Phase 1

Physical Progress All Scheme

Total Scheme : 63 O&M Scheme : 45 Under Trial Run Scheme : 4 In-Progress Scheme : 14
S.No   District         Name of Firm/Agency Scheme Id Scheme Name Villages Alloted
Start Date of Trial Run
Operational and Maintenance Details
ROAD DISMENTLING/RESTORATION(KM) Intake WTP T/W OHT
Automation Integration Status
Connectivity Status
Pump Status
EE E&M Verification Status
  Last 7 days         Automation Alert
Automation Integration OHT Status Functional OHT Water Demand OHT Water Supply Regular Water Supply Villages(Village Wise) CWR Distribution System INCL RWRM/CWRM(km) HGJ Status FHTC Electricity Commissioning of Village IMIS Scheme Completed
As Build Drawing Submitted
Final As Executed BOQ Submitted
Incoming Complaints Received Feedback from Gram Pradhan On Call Balance Work Scheme Completion Plan(Agency) U.P.Jal Nigam UP Jal Nigam Old Scheme Status
Initiated By Agency (scheme)
Finalized By Agency (scheme)
Approved By TPI (scheme)
Approved By EE (scheme)
Covered village
Regular water supply (Filled by pump operator)
Monthly O&M Charges(in Rs)
Yearly O&M Charges(in Rs)
Dismantle(Filled by EE) Restored(Filled by EE) Restored %(Filled by EE) Villages where 100% road restoration completed(Filled by TPI) Restored(%) In progress(%) Functional Images/Videos In progress(%) Functional Images/Videos Required /completed (LAST WEEK ) Images/Videos Required Started (Filled by Agency) Started(Filled by EE) Progress 0 to 25% Progress 26% to 50% Progress 51% to 75% Progress 76% to 99%
OHT completed
EE | Agency
OHT Fuctional(By ADM)
OHT with less manpower
EE | TPI
OHT and Signage Board Images/Videos OHT Logo Intake(Previous Status) WTP(Previous Status) No Of CWR(Previous Status) No Of OHT(Previous Status) Intake(Current Status) WTP(Current Status) No Of CWR(Current Status) No Of OHT(Current Status) O&M Verification Remark Total Alerts Action Taken Alerts Total OHT Not Integrated OHT Disconnected OHT (No water supply received in the last two days) Accurate data(EE E&M) Functional OHT Water supply less than 75% percent (Average water supply over 2 days) Water supply greater than 150% percent (Average water supply over 2 days) Last Month AVG Water Supply Days = [(Total Integrated OHT × Month Days) − (Disconnected OHT × Disconnected Days)] ÷ Total Integrated OHT Current Month AVG Water Supply Days = [(Total Integrated OHT × Month Days) − (Disconnected OHT × Disconnected Days)] ÷ Total Integrated OHT Regular water supply disruption(OHT) 1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Regular water supply disruption(Village)
1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Villages with pending complaints. Villages with complaints pending for more than 15 days. Daily Weekly Monthly Yesterday Yesterday(%) Weekly Monthly Regular water supply Villages Below 50% 50% to 75% 76% to 90% Above 90% 100% Household with RWS Required Started Completed Completed
CWR Images Required Laid Villages Alloted Household HGJ (100% Completed) HGJ Certified Villages FHTC Given as on Today FHTC Given as on Yesterday FHTC Given (last Week) FHTC % Connection Required/Completed Commissioned/Regular water supply(Verified by EE) Estimated Cost(Lacs)
Last Week / Last Month
Expenditure(Lacs)
Expenditure(%) All Complaints Close Complaints Pending Complaints All Complaints Close Complaints Pending Complaints
  • 0 T/W
  • 35 OHT
  • 2 CWR
  • 100.99 D.System
  • 71 Comissioning
  • 2 Electricity
  • 11401 FHTC
  • 611 HGJ
  • 1762 HGJ CERT
  • 6157 HOV
  • Scheme Wise Category A
  • 812 No. of Schemes
  • 1431 No. of Villages
  • Scheme Wise Category B
  • 3886 No. of Schemes
  • 7124 No. of Villages
  • Scheme Wise Category C
  • 1028 No. of Schemes
  • 1519 No. of Villages
  • Scheme Wise Total
  • 5726 Total No. of Schemes
  • 10074 Total No. of Villages
  • Village Wise Category A
  • 1158 No. of Villages
  • Village Wise Category B
  • 5728 No. of Villages
  • Village Wise Category C
  • 2984 No. of Villages
  • Village Wise Total
  • 9870 Total No. of Villages
  • 4687 Agreement Done Scheme
  • 8370 Agreement Done Village
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106
Total Schemes : 63 6547 49 53 46 46 45 4095 3898 6190013 74280156 10762 10458 97%
+0
5854
89 98.99 61 166 / 16 100.00 62 359 / 17
+0
557 / 557
213 / 83 1699
+0
1689
842 5 0 3 17
  +0
1644 | 1664
1583 0 / 0 1307 / 104 1136 -- -- -- 49 48 236 929 44 44 226 851 -- 8018 1651 1699 504 303 851 892 242 234 -- -- 0 + 27 + 0 + 37 + 0 = 64 0 + 73 + 0 + 78 + 0 = 151 525 306 317908 2225356 9537240 2242704 705.46% 60616616873 75988480988 5953 460 174 217 632 4470 455
+0
453
+0
453
453 0 58117.33
+0.00
58016.34
6547 1685084 5935
+ 0
4784
1673687 0 0 99.32
+0
900 / 898
+0
6399 / 5256
1624724.00
+0.00 / +0.00
1448305.80
89.14% 8 8 5 23926 23122 804 1902 1363 539
1 Banda Larsen & Toubro Ltd


8044758 Khatan GOV 342 01-May-2025 1 1 1 1 342 342 0 0 691 691 100%
+0
340
99 100.00 Yes 19 / 3 100.00 Yes 94 / 2
+0
0 / 0
0 / 0 116
+0
116
116 0 0 0 0
  +0
116 | 116
116 0 / 0 116 / 1 116 Integrated Off Verified Verified 22 114 Verified Verified 18 95 Verification Remarks Minutes of Meeting 737 617 116 0 19 95 97 0 0 21 15 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 47 33 35881 251167 1076430 30485 84.96% 199994 561984 342 0 0 11 31 300 39
+0
39
+0
39
39 0 4215.00
+0.00
4215.00
342 127889 342
+ 0
324
127889 0 0 100.00
+0
41 / 41
+0
342 / 338
156314.00
+0.00 / +0.00
142656.23
91.26% 1728 1653 75 112 107 5
  • 18 HGJ CERT
  • 333 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2023
Comissioning
0
  • 31-Jul-2024 OHT
  • 31-Mar-2024 CWR
  • 30-Sep-2023 D.System
  • 30-Jun-2024 Comissioning
  • 90 Villages
  • 54725 Households
  • 0 Last Week FHTC Given
  • 54725 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 90 HGJ
  • 89 HGJ Certified
  • 98.89 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 46 Handed Over Villages(before Portal)
  • 37 Handed Over Initiated/Approved On Portal
  • 92.22 Handed Over %
  • 89 OHT Required
  • 89 OHT Completed
  • Scheme Wise Category A
  • 35 No. of Schemes
  • 59 No. of Villages
  • Scheme Wise Category B
  • 21 No. of Schemes
  • 46 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 59 No. of Villages
  • Village Wise Category B
  • 46 No. of Villages
  • Village Wise Category C
  • 1 No. of Villages
  • Village Wise Total
  • 106 Total No. of Villages
  • 57 Total No. of Schemes
  • 106 Total No. of Villages
  • 102 Total No. of OHT
  • 52 Schemes Sent to O&M
  • 97 No. of OHT in O&M Schemes
  • 29813 Water Demand(M3)
  • 31207.66 Water Supply (M3)
  • 51 Agreement Done Scheme
  • 97 Agreement Done Village
NCC Ltd.


8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 202 15-May-2024 1 1 1 1 202 202 0 0 580 580 100%
+0
202
100 100.00 Yes 18 / 0 100.00 Yes 75 / 0
+0
31 / 31
32 / 0 80
+0
80
80 0 0 0 0
  +0
80 | 80
80 0 / 0 103 / 0 103 Integrated Off Verified Verified 12 70 Verified Verified 12 65 Verification Remarks Minutes of Meeting 232 160 80 0 0 65 80 16 22 29 21 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 22 9 27904 195328 837120 38789 139.01% 21584370 24417790 202 0 0 0 10 192 13
+0
13
+0
13
13 0 2581.60
+0.00
2581.60
202 82266 202
+ 0
201
82266 0 0 100.00
+0
34 / 34
+0
202 / 202
93222.00
+0.00 / +0.00
88170.52
94.58% 2661 2628 33 85 85 0
  • 1 HGJ CERT
  • 200 HOV
Intake
Approach Road Completed
WTP
Campus Development Completed
T/W
Completed
OHT
Completed
CWR
1 No. CWR Shall be Completed in 25-Sept-2024 ( New additional Scope).
D.System
15-Feb-2024
Comissioning
0
  • 15-Dec-2023 Intake
  • 30-Nov-2023 WTP
  • 15-Sep-2023 T/W
  • 25-Nov-2023 OHT
  • 15-Apr-2024 CWR
  • 15-Feb-2024 D.System
  • 15-Sep-2024 Comissioning
Total Banda 544 2 2 2 2 2 544 544 0 0 1271 1271 100%
+0
542
99.63 100.00 2 37 / 3 100.00 2 169 / 2
+0
31 / 31
32 / 0 196
+0
196
196 0 0 0 0
  +0
196 | 196
196 0 / 0 219 / 1 219 -- -- -- 2 2 34 184 2 2 30 184 -- 969 777 196 0 19 160 177 16 22 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 69 42 63785 446495 1913550 69274 108.61% 21784364 24979774 544 0 0 11 41 492 52
+0
52
+0
52
52 0 6796.60
+0.00
6796.60
544 210155 544
+ 0
525
210155 0 0 100
+0
75 / 75
+0
544 / 540
249536.00
+0.00 / +0.00
230826.75
92.50% 0 0 0 4389 4281 108 197 192 5
2 Chitrakoot GVPR


8135453 Raipura GOV 69 0 0 0 0 0 0 0 0 95 88 93%
+0
64
93 100.00 Yes 2 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 28
+3
28
28 0 0 0 0
  +0
28 | 28
26 0 / 0 4 / 0 3 Integrated Verified Verified 0 26 Verified Verified 0 25 Verification Remarks Minutes of Meeting 315 0 28 5 6 25 17 3 0 14 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 8 6 4523 31661 135690 3814 84.32% 29355 137770 66 6 2 5 13 40 11
+0
11
+0
11
11 0 882.90
+0.00
878.65
69 19570 69
+ 0
53
19570 0 0 100.00
+0
13 / 13
+0
66 / 65
30332.00
+0.00 / +0.00
23608.05
77.83% 211 202 9 31 3 28
  • 4 D.System
  • 3 COV
  • 16 HGJ CERT
  • 68 HOV
Intake
0
WTP
operational
T/W
0
OHT
May-26
CWR
June-24
D.System
30-Dec-2026
Comissioning
0
  • 30-Sep-2023 Intake
  • 31-Oct-2023 WTP
  • 31-May-2026 OHT
  • 10-Mar-2024 CWR
  • 30-Dec-2026 D.System
  • 15-Feb-2025 Comissioning
  • 140 Villages
  • 44632 Households
  • 0 Last Week FHTC Given
  • 44623 FHTC Given
  • 99 FHTC(%)
  • 9 Balance FHTC
  • 140 HGJ
  • 122 HGJ Certified
  • 87.14 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 37 Handed Over Villages(before Portal)
  • 90 Handed Over Initiated/Approved On Portal
  • 90.71 Handed Over %
  • 71 OHT Required
  • 71 OHT Completed
  • Scheme Wise Category A
  • 43 No. of Schemes
  • 102 No. of Villages
  • Scheme Wise Category B
  • 4 No. of Schemes
  • 42 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 47 No. of Villages
  • Village Wise Category B
  • 0 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 47 Total No. of Villages
  • 47 Total No. of Schemes
  • 144 Total No. of Villages
  • 81 Total No. of OHT
  • 19 Schemes Sent to O&M
  • 28 No. of OHT in O&M Schemes
  • 5482 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 0 Agreement Done Scheme
  • 0 Agreement Done Village
Larsen & Toubro Ltd


