| S.No. | Scheme ID | Scheme Name | OHT Code | Non-Compliance | Compliance(Current Status) | Description
|
||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Major Honey Comb | Alignment | Cube Test | Exposure | Deviation | Tank Observation | Other | SBC Issue | Demolish Partially | Demolish Fully | Under Examination | Serious Observation | Water Body | Compliance Major Honey Comb | Compliance Alignment | Compliance Cube Test | Compliance Exposure | Compliance Deviation | Compliance Tank | Compliance Other | Compliance SBC Issue | Compliance Demolish Partially | Compliance Demolish Fully | Compliance Under Examination | Compliance Serious Observation | Compliance Water Body | |||||
| 1 | 20015084 | GANDAPPA W/S SCHEME | 20015084/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | OHT GL Level column Reinforcement theft and cut , hence dismantling of column required | |||||||||||||
| 2 | 20089933 | GOVINDPUR KIRAT REORGANISATION W/S SCHEME (VSA) | No | No | No | Yes | No | No | No | No | No | No | No | No | No | Resolved | TPI Observation- The column is damaged, and the reinforcement is exposed, which may compromise the structural strength and durability of the column. The joints between the plinth beam and column have been improperly filled. Incompletely filled joints may reduce the structure. Rectification Status- Rectified Observation- Reinforcement is exposed for construction of stairs. Joints filled and repaired. | |||||||||||||
| 3 | 20083032 | NAWALI REORGANISATION W/S SCHEME (VSA) | 20083032/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | 1. Observation- Bleeding and segregation were observed in the concrete due to excessive water content in the cement concrete mix. This can adversely affect the strength, durability, and overall quality of the structure. Rectification Status- Rectified Observation- After instruction proper concrete mixing done during casting. | ||||||||||||
| 4 | 20097103 | BALAPUR REORGANISATION W/S SCHEME (VSA) | 20097103/01 | No | No | No | No | No | No | No | No | Yes | No | No | No | No | Resolved | TPI Observation- A significant structural cracks have been identified on the plinth beam of the OHT, which requires immediate assessment and rectification. Rectification Status- Rectified Observation- Hairline crack rectified by grouting. | ||||||||||||
| 5 | 20015819 | DAHENDU W/S SCHEME | 20015819/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- The reinforcement provided in the bracing beam is not as per the approved drawing. As per the drawing, the required bracing beam depth is 240 mm; however, only 200 mm was found during checking. Rectification Status- Rectified Observation- After instruction shuttering of beam rectified before casting. | ||||||||||||
| 6 | 20015619 | GATHIA W/S SCHEME | 20015619/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- Rusted steel reinforcement was used in the column, which may affect the bond strength with concrete and compromise the structural integrity. Rectification Status- Rectified Observation- Reinforcement is coated with anti-rust chemical/cement slurry after instruction. | ||||||||||||
| 7 | 20017706 | ARAJI ORASAN W/S SCHEME | 20017706/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | TPI Observation- Honeycombing was observed in the OHT column, indicating poor compaction during concrete placement. Cover of the column not as per drawing. Rectification Status- Rectified Observation- Honeycombing Rectified before upper column casting | ||||||||||||
| 8 | 20015550 | CHHATTARPUR W/S SCHEME | 20015550/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- Rusted reinforcement bars were used in the raft reinforcement work, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- Reinforcement is coated with cement slurry after instruction. | ||||||||||||
| 9 | 20083032 | NAWALI REORGANISATION W/S SCHEME (VSA) | 20083032/01/TW2 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- Rusted reinforcement bars were used in 2nd brace beam of OHT, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- Reinforcement is coated with cement slurry after instruction. | ||||||||||||
| 10 | 20086820 | RAMPUR SIDHAUNA REORGANISATION W/S SCHEME (VSA) | 20086820/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | TPI Observation- Honeycombing was observed in the OHT column, indicating poor compaction during concrete placement. Rectification Status- Rectified Observation- Honeycombing rectified by Cement grouting Finishing. | ||||||||||||
