Gap Analysis -Sewerage Treatment in State

Estimated Sewerage Generation and Treatment Gap

S.No Description Capacity (MLD)
1a Estimated sewage generation in all urban areas of UP (as per population Year-2022) 5500
1b Estimated Sewage generation in 129 City/Town(as per population year-2024) 4772.80
1c Actual Sewage generation in 129 City/Town 5240.51
2 Installed Capacity of total 146 STPs 4488.74
2a National Ganga River Basin Authority/Namami Gange - 44 840.75
2b Other programs (Jawaharlal Nehru National Urban Renewal Mission,GAP-I,GAP-2 etc.) – 109 3505.09
3 STPS under construction in different programs (Namami Gange, AMRUT, State Sector ) - 49 (Total) 1431.6
3a Namami Gange program-38 1071.60
3b AMRUT and State Sector – 09 312.5
3c Different departments(State sector) – 02 47.5
4 STPs under tendering in Namami Gange, AMRUT, State Sector program - 15 (Total) 672
4a Namami Gange – 13 588.00
4b AMRUT – 02 84
5 STPs proposed under Namami Gange Program – 8 552.00
6 STPs proposed under SBM 2.0 – 294 951
7 Total (2+3+4+5+6) 7451