8134589 Silauta Mustkil GOV 59 0 0 0 0 0 0 0 0 83 83 100%
+0
59
100 100.00 Yes 4 / 0 100.00 Yes 12 / 1
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 22 / 0 11 Integrated Verified Verified 5 17 Verified Verified 3 17 Verification Remarks Minutes of Meeting 120 0 17 5 2 17 10 5 1 3 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 5 2580 18060 77400 1960 75.97% 12601 38808 59 0 0 1 12 46 6
+0
6
+0
6
6 0 576.00
+0.00
567.05
59 11925 59
+ 0
59
11925 0 0 100.00
+0
7 / 7
+0
59 / 59
21359.00
+0.00 / +0.00
20939.14
98.03% 171 164 7 22 1 21
  • 8 D.System
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Oct-2023
Comissioning
0
  • 30-Nov-2023 Intake
  • 15-Dec-2023 WTP
  • 15-Oct-2024 OHT
  • 31-Aug-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Aug-2023 Comissioning
8134609 Chandi Bangar GOV 286 0 0 0 0 0 0 0 0 371 345 93%
+0
245
86 100.00 Yes 9 / 0 100.00 Yes 9 / 0
+0
0 / 0
0 / 0 91
+0
91
91 0 0 0 0
  +0
91 | 91
87 0 / 0 29 / 0 4 Integrated Off Verified Not Verified 5 28 Verified Not Verified 5 23 Verification Remarks Minutes of Meeting 576 0 91 7 84 23 0 0 0 0 0 0 + 27 + 0 + 4 + 0 = 31 0 + 73 + 0 + 17 + 0 = 90 42 29 0 0 0 0 0% 0 0 225 75 5 0 72 73 20
+0
20
+0
20
20 0 3052.00
+0.00
2846.86
286 86157 284
+ 0
131
86114 0 0 99.95
+0
21 / 21
+0
250 / 180
95975.00
+0.00 / +0.00
77188.06
80.43% 823 767 56 118 6 112
  • 205 D.System
  • 34 COV
  • 43 FHTC
  • 2 HGJ
  • 155 HGJ CERT
  • 284 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Nov-2025
Comissioning
0
  • 15-Dec-2023 Intake
  • 15-Dec-2023 WTP
  • 31-Dec-2025 OHT
  • 30-Jun-2024 CWR
  • 30-Nov-2025 D.System
  • 30-Jun-2026 Comissioning
Agency Total 345 0 0 0 0 0 0 0 0 454 428 94% 304 200.00 13 / 0 200.00 21 / 1
+0
0 / 0
0 / 0 108
+0
108
108 0 0 0 0
  +0
108 | 108
104 0 / 0 51 / 0 15 -- -- -- 2 1 10 45 2 1 8 40 -- 696 0 108 12 86 40 10 5 1 -- -- 0 + 27 + 0 + 4 + 0 = 31 0 + 73 + 0 + 17 + 0 = 90 47 34 2580 18060 77400 1960 75.97% 12601 38808 284 75 5 1 84 119 26
+0
26
+0
26
26 0 3628.00
+0.00
3413.91
345 98082 343
+ 0
190
98039 0 0 100
+0
28 / 28
+0
309 / 239
117334.00
+0.00
98127.20
84% 994 931 63 140 7 133
Total Chitrakoot 414 0 0 0 0 0 0 0 0 0 549 515 94%
+0
368
88.89 100.00 3 15 / 0 100.00 3 22 / 1
+0
0 / 0
0 / 0 136
+0
136
136 0 0 0 0
  +0
136 | 136
130 0 / 0 55 / 0 18 -- -- -- 3 2 10 71 3 2 8 71 -- 1011 0 136 17 92 65 27 8 1 -- -- 0 + 27 + 0 + 4 + 0 = 31 0 + 73 + 0 + 17 + 0 = 90 55 40 7103 49721 213090 5774 81.29% 41956 176578 350 81 7 6 97 159 37
+0
37
+0
37
37 0 4510.90
+0.00
4292.56
414 117652 412
+ 0
243
117609 0 0 99.96
+0
41 / 41
+0
375 / 304
147666.00
+0.00 / +0.00
121735.25
82.44% 0 0 0 1205 1133 72 171 10 161
3 Hamirpur PNC-SPML-JV


8135500 Haraulipur GOV and Tubewell Scheme 125 Nos. 193 20-Mar-2024 1 1 1 1 193 191 3092513 37110156 793 793 100%
+0
193
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
130 / 130
0 / 0 130
+0
130
0 0 0 0 0
  +0
130 | 130
130 0 / 0 118 / 0 113 Integrated Off Verified Verified 0 3 Verified Verified 0 3 Verification Remarks Minutes of Meeting 120 0 130 112 4 3 14 6 6 16 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 12 6 2550 17850 76500 3255 127.65% 23864 1891697217 193 0 0 0 8 185 6
+0
6
+0
6
6 0 1327.83
+0.00
1327.83
193 59675 193
+ 0
191
59675 0 0 100.00
+0
73 / 73
+0
193 / 193
27101.00
+0.00 / +0.00
25719.52
94.90% Yes Yes 1428 1414 14 88 88 0
  • 2 HGJ CERT
  • 191 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Dec-2023
Comissioning
0
  • 28-Feb-2024 T/W
  • 20-Mar-2024 OHT
  • 30-Oct-2023 CWR
  • 30-Dec-2023 D.System
  • 20-Mar-2024 Comissioning
  • 143 Villages
  • 79974 Households
  • 0 Last Week FHTC Given
  • 79974 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 143 HGJ
  • 130 HGJ Certified
  • 90.91 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 28 Handed Over Villages(before Portal)
  • 57 Handed Over Initiated/Approved On Portal
  • 59.44 Handed Over %
  • 60 OHT Required
  • 60 OHT Completed
  • Scheme Wise Category A
  • 76 No. of Schemes
  • 114 No. of Villages
  • Scheme Wise Category B
  • 27 No. of Schemes
  • 31 No. of Villages
  • Scheme Wise Category C
  • 2 No. of Schemes
  • 2 No. of Villages
  • Village Wise Category A
  • 106 No. of Villages
  • Village Wise Category B
  • 39 No. of Villages
  • Village Wise Category C
  • 2 No. of Villages
  • Village Wise Total
  • 147 Total No. of Villages
  • 105 Total No. of Schemes
  • 147 Total No. of Villages
  • 108 Total No. of OHT
  • 76 Schemes Sent to O&M
  • 79 No. of OHT in O&M Schemes
  • 20351 Water Demand(M3)
  • 22994.61 Water Supply (M3)
  • 105 Agreement Done Scheme
  • 147 Agreement Done Village
JWIL


8135488 Pathyora Danda GOV 129 20-Mar-2024 1 1 1 1 129 128 3097500 37170000 412 412 100%
+0
129
100 100.00 Yes 7 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 46
+0
46
0 0 0 0 0
  +0
46 | 46
46 0 / 0 45 / 0 42 Integrated Off Verified Verified 6 43 Verified Verified 6 32 Verification Remarks Minutes of Meeting 317 0 46 0 14 32 32 8 16 4 11 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 13 2 10211 71477 306330 29971 293.52% 157971 447681 129 0 0 0 10 119 10
+0
10
+0
10
10 0 1214.00
+0.00
1213.70
129 45475 129
+ 0
128
45475 0 0 100.00
+0
10 / 10
+0
129 / 129
39878.00
+0.00 / +0.00
37750.20
94.66% Yes Yes 1188 1172 16 58 55 3
  • 1 HGJ CERT
  • 127 HOV
Intake
Completed and functional
WTP
Completed and functional
T/W
0
OHT
To be completed by March2024
CWR
Completed
Comissioning
0
  • 15-Mar-2024 OHT
Total Hamirpur 322 2 2 2 2 2 322 319 6190013 74280156 1204 1204 100%
+0
322
100 100.00 2 11 / 0 100.00 2 5 / 0
+0
130 / 130
0 / 0 176
+0
176
0 0 0 0 0
  +0
176 | 176
176 0 / 0 163 / 0 155 -- -- -- 2 2 6 46 2 2 6 46 -- 437 0 176 112 18 35 46 14 22 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 25 8 12761 89327 382830 33226 260.37% 181835 1892144898 322 0 0 0 18 304 16
+0
16
+0
16
16 0 2541.83
+0.00
2541.53
322 105150 322
+ 0
319
105150 0 0 100
+0
83 / 83
+0
322 / 322
66979.00
+0.00 / +0.00
63469.72
94.76% 2 2 0 2616 2586 30 146 143 3
4 Jalaun BGCCPL-Ramky (JV)


8135522 Kota Mustakil GOV and Tubewell Scheme 270 Nos. 510 1 0 0 0 0 0 0 0 1123 968 86%
+0
231
45 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
256 / 256
0 / 0 272
+0
272
272 0 0 3 16
  +0
234 | 253
189 0 / 0 110 / 0 2 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 272 272 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 60 41 0 0 0 0 0% 0 0 278 145 60 24 23 26 5
+0
5
+0
5
5 0 2511.00
+0.00
2507.80
510 109509 201
+ 0
88
107150 0 0 97.85
+0
129 / 127
+0
505 / 128
52161.00
+0.00 / +0.00
51396.42
98.53% 907 802 105 103 59 44
  • 19 OHT
  • 3 D.System
  • 5 COV
  • 2 Electricity
  • 2359 FHTC
  • 309 HGJ
  • 422 HGJ CERT
  • 509 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2026
Comissioning
0
  • 30-Sep-2026 Intake
  • 30-Sep-2026 WTP
  • 30-Sep-2026 T/W
  • 30-Sep-2026 OHT
  • 30-Sep-2026 CWR
  • 30-Sep-2026 D.System
  • 30-Sep-2026 Comissioning
  • 61 Villages
  • 26484 Households
  • 0 Last Week FHTC Given
  • 26484 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 61 HGJ
  • 55 HGJ Certified
  • 90.16 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 3 Handed Over Villages(before Portal)
  • 19 Handed Over Initiated/Approved On Portal
  • 36.07 Handed Over %
  • 60 OHT Required
  • 60 OHT Completed
  • Scheme Wise Category A
  • 31 No. of Schemes
  • 34 No. of Villages
  • Scheme Wise Category B
  • 25 No. of Schemes
  • 29 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 34 No. of Villages
  • Village Wise Category B
  • 29 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 63 Total No. of Villages
  • 56 Total No. of Schemes
  • 63 Total No. of Villages
  • 59 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 59 No. of OHT in O&M Schemes
  • 11083 Water Demand(M3)
  • 12473.48 Water Supply (M3)
  • 56 Agreement Done Scheme
  • 63 Agreement Done Village
8135526 Raipur GOV 83 1 0 0 0 0 0 0 0 168 133 79%
+0
42
51 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 17 17 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6 5 0 0 0 0 0% 0 0 38 28 3 0 7 0 7
+0
7
+0
7
7 0 495.00
+0.00
494.49
83 18444 10
+ 0
2
17550 0 0 95.15
+0
8 / 8
+0
79 / 37
20745.00
+0.00 / +0.00
7276.12
35.07% 101 92 9 16 3 13
  • 3 COV
  • 894 FHTC
  • 73 HGJ
  • 81 HGJ CERT
  • 82 HOV
Intake
0
WTP
It is Functioning
T/W
0
OHT
Completed
CWR
0
D.System
30-Sep-2026
Comissioning
0
  • 30-Sep-2026 Intake
  • 30-Sep-2026 WTP
  • 30-Sep-2026 T/W
  • 30-Sep-2026 OHT
  • 30-Sep-2026 CWR
  • 30-Sep-2026 D.System
  • 30-Sep-2026 Comissioning
8135545 Madhepura GOV 67 1 0 0 0 0 0 0 0 162 132 81%
+0
34
51 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+1
12
12 0 0 0 1
  +0
10 | 11
9 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 11 8 0 0 0 0 0% 0 0 27 17 4 0 5 1 6
+0
6
+0
6
6 0 425.00
+0.00
424.25
67 15230 5
+ 0
4
14647 0 0 96.17
+0
7 / 7
+0
61 / 6
13157.00
+0.00 / +0.00
4250.57
32.31% 168 153 15 22 21 1
  • 1 OHT
  • 6 COV
  • 583 FHTC
  • 62 HGJ
  • 63 HGJ CERT
  • 63 HOV
Intake
0
WTP
Completed
T/W
0
OHT
Completed
CWR
0
D.System
30-Sep-2026
Comissioning
0
  • 30-Sep-2026 Intake
  • 30-Sep-2026 WTP
  • 30-Sep-2026 T/W
  • 30-Sep-2026 OHT
  • 30-Sep-2026 CWR
  • 30-Sep-2026 D.System
  • 30-Sep-2026 Comissioning
Agency Total 660 3 0 0 0 0 0 0 0 1453 1233 85% 307 300.00 1 / 0 300.00 0 / 0
+0
256 / 256
0 / 0 301
+1
301
301 0 0 3 17
  +0
261 | 281
215 0 / 0 110 / 0 2 -- -- -- -- 0 0 301 301 0 0 0 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 77 54 0 0 0 0 0% 0 0 343 190 67 24 35 27 18
+0
18
+0
18
18 0 3431.00
+0.00
3426.54
660 143183 216
+ 0
94
139347 0 0 97
+0
144 / 142
+0
645 / 171
86063.00
+0.00
62923.11
73% 1176 1047 129 141 83 58
GVPR


