FHTC/HGJ/Certified/HO Village Details

S.No. District Agency Scheme Id Scheme Name Phase No.Of.Village T/W Approved T/W Completed Total OHT OHT Completed Distribution Line Laying Approved(KM) Distribution Line Laying Completed(KM) Har Gar Jal Villages HGJ Certified Villages Handed Over Villages
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Total 1090 527 513 527 408 8320.51 7915.91 465 281 4
1 Varanasi Larsen & Toubro Ltd 20099603 Bedi water supply scheme PHASE-2 1 1 1 1 1 0.00 5.02 1 1 0
2 Varanasi Larsen & Toubro Ltd 20100143 Ghamahapur Water Supply Scheme PHASE-2 1 1 1 1 1 9.02 9.02 0 0 0
3 Varanasi Larsen & Toubro Ltd 20100148 Beruka Water Supply Scheme PHASE-2 1 1 1 1 0 4.99 4.87 1 1 0
4 Varanasi Larsen & Toubro Ltd 20100150 Vikrampur Water Supply Scheme PHASE-2 1 1 1 1 1 8.64 8.64 0 0 0
5 Varanasi Larsen & Toubro Ltd 20100153 Benipur Kala Water Supply Scheme PHASE-2 1 1 1 1 0 5.78 5.78 0 0 0
6 Varanasi Larsen & Toubro Ltd 20100155 Bhagwanpur Water Supply Scheme PHASE-2 3 1 1 1 0 10.70 10.27 1 0 0
7 Varanasi Larsen & Toubro Ltd 20100159 Chamav Water Supply Scheme PHASE-2 1 1 1 1 1 4.85 4.85 0 0 0
8 Varanasi Larsen & Toubro Ltd 20100164 Dhobahi Water Supply Scheme PHASE-2 1 1 1 1 0 6.41 0.00 1 0 0
9 Varanasi Larsen & Toubro Ltd 20100168 Koilipur Khurd Water Supply Scheme PHASE-2 1 1 0 1 0 7.48 7.26 0 0 0
10 Varanasi Larsen & Toubro Ltd 20100173 Singhpur Water Supply Scheme PHASE-2 1 1 1 1 1 10.24 10.14 1 0 0
11 Varanasi Larsen & Toubro Ltd 20100174 Mangari Newada Zone 4_ Godiya Gram Panchayat Scheme PHASE-2 1 1 1 1 1 11.71 11.69 0 0 0
12 Varanasi Larsen & Toubro Ltd 20100176 Kapar Phorwan Water Supply Scheme PHASE-2 2 1 1 1 0 17.31 17.31 0 0 0
13 Varanasi Larsen & Toubro Ltd 20100179 Pura Raghunathpur Water Supply Scheme PHASE-2 1 1 1 1 0 37.26 21.98 0 0 0
14 Varanasi Larsen & Toubro Ltd 20100286 Bhullanpur_Lakhanpur Water Supply Scheme PHASE-2 2 1 0 1 0 35.02 35.01 0 0 0
15 Varanasi Larsen & Toubro Ltd 20100289 Ramnagar Water Supply Scheme PHASE-2 2 1 0 1 0 15.97 15.97 0 0 0
16 Varanasi Larsen & Toubro Ltd 20101014 Sahpur W/S scheme PHASE-2 1 1 1 1 1 11.22 11.12 0 0 0
17 Varanasi Larsen & Toubro Ltd 20101015 Marui W/S scheme PHASE-2 1 1 1 1 1 23.76 23.73 0 0 0
18 Varanasi Larsen & Toubro Ltd 20101016 Khalispur W/S scheme PHASE-2 1 1 1 1 1 25.40 25.40 1 1 0
19 Varanasi Larsen & Toubro Ltd 20101039 Atesua W/S scheme PHASE-2 1 1 1 1 0 27.72 26.62 0 0 0
20 Varanasi Larsen & Toubro Ltd 20101459 Ramfiha w/s scheme PHASE-2 1 1 1 1 1 6.92 6.68 1 1 0
21 Varanasi Larsen & Toubro Ltd 20101690 Rampur w/s scheme PHASE-2 1 1 1 1 0 8.59 8.59 0 0 0
22 Varanasi Larsen & Toubro Ltd 20101691 Makshudan Patti w/s scheme PHASE-2 4 1 1 1 1 14.94 14.94 0 0 0
23 Varanasi Larsen & Toubro Ltd 20101887 Badagaon (Isipur) w/s scheme PHASE-2 1 1 1 1 1 15.21 15.11 0 0 0
24 Varanasi Larsen & Toubro Ltd 20101888 Bauliya_ Balua w/s scheme PHASE-2 3 1 1 1 0 29.76 29.72 1 0 0
25 Varanasi Larsen & Toubro Ltd 20103445 Viraokot Zone 6_Viraokot Gram Panchayat Scheme PHASE-2 3 1 1 1 1 18.48 18.48 0 0 0
26 Varanasi Larsen & Toubro Ltd 6394628 Roopapur PHASE-2 1 1 1 1 1 8.34 8.34 1 1 0
27 Varanasi Larsen & Toubro Ltd 7295407 Kaithor W/S Scheme PHASE-2 2 1 1 1 1 22.01 22.01 0 0 0
28 Varanasi Larsen & Toubro Ltd 7295411 Tala W/S Scheme PHASE-2 2 1 1 1 0 37.95 21.00 0 0 0
29 Varanasi Larsen & Toubro Ltd 7295431 Thathara W/S Scheme PHASE-2 2 1 1 1 1 43.51 43.51 0 0 0
30 Varanasi Larsen & Toubro Ltd 7295551 Thah Rampur W/S Scheme PHASE-2 2 0 0 0 0 37.62 25.74 2 0 0
31 Varanasi Larsen & Toubro Ltd 8358917 Udaipur PHASE-2 1 1 1 1 1 11.90 11.90 1 1 0
32 Varanasi Larsen & Toubro Ltd 8358919 Telari W/S Scheme PHASE-2 2 1 1 1 1 5.76 5.75 1 1 0
33 Varanasi Larsen & Toubro Ltd 8359552 HADIYA DEEH PHASE-2 1 1 1 1 1 19.84 19.68 0 0 0
34 Varanasi Larsen & Toubro Ltd 8359555 Pilori PHASE-2 1 1 1 1 1 16.25 16.10 1 0 0
35 Varanasi Larsen & Toubro Ltd 8359558 Ramgadva PHASE-2 1 1 1 1 1 5.58 7.90 1 0 0
36 Varanasi Larsen & Toubro Ltd 8359559 Singhai PHASE-2 1 1 1 1 1 4.52 6.36 1 0 0
37 Varanasi Larsen & Toubro Ltd 8359560 Matuka PHASE-2 1 1 1 1 1 13.93 13.93 0 0 0
38 Varanasi Larsen & Toubro Ltd 8359567 Gorai PHASE-2 1 1 1 1 1 8.36 8.36 1 0 0
39 Varanasi Larsen & Toubro Ltd 8359571 Lalpur PHASE-2 1 1 1 1 1 5.67 5.67 1 0 0
40 Varanasi Larsen & Toubro Ltd 8359572 Khemapur PHASE-2 1 1 1 1 1 5.47 5.47 1 1 0
41 Varanasi Larsen & Toubro Ltd 8359575 Bhorkala PHASE-2 1 1 1 1 1 9.90 9.90 0 0 0
42 Varanasi Larsen & Toubro Ltd 8359577 Munari PHASE-2 1 1 1 1 1 27.94 27.63 1 0 0
43 Varanasi Larsen & Toubro Ltd 8359581 Sarauni PHASE-2 1 1 1 1 1 11.13 11.13 1 1 0
44 Varanasi Larsen & Toubro Ltd 8359583 Kashipur 1 1 1 1 1 7.26 7.26 1 0 0
45 Varanasi Larsen & Toubro Ltd 8359584 Daudpur PHASE-2 1 1 1 1 1 7.68 7.55 0 0 0
46 Varanasi Larsen & Toubro Ltd 8359585 Koraut PHASE-2 1 1 1 1 1 3.67 3.67 0 0 0
47 Varanasi Larsen & Toubro Ltd 8359587 Lachapur PHASE-2 1 1 1 1 1 12.57 12.57 1 0 0
48 Varanasi Larsen & Toubro Ltd 8359589 Ganjari PHASE-2 1 1 1 1 1 12.16 12.48 0 0 0
49 Varanasi Larsen & Toubro Ltd 8359592 Mahada PHASE-2 1 1 1 1 1 5.51 5.51 1 0 0
50 Varanasi Larsen & Toubro Ltd 8360372 Mahgaon PHASE-2 1 1 1 1 1 23.26 23.11 0 0 0
51 Varanasi Larsen & Toubro Ltd 8360373 Rasulaha PHASE-2 1 1 1 1 1 4.00 5.86 1 1 0
52 Varanasi Larsen & Toubro Ltd 8360374 Udorampur PHASE-2 1 1 1 1 1 17.96 17.96 1 1 0
53 Varanasi Larsen & Toubro Ltd 8360375 Kurauna PHASE-2 1 1 1 1 1 18.95 18.95 0 0 0
54 Varanasi Larsen & Toubro Ltd 8360376 Parana Patti PHASE-2 1 1 1 1 1 8.63 8.76 1 1 0
55 Varanasi Larsen & Toubro Ltd 8360377 NAWADA PHASE-2 2 1 1 1 1 8.30 8.30 1 1 0
56 Varanasi Larsen & Toubro Ltd 8360378 Jogapur PHASE-2 1 1 1 1 1 3.41 3.74 1 1 0
57 Varanasi Larsen & Toubro Ltd 8360379 Sajoi PHASE-2 1 1 1 1 0 18.87 15.86 0 0 0
58 Varanasi Larsen & Toubro Ltd 8360380 JAKHINI PHASE-2 1 1 1 1 1 22.01 22.01 0 0 0
59 Varanasi Larsen & Toubro Ltd 8360640 Sarhari PHASE-2 3 1 1 1 1 29.86 29.86 1 0 0
60 Varanasi Larsen & Toubro Ltd 8360643 Balua PHASE-2 5 1 1 1 1 21.26 21.26 1 0 0
61 Varanasi Larsen & Toubro Ltd 8360646 Dindaspur PHASE-2 2 1 1 1 1 35.84 35.84 2 0 0
62 Varanasi Larsen & Toubro Ltd 8360649 Belwa PHASE-2 3 1 1 1 1 15.06 14.72 1 0 0
63 Varanasi Larsen & Toubro Ltd 8360650 Nonauti PHASE-2 2 1 1 1 1 11.95 11.95 1 0 0
64 Varanasi Larsen & Toubro Ltd 8360654 Daulatiya PHASE-2 3 1 1 1 1 15.84 15.84 3 2 0
65 Varanasi Larsen & Toubro Ltd 8360661 Sahanshapur PHASE-2 2 1 1 1 1 20.29 20.13 1 0 0
