Total Scheme : 63
O&M Scheme : 40
Under Trial Run Scheme : 9
In-Progress Scheme : 14

Physical Progress(Phase 1) All Scheme

S.No   District         Name of Firm/Agency Scheme Id Scheme Name Villages Alloted
Start Date of Trail Run
Operational and Maintenance Details
ROAD DISMENTLING/RESTORATION(KM) Intake WTP T/W OHT
Automation Integration Status
Connectivity Status
Pump Status
EE E&M Verification Status
  Last 7 days         Automation Alert
Automation Integration OHT Status Functional OHT Water Demand OHT Water Supply Regular Water Supply Villages(Village Wise) CWR Distribution System INCL RWRM/CWRM(km) HGJ Status FHTC Electricity Comissioning of Village IMIS Scheme Completed
As Build Drawing Submitted
Final As Executed BOQ Submitted
Incoming Complaints Received Feedback from Gram Pradhan On Call Balance Work Scheme Completion Plan(Agency) U.P.Jal Nigam UP Jal Nigam Old Scheme Status
Initiated By Agency (scheme)
Finalized By Agency (scheme)
Approved By TPI (scheme)
Approved By EE (scheme)
Covered village
Regular water supply (Filled by pump operator)
Monthly O&M Charges(in Rs)
Yearly O&M Charges(in Rs)
Dismental(Filled by EE) Restored(Filled by EE) Restored %(Filled by EE) Villages where 100% road restoration completed(Filled by TPI) Restored(%) In progress(%) Functional Images/Videos In progress(%) Functional Images/Videos Required /completed (LAST WEEK ) Images/Videos Required Started (Filled by Agency) Started(Filled by EE) Progress 0 to 25% Progress 26% to 50% Progress 51% to 75% Progress 76% to 99%
OHT completed
EE | Agency
OHT Fuctional(By ADM)
OHT with less manpower
EE | TPI
OHT and Signage Board Images/Videos OHT Logo Intake(Previous Status) WTP(Previous Status) No Of CWR(Previous Status) No Of OHT(Previous Status) Intake(Current Status) WTP(Current Status) No Of CWR(Current Status) No Of OHT(Current Status) O&M Verification Remark Total Alerts Action Taken Alerts Total OHT Not Integrated OHT Disconnected OHT (No water supply received in the last two days) Accurate data(EE E&M) Functional OHT Water supply less than 75% percent (Average water supply over 2 days) Water supply greater than 150% percent (Average water supply over 2 days) Last Month AVG Water Supply Days = [(Total Integrated OHT × Month Days) − (Disconnected OHT × Disconnected Days)] ÷ Total Integrated OHT Current Month AVG Water Supply Days = [(Total Integrated OHT × Month Days) − (Disconnected OHT × Disconnected Days)] ÷ Total Integrated OHT Regular water supply disruption(OHT) 1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Regular water supply disruption(Village)
1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Villages with pending complaints. Villages with complaints pending for more than 15 days. Daily Weekly Monthly Yesterday Yesterday(%) Weekly Monthly Regular water supply Villages Below 50% 50% to 75% 76% to 90% Above 90% 100% Household with RWS Required Started Completed Completed
Required Laid Villages Alloted Household HGJ (100% Completed) HGJ Certified Villages FHTC Given as on Today FHTC Given as on Yesterday FHTC Given (last Week) FHTC % Connection Required/Completed Comissioned/Regular water supply(Verified by EE) Estimated Cost(Lacs)
Last Week / Last Month
Expenditure(Lacs)
Expenditure(%) All Complaints Close Complaints Pending Complaints All Complaints Close Complaints Pending Complaints
  • 0 T/W
  • 53 OHT
  • 2 CWR
  • 400.15 D.System
  • 316 Comissioning
  • 2 Electricity
  • 23456 FHTC
  • 1160 HGJ
  • 2166 HGJ CERT
  • 6166 HOV
  • Scheme Wise Category A
  • 729 No. of Schemes
  • 1210 No. of Villages
  • Scheme Wise Category B
  • 3553 No. of Schemes
  • 6578 No. of Villages
  • Scheme Wise Category C
  • 1397 No. of Schemes
  • 2101 No. of Villages
  • Scheme Wise Total
  • 5679 Total No. of Schemes
  • 9889 Total No. of Villages
  • Village Wise Category A
  • 1077 No. of Villages
  • Village Wise Category B
  • 5505 No. of Villages
  • Village Wise Category C
  • 3244 No. of Villages
  • Village Wise Total
  • 9826 Total No. of Villages
  • 4666 Agreement Done Scheme
  • 8364 Agreement Done Village
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106
Total Schemes : 63 6556 49 50 41 41 40 3275 3239 0 0 9760 9416 96%
+0
5661
86 98.99 61 166 / 16 100.00 62 359 / 17
+0
550 / 550
213 / 83 1697
+0
1684
837 5 1 6 28
  +0
1599 | 1644
1562 3 / 0 1307 / 104 1136 -- -- -- 48 46 209 775 46 44 207 732 -- 5148 1008 1697 513 152 732 1032 332 189 -- -- 1 + 8 + 1 + 65 + 23 = 98 1 + 15 + 1 + 118 + 31 = 166 1203 1018 370953 2596671 11128590 359303 96.86% 2680966 11443305 4740 749 364 789 810 455
+0
412
+0
453
453 58095.78
+0.00
57695.63
6556 1687693 5395
+ 0
4389
1664241 0 0 98.61
+0
900 / 898
+-1
6189 / 4929
1624724.00
+0.00 / +-609.64
1386769.67
85.35% 4 6 6 15345 13052 2293 1135 273 862
1 Banda Larsen & Toubro Ltd


8044758 Khatan GOV 342 01-May-2025 1 0 0 0 0 0 0 0 691 676 98%
+0
329
96 100.00 Yes 19 / 3 100.00 Yes 94 / 2
+0
0 / 0
0 / 0 116
+0
116
116 0 0 0 0
  +0
116 | 116
116 0 / 0 116 / 1 116 Integrated Off Verified Verified 10 104 Verified Verified 10 101 Verification Remarks Minutes of Meeting 554 255 116 0 5 101 111 98 0 27 11 0 + 4 + 0 + 3 + 10 = 17 0 + 9 + 0 + 10 + 15 = 34 121 107 40650 284550 1219500 25594 62.96% 215268 996077 332 4 66 80 80 102 39
+0
39
+0
39
39 4215.00
+0.00
4215.00
342 127889 342
+ 0
301
127889 0 0 100.00
+0
41 / 41
+0
342 / 338
156314.00
+0.00 / +0.00
136622.31
87.40% 1166 957 209 62 11 51
  • 41 HGJ CERT
  • 333 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2023
Comissioning
0
  • 31-Jul-2024 OHT
  • 31-Mar-2024 CWR
  • 30-Sep-2023 D.System
  • 30-Jun-2024 Comissioning
  • 90 Villages
  • 54725 Households
  • 0 Last Week FHTC Given
  • 54725 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 90 HGJ
  • 89 HGJ Certified
  • 98.89 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 46 Handed Over Villages(before Portal)
  • 37 Handed Over Initiated/Approved On Portal
  • 92.22 Handed Over %
  • 89 OHT Required
  • 89 OHT Completed
  • Scheme Wise Category A
  • 35 No. of Schemes
  • 59 No. of Villages
  • Scheme Wise Category B
  • 21 No. of Schemes
  • 46 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 59 No. of Villages
  • Village Wise Category B
  • 46 No. of Villages
  • Village Wise Category C
  • 1 No. of Villages
  • Village Wise Total
  • 106 Total No. of Villages
  • 57 Total No. of Schemes
  • 106 Total No. of Villages
  • 102 Total No. of OHT
  • 51 Schemes Sent to O&M
  • 93 No. of OHT in O&M Schemes
  • 28153 Water Demand(M3)
  • 43822.42 Water Supply (M3)
  • 51 Agreement Done Scheme
  • 97 Agreement Done Village
NCC Ltd.


8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 202 15-May-2024 1 1 1 1 202 202 0 0 580 579 100%
+0
200
99 100.00 Yes 18 / 0 100.00 Yes 75 / 0
+0
31 / 31
32 / 0 80
+0
80
80 0 0 0 0
  +0
80 | 80
80 0 / 0 103 / 0 103 Integrated Off Verified Verified 12 70 Verified Verified 12 65 Verification Remarks Minutes of Meeting 117 117 80 0 0 65 80 16 17 30 12 0 + 0 + 0 + 9 + 0 = 9 0 + 0 + 0 + 10 + 0 = 10 68 54 27904 195328 837120 29330 105.11% 213598 976218 202 0 0 63 19 120 13
+0
13
+0
13
13 2581.60
+0.00
2581.60
202 82266 202
+ 0
201
82266 0 0 100.00
+0
34 / 34
+0
202 / 202
93222.00
+0.00 / +0.00
87435.51
93.79% 1871 1701 170 36 33 3
  • 1 HGJ CERT
  • 200 HOV
Intake
Approach Road Completed
WTP
Campus Development Completed
T/W
Completed
OHT
Completed
CWR
1 No. CWR Shall be Completed in 25-Sept-2024 ( New additional Scope).
D.System
15-Feb-2024
Comissioning
0
  • 15-Dec-2023 Intake
  • 30-Nov-2023 WTP
  • 15-Sep-2023 T/W
  • 25-Nov-2023 OHT
  • 15-Apr-2024 CWR
  • 15-Feb-2024 D.System
  • 15-Sep-2024 Comissioning
Total Banda 544 2 2 1 1 1 202 202 0 0 1271 1255 99%
+0
529
97.24 100.00 2 37 / 3 100.00 2 169 / 2
+0
31 / 31
32 / 0 196
+0
196
196 0 0 0 0
  +0
196 | 196
196 0 / 0 219 / 1 219 -- -- -- 2 2 22 174 2 2 22 174 -- 671 372 196 0 5 166 191 114 17 -- -- 0 + 4 + 0 + 12 + 10 = 26 0 + 9 + 0 + 20 + 15 = 44 189 161 68554 479878 2056620 54924 80.12% 428866 1972295 534 4 66 143 99 222 52
+0
52
+0
52
52 6796.60
+0.00
6796.60
544 210155 544
+ 0
502
210155 0 0 100
+0
75 / 75
+0
544 / 540
249536.00
+0.00 / +0.00
224057.82
89.79% 0 0 0 3037 2658 379 98 44 54
2 Chitrakoot GVPR


8135453 Raipura GOV 69 0 0 0 0 0 0 0 0 92 75 82%
+0
57
83 100.00 Yes 2 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 28
+3
28
28 0 1 0 1
  +0
26 | 26
25 3 / 0 4 / 0 3 Integrated Off Verified Verified 0 23 Verified Verified 0 20 Verification Remarks Minutes of Meeting 262 0 28 5 5 20 18 6 1 20 8 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 10 10 4110 28770 123300 4011 97.59% 26676 120834 60 10 3 4 17 26 11
+0
11
+0
11
11 882.90
+0.00
840.50
69 19570 69
+ 0
44
19570 0 0 100.00
+0
13 / 13
+0
65 / 60
30332.00
+0.00 / +0.00
22158.51
73.05% 135 122 13 20 2 18
  • 2 OHT
  • 42 D.System
  • 4 COV
  • 25 HGJ CERT
  • 68 HOV
Intake
0
WTP
operational
T/W
0
OHT
june-24
CWR
June-24
D.System
30-Dec-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 31-Oct-2023 WTP
  • 10-Apr-2024 OHT
  • 10-Mar-2024 CWR
  • 30-Dec-2024 D.System
  • 15-Feb-2025 Comissioning
  • 140 Villages
  • 44632 Households
  • 0 Last Week FHTC Given
  • 44623 FHTC Given
  • 99 FHTC(%)
  • 9 Balance FHTC
  • 140 HGJ
  • 121 HGJ Certified
  • 86.43 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 37 Handed Over Villages(before Portal)
  • 90 Handed Over Initiated/Approved On Portal
  • 90.71 Handed Over %
  • 71 OHT Required
  • 71 OHT Completed
  • Scheme Wise Category A
  • 42 No. of Schemes
  • 55 No. of Villages
  • Scheme Wise Category B
  • 4 No. of Schemes
  • 42 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 59 No. of Villages
  • Village Wise Category B
  • 30 No. of Villages
  • Village Wise Category C
  • 8 No. of Villages
  • Village Wise Total
  • 97 Total No. of Villages
  • 46 Total No. of Schemes
  • 97 Total No. of Villages
  • 74 Total No. of OHT
  • 42 Schemes Sent to O&M
  • 70 No. of OHT in O&M Schemes
  • 13076 Water Demand(M3)
  • 6008.66 Water Supply (M3)
  • 46 Agreement Done Scheme
  • 97 Agreement Done Village
Larsen & Toubro Ltd