8135513 Sala GOV 197 15-Jul-2025 1 1 1 1 197 158 0 0 496 496 100%
+0
186
94 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 56
+0
56
56 0 0 0 0
  +0
56 | 56
56 0 / 0 59 / 0 22 Integrated Off Verified Verified 10 56 Verified Verified 10 56 Verification Remarks Minutes of Meeting 269 0 56 0 18 56 38 22 13 20 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 10 3 10393 72751 311790 318250 3062.16% 3037867 11712132 197 0 0 13 34 150 11
+0
11
+0
11
11 0 1715.00
+0.00
1715.00
197 43098 197
+ 0
181
43098 0 0 100.00
+0
12 / 12
+0
197 / 197
50599.00
+0.00 / +0.00
44913.13
88.76% 490 479 11 42 42 0
  • 16 HGJ CERT
  • 195 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Total Jalaun 857 1 4 1 1 1 197 158 0 0 1949 1727 89%
+0
493
57.53 100.00 4 3 / 0 100.00 4 4 / 0
+0
256 / 256
0 / 0 357
+0
357
357 0 0 3 17
  +0
317 | 337
271 0 / 0 169 / 0 24 -- -- -- 1 1 10 56 1 1 10 56 -- 269 0 357 301 18 56 38 22 13 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 87 57 10393 72751 311790 318250 3062.16% 3037867 11712132 539 189 67 37 69 177 29
+0
29
+0
29
29 0 5146.00
+0.00
5141.54
857 184499 413
+ 0
275
180667 0 0 97.92
+0
156 / 154
+0
842 / 368
136662.00
+0.00 / +0.00
107836.24
78.91% 0 0 0 1655 1515 140 181 123 58
5 Jhansi BGCCPL-Ramky (JV)


8009955 Imlota GOV 87 0 0 0 0 0 0 0 0 242 226 93%
+0
14
16 100.00 Yes 1 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 4 / 0 7 Integrated Off Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 54 0 13 12 1 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 25 19 0 0 0 0 0% 0 0 80 2 0 0 13 65 8
+0
8
+0
8
8 0 899.95
+0.00
899.00
87 32259 85
+ 0
31
32235 0 0 99.93
+0
9 / 9
+0
87 / 66
29730.00
+0.00 / +0.00
26146.92
87.95% 393 353 40 33 24 9
  • 24 FHTC
  • 2 HGJ
  • 56 HGJ CERT
  • 86 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Jul-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Apr-2024 OHT
  • 14-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
  • 124 Villages
  • 49613 Households
  • 0 Last Week FHTC Given
  • 48184 FHTC Given
  • 97 FHTC(%)
  • 1429 Balance FHTC
  • 106 HGJ
  • 95 HGJ Certified
  • 76.61 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 31 Handed Over Villages(before Portal)
  • 47 Handed Over Initiated/Approved On Portal
  • 62.90 Handed Over %
  • 14 OHT Required
  • 14 OHT Completed
  • Scheme Wise Category A
  • 34 No. of Schemes
  • 58 No. of Villages
  • Scheme Wise Category B
  • 35 No. of Schemes
  • 64 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 53 No. of Villages
  • Village Wise Category B
  • 52 No. of Villages
  • Village Wise Category C
  • 18 No. of Villages
  • Village Wise Total
  • 123 Total No. of Villages
  • 70 Total No. of Schemes
  • 123 Total No. of Villages
  • 77 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 58 No. of OHT in O&M Schemes
  • 10674 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 70 Agreement Done Scheme
  • 123 Agreement Done Village
8135947 Teharka GOV 93 0 0 0 0 0 0 0 0 162 147 91%
+0
34
37 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 4 / 0 6 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 19 14 0 0 0 0 0% 0 0 83 16 3 5 23 36 9
+0
9
+0
9
9 0 786.55
+0.00
786.00
93 27437 46
+ 0
8
27316 0 0 99.56
+0
10 / 10
+0
91 / 59
29676.00
+0.00 / +0.00
18958.13
63.88% 306 270 36 34 16 18
  • 2 COV
  • 121 FHTC
  • 47 HGJ
  • 85 HGJ CERT
  • 93 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 31-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
8135956 Barthari GOV 106 0 0 0 0 0 0 0 0 179 167 93%
+0
45
42 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 4 / 0 10 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 15 15 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 13 11 0 0 0 0 0% 0 0 83 19 11 6 7 40 11
+0
11
+0
11
11 0 868.26
+0.00
863.85
106 27423 48
+ 0
1
27236 0 0 99.32
+0
12 / 12
+0
98 / 45
29490.00
+0.00 / +0.00
25567.66
86.70% 153 133 20 41 26 15
  • 4 D.System
  • 8 COV
  • 187 FHTC
  • 58 HGJ
  • 105 HGJ CERT
  • 106 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 30-Jun-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jun-2024 Comissioning
Agency Total 286 0 0 0 0 0 0 0 0 583 540 93% 93 300.00 3 / 0 300.00 8 / 0
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 12 / 0 23 -- -- -- -- 54 0 40 39 1 0 0 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 57 44 0 0 0 0 0% 0 0 246 37 14 11 43 141 28
+0
28
+0
28
28 0 2554.76
+0.00
2548.85
286 87119 179
+ 0
40
86787 0 0 100
+0
31 / 31
+0
276 / 170
88896.00
+0.00
70672.71
80% 852 756 96 108 66 42
Indian Hume Pipe


8010037 Kuraicha GOV 74 05-Feb-2024 1 1 1 1 74 72 0 0 294 294 100%
+0
72
97 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 14
+14
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 14 / 0 24 Integrated Off Verified Verified 10 14 Verified Verified 10 14 Verification Remarks Minutes of Meeting 145 0 14 0 0 14 14 0 11 30 21 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 3 + 0 = 3 8 3 8491 59437 254730 12903 151.96% 60127515930 73015828211 71 0 0 0 1 70 11
+0
11
+0
11
11 0 859.73
+0.00
859.37
74 29415 73
+ 0
70
29406 0 0 99.97
+0
19 / 19
+0
72 / 69
28180.00
+0.00 / +0.00
27954.08
99.20% Yes 399 388 11 25 23 2
  • 9 FHTC
  • 1 HGJ
  • 4 HGJ CERT
  • 74 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
NCC Ltd.


8009966 Tilaitha GOV 25 01-Sep-2023 1 1 1 1 25 25 0 0 68 68 100%
+0
25
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 10 / 0 5 Integrated Off Verified Verified 3 5 Verified Verified 3 5 Verification Remarks Minutes of Meeting 53 0 5 0 0 5 5 5 0 30 20 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 1 1930 13510 57900 0 0% 442830347 996490713 25 0 0 0 6 19 4
+0
4
+0
4
4 0 248.18
+0.00
248.18
25 6725 25
+ 0
24
6725 0 0 100.00
+0
7 / 7
+0
25 / 25
7517.00
+0.00 / +0.00
6711.81
89.29% Yes 127 125 2 5 5 0
  • 1 HGJ CERT
  • 25 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8009988 Bacholi Bauzurg GOV 37 01-Sep-2023 1 1 1 1 37 37 0 0 85 85 100%
+0
37
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 15 / 0 7 Integrated Off Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 47 0 7 0 0 7 7 1 5 27 20 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 8 4 3419 23933 102570 13318 389.53% 81176 239992 37 1 0 1 7 28 4
+0
4
+0
4
4 0 297.97
+0.00
297.97
37 11549 37
+ 0
37
11549 0 0 100.00
+0
10 / 10
+0
37 / 37
12643.00
+0.00 / +0.00
11923.47
94.31% Yes 177 161 16 6 5 1
  • 37 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 15-Oct-2023 Comissioning
8009992 Gulara GOV 42 01-Sep-2023 1 1 1 1 42 40 0 0 100 100 100%
+0
42
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 14 / 0 7 Integrated Off Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 40 0 7 0 0 7 7 7 0 30 19 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 1 0 3346 23422 100380 0 0% 53753 154147 42 0 0 2 3 37 4
+0
4
+0
4
4 0 309.37
+0.00
309.37
42 11437 42
+ 0
42
11437 0 0 100.00
+0
10 / 10
+0
42 / 42
11037.00
+0.00 / +0.00
10864.98
98.44% Yes 79 78 1 19 18 1
  • 42 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8010048 Burhpura GOV 59 01-Sep-2023 1 1 1 1 59 59 0 0 189 189 100%
+0
57
97 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 14
+0
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 32 / 0 14 Integrated Off Verified Verified 7 14 Verified Verified 7 14 Verification Remarks Minutes of Meeting 78 0 14 0 0 14 14 3 3 27 22 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 3 8009 56063 240270 11186 139.67% 78103 342007 59 2 1 6 22 28 8
+0
8
+0
8
8 0 869.06
+0.00
869.06
59 26650 59
+ 0
55
26650 0 0 100.00
+0
19 / 19
+0
59 / 59
27993.00
+0.00 / +0.00
26962.89
96.32% Yes 332 327 5 16 15 1
  • 4 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 163 4 4 4 4 163 161 0 0 442 442 100% 161 400.00 14 / 0 400.00 8 / 0
+0
0 / 0
0 / 0 33
+0
33
0 0 0 0 0
  +0
33 | 33
33 0 / 0 71 / 0 33 -- -- -- 4 4 16 33 4 4 16 33 -- 218 0 33 0 0 33 33 16 8 -- -- 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 14 8 16704 116928 501120 24504 146.70% 443043379 997226859 163 3 1 9 38 112 20
+0
20
+0
20
20 0 1724.58
+0.00
1724.58
163 56361 163
+ 0
158
56361 0 0 100
+0
46 / 46
+0
163 / 163
59190.00
+0.00
56463.15
95% 715 691 24 46 43 3
DARA ENGINEERING