66 Varanasi Larsen & Toubro Ltd 8360665 Khevali PHASE-2 2 1 1 1 1 21.57 22.15 1 1 0
67 Varanasi Larsen & Toubro Ltd 8360669 Kaneri PHASE-2 7 1 1 1 1 19.82 19.82 7 4 0
68 Varanasi Larsen & Toubro Ltd 8360671 Belauri PHASE-2 7 1 1 1 1 15.14 15.14 3 0 0
69 Varanasi Larsen & Toubro Ltd 8360674 Dayapur PHASE-2 2 1 1 1 1 9.76 9.76 2 1 0
70 Varanasi Larsen & Toubro Ltd 8360678 Kursato PHASE-2 1 1 1 1 1 17.89 17.89 1 1 0
71 Varanasi Larsen & Toubro Ltd 8360691 Parampur PHASE-2 2 1 1 1 1 6.56 10.14 2 2 0
72 Varanasi Larsen & Toubro Ltd 8360694 Surahee PHASE-2 2 1 1 1 1 28.66 28.64 2 2 0
73 Varanasi Larsen & Toubro Ltd 8360696 Khewasipur PHASE-2 2 1 1 1 1 11.47 11.47 2 2 0
74 Varanasi Larsen & Toubro Ltd 8360698 Ram Raipur PHASE-2 2 1 1 1 1 6.64 6.64 1 0 0
75 Varanasi Larsen & Toubro Ltd 8360703 Jagapatti PHASE-2 4 1 1 1 1 19.08 19.78 4 4 0
76 Varanasi Larsen & Toubro Ltd 8360705 Ashwari PHASE-2 2 1 1 1 1 18.70 18.68 1 1 0
77 Varanasi Larsen & Toubro Ltd 8360711 Bhai PHASE-2 1 1 1 1 1 6.57 6.60 1 1 0
78 Varanasi Larsen & Toubro Ltd 8360714 Saraiya PHASE-2 2 1 1 1 1 8.18 10.86 2 2 0
79 Varanasi Larsen & Toubro Ltd 8360716 Amarpatti PHASE-2 2 1 1 1 1 16.38 16.38 1 0 0
80 Varanasi Larsen & Toubro Ltd 8360722 Isharwar PHASE-2 3 1 1 1 1 13.39 13.37 3 3 0
81 Varanasi Larsen & Toubro Ltd 8360880 Bhidur PHASE-2 2 1 1 1 1 13.55 13.56 1 0 0
82 Varanasi Larsen & Toubro Ltd 8360991 Gaharpura PHASE-2 5 1 1 1 1 21.36 21.36 5 2 0
83 Varanasi Larsen & Toubro Ltd 8360993 Paniyara PHASE-2 2 1 1 1 1 16.71 16.71 2 1 0
84 Varanasi Larsen & Toubro Ltd 8361119 Harimanpur PHASE-2 2 1 1 1 1 12.16 13.01 1 0 0
85 Varanasi Larsen & Toubro Ltd 8361175 sikhari PHASE-2 2 1 1 1 1 14.89 14.89 0 0 0
86 Varanasi Larsen & Toubro Ltd 8361228 Kachariya PHASE-2 2 1 1 1 1 12.74 12.74 2 2 0
87 Varanasi Larsen & Toubro Ltd 8361230 JOGIYAPUR PHASE-2 5 1 1 1 1 14.33 14.33 5 5 0
88 Varanasi Larsen & Toubro Ltd 8361232 KANSHRAIPUR PHASE-2 2 1 1 1 1 12.87 13.67 2 2 0
89 Varanasi Larsen & Toubro Ltd 8361254 MILKYPUR PHASE-2 2 1 1 1 1 8.11 8.11 2 2 0
90 Varanasi Larsen & Toubro Ltd 8361440 BHABHIYAR PHASE-2 2 1 1 1 1 8.02 8.02 2 2 0
91 Varanasi Larsen & Toubro Ltd 8361446 BARTHARA KHURD PHASE-2 2 1 1 1 1 17.46 17.46 0 0 0
92 Varanasi Larsen & Toubro Ltd 8361456 BABHANIYAV PHASE-2 2 1 1 1 1 11.66 11.66 2 0 0
93 Varanasi Larsen & Toubro Ltd 8361458 CHAKLOLA PHASE-2 5 1 1 1 1 19.48 19.48 5 4 0
94 Varanasi Larsen & Toubro Ltd 8361460 RAKHI NAVADA PHASE-2 4 1 1 1 1 14.98 14.98 4 4 0
95 Varanasi Larsen & Toubro Ltd 8361461 PURANDARPUR PHASE-2 4 1 1 1 1 12.44 12.44 4 0 0
96 Varanasi Larsen & Toubro Ltd 8361462 SHOWNBARSA PHASE-2 1 1 1 1 1 5.31 5.31 1 0 0
97 Varanasi Larsen & Toubro Ltd 8361473 SHAMBHUPUR PHASE-2 6 1 1 1 1 11.89 13.19 6 6 0
98 Varanasi Larsen & Toubro Ltd 8361478 KRISHNADATPUR PHASE-2 2 1 1 1 1 17.29 17.29 1 1 0
99 Varanasi Larsen & Toubro Ltd 8361725 BARADIH PHASE-2 1 1 1 1 1 12.60 12.10 1 1 0
100 Varanasi Larsen & Toubro Ltd 8361741 AZGARA KHAS PHASE-2 1 1 1 1 1 36.28 16.00 0 0 0
101 Varanasi Larsen & Toubro Ltd 8361744 KHAJURI PHASE-2 2 1 1 1 1 27.77 27.77 2 0 0
102 Varanasi Larsen & Toubro Ltd 8361858 MILKYCHAK PHASE-2 1 1 1 1 1 11.57 11.57 0 0 0
103 Varanasi Larsen & Toubro Ltd 8361915 MANGOLEPUR PHASE-2 3 1 1 1 1 14.85 15.78 3 2 0
104 Varanasi Larsen & Toubro Ltd 8362347 DEVCHANDPUR 1 1 1 1 1 10.42 10.42 0 0 0
105 Varanasi Larsen & Toubro Ltd 8362355 SUILARA PHASE-2 3 1 1 1 1 8.76 8.75 3 3 0
106 Varanasi Larsen & Toubro Ltd 8362415 NIYASIPUR PHASE-2 5 1 1 1 1 19.04 19.04 2 0 0
107 Varanasi Larsen & Toubro Ltd 8362423 DAGHARIYA PHASE-2 2 1 1 1 1 17.65 17.65 1 1 0
108 Varanasi Larsen & Toubro Ltd 8362437 SULTANIPUR PHASE-2 2 1 1 1 1 6.10 6.01 2 2 0
109 Varanasi Larsen & Toubro Ltd 8362579 GAIRAHA PHASE-2 3 1 1 1 1 12.24 12.24 0 0 0
110 Varanasi Larsen & Toubro Ltd 8364138 Purebariyar - Barki PWS PHASE-2 2 1 1 1 1 18.84 20.85 1 0 0
111 Varanasi Larsen & Toubro Ltd 8386409 Anantpur PHASE-2 2 1 1 1 1 7.45 7.45 2 2 0
112 Varanasi Larsen & Toubro Ltd 8386423 Auroan PHASE-2 1 1 1 1 1 14.42 14.42 1 1 0
113 Varanasi Larsen & Toubro Ltd 8386425 Ayodhyapur PHASE-2 3 1 1 1 1 17.76 17.76 1 0 0
114 Varanasi Larsen & Toubro Ltd 8386427 Bandepur PHASE-2 2 1 1 1 1 18.86 18.86 2 2 0
115 Varanasi Larsen & Toubro Ltd 8386439 Bankat 2 1 1 1 1 7.85 7.85 0 0 0
116 Varanasi Larsen & Toubro Ltd 8386447 Berwa PHASE-2 2 1 1 1 1 8.03 9.91 0 0 0
117 Varanasi Larsen & Toubro Ltd 8386450 Bharaharia 2 1 1 1 1 5.75 6.50 0 0 0
118 Varanasi Larsen & Toubro Ltd 8386452 Bhatti PHASE-2 1 1 1 1 1 18.25 18.06 1 0 0
119 Varanasi Larsen & Toubro Ltd 8386459 Bhopapur PHASE-2 1 1 1 1 1 15.60 15.60 1 1 0
120 Varanasi Larsen & Toubro Ltd 8386461 Bikapur PHASE-2 2 1 1 1 1 7.56 9.20 1 0 0
121 Varanasi Larsen & Toubro Ltd 8386463 Chakrapanpur PHASE-2 2 1 1 1 1 8.93 10.05 2 2 0
122 Varanasi Larsen & Toubro Ltd 8386465 Charo PHASE-2 1 1 1 1 1 16.85 16.85 1 0 0
123 Varanasi Larsen & Toubro Ltd 8386466 Cherrapur PHASE-2 2 1 1 1 1 7.48 7.48 1 1 0
124 Varanasi Larsen & Toubro Ltd 8386467 Deepapur PHASE-2 1 1 1 1 1 9.26 9.53 1 0 0
125 Varanasi Larsen & Toubro Ltd 8386468 Deorai PHASE-2 1 1 1 1 1 13.79 13.79 1 0 0
126 Varanasi Larsen & Toubro Ltd 8386469 Deoji PHASE-2 1 1 1 1 1 6.08 7.35 1 1 0
127 Varanasi Larsen & Toubro Ltd 8386470 Gadva Khas PHASE-2 3 1 1 1 1 7.45 9.27 2 2 0
128 Varanasi Larsen & Toubro Ltd 8386472 Gangkala 2 1 1 1 1 18.71 18.69 1 0 0
129 Varanasi Larsen & Toubro Ltd 8386473 Gaurdiha PHASE-2 3 1 1 1 1 12.22 12.22 1 0 0
130 Varanasi Larsen & Toubro Ltd 8386477 Goghari PHASE-2 3 1 1 1 1 10.68 17.18 3 3 0
131 Varanasi Larsen & Toubro Ltd 8386481 NINDANPUR PHASE-2 1 1 1 1 1 11.54 13.66 1 1 0
132 Varanasi Larsen & Toubro Ltd 8386484 JAMUNIPUR PHASE-2 3 1 1 1 1 15.28 15.28 3 1 0
133 Varanasi Larsen & Toubro Ltd 8386486 Jaiyrampur PHASE-2 1 1 1 1 1 13.41 16.12 1 0 0
134 Varanasi Larsen & Toubro Ltd 8386487 Kaniyar PHASE-2 1 1 1 1 1 29.89 29.66 0 0 0
135 Varanasi Larsen & Toubro Ltd 8386488 Kharadaha PHASE-2 3 1 1 1 1 17.07 16.92 3 3 0
136 Varanasi Larsen & Toubro Ltd 8386489 Kudi PHASE-2 1 1 1 1 0 24.88 24.78 1 0 0
137 Varanasi Larsen & Toubro Ltd 8386490 Kurauli PHASE-2 1 1 1 1 1 9.78 9.64 1 1 0
138 Varanasi Larsen & Toubro Ltd 8386491 Kuwar PHASE-2 2 1 1 1 1 8.96 9.89 2 1 0
139 Varanasi Larsen & Toubro Ltd 8386495 LOHARPUR PHASE-2 1 1 1 1 1 13.75 13.57 0 0 0
140 Varanasi Larsen & Toubro Ltd 8386498 MAHAGIPUR PHASE-2 2 1 1 1 1 7.20 7.20 2 2 0