8134589 Silauta Mustkil GOV 59 0 0 0 0 0 0 0 0 59 57 97%
+0
54
92 100.00 Yes 4 / 0 100.00 Yes 12 / 1
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 22 / 0 11 Integrated Off Verified Verified 5 17 Verified Verified 3 17 Verification Remarks Minutes of Meeting 119 0 17 0 0 17 17 5 6 27 11 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 1 = 1 9 5 4278 29946 128340 4023 94.04% 29728 138550 59 0 1 4 13 41 6
+0
6
+0
6
6 576.00
+0.00
567.05
59 11925 59
+ 0
57
11925 0 0 100.00
+0
7 / 7
+0
59 / 59
21359.00
+0.00 / +-609.64
19737.98
92.41% 116 103 13 10 0 10
  • 8 D.System
  • 2 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Oct-2023
Comissioning
0
  • 30-Nov-2023 Intake
  • 15-Dec-2023 WTP
  • 15-Oct-2024 OHT
  • 31-Aug-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Aug-2023 Comissioning
8134609 Chandi Bangar GOV 297 0 0 0 0 0 0 0 0 304 221 73%
+0
187
63 100.00 Yes 9 / 0 100.00 Yes 9 / 0
+0
0 / 0
0 / 0 91
+0
91
91 0 0 0 1
  +0
90 | 90
82 0 / 0 29 / 0 4 Integrated Off Verified Not Verified 5 12 Verified Not Verified 5 12 Verification Remarks Minutes of Meeting 291 0 91 7 41 12 43 12 0 14 6 0 + 2 + 0 + 1 + 5 = 8 0 + 4 + 0 + 1 + 8 = 13 78 77 14452 101164 433560 10781 74.60% 81136 343049 164 55 35 41 21 12 20
+0
20
+0
20
20 3052.00
+0.00
2846.86
297 86157 284
+ 0
74
86114 0 0 99.95
+0
21 / 21
+0
240 / 164
95975.00
+0.00 / +0.00
73359.78
76.44% 489 354 135 57 1 56
  • 1 OHT
  • 205 D.System
  • 44 COV
  • 43 FHTC
  • 13 HGJ
  • 223 HGJ CERT
  • 295 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Nov-2025
Comissioning
0
  • 15-Dec-2023 Intake
  • 15-Dec-2023 WTP
  • 31-Dec-2025 OHT
  • 30-Jun-2024 CWR
  • 30-Nov-2025 D.System
  • 30-Jun-2026 Comissioning
Agency Total 356 0 0 0 0 0 0 0 0 363 278 77% 241 200.00 13 / 0 200.00 21 / 1
+0
0 / 0
0 / 0 108
+0
108
108 0 0 0 1
  +0
107 | 107
99 0 / 0 51 / 0 15 -- -- -- 2 1 10 29 2 1 8 29 -- 410 0 108 7 41 29 60 17 6 -- -- 0 + 2 + 0 + 1 + 6 = 9 0 + 4 + 0 + 1 + 9 = 14 87 82 18730 131110 561900 14804 79.04% 110864 481599 223 55 36 45 34 53 26
+0
26
+0
26
26 3628.00
+0.00
3413.91
356 98082 343
+ 0
131
98039 0 0 100
+0
28 / 28
+0
299 / 223
117334.00
+0.00
93097.76
79% 605 457 148 67 1 66
Total Chitrakoot 414 0 0 0 0 0 0 0 0 0 455 353 78%
+0
298
71.98 100.00 3 15 / 0 100.00 3 22 / 1
+0
0 / 0
0 / 0 136
+0
136
136 0 1 0 2
  +0
133 | 133
124 3 / 0 55 / 0 18 -- -- -- 3 2 10 52 3 2 8 52 -- 672 0 136 12 46 49 78 23 7 -- -- 0 + 2 + 0 + 1 + 6 = 9 0 + 4 + 0 + 1 + 9 = 14 97 92 22841 159887 685230 18815 82.37% 137540 602433 283 65 39 49 51 79 37
+0
37
+0
37
37 4510.90
+0.00
4254.41
414 117652 412
+ 0
175
117609 0 0 99.96
+0
41 / 41
+0
364 / 283
147666.00
+0.00 / +-609.64
115256.27
78.05% 0 0 0 740 579 161 87 3 84
3 Hamirpur PNC-SPML-JV


8135500 Haraulipur GOV and Tubewell Scheme 125 Nos. 193 20-Mar-2024 1 1 1 1 193 191 0 0 448 447 100%
+0
191
99 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
123 / 123
0 / 0 130
+0
130
0 0 0 0 0
  +0
130 | 130
130 0 / 0 118 / 0 113 Integrated Not Verified Not Verified 0 3 Not Verified Not Verified 0 3 Verification Remarks Minutes of Meeting 85 0 130 123 0 3 7 4 2 12 3 0 + 2 + 0 + 0 + 0 = 2 0 + 2 + 0 + 0 + 0 = 2 61 54 1227 8589 36810 1120 91.28% 5431 25767 193 0 0 19 41 133 6
+0
6
+0
6
6 1327.83
+0.00
1327.83
193 59675 193
+ 0
191
59675 0 0 100.00
+0
73 / 73
+0
193 / 193
27101.00
+0.00 / +0.00
25719.52
94.90% Yes 847 603 244 62 7 55
  • 2 HGJ CERT
  • 191 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Dec-2023
Comissioning
0
  • 28-Feb-2024 T/W
  • 20-Mar-2024 OHT
  • 30-Oct-2023 CWR
  • 30-Dec-2023 D.System
  • 20-Mar-2024 Comissioning
  • 143 Villages
  • 79974 Households
  • 0 Last Week FHTC Given
  • 79974 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 143 HGJ
  • 130 HGJ Certified
  • 90.91 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 28 Handed Over Villages(before Portal)
  • 57 Handed Over Initiated/Approved On Portal
  • 59.44 Handed Over %
  • 60 OHT Required
  • 60 OHT Completed
  • Scheme Wise Category A
  • 76 No. of Schemes
  • 114 No. of Villages
  • Scheme Wise Category B
  • 27 No. of Schemes
  • 31 No. of Villages
  • Scheme Wise Category C
  • 2 No. of Schemes
  • 2 No. of Villages
  • Village Wise Category A
  • 106 No. of Villages
  • Village Wise Category B
  • 39 No. of Villages
  • Village Wise Category C
  • 2 No. of Villages
  • Village Wise Total
  • 147 Total No. of Villages
  • 105 Total No. of Schemes
  • 147 Total No. of Villages
  • 108 Total No. of OHT
  • 76 Schemes Sent to O&M
  • 79 No. of OHT in O&M Schemes
  • 20351 Water Demand(M3)
  • 20798.83 Water Supply (M3)
  • 105 Agreement Done Scheme
  • 147 Agreement Done Village
JWIL


8135488 Pathyora Danda GOV 134 20-Mar-2024 1 1 1 1 129 128 0 0 412 411 100%
+0
129
96 100.00 Yes 7 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 46
+0
46
0 0 0 0 0
  +0
46 | 46
46 0 / 0 45 / 0 42 Integrated Verified Verified 6 42 Verified Verified 6 42 Verification Remarks Minutes of Meeting 175 0 46 0 3 42 43 17 7 23 10 0 + 0 + 0 + 3 + 2 = 5 0 + 0 + 0 + 5 + 2 = 7 42 37 12226 85582 366780 10998 89.96% 86650 295280 129 2 8 35 33 51 10
+0
10
+0
10
10 1214.00
+0.00
1213.70
134 45475 129
+ 0
127
45475 0 0 100.00
+0
10 / 10
+0
131 / 129
39878.00
+0.00 / +0.00
36621.43
91.83% 744 667 77 37 1 36
  • 5 HGJ
  • 7 HGJ CERT
  • 132 HOV
Intake
Completed and functional
WTP
Completed and functional
T/W
0
OHT
To be completed by March2024
CWR
Completed
Comissioning
0
  • 15-Mar-2024 OHT
Total Hamirpur 322 2 2 2 2 2 322 319 0 0 859 857 100%
+0
320
99.38 100.00 2 11 / 0 100.00 2 5 / 0
+0
123 / 123
0 / 0 176
+0
176
0 0 0 0 0
  +0
176 | 176
176 0 / 0 163 / 0 155 -- -- -- 1 1 6 45 1 1 6 45 -- 260 0 176 123 3 45 50 21 9 -- -- 0 + 2 + 0 + 3 + 2 = 7 0 + 2 + 0 + 5 + 2 = 9 103 91 13453 94171 403590 12118 90.08% 92081 321047 322 2 8 54 74 184 16
+0
16
+0
16
16 2541.83
+0.00
2541.53
322 105150 322
+ 0
318
105150 0 0 100
+0
83 / 83
+0
324 / 322
66979.00
+0.00 / +0.00
62340.95
93.08% 0 1 0 1591 1270 321 99 8 91
4 Jalaun BGCCPL-Ramky (JV)


