Phase 1

Physical Progress All Scheme

Total Scheme : 63 O&M Scheme : 45 Under Trial Run Scheme : 4 In-Progress Scheme : 14
S.No   District         Name of Firm/Agency Scheme Id Scheme Name Villages Alloted
Start Date of Trial Run
Operational and Maintenance Details
ROAD DISMENTLING/RESTORATION(KM) Intake WTP T/W OHT
Automation Integration Status
Connectivity Status
Pump Status
EE E&M Verification Status
  Last 7 days         Automation Alert
Automation Integration OHT Status Functional OHT Water Demand OHT Water Supply Regular Water Supply Villages(Village Wise) CWR Distribution System INCL RWRM/CWRM(km) HGJ Status FHTC Electricity Commissioning of Village IMIS Scheme Completed
As Build Drawing Submitted
Final As Executed BOQ Submitted
Incoming Complaints Received Feedback from Gram Pradhan On Call Balance Work Scheme Completion Plan(Agency) U.P.Jal Nigam UP Jal Nigam Old Scheme Status
Initiated By Agency (scheme)
Finalized By Agency (scheme)
Approved By TPI (scheme)
Approved By EE (scheme)
Covered village
Regular water supply (Filled by pump operator)
Monthly O&M Charges(in Rs)
Yearly O&M Charges(in Rs)
Dismantle(Filled by EE) Restored(Filled by EE) Restored %(Filled by EE) Villages where 100% road restoration completed(Filled by TPI) Restored(%) In progress(%) Functional Images/Videos In progress(%) Functional Images/Videos Required /completed (LAST WEEK ) Images/Videos Required Started (Filled by Agency) Started(Filled by EE) Progress 0 to 25% Progress 26% to 50% Progress 51% to 75% Progress 76% to 99%
OHT completed
EE | Agency
OHT Fuctional(By ADM)
OHT with less manpower
EE | TPI
OHT and Signage Board Images/Videos OHT Logo Intake(Previous Status) WTP(Previous Status) No Of CWR(Previous Status) No Of OHT(Previous Status) Intake(Current Status) WTP(Current Status) No Of CWR(Current Status) No Of OHT(Current Status) O&M Verification Remark Total Alerts Action Taken Alerts Total OHT Not Integrated OHT Disconnected OHT (No water supply received in the last two days) Accurate data(EE E&M) Functional OHT Water supply less than 75% percent (Average water supply over 2 days) Water supply greater than 150% percent (Average water supply over 2 days) Last Month AVG Water Supply Days = [(Total Integrated OHT × Month Days) − (Disconnected OHT × Disconnected Days)] ÷ Total Integrated OHT Current Month AVG Water Supply Days = [(Total Integrated OHT × Month Days) − (Disconnected OHT × Disconnected Days)] ÷ Total Integrated OHT Regular water supply disruption(OHT) 1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Regular water supply disruption(Village)
1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Villages with pending complaints. Villages with complaints pending for more than 15 days. Daily Weekly Monthly Yesterday Yesterday(%) Weekly Monthly Regular water supply Villages Below 50% 50% to 75% 76% to 90% Above 90% 100% Household with RWS Required Started Completed Completed
CWR Images Required Laid Villages Alloted Household HGJ (100% Completed) HGJ Certified Villages FHTC Given as on Today FHTC Given as on Yesterday FHTC Given (last Week) FHTC % Connection Required/Completed Commissioned/Regular water supply(Verified by EE) Estimated Cost(Lacs)
Last Week / Last Month
Expenditure(Lacs)
Expenditure(%) All Complaints Close Complaints Pending Complaints All Complaints Close Complaints Pending Complaints
  • 0 T/W
  • 35 OHT
  • 2 CWR
  • 162.21 D.System
  • 74 Comissioning
  • 2 Electricity
  • 12496 FHTC
  • 729 HGJ
  • 1773 HGJ CERT
  • 6157 HOV
  • Scheme Wise Category A
  • 808 No. of Schemes
  • 1427 No. of Villages
  • Scheme Wise Category B
  • 3878 No. of Schemes
  • 7116 No. of Villages
  • Scheme Wise Category C
  • 1049 No. of Schemes
  • 1554 No. of Villages
  • Scheme Wise Total
  • 5735 Total No. of Schemes
  • 10097 Total No. of Villages
  • Village Wise Category A
  • 1157 No. of Villages
  • Village Wise Category B
  • 5722 No. of Villages
  • Village Wise Category C
  • 3014 No. of Villages
  • Village Wise Total
  • 9893 Total No. of Villages
  • 4688 Agreement Done Scheme
  • 8378 Agreement Done Village
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106
Total Schemes : 63 6547 49 53 45 45 45 4095 3898 6190013 74280156 10668 10318 97%
+1
5817
89 98.99 61 166 / 16 100.00 62 359 / 17
+0
557 / 557
213 / 83 1699
+0
1689
842 5 0 3 17
  +1
1644 | 1664
1583 0 / 0 1307 / 104 1136 -- -- -- 49 48 236 929 44 44 226 854 -- 8551 1861 1699 508 489 854 702 475 0 -- -- 1 + 1 + 0 + 37 + 0 = 39 1 + 1 + 0 + 67 + 0 = 69 382 189 243364 1703548 7300920 0 0% 1840569 9263397 5935 473 182 226 653 4401 455
+0
453
+0
453
453 0 58117.33
+27.65
57955.12
6547 1685084 5817
+ 6
4773
1672592 0 0 99.26
+0
900 / 898
+1
6396 / 5256
1624724.00
+0.00 / +0.00
1448305.80
89.14% 8 8 5 23396 22868 528 1902 1333 569
1 Banda Larsen & Toubro Ltd


8044758 Khatan GOV 342 01-May-2025 1 1 1 1 342 342 0 0 691 688 100%
+0
337
99 100.00 Yes 19 / 3 100.00 Yes 94 / 2
+0
0 / 0
0 / 0 116
+0
116
116 0 0 0 0
  +0
116 | 116
116 0 / 0 116 / 1 116 Integrated Off Verified Verified 22 114 Verified Verified 18 99 Verification Remarks Minutes of Meeting 1011 812 116 0 116 99 0 0 0 21 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 40 29 0 0 0 0 0% 82759 565760 342 0 0 11 42 289 39
+0
39
+0
39
39 0 4215.00
+0.00
4215.00
342 127889 342
+ 0
324
127889 0 0 100.00
+0
41 / 41
+0
342 / 338
156314.00
+0.00 / +0.00
142656.23
91.26% 1697 1640 57 112 100 12
  • 18 HGJ CERT
  • 333 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2023
Comissioning
0
  • 31-Jul-2024 OHT
  • 31-Mar-2024 CWR
  • 30-Sep-2023 D.System
  • 30-Jun-2024 Comissioning
  • 90 Villages
  • 54725 Households
  • 0 Last Week FHTC Given
  • 54725 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 90 HGJ
  • 89 HGJ Certified
  • 98.89 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 46 Handed Over Villages(before Portal)
  • 37 Handed Over Initiated/Approved On Portal
  • 92.22 Handed Over %
  • 89 OHT Required
  • 89 OHT Completed
  • Scheme Wise Category A
  • 35 No. of Schemes
  • 59 No. of Villages
  • Scheme Wise Category B
  • 21 No. of Schemes
  • 46 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 59 No. of Villages
  • Village Wise Category B
  • 46 No. of Villages
  • Village Wise Category C
  • 1 No. of Villages
  • Village Wise Total
  • 106 Total No. of Villages
  • 57 Total No. of Schemes
  • 106 Total No. of Villages
  • 102 Total No. of OHT
  • 52 Schemes Sent to O&M
  • 97 No. of OHT in O&M Schemes
  • 29813 Water Demand(M3)
  • 31207.66 Water Supply (M3)
  • 51 Agreement Done Scheme
  • 97 Agreement Done Village
NCC Ltd.


