1 |
Agra |
Yamuna |
Almirah Factory |
Untapped Drains |
0.04 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24. |
01-Jul-2024 12:00 AM |
2 |
Agra |
Yamuna |
Amar Vihar-I Drain |
Tapped Drains |
0.54 |
Tapped to 14 MLD STP at Jaganpur |
01-Jul-2024 12:00 AM |
3 |
Agra |
Yamuna |
Amar Vihar-II Drain |
Tapped Drains |
0.31 |
Tapped to 14 MLD STP at Jaganpur |
01-Jul-2024 12:00 AM |
4 |
Agra |
Yamuna |
Ambedkar Park |
Untapped Drains |
0.78 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
5 |
Agra |
Yamuna |
Anurag Nagar Drain |
Tapped Drains |
5.42 |
Tapped to 14 MLD STP at Jaganpur |
01-Jul-2024 12:00 AM |
6 |
Agra |
Yamuna |
Aqua Cool Water Treatment |
Untapped Drains |
0.02 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
7 |
Agra |
Yamuna |
Artoni |
Untapped Drains |
0.21 |
Construction of 0.35 MLD capacity DSTP at Artoni village is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
8 |
Agra |
Yamuna |
Bahadurpur Gaon |
Untapped Drains |
0.04 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
9 |
Agra |
Yamuna |
Balkeshwar Drain |
Tapped Drains |
1.53 |
Tapped to 78 MLD STP at Dhandhupura |
01-Jul-2024 12:00 AM |
10 |
Agra |
Yamuna |
Baluganj Drain |
Tapped Drains |
2.09 |
Tapped to 78 MLD STP at Dhandhupura |
01-Jul-2024 12:00 AM |
11 |
Agra |
Yamuna |
Belanganj Bridge |
Untapped Drains |
0.38 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
12 |
Agra |
Yamuna |
Belanganj Kali Mandir |
Untapped Drains |
0.00 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
13 |
Agra |
Yamuna |
Belanganj Police Chowki |
Untapped Drains |
0.21 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
14 |
Agra |
Yamuna |
Bhairon drain |
Partial Tapped |
26.07 |
Partially Tapped (26.07 MLD) to 78 MLD STP. Balance tapping is proposed by UPJN (U) |
01-Jul-2024 12:00 AM |
15 |
Agra |
Yamuna |
Bhalla ji Wali Drain |
Untapped Drains |
0.01 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
16 |
Agra |
Yamuna |
Buri ka nagla Drain |
Partial Tapped |
14.98 |
31 MLD STP is under Construction after that this drain will be fully tapped |
01-Jul-2024 12:00 AM |
17 |
Agra |
Yamuna |
Chini Ka Roza - I |
Untapped Drains |
1.03 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
18 |
Agra |
Yamuna |
Chini Ka Roza - II |
Untapped Drains |
0.03 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
19 |
Agra |
Yamuna |
Dayanand Ashram |
Untapped Drains |
0.21 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
20 |
Agra |
Yamuna |
Devri Road Drain |
Tapped Drains |
9.00 |
Tapped to 12 MLD STP Devri Road |
01-Jul-2024 12:00 AM |
21 |
Agra |
Yamuna |
Dharwale Baba - I |
Untapped Drains |
0.17 |
Construction of 1.10 MLD capacity DSTP at Islam Nagar is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
22 |
Agra |
Yamuna |
Dharwale Baba - II |
Untapped Drains |
0.00 |
Construction of 1.10 MLD capacity DSTP at Islam Nagar is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
23 |
Agra |
Yamuna |
Etmad-ud-daula Drain |
Tapped Drains |
2.79 |
Tapped to 10 MLD STP Peelakhar |
01-Jul-2024 12:00 AM |
24 |
Agra |
Yamuna |
Foundry nagar drain |
Tapped Drains |
0.08 |
Tapped to 10 MLD STP Peelakhar |
01-Jul-2024 12:00 AM |
25 |
Agra |
Yamuna |
Gailana |
Untapped Drains |
0.24 |
Construction of 3.00 MLD capacity DSTP at Transport Nagar is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
26 |
Agra |
Yamuna |
Gali Amanat Ram Bagichi-I |
Untapped Drains |
0.08 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
27 |
Agra |
Yamuna |
Gali Amanat Ram Bagichi-II |
Untapped Drains |
0.01 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
28 |
Agra |
Yamuna |
Gali Subedar Nagar |
Untapped Drains |
0.15 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
29 |
Agra |
Yamuna |
Ganesh Nagar |
Untapped Drains |
0.24 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
30 |
Agra |
Yamuna |
Gokul Nagar |
Untapped Drains |
0.39 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
31 |
Agra |
Yamuna |
Indira Memorial Bridge |
Untapped Drains |
0.15 |
Construction of 1.50 MLD capacity DSTP at Indira memorial is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
32 |
Agra |
Yamuna |
Industrial Area Drain |
Partial Tapped |
2.63 |