8135522 Kota Mustakil GOV and Tubewell Scheme 270 Nos. 515 01-Sep-2024 1 0 0 0 0 0 0 0 923 863 93%
+0
214
42 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
256 / 256
0 / 0 272
+0
272
269 0 0 5 25
  +0
223 | 242
181 0 / 0 110 / 0 2 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 272 272 0 0 0 0 0 0 0 + 0 + 0 + 8 + 1 = 9 0 + 0 + 0 + 8 + 1 = 9 144 134 0 0 0 0 0% 0 0 3 1 0 0 1 1 5
+0
5
+0
5
5 2511.00
+0.00
2507.80
515 109509 201
+ 0
88
107150 0 0 97.85
+0
129 / 127
+0
505 / 128
52161.00
+0.00 / +0.00
49382.21
94.67% 602 342 260 64 2 62
  • 30 OHT
  • 3 D.System
  • 10 COV
  • 2 Electricity
  • 2359 FHTC
  • 314 HGJ
  • 427 HGJ CERT
  • 514 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2026
Comissioning
0
  • 31-Mar-2026 Intake
  • 31-Mar-2026 WTP
  • 31-Mar-2026 T/W
  • 31-Mar-2026 OHT
  • 31-Mar-2026 CWR
  • 31-Mar-2026 D.System
  • 31-Mar-2026 Comissioning
  • 61 Villages
  • 26484 Households
  • 0 Last Week FHTC Given
  • 26484 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 61 HGJ
  • 54 HGJ Certified
  • 88.52 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 3 Handed Over Villages(before Portal)
  • 19 Handed Over Initiated/Approved On Portal
  • 36.07 Handed Over %
  • 60 OHT Required
  • 60 OHT Completed
  • Scheme Wise Category A
  • 31 No. of Schemes
  • 34 No. of Villages
  • Scheme Wise Category B
  • 25 No. of Schemes
  • 29 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 34 No. of Villages
  • Village Wise Category B
  • 29 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 63 Total No. of Villages
  • 56 Total No. of Schemes
  • 63 Total No. of Villages
  • 59 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 59 No. of OHT in O&M Schemes
  • 11083 Water Demand(M3)
  • 11079.34 Water Supply (M3)
  • 56 Agreement Done Scheme
  • 63 Agreement Done Village
8135526 Raipur GOV 86 1 0 0 0 0 0 0 0 148 122 82%
+0
39
45 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
15 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 17 17 0 0 0 0 0 0 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 3 + 0 = 3 20 19 0 0 0 0 0% 0 0 18 4 2 4 4 4 7
+0
7
+0
7
7 495.00
+0.00
494.30
86 18444 10
+ 0
2
17550 0 0 95.15
+0
8 / 8
+0
79 / 5
20745.00
+0.00 / +0.00
5948.65
28.68% 73 39 34 13 0 13
  • 4 COV
  • 894 FHTC
  • 76 HGJ
  • 84 HGJ CERT
  • 85 HOV
Intake
0
WTP
It is Functioning
T/W
0
OHT
Completed
CWR
0
D.System
31-Mar-2026
Comissioning
0
  • 31-Mar-2026 Intake
  • 31-Mar-2026 WTP
  • 31-Mar-2026 T/W
  • 31-Mar-2026 OHT
  • 31-Mar-2026 CWR
  • 31-Mar-2026 D.System
  • 31-Mar-2026 Comissioning
8135545 Madhepura GOV 74 1 0 0 0 0 0 0 0 142 121 85%
+0
34
46 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+1
12
12 0 0 0 1
  +0
10 | 11
9 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 0 0 + 0 + 0 + 4 + 1 = 5 0 + 0 + 0 + 5 + 1 = 6 21 21 0 0 0 0 0% 0 0 10 5 1 1 1 2 6
+0
6
+0
6
6 425.00
+0.00
424.25
74 15230 5
+ 0
4
14647 0 0 96.17
+0
7 / 7
+0
61 / 6
13157.00
+0.00 / +0.00
3770.43
28.66% 45 20 25 19 3 16
  • 1 OHT
  • 6 COV
  • 583 FHTC
  • 69 HGJ
  • 70 HGJ CERT
  • 70 HOV
Intake
0
WTP
Completed
T/W
0
OHT
Completed
CWR
0
D.System
31-Mar-2026
Comissioning
0
  • 31-Mar-2026 Intake
  • 31-Mar-2026 WTP
  • 31-Mar-2026 T/W
  • 31-Mar-2026 OHT
  • 31-Mar-2026 CWR
  • 31-Mar-2026 D.System
  • 31-Mar-2026 Comissioning
Agency Total 675 3 0 0 0 0 0 0 0 1213 1106 91% 287 300.00 1 / 0 300.00 0 / 0
+0
256 / 256
0 / 0 301
+1
301
298 0 0 5 26
  +0
250 | 270
205 0 / 0 110 / 0 2 -- -- -- -- 0 0 301 301 0 0 0 0 -- -- 0 + 0 + 0 + 15 + 2 = 17 0 + 0 + 0 + 16 + 2 = 18 185 174 0 0 0 0 0% 0 0 31 10 3 5 6 7 18
+0
18
+0
18
18 3431.00
+0.00
3426.35
675 143183 216
+ 0
94
139347 0 0 97
+0
144 / 142
+0
645 / 139
86063.00
+0.00
59101.29
69% 720 401 319 96 5 91
GVPR


8135513 Sala GOV 197 15-Jul-2025 1 1 1 0 0 0 0 0 496 492 99%
+0
162
82 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 56
+0
56
56 0 0 0 0
  +0
56 | 56
56 0 / 0 59 / 0 22 Integrated Off Verified Verified 9 45 Verified Verified 9 44 Verification Remarks Minutes of Meeting 218 0 56 4 9 44 43 25 13 21 9 0 + 0 + 0 + 3 + 1 = 4 0 + 0 + 0 + 3 + 1 = 4 64 62 12043 84301 361290 11098 92.15% 73496 282047 196 1 7 36 61 91 11
+0
11
+0
11
11 1715.00
+0.00
1715.00
197 43098 188
+ 0
140
43089 0 0 99.98
+0
12 / 12
+0
197 / 197
50599.00
+0.00 / +0.00
41240.12
81.50% 271 159 112 40 16 24
  • 9 FHTC
  • 9 HGJ
  • 57 HGJ CERT
  • 195 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Total Jalaun 857 2 4 1 1 0 0 0 0 0 1709 1598 94%
+0
449
52.39 100.00 4 3 / 0 100.00 4 4 / 0
+0
256 / 256
0 / 0 357
+0
357
354 0 0 5 26
  +0
306 | 326
261 0 / 0 169 / 0 24 -- -- -- 1 1 9 45 1 1 9 45 -- 218 0 357 305 9 44 43 25 13 -- -- 0 + 0 + 0 + 18 + 3 = 21 0 + 0 + 0 + 19 + 3 = 22 249 236 12043 84301 361290 11098 92.15% 73496 282047 227 11 10 41 67 98 29
+0
29
+0
29
29 5146.00
+0.00
5141.35
857 184499 404
+ 0
234
180658 0 0 97.92
+0
156 / 154
+0
842 / 336
136662.00
+0.00 / +0.00
100341.41
73.42% 0 0 0 981 550 431 134 20 114
5 Jhansi BGCCPL-Ramky (JV)


8009955 Imlota GOV 91 0 0 0 0 0 0 0 0 192 163 85%
+0
13
14 100.00 Yes 1 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 4 / 0 7 Integrated Off Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 40 0 13 12 1 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 48 46 0 0 0 0 0% 0 0 0 0 0 0 0 0 8
+0
8
+0
8
8 899.95
+0.00
899.00
91 32259 71
+ 0
5
32189 0 0 99.78
+0
9 / 9
+0
85 / 55
29730.00
+0.00 / +0.00
25851.08
86.95% 250 137 113 26 19 7
  • 2 COV
  • 70 FHTC
  • 20 HGJ
  • 86 HGJ CERT
  • 90 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Jul-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Apr-2024 OHT
  • 14-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
  • 124 Villages
  • 49613 Households
  • 0 Last Week FHTC Given
  • 48096 FHTC Given
  • 96 FHTC(%)
  • 1517 Balance FHTC
  • 105 HGJ
  • 95 HGJ Certified
  • 76.61 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 31 Handed Over Villages(before Portal)
  • 47 Handed Over Initiated/Approved On Portal
  • 62.90 Handed Over %
  • 14 OHT Required
  • 14 OHT Completed
  • Scheme Wise Category A
  • 34 No. of Schemes
  • 58 No. of Villages
  • Scheme Wise Category B
  • 35 No. of Schemes
  • 64 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 43 No. of Villages
  • Village Wise Category B
  • 63 No. of Villages
  • Village Wise Category C
  • 17 No. of Villages
  • Village Wise Total
  • 123 Total No. of Villages
  • 70 Total No. of Schemes
  • 123 Total No. of Villages
  • 77 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 58 No. of OHT in O&M Schemes
  • 10674 Water Demand(M3)
  • 14716.15 Water Supply (M3)
  • 70 Agreement Done Scheme
  • 123 Agreement Done Village
8135947 Teharka GOV 93 0 0 0 0 0 0 0 0 162 130 80%
+0
27
29 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 4 / 0 6 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 38 37 0 0 0 0 0% 0 0 44 0 4 19 14 7 9
+0
9
+0
9
9 786.55
+0.00
786.00
93 27437 29
+ 0
4
27273 0 0 99.40
+0
10 / 10
+0
80 / 45
29676.00
+0.00 / +0.00
18958.13
63.88% 168 79 89 16 15 1
  • 13 COV
  • 164 FHTC
  • 64 HGJ
  • 89 HGJ CERT
  • 93 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 31-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
8135956 Barthari GOV 106 0 0 0 0 0 0 0 0 177 161 91%
+0
30
28 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
14 0 / 0 4 / 0 10 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 15 15 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 32 31 0 0 0 0 0% 0 0 0 0 0 0 0 0 11
+0
11
+0
11
11 868.26
+0.00
863.85
106 27423 28
+ 0
1
27176 0 0 99.10
+0
12 / 12
+0
71 / 25
29490.00
+0.00 / +0.00
19962.03
67.69% 96 59 37 25 19 6
  • 4 D.System
  • 35 COV
  • 247 FHTC
  • 78 HGJ
  • 105 HGJ CERT
  • 106 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 30-Jun-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jun-2024 Comissioning
Agency Total 290 0 0 0 0 0 0 0 0 531 454 85% 70 300.00 3 / 0 300.00 8 / 0
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
39 0 / 0 12 / 0 23 -- -- -- -- 40 0 40 39 1 0 0 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 118 114 0 0 0 0 0% 0 0 44 0 4 19 14 7 28
+0
28
+0
28
28 2554.76
+0.00
2548.85
290 87119 128
+ 0
10
86638 0 0 99
+0
31 / 31
+0
236 / 125
88896.00
+0.00
64771.24
73% 514 275 239 67 53 14
Indian Hume Pipe


8010037 Kuraicha GOV 72 05-Feb-2024 1 1 1 1 74 72 0 0 289 288 100%
+0
69
96 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 14
+14
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 14 / 0 24 Integrated Off Verified Verified 10 14 Verified Verified 10 14 Verification Remarks Minutes of Meeting 101 41 14 0 0 14 14 0 1 29 12 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 3 + 0 = 3 2 2 8491 59437 254730 8410 99.05% 73572 308176 72 3 1 9 8 51 11
+0
0
+0
11
11 859.73
+0.00
859.37
72 29415 73
+ 0
70
29406 0 0 99.97
+0
19 / 19
+0
72 / 69
28180.00
+0.00 / +0.00
27954.08
99.20% Yes 276 274 2 18 16 2
  • 9 FHTC
  • 2 HGJ CERT
  • 72 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
NCC Ltd.


8009966 Tilaitha GOV 25 01-Sep-2023 1 1 1 1 25 25 0 0 65 65 100%
+0
25
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 10 / 0 5 Integrated Off Verified Verified 3 5 Verified Verified 3 5 Verification Remarks Minutes of Meeting 27 27 5 0 1 5 4 2 0 29 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 1464 10248 43920 0 0% 16471 76837 24 0 0 5 7 12 4
+0
4
+0
4
4 248.18
+0.00
248.18
25 6725 25
+ 0
24
6725 0 0 100.00
+0
7 / 7
+0
25 / 25
7517.00
+0.00 / +0.00
6605.35
87.87% Yes 104 102 2 4 4 0
  • 1 HGJ CERT
  • 25 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8009988 Bacholi Bauzurg GOV 37 01-Sep-2023 1 1 1 1 37 37 0 0 75 75 100%
+0
37
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 15 / 0 7 Integrated Off Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 33 33 7 0 0 7 7 6 0 30 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 9 7 3419 23933 102570 0 0% 18708 137479 36 1 1 8 8 18 4
+0
4
+0
4
4 297.97
+0.00
297.97
37 11549 37
+ 0
36
11549 0 0 100.00
+0
10 / 10
+0
37 / 37
12643.00
+0.00 / +0.00
11763.97
93.05% Yes 131 118 13 6 5 1
  • 1 HGJ CERT
  • 37 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 15-Oct-2023 Comissioning
8009992 Gulara GOV 42 01-Sep-2023 1 1 1 1 42 40 0 0 99 99 100%
+0
42
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 14 / 0 7 Integrated Off Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 6 6 7 0 0 7 7 7 0 30 11 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 3346 23422 100380 0 0% 21296 113688 42 0 0 4 8 30 4
+0
4
+0
4
4 309.37
+0.00
309.37
42 11437 42
+ 0
42
11437 0 0 100.00
+0
10 / 10
+0
42 / 42
11037.00
+0.00 / +0.00
10864.98
98.44% Yes 52 51 1 8 8 0
  • 42 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8010048 Burhpura GOV 59 01-Sep-2023 1 1 1 1 59 59 0 0 189 188 99%
+0
57
97 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 14
+0
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 32 / 0 14 Integrated Verified Verified 7 14 Verified Verified 7 14 Verification Remarks Minutes of Meeting 64 64 14 0 0 14 14 1 6 31 12 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 14 11 8009 56063 240270 11855 148.02% 77594 329734 59 3 3 22 19 12 8
+0
8
+0
8
8 869.06
+0.00
869.06
59 26650 59
+ 0
52
26650 0 0 100.00
+0
19 / 19
+0
59 / 59
27993.00
+0.00 / +0.00
26800.71
95.74% Yes 245 215 30 12 11 1
  • 7 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 163 4 4 4 4 163 161 0 0 428 427 100% 161 400.00 14 / 0 400.00 8 / 0
+0
0 / 0
0 / 0 33
+0
33
0 0 0 0 0
  +0
33 | 33
33 0 / 0 71 / 0 33 -- -- -- 4 4 16 33 4 4 16 33 -- 130 130 33 0 1 33 32 16 6 -- -- 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 26 20 16238 113666 487140 11855 73.01% 134069 657738 161 4 4 39 42 72 20
+0
20
+0
20
20 1724.58
+0.00
1724.58
163 56361 163
+ 0
154
56361 0 0 100
+0
46 / 46
+0
163 / 163
59190.00
+0.00
56035.01
95% 532 486 46 30 28 2
DARA ENGINEERING