8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 202 15-May-2024 1 1 1 1 202 202 0 0 580 580 100%
+0
202
100 100.00 Yes 18 / 0 100.00 Yes 75 / 0
+0
31 / 31
32 / 0 80
+0
80
80 0 0 0 0
  +0
80 | 80
80 0 / 0 103 / 0 103 Integrated Verified Verified 12 70 Verified Verified 12 64 Verification Remarks Minutes of Meeting 238 158 80 0 3 64 77 54 0 29 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 18 4 27436 192052 823080 0 0% 201532 952003 202 0 0 0 14 188 13
+0
13
+0
13
13 0 2581.60
+0.00
2581.60
202 82266 202
+ 0
201
82266 0 0 100.00
+0
34 / 34
+0
202 / 202
93222.00
+0.00 / +0.00
88170.52
94.58% 2605 2586 19 85 82 3
  • 1 HGJ CERT
  • 200 HOV
Intake
Approach Road Completed
WTP
Campus Development Completed
T/W
Completed
OHT
Completed
CWR
1 No. CWR Shall be Completed in 25-Sept-2024 ( New additional Scope).
D.System
15-Feb-2024
Comissioning
0
  • 15-Dec-2023 Intake
  • 30-Nov-2023 WTP
  • 15-Sep-2023 T/W
  • 25-Nov-2023 OHT
  • 15-Apr-2024 CWR
  • 15-Feb-2024 D.System
  • 15-Sep-2024 Comissioning
Total Banda 544 2 2 2 2 2 544 544 0 0 1271 1268 100%
+0
539
99.08 100.00 2 37 / 3 100.00 2 169 / 2
+0
31 / 31
32 / 0 196
+0
196
196 0 0 0 0
  +0
196 | 196
196 0 / 0 219 / 1 219 -- -- -- 2 2 34 184 2 2 30 184 -- 1249 970 196 0 119 163 77 54 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 58 33 27436 192052 823080 0 0% 284291 1517763 544 0 0 11 56 477 52
+0
52
+0
52
52 0 6796.60
+0.00
6796.60
544 210155 544
+ 0
525
210155 0 0 100
+0
75 / 75
+0
544 / 540
249536.00
+0.00 / +0.00
230826.75
92.50% 0 0 0 4302 4226 76 197 182 15
2 Chitrakoot GVPR


8135453 Raipura GOV 69 0 0 0 0 0 0 0 0 92 85 92%
+0
63
91 100.00 Yes 2 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 28
+3
28
28 0 0 0 0
  +1
28 | 28
26 0 / 0 4 / 0 3 Integrated Off Verified Verified 0 26 Verified Verified 0 25 Verification Remarks Minutes of Meeting 326 0 28 5 8 25 15 14 0 14 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 3 3857 26999 115710 0 0% 18682 95455 66 6 2 5 13 40 11
+0
11
+0
11
11 0 882.90
+0.80
878.65
69 19570 69
+ 0
53
19570 0 0 100.00
+0
13 / 13
+0
65 / 65
30332.00
+0.00 / +0.00
23608.05
77.83% 208 201 7 31 2 29
  • 4 D.System
  • 4 COV
  • 16 HGJ CERT
  • 68 HOV
Intake
0
WTP
operational
T/W
0
OHT
May-26
CWR
June-24
D.System
30-Dec-2026
Comissioning
0
  • 30-Sep-2023 Intake
  • 31-Oct-2023 WTP
  • 31-May-2026 OHT
  • 10-Mar-2024 CWR
  • 30-Dec-2026 D.System
  • 15-Feb-2025 Comissioning
  • 140 Villages
  • 44632 Households
  • 0 Last Week FHTC Given
  • 44623 FHTC Given
  • 99 FHTC(%)
  • 9 Balance FHTC
  • 140 HGJ
  • 122 HGJ Certified
  • 87.14 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 37 Handed Over Villages(before Portal)
  • 90 Handed Over Initiated/Approved On Portal
  • 90.71 Handed Over %
  • 71 OHT Required
  • 71 OHT Completed
  • Scheme Wise Category A
  • 43 No. of Schemes
  • 102 No. of Villages
  • Scheme Wise Category B
  • 4 No. of Schemes
  • 42 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 47 No. of Villages
  • Village Wise Category B
  • 0 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 47 Total No. of Villages
  • 47 Total No. of Schemes
  • 144 Total No. of Villages
  • 81 Total No. of OHT
  • 19 Schemes Sent to O&M
  • 28 No. of OHT in O&M Schemes
  • 5482 Water Demand(M3)
  • 11130.07 Water Supply (M3)
  • 0 Agreement Done Scheme
  • 0 Agreement Done Village
Larsen & Toubro Ltd


8134589 Silauta Mustkil GOV 59 0 0 0 0 0 0 0 0 59 59 100%
+1
59
100 100.00 Yes 4 / 0 100.00 Yes 12 / 1
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 22 / 0 11 Integrated Off Verified Verified 5 17 Verified Verified 3 17 Verification Remarks Minutes of Meeting 205 0 17 0 17 17 0 0 0 3 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 1 0 0 0 0 0% 3309 14214 59 0 0 1 12 46 6
+0
6
+0
6
6 0 576.00
+0.00
567.05
59 11925 59
+ 0
59
11925 0 0 100.00
+0
7 / 7
+0
59 / 59
21359.00
+0.00 / +0.00
20939.14
98.03% 169 164 5 22 1 21
  • 8 D.System
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Oct-2023
Comissioning
0
  • 30-Nov-2023 Intake
  • 15-Dec-2023 WTP
  • 15-Oct-2024 OHT
  • 31-Aug-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Aug-2023 Comissioning
8134609 Chandi Bangar GOV 286 0 0 0 0 0 0 0 0 304 275 90%
+0
237
83 100.00 Yes 9 / 0 100.00 Yes 9 / 0
+0
0 / 0
0 / 0 91
+0
91
91 0 0 0 0
  +0
91 | 91
87 0 / 0 29 / 0 4 Integrated Off Verified Not Verified 5 28 Verified Not Verified 5 23 Verification Remarks Minutes of Meeting 576 0 91 7 84 23 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 27 21 0 0 0 0 0% 0 0 221 71 5 0 72 73 20
+0
20
+0
20
20 0 3052.00
+0.00
2846.86
286 86157 284
+ 0
131
86114 0 0 99.95
+0
21 / 21
+0
250 / 180
95975.00
+0.00 / +0.00
77188.06
80.43% 801 767 34 118 2 116
  • 205 D.System
  • 34 COV
  • 43 FHTC
  • 2 HGJ
  • 155 HGJ CERT
  • 284 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Nov-2025
Comissioning
0
  • 15-Dec-2023 Intake
  • 15-Dec-2023 WTP
  • 31-Dec-2025 OHT
  • 30-Jun-2024 CWR
  • 30-Nov-2025 D.System
  • 30-Jun-2026 Comissioning
Agency Total 345 0 0 0 0 0 0 0 0 363 334 92% 296 200.00 13 / 0 200.00 21 / 1
+0
0 / 0
0 / 0 108
+0
108
108 0 0 0 0
  +0
108 | 108
104 0 / 0 51 / 0 15 -- -- -- 2 1 10 45 2 1 8 40 -- 781 0 108 7 101 40 0 0 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 32 22 0 0 0 0 0% 3309 14214 280 71 5 1 84 119 26
+0
26
+0
26
26 0 3628.00
+0.00
3413.91
345 98082 343
+ 0
190
98039 0 0 100
+0
28 / 28
+0
309 / 239
117334.00
+0.00
98127.20
84% 970 931 39 140 3 137
Total Chitrakoot 414 0 0 0 0 0 0 0 0 0 455 418 92%
+1
359
86.71 100.00 3 15 / 0 100.00 3 22 / 1
+0
0 / 0
0 / 0 136
+0
136
136 0 0 0 0
  +1
136 | 136
130 0 / 0 55 / 0 18 -- -- -- 3 2 10 71 3 2 8 71 -- 1107 0 136 12 109 65 15 14 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 39 25 3857 26999 115710 0 0% 21991 109669 346 77 7 6 97 159 37
+0
37
+0
37
37 0 4510.90
+0.80
4292.56
414 117652 412
+ 0
243
117609 0 0 99.96
+0
41 / 41
+0
374 / 304
147666.00
+0.00 / +0.00
121735.25
82.44% 0 0 0 1178 1132 46 171 5 166
3 Hamirpur PNC-SPML-JV