141 Varanasi Larsen & Toubro Ltd 8386500 Mahimapur PHASE-2 1 1 1 1 1 29.94 29.94 1 1 0
142 Varanasi Larsen & Toubro Ltd 8386503 Mawaiya PHASE-2 1 1 1 1 1 13.37 13.15 1 1 0
143 Varanasi Larsen & Toubro Ltd 8386505 Milkopur PHASE-2 1 1 1 1 1 4.03 7.51 1 1 0
144 Varanasi Larsen & Toubro Ltd 8386506 Murdaha 2 1 1 1 1 21.49 21.49 0 0 0
145 Varanasi Larsen & Toubro Ltd 8386509 Nathaiya Pur PHASE-2 3 1 1 1 1 19.71 19.71 3 3 0
146 Varanasi Larsen & Toubro Ltd 8386511 Pachrasi PHASE-2 1 1 1 1 1 8.70 8.70 1 1 0
147 Varanasi Larsen & Toubro Ltd 8386512 Parshra PHASE-2 1 1 1 1 1 23.01 23.01 0 0 0
148 Varanasi Larsen & Toubro Ltd 8386514 Patirajpur PHASE-2 2 1 1 1 1 14.56 14.52 2 2 0
149 Varanasi Larsen & Toubro Ltd 8386516 Phulwaria PHASE-2 3 1 1 1 1 26.77 26.77 2 2 0
150 Varanasi Larsen & Toubro Ltd 8386520 Ramsinghpur PHASE-2 3 1 1 1 1 10.94 10.94 2 1 0
151 Varanasi Larsen & Toubro Ltd 8386522 Ramraypur PHASE-2 2 1 1 1 0 6.64 6.64 1 0 0
152 Varanasi Larsen & Toubro Ltd 8386524 Rasulahaa PHASE-2 1 1 1 1 1 16.33 16.33 0 0 0
153 Varanasi Larsen & Toubro Ltd 8386526 Saliwahanpur PHASE-2 3 1 1 1 1 13.46 13.46 2 1 0
154 Varanasi Larsen & Toubro Ltd 8386527 Sarvipur PHASE-2 5 1 1 1 1 12.07 12.75 5 5 0
155 Varanasi Larsen & Toubro Ltd 8386528 Udaipur 5 1 1 1 1 23.03 23.02 1 0 0
156 Varanasi Larsen & Toubro Ltd 8386529 Tikari Khurd PHASE-2 5 1 1 1 1 20.66 20.66 4 4 0
157 Varanasi Larsen & Toubro Ltd 8386530 Viswanathpur PHASE-2 1 1 1 1 1 9.89 10.86 1 0 0
158 Varanasi Larsen & Toubro Ltd 8386532 Vyaspur PHASE-2 3 1 1 1 1 7.94 8.48 3 3 0
159 Varanasi Larsen & Toubro Ltd 20009677 SULTANPUR PHASE-2 1 1 1 1 1 4.39 4.52 1 1 0
160 Varanasi Larsen & Toubro Ltd 20012570 PURANPATTI PHASE-2 1 1 1 1 1 2.91 5.00 1 0 0
161 Varanasi Larsen & Toubro Ltd 20012586 KUSHMARA PHASE-2 2 1 1 1 1 19.29 19.29 1 1 0
162 Varanasi Larsen & Toubro Ltd 20013245 PANIHARI PHASE-2 4 1 1 1 1 11.05 10.91 1 0 0
163 Varanasi Larsen & Toubro Ltd 20013264 GAURKALA PHASE-2 5 1 1 1 1 17.85 17.85 1 0 0
164 Varanasi Larsen & Toubro Ltd 20013398 BARHI NEWADA PHASE-2 1 1 1 1 1 27.29 27.29 1 0 0
165 Varanasi Larsen & Toubro Ltd 20013429 ARJUNPUR PHASE-2 1 1 1 1 1 6.55 7.28 1 1 0
166 Varanasi Larsen & Toubro Ltd 20013454 UKTHI PHASE-2 1 1 1 1 1 3.93 4.69 0 0 0
167 Varanasi Larsen & Toubro Ltd 20013460 PAHARIYA PHASE-2 1 1 1 1 1 3.98 3.98 1 1 0
168 Varanasi Larsen & Toubro Ltd 20013478 RAMPUR PHASE-2 1 1 1 1 1 5.07 5.07 1 1 0
169 Varanasi Larsen & Toubro Ltd 20013486 BARHIKALA PHASE-2 1 1 1 1 1 20.55 20.55 0 0 0
170 Varanasi Larsen & Toubro Ltd 20013490 AAYELI PHASE-2 2 1 1 1 1 11.66 12.80 0 0 0
171 Varanasi Larsen & Toubro Ltd 20013827 TAARI PHASE-2 2 1 1 1 1 5.94 5.94 0 0 0
172 Varanasi Larsen & Toubro Ltd 20013863 NAVAPURA PHASE-2 3 1 1 1 1 13.10 13.00 1 0 0
173 Varanasi Larsen & Toubro Ltd 20013904 SURHI PHASE-2 1 1 1 1 1 28.66 28.45 1 1 0
174 Varanasi Larsen & Toubro Ltd 20013946 MANGALPUR PHASE-2 1 1 1 1 1 5.74 5.74 0 0 0
175 Varanasi Larsen & Toubro Ltd 20014846 JHANJHOUR PHASE-2 2 1 1 1 1 7.01 7.01 0 0 0
176 Varanasi Larsen & Toubro Ltd 20014847 Tiwaripur PHASE-2 6 1 1 1 1 12.24 12.24 6 5 0
177 Varanasi Larsen & Toubro Ltd 20014850 Bhadewali PHASE-2 1 1 1 1 1 7.55 7.51 1 1 0
178 Varanasi Larsen & Toubro Ltd 20014851 DHARSOUNA PHASE-2 1 1 1 1 1 13.82 13.82 1 1 0
179 Varanasi Larsen & Toubro Ltd 20014854 NIHALPUR PHASE-2 6 1 1 1 1 17.20 17.20 6 6 0
180 Varanasi Larsen & Toubro Ltd 20014855 AMAUT PHASE-2 2 1 1 1 1 39.11 39.11 0 0 0
181 Varanasi Larsen & Toubro Ltd 20014856 BHATPURWAN PHASE-2 4 1 1 1 1 18.59 18.59 1 0 0
182 Varanasi Larsen & Toubro Ltd 20014857 MANIYARIPUR PHASE-2 1 1 1 1 1 7.01 7.01 0 0 0
183 Varanasi Larsen & Toubro Ltd 20014858 NAHWANIPUR PHASE-2 2 1 1 1 1 18.66 18.66 0 0 0
184 Varanasi Larsen & Toubro Ltd 20015762 BHETAULI PHASE-2 1 1 1 1 1 11.07 10.88 1 0 0
185 Varanasi Larsen & Toubro Ltd 20015764 KHATTALPUR PHASE-2 2 1 1 1 1 5.72 7.65 2 2 0
186 Varanasi Larsen & Toubro Ltd 20015765 JAGDEESHPUR PHASE-2 1 1 1 1 1 30.90 30.89 1 0 0
187 Varanasi Larsen & Toubro Ltd 20016496 LALMANKOT PHASE-2 2 1 1 1 1 15.74 16.69 2 2 0
188 Varanasi Larsen & Toubro Ltd 20016500 TILMAPUR PHASE-2 2 1 1 1 1 11.06 11.05 2 2 0
189 Varanasi Larsen & Toubro Ltd 20016501 LAKHI PHASE-2 2 1 1 1 1 6.87 6.78 2 1 0
190 Varanasi Larsen & Toubro Ltd 20016512 KARNADANDI PHASE-2 1 1 1 1 1 12.47 12.47 0 0 0
191 Varanasi Larsen & Toubro Ltd 20016707 JAGARDEVPUR PHASE-2 1 1 1 1 1 6.17 7.58 1 1 0
192 Varanasi Larsen & Toubro Ltd 20016838 TARAYA PHASE-2 1 1 1 1 1 3.96 5.70 1 0 0
193 Varanasi Larsen & Toubro Ltd 20017126 CHANDAPUR PHASE-2 1 1 1 1 1 17.53 17.53 1 1 0
194 Varanasi Larsen & Toubro Ltd 20017134 KANAKPUR PHASE-2 5 1 1 1 1 4.67 4.65 1 0 0
195 Varanasi Larsen & Toubro Ltd 20017136 MAANI PHASE-2 1 1 1 1 1 19.72 19.72 0 0 0
196 Varanasi Larsen & Toubro Ltd 20017563 CHAUKHANDI PHASE-2 1 1 1 1 1 15.54 15.38 1 1 0
197 Varanasi Larsen & Toubro Ltd 20018232 LATAUNI PHASE-2 1 1 1 1 1 19.04 19.04 1 0 0
198 Varanasi Larsen & Toubro Ltd 20018268 SIRIHARA PHASE-2 1 1 1 1 1 6.48 7.64 1 1 0
199 Varanasi Larsen & Toubro Ltd 20018274 VAREMA PHASE-2 2 1 1 1 1 8.68 8.68 2 1 0
200 Varanasi Larsen & Toubro Ltd 20018384 MAHGAON PHASE-2 1 1 1 1 1 24.65 24.65 0 0 0
201 Varanasi Larsen & Toubro Ltd 20018679 MADHOMAKHIYA PHASE-2 2 1 1 1 1 13.64 13.64 2 2 4
202 Varanasi Larsen & Toubro Ltd 20020173 Lakhimpur PHASE-2 1 1 1 1 1 11.82 12.18 1 1 0
203 Varanasi Larsen & Toubro Ltd 20020188 Mahaban PHASE-2 2 1 1 1 1 8.46 8.46 2 2 0
204 Varanasi Larsen & Toubro Ltd 20020223 Marya PHASE-2 4 1 1 1 1 14.20 13.97 3 3 0
205 Varanasi Larsen & Toubro Ltd 20021370 NIMAICH 2 1 1 1 1 9.80 9.80 2 2 0
206 Varanasi Larsen & Toubro Ltd 20021371 RASARA PHASE-2 2 1 1 1 1 14.81 14.62 2 2 0
207 Varanasi Larsen & Toubro Ltd 20023742 Bharthara PHASE-2 2 1 1 1 1 10.94 10.94 2 2 0
208 Varanasi Larsen & Toubro Ltd 20023743 Balrampur PHASE-2 1 1 1 1 1 10.90 14.85 1 1 0
209 Varanasi Larsen & Toubro Ltd 20023799 Madhani PHASE-2 1 1 1 1 1 6.85 6.85 1 1 0
210 Varanasi Larsen & Toubro Ltd 20023800 GAJOKHAR PHASE-2 1 1 1 1 1 14.46 14.37 1 0 0
211 Varanasi Larsen & Toubro Ltd 20023801 Bhisampur PHASE-2 1 1 1 1 1 9.69 9.61 1 1 0
212 Varanasi Larsen & Toubro Ltd 20023802 Bhopatpur PHASE-2 1 1 1 1 1 4.41 4.41 1 1 0
213 Varanasi Larsen & Toubro Ltd 20023836 Pratap Patti PHASE-2 2 1 1 1 1 13.95 13.95 1 1 0
214 Varanasi Larsen & Toubro Ltd 20023972 Lenuwayi PHASE-2 3 1 1 1 1 4.27 4.27 2 1 0
215 Varanasi Larsen & Toubro Ltd 20023976 Bhitkuri PHASE-2 2 1 1 1 1 14.70 14.70 2 2 0