8135931 Purwa GOV 32 01-Jan-2024 1 1 1 1 32 32 0 0 75 75 100%
+0
31
97 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 6
+6
6
0 0 0 0 0
  +0
6 | 6
6 0 / 0 6 / 0 10 Integrated Verified Verified 3 6 Verified Verified 3 6 Verification Remarks Minutes of Meeting 12 12 6 0 0 6 6 0 3 31 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 4025 28175 120750 5149 127.93% 36148 161217 32 0 0 4 4 24 3
+0
0
+0
3
3 292.54
+0.00
292.54
32 12762 32
+ 0
32
12762 0 0 100.00
+0
8 / 8
+0
32 / 32
9704.00
+0.00 / +0.00
8586.65
88.49% Yes 180 179 1 5 4 1
  • 32 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Unipro


8135681 Barwar GOV 57 05-Feb-2024 1 1 1 1 57 57 0 0 257 257 100%
+0
57
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 9 / 0 9 Integrated Verified Verified 4 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 81 81 9 0 0 9 9 1 7 30 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 4211 29477 126330 7177 170.43% 49017 195491 55 0 0 6 24 25 5
+0
5
+0
5
5 458.49
+0.00
458.49
57 15848 57
+ 0
57
15848 0 0 100.00
+0
13 / 13
+0
57 / 57
14645.00
+0.00 / +0.00
12732.70
86.94% Yes 160 159 1 6 6 0
  • 57 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 30-Aug-2023 D.System
  • 30-Aug-2023 Comissioning
Total Jhansi 612 7 7 7 7 7 326 322 0 0 1577 1498 95%
+0
388
63.40 100.00 10 21 / 0 100.00 10 22 / 0
+0
0 / 0
0 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
101 0 / 0 112 / 0 99 -- -- -- 7 7 33 62 7 7 33 62 -- 364 264 102 39 2 62 61 17 17 -- -- 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 4 + 0 = 4 148 136 32967 230769 989010 32591 98.86% 292807 1322621 364 7 9 77 92 179 67
+0
53
+0
67
67 5890.10
+0.00
5883.83
612 201505 453
+ 0
323
201015 0 0 99.76
+0
117 / 117
+0
560 / 446
200615.00
+0.00 / +0.00
170079.68
84.78% 0 0 3 1662 1373 289 126 107 19
6 Lalitpur M/s Sudhakara Infratech Pvt. Ltd


8010072 Lagaon GOV 50 15-Jan-2024 1 1 1 1 50 50 0 0 115 115 100%
+0
50
100 100.00 Yes 1 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 13
+13
13
13 0 0 0 0
  +0
13 | 13
13 0 / 0 13 / 0 13 Integrated Off Verified Verified 7 12 Verified Verified 7 12 Verification Remarks Minutes of Meeting 72 0 13 0 0 12 13 8 0 28 11 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 1 4106 28742 123180 1890 46.03% 30933 139997 50 0 0 1 9 40 9
+0
9
+0
9
9 381.75
+0.00
409.16
50 12964 50
+ 0
50
12964 0 0 100.00
+0
10 / 10
+0
50 / 50
17608.00
+0.00 / +0.00
17443.84
99.07% Yes 102 99 3 20 1 19
  • 49 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
9 CWR Completed
D.System
30-Sep-2023
Comissioning
30/12/2023
  • 14-Aug-2023 Intake
  • 31-Aug-2023 WTP
  • 14-Jun-2023 OHT
  • 17-May-2023 CWR
  • 30-Sep-2023 D.System
  • 30-Dec-2023 Comissioning
  • 105 Villages
  • 46145 Households
  • 0 Last Week FHTC Given
  • 46145 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 105 HGJ
  • 94 HGJ Certified
  • 89.52 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 7 Handed Over Villages(before Portal)
  • 45 Handed Over Initiated/Approved On Portal
  • 49.52 Handed Over %
  • 37 OHT Required
  • 37 OHT Completed
  • Scheme Wise Category A
  • 5 No. of Schemes
  • 9 No. of Villages
  • Scheme Wise Category B
  • 11 No. of Schemes
  • 93 No. of Villages
  • Scheme Wise Category C
  • 15 No. of Schemes
  • 16 No. of Villages
  • Village Wise Category A
  • 11 No. of Villages
  • Village Wise Category B
  • 49 No. of Villages
  • Village Wise Category C
  • 58 No. of Villages
  • Village Wise Total
  • 118 Total No. of Villages
  • 31 Total No. of Schemes
  • 118 Total No. of Villages
  • 51 Total No. of OHT
  • 13 Schemes Sent to O&M
  • 29 No. of OHT in O&M Schemes
  • 11185 Water Demand(M3)
  • 8366.00 Water Supply (M3)
  • 16 Agreement Done Scheme
  • 102 Agreement Done Village
8134917 Jakhlaun Birdha GOV 60 03-Dec-2024 1 1 1 1 60 60 0 0 116 116 100%
+0
60
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+13
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 11 / 0 14 Integrated Verified Verified 2 8 Verified Verified 2 8 Verification Remarks Minutes of Meeting 79 0 15 0 0 8 15 3 4 29 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 20 18 5836 40852 175080 7505 128.60% 52646 182600 60 2 0 5 10 43 5
+0
5
+0
5
5 462.02
+0.00
520.82
60 17590 60
+ 0
53
17590 0 0 100.00
+0
6 / 6
+0
60 / 58
23368.00
+0.00 / +0.00
22027.38
94.26% 139 108 31 21 0 21
  • 7 HGJ CERT
  • 51 HOV
Intake
remaining work done by 20/10/2023
WTP
remaining work done by 30/01/2024
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 15/11/2023
D.System
15-Feb-2024
Comissioning
comissioning 03/03/2024
  • 20-Oct-2023 Intake
  • 20-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 30-Nov-2023 CWR
  • 15-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134922 Dhoora Balabehat GOV 58 03-Dec-2024 1 1 1 1 58 58 0 0 55 54 98%
+0
57
98 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 11
+10
11
11 0 0 0 0
  +0
11 | 11
11 0 / 0 6 / 0 6 Integrated Verified Verified 2 9 Verified Verified 2 7 Verification Remarks Minutes of Meeting 78 0 11 0 2 7 9 4 3 30 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 14 11 2577 18039 77310 2697 104.66% 27110 108516 58 0 0 3 18 37 5
+0
5
+0
5
5 332.97
+0.00
372.33
58 9685 58
+ 0
55
9685 0 0 100.00
+0
6 / 6
+0
58 / 56
15059.00
+0.00 / +0.00
14818.61
98.40% 84 62 22 12 0 12
  • 3 HGJ CERT
  • 48 HOV
Intake
remaining work done by 30/10/2023
WTP
remaining work done by 30/10/2023
T/W
0
OHT
remaining work done by 30/10/2023
CWR
Work has started on 5 CWR, No one Complete.
D.System
21-Feb-2024
Comissioning
comissioning 15/10/2024
  • 06-Jan-2024 Intake
  • 16-Jan-2024 WTP
  • 30-Dec-2023 OHT
  • 30-Oct-2023 CWR
  • 21-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134938 Kadesra Kalan GOV 7 20-Jun-2024 1 1 1 1 7 7 0 0 62 61 98%
+0
6
86 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 5 10 Verified Verified 5 10 Verification Remarks Minutes of Meeting 40 0 4 0 0 10 4 0 0 31 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 1696 11872 50880 3051 179.89% 20604 91711 7 1 0 0 3 3 2
+0
2
+0
2
2 130.13
+0.00
160.49
7 7371 7
+ 0
6
7371 0 0 100.00
+0
3 / 3
+0
7 / 7
5977.00
+0.00 / +0.00
5804.70
97.12% 46 42 4 3 0 3
  • 1 HGJ CERT
  • 7 HOV
Intake
remaining work done by31/10/2023
WTP
remaining work done by 30/12/2023
T/W
0
OHT
15/10/2023
CWR
15/10/2023
D.System
30-Jan-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Dec-2023 WTP
  • 15-Oct-2023 OHT
  • 15-Oct-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
8134955 Mau GOV 15 20-Jun-2024 1 1 1 1 15 14 0 0 38 38 100%
+0
15
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 6
+5
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 0 / 0 3 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 0 0 6 0 0 6 0 1 29 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 923 6461 27690 0 0% 0 0 15 0 0 0 5 10 3
+0
3
+0
3
3 120.25
+0.00
162.11
15 3347 15
+ 0
14
3347 0 0 100.00
+0
3 / 3
+0
15 / 15
5996.00
+0.00 / +0.00
4735.34
78.97% 52 52 0 6 1 5
  • 1 HGJ CERT
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 31/10/2023
D.System
30-Jan-2024
Comissioning
comissioning 30/10/2023
  • 20-Oct-2023 Intake
  • 30-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 31-Aug-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
8063544 Kachnauda Kala GOV 61 01-Apr-2024 1 1 1 1 61 61 0 0 171 171 100%
+0
61
100 100.00 Yes 1 / 1 100.00 Yes 8 / 1
+0
0 / 0
0 / 0 17
+16
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 17 / 0 19 Integrated Verified Verified 4 16 Verified Verified 4 13 Verification Remarks Minutes of Meeting 74 0 17 0 0 13 17 1 1 29 11 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 22 20 6661 46627 199830 7271 109.16% 46778 183655 61 1 1 12 11 36 8
+0
8
+0
8
8 578.14
+0.00
594.56
61 22452 61
+ 0
59
22452 0 0 100.00
+0
9 / 9
+0
61 / 60
24598.00
+0.00 / +0.00
21258.09
86.42% 261 229 32 22 0 22
  • 2 HGJ CERT
  • 58 HOV
Intake
100% structure completed work done by 30/10/2023
WTP
100% WTP structure done remaining work done by 30/10/2023
T/W
0
OHT
remaining work completed by 30/11/2023
CWR
remaining work done by 15/12/2023
D.System
30-Oct-2023
Comissioning
comissioning start by 30/10/2023
  • 30-Sep-2023 Intake
  • 23-Oct-2023 WTP
  • 13-Nov-2023 OHT
  • 30-Nov-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Oct-2023 Comissioning
Agency Total 251 6 6 6 6 251 250 0 0 557 555 100% 249 600.00 9 / 1 600.00 24 / 1
+0
0 / 0
0 / 0 66
+61
66
66 0 0 0 0
  +0
66 | 66
66 0 / 0 47 / 0 59 -- -- -- 5 5 20 55 5 5 20 50 -- 343 0 66 0 2 50 64 16 9 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 61 52 21799 152593 653970 22414 102.82% 178071 706479 251 4 1 21 56 169 32
+0
32
+0
32
32 2005.26
+0.00
2219.47
251 73409 251
+ 0
237
73409 0 0 100
+0
37 / 37
+0
251 / 246
92606.00
+0.00
86087.96
93% 684 592 92 84 2 82
Brija Banco Pvt. Ltd


8282117 Chandawali GOV 16 25-Mar-2024 1 1 1 1 15 15 0 0 18 18 100%
+0
15
94 100.00 Yes 2 / 0 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 6
+6
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 1 / 1 6 Integrated Verified Verified 1 1 Verified Verified 1 1 Verification Remarks Minutes of Meeting 72 0 6 0 2 1 4 2 0 20 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1070 7490 32100 978 91.40% 4122 22384 15 0 1 6 0 8 3
+0
3
+0
3
3 108.90
+0.00
108.90
16 3501 15
+ 0
15
3501 0 0 100.00
+0
4 / 4
+0
16 / 16
4615.00
+0.00 / +0.00
3545.95
76.84% 43 43 0 4 0 4
  • 1 HGJ
  • 1 HGJ CERT
  • 16 HOV
Intake
0
WTP
0
T/W
0
OHT
civil work is done and E&M work is onging
CWR
All civil work finished and E&M work will be finished on 15 december
D.System
29-Jun-2023
Comissioning
0
  • 31-Oct-2023 Intake
  • 31-Oct-2023 WTP
  • 30-Sep-2023 OHT
  • 30-Sep-2023 CWR
  • 29-Jun-2023 D.System
  • 30-Nov-2023 Comissioning
DARA ENGINEERING