Partially Tapped to 10 MLD STP. Balance tapping is proposed by UPJN (U) |
01-Jul-2024 12:00 AM |
33 |
Agra |
Yamuna |
Islam Nagar |
Untapped Drains |
0.49 |
Construction of 1.10 MLD capacity DSTP at Islam Nagar is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
34 |
Agra |
Yamuna |
Ispat Nagar drain |
Tapped Drains |
0.07 |
Tapped to 10 MLD STP Peelakhar |
01-Jul-2024 12:00 AM |
35 |
Agra |
Yamuna |
Jalma |
Untapped Drains |
0.52 |
Construction of 0.30 MLD capacity DSTP near Jalma institue is in progress under Agra Sewerage Schem |
01-Jul-2024 12:00 AM |
36 |
Agra |
Yamuna |
Jaswant Singh Ki Chatri - I |
Untapped Drains |
0.03 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
37 |
Agra |
Yamuna |
Jaswant Singh Ki Chatri - II |
Untapped Drains |
0.02 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
38 |
Agra |
Yamuna |
Jaswant Singh Ki Chatri - III |
Untapped Drains |
0.01 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
39 |
Agra |
Yamuna |
K.K. Nagar |
Untapped Drains |
0.60 |
Construction of 1.6 MLD capacity DSTP is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
40 |
Agra |
Yamuna |
Kacchpura Drain |
Tapped Drains |
2.79 |
Constructed wetland treatment in forest area |
01-Jul-2024 12:00 AM |
41 |
Agra |
Yamuna |
Kailash Mandir |
Untapped Drains |
0.01 |
Construction of 0.02 MLD capacity DSTP near Kailash Mandir is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
42 |
Agra |
Yamuna |
Kakretha Drain |
Tapped Drains |
2.98 |
Constructed wetland treatment in forest area |
01-Jul-2024 12:00 AM |
43 |
Agra |
Yamuna |
Kamayani Hospital |
Untapped Drains |
0.40 |
Construction of 1.6 MLD capacity DSTP at KK Nagar is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
44 |
Agra |
Yamuna |
Katra Wazir Khan - I |
Untapped Drains |
0.02 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
45 |
Agra |
Yamuna |
Katra Wazir Khan - II |
Untapped Drains |
0.01 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
46 |
Agra |
Yamuna |
Khairati Tola |
Untapped Drains |
1.36 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
47 |
Agra |
Yamuna |
Khemchand Tofee factory |
Untapped Drains |
0.03 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
48 |
Agra |
Yamuna |
Khoja Drain |
Partial Tapped |
1.60 |
Partially Tapped to 78 MLD STP. Balance tapping is proposed by UPJN (U) |
01-Jul-2024 12:00 AM |
49 |
Agra |
Yamuna |
Krishna colony drain |
Tapped Drains |
1.71 |
Tapped to 78 MLD STP at Dhandhupura |
01-Jul-2024 12:00 AM |
50 |
Agra |
Yamuna |
Lohia Nagar |
Untapped Drains |
0.38 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
51 |
Agra |
Yamuna |
Lohia Nagar Bankey Bihari Bagichi |
Untapped Drains |
0.10 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
52 |
Agra |
Yamuna |
Lohia Nagar Rathor Wali Gali |
Untapped Drains |
0.19 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
53 |
Agra |
Yamuna |
Manoharpur Drain |
Tapped Drains |
4.07 |
Tapped to 14 MLD STP at Jaganpur |
01-Jul-2024 12:00 AM |
54 |
Agra |
Yamuna |
Manoharpura |
Untapped Drains |
1.31 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
55 |
Agra |
Yamuna |
Mantola Drain |
Partial Tapped |
123.22 |
100 MLD STP is under Construction after that this drain will be fully tapped |
01-Jul-2024 12:00 AM |
56 |
Agra |
Yamuna |
Mau Nala - I |
Untapped Drains |
0.11 |
Construction of 1.13 MLD capacity DSTP at Mau is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
57 |
Agra |
Yamuna |
Mau Nala - II |
Untapped Drains |
0.58 |
Construction of 1.13 MLD capacity DSTP at Mau is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
58 |
Agra |
Yamuna |
Moti Mahal - 1 |
Untapped Drains |
0.04 |
Construction of 1.50 MLD capacity DSTP at Indira Memorial is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
59 |
Agra |
Yamuna |
Moti Mahal - 2 |
Untapped Drains |
0.05 |
Construction of 1.50 MLD capacity DSTP at Indira Memorial is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
60 |
Agra |
Yamuna |
Moti Mahal - 3 |
Untapped Drains |
0.01 |
Construction of 1.50 MLD capacity DSTP at Indira Memorial is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
61 |
Agra |
Yamuna |
Moti Mahal - 4 |
Untapped Drains |
0.12 |