8135500 Haraulipur GOV and Tubewell Scheme 125 Nos. 193 20-Mar-2024 1 1 1 1 193 191 3092513 37110156 793 793 100%
+0
192
99 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
130 / 130
0 / 0 130
+0
130
0 0 0 0 0
  +0
130 | 130
130 0 / 0 118 / 0 113 Integrated Off Verified Verified 0 3 Verified Verified 0 3 Verification Remarks Minutes of Meeting 88 0 130 121 8 3 1 0 0 16 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 16 6 24 168 720 0 0% 2549 28411 193 0 0 0 12 181 6
+0
6
+0
6
6 0 1327.83
+0.00
1327.83
193 59675 193
+ 0
191
59675 0 0 100.00
+0
73 / 73
+0
193 / 193
27101.00
+0.00 / +0.00
25719.52
94.90% Yes Yes 1413 1395 18 88 84 4
  • 2 HGJ CERT
  • 191 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Dec-2023
Comissioning
0
  • 28-Feb-2024 T/W
  • 20-Mar-2024 OHT
  • 30-Oct-2023 CWR
  • 30-Dec-2023 D.System
  • 20-Mar-2024 Comissioning
  • 143 Villages
  • 79974 Households
  • 0 Last Week FHTC Given
  • 79974 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 143 HGJ
  • 130 HGJ Certified
  • 90.91 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 28 Handed Over Villages(before Portal)
  • 57 Handed Over Initiated/Approved On Portal
  • 59.44 Handed Over %
  • 60 OHT Required
  • 60 OHT Completed
  • Scheme Wise Category A
  • 76 No. of Schemes
  • 114 No. of Villages
  • Scheme Wise Category B
  • 27 No. of Schemes
  • 31 No. of Villages
  • Scheme Wise Category C
  • 2 No. of Schemes
  • 2 No. of Villages
  • Village Wise Category A
  • 106 No. of Villages
  • Village Wise Category B
  • 39 No. of Villages
  • Village Wise Category C
  • 2 No. of Villages
  • Village Wise Total
  • 147 Total No. of Villages
  • 105 Total No. of Schemes
  • 147 Total No. of Villages
  • 108 Total No. of OHT
  • 76 Schemes Sent to O&M
  • 79 No. of OHT in O&M Schemes
  • 20351 Water Demand(M3)
  • 24612.33 Water Supply (M3)
  • 105 Agreement Done Scheme
  • 147 Agreement Done Village
JWIL


8135488 Pathyora Danda GOV 129 20-Mar-2024 1 1 1 1 129 128 3097500 37170000 412 412 100%
+0
129
100 100.00 Yes 7 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 46
+0
46
0 0 0 0 0
  +0
46 | 46
46 0 / 0 45 / 0 42 Integrated Off Verified Verified 6 43 Verified Verified 6 32 Verification Remarks Minutes of Meeting 383 0 46 0 46 32 0 0 0 4 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 0 0 0 0 0 0% 28073 109378 129 0 0 0 15 114 10
+0
10
+0
10
10 0 1214.00
+0.00
1213.70
129 45475 129
+ 0
128
45475 0 0 100.00
+0
10 / 10
+0
129 / 129
39878.00
+0.00 / +0.00
37750.20
94.66% Yes Yes 1164 1162 2 58 52 6
  • 1 HGJ CERT
  • 127 HOV
Intake
Completed and functional
WTP
Completed and functional
T/W
0
OHT
To be completed by March2024
CWR
Completed
Comissioning
0
  • 15-Mar-2024 OHT
Total Hamirpur 322 2 2 2 2 2 322 319 6190013 74280156 1204 1204 100%
+0
321
99.69 100.00 2 11 / 0 100.00 2 5 / 0
+0
130 / 130
0 / 0 176
+0
176
0 0 0 0 0
  +0
176 | 176
176 0 / 0 163 / 0 155 -- -- -- 2 2 6 46 2 2 6 46 -- 471 0 176 121 54 35 1 0 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 18 6 24 168 720 0 0% 30622 137789 322 0 0 0 27 295 16
+0
16
+0
16
16 0 2541.83
+0.00
2541.53
322 105150 322
+ 0
319
105150 0 0 100
+0
83 / 83
+0
322 / 322
66979.00
+0.00 / +0.00
63469.72
94.76% 2 2 0 2577 2557 20 146 136 10
4 Jalaun BGCCPL-Ramky (JV)


8135522 Kota Mustakil GOV and Tubewell Scheme 270 Nos. 510 1 0 0 0 0 0 0 0 1123 963 86%
+0
231
45 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
256 / 256
0 / 0 272
+0
272
272 0 0 3 16
  +0
234 | 253
189 0 / 0 110 / 0 2 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 272 272 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 41 22 0 0 0 0 0% 0 0 278 145 60 24 23 26 5
+0
5
+0
5
5 0 2511.00
+0.00
2507.80
510 109509 201
+ 0
88
107150 0 0 97.85
+0
129 / 127
+0
505 / 128
52161.00
+0.00 / +0.00
51396.42
98.53% 871 799 72 103 59 44
  • 19 OHT
  • 3 D.System
  • 5 COV
  • 2 Electricity
  • 2359 FHTC
  • 309 HGJ
  • 422 HGJ CERT
  • 509 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2026
Comissioning
0
  • 30-Sep-2026 Intake
  • 30-Sep-2026 WTP
  • 30-Sep-2026 T/W
  • 30-Sep-2026 OHT
  • 30-Sep-2026 CWR
  • 30-Sep-2026 D.System
  • 30-Sep-2026 Comissioning
  • 61 Villages
  • 26484 Households
  • 0 Last Week FHTC Given
  • 26484 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 61 HGJ
  • 55 HGJ Certified
  • 90.16 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 3 Handed Over Villages(before Portal)
  • 19 Handed Over Initiated/Approved On Portal
  • 36.07 Handed Over %
  • 60 OHT Required
  • 60 OHT Completed
  • Scheme Wise Category A
  • 31 No. of Schemes
  • 34 No. of Villages
  • Scheme Wise Category B
  • 25 No. of Schemes
  • 29 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 34 No. of Villages
  • Village Wise Category B
  • 29 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 63 Total No. of Villages
  • 56 Total No. of Schemes
  • 63 Total No. of Villages
  • 59 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 59 No. of OHT in O&M Schemes
  • 11083 Water Demand(M3)
  • 2885.29 Water Supply (M3)
  • 56 Agreement Done Scheme
  • 63 Agreement Done Village
8135526 Raipur GOV 83 1 0 0 0 0 0 0 0 168 132 79%
+0
39
47 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 17 17 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 3 0 0 0 0 0% 0 0 38 28 3 0 7 0 7
+0
7
+0
7
7 0 495.00
+0.00
494.49
83 18444 10
+ 0
2
17550 0 0 95.15
+0
8 / 8
+0
79 / 37
20745.00
+0.00 / +0.00
7276.12
35.07% 98 92 6 16 3 13
  • 3 COV
  • 894 FHTC
  • 73 HGJ
  • 81 HGJ CERT
  • 82 HOV
Intake
0
WTP
It is Functioning
T/W
0
OHT
Completed
CWR
0
D.System
30-Sep-2026
Comissioning
0
  • 30-Sep-2026 Intake
  • 30-Sep-2026 WTP
  • 30-Sep-2026 T/W
  • 30-Sep-2026 OHT
  • 30-Sep-2026 CWR
  • 30-Sep-2026 D.System
  • 30-Sep-2026 Comissioning
8135545 Madhepura GOV 67 1 0 0 0 0 0 0 0 162 131 81%
+0
34
51 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+1
12
12 0 0 0 1
  +0
10 | 11
9 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 8 6 0 0 0 0 0% 0 0 27 17 4 0 5 1 6
+0
6
+0
6
6 0 425.00
+0.00
424.25
67 15230 5
+ 0
4
14647 0 0 96.17
+0
7 / 7
+0
61 / 6
13157.00
+0.00 / +0.00
4250.57
32.31% 162 152 10 22 21 1
  • 1 OHT
  • 6 COV
  • 583 FHTC
  • 62 HGJ
  • 63 HGJ CERT
  • 63 HOV
Intake
0
WTP
Completed
T/W
0
OHT
Completed
CWR
0
D.System
30-Sep-2026
Comissioning
0
  • 30-Sep-2026 Intake
  • 30-Sep-2026 WTP
  • 30-Sep-2026 T/W
  • 30-Sep-2026 OHT
  • 30-Sep-2026 CWR
  • 30-Sep-2026 D.System
  • 30-Sep-2026 Comissioning
Agency Total 660 3 0 0 0 0 0 0 0 1453 1226 84% 304 300.00 1 / 0 300.00 0 / 0
+0
256 / 256
0 / 0 301
+1
301
301 0 0 3 17
  +0
261 | 281
215 0 / 0 110 / 0 2 -- -- -- -- 0 0 301 301 0 0 0 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 54 31 0 0 0 0 0% 0 0 343 190 67 24 35 27 18
+0
18
+0
18
18 0 3431.00
+0.00
3426.54
660 143183 216
+ 0
94
139347 0 0 97
+0
144 / 142
+0
645 / 171
86063.00
+0.00
62923.11
73% 1131 1043 88 141 83 58
GVPR