8136125 Sukul Guwan GOV 16 10-Jan-2024 1 1 1 1 16 16 0 0 15 15 100%
+0
16
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Off Verified Verified 3 4 Verified Verified 3 4 Verification Remarks Minutes of Meeting 13 13 4 0 0 4 4 1 2 31 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1117 7819 33510 1606 143.78% 11289 48826 16 0 0 0 4 12 3
+0
3
+0
3
3 80.80
+0.00
80.80
16 3297 16
+ 0
16
3297 0 0 100.00
+0
4 / 4
+0
16 / 16
4614.00
+0.00 / +0.00
3765.78
81.62% Yes 23 23 0 6 1 5
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136173 Billa Mogan GOV 23 05-Aug-2025 0 0 0 0 0 0 0 0 54 47 87%
+0
11
48 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 8 / 0 8 Integrated Verified Verified 4 8 Verified Verified 4 8 Verification Remarks Minutes of Meeting 17 17 8 0 0 8 8 1 4 30 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 10 10 2551 17857 76530 4182 163.94% 29677 100372 23 0 2 1 8 12 4
+0
4
+0
4
4 148.83
+0.00
148.78
23 8735 23
+ 0
11
8735 0 0 100.00
+0
5 / 5
+0
23 / 23
8794.00
+0.00 / +0.00
7277.77
82.76% 73 36 37 10 0 10
  • 12 HGJ CERT
  • 23 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Jul-2023
Comissioning
0
  • 31-Jul-2023 Intake
  • 31-Aug-2023 WTP
  • 31-Jul-2023 OHT
  • 31-Jul-2023 CWR
  • 31-Jul-2023 D.System
  • 31-Aug-2023 Comissioning
8136187 Badanpur GOV 31 10-Jan-2024 1 1 1 1 31 29 0 0 33 33 100%
+0
31
100 100.00 Yes 0 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Off Verified Verified 4 8 Verified Verified 4 8 Verification Remarks Minutes of Meeting 29 29 8 0 0 8 8 2 4 31 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1989 13923 59670 2567 129.06% 17071 81050 31 0 0 1 22 8 4
+0
4
+0
4
4 157.92
+0.00
157.92
31 6972 31
+ 0
31
6972 0 0 100.00
+0
5 / 5
+0
31 / 31
8836.00
+0.00 / +0.00
8056.90
91.18% Yes 30 30 0 9 2 7
  • 29 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136199 Sojana Gurgha GOV 32 10-Feb-2024 1 1 1 1 32 32 0 0 58 58 100%
+0
32
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 12
+12
12
12 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 12 Integrated Verified Verified 3 12 Verified Verified 3 12 Verification Remarks Minutes of Meeting 12 12 12 0 0 12 12 0 3 30 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 14 14 3126 21882 93780 3707 118.59% 28522 105821 32 1 1 3 7 20 3
+0
3
+0
3
3 169.97
+0.00
169.90
32 9621 32
+ 0
32
9621 0 0 100.00
+0
4 / 4
+0
32 / 31
9528.00
+0.00 / +0.00
8843.68
92.82% 150 116 34 15 1 14
  • 31 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136210 Mandawara GOV 17 10-Jan-2024 1 1 1 1 17 16 0 0 55 55 100%
+0
17
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Off Verified Verified 2 4 Verified Verified 2 4 Verification Remarks Minutes of Meeting 10 10 4 0 0 4 4 0 1 31 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 3 1875 13125 56250 2451 130.72% 16418 73940 17 0 0 1 4 12 2
+0
2
+0
2
2 125.40
+0.00
125.30
17 7306 17
+ 0
16
7306 0 0 100.00
+0
3 / 3
+0
17 / 17
6007.00
+0.00 / +0.00
4589.43
76.40% 52 47 5 6 0 6
  • 1 HGJ CERT
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
Agency Total 119 4 4 4 4 96 93 0 0 215 208 97% 107 500.00 4 / 1 500.00 3 / 1
+0
0 / 0
0 / 0 36
+36
36
36 0 0 0 0
  +0
36 | 36
36 0 / 0 8 / 0 36 -- -- -- 5 5 16 36 5 5 16 36 -- 81 81 36 0 0 36 36 4 14 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 27 27 10658 74606 319740 14513 136.17% 102977 410009 119 1 3 6 45 64 16
+0
16
+0
16
16 682.92
+0.00
682.70
119 35931 119
+ 0
106
35931 0 0 100
+0
21 / 21
+0
119 / 118
37779.00
+0.00
32533.56
86% 328 252 76 46 4 42
JMC-JWIL (JV)


8010063 Gona Narhat GOV 54 01-Nov-2023 1 1 1 1 54 53 0 0 115 115 100%
+0
54
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 10
+10
10
10 0 0 0 0
  +0
10 | 10
10 0 / 0 10 / 0 10 Integrated Verified Verified 4 8 Verified Verified 4 8 Verification Remarks Minutes of Meeting 45 0 10 0 1 8 9 1 3 24 10 0 + 0 + 1 + 2 + 2 = 5 0 + 0 + 1 + 12 + 2 = 15 19 16 3729 26103 111870 4320 115.85% 27882 105798 54 16 6 12 6 14 6
+0
6
+0
6
6 378.00
+0.00
378.00
54 12897 54
+ 0
54
12897 0 0 100.00
+0
7 / 7
+0
54 / 41
13299.00
+0.00 / +0.00
11569.42
86.99% 235 203 32 21 0 21
  • 50 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010076 Masora Sindwaha GOV 45 01-Mar-2024 1 1 1 1 45 44 0 0 98 98 100%
+0
45
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 15
+8
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 15 Integrated Verified Verified 7 15 Verified Verified 7 15 Verification Remarks Minutes of Meeting 21 0 15 0 0 15 15 2 1 30 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 10 9 4790 33530 143700 5026 104.93% 32689 140580 45 1 0 1 2 41 7
+0
7
+0
7
7 512.43
+0.00
512.41
45 14057 45
+ 0
45
14057 0 0 100.00
+0
8 / 8
+0
45 / 44
16681.00
+0.00 / +0.00
15409.87
92.38% 139 126 13 17 1 16
  • 40 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 07-May-2024 OHT
  • 18-Jul-2023 CWR
  • 30-Aug-2023 D.System
  • 29-Jan-2025 Comissioning
8010056 Saidpur Kumheri GOV 47 01-Nov-2023 1 1 1 1 47 46 0 0 109 109 100%
+0
47
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 7
+7
7
7 0 0 0 0
  +0
7 | 7
7 0 / 0 7 / 0 7 Integrated Verified Verified 3 6 Verified Verified 3 6 Verification Remarks Minutes of Meeting 38 0 7 0 1 6 6 3 1 28 11 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 3 + 0 = 3 8 7 3836 26852 115080 2423 63.16% 22390 98876 46 3 1 10 18 14 5
+0
5
+0
5
5 385.45
+0.00
385.45
47 13818 47
+ 0
47
13818 0 0 100.00
+0
6 / 6
+0
46 / 43
14171.00
+0.00 / +0.00
12582.41
88.79% 176 163 13 17 0 17
  • 47 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
Agency Total 146 3 3 3 3 146 143 0 0 322 322 100% 146 300.00 3 / 0 300.00 3 / 0
+0
0 / 0
0 / 0 32
+25
32
32 0 0 0 0
  +0
32 | 32
32 0 / 0 32 / 0 32 -- -- -- 3 3 14 29 3 3 14 29 -- 104 0 32 0 2 29 30 6 5 -- -- 0 + 0 + 1 + 3 + 2 = 6 0 + 0 + 1 + 15 + 2 = 18 37 32 12355 86485 370650 11769 95.26% 82961 345254 145 20 7 23 26 69 18
+0
18
+0
18
18 1275.88
+0.00
1275.86
146 40772 146
+ 0
146
40772 0 0 100
+0
21 / 21
+0
145 / 128
44151.00
+0.00
39561.70
90% 550 492 58 55 1 54
Banko Ganga


8282120 Tori GOV 19 15-Jan-2024 1 1 1 1 19 19 0 0 35 35 100%
+0
19
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 7 / 0 8 Integrated Off Verified Verified 2 8 Verified Not Verified 2 8 Verification Remarks Minutes of Meeting 48 0 8 0 0 8 8 0 0 25 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1277 8939 38310 1327 103.92% 9249 36053 19 0 0 0 2 17 2
+0
2
+0
2
2 133.36
+0.00
133.36
19 3984 19
+ 0
19
3984 0 0 100.00
+0
3 / 3
+0
19 / 19
4036.00
+0.00 / +0.00
3434.39
85.09% Yes 35 35 0 6 0 6
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 20-May-2023 Intake
  • 25-May-2023 WTP
  • 05-Dec-2022 OHT
  • 15-Mar-2023 CWR
Total Lalitpur 550 16 15 15 15 15 527 520 0 0 1143 1134 99%
+0
536
97.45 100.00 16 20 / 2 100.00 16 33 / 3
+0
0 / 0
0 / 0 148
+0
148
148 0 0 0 0
  +0
148 | 148
148 0 / 0 95 / 1 141 -- -- -- 15 15 53 129 15 14 53 129 -- 648 81 148 0 6 124 142 28 28 -- -- 0 + 0 + 1 + 3 + 2 = 6 0 + 0 + 1 + 15 + 2 = 18 125 111 47165 330155 1414950 51002 108.14% 377380 1520181 548 25 11 56 129 327 71
+0
71
+0
71
71 4206.32
+0.00
4420.29
550 156973 549
+ 0
522
156973 0 0 100
+0
86 / 86
+0
550 / 527
183187.00
+0.00 / +0.00
165163.56
90.16% 0 2 0 1636 1410 226 192 6 186
7 Mahoba Larsen & Toubro Ltd


8009844 Shivhar GOV 61 01-Dec-2023 1 1 1 1 60 60 0 0 201 201 100%
+0
60
98 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 18
+0
18
0 0 0 0 0
  +0
18 | 18
18 0 / 0 18 / 0 18 Integrated Verified Verified 6 18 Verified Verified 6 5 Verification Remarks Minutes of Meeting 61 0 18 0 0 5 18 4 6 31 12 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 12 6 6444 45108 193320 8689 134.84% 61910 318163 60 1 2 8 8 41 6
+0
6
+0
6
6 672.57
+0.00
672.20
61 20449 60
+ 0
60
20449 0 0 100.00
+0
7 / 7
+0
61 / 60
27118.00
+0.00 / +0.00
26341.47
97.14% Yes Yes Yes 296 265 31 11 0 11
  • 1 HGJ
  • 1 HGJ CERT
  • 61 HOV
Intake
Completed
WTP
Completed
T/W
0
OHT
0
CWR
Completed
Comissioning
0
  • 31-Aug-2023 OHT
  • 31-Aug-2023 Comissioning
  • 73 Villages
  • 26427 Households
  • 0 Last Week FHTC Given
  • 26427 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 73 HGJ
  • 63 HGJ Certified
  • 86.30 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 45 Handed Over Villages(before Portal)
  • 4 Handed Over Initiated/Approved On Portal
  • 67.12 Handed Over %
  • 59 OHT Required
  • 59 OHT Completed
  • Scheme Wise Category A
  • 2 No. of Schemes
  • 4 No. of Villages
  • Scheme Wise Category B
  • 34 No. of Schemes
  • 59 No. of Villages
  • Scheme Wise Category C
  • 10 No. of Schemes
  • 10 No. of Villages
  • Village Wise Category A
  • 1 No. of Villages
  • Village Wise Category B
  • 62 No. of Villages
  • Village Wise Category C
  • 10 No. of Villages
  • Village Wise Total
  • 73 Total No. of Villages
  • 46 Total No. of Schemes
  • 73 Total No. of Villages
  • 58 Total No. of OHT
  • 34 Schemes Sent to O&M
  • 46 No. of OHT in O&M Schemes
  • 7931 Water Demand(M3)
  • 7631.43 Water Supply (M3)
  • 46 Agreement Done Scheme
  • 73 Agreement Done Village
JMC-JWIL (JV)