| 11 | 20015840 | CHAK MOLANA KHIJIR W/S SCHEME | 20015840/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- Rusted reinforcement bars were used in column of OHT, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- Stirrups bar changed after instruction. | ||||||||||||
| 12 | 20015446 | SUKHPURA W/S SCHEME | 20015446/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- Rusted reinforcement bars were used in column of OHT, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- Reinforcement is coated with cement slurry after instruction. | ||||||||||||
| 13 | 20015398 | LAHURAPUR W/S SCHEME | 20015398/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | TPI Observation- The columns of the OHT were found to be misaligned during inspection, with noticeable undulations indicating deviation from the vertical alignment as per the approved. Rectification Status- Rectified Observation- 4mm Variation found in Column after re-verification. | ||||||||||||
| 14 | 20094974 | DEOKALI REORGANISATION W/S SCHEME (VSA) | 20094974/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | TPI Observation- Honeycombing was observed in brace beam of OHT, indicating poor compaction during concrete placement. Cracks has been observed on the column of OHT. Rectification Status- Rectified Observation- Honeycombing rectified after by finishing. | ||||||||||||
| 15 | 20017704 | GAURA W/S SCHEME | 20017704/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | TPI Observation- Honeycombing was observed in junction of column and beam, indicating poor compaction during concrete placement. Rectification Status- Rectified Observation- Honeycombing rectified by finishing. | ||||||||||||
| 16 | 20015065 | PATAR W/S SCHEME | 20015065/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | TPI Observation- The OHT column is not plumb; a deviation of 35 mm from top to bottom was observed during inspection, indicating misalignment from the vertical axis. Rectification Status- Rectified Observation- Rectification done by dismantling of column about 40mm. | ||||||||||||
| 17 | 20015367 | MUBARAKPUR JUGUNU W/S SCHEME | 20015367/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- Bulging has been observed in the plinth beam, and the beam is not aligned as per the specified layout, indicating a deviation from the approved structural design. Rectification Status- Not Rectified Observation- Bulging of concrete not rectified | ||||||||||||
| 18 | 20015559 | PAYGUMBURPUR URF CHALAKPUR | 20015559/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- Rusted reinforcement bars were used in brace beam, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- New steel bars were used in place of rusted bars in reinforcement after instruction. | ||||||||||||
| 19 | 20015604 | DOLATABAD W/S SCHEME | 20015604/01 | No | Yes | No | No | No | No | No | No | No | No | No | No | No | Resolved | TPI Observation- The bracing beam was found to be shifted inward from its designated location, indicating a deviation from the approved structural layout. Rectification Status- Not Rectified Observation- Brace and column joint looks shifted 6mm inward(Minor) | ||||||||||||
| 20 | 20013408 | BARAHPUR NUSARATPUR W/S SCHEME | 20013408/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | TPI Observation- Honeycomb visible in OHT Column area. Rectification Status- Rectified Observation- Honeycombing rectified by finishing. | ||||||||||||
| 21 | 20015646 | MUDIAR W/S SCHEME | 20015646/01 | Yes | No | No | No | No | No | No | No | No | No | No | No | No | Resolved | TPI Observation- Honeycombing was observed in raft of OHT, indicating poor compaction during concrete placement. Rectification Status- Rectified Observation- Honeycombing rectified before further work. | ||||||||||||
| 22 | 20083183 | DADNI REORGANISATION W/S SCHEME (VSA) | 20083183/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- Rusted reinforcement bars were used in top dome, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- Reinforcement is coated with cement slurry after instruction. | ||||||||||||
| 23 | 20097091 | GAHMAR REORGANISATION W/S SCHEME (VSA) | 20097091/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- Rusted reinforcement bars were used in top dome, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- Reinforcement is coated with cement slurry after instruction. | ||||||||||||