8135513 Sala GOV 197 15-Jul-2025 1 1 1 1 197 158 0 0 496 495 100%
+0
186
94 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 56
+0
56
56 0 0 0 0
  +0
56 | 56
56 0 / 0 59 / 0 22 Integrated Off Verified Verified 10 56 Verified Verified 10 56 Verification Remarks Minutes of Meeting 269 0 56 0 19 56 37 25 0 20 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6 2 10376 72632 311280 0 0% 56429 314099 197 0 0 13 34 150 11
+0
11
+0
11
11 0 1715.00
+0.00
1715.00
197 43098 197
+ 0
181
43098 0 0 100.00
+0
12 / 12
+0
197 / 197
50599.00
+0.00 / +0.00
44913.13
88.76% 483 475 8 42 42 0
  • 16 HGJ CERT
  • 195 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Total Jalaun 857 1 4 1 1 1 197 158 0 0 1949 1720 88%
+0
490
57.18 100.00 4 3 / 0 100.00 4 4 / 0
+0
256 / 256
0 / 0 357
+0
357
357 0 0 3 17
  +0
317 | 337
271 0 / 0 169 / 0 24 -- -- -- 1 1 10 56 1 1 10 56 -- 269 0 357 301 19 56 37 25 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 60 33 10376 72632 311280 0 0% 56429 314099 539 189 67 37 69 177 29
+0
29
+0
29
29 0 5146.00
+0.00
5141.54
857 184499 413
+ 0
275
180667 0 0 97.92
+0
156 / 154
+0
842 / 368
136662.00
+0.00 / +0.00
107836.24
78.91% 0 0 0 1603 1507 96 181 123 58
5 Jhansi BGCCPL-Ramky (JV)


8009955 Imlota GOV 87 0 0 0 0 0 0 0 0 242 215 89%
+0
13
15 100.00 Yes 1 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 4 / 0 7 Integrated Off Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 46 0 13 12 1 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 18 9 0 0 0 0 0% 0 0 79 6 0 0 16 57 8
+0
8
+0
8
8 0 899.95
+0.00
899.00
87 32259 82
+ 0
29
32223 0 0 99.89
+0
9 / 9
+0
87 / 66
29730.00
+0.00 / +0.00
26146.92
87.95% 379 353 26 33 24 9
  • 36 FHTC
  • 5 HGJ
  • 58 HGJ CERT
  • 86 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Jul-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Apr-2024 OHT
  • 14-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
  • 124 Villages
  • 49613 Households
  • 0 Last Week FHTC Given
  • 48096 FHTC Given
  • 96 FHTC(%)
  • 1517 Balance FHTC
  • 105 HGJ
  • 95 HGJ Certified
  • 76.61 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 31 Handed Over Villages(before Portal)
  • 47 Handed Over Initiated/Approved On Portal
  • 62.90 Handed Over %
  • 14 OHT Required
  • 14 OHT Completed
  • Scheme Wise Category A
  • 34 No. of Schemes
  • 58 No. of Villages
  • Scheme Wise Category B
  • 35 No. of Schemes
  • 64 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 53 No. of Villages
  • Village Wise Category B
  • 52 No. of Villages
  • Village Wise Category C
  • 18 No. of Villages
  • Village Wise Total
  • 123 Total No. of Villages
  • 70 Total No. of Schemes
  • 123 Total No. of Villages
  • 77 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 58 No. of OHT in O&M Schemes
  • 10674 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 70 Agreement Done Scheme
  • 123 Agreement Done Village
8135947 Teharka GOV 93 0 0 0 0 0 0 0 0 162 135 83%
+0
28
30 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 4 / 0 6 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 14 7 0 0 0 0 0% 0 0 81 16 3 6 24 32 9
+0
9
+0
9
9 0 786.55
+0.00
786.00
93 27437 33
+ 0
8
27285 0 0 99.45
+0
10 / 10
+0
91 / 59
29676.00
+0.00 / +0.00
18958.13
63.88% 289 270 19 34 16 18
  • 2 COV
  • 152 FHTC
  • 60 HGJ
  • 85 HGJ CERT
  • 93 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 31-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
8135956 Barthari GOV 106 0 0 0 0 0 0 0 0 179 160 89%
+0
42
40 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 4 / 0 10 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 15 15 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 11 9 0 0 0 0 0% 0 0 80 24 10 6 7 33 11
+0
11
+0
11
11 0 868.26
+0.00
863.85
106 27423 39
+ 0
1
27209 0 0 99.22
+0
12 / 12
+0
98 / 45
29490.00
+0.00 / +0.00
25567.66
86.70% 149 133 16 41 26 15
  • 4 D.System
  • 8 COV
  • 214 FHTC
  • 67 HGJ
  • 105 HGJ CERT
  • 106 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 30-Jun-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jun-2024 Comissioning
Agency Total 286 0 0 0 0 0 0 0 0 583 510 87% 83 300.00 3 / 0 300.00 8 / 0
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 12 / 0 23 -- -- -- -- 46 0 40 39 1 0 0 0 -- -- 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 43 25 0 0 0 0 0% 0 0 240 46 13 12 47 122 28
+0
28
+0
28
28 0 2554.76
+0.00
2548.85
286 87119 154
+ 0
38
86717 0 0 100
+0
31 / 31
+0
276 / 170
88896.00
+0.00
70672.71
80% 817 756 61 108 66 42
Indian Hume Pipe


8010037 Kuraicha GOV 74 05-Feb-2024 1 1 1 1 74 72 0 0 294 291 99%
+0
69
93 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 14
+14
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 14 / 0 24 Integrated Verified Verified 10 14 Verified Verified 10 14 Verification Remarks Minutes of Meeting 138 0 14 0 0 14 14 14 0 30 5 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 3 + 0 = 3 5 3 8491 59437 254730 0 0% 49154 332319 71 0 0 0 1 70 11
+0
11
+0
11
11 0 859.73
+0.00
859.37
74 29415 73
+ 0
70
29406 0 0 99.97
+0
19 / 19
+0
72 / 69
28180.00
+0.00 / +0.00
27954.08
99.20% Yes 392 386 6 25 23 2
  • 9 FHTC
  • 1 HGJ
  • 4 HGJ CERT
  • 74 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
NCC Ltd.


