Gap Analysis -Sewerage Treatment in State

Estimated Sewerage Generation and Treatment Gap

S.No Description Capacity (MLD)
1a Estimated sewage generation in all urban areas of UP (as per population Year-2022) 5500
1b Estimated Sewage generation in 94 City/Town(as per population year-2024) 4626.55
1c Actual Sewage generation in 94 City/Town 5320.80
2 Installed Capacity of total 143 STPs 4282.24
2a National Ganga River Basin Authority/Namami Gange - 42 793.05
2b Other programs (Jawaharlal Nehru National Urban Renewal Mission,GAP-I,GAP-2 etc.) – 109 3505.09
3 STPS under construction in different programs (Namami Gange, AMRUT, State Sector ) - 41 (Total) 1065.3
3a Namami Gange program-30 705.30
3b AMRUT and State Sector – 09 312.5
3c Different departments(State sector) – 02 47.5
4 STPs under tendering in Namami Gange, AMRUT, State Sector program - 14 (Total) 733
4a Namami Gange – 12 649.00
4b AMRUT – 02 84
5 STPs proposed under Namami Gange Program – 17 854.50
6 STPs proposed under SBM 2.0 – 294 951
7 Total (2+3+4+5+6) 7451