8135931 Purwa GOV 32 01-Jan-2024 1 1 1 1 32 32 0 0 76 76 100%
+0
31
97 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 6
+6
6
0 0 0 0 0
  +0
6 | 6
6 0 / 0 6 / 0 10 Integrated Off Verified Verified 3 6 Verified Verified 3 6 Verification Remarks Minutes of Meeting 21 16 6 0 0 6 6 0 0 29 21 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 4025 28175 120750 5959 148.05% 30516 163410 32 0 0 0 0 32 3
+0
3
+0
3
3 0 292.54
+0.00
292.54
32 12762 32
+ 0
32
12762 0 0 100.00
+0
8 / 8
+0
32 / 32
9704.00
+0.00 / +0.00
9021.80
92.97% Yes 252 250 2 5 5 0
  • 32 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Unipro


8135681 Barwar GOV 57 05-Feb-2024 1 1 1 1 57 57 0 0 263 263 100%
+0
57
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 9 / 0 9 Integrated Off Verified Verified 4 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 128 107 9 0 1 9 8 0 3 25 19 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 0 3641 25487 109230 6688 183.69% 59042 221803 57 0 0 0 0 57 5
+0
5
+0
5
5 0 458.49
+0.00
458.49
57 15848 57
+ 0
57
15848 0 0 100.00
+0
13 / 13
+0
57 / 57
14645.00
+0.00 / +0.00
13881.43
94.79% Yes 210 201 9 14 12 2
  • 57 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 30-Aug-2023 D.System
  • 30-Aug-2023 Comissioning
Total Jhansi 612 7 7 7 7 7 326 322 0 0 1656 1611 97%
+0
414
67.65 100.00 10 21 / 0 100.00 10 22 / 0
+0
0 / 0
0 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 112 / 0 99 -- -- -- 7 7 33 62 7 7 33 62 -- 566 123 102 39 2 62 61 16 22 -- -- 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 4 + 0 = 4 85 55 32862 230034 985860 50054 152.32% 60570648867 74013440283 569 40 15 20 82 412 67
+0
67
+0
67
67 0 5890.10
+0.00
5883.83
612 201505 504
+ 0
357
201164 0 0 99.83
+0
117 / 117
+0
600 / 491
200615.00
+0.00 / +0.00
177993.17
88.72% 0 0 3 2428 2286 142 198 149 49
6 Lalitpur M/s Sudhakara Infratech Pvt. Ltd


8010072 Lagaon GOV 50 15-Jan-2024 1 1 1 1 50 50 0 0 115 115 100%
+0
50
100 100.00 Yes 1 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 13
+13
13
13 0 0 0 0
  +0
13 | 13
13 0 / 0 13 / 0 13 Integrated Verified Verified 7 13 Verified Verified 7 12 Verification Remarks Minutes of Meeting 114 0 13 0 1 12 12 3 4 28 20 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 3955 27685 118650 4674 118.18% 38101 163364 50 0 0 0 3 47 9
+0
9
+0
9
9 0 381.75
+0.00
409.16
50 12964 50
+ 0
50
12964 0 0 100.00
+0
10 / 10
+0
50 / 50
17608.00
+0.00 / +0.00
17578.70
99.83% Yes 145 144 1 25 25 0
  • 49 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
9 CWR Completed
D.System
30-Sep-2023
Comissioning
30/12/2023
  • 14-Aug-2023 Intake
  • 31-Aug-2023 WTP
  • 14-Jun-2023 OHT
  • 17-May-2023 CWR
  • 30-Sep-2023 D.System
  • 30-Dec-2023 Comissioning
  • 105 Villages
  • 46145 Households
  • 0 Last Week FHTC Given
  • 46145 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 105 HGJ
  • 94 HGJ Certified
  • 89.52 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 7 Handed Over Villages(before Portal)
  • 45 Handed Over Initiated/Approved On Portal
  • 49.52 Handed Over %
  • 37 OHT Required
  • 37 OHT Completed
  • Scheme Wise Category A
  • 15 No. of Schemes
  • 20 No. of Villages
  • Scheme Wise Category B
  • 11 No. of Schemes
  • 87 No. of Villages
  • Scheme Wise Category C
  • 2 No. of Schemes
  • 2 No. of Villages
  • Village Wise Category A
  • 11 No. of Villages
  • Village Wise Category B
  • 49 No. of Villages
  • Village Wise Category C
  • 49 No. of Villages
  • Village Wise Total
  • 109 Total No. of Villages
  • 28 Total No. of Schemes
  • 109 Total No. of Villages
  • 48 Total No. of OHT
  • 20 Schemes Sent to O&M
  • 36 No. of OHT in O&M Schemes
  • 11198 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 16 Agreement Done Scheme
  • 96 Agreement Done Village
8063544 Kachnauda Kala GOV 61 01-Apr-2024 1 1 1 1 61 61 0 0 171 171 100%
+0
61
100 100.00 Yes 1 / 1 100.00 Yes 8 / 1
+0
0 / 0
0 / 0 17
+16
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 17 / 0 19 Integrated Off Verified Verified 5 17 Verified Verified 5 14 Verification Remarks Minutes of Meeting 148 0 17 0 3 14 14 1 3 24 17 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 1 4976 34832 149280 6937 139.41% 79448 345595 60 0 0 1 4 55 8
+0
8
+0
8
8 0 578.14
+0.00
594.56
61 22452 61
+ 0
59
22452 0 0 100.00
+0
9 / 9
+0
61 / 60
24598.00
+0.00 / +0.00
23998.94
97.56% 383 378 5 24 24 0
  • 2 HGJ CERT
  • 58 HOV
Intake
100% structure completed work done by 30/10/2023
WTP
100% WTP structure done remaining work done by 30/10/2023
T/W
0
OHT
remaining work completed by 30/11/2023
CWR
remaining work done by 15/12/2023
D.System
30-Oct-2023
Comissioning
comissioning start by 30/10/2023
  • 30-Sep-2023 Intake
  • 23-Oct-2023 WTP
  • 13-Nov-2023 OHT
  • 30-Nov-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Oct-2023 Comissioning
8134917 Jakhlaun Birdha GOV 60 03-Dec-2024 1 1 1 1 60 60 0 0 116 116 100%
+0
60
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+13
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 11 / 0 14 Integrated Off Verified Verified 2 13 Verified Verified 2 13 Verification Remarks Minutes of Meeting 143 0 15 0 1 13 14 0 13 27 21 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6 0 5584 39088 167520 28985 519.07% 144333 565174 59 0 0 1 3 55 5
+0
5
+0
5
5 0 462.02
+0.00
520.82
60 17590 60
+ 0
54
17590 0 0 100.00
+0
6 / 6
+0
60 / 59
23368.00
+0.00 / +0.00
22206.49
95.03% 256 250 6 26 26 0
  • 6 HGJ CERT
  • 51 HOV
Intake
remaining work done by 20/10/2023
WTP
remaining work done by 30/01/2024
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 15/11/2023
D.System
15-Feb-2024
Comissioning
comissioning 03/03/2024
  • 20-Oct-2023 Intake
  • 20-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 30-Nov-2023 CWR
  • 15-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134922 Dhoora Balabehat GOV 58 03-Dec-2024 1 1 1 1 58 58 0 0 55 55 100%
+0
58
100 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 11
+10
11
11 0 0 0 0
  +0
11 | 11
11 0 / 0 6 / 0 6 Integrated Off Verified Verified 2 10 Verified Verified 2 9 Verification Remarks Minutes of Meeting 113 0 11 0 3 9 8 0 6 24 16 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 2210 15470 66300 1986 89.86% 31070 157078 58 0 0 0 3 55 5
+0
5
+0
5
5 0 332.97
+0.00
372.33
58 9685 58
+ 0
55
9685 0 0 100.00
+0
6 / 6
+0
58 / 58
15059.00
+0.00 / +0.00
14955.24
99.31% 124 124 0 12 12 0
  • 3 HGJ CERT
  • 48 HOV
Intake
remaining work done by 30/10/2023
WTP
remaining work done by 30/10/2023
T/W
0
OHT
remaining work done by 30/10/2023
CWR
Work has started on 5 CWR, No one Complete.
D.System
21-Feb-2024
Comissioning
comissioning 15/10/2024
  • 06-Jan-2024 Intake
  • 16-Jan-2024 WTP
  • 30-Dec-2023 OHT
  • 30-Oct-2023 CWR
  • 21-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134938 Kadesra Kalan GOV 7 20-Jun-2024 1 1 1 1 7 7 0 0 62 62 100%
+0
7
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Off Verified Verified 5 10 Verified Verified 5 10 Verification Remarks Minutes of Meeting 53 0 4 0 0 10 4 0 1 27 21 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 1696 11872 50880 3735 220.22% 25351 109822 7 0 0 0 1 6 2
+0
2
+0
2
2 0 130.13
+0.00
160.49
7 7371 7
+ 0
6
7371 0 0 100.00
+0
3 / 3
+0
7 / 7
5977.00
+0.00 / +0.00
5976.98
100.00% 87 84 3 3 3 0
  • 1 HGJ CERT
  • 7 HOV
Intake
remaining work done by31/10/2023
WTP
remaining work done by 30/12/2023
T/W
0
OHT
15/10/2023
CWR
15/10/2023
D.System
30-Jan-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Dec-2023 WTP
  • 15-Oct-2023 OHT
  • 15-Oct-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
8134955 Mau GOV 15 20-Jun-2024 1 1 1 1 15 14 0 0 38 38 100%
+0
15
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 6
+5
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 0 / 0 3 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 0 0 6 0 0 6 0 3 28 21 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 923 6461 27690 0 0% 0 0 15 0 0 0 0 15 3
+0
3
+0
3
3 0 120.25
+0.00
162.11
15 3347 15
+ 0
14
3347 0 0 100.00
+0
3 / 3
+0
15 / 15
5996.00
+0.00 / +0.00
4881.97
81.42% 55 55 0 6 6 0
  • 1 HGJ CERT
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 31/10/2023
D.System
30-Jan-2024
Comissioning
comissioning 30/10/2023
  • 20-Oct-2023 Intake
  • 30-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 31-Aug-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
Agency Total 251 6 6 6 6 251 250 0 0 557 557 100% 251 600.00 9 / 1 600.00 24 / 1
+0
0 / 0
0 / 0 66
+61
66
66 0 0 0 0
  +0
66 | 66
66 0 / 0 47 / 0 59 -- -- -- 5 5 21 63 5 5 21 58 -- 571 0 66 0 8 58 58 4 30 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 12 1 19344 135408 580320 46317 239.44% 318303 1341033 249 0 0 2 14 233 32
+0
32
+0
32
32 0 2005.26
+0.00
2219.47
251 73409 251
+ 0
238
73409 0 0 100
+0
37 / 37
+0
251 / 249
92606.00
+0.00
89598.32
97% 1050 1035 15 96 96 0
Brija Banco Pvt. Ltd


8282117 Chandawali GOV 15 25-Mar-2024 1 1 1 1 15 15 0 0 18 18 100%
+0
15
100 100.00 Yes 2 / 0 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 6
+6
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 1 / 1 6 Integrated Off Verified Verified 1 1 Verified Verified 0 0 Verification Remarks Minutes of Meeting 102 69 6 0 6 0 0 0 0 16 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 0 0 0 0 0% 0 7360 15 0 0 1 1 13 3
+0
3
+0
3
3 0 108.90
+0.00
108.90
15 3501 15
+ 0
15
3501 0 0 100.00
+0
4 / 4
+0
15 / 15
4615.00
+0.00 / +0.00
3841.40
83.24% 62 61 1 5 4 1
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
civil work is done and E&M work is onging
CWR
All civil work finished and E&M work will be finished on 15 december
D.System
29-Jun-2023
Comissioning
0
  • 31-Oct-2023 Intake
  • 31-Oct-2023 WTP
  • 30-Sep-2023 OHT
  • 30-Sep-2023 CWR
  • 29-Jun-2023 D.System
  • 30-Nov-2023 Comissioning
DARA ENGINEERING