8009966 Tilaitha GOV 25 01-Sep-2023 1 1 1 1 25 25 0 0 68 68 100%
+0
25
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 10 / 0 5 Integrated Off Verified Verified 3 5 Verified Verified 3 5 Verification Remarks Minutes of Meeting 39 0 5 0 0 5 5 2 0 30 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 1 1930 13510 57900 0 0% 18212 90097 25 0 0 0 8 17 4
+0
4
+0
4
4 0 248.18
+0.00
248.18
25 6725 25
+ 0
24
6725 0 0 100.00
+0
7 / 7
+0
25 / 25
7517.00
+0.00 / +0.00
6711.81
89.29% Yes 126 125 1 5 5 0
  • 1 HGJ CERT
  • 25 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8009988 Bacholi Bauzurg GOV 37 01-Sep-2023 1 1 1 1 37 37 0 0 85 85 100%
+0
37
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 15 / 0 7 Integrated Off Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 46 0 7 0 0 7 7 3 0 27 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 0 3419 23933 102570 0 0% 28714 135443 37 1 0 1 8 27 4
+0
4
+0
4
4 0 297.97
+0.00
297.97
37 11549 37
+ 0
37
11549 0 0 100.00
+0
10 / 10
+0
37 / 37
12643.00
+0.00 / +0.00
11923.47
94.31% Yes 166 160 6 6 5 1
  • 37 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 15-Oct-2023 Comissioning
8009992 Gulara GOV 42 01-Sep-2023 1 1 1 1 42 40 0 0 100 100 100%
+0
42
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 14 / 0 7 Integrated Off Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 34 0 7 0 0 7 7 4 0 30 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 3346 23422 100380 0 0% 28005 131263 42 0 0 2 3 37 4
+0
4
+0
4
4 0 309.37
+0.00
309.37
42 11437 42
+ 0
42
11437 0 0 100.00
+0
10 / 10
+0
42 / 42
11037.00
+0.00 / +0.00
10864.98
98.44% Yes 75 75 0 19 18 1
  • 42 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8010048 Burhpura GOV 59 01-Sep-2023 1 1 1 1 59 59 0 0 189 189 100%
+0
57
97 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 14
+0
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 32 / 0 14 Integrated Off Verified Verified 7 14 Verified Verified 7 14 Verification Remarks Minutes of Meeting 74 0 14 0 0 14 14 7 0 27 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 2 8009 56063 240270 0 0% 67486 297162 59 2 1 6 22 28 8
+0
8
+0
8
8 0 869.06
+0.00
869.06
59 26650 59
+ 0
55
26650 0 0 100.00
+0
19 / 19
+0
59 / 59
27993.00
+0.00 / +0.00
26962.89
96.32% Yes 330 323 7 16 15 1
  • 4 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 163 4 4 4 4 163 161 0 0 442 442 100% 161 400.00 14 / 0 400.00 8 / 0
+0
0 / 0
0 / 0 33
+0
33
0 0 0 0 0
  +0
33 | 33
33 0 / 0 71 / 0 33 -- -- -- 4 4 16 33 4 4 16 33 -- 193 0 33 0 0 33 33 16 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 10 3 16704 116928 501120 0 0% 142417 653965 163 3 1 9 41 109 20
+0
20
+0
20
20 0 1724.58
+0.00
1724.58
163 56361 163
+ 0
158
56361 0 0 100
+0
46 / 46
+0
163 / 163
59190.00
+0.00
56463.15
95% 697 683 14 46 43 3
DARA ENGINEERING


8135931 Purwa GOV 32 01-Jan-2024 1 1 1 1 32 32 0 0 76 76 100%
+0
31
97 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 6
+6
6
0 0 0 0 0
  +0
6 | 6
6 0 / 0 6 / 0 10 Integrated Verified Verified 3 6 Verified Verified 3 6 Verification Remarks Minutes of Meeting 17 17 6 0 0 6 6 2 0 29 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 4025 28175 120750 0 0% 35278 163006 32 0 0 0 0 32 3
+0
3
+0
3
3 0 292.54
+0.00
292.54
32 12762 32
+ 0
32
12762 0 0 100.00
+0
8 / 8
+0
32 / 32
9704.00
+0.00 / +0.00
9021.80
92.97% Yes 249 248 1 5 5 0
  • 32 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Unipro


8135681 Barwar GOV 57 05-Feb-2024 1 1 1 1 57 57 0 0 263 263 100%
+0
57
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 9 / 0 9 Integrated Verified Verified 4 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 101 101 9 0 1 9 8 3 0 25 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 3641 25487 109230 0 0% 39499 205539 57 0 0 0 0 57 5
+0
5
+0
5
5 0 458.49
+0.00
458.49
57 15848 57
+ 0
57
15848 0 0 100.00
+0
13 / 13
+0
57 / 57
14645.00
+0.00 / +0.00
13881.43
94.79% Yes 201 200 1 14 12 2
  • 57 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 30-Aug-2023 D.System
  • 30-Aug-2023 Comissioning
Total Jhansi 612 7 7 7 7 7 326 322 0 0 1656 1579 95%
+0
401
65.52 100.00 10 21 / 0 100.00 10 22 / 0
+0
0 / 0
0 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 112 / 0 99 -- -- -- 7 7 33 62 7 7 33 62 -- 495 118 102 39 2 62 61 35 0 -- -- 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 4 + 0 = 4 60 31 32862 230034 985860 0 0% 266347 1354830 563 49 14 21 89 390 67
+0
67
+0
67
67 0 5890.10
+0.00
5883.83
612 201505 479
+ 0
355
201094 0 0 99.80
+0
117 / 117
+0
600 / 491
200615.00
+0.00 / +0.00
177993.17
88.72% 0 0 3 2356 2273 83 198 149 49
6 Lalitpur M/s Sudhakara Infratech Pvt. Ltd