216 Varanasi Larsen & Toubro Ltd 20024646 CHHAHI PHASE-2 4 1 1 1 1 21.10 21.10 3 0 0
217 Varanasi Larsen & Toubro Ltd 20024845 GOSAIPUR PHASE-2 2 1 1 1 1 5.51 5.99 2 0 0
218 Varanasi Larsen & Toubro Ltd 20024863 AURAA PHASE-2 1 1 1 1 1 14.67 14.67 1 0 0
219 Varanasi Larsen & Toubro Ltd 20024864 BARAURA PHASE-2 6 1 1 1 1 16.73 16.73 1 0 0
220 Varanasi Larsen & Toubro Ltd 20024866 Barhouna PHASE-2 1 1 1 1 1 17.61 17.60 0 0 0
221 Varanasi Larsen & Toubro Ltd 20024887 BHARATPUR PHASE-2 2 1 1 1 1 16.51 16.30 2 2 0
222 Varanasi Larsen & Toubro Ltd 20025021 ALLAUDINPUR PHASE-2 1 1 1 1 1 11.92 11.92 0 0 0
223 Varanasi Larsen & Toubro Ltd 20025025 BHIMCHANDI PHASE-2 2 1 1 1 1 11.00 10.99 1 0 0
224 Varanasi Larsen & Toubro Ltd 20025033 Birsinghpur PHASE-2 5 1 1 1 1 10.14 10.13 1 0 0
225 Varanasi Larsen & Toubro Ltd 20025039 CHAUBEPUR KHURD PHASE-2 3 1 1 1 1 8.10 8.09 1 0 0
226 Varanasi Larsen & Toubro Ltd 20025051 CHITTAMPUR PHASE-2 3 1 1 1 1 12.18 12.17 0 0 0
227 Varanasi Larsen & Toubro Ltd 20025061 CHILBILLA PHASE-2 1 1 1 1 1 16.42 16.41 0 0 0
228 Varanasi Larsen & Toubro Ltd 20025062 DASEPUR PHASE-2 2 1 1 1 1 16.98 16.98 1 0 0
229 Varanasi Larsen & Toubro Ltd 20025080 DHANNIPUR PHASE-2 1 1 1 1 1 14.15 13.73 0 0 0
230 Varanasi Larsen & Toubro Ltd 20025091 DUBKIYA PHASE-2 3 1 1 1 1 5.84 5.84 0 0 0
231 Varanasi Larsen & Toubro Ltd 20025097 DUDUA PHASE-2 1 1 1 1 1 9.63 9.63 1 0 0
232 Varanasi Larsen & Toubro Ltd 20025109 GAURA PHASE-2 3 1 1 1 1 20.81 20.60 1 0 0
233 Varanasi Larsen & Toubro Ltd 20025130 GOGHALI PHASE-2 1 1 1 1 1 10.68 10.51 0 0 0
234 Varanasi Larsen & Toubro Ltd 20025143 GURIA PHASE-2 1 1 1 1 1 9.01 9.01 0 0 0
235 Varanasi Larsen & Toubro Ltd 20025148 HAJIPUR PHASE-2 2 1 1 1 1 11.60 10.00 0 0 0
236 Varanasi Larsen & Toubro Ltd 20025157 HAMIRAPUR PHASE-2 1 1 1 1 1 6.42 6.42 0 0 0
237 Varanasi Larsen & Toubro Ltd 20025200 HARIHARPUR PHASE-2 2 1 1 1 1 15.26 15.25 0 0 0
238 Varanasi Larsen & Toubro Ltd 20025203 KAUAAPUR PHASE-2 1 1 1 1 1 7.03 6.86 1 1 0
239 Varanasi Larsen & Toubro Ltd 20025206 KHARAGRAMPUR PHASE-2 3 1 1 1 1 14.03 14.03 2 2 0
240 Varanasi Larsen & Toubro Ltd 20025208 KHARAWAN PHASE-2 1 1 1 1 1 18.24 18.11 0 0 0
241 Varanasi Larsen & Toubro Ltd 20025388 Magrahua PHASE-2 1 1 1 1 1 11.20 13.11 1 1 0
242 Varanasi Larsen & Toubro Ltd 20025395 Purabpur PHASE-2 2 1 1 1 1 28.17 28.03 2 1 0
243 Varanasi Larsen & Toubro Ltd 20025407 Basawn PHASE-2 2 1 1 1 1 22.88 22.88 2 2 0
244 Varanasi Larsen & Toubro Ltd 20025420 Indarpur PHASE-2 3 1 1 1 1 11.54 11.54 2 2 0
245 Varanasi Larsen & Toubro Ltd 20025424 Karemoua PHASE-2 1 1 1 1 1 13.98 13.98 1 1 0
246 Varanasi Larsen & Toubro Ltd 20025432 MAJHAWAN PHASE-2 2 1 1 1 1 21.98 22.02 2 2 0
247 Varanasi Larsen & Toubro Ltd 20025469 KOCHWA PHASE-2 2 1 1 1 1 10.88 10.87 2 0 0
248 Varanasi Larsen & Toubro Ltd 20025470 KOIRAN PHASE-2 1 1 1 1 1 6.22 6.22 1 0 0
249 Varanasi Larsen & Toubro Ltd 20025471 KORAUTA PHASE-2 2 1 1 1 1 23.98 23.95 0 0 0
250 Varanasi Larsen & Toubro Ltd 20025477 MAHARAJPUR PHASE-2 3 1 1 1 1 7.58 7.58 3 3 0
251 Varanasi Larsen & Toubro Ltd 20025479 MALHATH PHASE-2 1 1 1 1 1 12.34 12.34 0 0 0
252 Varanasi Larsen & Toubro Ltd 20025483 NANDAPUR PHASE-2 3 1 1 1 1 17.78 17.78 3 3 0
253 Varanasi Larsen & Toubro Ltd 20025487 NEWRIYA PHASE-2 3 1 1 1 1 7.78 8.22 1 0 0
254 Varanasi Larsen & Toubro Ltd 20025489 PACHWAR PHASE-2 1 1 1 1 1 10.19 9.96 1 0 0
255 Varanasi Larsen & Toubro Ltd 20025493 PALHIPATTI PHASE-2 1 1 1 1 1 14.53 14.36 0 0 0
256 Varanasi Larsen & Toubro Ltd 20025502 TISORA PHASE-2 1 1 1 1 1 14.13 13.99 1 1 0
257 Varanasi Larsen & Toubro Ltd 20025504 SULTANPUR PHASE-2 1 1 1 1 1 13.35 13.35 0 0 0
258 Varanasi Larsen & Toubro Ltd 20025506 PARANAPUR PHASE-2 3 1 1 1 1 10.47 10.23 0 0 0
259 Varanasi Larsen & Toubro Ltd 20025508 Sihorva(uttari) PHASE-2 1 1 1 1 1 16.18 15.79 0 0 0
260 Varanasi Larsen & Toubro Ltd 20025516 PARJANPUR PHASE-2 1 1 1 1 1 10.09 10.06 1 1 0
261 Varanasi Larsen & Toubro Ltd 20025518 SARVANPUR PHASE-2 1 1 1 1 1 8.00 9.08 0 0 0
262 Varanasi Larsen & Toubro Ltd 20025522 Shervanipur PHASE-2 1 1 1 1 1 6.87 6.87 1 1 0
263 Varanasi Larsen & Toubro Ltd 20025525 SARAIYA NO 2 PHASE-2 2 1 1 1 1 5.20 5.20 0 0 0
264 Varanasi Larsen & Toubro Ltd 20025526 PASCHIMIPUR PHASE-2 2 1 1 1 1 16.17 16.15 2 0 0
265 Varanasi Larsen & Toubro Ltd 20025531 ROH SCHEME PHASE-2 1 1 1 1 1 18.58 18.58 1 0 0
266 Varanasi Larsen & Toubro Ltd 20025534 PUARI KHURD PHASE-2 1 1 1 1 1 19.82 19.82 0 0 0
267 Varanasi Larsen & Toubro Ltd 20025535 RAMESHWAR PHASE-2 1 1 1 1 1 11.09 15.03 1 1 0
268 Varanasi Larsen & Toubro Ltd 20025541 TILAWAR PHASE-2 5 1 1 1 1 16.38 17.19 0 0 0
269 Varanasi Larsen & Toubro Ltd 20025544 SUGULPUR PHASE-2 2 1 1 1 1 9.51 9.47 2 1 0
270 Varanasi Larsen & Toubro Ltd 20025548 SATTANPUR PHASE-2 2 1 1 1 1 13.52 13.52 0 0 0
271 Varanasi Larsen & Toubro Ltd 20025555 SARAIYA NARSARA PHASE-2 3 1 1 1 0 31.91 31.90 0 0 0
272 Varanasi Larsen & Toubro Ltd 20025562 SHIHORVA (DAXINI) PHASE-2 2 1 1 1 1 16.18 16.18 0 0 0
273 Varanasi Larsen & Toubro Ltd 20025580 SHANKARPUR PHASE-2 2 1 1 1 1 9.61 7.21 0 0 0
274 Varanasi Larsen & Toubro Ltd 20025678 WAR SCHEME PHASE-2 4 1 1 1 1 10.35 10.35 2 0 0
275 Varanasi Larsen & Toubro Ltd 20025679 BARWAN PHASE-2 1 1 1 1 1 17.79 17.79 1 1 0
276 Varanasi Larsen & Toubro Ltd 20025906 BACHHAURA PHASE-2 2 1 1 1 1 21.38 21.38 2 2 0
277 Varanasi Larsen & Toubro Ltd 20025907 CHANGWAR PHASE-2 1 1 1 1 1 18.39 20.12 1 1 0
278 Varanasi Larsen & Toubro Ltd 20025908 SISWA PHASE-2 2 1 1 1 1 10.79 10.79 1 1 0
279 Varanasi Larsen & Toubro Ltd 20025909 JALAALPUR PHASE-2 1 1 1 1 1 6.54 6.54 1 0 0
280 Varanasi Larsen & Toubro Ltd 20025910 DHADORPUR PHASE-2 4 1 1 1 1 15.33 15.33 1 0 0
281 Varanasi Larsen & Toubro Ltd 20025988 BAKHARIYAN PHASE-2 1 1 1 1 1 17.65 17.63 0 0 0
282 Varanasi Larsen & Toubro Ltd 20026011 SIYARAHA PHASE-2 3 1 1 1 1 12.16 12.16 3 3 0
283 Varanasi Larsen & Toubro Ltd 20026014 SATHAWA PHASE-2 2 1 1 1 1 10.28 10.28 1 0 0
284 Varanasi Larsen & Toubro Ltd 20026484 KHALISPUR PHASE-2 1 1 1 1 1 12.69 12.69 1 1 0
285 Varanasi Larsen & Toubro Ltd 20026487 GAZAPUR PHASE-2 1 1 1 1 1 9.92 9.92 0 0 0
286 Varanasi Larsen & Toubro Ltd 20026489 SHAHPUR PHASE-2 1 1 1 1 1 7.85 7.85 0 0 0
287 Varanasi Larsen & Toubro Ltd 20026490 GOPPUR PHASE-2 1 1 1 1 1 12.78 12.78 0 0 0
288 Varanasi Larsen & Toubro Ltd 20026491 KATHAN PHASE-2 1 1 1 1 1 9.69 9.62 0 0 0
289 Varanasi Larsen & Toubro Ltd 20026492 MURDI PHASE-2 1 1 1 1 1 10.47 10.47 1 1 0