8009837 Lahchura Kashipura GOV 78 15-Mar-2024 1 1 1 1 75 74 0 0 235 235 100%
+0
75
96 100.00 Yes 10 / 1 100.00 Yes 11 / 1
+0
0 / 0
0 / 0 32
+0
32
0 0 0 0 0
  +0
32 | 32
32 0 / 0 23 / 0 27 Integrated Off Verified Verified 8 31 Verified Verified 8 30 Verification Remarks Minutes of Meeting 94 3 32 0 0 30 32 0 10 30 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 14 4 5652 39564 169560 8020 141.90% 54064 236153 74 0 1 7 8 58 10
+0
10
+0
10
10 601.08
+0.00
599.17
78 21622 75
+ 0
75
21622 0 0 100.00
+0
11 / 11
+0
78 / 74
23602.00
+0.00 / +0.00
22934.14
97.17% Yes Yes Yes 252 237 15 22 0 22
  • 1 D.System
  • 3 HGJ
  • 3 HGJ CERT
  • 78 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Apr-2024
Comissioning
0
  • 15-Apr-2024 OHT
  • 15-Apr-2024 D.System
8009841 Salaiya Khalsa Nathupura GOV 77 15-Mar-2024 1 1 1 1 77 77 0 0 232 232 100%
+0
77
100 100.00 Yes 1 / 1 100.00 Yes 16 / 1
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 16 / 3 40 Integrated Verified Verified 22 40 Verified Verified 22 40 Verification Remarks Minutes of Meeting 137 111 40 0 0 40 40 0 18 30 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 19 10 6961 48727 208830 9000 129.29% 64577 252682 77 3 1 13 33 27 22
+0
22
+0
22
22 785.00
+0.00
784.25
77 28072 77
+ 0
76
28072 0 0 100.00
+0
23 / 23
+0
77 / 76
26009.00
+0.00 / +0.00
25934.64
99.71% 221 188 33 20 1 19
  • 1 HGJ CERT
  • 77 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
29-Feb-2024
Comissioning
0
  • 29-Feb-2024 OHT
  • 29-Feb-2024 CWR
  • 29-Feb-2024 D.System
Agency Total 155 2 2 2 2 152 151 0 0 467 467 100% 152 200.00 11 / 2 200.00 27 / 2
+0
0 / 0
0 / 0 72
+0
72
0 0 0 0 0
  +0
72 | 72
72 0 / 0 39 / 3 67 -- -- -- 2 2 30 71 2 2 30 70 -- 231 114 72 0 0 70 72 0 28 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 33 14 12613 88291 378390 17020 134.94% 118641 488835 151 3 2 20 41 85 32
+0
32
+0
32
32 1386.08
+0.00
1383.42
155 49694 152
+ 0
151
49694 0 0 100
+0
34 / 34
+0
155 / 150
49611.00
+0.00
48868.78
99% 473 425 48 42 1 41
N.K. Gupta & K.B. Gupta Contractors


8175353 kabrai GOV 38 01-Jul-2024 1 1 1 1 37 35 0 0 158 157 99%
+0
35
92 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 11 / 0 8 Integrated Off Verified Verified 0 11 Verified Verified 0 11 Verification Remarks Minutes of Meeting 85 0 13 0 3 11 10 7 2 22 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 6 2999 20993 89970 1660 55.35% 13578 75332 36 0 1 10 19 6 9
+0
9
+0
9
9 349.51
+0.00
349.35
38 11976 36
+ 0
35
11800 0 0 98.53
+0
9 / 9
+0
38 / 36
15787.00
+0.00 / +0.00
13546.69
85.81% Yes 0 0 0 0 0 0
  • 176 FHTC
  • 2 HGJ
  • 3 HGJ CERT
  • 38 HOV
Intake
28/02/2023
WTP
30/6/2023
T/W
0
OHT
30/04/2024
CWR
16/04/2024
D.System
14-Jul-2023
Comissioning
10/06/2024
  • 28-Feb-2023 Intake
  • 30-Jun-2023 WTP
  • 30-May-2023 OHT
  • 15-Jun-2023 CWR
  • 14-Jul-2023 D.System
  • 16-Jul-2023 Comissioning
SLC-SMC (JV)


8152383 Dhawarra GOV 95 13-Sep-2024 1 0 0 0 0 0 0 0 305 293 96%
+0
90
95 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 29
+0
29
0 0 0 0 0
  +0
29 | 29
29 0 / 0 29 / 0 19 Integrated Off Verified Verified 0 19 Verified Verified 0 14 Verification Remarks Minutes of Meeting 192 0 29 0 9 14 20 1 5 21 7 1 + 0 + 0 + 3 + 0 = 4 1 + 0 + 0 + 4 + 0 = 5 29 22 5821 40747 174630 6747 115.91% 49681 228157 95 15 7 27 29 17 9
+0
9
+0
9
9 782.93
+0.00
781.27
95 30104 95
+ 0
82
30104 0 0 100.00
+0
9 / 9
+0
95 / 92
33301.00
+0.00 / +0.00
27390.79
82.25% 493 393 100 4 0 4
  • 1 D.System
  • 13 HGJ CERT
  • 95 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
23-Jul-2024
Comissioning
0
  • 27-Mar-2024 CWR
  • 23-Jul-2024 D.System
  • 25-Jul-2024 Comissioning
Total Mahoba 344 5 5 4 4 4 249 246 0 0 1131 1115 99%
+0
337
97.97 100.00 5 15 / 3 100.00 5 30 / 3
+0
0 / 0
0 / 0 132
+0
132
0 0 0 0 0
  +0
132 | 132
132 0 / 0 97 / 3 112 -- -- -- 5 5 36 119 5 5 36 119 -- 569 114 132 0 12 100 120 12 41 -- -- 1 + 0 + 0 + 4 + 0 = 5 1 + 0 + 0 + 5 + 0 = 6 81 48 27878 195146 836340 34116 122.38% 243810 1110487 342 19 12 65 97 149 56
+0
56
+0
56
56 3191.09
+0.00
3186.24
344 112223 343
+ 0
328
112047 0 0 99.84
+0
59 / 59
+0
349 / 338
125817.00
+0.00 / +0.00
116147.73
92.31% 2 2 3 1262 1083 179 57 1 56
8 Mirzapur GVPR


8152576 Leduki GOV 124 01-Jan-2024 1 1 1 1 124 124 0 0 120 120 100%
+0
124
100 100.00 Yes 2 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 0 Integrated Off Verified Verified 1 2 Not Verified Not Verified 1 1 Verification Remarks Minutes of Meeting 66 0 12 0 0 1 12 4 3 22 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 8 7 7608 53256 228240 8286 108.91% 55208 193398 121 0 60 58 0 3 5
+0
5
+0
5
5 764.43
+0.00
879.84
124 22530 124
+ 0
124
22530 0 0 100.00
+0
6 / 6
+0
124 / 124
26901.00
+0.00 / +0.00
25282.10
93.98% 168 155 13 0 0 0
  • 100 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Oct-2023
Comissioning
0
  • 31-Jul-2023 WTP
  • 15-Oct-2023 OHT
  • 31-Oct-2023 CWR
  • 31-Oct-2023 D.System
  • 31-Dec-2023 Comissioning
  • 128 Villages
  • 33860 Households
  • 0 Last Week FHTC Given
  • 33726 FHTC Given
  • 99 FHTC(%)
  • 134 Balance FHTC
  • 124 HGJ
  • 122 HGJ Certified
  • 95.31 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 49 Handed Over Villages(before Portal)
  • 43 Handed Over Initiated/Approved On Portal
  • 71.88 Handed Over %
  • 81 OHT Required
  • 78 OHT Completed
  • Scheme Wise Category A
  • 1 No. of Schemes
  • 2 No. of Villages
  • Scheme Wise Category B
  • 51 No. of Schemes
  • 100 No. of Villages
  • Scheme Wise Category C
  • 20 No. of Schemes
  • 31 No. of Villages
  • Village Wise Category A
  • 2 No. of Villages
  • Village Wise Category B
  • 86 No. of Villages
  • Village Wise Category C
  • 45 No. of Villages
  • Village Wise Total
  • 133 Total No. of Villages
  • 72 Total No. of Schemes
  • 133 Total No. of Villages
  • 74 Total No. of OHT
  • 52 Schemes Sent to O&M
  • 53 No. of OHT in O&M Schemes
  • 11094 Water Demand(M3)
  • 8583.00 Water Supply (M3)
  • 52 Agreement Done Scheme
  • 102 Agreement Done Village
Megha


8152518 Talar GOV 86 01-Aug-2024 1 1 1 1 86 85 0 0 54 54 100%
+0
86
100 100.00 Yes 2 / 1 100.00 Yes 4 / 1
+0
0 / 0
0 / 0 15
+15
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 25 / 1 15 Integrated Verified Verified 3 7 Not Verified Verified 3 7 Verification Remarks Minutes of Meeting 110 0 15 0 5 7 10 6 1 30 11 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 3 3287 23009 98610 1737 52.84% 36080 173904 84 5 9 26 33 11 6
+0
0
+0
6
6 972.11
+0.00
972.11
86 20367 86
+ 0
86
20367 0 0 100.00
+0
8 / 8
+0
86 / 85
20345.00
+0.00 / +0.00
19327.19
95.00% Yes 170 165 5 0 0 0
  • 78 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
20-May-2023
Comissioning
0
  • 27-Jul-2022 Intake
  • 10-Oct-2022 WTP
  • 22-Apr-2023 OHT
  • 17-May-2023 CWR
  • 20-May-2023 D.System
  • 20-Dec-2023 Comissioning
8153309 Gothaura GOV 142 01-Aug-2024 1 1 1 1 141 138 0 0 149 149 100%
+0
141
99 0.00 No 3 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 5 / 0 12 Integrated Verified Verified 0 5 Verified Verified 0 5 Verification Remarks Minutes of Meeting 56 0 12 0 0 5 12 3 0 26 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 8 3 9559 66913 286770 6385 66.80% 53711 135340 136 27 35 40 21 13 7
+0
0
+0
7
7 723.50
+0.00
723.50
142 29745 141
+ 0
141
29745 0 0 100.00
+0
8 / 8
+0
142 / 139
20152.00
+0.00 / +0.00
17788.70
88.27% Yes 200 189 11 6 0 6
  • 1 HGJ
  • 1 HGJ CERT
  • 119 HOV
Intake
0
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
29-Apr-2023
Comissioning
0
  • 24-Jul-2023 WTP
  • 11-Jul-2023 T/W
  • 08-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 29-Apr-2023 D.System
  • 29-Feb-2024 Comissioning
8153338 Dhauha GOV 215 01-Aug-2024 1 1 1 1 213 211 0 0 276 276 100%
+0
213
99 100.00 Yes 5 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 10 / 0 25 Integrated Verified Verified 6 5 Verified Verified 6 5 Verification Remarks Minutes of Meeting 133 0 25 0 0 5 25 8 11 28 11 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 10 5 14505 101535 435150 13671 94.25% 88048 402360 211 33 21 57 68 32 11
+0
0
+0
11
11 1327.06
+0.00
1327.06
215 42736 212
+ 0
203
42734 0 0 100.00
+0
13 / 13
+0
215 / 213
40622.00
+0.00 / +0.00
40194.44
98.95% Yes 314 302 12 0 0 0
  • 2 FHTC
  • 3 HGJ
  • 12 HGJ CERT
  • 175 HOV
Intake
Functional
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
24-Sep-2023
Comissioning
0
  • 22-Jul-2022 Intake
  • 13-Oct-2022 WTP
  • 11-Jul-2023 T/W
  • 20-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 24-Sep-2023 D.System
  • 29-Feb-2024 Comissioning
Agency Total 443 3 3 3 3 440 434 0 0 479 479 100% 440 200.00 10 / 3 300.00 6 / 3
+0
0 / 0
0 / 0 52
+15
52
0 0 0 0 0
  +0
52 | 52
52 0 / 0 40 / 1 52 -- -- -- 3 3 9 17 2 3 9 17 -- 299 0 52 0 5 17 47 17 12 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 23 11 27351 191457 820530 21793 79.68% 177839 711604 431 65 65 123 122 56 24
+0
0
+0
24
24 3022.67
+0.00
3022.67
443 92848 439
+ 0
430
92846 0 0 100
+0
29 / 29
+0
443 / 437
81119.00
+0.00
77310.33
95% 684 656 28 6 0 6
NCC Ltd.