8010072 Lagaon GOV 50 15-Jan-2024 1 1 1 1 50 50 0 0 115 115 100%
+0
50
100 100.00 Yes 1 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 13
+13
13
13 0 0 0 0
  +0
13 | 13
13 0 / 0 13 / 0 13 Integrated Verified Verified 7 13 Verified Verified 7 12 Verification Remarks Minutes of Meeting 108 0 13 0 1 12 12 9 0 28 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 3955 27685 118650 0 0% 28829 157151 50 0 0 0 3 47 9
+0
9
+0
9
9 0 381.75
+0.00
409.16
50 12964 50
+ 0
50
12964 0 0 100.00
+0
10 / 10
+0
50 / 50
17608.00
+0.00 / +0.00
17578.70
99.83% Yes 142 142 0 25 25 0
  • 49 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
9 CWR Completed
D.System
30-Sep-2023
Comissioning
30/12/2023
  • 14-Aug-2023 Intake
  • 31-Aug-2023 WTP
  • 14-Jun-2023 OHT
  • 17-May-2023 CWR
  • 30-Sep-2023 D.System
  • 30-Dec-2023 Comissioning
  • 105 Villages
  • 46145 Households
  • 0 Last Week FHTC Given
  • 46145 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 105 HGJ
  • 94 HGJ Certified
  • 89.52 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 7 Handed Over Villages(before Portal)
  • 45 Handed Over Initiated/Approved On Portal
  • 49.52 Handed Over %
  • 37 OHT Required
  • 37 OHT Completed
  • Scheme Wise Category A
  • 15 No. of Schemes
  • 20 No. of Villages
  • Scheme Wise Category B
  • 11 No. of Schemes
  • 93 No. of Villages
  • Scheme Wise Category C
  • 5 No. of Schemes
  • 5 No. of Villages
  • Village Wise Category A
  • 11 No. of Villages
  • Village Wise Category B
  • 49 No. of Villages
  • Village Wise Category C
  • 58 No. of Villages
  • Village Wise Total
  • 118 Total No. of Villages
  • 31 Total No. of Schemes
  • 118 Total No. of Villages
  • 51 Total No. of OHT
  • 20 Schemes Sent to O&M
  • 36 No. of OHT in O&M Schemes
  • 11198 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 16 Agreement Done Scheme
  • 102 Agreement Done Village
8063544 Kachnauda Kala GOV 61 01-Apr-2024 1 1 1 1 61 61 0 0 171 171 100%
+0
61
100 100.00 Yes 1 / 1 100.00 Yes 8 / 1
+0
0 / 0
0 / 0 17
+16
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 17 / 0 19 Integrated Off Verified Verified 5 17 Verified Verified 5 14 Verification Remarks Minutes of Meeting 186 0 17 0 2 14 15 2 0 24 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 5631 39417 168930 0 0% 58976 211686 60 0 0 1 5 54 8
+0
8
+0
8
8 0 578.14
+0.00
594.56
61 22452 61
+ 0
59
22452 0 0 100.00
+0
9 / 9
+0
61 / 60
24598.00
+0.00 / +0.00
23998.94
97.56% 376 376 0 24 24 0
  • 2 HGJ CERT
  • 58 HOV
Intake
100% structure completed work done by 30/10/2023
WTP
100% WTP structure done remaining work done by 30/10/2023
T/W
0
OHT
remaining work completed by 30/11/2023
CWR
remaining work done by 15/12/2023
D.System
30-Oct-2023
Comissioning
comissioning start by 30/10/2023
  • 30-Sep-2023 Intake
  • 23-Oct-2023 WTP
  • 13-Nov-2023 OHT
  • 30-Nov-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Oct-2023 Comissioning
8134917 Jakhlaun Birdha GOV 60 03-Dec-2024 1 1 1 1 60 60 0 0 116 116 100%
+0
60
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+13
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 11 / 0 14 Integrated Verified Verified 2 13 Verified Verified 2 13 Verification Remarks Minutes of Meeting 120 0 15 0 0 13 15 0 0 27 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 5836 40852 175080 0 0% 58522 239520 59 0 0 1 3 55 5
+0
5
+0
5
5 0 462.02
+0.00
520.82
60 17590 60
+ 0
54
17590 0 0 100.00
+0
6 / 6
+0
60 / 59
23368.00
+0.00 / +0.00
22206.49
95.03% 248 247 1 26 26 0
  • 6 HGJ CERT
  • 51 HOV
Intake
remaining work done by 20/10/2023
WTP
remaining work done by 30/01/2024
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 15/11/2023
D.System
15-Feb-2024
Comissioning
comissioning 03/03/2024
  • 20-Oct-2023 Intake
  • 20-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 30-Nov-2023 CWR
  • 15-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134922 Dhoora Balabehat GOV 58 03-Dec-2024 1 1 1 1 58 58 0 0 55 54 98%
+0
57
98 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 11
+10
11
11 0 0 0 0
  +0
11 | 11
11 0 / 0 6 / 0 6 Integrated Off Verified Verified 2 10 Verified Verified 2 9 Verification Remarks Minutes of Meeting 109 0 11 0 2 9 9 3 0 24 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 2482 17374 74460 0 0% 22482 113265 58 0 0 0 3 55 5
+0
5
+0
5
5 0 332.97
+0.00
372.33
58 9685 58
+ 0
55
9685 0 0 100.00
+0
6 / 6
+0
58 / 58
15059.00
+0.00 / +0.00
14955.24
99.31% 124 124 0 12 12 0
  • 3 HGJ CERT
  • 48 HOV
Intake
remaining work done by 30/10/2023
WTP
remaining work done by 30/10/2023
T/W
0
OHT
remaining work done by 30/10/2023
CWR
Work has started on 5 CWR, No one Complete.
D.System
21-Feb-2024
Comissioning
comissioning 15/10/2024
  • 06-Jan-2024 Intake
  • 16-Jan-2024 WTP
  • 30-Dec-2023 OHT
  • 30-Oct-2023 CWR
  • 21-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134938 Kadesra Kalan GOV 7 20-Jun-2024 1 1 1 1 7 7 0 0 62 62 100%
+0
7
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 5 10 Verified Verified 5 10 Verification Remarks Minutes of Meeting 51 0 4 0 0 10 4 3 0 27 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1696 11872 50880 0 0% 19469 97833 7 0 0 0 1 6 2
+0
2
+0
2
2 0 130.13
+0.00
160.49
7 7371 7
+ 0
6
7371 0 0 100.00
+0
3 / 3
+0
7 / 7
5977.00
+0.00 / +0.00
5976.98
100.00% 82 82 0 3 3 0
  • 1 HGJ CERT
  • 7 HOV
Intake
remaining work done by31/10/2023
WTP
remaining work done by 30/12/2023
T/W
0
OHT
15/10/2023
CWR
15/10/2023
D.System
30-Jan-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Dec-2023 WTP
  • 15-Oct-2023 OHT
  • 15-Oct-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
8134955 Mau GOV 15 20-Jun-2024 1 1 1 1 15 14 0 0 38 38 100%
+0
15
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 6
+5
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 0 / 0 3 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 0 0 6 0 0 6 5 0 28 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 923 6461 27690 0 0% 0 0 15 0 0 0 1 14 3
+0
3
+0
3
3 0 120.25
+0.00
162.11
15 3347 15
+ 0
14
3347 0 0 100.00
+0
3 / 3
+0
15 / 15
5996.00
+0.00 / +0.00
4881.97
81.42% 55 54 1 6 6 0
  • 1 HGJ CERT
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 31/10/2023
D.System
30-Jan-2024
Comissioning
comissioning 30/10/2023
  • 20-Oct-2023 Intake
  • 30-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 31-Aug-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
Agency Total 251 6 6 6 6 251 250 0 0 557 556 100% 250 600.00 9 / 1 600.00 24 / 1
+0
0 / 0
0 / 0 66
+61
66
66 0 0 0 0
  +0
66 | 66
66 0 / 0 47 / 0 59 -- -- -- 5 5 21 63 5 5 21 58 -- 574 0 66 0 5 58 61 22 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 0 20523 143661 615690 0 0% 188278 819455 249 0 0 2 16 231 32
+0
32
+0
32
32 0 2005.26
+0.00
2219.47
251 73409 251
+ 0
238
73409 0 0 100
+0
37 / 37
+0
251 / 249
92606.00
+0.00
89598.32
97% 1027 1025 2 96 96 0
Brija Banco Pvt. Ltd


8282117 Chandawali GOV 15 25-Mar-2024 1 1 1 1 15 15 0 0 18 18 100%
+0
15
100 100.00 Yes 2 / 0 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 6
+6
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 1 / 1 6 Integrated Off Verified Verified 1 1 Verified Verified 0 0 Verification Remarks Minutes of Meeting 79 62 6 0 6 0 0 0 0 16 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 0 0 0 0 0% 4525 11532 15 0 0 1 1 13 3
+0
3
+0
3
3 0 108.90
+0.00
108.90
15 3501 15
+ 0
15
3501 0 0 100.00
+0
4 / 4
+0
15 / 15
4615.00
+0.00 / +0.00
3841.40
83.24% 60 59 1 5 4 1
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
civil work is done and E&M work is onging
CWR
All civil work finished and E&M work will be finished on 15 december
D.System
29-Jun-2023
Comissioning
0
  • 31-Oct-2023 Intake
  • 31-Oct-2023 WTP
  • 30-Sep-2023 OHT
  • 30-Sep-2023 CWR
  • 29-Jun-2023 D.System
  • 30-Nov-2023 Comissioning
DARA ENGINEERING


8136125 Sukul Guwan GOV 16 10-Jan-2024 1 1 1 1 16 16 0 0 15 15 100%
+0
16
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 3 4 Verified Verified 3 4 Verification Remarks Minutes of Meeting 34 34 4 0 0 4 4 0 0 29 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1117 7819 33510 0 0% 13361 59971 16 0 0 0 0 16 3
+0
3
+0
3
3 0 80.80
+0.00
80.80
16 3297 16
+ 0
16
3297 0 0 100.00
+0
4 / 4
+0
16 / 16
4614.00
+0.00 / +0.00
4075.86
88.34% Yes 33 33 0 7 7 0
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136173 Billa Mogan GOV 23 05-Aug-2025 1 1 1 1 23 20 0 0 54 54 100%
+0
21
91 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 8 / 0 8 Integrated Verified Verified 4 8 Verified Verified 4 8 Verification Remarks Minutes of Meeting 32 32 8 0 0 8 8 5 0 29 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 1 2551 17857 76530 0 0% 16989 81236 23 0 1 0 2 20 4
+0
4
+0
4
4 0 148.83
+0.00
148.78
23 8735 23
+ 0
19
8735 0 0 100.00
+0
5 / 5
+0
23 / 23
8794.00
+0.00 / +0.00
8027.09
91.28% 153 149 4 12 12 0
  • 4 HGJ CERT
  • 23 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Jul-2023
Comissioning
0
  • 31-Jul-2023 Intake
  • 31-Aug-2023 WTP
  • 31-Jul-2023 OHT
  • 31-Jul-2023 CWR
  • 31-Jul-2023 D.System
  • 31-Aug-2023 Comissioning
8136187 Badanpur GOV 31 10-Jan-2024 1 1 1 1 31 29 0 0 33 33 100%
+0
31
100 100.00 Yes 0 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Off Verified Verified 4 8 Verified Verified 4 8 Verification Remarks Minutes of Meeting 34 34 8 0 0 8 8 3 0 29 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1989 13923 59670 0 0% 16790 79732 31 0 0 0 3 28 4
+0
4
+0
4
4 0 157.92
+0.00
157.92
31 6972 31
+ 0
31
6972 0 0 100.00
+0
5 / 5
+0
31 / 31
8836.00
+0.00 / +0.00
8610.34
97.45% Yes 49 49 0 9 9 0
  • 29 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136199 Sojana Gurgha GOV 32 10-Feb-2024 1 1 1 1 32 32 0 0 58 58 100%
+0
32
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 12
+12
12
12 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 12 Integrated Off Verified Verified 3 12 Verified Verified 3 12 Verification Remarks Minutes of Meeting 108 108 12 0 12 12 0 0 0 23 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 0 0 0 0 0% 0 75696 32 0 0 0 4 28 3
+0
3
+0
3
3 0 169.97
+0.00
169.90
32 9621 32
+ 0
32
9621 0 0 100.00
+0
4 / 4
+0
32 / 32
9528.00
+0.00 / +0.00
9028.53
94.76% 193 191 2 18 18 0
  • 31 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136210 Mandawara GOV 17 10-Jan-2024 1 1 1 1 17 16 0 0 55 55 100%
+0
17
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 2 4 Verified Verified 2 4 Verification Remarks Minutes of Meeting 23 23 4 0 0 4 4 1 0 26 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1875 13125 56250 0 0% 16698 72361 17 0 0 0 0 17 2
+0
2
+0
2
2 0 125.40
+0.00
125.30
17 7306 17
+ 0
16
7306 0 0 100.00
+0
3 / 3
+0
17 / 17
6007.00
+0.00 / +0.00
5052.79
84.12% 76 76 0 6 6 0
  • 1 HGJ CERT
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
Agency Total 119 5 5 5 5 119 113 0 0 215 215 100% 117 500.00 4 / 1 500.00 3 / 1
+0
0 / 0
0 / 0 36
+36
36
36 0 0 0 0
  +0
36 | 36
36 0 / 0 8 / 0 36 -- -- -- 5 5 16 36 5 5 16 36 -- 231 231 36 0 12 36 24 9 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 1 7532 52724 225960 0 0% 63838 368996 119 0 1 0 9 109 16
+0
16
+0
16
16 0 682.92
+0.00
682.70
119 35931 119
+ 0
114
35931 0 0 100
+0
21 / 21
+0
119 / 119
37779.00
+0.00
34794.61
92% 504 498 6 52 52 0
JMC-JWIL (JV)