8136125 Sukul Guwan GOV 16 10-Jan-2024 1 1 1 1 16 16 0 0 15 15 100%
+0
16
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Off Verified Verified 3 4 Verified Verified 3 4 Verification Remarks Minutes of Meeting 27 21 4 0 0 4 4 0 4 29 22 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1117 7819 33510 1958 175.29% 2462623 5702843 16 0 0 0 0 16 3
+0
3
+0
3
3 0 80.80
+0.00
80.80
16 3297 16
+ 0
16
3297 0 0 100.00
+0
4 / 4
+0
16 / 16
4614.00
+0.00 / +0.00
4075.86
88.34% Yes 33 33 0 7 7 0
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136173 Billa Mogan GOV 23 05-Aug-2025 1 1 1 1 23 20 0 0 54 54 100%
+0
22
96 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 8 / 0 8 Integrated Off Verified Verified 4 8 Verified Verified 4 8 Verification Remarks Minutes of Meeting 39 33 8 0 0 8 8 1 5 29 22 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 4 2551 17857 76530 4635 181.69% 31903 102899 23 0 1 0 2 20 4
+0
4
+0
4
4 0 148.83
+0.00
148.78
23 8735 23
+ 0
19
8735 0 0 100.00
+0
5 / 5
+0
23 / 23
8794.00
+0.00 / +0.00
8027.09
91.28% 155 149 6 12 12 0
  • 4 HGJ CERT
  • 23 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Jul-2023
Comissioning
0
  • 31-Jul-2023 Intake
  • 31-Aug-2023 WTP
  • 31-Jul-2023 OHT
  • 31-Jul-2023 CWR
  • 31-Jul-2023 D.System
  • 31-Aug-2023 Comissioning
8136187 Badanpur GOV 31 10-Jan-2024 1 1 1 1 31 29 0 0 33 33 100%
+0
31
100 100.00 Yes 0 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Off Verified Verified 4 8 Verified Verified 4 8 Verification Remarks Minutes of Meeting 53 47 8 0 0 8 8 1 4 29 19 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 1 1989 13923 59670 3655 183.76% 13086 81375 31 0 0 0 3 28 4
+0
4
+0
4
4 0 157.92
+0.00
157.92
31 6972 31
+ 0
31
6972 0 0 100.00
+0
5 / 5
+0
31 / 31
8836.00
+0.00 / +0.00
8610.34
97.45% Yes 52 49 3 9 9 0
  • 29 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136199 Sojana Gurgha GOV 32 10-Feb-2024 1 1 1 1 32 32 0 0 58 58 100%
+0
32
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 12
+12
12
12 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 12 Integrated Off Verified Verified 3 12 Verified Verified 3 12 Verification Remarks Minutes of Meeting 108 90 12 0 12 12 0 0 0 23 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 2 0 0 0 0 0% 0 6066 32 0 0 0 3 29 3
+0
3
+0
3
3 0 169.97
+0.00
169.90
32 9621 32
+ 0
32
9621 0 0 100.00
+0
4 / 4
+0
32 / 32
9528.00
+0.00 / +0.00
9028.53
94.76% 204 191 13 18 18 0
  • 31 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136210 Mandawara GOV 17 10-Jan-2024 1 1 1 1 17 16 0 0 55 55 100%
+0
17
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Off Verified Verified 2 4 Verified Verified 2 4 Verification Remarks Minutes of Meeting 22 18 4 0 0 4 4 0 2 26 22 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 1875 13125 56250 2890 154.13% 21282 87661 17 0 0 0 0 17 2
+0
2
+0
2
2 0 125.40
+0.00
125.30
17 7306 17
+ 0
16
7306 0 0 100.00
+0
3 / 3
+0
17 / 17
6007.00
+0.00 / +0.00
5052.79
84.12% 77 76 1 6 6 0
  • 1 HGJ CERT
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
Agency Total 119 5 5 5 5 119 113 0 0 215 215 100% 118 500.00 4 / 1 500.00 3 / 1
+0
0 / 0
0 / 0 36
+36
36
36 0 0 0 0
  +0
36 | 36
36 0 / 0 8 / 0 36 -- -- -- 5 5 16 36 5 5 16 36 -- 249 209 36 0 12 36 24 2 15 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 12 7 7532 52724 225960 13138 174.43% 2528894 5980844 119 0 1 0 8 110 16
+0
16
+0
16
16 0 682.92
+0.00
682.70
119 35931 119
+ 0
114
35931 0 0 100
+0
21 / 21
+0
119 / 119
37779.00
+0.00
34794.61
92% 521 498 23 52 52 0
JMC-JWIL (JV)


8010056 Saidpur Kumheri GOV 47 01-Nov-2023 1 1 1 1 47 46 0 0 109 109 100%
+0
47
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 7
+7
7
7 0 0 0 0
  +0
7 | 7
7 0 / 0 7 / 0 7 Integrated Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 42 0 7 0 0 7 7 0 2 24 21 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 1 4365 30555 130950 4509 103.30% 544052 1308517 47 0 1 0 8 38 5
+0
5
+0
5
5 0 385.45
+0.00
385.45
47 13818 47
+ 0
47
13818 0 0 100.00
+0
6 / 6
+0
46 / 45
14171.00
+0.00 / +0.00
13523.42
95.43% 244 241 3 17 17 0
  • 47 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010063 Gona Narhat GOV 54 01-Nov-2023 1 1 1 1 54 53 0 0 115 115 100%
+0
54
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 10
+10
10
10 0 0 0 0
  +0
10 | 10
10 0 / 0 10 / 0 10 Integrated Off Verified Verified 5 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 276 0 10 0 10 9 0 0 0 16 16 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 1 0 0 0 0 0% 4161 81736 54 3 3 0 14 34 6
+0
6
+0
6
6 0 378.00
+0.00
378.00
54 12897 54
+ 0
54
12897 0 0 100.00
+0
7 / 7
+0
54 / 50
13299.00
+0.00 / +0.00
11725.18
88.17% 346 341 5 23 21 2
  • 50 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010076 Masora Sindwaha GOV 45 01-Mar-2024 1 1 1 1 45 44 0 0 98 98 100%
+0
45
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 15
+8
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 15 Integrated Off Verified Verified 7 15 Verified Verified 7 15 Verification Remarks Minutes of Meeting 100 0 15 0 0 15 15 8 4 27 19 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 2 4790 33530 143700 4758 99.33% 89043 224493 45 1 0 0 1 43 7
+0
7
+0
7
7 0 512.43
+0.00
512.41
45 14057 45
+ 0
45
14057 0 0 100.00
+0
8 / 8
+0
45 / 44
16681.00
+0.00 / +0.00
15925.10
95.47% 213 204 9 20 19 1
  • 40 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 07-May-2024 OHT
  • 18-Jul-2023 CWR
  • 30-Aug-2023 D.System
  • 29-Jan-2025 Comissioning
Agency Total 146 3 3 3 3 146 143 0 0 322 322 100% 146 300.00 3 / 0 300.00 3 / 0
+0
0 / 0
0 / 0 32
+25
32
32 0 0 0 0
  +0
32 | 32
32 0 / 0 32 / 0 32 -- -- -- 3 3 15 31 3 3 14 31 -- 418 0 32 0 10 31 22 8 6 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 14 4 9155 64085 274650 9267 101.22% 637256 1614746 146 4 4 0 23 115 18
+0
18
+0
18
18 0 1275.88
+0.00
1275.86
146 40772 146
+ 0
146
40772 0 0 100
+0
21 / 21
+0
145 / 139
44151.00
+0.00
41173.70
93% 803 786 17 60 57 3
Banko Ganga


8282120 Tori GOV 19 15-Jan-2024 1 1 1 1 19 19 0 0 35 35 100%
+0
19
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 7 / 0 8 Integrated Off Verified Verified 2 8 Verified Verified 2 8 Verification Remarks Minutes of Meeting 58 0 8 0 0 8 8 0 0 29 22 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1277 8939 38310 1323 103.60% 9270 41069 19 0 0 0 0 19 2
+0
2
+0
2
2 0 133.36
+0.00
133.36
19 3984 19
+ 0
19
3984 0 0 100.00
+0
3 / 3
+0
19 / 19
4036.00
+0.00 / +0.00
3434.39
85.09% Yes 40 40 0 6 6 0
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 20-May-2023 Intake
  • 25-May-2023 WTP
  • 05-Dec-2022 OHT
  • 15-Mar-2023 CWR
Total Lalitpur 550 16 16 16 16 16 550 540 0 0 1143 1143 100%
+0
549
99.82 100.00 16 20 / 2 100.00 16 33 / 3
+0
0 / 0
0 / 0 148
+0
148
148 0 0 0 0
  +0
148 | 148
148 0 / 0 95 / 1 141 -- -- -- 15 15 55 139 15 15 53 139 -- 1398 278 148 0 36 133 112 14 51 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 39 12 37312 261184 1119360 70046 187.73% 3493724 8985051 547 4 4 3 46 490 71
+0
71
+0
71
71 0 4206.32
+0.00
4420.29
550 156973 549
+ 0
531
156973 0 0 100
+0
86 / 86
+0
549 / 541
183187.00
+0.00 / +0.00
172842.42
94.35% 0 2 0 2469 2413 56 214 210 4
7 Mahoba Larsen & Toubro Ltd


8009844 Shivhar GOV 60 01-Dec-2023 1 1 1 1 60 60 0 0 254 254 100%
+0
60
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 18
+0
18
0 0 0 0 0
  +0
18 | 18
18 0 / 0 18 / 0 18 Integrated Off Verified Verified 6 18 Verified Verified 6 18 Verification Remarks Minutes of Meeting 87 56 18 0 3 18 15 7 4 26 18 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 14 12 5579 39053 167370 5923 106.17% 51666 166513 59 0 0 0 5 54 6
+0
6
+0
6
6 0 672.57
+0.00
672.20
60 20449 60
+ 0
60
20449 0 0 100.00
+0
7 / 7
+0
60 / 60
27118.00
+0.00 / +0.00
27118.00
100.00% Yes Yes Yes 529 510 19 11 3 8
  • 60 HOV
Intake
Completed
WTP
Completed
T/W
0
OHT
0
CWR
Completed
Comissioning
0
  • 31-Aug-2023 OHT
  • 31-Aug-2023 Comissioning
  • 74 Villages
  • 26604 Households
  • 0 Last Week FHTC Given
  • 26428 FHTC Given
  • 99 FHTC(%)
  • 176 Balance FHTC
  • 73 HGJ
  • 63 HGJ Certified
  • 85.14 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 45 Handed Over Villages(before Portal)
  • 4 Handed Over Initiated/Approved On Portal
  • 66.22 Handed Over %
  • 59 OHT Required
  • 59 OHT Completed
  • Scheme Wise Category A
  • 2 No. of Schemes
  • 4 No. of Villages
  • Scheme Wise Category B
  • 34 No. of Schemes
  • 59 No. of Villages
  • Scheme Wise Category C
  • 10 No. of Schemes
  • 10 No. of Villages
  • Village Wise Category A
  • 1 No. of Villages
  • Village Wise Category B
  • 62 No. of Villages
  • Village Wise Category C
  • 10 No. of Villages
  • Village Wise Total
  • 73 Total No. of Villages
  • 46 Total No. of Schemes
  • 73 Total No. of Villages
  • 58 Total No. of OHT
  • 31 Schemes Sent to O&M
  • 33 No. of OHT in O&M Schemes
  • 6471 Water Demand(M3)
  • 6556.83 Water Supply (M3)
  • 46 Agreement Done Scheme
  • 73 Agreement Done Village
JMC-JWIL (JV)