8010572 Ahugi Kalan GOV 159 01-Jan-2024 1 1 1 1 159 159 0 0 33 33 100%
+0
159
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 30
+0
25
0 0 0 0 0
  +0
0 | 25
25 0 / 0 25 / 0 25 Integrated Off Verified Verified 9 29 Verified Verified 9 29 Verification Remarks Minutes of Meeting 5 0 30 0 0 29 30 0 0 30 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6 4 11587 81109 347610 12530 108.14% 88535 378738 159 0 1 11 12 135 9
+0
9
+0
9
9 1582.00
+0.00
1582.00
159 31881 159
+ 0
158
31881 0 0 100.00
+0
9 / 9
+0
159 / 159
32828.00
+0.00 / +0.00
29622.54
90.24% Yes Yes 227 220 7 0 0 0
  • 5 OHT
  • 1 HGJ CERT
  • 130 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
31-Jul-2023
Comissioning
Commissioning under progress
  • 09-Aug-2022 Intake
  • 17-Aug-2022 WTP
  • 31-Jul-2023 OHT
  • 02-Mar-2023 CWR
  • 31-Jul-2023 D.System
  • 15-Jul-2024 Comissioning
8011637 Mahadev GOV 254 01-Jan-2024 1 1 1 1 254 254 0 0 14 14 100%
+0
254
100 100.00 Yes 2 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 25 / 0 25 Integrated Verified Verified 6 24 Verified Verified 6 23 Verification Remarks Minutes of Meeting 26 0 25 0 0 23 25 1 1 31 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 10 5 11812 82684 354360 12678 107.33% 92221 373904 254 0 0 12 17 225 7
+0
7
+0
7
7 1464.00
+0.00
1464.00
254 35318 254
+ 0
251
35318 0 0 100.00
+0
7 / 7
+0
254 / 255
33415.00
+0.00 / +0.00
31088.78
93.04% Yes Yes 308 292 16 0 0 0
  • 3 HGJ CERT
  • 189 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
30-Jun-2023
Comissioning
Trial run is U/P.
  • 31-Aug-2022 Intake
  • 31-Aug-2022 WTP
  • 30-Jun-2023 OHT
  • 30-Dec-2022 CWR
  • 30-Jun-2023 D.System
  • 15-May-2024 Comissioning
Agency Total 413 2 2 2 2 413 413 0 0 47 47 100% 413 200.00 4 / 0 200.00 8 / 0
+0
0 / 0
0 / 0 55
+0
50
0 0 0 0 0
  +0
25 | 50
50 0 / 0 50 / 0 50 -- -- -- 2 2 15 53 2 2 15 52 -- 31 0 55 0 0 52 55 1 1 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 16 9 23399 163793 701970 25208 107.73% 180756 752642 413 0 1 23 29 360 16
+0
16
+0
16
16 3046.00
+0.00
3046.00
413 67199 413
+ 0
409
67199 0 0 100
+0
16 / 16
+0
413 / 414
66243.00
+0.00
60711.32
92% 535 512 23 0 0 0
GA INFRA


8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 305 01-Feb-2024 1 1 1 1 305 296 0 0 234 234 100%
+0
298
98 100.00 Yes 4 / 0 100.00 Yes 6 / 0
+0
98 / 98
97 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 100 / 0 99 Integrated Verified Verified 1 42 Verified Verified 1 38 Verification Remarks Minutes of Meeting 177 177 102 0 0 38 102 33 8 28 11 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 3 + 0 = 3 19 6 25320 177240 759600 19730 77.92% 142375 652530 251 1 4 20 26 200 2
+0
2
+0
2
2 1851.89
+0.00
1810.28
305 75783 303
+ 0
296
75306 0 0 99.37
+0
101 / 101
+0
302 / 296
6563.00
+0.00 / +0.00
6563.00
100.00% 948 922 26 20 0 20
  • 41 D.System
  • 3 COV
  • 477 FHTC
  • 2 HGJ
  • 9 HGJ CERT
  • 279 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
01-Feb-2024
Comissioning
0
  • 25-Aug-2023 OHT
  • 01-Feb-2024 D.System
  • 20-Aug-2023 Comissioning
Multiurban


8282154 Manikpur GOV 63 01-Mar-2024 1 1 1 1 63 60 0 0 23 23 100%
+0
58
92 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 4 / 2 0 Integrated Off Verified Verified 0 2 Verified Verified 0 2 Verification Remarks Minutes of Meeting 26 0 5 0 0 2 5 2 1 30 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 3 2968 20776 89040 3471 116.95% 20107 101669 59 1 5 14 5 34 1
+0
0
+0
1
1 248.50
+0.00
248.50
63 9280 62
+ 0
59
9134 0 0 98.43
+0
2 / 2
+0
61 / 57
6498.00
+0.00 / +0.00
5943.68
91.47% 54 51 3 1 0 1
  • 2 COV
  • 146 FHTC
  • 1 HGJ
  • 4 HGJ CERT
  • 63 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 30-Jul-2023 OHT
  • 31-Dec-2023 Comissioning
Ramky baba


8152635 Danti GOV and Tubewell Scheme 42 Nos. 261 15-Feb-2024 1 1 1 1 263 262 0 0 168 168 100%
+0
257
98 100.00 Yes 2 / 2 100.00 Yes 2 / 2
+0
42 / 42
84 / 83 48
+48
48
0 0 0 0 0
  +0
48 | 48
48 0 / 0 97 / 96 95 Integrated Off Verified Not Verified 0 0 Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 119 0 48 0 0 0 48 11 14 29 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 29 17 16245 113715 487350 21082 129.78% 147577 581951 237 21 73 61 16 66 2
+0
0
+0
2
2 1344.50
+0.00
1344.50
261 43416 259
+ 0
250
43280 0 0 99.69
+0
46 / 46
+0
259 / 241
12983.00
+0.00 / +0.00
12360.43
95.20% 494 460 34 17 0 17
  • 2 COV
  • 136 FHTC
  • 2 HGJ
  • 11 HGJ CERT
  • 240 HOV
Intake
100% Complete
WTP
100% Complete
T/W
All complete
OHT
Completed
CWR
completed
D.System
15-Aug-2023
Comissioning
Commissioning under progress
  • 26-Apr-2023 Intake
  • 02-Mar-2023 WTP
  • 20-Jun-2023 T/W
  • 10-Aug-2023 OHT
  • 18-Jun-2022 CWR
  • 15-Aug-2023 D.System
  • 30-Sep-2023 Comissioning
Total Mirzapur 1608 9 9 9 9 9 1608 1589 0 0 1069 1065 100%
+0
1590
98.88 94.44 8 23 / 6 100.00 9 23 / 6
+0
140 / 140
181 / 83 274
+0
269
0 0 0 0 0
  +0
244 | 269
269 0 / 0 291 / 99 296 -- -- -- 9 8 26 116 7 7 26 116 -- 718 177 274 0 5 110 269 68 39 -- -- 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 3 + 0 = 3 98 53 102892 720244 3086760 99571 96.77% 723862 2993792 1512 88 208 299 198 719 50
+0
23
+0
50
50 10277.99
+0.00
10351.79
1608 311056 1600
+ 0
1568
310295 0 0 99.76
+0
200 / 200
+-1
1602 / 1569
200307.00
+0.00 / +0.00
188170.86
93.94% 2 0 0 2883 2756 127 44 0 44
9 Sonbhadra GVPR


8175161 Jhilo/ Bijpur GOV 179 05-Jan-2026 0 0 0 0 0 0 0 0 20 19 95%
+0
161
90 100.00 Yes 9 / 1 100.00 Yes 23 / 1
+0
0 / 0
0 / 0 27
+3
27
0 0 0 0 0
  +0
27 | 27
27 0 / 0 30 / 0 22 Integrated Off Not Verified Verified 12 21 Not Verified Verified 12 21 Verification Remarks Minutes of Meeting 157 0 27 3 6 21 18 4 7 21 9 0 + 0 + 0 + 7 + 0 = 7 0 + 0 + 0 + 21 + 0 = 21 28 24 13361 93527 400830 18534 138.72% 104784 452019 3 2 0 0 0 1 16
+0
16
+0
16
16 3904.00
+0.00
3904.00
179 66179 152
+ 0
82
63638 0 0 96.16
+0
14 / 14
+0
153 / 126
74794.00
+0.00 / +0.00
60493.96
80.88% 358 318 40 57 0 57
  • 18 COV
  • 2541 FHTC
  • 27 HGJ
  • 97 HGJ CERT
  • 175 HOV
Intake
0
WTP
0
T/W
0
OHT
All OHT complete
CWR
2 nos CWR new locations as per revised DPR.
D.System
31-Aug-2025
Comissioning
0
  • 28-Feb-2023 Intake
  • 20-Mar-2023 WTP
  • 25-Oct-2025 OHT
  • 31-Aug-2025 CWR
  • 31-Aug-2025 D.System
  • 31-Mar-2026 Comissioning
  • 82 Villages
  • 18169 Households
  • 0 Last Week FHTC Given
  • 17524 FHTC Given
  • 96 FHTC(%)
  • 645 Balance FHTC
  • 79 HGJ
  • 52 HGJ Certified
  • 63.41 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 11 Handed Over Villages(before Portal)
  • 34 Handed Over Initiated/Approved On Portal
  • 54.88 Handed Over %
  • 0 OHT Required
  • 0 OHT Completed
  • Scheme Wise Category A
  • 0 No. of Schemes
  • 0 No. of Villages
  • Scheme Wise Category B
  • 10 No. of Schemes
  • 55 No. of Villages
  • Scheme Wise Category C
  • 15 No. of Schemes
  • 27 No. of Villages
  • Village Wise Category A
  • 0 No. of Villages
  • Village Wise Category B
  • 38 No. of Villages
  • Village Wise Category C
  • 44 No. of Villages
  • Village Wise Total
  • 82 Total No. of Villages
  • 25 Total No. of Schemes
  • 82 Total No. of Villages
  • 30 Total No. of OHT
  • 1 Schemes Sent to O&M
  • 1 No. of OHT in O&M Schemes
  • 87 Water Demand(M3)
  • 2938.90 Water Supply (M3)
  • 25 Agreement Done Scheme
  • 82 Agreement Done Village
Larsen & Toubro Ltd