Construction of 1.50 MLD capacity DSTP at Indira Memorial is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
62 |
Agra |
Yamuna |
Moti Mahal - 5 |
Untapped Drains |
0.03 |
Construction of 1.50 MLD capacity DSTP at Indira Memorial is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
63 |
Agra |
Yamuna |
Moti Mahal - 6 |
Untapped Drains |
0.00 |
Construction of 1.50 MLD capacity DSTP at Indira Memorial is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
64 |
Agra |
Yamuna |
Moti Mahal - 7 |
Untapped Drains |
0.27 |
Construction of 1.50 MLD capacity DSTP at Indira Memorial is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
65 |
Agra |
Yamuna |
Moti Mahal - 8 |
Untapped Drains |
0.20 |
Construction of 1.50 MLD capacity DSTP at Indira Memorial is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
66 |
Agra |
Yamuna |
Moti Mahal Mal Godam Drain |
Tapped Drains |
1.44 |
Tapped to 10 MLD STP Peelakhar |
01-Jul-2024 12:00 AM |
67 |
Agra |
Yamuna |
Naraich Drain |
Partial Tapped |
5.90 |
Partially Tapped to 10 MLD STP. Balance tapping is proposed by UPJN (U) |
01-Jul-2024 12:00 AM |
68 |
Agra |
Yamuna |
New Radha Nagar |
Untapped Drains |
0.06 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
69 |
Agra |
Yamuna |
New Radha Nagar |
Untapped Drains |
0.05 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
70 |
Agra |
Yamuna |
Nursery Mandir - I |
Untapped Drains |
0.07 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
71 |
Agra |
Yamuna |
Nursery Mandir - II |
Untapped Drains |
0.01 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
72 |
Agra |
Yamuna |
Paliwal Park drain |
Tapped Drains |
1.01 |
Tapped to 78 MLD STP at Dhandhupura |
01-Jul-2024 12:00 AM |
73 |
Agra |
Yamuna |
Peelakhar Drain |
Partial Tapped |
6.60 |
35 MLD STP is under Construction after that this drain will be fully tapped |
01-Jul-2024 12:00 AM |
74 |
Agra |
Yamuna |
Peeli Pokhar |
Untapped Drains |
0.19 |
Construction of 0.25 MLD capacity DSTP at Poiya village is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
75 |
Agra |
Yamuna |
Peepalmandi drain |
Tapped Drains |
3.53 |
Tapped to 78 MLD STP at Dhandhupura |
01-Jul-2024 12:00 AM |
76 |
Agra |
Yamuna |
Poia Ghat - I |
Untapped Drains |
0.34 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
77 |
Agra |
Yamuna |
Poia Ghat - II |
Untapped Drains |
0.01 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
78 |
Agra |
Yamuna |
Radha Nagar |
Untapped Drains |
0.31 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
79 |
Agra |
Yamuna |
Rajwah Drain |
Tapped Drains |
2.00 |
Tapped to 78 MLD STP at Dhandhupura |
01-Jul-2024 12:00 AM |
80 |
Agra |
Yamuna |
Rambagh - III |
Untapped Drains |
0.78 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
81 |
Agra |
Yamuna |
Rambagh Drain I |
Tapped Drains |
0.54 |
Tapped to 10 MLD STP Peelakhar |
01-Jul-2024 12:00 AM |
82 |
Agra |
Yamuna |
Rambagh Drain II |
Tapped Drains |
3.32 |
Tapped to 10 MLD STP Peelakhar |
01-Jul-2024 12:00 AM |
83 |
Agra |
Yamuna |
Sakseria Drain |
Untapped Drains |
1.91 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
84 |
Agra |
Yamuna |
Shambhunath J.H. School |
Untapped Drains |
0.02 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
85 |
Agra |
Yamuna |
Shyam Lal Vidya Mandir |
Untapped Drains |
0.14 |
DPR Submitted in NMCG by UPJN - U of RS 136.41 Cr and observation received from NMCG on 23.02.24 |
01-Jul-2024 12:00 AM |
86 |
Agra |
Yamuna |
Taj East Gate Drain |
Tapped Drains |
15.02 |
Tapped to 24 MLD STP Dhandhupura |
01-Jul-2024 12:00 AM |
87 |
Agra |
Yamuna |
Taj West Gate Drain |
Tapped Drains |
1.01 |
Tapped to 78 MLD STP at Dhandhupura |
01-Jul-2024 12:00 AM |
88 |
Agra |
Yamuna |
Transport Nagar |
Untapped Drains |
1.71 |
Construction of 3.00 MLD capacity DSTP at Transport Nagar is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
89 |
Agra |
Yamuna |
Vayepur |
Untapped Drains |
1.44 |
Construction of 2.35 MLD capacity DSTP at Vayepur village is in progress under Agra Sewerage Scheme |
01-Jul-2024 12:00 AM |
90 |
Agra |
Yamuna |
Water works drain |
Partial Tapped |
26.28 |
Partially Tapped (26.28 MLD) to 78 MLD STP. Balance tapping is proposed by UPJN (U) |
01-Jul-2024 12:00 AM |