8009837 Lahchura Kashipura GOV 75 15-Mar-2024 1 1 1 1 75 74 0 0 243 243 100%
+0
75
100 100.00 Yes 10 / 1 100.00 Yes 11 / 1
+0
0 / 0
0 / 0 32
+0
32
0 0 0 0 0
  +0
32 | 32
32 0 / 0 23 / 0 27 Integrated Verified Verified 9 31 Verified Verified 9 30 Verification Remarks Minutes of Meeting 225 0 32 0 6 30 26 13 6 22 18 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 0 4847 33929 145410 5136 105.96% 2528662 5362720 75 1 1 1 6 66 10
+0
10
+0
10
10 0 601.08
+0.00
599.17
75 21622 75
+ 0
75
21622 0 0 100.00
+0
11 / 11
+0
75 / 74
23602.00
+0.00 / +0.00
22934.14
97.17% Yes Yes Yes 622 612 10 22 6 16
  • 1 D.System
  • 75 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Apr-2024
Comissioning
0
  • 15-Apr-2024 OHT
  • 15-Apr-2024 D.System
8009841 Salaiya Khalsa Nathupura GOV 77 15-Mar-2024 1 1 1 1 77 77 0 0 282 282 100%
+0
77
100 100.00 Yes 1 / 1 100.00 Yes 16 / 1
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 16 / 3 40 Integrated Off Verified Verified 22 40 Verified Verified 22 40 Verification Remarks Minutes of Meeting 300 35 40 0 0 40 40 16 12 25 21 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 1 6961 48727 208830 15674 225.17% 120425 413522 77 1 0 6 8 62 22
+0
22
+0
22
22 0 785.00
+0.00
784.25
77 28072 77
+ 0
76
28072 0 0 100.00
+0
23 / 23
+0
77 / 76
26009.00
+0.00 / +0.00
26008.94
100.00% Yes Yes Yes 496 493 3 20 13 7
  • 1 HGJ CERT
  • 77 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
29-Feb-2024
Comissioning
0
  • 29-Feb-2024 OHT
  • 29-Feb-2024 CWR
  • 29-Feb-2024 D.System
Agency Total 152 2 2 2 2 152 151 0 0 525 525 100% 152 200.00 11 / 2 200.00 27 / 2
+0
0 / 0
0 / 0 72
+0
72
0 0 0 0 0
  +0
72 | 72
72 0 / 0 39 / 3 67 -- -- -- 2 2 31 71 2 2 31 70 -- 525 35 72 0 6 70 66 29 18 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 1 11808 82656 354240 20810 176.24% 2649087 5776242 152 2 1 7 14 128 32
+0
32
+0
32
32 0 1386.08
+0.00
1383.42
152 49694 152
+ 0
151
49694 0 0 100
+0
34 / 34
+0
152 / 150
49611.00
+0.00
48943.08
99% 1118 1105 13 42 19 23
N.K. Gupta & K.B. Gupta Contractors


8175353 kabrai GOV 36 01-Jul-2024 1 1 1 1 36 35 0 0 181 181 100%
+0
36
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 11 / 0 8 Integrated Verified Verified 0 12 Verified Verified 0 2 Verification Remarks Minutes of Meeting 113 0 13 0 3 2 10 9 0 19 14 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 10 7 2760 19320 82800 871 31.56% 4328 15779 36 0 0 6 12 18 9
+0
9
+0
9
9 0 349.51
+0.00
349.35
36 11799 36
+ 0
35
11799 0 0 100.00
+0
9 / 9
+0
36 / 36
15787.00
+0.00 / +0.00
13546.69
85.81% Yes Yes Yes 208 196 12 0 0 0
  • 1 HGJ CERT
  • 36 HOV
Intake
28/02/2023
WTP
30/6/2023
T/W
0
OHT
30/04/2024
CWR
16/04/2024
D.System
14-Jul-2023
Comissioning
10/06/2024
  • 28-Feb-2023 Intake
  • 30-Jun-2023 WTP
  • 30-May-2023 OHT
  • 15-Jun-2023 CWR
  • 14-Jul-2023 D.System
  • 16-Jul-2023 Comissioning
SLC-SMC (JV)


8152383 Dhawarra GOV 95 13-Sep-2024 1 0 0 0 0 0 0 0 418 418 100%
+0
95
100 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 29
+0
29
0 0 0 0 0
  +0
29 | 29
29 0 / 0 29 / 0 19 Integrated Off Verified Verified 1 24 Verified Verified 1 11 Verification Remarks Minutes of Meeting 198 0 29 0 4 11 25 22 1 24 17 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 4 + 0 = 4 14 14 7814 54698 234420 0 0% 112519 382821 90 0 4 7 41 38 9
+0
9
+0
9
9 0 804.48
+0.00
801.00
95 30104 95
+ 0
82
30104 0 0 100.00
+0
9 / 9
+0
95 / 92
33301.00
+0.00 / +0.00
28849.34
86.63% Yes 657 624 33 4 0 4
  • 3 D.System
  • 13 HGJ CERT
  • 95 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
23-Jul-2024
Comissioning
0
  • 27-Mar-2024 CWR
  • 23-Jul-2024 D.System
  • 25-Jul-2024 Comissioning
Total Mahoba 343 5 5 4 4 4 248 246 0 0 1375 1375 100%
+0
343
100 100.00 5 15 / 3 100.00 5 30 / 3
+0
0 / 0
0 / 0 132
+0
132
0 0 0 0 0
  +0
132 | 132
132 0 / 0 97 / 3 112 -- -- -- 5 5 38 125 5 5 38 125 -- 923 91 132 0 16 101 116 67 23 -- -- 0 + 0 + 0 + 4 + 0 = 4 0 + 0 + 0 + 5 + 0 = 5 45 34 27961 195727 838830 27604 98.72% 2817600 6341355 337 2 5 20 72 238 56
+0
56
+0
56
56 0 3212.64
+0.00
3205.97
343 112046 343
+ 0
328
112046 0 0 100
+0
59 / 59
+0
343 / 338
125817.00
+0.00 / +0.00
118457.11
94.15% 4 3 2 2512 2435 77 57 22 35
8 Mirzapur GVPR


8152576 Leduki GOV 124 01-Jan-2024 1 1 1 1 124 124 0 0 120 120 100%
+0
124
100 100.00 Yes 2 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 0 Integrated Off Verified Verified 1 2 Not Verified Not Verified 1 0 Verification Remarks Minutes of Meeting 126 0 12 0 5 0 7 2 3 15 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6 5 5239 36673 157170 15732 300.29% 92054 221495 123 0 3 2 19 99 5
+0
5
+0
5
5 0 764.43
+0.00
879.84
124 22530 124
+ 0
124
22530 0 0 100.00
+0
6 / 6
+0
124 / 124
26901.00
+0.00 / +0.00
25970.57
96.54% 237 230 7 17 1 16
  • 100 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Oct-2023
Comissioning
0
  • 31-Jul-2023 WTP
  • 15-Oct-2023 OHT
  • 31-Oct-2023 CWR
  • 31-Oct-2023 D.System
  • 31-Dec-2023 Comissioning
  • 128 Villages
  • 33860 Households
  • 0 Last Week FHTC Given
  • 33726 FHTC Given
  • 99 FHTC(%)
  • 134 Balance FHTC
  • 124 HGJ
  • 122 HGJ Certified
  • 95.31 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 49 Handed Over Villages(before Portal)
  • 43 Handed Over Initiated/Approved On Portal
  • 71.88 Handed Over %
  • 81 OHT Required
  • 78 OHT Completed
  • Scheme Wise Category A
  • 1 No. of Schemes
  • 2 No. of Villages
  • Scheme Wise Category B
  • 58 No. of Schemes
  • 113 No. of Villages
  • Scheme Wise Category C
  • 13 No. of Schemes
  • 18 No. of Villages
  • Village Wise Category A
  • 2 No. of Villages
  • Village Wise Category B
  • 86 No. of Villages
  • Village Wise Category C
  • 45 No. of Villages
  • Village Wise Total
  • 133 Total No. of Villages
  • 72 Total No. of Schemes
  • 133 Total No. of Villages
  • 74 Total No. of OHT
  • 55 Schemes Sent to O&M
  • 57 No. of OHT in O&M Schemes
  • 11888 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 58 Agreement Done Scheme
  • 114 Agreement Done Village
Megha


8152518 Talar GOV 86 01-Aug-2024 1 1 1 1 86 85 0 0 54 54 100%
+0
86
100 100.00 Yes 2 / 1 100.00 Yes 4 / 1
+0
0 / 0
0 / 0 15
+15
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 25 / 1 15 Integrated Off Verified Verified 5 7 Verified Verified 5 7 Verification Remarks Minutes of Meeting 180 51 15 0 15 7 0 0 0 27 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 1 0 0 0 0 0% 0 95401 86 0 1 6 5 74 6
+0
6
+0
6
6 0 972.11
+0.00
972.11
86 20367 86
+ 0
86
20367 0 0 100.00
+0
8 / 8
+0
86 / 85
20345.00
+0.00 / +0.00
19327.19
95.00% Yes 246 244 2 20 9 11
  • 78 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
20-May-2023
Comissioning
0
  • 27-Jul-2022 Intake
  • 10-Oct-2022 WTP
  • 22-Apr-2023 OHT
  • 17-May-2023 CWR
  • 20-May-2023 D.System
  • 20-Dec-2023 Comissioning
8153309 Gothaura GOV 141 01-Aug-2024 1 1 1 1 141 138 0 0 149 149 100%
+0
141
100 0.00 No 3 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 5 / 0 12 Integrated Off Verified Verified 5 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 99 26 12 0 1 9 11 2 2 29 8 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6 3 8624 60368 258720 8988 104.22% 49088 112469 138 3 2 4 9 120 7
+0
7
+0
7
7 0 723.50
+0.00
723.50
141 29745 141
+ 0
141
29745 0 0 100.00
+0
8 / 8
+0
141 / 139
20152.00
+0.00 / +0.00
17788.70
88.27% Yes 357 342 15 38 1 37
  • 118 HOV
Intake
0
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
29-Apr-2023
Comissioning
0
  • 24-Jul-2023 WTP
  • 11-Jul-2023 T/W
  • 08-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 29-Apr-2023 D.System
  • 29-Feb-2024 Comissioning
8153338 Dhauha GOV 213 01-Aug-2024 1 1 1 1 213 211 0 0 276 276 100%
+0
213
100 100.00 Yes 5 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 10 / 0 25 Integrated Off Verified Verified 6 10 Verified Verified 6 10 Verification Remarks Minutes of Meeting 229 77 25 0 1 10 24 5 13 27 11 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 3 + 0 = 3 9 3 14241 99687 427230 560017 3932.43% 2261599 3494715 207 1 3 2 2 199 11
+0
11
+0
11
11 0 1327.06
+0.00
1327.06
213 42736 212
+ 0
207
42734 0 0 100.00
+0
13 / 13
+0
213 / 213
40622.00
+0.00 / +0.00
40194.44
98.95% Yes 505 479 26 54 6 48
  • 2 FHTC
  • 1 HGJ
  • 6 HGJ CERT
  • 173 HOV
Intake
Functional
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
24-Sep-2023
Comissioning
0
  • 22-Jul-2022 Intake
  • 13-Oct-2022 WTP
  • 11-Jul-2023 T/W
  • 20-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 24-Sep-2023 D.System
  • 29-Feb-2024 Comissioning
Agency Total 440 3 3 3 3 440 434 0 0 479 479 100% 440 200.00 10 / 3 300.00 6 / 3
+0
0 / 0
0 / 0 52
+15
52
0 0 0 0 0
  +0
52 | 52
52 0 / 0 40 / 1 52 -- -- -- 3 3 16 26 3 3 15 26 -- 508 154 52 0 17 26 35 7 15 -- -- 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 3 + 0 = 3 17 7 22865 160055 685950 569005 2488.54% 2310687 3702585 431 4 6 12 16 393 24
+0
24
+0
24
24 0 3022.67
+0.00
3022.67
440 92848 439
+ 0
434
92846 0 0 100
+0
29 / 29
+0
440 / 437
81119.00
+0.00
77310.33
95% 1108 1065 43 112 16 96
NCC Ltd.