8010143 Parasi GOV 29 27-Aug-2024 1 1 1 1 29 29 0 0 83 83 100%
+0
29
100 100.00 Yes 2 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 5 Integrated Off Verified Verified 0 0 Verified Verified 0 0 Verification Remarks Minutes of Meeting 159 0 15 0 0 0 15 2 3 29 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 12 12 6425 44975 192750 7392 115.05% 50870 213396 29 1 0 1 1 26 9
+0
9
+0
9
9 744.00
+0.00
744.00
29 19081 29
+ 0
24
19081 0 0 100.00
+0
9 / 9
+0
29 / 29
13244.00
+0.00 / +0.00
12520.47
94.54% 88 61 27 10 0 10
  • 5 HGJ CERT
  • 28 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Aug-2023
Comissioning
0
  • 30-Apr-2023 Intake
  • 30-Jul-2023 WTP
  • 30-Nov-2023 OHT
  • 31-Aug-2023 D.System
  • 15-Dec-2023 Comissioning
8175086 Amawar GOV 58 0 0 0 0 0 0 0 0 63 63 100%
+0
52
90 100.00 No 1 / 1 100.00 No 1 / 1
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
3 0 / 0 7 / 0 7 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 7 7 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 16 16 0 0 0 0 0% 0 0 52 52 0 0 0 0 3
+0
3
+0
3
3 616.21
+0.00
602.40
58 15616 18
+ 0
0
10361 0 0 66.35
+0
4 / 4
+0
0 / 0
23765.00
+0.00 / +0.00
14928.46
62.82% 35 19 16 16 0 16
  • 13 D.System
  • 58 COV
  • 5255 FHTC
  • 40 HGJ
  • 58 HGJ CERT
  • 58 HOV
Intake
Completed
WTP
Completed.
T/W
NA
OHT
All OHT works completed.
CWR
Completed.
D.System
31-Jan-2024
Comissioning
Phase wise commissioning works will start after the availability of Water in the Kanhar Dam.
  • 31-Dec-2022 Intake
  • 15-Dec-2023 WTP
  • 31-Oct-2023 OHT
  • 28-Feb-2023 CWR
  • 31-Jan-2024 D.System
8177926 Gurmura GOV 8 0 0 0 0 0 0 0 0 10 10 100%
+0
8
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+2
7
2 2 0 0 0
  +0
5 | 5
5 0 / 0 5 / 0 5 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 10 10 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 0 0 0 0 0% 0 0 8 7 0 1 0 0 4
+0
3
+0
3
3 610.00
+0.00
610.00
8 8051 0
+ 0
0
6607 0 0 82.06
+0
4 / 4
+0
2 / 1
12483.00
+0.00 / +0.00
9158.15
73.36% 20 10 10 1 0 1
  • 5 OHT
  • 1 CWR
  • 6 COV
  • 1444 FHTC
  • 8 HGJ
  • 8 HGJ CERT
  • 8 HOV
Intake
Completed. It is also in functional stage. Commissioning has been started.
WTP
Work Is In Progress. It is also in functional stage.
T/W
NA
OHT
5 Nos OHTs Completed. Commissioning works also completed.
CWR
3 Nos Completed. 3 Nos Commissioning works also Completed.
D.System
31-Dec-2023
Comissioning
2 Village is commissioned.
  • 30-Jun-2023 Intake
  • 31-Jan-2024 WTP
  • 30-Jun-2023 OHT
  • 30-Jul-2023 CWR
  • 31-Dec-2023 D.System
  • 16-Aug-2023 Comissioning
8182027 Panari GOV 6 0 0 0 0 0 0 0 0 1 1 100%
+0
6
100 100.00 Yes 3 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 11
+1
6
1 3 0 0 0
  +0
3 | 3
3 0 / 0 3 / 0 3 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 44 0 11 9 0 2 1 1 3 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 1465 10255 43950 1106 75.49% 6465 8977 6 4 1 1 0 0 3
+0
2
+0
2
2 306.24
+0.00
306.24
6 8465 0
+ 0
0
6055 0 0 71.53
+0
3 / 3
+0
2 / 2
11871.00
+0.00 / +0.00
7233.26
60.93% 11 5 6 1 1 0
  • 8 OHT
  • 1 CWR
  • 4 COV
  • 2410 FHTC
  • 6 HGJ
  • 6 HGJ CERT
  • 6 HOV
Intake
Completed. Intake Well is in functional stage.
WTP
Finishing works in progress. Pre Commissioning Completed. Water Supply is in progress.
T/W
0
OHT
Commissioning works completed.
CWR
Commissioning Completed.
D.System
16-Aug-2023
Comissioning
Panari & Bairpur Villages are Commissioned.
  • 31-Jul-2023 Intake
  • 30-Sep-2023 WTP
  • 30-Sep-2023 OHT
  • 16-Aug-2023 D.System
  • 31-Jul-2023 Comissioning
Agency Total 101 1 1 1 1 29 29 0 0 157 157 100% 95 400.00 6 / 1 400.00 17 / 1
+0
0 / 0
0 / 0 43
+3
35
3 5 0 0 0
  +0
30 | 30
26 0 / 0 30 / 0 20 -- -- -- 1 1 0 0 1 1 0 0 -- 203 0 43 26 0 0 17 3 4 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 32 32 7890 55230 236700 8498 107.71% 57335 222373 95 64 1 3 1 26 19
+0
17
+0
17
17 2276.45
+0.00
2262.64
101 51213 47
+ 0
24
42104 0 0 82
+0
20 / 20
+0
33 / 32
61363.00
+0.00
43840.34
71% 154 95 59 28 1 27
NCC Ltd.


8338933 Patwadh GOV 658 0 0 0 0 0 0 0 0 194 191 98%
+0
604
92 100.00 Yes 5 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 55
+4
55
0 0 0 0 0
  +0
55 | 55
54 0 / 0 45 / 0 0 Integrated Verified Verified 1 4 Verified Verified 1 3 Verification Remarks Minutes of Meeting 283 0 55 0 48 3 7 2 1 3 1 0 + 0 + 0 + 4 + 0 = 4 0 + 0 + 0 + 6 + 0 = 6 20 6 3343 23401 100290 3310 99.01% 26407 106110 416 411 0 0 1 4 15
+0
15
+0
15
15 3885.16
+0.00
3490.65
658 103482 204
+ 0
25
97771 0 0 94.48
+0
16 / 16
+0
508 / 122
99181.00
+0.00 / +0.00
73000.43
73.60% 550 526 24 151 75 76
  • 394 D.System
  • 153 COV
  • 5711 FHTC
  • 454 HGJ
  • 633 HGJ CERT
  • 654 HOV
Intake
With all finishing work 30/04/2025
WTP
With all finishing work 30/04/2025
T/W
0
OHT
With all finishing work 15/09/2025 (WL)
CWR
With all finishing work 20/06/2025 (WL)
D.System
31-Mar-2026
Comissioning
31/03/2026
  • 30-Apr-2025 Intake
  • 30-Apr-2025 WTP
  • 30-Apr-2024 T/W
  • 15-Sep-2025 OHT
  • 20-Jun-2025 CWR
  • 31-Mar-2026 D.System
  • 31-Mar-2026 Comissioning
Jain Const.


8175315 Kewatha GOV 12 01-Apr-2024 1 1 1 1 12 12 0 0 8 8 100%
+0
12
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 138 0 12 0 0 0 12 3 6 22 12 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 3 7826 54782 234780 7057 90.17% 45166 189967 12 1 0 1 0 10 7
+0
7
+0
7
7 645.00
+0.00
645.00
12 9045 12
+ 0
11
9045 0 0 100.00
+0
8 / 8
+0
12 / 12
11940.00
+0.00 / +0.00
10571.84
88.54% Yes 27 14 13 1 1 0
  • 1 HGJ CERT
  • 11 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Mar-2023 Comissioning
VPRPL


8175110 Belahai GOV 186 0 0 0 0 0 0 0 0 33 33 100%
+0
180
97 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+2
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 7 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 18 0 9 2 0 0 7 3 0 23 12 0 + 0 + 0 + 6 + 0 = 6 0 + 0 + 0 + 16 + 0 = 16 13 10 5597 39179 167910 4855 86.74% 34512 169052 0 0 0 0 0 0 5
+0
5
+0
5
5 1421.64
+0.00
1418.76
186 19691 183
+ 0
133
19586 0 0 99.47
+0
6 / 6
+0
179 / 160
23145.00
+0.00 / +0.00
19158.82
82.78% 292 274 18 35 1 34
  • 2 D.System
  • 6 COV
  • 105 FHTC
  • 3 HGJ
  • 53 HGJ CERT
  • 130 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175262 Harra GOV 45 20-Jun-2024 1 0 0 0 0 0 0 0 51 51 100%
+0
42
93 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+0
10
0 0 0 0 0
  +0
10 | 10
10 0 / 0 0 / 0 10 Integrated Off Verified Not Verified 0 0 Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 133 0 10 0 10 0 0 0 0 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 2 + 0 = 2 2 2 0 0 0 0 0% 0 1 43 43 0 0 0 0 6
+0
6
+0
6
6 918.46
+0.00
918.46
45 17677 44
+ 0
43
17669 0 0 99.95
+0
7 / 7
+0
44 / 0
18231.00
+0.00 / +0.00
15743.43
86.36% 62 58 4 7 5 2
  • 8 FHTC
  • 1 HGJ
  • 2 HGJ CERT
  • 33 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Jul-2023 Comissioning
8175280 Kadara GOV 4 1 0 0 0 0 0 0 0 0 0 0%
+0
0
0 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 3
+0
3
0 0 0 1 0
  +0
2 | 2
0 0 / 0 1 / 0 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 3 3 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 0 0 0 0 0% 0 0 4 4 0 0 0 0 1
+0
1
+0
1
1 102.16
+0.00
100.19
4 1168 1
+ 0
0
515 0 0 44.09
+0
2 / 2
+0
1 / 0
2971.00
+0.00 / +0.00
2812.91
94.68% 4 2 2 0 0 0
  • 1 OHT
  • 1 D.System
  • 3 COV
  • 653 FHTC
  • 3 HGJ
  • 4 HGJ CERT
  • 4 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8175013 Nagawan GOV 46 15-Jul-2024 1 0 0 0 0 0 0 0 21 21 100%
+0
42
91 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 8
+0
8
0 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Verified Verified 0 2 Verified Verified 0 2 Verification Remarks Minutes of Meeting 46 0 8 0 0 2 8 7 0 25 10 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 4 4 1958 13706 58740 567 28.96% 13783 53143 33 3 0 0 0 30 4
+0
4
+0
4
4 1808.21
+0.00
1808.21
46 7268 46
+ 0
33
7268 0 0 100.00
+0
5 / 5
+0
44 / 37
9472.00
+0.00 / +0.00
8107.35
85.59% 23 18 5 8 1 7
  • 13 HGJ CERT
  • 44 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 19-Feb-2023 Intake
  • 19-Feb-2023 WTP
  • 31-Aug-2023 Comissioning
8175050 Tenduahi GOV 80 15-Jul-2024 1 0 0 0 0 0 0 0 64 63 98%
+0
78
98 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 5 Integrated Verified Verified 1 6 Verified Verified 1 6 Verification Remarks Minutes of Meeting 50 0 9 0 0 6 9 2 0 16 10 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 9 7 3184 22288 95520 2247 70.57% 29137 125738 2 0 0 1 1 0 4
+0
4
+0
4
4 573.87
+0.00
571.68
80 12757 79
+ 0
68
12743 0 0 99.89
+0
5 / 5
+0
80 / 79
12858.00
+0.00 / +0.00
11482.31
89.30% 83 68 15 16 1 15
  • 2 D.System
  • 14 FHTC
  • 1 HGJ
  • 12 HGJ CERT
  • 71 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
Agency Total 361 4 0 0 0 0 0 0 0 169 168 99% 342 500.00 1 / 0 500.00 1 / 0
+0
0 / 0
0 / 0 39
+2
39
0 0 0 1 0
  +0
38 | 38
36 0 / 0 1 / 0 30 -- -- -- 3 2 1 8 3 2 1 8 -- 247 0 39 5 10 8 24 12 0 -- -- 0 + 0 + 0 + 8 + 0 = 8 0 + 0 + 0 + 19 + 0 = 19 30 25 10739 75173 322170 7669 71.41% 77432 347934 82 50 0 1 1 30 20
+0
20
+0
20
20 4824.34
+0.00
4817.30
361 58561 353
+ 0
277
57781 0 0 99
+0
25 / 25
+0
348 / 276
66677.00
+0.00
57304.82
86% 464 420 44 66 8 58
Total Sonbhadra 1305 6 6 2 2 2 41 41 0 0 546 541 99%
+0
1214
93.03 100.00 11 21 / 2 100.00 11 51 / 2
+0
0 / 0
0 / 0 176
+0
168
3 5 0 1 0
  +0
162 | 162
155 0 / 0 106 / 0 72 -- -- -- 5 5 14 33 5 5 14 33 -- 1028 0 176 34 64 32 78 24 18 -- -- 0 + 0 + 0 + 19 + 0 = 19 0 + 0 + 0 + 46 + 0 = 46 113 90 43160 302120 1294800 45068 104.42% 311124 1318402 608 528 1 5 3 71 77
+0
75
+0
75
75 15534.95
+0.00
15119.59
1305 288480 768
+ 0
419
270339 0 0 93.71
+0
83 / 83
+0
1054 / 568
313955.00
+0.00 / +0.00
245211.39
78.10% 0 1 0 1553 1373 180 298 84 214
Project Completion Plan

Minutes of Meeting Date -