. Rectification Status- Not Rectified Observation- Bulging of concrete not rectified
18 20015559 PAYGUMBURPUR URF CHALAKPUR 20015559/01 No No No No No No Yes No No No No No No Resolved TPI Observation- Rusted reinforcement bars were used in brace beam, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- New steel bars were used in place of rusted bars in reinforcement after instruction.
19 20015604 DOLATABAD W/S SCHEME 20015604/01 No Yes No No No No No No No No No No No Resolved TPI Observation- The bracing beam was found to be shifted inward from its designated location, indicating a deviation from the approved structural layout. Rectification Status- Not Rectified Observation- Brace and column joint looks shifted 6mm inward(Minor)
20 20013408 BARAHPUR NUSARATPUR W/S SCHEME 20013408/01 Yes No No No No No No No No No No No No Resolved TPI Observation- Honeycomb visible in OHT Column area. Rectification Status- Rectified Observation- Honeycombing rectified by finishing.
21 20015646 MUDIAR W/S SCHEME 20015646/01 Yes No No No No No No No No No No No No Resolved TPI Observation- Honeycombing was observed in raft of OHT, indicating poor compaction during concrete placement. Rectification Status- Rectified Observation- Honeycombing rectified before further work.
22 20083183 DADNI REORGANISATION W/S SCHEME (VSA) 20083183/01 No No No No No No Yes No No No No No No Resolved TPI Observation- Rusted reinforcement bars were used in top dome, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- Reinforcement is coated with cement slurry after instruction.
23 20097091 GAHMAR REORGANISATION W/S SCHEME (VSA) 20097091/01 No No No No No No Yes No No No No No No Resolved TPI Observation- Rusted reinforcement bars were used in top dome, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- Reinforcement is coated with cement slurry after instruction.
24 20015358 BHADEYSAR W/S SCHEME 20015358/01 No No No No No No Yes No No No No No No Resolved TPI Observation- Rusted reinforcement bars were used in top dome, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- Reinforcement is changed by new steel bars.
25 20015582 ICHAULI W/S SCHEME 20015582/01 No No No No No No Yes No No No No No No Resolved TPI Observation- Leakage found at the joint of DI pipe. DPT test not done after welding. Rectification Status- Rectified Observation- DI Leakage Repaired, DPT test done after welding as per instruction.
26 8362375 ARANGI GRAM PANCHAYAT WATER SUPPLY SCHEME 8362375/01 No No No No No No Yes No No No No No No Resolved TPI Observation- OHT ground brace beam Shuttering oil required. Rectification Status- Rectified Observation- OHT ground beam shuttering oil use properly before casting.
27 20015476 ANORI W/S SCHEME 20015476/01 No No No No No No Yes No No No No No No Resolved TPI Observation- Gap found in OHT slab shuttering area. Rectification Status- Rectified Observation- After instruction proper shuttering done during casting.
28 20015561 DHANESHPUR W/S SCHEME 20015561/01 No No No No No No Yes No No No No No No Resolved TPI Rectification Status- Rectified Observation- Proper Spacing in OHT column ring bar done as per code specification. Rectification Status- Rectified Observation- Proper Spacing in OHT column ring bar done as per code specification.
29 20088250 KAITHAWALIA BINDWALIA REORGANISATION W/S SCHEME (VSA) 20088250/01 No No No No No No Yes No No No No No No Resolved TPI Observation- The ground beam columns of the OHT require backfilling and soil compaction. Rectification Status- Rectified Observation- Proper backfilling and soil compaction done as per instruction.
30 20014947 RASULPUR HABIBULLAH W/S SCHEME 20014947/01 No No No No No Yes No No No No No No No Resolved TPI Observation- Studs nut not found during inspection. Rectification Status- Rectified Observation- After instruction studs nuts are fixed and tied.
31 20015508 NIRAHU KA PURA W/S SCHEME 20015508/01 No No No No No No Yes No No No No No No TPI Observation- Proper bending of hook at 135 degree was not provided. Rectification Status- Not Rectified Observation- 135 degree hook provide properly.
32 20086900 VARACHAWAR REORGANISATION W/S SCHEME (VSA) 20086900/01 No No No No No No Yes No No No No No No TPI Observation- Oht column has been observed rusted during site inspection. oht work has been stopped since 1year and all column if oht submerged in water during long time. Rectification Status- Not Rectified
33 20015557 Baki Khurd W/S Scheme 20015557/01 No No No No No No Yes No No No No No No Resolved TPI Observation- OHT columns reinforcement found rusted. Rectification Status- Rectified Observation- Rusted steel bars replaced by new bars.
34 20015645 JAIRAMPUR W/S SCHEME 20015645/01 No No No No No No No No No No No No No
35 20015408 SARDARPUR W/S SCHEME 20015408/01 No No No No No No No No No No No No No
36 20015595 KUNDARI W/S SCHEME 20015595/01 No No No No No No No No No No No No No
37 20097095 MAHRAJGANJ REORGANISATION W/S SCHEME (VSA) 20097095/01 No No No No No No No No No No No No No Diliya Zone-8, Mohav-Zone-4, Hetimpur-2
38 20086687 SHADIYABAD (KASBA DAYAL) REORGANISATION W/S SCHEME (VSA) 20086687/01 No No No No No No No No No No No No No Khatirpur & Masudpur
39 20087022 ANDHAUN REORGANISATION W/S SCHEME (VSA) 20087022/01 No No No No No No No No No No No No No Pithapur Zone-5
40 20094942 SAHERI REORGANISATION W/S SCHEME (VSA) 20094942/01 No No No No No No No No No No No No No
41 20078508 SARAI MUBARAK W/S SCHEME (VSA) 20078508/01 No No No No No No No No No No No No No
42 20086649 ARSADPUR(JANGIPUR) REORGANISATION W/S SCHEME (VSA) 20086649/01 No No No No No No No No No No No No No
43 20015565 MALETHI W/S SCHEME 20015565/01 No No No No No No No No No No No No No
44 20015620 SEMUR W/S SCHEME 20015620/01 No No No No No No No No No No No No No