8010572 Ahugi Kalan GOV 159 01-Jan-2024 1 1 1 1 159 159 0 0 33 33 100%
+0
159
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 30
+5
30
0 0 0 0 0
  +0
30 | 30
25 0 / 0 25 / 0 25 Integrated Off Verified Verified 9 29 Verified Verified 9 29 Verification Remarks Minutes of Meeting 52 40 30 0 1 29 29 2 5 28 21 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 8 1 11180 78260 335400 12457 111.42% 87234 386814 159 0 0 4 17 138 9
+0
9
+0
9
9 0 1582.00
+0.00
1582.00
159 31881 159
+ 0
158
31881 0 0 100.00
+0
9 / 9
+0
159 / 159
32828.00
+0.00 / +0.00
29948.30
91.23% Yes Yes 380 366 14 26 26 0
  • 1 HGJ CERT
  • 130 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
31-Jul-2023
Comissioning
Commissioning under progress
  • 09-Aug-2022 Intake
  • 17-Aug-2022 WTP
  • 31-Jul-2023 OHT
  • 02-Mar-2023 CWR
  • 31-Jul-2023 D.System
  • 15-Jul-2024 Comissioning
8011637 Mahadev GOV 254 01-Jan-2024 1 1 1 1 254 254 0 0 14 14 100%
+0
254
100 100.00 Yes 2 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 25 / 0 25 Integrated Verified Verified 6 24 Verified Verified 6 23 Verification Remarks Minutes of Meeting 53 17 25 0 0 23 25 0 14 29 22 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 2 11579 81053 347370 958271 8275.94% 9634470 20598534 254 0 0 3 20 231 7
+0
7
+0
7
7 0 1464.00
+0.00
1464.00
254 35318 254
+ 0
251
35318 0 0 100.00
+0
7 / 7
+0
254 / 254
33415.00
+0.00 / +0.00
31276.44
93.60% Yes Yes 451 445 6 43 43 0
  • 3 HGJ CERT
  • 189 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
30-Jun-2023
Comissioning
Trial run is U/P.
  • 31-Aug-2022 Intake
  • 31-Aug-2022 WTP
  • 30-Jun-2023 OHT
  • 30-Dec-2022 CWR
  • 30-Jun-2023 D.System
  • 15-May-2024 Comissioning
Agency Total 413 2 2 2 2 413 413 0 0 47 47 100% 413 200.00 4 / 0 200.00 8 / 0
+0
0 / 0
0 / 0 55
+5
55
0 0 0 0 0
  +0
55 | 55
50 0 / 0 50 / 0 50 -- -- -- 2 2 15 53 2 2 15 52 -- 105 57 55 0 1 52 54 2 19 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 13 3 22759 159313 682770 970728 4265.25% 9721704 20985348 413 0 0 7 37 369 16
+0
16
+0
16
16 0 3046.00
+0.00
3046.00
413 67199 413
+ 0
409
67199 0 0 100
+0
16 / 16
+0
413 / 413
66243.00
+0.00
61224.74
92% 831 811 20 69 69 0
GA INFRA


8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 305 01-Feb-2024 1 1 1 1 305 296 0 0 234 234 100%
+0
298
98 100.00 Yes 4 / 0 100.00 Yes 6 / 0
+0
98 / 98
97 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 100 / 0 99 Integrated Off Verified Verified 1 89 Verified Verified 1 89 Verification Remarks Minutes of Meeting 165 92 102 0 3 89 99 15 14 24 20 0 + 0 + 0 + 14 + 0 = 14 0 + 0 + 0 + 24 + 0 = 24 6 1 24510 171570 735300 27480 112.12% 1109662 1649295 305 5 6 15 27 252 2
+0
2
+0
2
2 0 1851.89
+0.00
1810.28
305 75783 304
+ 0
296
75782 0 0 100.00
+0
101 / 101
+0
302 / 296
6563.00
+0.00 / +0.00
6563.00
100.00% 1329 1321 8 107 105 2
  • 41 D.System
  • 3 COV
  • 1 FHTC
  • 1 HGJ
  • 9 HGJ CERT
  • 279 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
01-Feb-2024
Comissioning
0
  • 25-Aug-2023 OHT
  • 01-Feb-2024 D.System
  • 20-Aug-2023 Comissioning
Multiurban


8282154 Manikpur GOV 63 01-Mar-2024 1 1 1 1 63 60 0 0 23 23 100%
+0
62
98 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 4 / 2 0 Integrated Verified Verified 1 3 Verified Not Verified 1 2 Verification Remarks Minutes of Meeting 40 0 5 0 1 2 4 1 1 21 18 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 0 2368 16576 71040 2666 112.58% 20652 331938 63 0 1 4 12 46 1
+0
1
+0
1
1 0 248.50
+0.00
248.50
63 9280 62
+ 0
60
9134 0 0 98.43
+0
2 / 2
+0
61 / 57
6498.00
+0.00 / +0.00
6413.97
98.71% 92 90 2 11 3 8
  • 2 COV
  • 146 FHTC
  • 1 HGJ
  • 3 HGJ CERT
  • 63 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 30-Jul-2023 OHT
  • 31-Dec-2023 Comissioning
Ramky baba


8152635 Danti GOV and Tubewell Scheme 42 Nos. 263 15-Feb-2024 1 1 1 1 263 262 0 0 168 168 100%
+0
258
98 100.00 Yes 2 / 2 100.00 Yes 2 / 2
+0
42 / 42
84 / 83 48
+48
48
0 0 0 0 0
  +0
48 | 48
48 0 / 0 97 / 96 95 Integrated Off Verified Verified 0 35 Verified Verified 0 34 Verification Remarks Minutes of Meeting 108 0 48 0 0 34 48 39 3 18 21 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 10 3 16245 113715 487350 11284 69.46% 81345 397197 262 1 1 0 34 226 2
+0
2
+0
2
2 0 1344.50
+0.00
1344.50
263 43416 259
+ 0
250
43280 0 0 99.69
+0
46 / 46
+0
259 / 241
12983.00
+0.00 / +0.00
12393.12
95.46% 632 622 10 61 59 2
  • 2 COV
  • 136 FHTC
  • 4 HGJ
  • 13 HGJ CERT
  • 242 HOV
Intake
100% Complete
WTP
100% Complete
T/W
All complete
OHT
Completed
CWR
completed
D.System
15-Aug-2023
Comissioning
Commissioning under progress
  • 26-Apr-2023 Intake
  • 02-Mar-2023 WTP
  • 20-Jun-2023 T/W
  • 10-Aug-2023 OHT
  • 18-Jun-2022 CWR
  • 15-Aug-2023 D.System
  • 30-Sep-2023 Comissioning
Total Mirzapur 1608 9 9 9 9 9 1608 1589 0 0 1069 1069 100%
+0
1595
99.19 94.44 8 23 / 6 100.00 9 23 / 6
+0
140 / 140
181 / 83 274
+0
274
0 0 0 0 0
  +0
274 | 274
269 0 / 0 291 / 99 296 -- -- -- 9 9 34 208 8 7 33 208 -- 1052 303 274 0 27 203 247 66 55 -- -- 0 + 0 + 0 + 17 + 0 = 17 0 + 0 + 0 + 28 + 0 = 28 54 19 93988 657916 2819640 1596895 1699.04% 13336104 27287859 1597 10 17 40 145 1385 50
+0
50
+0
50
50 0 10277.99
+0.00
10351.79
1608 311056 1601
+ 0
1573
310771 0 0 99.91
+0
200 / 200
+0
1599 / 1568
200307.00
+0.00 / +0.00
189875.73
94.79% 2 0 0 4229 4139 90 375 253 122
9 Sonbhadra GVPR


8175161 Jhilo/ Bijpur GOV 179 05-Jan-2026 1 1 1 1 179 97 0 0 20 20 100%
+0
170
95 100.00 Yes 9 / 1 100.00 Yes 23 / 1
+0
0 / 0
0 / 0 27
+3
27
0 0 0 0 0
  +0
27 | 27
27 0 / 0 30 / 0 22 Integrated Off Not Verified Verified 12 22 Not Verified Verified 12 22 Verification Remarks Minutes of Meeting 219 0 27 3 10 22 14 3 5 12 11 0 + 0 + 0 + 7 + 0 = 7 0 + 0 + 0 + 20 + 0 = 20 6 3 8142 56994 244260 32665 401.19% 210369 452612 151 5 1 2 4 139 16
+0
16
+0
16
16 0 3904.00
+0.00
3904.00
179 66179 178
+ 0
138
66172 0 0 99.99
+0
14 / 14
+0
171 / 73
74794.00
+0.00 / +0.00
65085.22
87.02% 514 501 13 68 68 0
  • 7 FHTC
  • 1 HGJ
  • 41 HGJ CERT
  • 175 HOV
Intake
0
WTP
0
T/W
0
OHT
All OHT complete
CWR
2 nos CWR new locations as per revised DPR.
D.System
31-Aug-2025
Comissioning
0
  • 28-Feb-2023 Intake
  • 20-Mar-2023 WTP
  • 25-Oct-2025 OHT
  • 31-Aug-2025 CWR
  • 31-Aug-2025 D.System
  • 30-Jul-2026 Comissioning
  • 82 Villages
  • 18169 Households
  • 0 Last Week FHTC Given
  • 17571 FHTC Given
  • 96 FHTC(%)
  • 598 Balance FHTC
  • 79 HGJ
  • 52 HGJ Certified
  • 63.41 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 11 Handed Over Villages(before Portal)
  • 34 Handed Over Initiated/Approved On Portal
  • 54.88 Handed Over %
  • 0 OHT Required
  • 0 OHT Completed
  • Scheme Wise Category A
  • 0 No. of Schemes
  • 0 No. of Villages
  • Scheme Wise Category B
  • 10 No. of Schemes
  • 55 No. of Villages
  • Scheme Wise Category C
  • 15 No. of Schemes
  • 27 No. of Villages
  • Village Wise Category A
  • 0 No. of Villages
  • Village Wise Category B
  • 38 No. of Villages
  • Village Wise Category C
  • 44 No. of Villages
  • Village Wise Total
  • 82 Total No. of Villages
  • 25 Total No. of Schemes
  • 82 Total No. of Villages
  • 30 Total No. of OHT
  • 1 Schemes Sent to O&M
  • 1 No. of OHT in O&M Schemes
  • 87 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 25 Agreement Done Scheme
  • 82 Agreement Done Village
Larsen & Toubro Ltd