| 24 | 20015358 | BHADEYSAR W/S SCHEME | 20015358/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- Rusted reinforcement bars were used in top dome, which may adversely affect the bonding with concrete and the overall durability of the structure. Rectification Status- Rectified Observation- Reinforcement is changed by new steel bars. | ||||||||||||
| 25 | 20015582 | ICHAULI W/S SCHEME | 20015582/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- Leakage found at the joint of DI pipe. DPT test not done after welding. Rectification Status- Rectified Observation- DI Leakage Repaired, DPT test done after welding as per instruction. | ||||||||||||
| 26 | 8362375 | ARANGI GRAM PANCHAYAT WATER SUPPLY SCHEME | 8362375/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- OHT ground brace beam Shuttering oil required. Rectification Status- Rectified Observation- OHT ground beam shuttering oil use properly before casting. | ||||||||||||
| 27 | 20015476 | ANORI W/S SCHEME | 20015476/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- Gap found in OHT slab shuttering area. Rectification Status- Rectified Observation- After instruction proper shuttering done during casting. | ||||||||||||
| 28 | 20015561 | DHANESHPUR W/S SCHEME | 20015561/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Rectification Status- Rectified Observation- Proper Spacing in OHT column ring bar done as per code specification. Rectification Status- Rectified Observation- Proper Spacing in OHT column ring bar done as per code specification. | ||||||||||||
| 29 | 20088250 | KAITHAWALIA BINDWALIA REORGANISATION W/S SCHEME (VSA) | 20088250/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- The ground beam columns of the OHT require backfilling and soil compaction. Rectification Status- Rectified Observation- Proper backfilling and soil compaction done as per instruction. | ||||||||||||
| 30 | 20014947 | RASULPUR HABIBULLAH W/S SCHEME | 20014947/01 | No | No | No | No | No | Yes | No | No | No | No | No | No | No | Resolved | TPI Observation- Studs nut not found during inspection. Rectification Status- Rectified Observation- After instruction studs nuts are fixed and tied. | ||||||||||||
| 31 | 20015508 | NIRAHU KA PURA W/S SCHEME | 20015508/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | TPI Observation- Proper bending of hook at 135 degree was not provided. Rectification Status- Not Rectified Observation- 135 degree hook provide properly. | |||||||||||||
| 32 | 20086900 | VARACHAWAR REORGANISATION W/S SCHEME (VSA) | 20086900/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | TPI Observation- Oht column has been observed rusted during site inspection. oht work has been stopped since 1year and all column if oht submerged in water during long time. Rectification Status- Not Rectified | |||||||||||||
| 33 | 20015557 | Baki Khurd W/S Scheme | 20015557/01 | No | No | No | No | No | No | Yes | No | No | No | No | No | No | Resolved | TPI Observation- OHT columns reinforcement found rusted. Rectification Status- Rectified Observation- Rusted steel bars replaced by new bars. | ||||||||||||
| 34 | 20015645 | JAIRAMPUR W/S SCHEME | 20015645/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 35 | 20015408 | SARDARPUR W/S SCHEME | 20015408/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 36 | 20015595 | KUNDARI W/S SCHEME | 20015595/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 37 | 20097095 | MAHRAJGANJ REORGANISATION W/S SCHEME (VSA) | 20097095/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | Diliya Zone-8, Mohav-Zone-4, Hetimpur-2 | |||||||||||||
| 38 | 20086687 | SHADIYABAD (KASBA DAYAL) REORGANISATION W/S SCHEME (VSA) | 20086687/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | Khatirpur & Masudpur | |||||||||||||
| 39 | 20087022 | ANDHAUN REORGANISATION W/S SCHEME (VSA) | 20087022/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | Pithapur Zone-5 | |||||||||||||
| 40 | 20094942 | SAHERI REORGANISATION W/S SCHEME (VSA) | 20094942/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 41 | 20078508 | SARAI MUBARAK W/S SCHEME (VSA) | 20078508/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 42 | 20086649 | ARSADPUR(JANGIPUR) REORGANISATION W/S SCHEME (VSA) | 20086649/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 43 | 20015565 | MALETHI W/S SCHEME | 20015565/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||
| 44 | 20015620 | SEMUR W/S SCHEME | 20015620/01 | No | No | No | No | No | No | No | No | No | No | No | No | No | ||||||||||||||