290 Varanasi Larsen & Toubro Ltd 20026493 RATANPUR PHASE-2 1 1 1 1 1 12.87 12.87 0 0 0
291 Varanasi Larsen & Toubro Ltd 20026494 SAHPUR PHASE-2 1 1 1 1 1 12.57 12.57 1 1 0
292 Varanasi Larsen & Toubro Ltd 20026495 VINDA PHASE-2 2 1 1 1 1 26.09 26.09 2 2 0
293 Varanasi Larsen & Toubro Ltd 20030872 Chiurapur PHASE-2 1 1 1 1 1 8.50 8.50 0 0 0
294 Varanasi Larsen & Toubro Ltd 20030873 HIRAMANPUR PHASE-2 1 1 1 1 1 20.31 20.31 1 1 0
295 Varanasi Larsen & Toubro Ltd 20034430 Bankat w/s Scheme PHASE-2 3 1 1 1 0 0.00 10.59 1 0 0
296 Varanasi Larsen & Toubro Ltd 20037315 Hardantpur W/S Scheme PHASE-2 1 1 1 1 0 11.44 11.29 0 0 0
297 Varanasi Larsen & Toubro Ltd 20037317 Rakohana W/S Scheme PHASE-2 1 1 1 1 1 15.02 15.39 0 0 0
298 Varanasi Larsen & Toubro Ltd 20037320 JAGATPUR W/S Scheme PHASE-2 1 1 1 1 0 12.21 12.19 1 0 0
299 Varanasi Larsen & Toubro Ltd 20049104 GADSARA TADI PHASE-2 2 1 1 1 1 26.95 26.92 0 0 0
300 Varanasi Larsen & Toubro Ltd 20049109 RAISIPUR 3 1 1 1 1 7.05 7.01 1 0 0
301 Varanasi Larsen & Toubro Ltd 20055475 Anaura PHASE-2 2 1 1 1 0 9.63 7.22 1 0 0
302 Varanasi Larsen & Toubro Ltd 20055485 Bhadrasi PHASE-2 2 1 1 1 1 12.52 13.47 1 1 0
303 Varanasi Larsen & Toubro Ltd 20055490 Bhelkha PHASE-2 3 1 1 1 1 7.91 7.74 0 0 0
304 Varanasi Larsen & Toubro Ltd 20055502 Chamaru PHASE-2 2 1 1 1 1 9.88 9.68 2 2 0
305 Varanasi Larsen & Toubro Ltd 20055509 Chintapur PHASE-2 2 1 1 1 1 10.26 10.48 2 2 0
306 Varanasi Larsen & Toubro Ltd 20055542 Niyar Dih PHASE-2 1 1 1 1 1 24.03 23.90 0 0 0
307 Varanasi Larsen & Toubro Ltd 20055551 Kadipur PHASE-2 2 1 1 1 0 11.27 11.27 0 0 0
308 Varanasi Larsen & Toubro Ltd 20055563 Korauti PHASE-2 2 1 1 1 1 7.76 7.76 2 2 0
309 Varanasi Larsen & Toubro Ltd 20055569 Sarangpur PHASE-2 3 1 1 1 1 7.87 8.64 1 0 0
310 Varanasi Larsen & Toubro Ltd 20055577 Vadipur PHASE-2 2 1 1 1 1 9.34 8.96 0 0 0
311 Varanasi Larsen & Toubro Ltd 20055587 Dhola Pur PHASE-2 3 1 1 1 1 8.15 8.16 3 2 0
312 Varanasi Larsen & Toubro Ltd 20055624 Majhgawa Kala PHASE-2 2 1 1 1 1 10.80 10.80 2 2 0
313 Varanasi Larsen & Toubro Ltd 20055630 Rai Pur PHASE-2 2 1 1 1 0 6.43 6.86 0 0 0
314 Varanasi Larsen & Toubro Ltd 20055642 Venipur PHASE-2 2 1 1 1 1 21.90 21.90 2 1 0
315 Varanasi Larsen & Toubro Ltd 20055652 Ghamahapur PHASE-2 3 1 1 1 1 16.93 16.93 2 2 0
316 Varanasi Larsen & Toubro Ltd 20055660 Gangpur PHASE-2 1 1 1 1 1 11.49 11.97 1 0 0
317 Varanasi Larsen & Toubro Ltd 20055695 Sahamalpur PHASE-2 1 1 1 1 0 17.91 17.68 0 0 0
318 Varanasi Larsen & Toubro Ltd 20055698 Saraysekhlard PHASE-2 1 1 1 1 0 10.51 10.51 0 0 0
319 Varanasi Larsen & Toubro Ltd 20055700 Sui Chak PHASE-2 1 1 1 1 1 7.20 7.20 1 1 0
320 Varanasi Larsen & Toubro Ltd 20055701 Belvan PHASE-2 1 1 1 1 1 26.10 26.10 0 0 0
321 Varanasi Larsen & Toubro Ltd 20055703 Chataav PHASE-2 1 1 1 1 1 20.55 20.55 1 1 0
322 Varanasi Larsen & Toubro Ltd 20055704 Gahni PHASE-2 1 1 1 1 1 11.71 11.48 1 1 0
323 Varanasi Larsen & Toubro Ltd 20055706 Lakhamipur PHASE-2 1 1 1 1 1 11.82 11.82 0 0 0
324 Varanasi Larsen & Toubro Ltd 20055708 Nadoy PHASE-2 1 1 1 1 1 11.17 11.17 0 0 0
325 Varanasi Larsen & Toubro Ltd 20055709 Sarai Takki PHASE-2 3 1 1 1 1 8.56 8.56 3 3 0
326 Varanasi Larsen & Toubro Ltd 20055711 Indravar_Raisipatti PHASE-2 10 1 1 1 1 30.74 30.69 1 0 0
327 Varanasi Larsen & Toubro Ltd 20055713 Jalalpur PHASE-2 4 1 1 1 1 15.23 15.23 3 3 0
328 Varanasi Larsen & Toubro Ltd 20086159 Shivrampur W/S Scheme PHASE-2 1 1 1 1 1 14.12 14.12 0 0 0
329 Varanasi Larsen & Toubro Ltd 20086259 AJAWAN WATER SUPPLY SCHEME PHASE-2 1 1 1 1 1 17.70 17.70 1 0 0
330 Varanasi Larsen & Toubro Ltd 20086267 Bhatpurwa Kala Water Supply Scheme PHASE-2 1 1 1 1 1 12.08 12.00 0 0 0
331 Varanasi Larsen & Toubro Ltd 20086273 Dilavalpur Water Supply Scheme PHASE-2 1 1 1 1 0 11.21 11.21 1 1 0
332 Varanasi Larsen & Toubro Ltd 20086329 Harinathpur Water Supply Scheme PHASE-2 1 1 1 1 1 7.27 5.46 0 0 0
333 Varanasi Larsen & Toubro Ltd 20086342 Ghamhapur Water Supply Scheme PHASE-2 1 1 1 1 1 6.73 7.65 1 1 0
334 Varanasi Larsen & Toubro Ltd 20086346 Chakarma Water Supply Scheme PHASE-2 2 1 1 1 1 13.44 13.33 0 0 0
335 Varanasi Larsen & Toubro Ltd 20086355 Harihar Pur Water Supply Scheme PHASE-2 5 1 1 1 1 15.46 15.44 0 0 0
336 Varanasi Larsen & Toubro Ltd 20086362 Kharagpur_Phatehpur Katauna Water Supply Scheme 6 1 1 1 0 26.11 26.08 0 0 0
337 Varanasi Larsen & Toubro Ltd 20086387 Kharariya Taluka Birawn Water Supply Scheme PHASE-2 2 1 1 1 0 11.60 8.70 0 0 0
338 Varanasi Larsen & Toubro Ltd 20086392 Laxmisenpur Water Supply Scheme PHASE-2 2 1 1 1 1 8.14 8.14 1 0 0
339 Varanasi Larsen & Toubro Ltd 20086396 Rasulpur Water Supply Scheme PHASE-2 2 1 1 1 1 20.34 20.33 0 0 0
340 Varanasi Larsen & Toubro Ltd 20086409 Virdawalpur Water Supply Scheme PHASE-2 2 1 1 1 0 7.80 7.80 0 0 0
341 Varanasi Larsen & Toubro Ltd 20086639 Kohasi Water Supply Scheme PHASE-2 1 1 1 1 1 10.37 10.35 0 0 0
342 Varanasi Larsen & Toubro Ltd 20086643 Palia Shambhupur Water Supply Scheme PHASE-2 1 1 1 1 1 13.84 13.82 0 0 0
343 Varanasi Larsen & Toubro Ltd 20086645 Saray Water Supply Scheme PHASE-2 1 1 1 1 1 6.56 7.00 1 1 0
344 Varanasi Larsen & Toubro Ltd 20086696 Sonpurwa_Aneai_Dhanraj aipur W/S scheme PHASE-2 9 1 1 1 1 34.45 34.45 1 0 0
345 Varanasi Larsen & Toubro Ltd 20086718 Barai_Dallipur W/S scheme PHASE-2 5 1 1 1 0 24.89 24.86 1 0 0
346 Varanasi Larsen & Toubro Ltd 20086734 Fatehpur_Eshipur W/S scheme PHASE-2 4 1 1 1 1 13.72 13.72 0 0 0
347 Varanasi Larsen & Toubro Ltd 20086743 Rampur_Ratanpur W/S scheme PHASE-2 3 1 1 1 0 15.27 15.27 0 0 0
348 Varanasi Larsen & Toubro Ltd 20086773 Barai W/S Scheme PHASE-2 1 1 1 1 0 20.24 20.23 0 0 0
349 Varanasi Larsen & Toubro Ltd 20086774 Barani Kala W/S Scheme PHASE-2 2 1 1 1 1 14.81 11.11 0 0 0
350 Varanasi Larsen & Toubro Ltd 20086778 BHITTI W/S Scheme PHASE-2 3 1 0 1 0 7.13 0.00 0 0 0
351 Varanasi Larsen & Toubro Ltd 20086786 Chakka W/S Scheme PHASE-2 1 1 1 1 1 8.41 8.30 0 0 0
352 Varanasi Larsen & Toubro Ltd 20086790 Harsos W/S Scheme PHASE-2 2 1 1 1 0 25.85 25.76 0 0 0
353 Varanasi Larsen & Toubro Ltd 20086795 KERAKATPUR W/S Scheme PHASE-2 1 1 0 1 0 8.67 0.00 0 0 0
354 Varanasi Larsen & Toubro Ltd 20086800 LOHARA DIH W/S Scheme PHASE-2 1 1 1 1 1 8.34 8.33 0 0 0
355 Varanasi Larsen & Toubro Ltd 20086805 Narayanpur W/S Scheme PHASE-2 1 1 1 1 0 18.23 18.19 0 0 0
356 Varanasi Larsen & Toubro Ltd 20086809 Virapatti W/S Scheme PHASE-2 1 1 1 1 1 10.38 7.78 0 0 0