8010143 Parasi GOV 29 27-Aug-2024 1 1 1 1 29 29 0 0 83 83 100%
+0
29
100 100.00 Yes 2 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 5 Integrated Off Verified Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 181 59 15 0 0 0 15 7 3 30 22 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 1 6425 44975 192750 6048 94.13% 45683 182034 29 1 0 0 0 28 9
+0
9
+0
9
9 0 744.00
+0.00
744.00
29 19081 29
+ 0
25
19081 0 0 100.00
+0
9 / 9
+0
29 / 29
13244.00
+0.00 / +0.00
13244.00
100.00% 115 114 1 11 9 2
  • 4 HGJ CERT
  • 28 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Aug-2023
Comissioning
0
  • 30-Apr-2023 Intake
  • 30-Jul-2023 WTP
  • 30-Nov-2023 OHT
  • 31-Aug-2023 D.System
  • 15-Dec-2023 Comissioning
8175086 Amawar GOV 52 0 0 0 0 0 0 0 0 63 63 100%
+0
52
100 100.00 No 1 / 1 100.00 No 1 / 1
+0
0 / 0
0 / 0 9
+0
7
2 0 0 0 0
  +0
7 | 7
3 0 / 0 7 / 0 7 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 9 9 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 3 0 0 0 0 0% 0 0 8 0 1 4 0 3 3
+0
3
+0
3
3 0 616.21
+0.00
602.40
52 15616 22
+ 0
1
11176 0 0 71.57
+0
4 / 4
+0
16 / 7
23765.00
+0.00 / +0.00
15430.89
64.93% 44 41 3 22 4 18
  • 2 OHT
  • 13 D.System
  • 36 COV
  • 4440 FHTC
  • 30 HGJ
  • 51 HGJ CERT
  • 52 HOV
Intake
Completed
WTP
Completed.
T/W
NA
OHT
All OHT works completed.
CWR
Completed.
D.System
31-Jan-2024
Comissioning
Phase wise commissioning works will start after the availability of Water in the Kanhar Dam.
  • 31-Dec-2022 Intake
  • 15-Dec-2023 WTP
  • 31-Oct-2023 OHT
  • 28-Feb-2023 CWR
  • 31-Jan-2024 D.System
  • 16-Jun-2026 Comissioning
8177926 Gurmura GOV 8 0 0 0 0 0 0 0 0 10 10 100%
+0
8
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+2
7
2 2 0 0 0
  +0
5 | 5
5 0 / 0 5 / 0 5 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 10 10 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0 0 0% 0 0 1 0 0 1 0 0 4
+0
3
+0
3
3 0 610.00
+0.00
610.00
8 8051 3
+ 0
0
7223 0 0 89.72
+0
4 / 4
+0
2 / 1
12483.00
+0.00 / +0.00
9174.10
73.49% 23 23 0 1 0 1
  • 5 OHT
  • 1 CWR
  • 6 COV
  • 828 FHTC
  • 5 HGJ
  • 8 HGJ CERT
  • 8 HOV
Intake
Completed. It is also in functional stage. Commissioning has been started.
WTP
Work Is In Progress. It is also in functional stage.
T/W
NA
OHT
5 Nos OHTs Completed. Commissioning works also completed.
CWR
3 Nos Completed. 3 Nos Commissioning works also Completed.
D.System
31-Dec-2023
Comissioning
2 Village is commissioned.
  • 30-Jun-2023 Intake
  • 31-Jan-2024 WTP
  • 30-Jun-2023 OHT
  • 30-Jul-2023 CWR
  • 31-Dec-2023 D.System
  • 16-Aug-2023 Comissioning
8182027 Panari GOV 6 0 0 0 0 0 0 0 0 1 1 100%
+0
6
100 100.00 Yes 3 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 11
+1
6
1 3 0 0 0
  +0
3 | 3
3 0 / 0 3 / 0 3 Integrated Off Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 60 20 11 8 3 0 0 0 25 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0 0 0% 0 20504 2 0 1 1 0 0 3
+0
2
+0
2
2 0 306.24
+0.00
306.24
6 8465 1
+ 0
0
7538 0 0 89.05
+0
3 / 3
+0
2 / 2
11871.00
+0.00 / +0.00
7419.11
62.50% 15 15 0 1 1 0
  • 8 OHT
  • 1 CWR
  • 4 COV
  • 927 FHTC
  • 5 HGJ
  • 6 HGJ CERT
  • 6 HOV
Intake
Completed. Intake Well is in functional stage.
WTP
Finishing works in progress. Pre Commissioning Completed. Water Supply is in progress.
T/W
0
OHT
Commissioning works completed.
CWR
Commissioning Completed.
D.System
16-Aug-2023
Comissioning
Panari & Bairpur Villages are Commissioned.
  • 31-Jul-2023 Intake
  • 30-Sep-2023 WTP
  • 30-Sep-2023 OHT
  • 16-Aug-2023 D.System
  • 31-Jul-2023 Comissioning
Agency Total 95 1 1 1 1 29 29 0 0 157 157 100% 95 400.00 6 / 1 400.00 17 / 1
+0
0 / 0
0 / 0 45
+3
35
5 5 0 0 0
  +0
30 | 30
26 0 / 0 30 / 0 20 -- -- -- 1 1 0 0 0 0 0 0 -- 241 79 45 27 3 0 15 7 3 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 4 6425 44975 192750 6048 94.13% 45683 202538 40 1 2 6 0 31 19
+0
17
+0
17
17 0 2276.45
+0.00
2262.64
95 51213 55
+ 0
26
45018 0 0 88
+0
20 / 20
+0
49 / 39
61363.00
+0.00
45268.10
74% 197 193 4 35 14 21
NCC Ltd.


8338933 Patwadh GOV 650 0 0 0 0 0 0 0 0 194 192 99%
+0
597
92 100.00 Yes 5 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 55
+4
55
0 0 0 0 0
  +0
55 | 55
55 0 / 0 45 / 0 0 Integrated Off Verified Verified 1 5 Verified Verified 1 4 Verification Remarks Minutes of Meeting 332 0 55 0 37 4 18 2 12 9 7 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 3 + 0 = 3 42 24 4714 32998 141420 13194 279.89% 89946 1406108 607 124 43 45 54 341 15
+0
15
+0
15
15 0 3885.16
+0.00
3751.32
650 101050 648
+ 0
153
101046 0 0 100.00
+0
16 / 16
+0
637 / 371
99181.00
+0.00 / +0.00
83938.49
84.63% 1061 1007 54 181 102 79
  • 133 D.System
  • 13 COV
  • 4 FHTC
  • 2 HGJ
  • 497 HGJ CERT
  • 646 HOV
Intake
With all finishing work 30/04/2025
WTP
With all finishing work 30/04/2025
T/W
0
OHT
With all finishing work 15/09/2025 (WL)
CWR
With all finishing work 20/06/2025 (WL)
D.System
31-Oct-2026
Comissioning
31/10/2026
  • 30-Apr-2025 Intake
  • 30-Apr-2025 WTP
  • 30-Apr-2024 T/W
  • 15-Sep-2025 OHT
  • 20-Jun-2025 CWR
  • 31-Oct-2026 D.System
  • 31-Oct-2026 Comissioning
Jain Const.


8175315 Kewatha GOV 12 01-Apr-2024 1 1 1 1 12 12 0 0 8 8 100%
+0
12
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 228 0 12 0 12 0 0 0 0 20 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0 0 0% 0 205 12 0 0 1 0 11 7
+0
7
+0
7
7 0 645.00
+0.00
645.00
12 9045 12
+ 0
11
9045 0 0 100.00
+0
8 / 8
+0
12 / 12
11940.00
+0.00 / +0.00
10929.93
91.54% Yes 38 38 0 4 4 0
  • 1 HGJ CERT
  • 11 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Mar-2023 Comissioning
VPRPL


8175013 Nagawan GOV 46 15-Jul-2024 1 1 1 0 0 0 0 0 21 21 100%
+0
46
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 8
+0
8
0 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Off Verified Verified 2 2 Not Verified Verified 1 2 Verification Remarks Minutes of Meeting 81 0 8 0 4 2 4 2 1 9 9 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 1 0 956 6692 28680 733 76.67% 832316 869730 45 0 1 3 0 41 4
+0
4
+0
4
4 0 1808.21
+0.00
1808.21
46 7268 46
+ 0
36
7268 0 0 100.00
+0
5 / 5
+0
44 / 37
9472.00
+0.00 / +0.00
9191.10
97.03% 35 34 1 11 11 0
  • 10 HGJ CERT
  • 44 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 19-Feb-2023 Intake
  • 19-Feb-2023 WTP
  • 31-Aug-2023 Comissioning
8175050 Tenduahi GOV 80 15-Jul-2024 1 1 1 1 80 42 0 0 64 64 100%
+0
80
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 5 Integrated Off Verified Verified 1 9 Not Verified Not Verified 1 8 Verification Remarks Minutes of Meeting 71 0 9 0 3 8 6 0 1 19 18 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 1 2865 20055 85950 4069 142.02% 27219 96461 79 0 1 1 0 77 4
+0
4
+0
4
4 0 573.87
+0.00
571.68
80 12757 79
+ 0
73
12743 0 0 99.89
+0
5 / 5
+0
80 / 78
12858.00
+0.00 / +0.00
11482.31
89.30% 117 114 3 18 18 0
  • 2 D.System
  • 14 FHTC
  • 1 HGJ
  • 7 HGJ CERT
  • 71 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175110 Belahai GOV 186 20-Mar-2026 1 0 0 0 0 0 0 0 33 33 100%
+0
186
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+2
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 7 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 103 0 9 2 0 0 7 1 3 23 16 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 4 5597 39179 167910 14250 254.60% 64894 252143 178 0 1 14 4 159 5
+0
5
+0
5
5 0 1421.64
+0.00
1418.76
186 19691 184
+ 0
153
19595 0 0 99.51
+0
6 / 6
+0
185 / 174
23145.00
+0.00 / +0.00
20488.45
88.52% 383 375 8 41 41 0
  • 2 D.System
  • 96 FHTC
  • 2 HGJ
  • 33 HGJ CERT
  • 130 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175262 Harra GOV 45 20-Jun-2024 1 0 0 0 0 0 0 0 51 51 100%
+0
42
93 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+0
10
0 0 0 0 0
  +0
10 | 10
10 0 / 0 0 / 0 10 Integrated Off Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 118 0 10 0 6 0 4 4 0 4 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 2 3042 21294 91260 622 20.45% 4130 133261 33 2 10 7 0 14 6
+0
6
+0
6
6 0 918.46
+0.00
918.46
45 17677 44
+ 0
43
17669 0 0 99.95
+0
7 / 7
+0
44 / 0
18231.00
+0.00 / +0.00
16072.90
88.16% 72 67 5 10 8 2
  • 8 FHTC
  • 1 HGJ
  • 2 HGJ CERT
  • 33 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Jul-2023 Comissioning
8175280 Kadara GOV 4 1 0 0 0 0 0 0 0 0 0 0%
+0
0
0 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 3
+0
3
0 0 0 0 0
  +0
3 | 3
3 0 / 0 1 / 0 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 3 3 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 1 0 0 0 0 0% 0 0 3 2 0 1 0 0 1
+0
1
+0
1
1 0 102.16
+0.00
102.16
4 1168 1
+ 0
0
596 0 0 51.03
+0
2 / 2
+0
3 / 0
2971.00
+0.00 / +0.00
2812.91
94.68% 6 5 1 0 0 0
  • 1 COV
  • 572 FHTC
  • 3 HGJ
  • 4 HGJ CERT
  • 4 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 361 5 2 2 1 80 42 0 0 169 169 100% 354 500.00 1 / 0 500.00 1 / 0
+0
0 / 0
0 / 0 39
+2
39
0 0 0 0 0
  +0
39 | 39
39 0 / 0 1 / 0 30 -- -- -- 3 2 3 11 0 1 2 10 -- 373 0 39 5 13 10 21 7 5 -- -- 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 14 8 12460 87220 373800 19674 157.90% 928559 1351595 338 4 13 26 4 291 20
+0
20
+0
20
20 0 4824.34
+0.00
4819.27
361 58561 354
+ 0
305
57871 0 0 99
+0
25 / 25
+0
356 / 289
66677.00
+0.00
60047.67
90% 613 595 18 80 78 2
Total Sonbhadra 1297 7 8 5 5 4 300 180 0 0 546 543 99%
+0
1228
94.68 100.00 11 21 / 2 100.00 11 51 / 2
+0
0 / 0
0 / 0 178
+0
168
5 5 0 0 0
  +0
163 | 163
159 0 / 0 106 / 0 72 -- -- -- 5 5 16 38 1 3 15 38 -- 1393 79 178 35 75 36 68 19 25 -- -- 0 + 0 + 0 + 10 + 0 = 10 0 + 0 + 0 + 24 + 0 = 24 66 39 31743 222201 952290 71581 225.50% 1274556 3413058 1148 134 59 80 62 813 77
+0
75
+0
75
75 0 15534.95
+0.00
15382.23
1297 286048 1247
+ 0
633
279152 0 0 97.59
+0
83 / 83
+0
1225 / 784
313955.00
+0.00 / +0.00
265269.41
84.49% 0 1 0 2423 2334 89 363 261 102
Project Completion Plan

Minutes of Meeting Date -