8010056 Saidpur Kumheri GOV 47 01-Nov-2023 1 1 1 1 47 46 0 0 109 109 100%
+0
47
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 7
+7
7
7 0 0 0 0
  +0
7 | 7
7 0 / 0 7 / 0 7 Integrated Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 39 0 7 0 1 7 6 2 0 24 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 3482 24374 104460 0 0% 33740 136474 47 1 1 0 8 37 5
+0
5
+0
5
5 0 385.45
+0.00
385.45
47 13818 47
+ 0
47
13818 0 0 100.00
+0
6 / 6
+0
46 / 45
14171.00
+0.00 / +0.00
13523.42
95.43% 240 239 1 17 16 1
  • 47 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010063 Gona Narhat GOV 54 01-Nov-2023 1 1 1 1 54 53 0 0 115 115 100%
+0
54
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 10
+10
10
10 0 0 0 0
  +0
10 | 10
10 0 / 0 10 / 0 10 Integrated Verified Verified 5 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 220 0 10 0 0 9 10 9 0 16 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 4224 29568 126720 0 0% 21270 62412 54 3 3 0 15 33 6
+0
6
+0
6
6 0 378.00
+0.00
378.00
54 12897 54
+ 0
54
12897 0 0 100.00
+0
7 / 7
+0
54 / 50
13299.00
+0.00 / +0.00
11725.18
88.17% 338 337 1 23 16 7
  • 50 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010076 Masora Sindwaha GOV 45 01-Mar-2024 1 1 1 1 45 44 0 0 98 98 100%
+0
45
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 15
+8
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 15 Integrated Off Verified Verified 7 15 Verified Verified 7 15 Verification Remarks Minutes of Meeting 120 0 15 0 3 15 12 8 0 27 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 0 3666 25662 109980 0 0% 13753 103809 45 1 0 0 1 43 7
+0
7
+0
7
7 0 512.43
+0.00
512.41
45 14057 45
+ 0
45
14057 0 0 100.00
+0
8 / 8
+0
45 / 44
16681.00
+0.00 / +0.00
15925.10
95.47% 206 204 2 20 19 1
  • 40 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 07-May-2024 OHT
  • 18-Jul-2023 CWR
  • 30-Aug-2023 D.System
  • 29-Jan-2025 Comissioning
Agency Total 146 3 3 3 3 146 143 0 0 322 322 100% 146 300.00 3 / 0 300.00 3 / 0
+0
0 / 0
0 / 0 32
+25
32
32 0 0 0 0
  +0
32 | 32
32 0 / 0 32 / 0 32 -- -- -- 3 3 15 31 3 3 14 31 -- 379 0 32 0 4 31 28 19 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 0 11372 79604 341160 0 0% 68763 302695 146 5 4 0 24 113 18
+0
18
+0
18
18 0 1275.88
+0.00
1275.86
146 40772 146
+ 0
146
40772 0 0 100
+0
21 / 21
+0
145 / 139
44151.00
+0.00
41173.70
93% 784 780 4 60 51 9
Banko Ganga


8282120 Tori GOV 19 15-Jan-2024 1 1 1 1 19 19 0 0 35 35 100%
+0
19
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 7 / 0 8 Integrated Verified Verified 2 8 Verified Verified 2 8 Verification Remarks Minutes of Meeting 63 0 8 0 0 8 8 8 0 29 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 1277 8939 38310 0 0% 7938 39765 19 0 0 0 0 19 2
+0
2
+0
2
2 0 133.36
+0.00
133.36
19 3984 19
+ 0
19
3984 0 0 100.00
+0
3 / 3
+0
19 / 19
4036.00
+0.00 / +0.00
3434.39
85.09% Yes 40 39 1 6 6 0
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 20-May-2023 Intake
  • 25-May-2023 WTP
  • 05-Dec-2022 OHT
  • 15-Mar-2023 CWR
Total Lalitpur 550 16 16 16 16 16 550 540 0 0 1143 1142 100%
+0
547
99.45 100.00 16 20 / 2 100.00 16 33 / 3
+0
0 / 0
0 / 0 148
+0
148
148 0 0 0 0
  +0
148 | 148
148 0 / 0 95 / 1 141 -- -- -- 15 15 55 139 15 15 53 139 -- 1326 293 148 0 27 133 121 58 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 13 1 40708 284956 1221240 0 0% 333339 1542441 547 5 4 3 50 485 71
+0
71
+0
71
71 0 4206.32
+0.00
4420.29
550 156973 549
+ 0
531
156973 0 0 100
+0
86 / 86
+0
549 / 541
183187.00
+0.00 / +0.00
172842.42
94.35% 0 2 0 2408 2394 14 214 204 10
7 Mahoba Larsen & Toubro Ltd


8009844 Shivhar GOV 60 01-Dec-2023 1 1 1 1 60 60 0 0 254 254 100%
+0
60
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 18
+0
18
0 0 0 0 0
  +0
18 | 18
18 0 / 0 18 / 0 18 Integrated Off Verified Verified 6 18 Verified Verified 6 18 Verification Remarks Minutes of Meeting 114 81 18 0 1 18 17 14 0 26 4 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 15 7 6407 44849 192210 0 0% 23403 156050 59 0 1 0 4 54 6
+0
6
+0
6
6 0 672.57
+0.00
672.20
60 20449 60
+ 0
60
20449 0 0 100.00
+0
7 / 7
+0
60 / 60
27118.00
+0.00 / +0.00
27118.00
100.00% Yes Yes Yes 514 487 27 11 3 8
  • 60 HOV
Intake
Completed
WTP
Completed
T/W
0
OHT
0
CWR
Completed
Comissioning
0
  • 31-Aug-2023 OHT
  • 31-Aug-2023 Comissioning
  • 74 Villages
  • 26604 Households
  • 0 Last Week FHTC Given
  • 26428 FHTC Given
  • 99 FHTC(%)
  • 176 Balance FHTC
  • 73 HGJ
  • 63 HGJ Certified
  • 85.14 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 45 Handed Over Villages(before Portal)
  • 4 Handed Over Initiated/Approved On Portal
  • 66.22 Handed Over %
  • 59 OHT Required
  • 59 OHT Completed
  • Scheme Wise Category A
  • 2 No. of Schemes
  • 4 No. of Villages
  • Scheme Wise Category B
  • 34 No. of Schemes
  • 59 No. of Villages
  • Scheme Wise Category C
  • 10 No. of Schemes
  • 10 No. of Villages
  • Village Wise Category A
  • 1 No. of Villages
  • Village Wise Category B
  • 62 No. of Villages
  • Village Wise Category C
  • 10 No. of Villages
  • Village Wise Total
  • 73 Total No. of Villages
  • 46 Total No. of Schemes
  • 73 Total No. of Villages
  • 58 Total No. of OHT
  • 35 Schemes Sent to O&M
  • 37 No. of OHT in O&M Schemes
  • 6579 Water Demand(M3)
  • 7633.95 Water Supply (M3)
  • 46 Agreement Done Scheme
  • 73 Agreement Done Village
JMC-JWIL (JV)