357 Varanasi Larsen & Toubro Ltd 20086823 Bahrampur W/S Scheme PHASE-2 1 1 1 1 1 4.24 4.24 0 0 0
358 Varanasi Larsen & Toubro Ltd 20086828 Bahutara W/S Scheme PHASE-2 1 1 1 1 1 9.95 9.76 1 1 0
359 Varanasi Larsen & Toubro Ltd 20086836 Chowka W/S Scheme PHASE-2 2 1 1 1 1 10.94 10.69 2 2 0
360 Varanasi Larsen & Toubro Ltd 20086843 Harhua W/S Scheme PHASE-2 3 1 1 1 1 11.67 11.66 1 1 0
361 Varanasi Larsen & Toubro Ltd 20086914 Khulaspur W/S Scheme PHASE-2 2 1 1 1 1 8.66 8.64 0 0 0
362 Varanasi Larsen & Toubro Ltd 20086918 Rajpur W/S Scheme PHASE-2 4 1 1 1 0 15.15 14.91 0 0 0
363 Varanasi Larsen & Toubro Ltd 20086922 Ramaipatti_Paschimpur_Ba batpur W/S Scheme PHASE-2 7 1 1 1 0 59.11 23.65 0 0 0
364 Varanasi Larsen & Toubro Ltd 20086955 Kodai W/S Scheme PHASE-2 2 1 1 1 1 20.34 15.25 0 0 0
365 Varanasi Larsen & Toubro Ltd 20086963 BAIKUNTHPUR W/S Scheme PHASE-2 2 1 0 1 0 7.64 0.00 0 0 0
366 Varanasi Larsen & Toubro Ltd 20086966 Uparwar W/S Scheme PHASE-2 6 1 1 1 1 11.84 11.84 3 3 0
367 Varanasi Larsen & Toubro Ltd 20086972 SARAI KAJI W/S Scheme PHASE-2 2 1 1 1 0 8.83 6.62 0 0 0
368 Varanasi Larsen & Toubro Ltd 20088108 Bharthara Kala Water Supply Scheme PHASE-2 3 1 1 1 1 17.40 17.37 3 3 0
369 Varanasi Larsen & Toubro Ltd 20088113 Chaubepur Water Supply Scheme PHASE-2 3 1 1 1 1 16.41 16.41 3 0 0
370 Varanasi Larsen & Toubro Ltd 20088117 Bhawanipur Zone 2_Bairwan Water Supply Scheme PHASE-2 3 1 1 1 0 9.64 9.54 1 0 0
371 Varanasi Larsen & Toubro Ltd 20088121 Cholapur Zone 1_Cholapur Water Supply Scheme PHASE-2 3 1 1 1 1 33.78 33.78 0 0 0
372 Varanasi Larsen & Toubro Ltd 20088155 Hathi Barni Zone-01 ( Hathi) Water Supply Scheme PHASE-2 1 1 1 1 1 24.22 11.14 0 0 0
373 Varanasi Larsen & Toubro Ltd 20088161 Cholapur Zone 3_Dharsauna Water Supply Scheme PHASE-2 1 1 1 1 0 26.32 26.32 0 0 0
374 Varanasi Larsen & Toubro Ltd 20088167 Cholapur Zone 4_Bhawanipur_Murli_Deipur Water Supply Scheme PHASE-2 8 1 1 1 0 26.74 26.71 0 0 0
375 Varanasi Larsen & Toubro Ltd 20088174 Harahua Zone 5_ Gokulpur Gram Panchayat Scheme PHASE-2 4 1 1 1 0 18.37 18.27 0 0 0
376 Varanasi Larsen & Toubro Ltd 20088181 Harhua Zone 2_Wazidpur_Koirajpur Water Supply Scheme PHASE-2 2 1 1 1 0 31.37 31.37 0 0 0
377 Varanasi Larsen & Toubro Ltd 20088190 Harhua Zone 3_Mohanpur_Chandi Patti Water Supply Scheme PHASE-2 5 1 1 1 1 29.38 19.88 0 0 0
378 Varanasi Larsen & Toubro Ltd 20088199 Harhua Zone 4_Singhapur_Karoma_Ausanp Ur Water Supply Scheme PHASE-2 8 1 1 1 1 43.71 23.71 1 0 0
379 Varanasi Larsen & Toubro Ltd 20088213 Hathi Barni Zone 2_Gosai Pur_Bhatauli Water Supply Scheme PHASE-2 7 1 1 1 0 22.39 22.39 7 0 0
380 Varanasi Larsen & Toubro Ltd 20088222 Hathi Barni Zone 3_Khargu Pur_Varani Water Supply Scheme PHASE-2 9 1 1 1 0 32.89 32.89 0 0 0
381 Varanasi Larsen & Toubro Ltd 20088230 Jalhupur Water Supply Scheme PHASE-2 1 1 1 1 1 29.48 29.48 0 0 0
382 Varanasi Larsen & Toubro Ltd 20088235 Mirzamurad Zone 3_Amini Water Supply Scheme PHASE-2 1 1 1 1 0 13.32 13.32 1 0 0
383 Varanasi Larsen & Toubro Ltd 20088247 Mustfabad Water Supply Scheme PHASE-2 1 1 0 1 0 58.68 55.60 0 0 0
384 Varanasi Larsen & Toubro Ltd 20088252 Rajatalab Zone 2_Kachnar Water Supply Scheme PHASE-2 1 1 1 1 0 15.65 15.65 1 0 0
385 Varanasi Larsen & Toubro Ltd 20088254 Rajatalab Zone 3_Mehadiganj Water Supply Scheme PHASE-2 1 1 1 1 0 41.71 27.00 0 0 0
386 Varanasi Larsen & Toubro Ltd 20088256 Rajatalab Zone 4_Harpur Water Supply Scheme PHASE-2 1 1 1 1 1 8.58 8.58 0 0 0
387 Varanasi Larsen & Toubro Ltd 20088283 Jariyari_Mohanidih_Suari Water Supply Scheme PHASE-2 5 1 1 1 1 38.97 38.88 0 0 0
388 Varanasi Larsen & Toubro Ltd 20088855 Benipur Zone 3_Mahmdpur_Kundriya Water Supply Scheme PHASE-2 3 1 1 1 0 15.92 15.92 0 0 0
389 Varanasi Larsen & Toubro Ltd 20089776 Bhawanipur Zone 1_Bhawanipur_Bahoran Pur_Dhanapur Water Supply Scheme PHASE-2 9 1 1 1 0 43.02 0.00 1 0 0
390 Varanasi Larsen & Toubro Ltd 20090272 Kandawa Old Zone 1_Zafarabad_Faridpur Water Supply Scheme PHASE-2 4 1 1 1 0 25.62 24.59 1 0 0
391 Varanasi Larsen & Toubro Ltd 20090639 Kandawa Old Zone 5_Khusipur_Delhana_Savhat Water Supply Scheme PHASE-2 4 1 1 1 0 52.05 52.05 2 0 0
392 Varanasi Larsen & Toubro Ltd 20090697 Zone 1 - Rauna Khurd_Barthauli Water Supply Scheme PHASE-2 2 1 1 1 1 26.68 26.64 0 0 0
393 Varanasi Larsen & Toubro Ltd 20090745 Tikari Old Zone-02 (Gajadharpur_Khanwa) Water Supply Scheme PHASE-2 3 1 1 1 0 29.35 29.35 1 0 0
394 Varanasi Larsen & Toubro Ltd 20090746 Tikari Old Zone 3_Akhari_Tariya Water Supply Scheme PHASE-2 2 1 1 1 1 59.94 24.00 0 0 0
395 Varanasi Larsen & Toubro Ltd 20090750 Thathara Zone 3_Domalia_Chhateri Manapur Water Supply Scheme PHASE-2 2 1 1 1 0 30.14 22.60 0 0 0
396 Varanasi Larsen & Toubro Ltd 20090754 Tendui_Hirampur Water Supply Scheme PHASE-2 4 1 1 1 1 39.59 39.59 0 0 0
397 Varanasi Larsen & Toubro Ltd 20090760 Sindhora Zone -05 (Garkhara Water Supply Scheme) PHASE-2 2 1 1 1 0 41.12 39.48 0 0 0
398 Varanasi Larsen & Toubro Ltd 20090762 Rohania Zone 5_Uchgoan Water Supply Scheme PHASE-2 2 1 1 1 0 34.71 34.71 0 0 0
399 Varanasi Larsen & Toubro Ltd 20090763 Rohania Zone 3_Ghatmpur Water Supply Scheme PHASE-2 3 1 1 1 1 14.89 14.86 1 0 0
400 Varanasi Larsen & Toubro Ltd 20090800 Rauna Khurd Zone 2 - Tekari_Rauna Kala Water Supply Scheme PHASE-2 2 1 1 1 1 44.29 44.29 0 0 0
401 Varanasi Larsen & Toubro Ltd 20090815 Rajatalab Zone 5_Birbhanpur Water Supply Scheme PHASE-2 2 1 1 1 0 35.60 35.60 0 0 0
402 Varanasi Larsen & Toubro Ltd 20090850 Rajatalab Zone 1_Rani Bazar_Bhikhari Pur Water Supply Scheme PHASE-2 2 1 1 1 1 15.13 15.11 0 0 0
403 Varanasi Larsen & Toubro Ltd 20090873 Prayagpur Zone-02 (Todarpur_Ashwari) Water Supply Scheme PHASE-2 2 1 1 1 0 27.38 27.34 0 0 0
404 Varanasi Larsen & Toubro Ltd 20090880 Prayagpur Zone 1_Burapur_Payagpur Water Supply Scheme PHASE-2 3 1 1 1 0 21.93 21.93 0 0 0
405 Varanasi Larsen & Toubro Ltd 20090889 Pindra Zone 3_Aswalpur_Pindrai Water Supply Scheme 3 1 1 1 0 39.35 39.51 1 0 0
406 Varanasi Larsen & Toubro Ltd 20090898 Pindra Zone 2_Jamapur_Ajaipur Water Supply Scheme PHASE-2 3 1 1 1 0 7.88 7.66 2 0 0
407 Varanasi Larsen & Toubro Ltd 20090928 Mangari Newada Zone 1_Mangari_Newada Water Supply Scheme PHASE-2 2 1 1 1 1 19.60 0.00 2 0 0
408 Varanasi Larsen & Toubro Ltd 20090936 Mangari Newada Zone 5_Jagdishpur_Gangapur Water Supply Scheme PHASE-2 2 1 0 1 0 35.14 35.14 0 0 0
409 Varanasi Larsen & Toubro Ltd 20090945 Mirzamurad Zone 1_Goar Water Supply Scheme PHASE-2 3 1 1 1 1 26.92 26.92 2 0 0
