Follow us on for latest updates.    |    To Lodge Complaint Call On 18001212164   or   visit   www.jalsamadhan.in

Gap Analysis -Sewerage Treatment in State

Estimated Sewerage Generation and Treatment Gap

S.No Description Capacity (MLD)
1a Estimated sewage generation in all urban areas of UP (as per population Year-2022) 5500
2 Installed Capacity of total 150 STPs 4567.74
2a National Ganga River Basin Authority/Namami Gange - 46 895.25
2b Other programs (Jawaharlal Nehru National Urban Renewal Mission,GAP-I,GAP-2 etc.) – 109 3505.09
3 STPS under construction in different programs (Namami Gange, AMRUT, State Sector ) - 47 (Total) 1377.1
3a Namami Gange program-36 1017.10
3b AMRUT and State Sector – 09 312.5
3c Different departments(State sector) – 02 47.5
4 STPs under tendering in Namami Gange, AMRUT, State Sector program - 15 (Total) 672
4a Namami Gange – 13 588.00
4b AMRUT – 02 84
5 STPs proposed under Namami Gange Program – 8 552.00
6 STPs proposed under SBM 2.0 – 294 951
7 Total (2+3+4+5+6) 7451