S.No. District Scheme ID Scheme Name Program Name Department PWS Exist Physical Completion Financial Completion Work Cost Released Cost Expenditure Cost Liability Balance Fund Final Cost Scheme Status Physical Progress(%) Remark
1 Lalitpur 20089022 PURA KALAN VILLAGE WATER SUPPLY SCHEME NEW RETROFIT Jal Nigam YES NO NO 290.00 0.00 0.00 0.00 290.00 290.00 Under Construction 60.00 In Poorakalan Scheme, there is 1 village with 22 habitations proposed to be covered. Out of the 17 km distribution pipeline proposed, 9 km has been laid and 8 km is still pending. Testing work is also pending. Out of the target of 1,500 FHTCs, 600 have been completed and approximately 900 FHTCs are still pending.
2 Lalitpur 20094881 MATHURADANG GOV WATER SUPPLY SCHEME NEW RETROFIT Jal Nigam YES NO NO 955.24 114.66 114.66 0.00 840.58 955.24 Under Construction 60.00 In Mathuradang Scheme, the plant is currently operational and covers 24 villages, out of which 19 villages are presently receiving water supply. Approximately 8 km of distribution pipeline laying is still pending. Out of 8,000 proposed FHTCs, only 1,500 have been completed and around 6,500 are still pending. Under electrical works, motor installation and installation of the vertical turbine (VT) pump at the C.P. tank are pending.
3 Lalitpur 20094959 BAR REORGNAIZATION WATER SUPPLY SCHEME NEW RETROFIT Jal Nigam YES NO NO 923.00 407.82 407.82 0.00 515.18 923.00 Under Construction 70.00 In Bar Scheme, out of the total 27 km distribution pipeline along with 5 MLD capacity, 17 km of distribution pipeline work is still pending. The 9.7 km raising main has been completed, with only interconnection work remaining. The scheme includes one tank, which has been completed 100%. Out of 2,000 proposed FHTCs, only 500 have been completed and the remaining 1,500 FHTCs are still pending.
4 Lalitpur 20099714 JAITUPURA VILLAGE WATER SUPPLY SCHEME NEW RETROFIT Jal Nigam YES NO NO 68.30 6.56 6.56 0.00 61.74 68.30 Under Construction 70.00 In Jaitpura Scheme, the one proposed borewell has been completed. The pump lowering and solar installation are still pending. The pump house has been constructed. Out of the 60 proposed FHTCs, all 60 are still pending.
5 Lalitpur 20103935 Bansi Harshpur GOV water supply Scheme(Retrofitting) NEW RETROFIT Jal Nigam YES NO NO 1335.08 327.10 327.10 0.00 1007.98 1335.08 Under Construction 70.00 In Bansi Scheme, covering 19 villages, one new tank has been constructed, in which painting and flooring work is still pending. The distribution pipeline work has been completed. Approximately 2,000 FHTCs are pending across all 19 villages, out of which around 1,500 FHTCs are to be completed in Major Harshur village. At Jamalpur CWR pumping plant, installation of a 10 HP motor is the only remaining work.