410 Varanasi Larsen & Toubro Ltd 20091474 Kavirampur_Siswa Water Supply Scheme PHASE-2 3 1 1 1 0 20.48 20.43 2 2 0
411 Varanasi Larsen & Toubro Ltd 20092550 Viraokot Zone 4_Dandupur Water Supply Scheme PHASE-2 2 1 1 1 0 21.38 21.28 0 0 0
412 Varanasi Larsen & Toubro Ltd 20092572 Tikari Old Zone 4_Bachhawn Water Supply Scheme PHASE-2 1 1 1 1 0 40.31 30.24 0 0 0
413 Varanasi Larsen & Toubro Ltd 20092584 Tikari Old Zone 1_Amara Khaira Chak Water Supply Scheme PHASE-2 2 1 1 1 0 61.44 38.99 0 0 0
414 Varanasi Larsen & Toubro Ltd 20092627 Thathara Zone 3_Chitarsenpur Water Supply Scheme PHASE-2 1 1 1 1 1 13.45 12.91 0 0 0
415 Varanasi Larsen & Toubro Ltd 20092641 Viraokot Zone 2_Koailar_Shaipur_Kuru Water Supply Scheme PHASE-2 3 1 1 1 0 39.79 38.20 0 0 0
416 Varanasi Larsen & Toubro Ltd 20092645 Viraokot Zone 1_Hasanpur Water Supply Scheme PHASE-2 2 1 1 1 1 11.98 11.98 0 0 0
417 Varanasi Larsen & Toubro Ltd 20092675 Sindhora Zone 1_Sindhora Water Supply Scheme PHASE-2 1 1 1 1 0 17.73 17.70 0 0 0
418 Varanasi Larsen & Toubro Ltd 20092683 Sindhora Zone 2_Maruee Water Supply Scheme PHASE-2 3 1 1 1 0 36.02 36.02 0 0 0
419 Varanasi Larsen & Toubro Ltd 20092725 Cholapur Zone 2_Katari Water Supply Scheme PHASE-2 3 1 1 1 0 30.09 28.89 0 0 0
420 Varanasi Larsen & Toubro Ltd 20092760 Kesaripur_Narur_Parmanand Pur_Bisunpur Water Supply Scheme PHASE-2 5 1 1 1 1 54.03 9.39 2 0 0
421 Varanasi Larsen & Toubro Ltd 20092774 Mirzamurad Zone 2_Pratappur Water Supply Scheme PHASE-2 2 1 1 1 0 16.93 16.93 1 0 0
422 Varanasi Larsen & Toubro Ltd 20092790 Mirzamurad Zone 5_Gurudaspur Water Supply Scheme PHASE-2 3 1 1 1 1 12.05 12.05 0 0 0
423 Varanasi Larsen & Toubro Ltd 20092800 Odar_Chitaura Water Supply Scheme PHASE-2 2 1 1 1 0 28.67 28.67 0 0 0
424 Varanasi Larsen & Toubro Ltd 20092987 Kandawa Old Zone 2-Mishirpur Water Supply Scheme PHASE-2 1 1 1 1 1 15.58 15.58 0 0 0
425 Varanasi Larsen & Toubro Ltd 20093032 Karasada W/S Scheme PHASE-2 1 1 1 1 0 21.26 15.95 0 0 0
426 Varanasi Larsen & Toubro Ltd 20095201 Bhadwa water supply scheme PHASE-2 1 1 1 1 0 8.68 8.58 0 0 0
427 Varanasi Larsen & Toubro Ltd 20095239 Dewara PHASE-2 1 1 1 1 0 8.09 8.09 0 0 0
428 Varanasi Larsen & Toubro Ltd 20095240 Sarai Mohan PHASE-2 1 1 1 1 1 7.34 7.21 0 0 0
429 Varanasi Larsen & Toubro Ltd 20095247 Karampura (Revision) PHASE-2 1 1 1 1 1 5.55 5.55 0 0 0
430 Varanasi Larsen & Toubro Ltd 20095253 Kharaiya Khas PHASE-2 1 1 1 1 1 18.32 18.32 1 1 0
431 Varanasi Larsen & Toubro Ltd 20095259 Sagunha PHASE-2 1 1 1 1 1 14.57 14.57 0 0 0
432 Varanasi Larsen & Toubro Ltd 20095261 Tarasara PHASE-2 1 1 1 1 1 15.63 15.61 0 0 0
433 Varanasi Larsen & Toubro Ltd 20095268 Kadipur Khurd PHASE-2 1 1 1 1 1 9.91 7.44 0 0 0
434 Varanasi Larsen & Toubro Ltd 20095272 Tohafpur WPS PHASE-2 2 1 1 1 1 8.44 8.44 0 0 0
435 Varanasi Larsen & Toubro Ltd 20095306 Jamunipur PHASE-2 1 1 1 1 1 6.36 6.36 1 1 0
436 Varanasi Larsen & Toubro Ltd 20095313 Ramgaon 1 0 0 0 0 0.00 0.00 0 0 0
437 Varanasi Larsen & Toubro Ltd 20095320 Sutvalpur PHASE-2 1 1 1 1 0 8.64 8.64 1 1 0
438 Varanasi Larsen & Toubro Ltd 20095324 Bazar Kalika PHASE-2 1 1 1 1 1 2.97 2.97 0 0 0
439 Varanasi Larsen & Toubro Ltd 20095350 Garthama PHASE-2 1 1 1 1 0 14.51 14.51 0 0 0
440 Varanasi Larsen & Toubro Ltd 20095490 Bahoripur PHASE-2 3 1 1 1 1 14.33 14.33 3 3 0
441 Varanasi Larsen & Toubro Ltd 20095492 Bankat PHASE-2 2 1 1 1 1 5.94 5.84 0 0 0
442 Varanasi Larsen & Toubro Ltd 20095501 BHAGTUPUR PHASE-2 1 1 1 1 1 7.55 5.66 0 0 0
443 Varanasi Larsen & Toubro Ltd 20095514 Dodhaipur PHASE-2 3 1 1 1 0 9.16 8.92 0 0 0
444 Varanasi Larsen & Toubro Ltd 20095517 Gajapur PHASE-2 3 1 1 1 1 8.56 8.44 0 0 0
445 Varanasi Larsen & Toubro Ltd 20095520 Hathiyar Kalan PHASE-2 3 1 1 1 1 23.11 14.71 0 0 0
446 Varanasi Larsen & Toubro Ltd 20095522 KANTHIPUR PHASE-2 2 1 1 1 0 13.60 13.52 0 0 0
447 Varanasi Larsen & Toubro Ltd 20095526 Krishnapur Kala PHASE-2 4 1 1 1 0 10.56 10.55 0 0 0
448 Varanasi Larsen & Toubro Ltd 20095530 LAKHANSENPUR PHASE-2 2 1 1 1 0 9.82 9.81 0 0 0
449 Varanasi Larsen & Toubro Ltd 20095535 Lokapur (Revision) PHASE-2 4 1 1 1 1 13.03 13.63 3 3 0
450 Varanasi Larsen & Toubro Ltd 20095540 Razala PHASE-2 3 1 1 1 1 17.60 17.57 1 0 0
451 Varanasi Larsen & Toubro Ltd 20095544 Bahadava PHASE-2 3 1 1 1 0 13.99 13.43 0 0 0
452 Varanasi Larsen & Toubro Ltd 20095561 Bhojubeer PHASE-2 3 1 1 1 0 9.04 9.04 0 0 0
453 Varanasi Larsen & Toubro Ltd 20095578 Kapsethi PHASE-2 1 1 1 1 1 16.18 16.15 0 0 0
454 Varanasi Larsen & Toubro Ltd 20095587 Lallapur PHASE-2 2 1 1 1 0 4.62 4.51 0 0 0
455 Varanasi Larsen & Toubro Ltd 20095593 Moglabir PHASE-2 3 1 1 1 1 12.65 12.65 0 0 0
456 Varanasi Larsen & Toubro Ltd 20095604 Ghoshila PHASE-2 3 1 1 1 1 11.89 11.89 3 0 0
457 Varanasi Larsen & Toubro Ltd 20095642 HARPALPUR PHASE-2 1 1 0 1 0 15.96 0.00 0 0 0
458 Varanasi Larsen & Toubro Ltd 20095660 Gajepur PHASE-2 4 1 1 1 1 12.16 12.16 4 4 0
459 Varanasi Larsen & Toubro Ltd 20095889 DHAURHARA PROPSED WATER SUPPLY SCHEME PHASE-2 2 1 0 1 0 25.76 25.76 1 0 0
460 Varanasi Larsen & Toubro Ltd 20095894 KATHIRAON WATER SUPPLY SCHEME PHASE-2 2 1 1 1 0 63.51 43.25 0 0 0
461 Varanasi Larsen & Toubro Ltd 20095901 Mangari Newada Zone 2_NEHIYA_PRASADPUR WATER SUPPLY SCHEME PHASE-2 4 1 1 1 0 45.31 45.31 0 0 0
462 Varanasi Larsen & Toubro Ltd 20095906 NARPATPUR WATER SUPPLY SCHEME PHASE-2 2 1 1 1 0 25.62 10.00 0 0 0
463 Varanasi Larsen & Toubro Ltd 20095916 Aayar Shivrampur Zone 2_AHIRAULI_SULEMAPUR WATER SUPPLY SCHEME PHASE-2 4 1 1 1 0 27.82 27.82 1 0 0
464 Varanasi Larsen & Toubro Ltd 20095922 Benipur Zone 2_GANESHPUR WATER SUPPLY SCHEME PHASE-2 2 1 1 1 0 10.58 10.57 1 0 0
465 Varanasi Larsen & Toubro Ltd 20095936 DHAURHARA EXISTING WATER SUPPLY SCHEME PHASE-2 1 1 1 1 1 14.29 14.29 0 0 0
466 Varanasi Larsen & Toubro Ltd 20095961 Mangari Newada Zone 6_GADAR_GAJENDRA WATER SUPPLY SCHEME PHASE-2 3 1 1 1 1 23.68 22.74 0 0 0
467 Varanasi Larsen & Toubro Ltd 20095990 Jalhupur Zone 2_PACHWAR WATER SUPPLY SCHEME PHASE-2 3 1 1 1 0 10.19 10.09 0 0 0
468 Varanasi Larsen & Toubro Ltd 20096009 SEWAPURI WATER SUPPLY SCHEME PHASE-2 4 1 1 1 1 25.99 25.94 3 0 0
469 Varanasi Larsen & Toubro Ltd 20096024 Sindhora Zone 3_BASANTPUR WATER SUPPLY SCHEME 3 1 1 1 1 20.67 20.64 1 0 0
470 Varanasi Larsen & Toubro Ltd 20097295 Gora Water Supply Scheme PHASE-2 1 1 1 1 1 9.53 7.15 0 0 0
471 Varanasi Larsen & Toubro Ltd 20097322 Dhanpalpur Water Supply Scheme PHASE-2 1 1 1 1 0 7.80 7.80 0 0 0
472 Varanasi Larsen & Toubro Ltd 20097331 Dabethua Water Supply Scheme PHASE-2 1 1 1 1 1 20.88 20.88 0 0 0
473 Varanasi Larsen & Toubro Ltd 20097335 Raimala Water Supply Scheme PHASE-2 1 1 1 1 1 7.33 7.33 0 0 0
474 Varanasi Larsen & Toubro Ltd 20097338 Chukaha Water Supply Scheme PHASE-2 1 1 1 1 1 8.45 8.28 0 0 0
475 Varanasi Larsen & Toubro Ltd 20097362 Babatpur Water Supply Scheme PHASE-2 1 1 1 1 1 11.56 11.46 1 0 0
476 Varanasi Larsen & Toubro Ltd 20097366 Khanuan Water Supply Scheme PHASE-2 1 1 1 1 1 10.30 10.29 1 1 0
477 Varanasi Larsen & Toubro Ltd 20097368 Khanpur Water Supply Scheme PHASE-2 1 1 0 1 0 5.18 4.98 0 0 0
478 Varanasi Larsen & Toubro Ltd 20097373 Ahiran Water Supply Scheme PHASE-2 1 1 1 1 0 10.01 10.01 0 0 0
479 Varanasi Larsen & Toubro Ltd 20097390 Madhopur Water Supply Scheme PHASE-2 1 1 1 1 1 4.34 4.34 0 0 0
480 Varanasi Larsen & Toubro Ltd 20097464 Chandapur Water Supply Scheme PHASE-2 1 1 1 1 0 6.94 5.21 0 0 0
481 Varanasi Larsen & Toubro Ltd 20097470 Mhamudpur Water Supply Scheme PHASE-2 1 1 1 1 0 3.69 3.59 0 0 0
482 Varanasi Larsen & Toubro Ltd 20097489 Kachhiya Water Supply Scheme PHASE-2 1 1 1 1 1 5.66 5.66 1 0 0
483 Varanasi Larsen & Toubro Ltd 20097493 Sakalpur Water Supply Scheme PHASE-2 1 1 1 1 1 10.66 10.61 0 0 0
484 Varanasi Larsen & Toubro Ltd 20097497 Maniyaripur Water Supply Scheme PHASE-2 1 1 1 1 1 7.01 6.68 1 1 0
485 Varanasi Larsen & Toubro Ltd 20097504 Beshupur Water Supply Scheme PHASE-2 1 1 1 1 1 15.56 15.53 0 0 0
486 Varanasi Larsen & Toubro Ltd 20097506 Binda Water Supply Scheme PHASE-2 1 1 1 1 1 26.13 26.10 1 0 0
487 Varanasi Larsen & Toubro Ltd 20097516 Benipur (Ct) Water Supply Scheme PHASE-2 1 1 0 1 1 27.90 27.90 0 0 0
488 Varanasi Larsen & Toubro Ltd 20097576 Kharagaipur Water Supply Scheme PHASE-2 1 1 1 1 0 11.93 11.93 1 1 0
489 Varanasi Larsen & Toubro Ltd 20098786 Gosaipur Mohav Water Supply Scheme PHASE-2 1 1 1 1 1 37.12 37.12 0 0 0
490 Varanasi Larsen & Toubro Ltd 20098787 Jalhupur Zone 3_Ramna Water Supply Scheme PHASE-2 1 1 1 1 0 30.42 30.37 0 0 0
491 Varanasi Larsen & Toubro Ltd 20098788 Kotwa Water Supply Scheme PHASE-2 1 1 1 1 0 22.53 22.49 0 0 0
492 Varanasi Larsen & Toubro Ltd 20098789 Madav Water Supply Scheme 1 1 0 1 0 0.00 32.30 0 0 0
493 Varanasi Larsen & Toubro Ltd 20098790 Pindra Water Supply Scheme PHASE-2 1 1 1 1 1 44.23 37.00 0 0 0
494 Varanasi Larsen & Toubro Ltd 20098791 Sindhora Zone -04 (Jathi) Water Supply Scheme PHASE-2 1 1 1 1 1 31.52 31.50 0 0 0
495 Varanasi Larsen & Toubro Ltd 20098798 Basantpur Water Supply Scheme PHASE-2 5 1 1 1 1 16.61 16.58 0 0 0
496 Varanasi Larsen & Toubro Ltd 20098801 Bhedahan Water Supply Scheme PHASE-2 2 1 1 1 0 7.22 7.20 0 0 0
497 Varanasi Larsen & Toubro Ltd 20098807 Badhaini Khurd Water Supply Scheme PHASE-2 3 1 1 1 1 10.84 10.41 1 0 0
498 Varanasi Larsen & Toubro Ltd 20098811 Pachai (Revision) PHASE-2 2 1 1 1 1 9.06 8.88 0 0 0
499 Varanasi Larsen & Toubro Ltd 20098814 Dhora Water Supply Scheme PHASE-2 3 1 1 1 1 18.48 18.38 2 2 0
500 Varanasi Larsen & Toubro Ltd 20098817 Sareya Water Supply Scheme PHASE-2 3 1 1 1 1 6.38 6.38 2 0 0
501 Varanasi Larsen & Toubro Ltd 20098820 Bahadurpur Water Supply Scheme PHASE-2 3 1 1 1 1 14.17 13.61 0 0 0
502 Varanasi Larsen & Toubro Ltd 20098823 Kakalpur Water Supply Scheme PHASE-2 2 1 1 1 1 30.03 29.99 2 2 0
503 Varanasi Larsen & Toubro Ltd 20098825 Adampur Water Supply Scheme PHASE-2 3 1 1 1 0 9.13 9.13 2 0 0
504 Varanasi Larsen & Toubro Ltd 20098831 Rampur Water Supply Scheme PHASE-2 5 1 1 1 0 22.03 16.52 0 0 0
505 Varanasi Larsen & Toubro Ltd 20098839 Karmi Water Supply Scheme PHASE-2 3 1 1 1 1 16.99 16.99 0 0 0
506 Varanasi Larsen & Toubro Ltd 20098842 Dallipur Water Supply Scheme PHASE-2 3 1 1 1 0 11.40 13.00 1 0 0
507 Varanasi Larsen & Toubro Ltd 20098846 Gajapur Water Supply Scheme PHASE-2 2 1 1 1 1 10.31 10.31 0 0 0
508 Varanasi Larsen & Toubro Ltd 20098848 Todarpur_Nayapur Water Supply Scheme PHASE-2 3 1 1 1 0 13.58 13.55 0 0 0
509 Varanasi Larsen & Toubro Ltd 20098853 Inderkhapur (Revision) PHASE-2 3 1 1 1 1 21.90 21.90 0 0 0
510 Varanasi Larsen & Toubro Ltd 20099023 Kaithor Zone-01 (Kaithor )Water Supply Scheme PHASE-2 2 1 1 1 1 22.01 22.01 0 0 0
511 Varanasi Larsen & Toubro Ltd 20099024 Tala_Babiyaav Water Supply Scheme PHASE-2 2 1 1 1 1 37.95 37.95 0 0 0
512 Varanasi Larsen & Toubro Ltd 20099025 Thana_Rampur Water Supply Scheme PHASE-2 2 1 1 1 1 10.36 10.36 2 0 0
513 Varanasi Larsen & Toubro Ltd 20099573 Parmandapur W/S scheme PHASE-2 1 1 1 1 0 19.57 19.54 0 0 0
514 Varanasi Larsen & Toubro Ltd 20099574 Chhitauni Water Supply Scheme PHASE-2 2 1 1 1 1 21.07 21.90 1 1 0
515 Varanasi Larsen & Toubro Ltd 20099575 Shahababad Water Supply Scheme PHASE-2 1 1 1 1 0 3.26 0.00 1 0 0
516 Varanasi Larsen & Toubro Ltd 20099576 Chandapur Water Supply Scheme PHASE-2 1 1 1 1 0 6.77 6.67 1 0 0
517 Varanasi Larsen & Toubro Ltd 20099577 Kanakpur Water Supply Scheme PHASE-2 1 1 1 1 1 4.67 4.61 0 0 0
518 Varanasi Larsen & Toubro Ltd 20099578 Aneyi Zone 3_Kaithauli Water Supply Scheme PHASE-2 1 1 1 1 0 7.22 7.00 0 0 0
519 Varanasi Larsen & Toubro Ltd 20099579 Viraokot Zone 5_Sharawa Water Supply Scheme PHASE-2 1 1 0 1 1 16.47 16.47 0 0 0
520 Varanasi Larsen & Toubro Ltd 20099580 Kaithore Zone 3_Bhadwan Water Supply Scheme PHASE-2 1 1 1 1 0 13.12 13.11 1 0 0
521 Varanasi Larsen & Toubro Ltd 20099581 Harhua Zone 1_Mahadepur Water Supply Scheme PHASE-2 1 1 1 1 1 9.16 9.16 1 0 0
522 Varanasi Larsen & Toubro Ltd 20099582 Kandawa Old Zone 3_Lathiya Water Supply Scheme PHASE-2 1 1 1 1 0 19.51 9.36 0 0 0
523 Varanasi Larsen & Toubro Ltd 20099585 Mirzamurad Zone 4_Admapur Water Supply Scheme PHASE-2 1 1 1 1 1 12.68 6.36 0 0 0
524 Varanasi Larsen & Toubro Ltd 20099586 Akodha Water Supply Scheme PHASE-2 2 1 1 1 1 12.36 12.26 0 0 0
525 Varanasi Larsen & Toubro Ltd 20099587 Viraokot Zone 3_Bhiti Water Supply Scheme PHASE-2 1 1 1 1 1 11.98 11.65 1 1 0
526 Varanasi Larsen & Toubro Ltd 20099588 Kaithore Zone 2_Rampur Water Supply Scheme PHASE-2 2 1 1 1 0 8.59 8.59 1 0 0
527 Varanasi Larsen & Toubro Ltd 20099589 Pindra Zone 4_Samogara Water Supply Scheme PHASE-2 2 1 1 1 0 14.13 13.89 0 0 0
528 Varanasi Larsen & Toubro Ltd 20099590 Mangari Newada Zone 3_Aharak Water Supply Scheme PHASE-2 2 1 1 1 0 10.36 10.31 0 0 0
529 Varanasi Larsen & Toubro Ltd 20099591 Panditpur_Ramsipur Water Supply Scheme PHASE-2 2 1 1 1 0 31.72 31.72 0 0 0