8009837 Lahchura Kashipura GOV 75 15-Mar-2024 1 1 1 1 75 74 0 0 243 243 100%
+0
75
100 100.00 Yes 10 / 1 100.00 Yes 11 / 1
+0
0 / 0
0 / 0 32
+0
32
0 0 0 0 0
  +0
32 | 32
32 0 / 0 23 / 0 27 Integrated Verified Verified 9 31 Verified Verified 9 30 Verification Remarks Minutes of Meeting 256 0 32 0 5 30 27 15 0 22 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 5049 35343 151470 0 0% 41106 169967 75 1 1 1 6 66 10
+0
10
+0
10
10 0 601.08
+0.00
599.17
75 21622 75
+ 0
75
21622 0 0 100.00
+0
11 / 11
+0
75 / 74
23602.00
+0.00 / +0.00
22934.14
97.17% Yes Yes Yes 609 608 1 22 5 17
  • 1 D.System
  • 75 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Apr-2024
Comissioning
0
  • 15-Apr-2024 OHT
  • 15-Apr-2024 D.System
8009841 Salaiya Khalsa Nathupura GOV 77 15-Mar-2024 1 1 1 1 77 77 0 0 282 282 100%
+0
77
100 100.00 Yes 1 / 1 100.00 Yes 16 / 1
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 16 / 3 40 Integrated Off Verified Verified 22 40 Verified Verified 22 40 Verification Remarks Minutes of Meeting 306 11 40 0 0 40 40 27 0 25 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 1 6961 48727 208830 0 0% 45349 201103 77 1 0 6 8 62 22
+0
22
+0
22
22 0 785.00
+0.00
784.25
77 28072 77
+ 0
76
28072 0 0 100.00
+0
23 / 23
+0
77 / 76
26009.00
+0.00 / +0.00
26008.94
100.00% Yes Yes Yes 488 483 5 20 12 8
  • 1 HGJ CERT
  • 77 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
29-Feb-2024
Comissioning
0
  • 29-Feb-2024 OHT
  • 29-Feb-2024 CWR
  • 29-Feb-2024 D.System
Agency Total 152 2 2 2 2 152 151 0 0 525 525 100% 152 200.00 11 / 2 200.00 27 / 2
+0
0 / 0
0 / 0 72
+0
72
0 0 0 0 0
  +0
72 | 72
72 0 / 0 39 / 3 67 -- -- -- 2 2 31 71 2 2 31 70 -- 562 11 72 0 5 70 67 42 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 1 12010 84070 360300 0 0% 86455 371070 152 2 1 7 14 128 32
+0
32
+0
32
32 0 1386.08
+0.00
1383.42
152 49694 152
+ 0
151
49694 0 0 100
+0
34 / 34
+0
152 / 150
49611.00
+0.00
48943.08
99% 1097 1091 6 42 17 25
N.K. Gupta & K.B. Gupta Contractors


8175353 kabrai GOV 36 01-Jul-2024 1 1 1 1 36 35 0 0 181 181 100%
+0
35
97 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 11 / 0 8 Integrated Verified Verified 0 12 Verified Verified 0 2 Verification Remarks Minutes of Meeting 118 0 13 0 3 2 10 9 0 19 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 6 2760 19320 82800 0 0% 2917 15182 36 0 0 6 12 18 9
+0
9
+0
9
9 0 349.51
+0.00
349.35
36 11799 36
+ 0
35
11799 0 0 100.00
+0
9 / 9
+0
36 / 36
15787.00
+0.00 / +0.00
13546.69
85.81% Yes Yes Yes 204 196 8 0 0 0
  • 1 HGJ CERT
  • 36 HOV
Intake
28/02/2023
WTP
30/6/2023
T/W
0
OHT
30/04/2024
CWR
16/04/2024
D.System
14-Jul-2023
Comissioning
10/06/2024
  • 28-Feb-2023 Intake
  • 30-Jun-2023 WTP
  • 30-May-2023 OHT
  • 15-Jun-2023 CWR
  • 14-Jul-2023 D.System
  • 16-Jul-2023 Comissioning
SLC-SMC (JV)


8152383 Dhawarra GOV 95 13-Sep-2024 1 0 0 0 0 0 0 0 418 418 100%
+0
95
100 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 29
+0
29
0 0 0 0 0
  +0
29 | 29
29 0 / 0 29 / 0 19 Integrated Verified Verified 1 24 Verified Verified 1 11 Verification Remarks Minutes of Meeting 195 0 29 0 2 11 27 22 0 24 3 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 5 + 0 = 5 20 16 8221 57547 246630 0 0% 41241 221005 90 0 4 9 40 37 9
+0
9
+0
9
9 0 804.48
+0.00
801.00
95 30104 95
+ 0
82
30104 0 0 100.00
+0
9 / 9
+0
95 / 92
33301.00
+0.00 / +0.00
28849.34
86.63% Yes 645 616 29 4 0 4
  • 3 D.System
  • 13 HGJ CERT
  • 95 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
23-Jul-2024
Comissioning
0
  • 27-Mar-2024 CWR
  • 23-Jul-2024 D.System
  • 25-Jul-2024 Comissioning
Total Mahoba 343 5 5 4 4 4 248 246 0 0 1375 1375 100%
+0
342
99.71 100.00 5 15 / 3 100.00 5 30 / 3
+0
0 / 0
0 / 0 132
+0
132
0 0 0 0 0
  +0
132 | 132
132 0 / 0 97 / 3 112 -- -- -- 5 5 38 125 5 5 38 125 -- 989 92 132 0 11 101 121 87 0 -- -- 0 + 0 + 0 + 4 + 0 = 4 0 + 0 + 0 + 6 + 0 = 6 46 30 29399 205793 881970 0 0% 154015 763307 337 2 6 22 70 237 56
+0
56
+0
56
56 0 3212.64
+0.00
3205.97
343 112046 343
+ 0
328
112046 0 0 100
+0
59 / 59
+0
343 / 338
125817.00
+0.00 / +0.00
118457.11
94.15% 4 3 2 2460 2390 70 57 20 37
8 Mirzapur GVPR


8152576 Leduki GOV 124 01-Jan-2024 1 1 1 1 124 124 0 0 120 120 100%
+0
124
100 100.00 Yes 2 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 0 Integrated Off Verified Verified 1 2 Not Verified Not Verified 1 0 Verification Remarks Minutes of Meeting 141 0 12 0 6 0 6 5 0 15 2 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 5 1 3962 27734 118860 0 0% 24822 113425 123 0 3 2 19 99 5
+0
5
+0
5
5 0 764.43
+0.00
879.84
124 22530 124
+ 0
124
22530 0 0 100.00
+0
6 / 6
+0
124 / 124
26901.00
+0.00 / +0.00
25970.57
96.54% 236 230 6 17 1 16
  • 100 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Oct-2023
Comissioning
0
  • 31-Jul-2023 WTP
  • 15-Oct-2023 OHT
  • 31-Oct-2023 CWR
  • 31-Oct-2023 D.System
  • 31-Dec-2023 Comissioning
  • 128 Villages
  • 33860 Households
  • 0 Last Week FHTC Given
  • 33726 FHTC Given
  • 99 FHTC(%)
  • 134 Balance FHTC
  • 124 HGJ
  • 122 HGJ Certified
  • 95.31 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 49 Handed Over Villages(before Portal)
  • 43 Handed Over Initiated/Approved On Portal
  • 71.88 Handed Over %
  • 81 OHT Required
  • 78 OHT Completed
  • Scheme Wise Category A
  • 1 No. of Schemes
  • 2 No. of Villages
  • Scheme Wise Category B
  • 58 No. of Schemes
  • 113 No. of Villages
  • Scheme Wise Category C
  • 13 No. of Schemes
  • 18 No. of Villages
  • Village Wise Category A
  • 2 No. of Villages
  • Village Wise Category B
  • 86 No. of Villages
  • Village Wise Category C
  • 45 No. of Villages
  • Village Wise Total
  • 133 Total No. of Villages
  • 72 Total No. of Schemes
  • 133 Total No. of Villages
  • 74 Total No. of OHT
  • 55 Schemes Sent to O&M
  • 57 No. of OHT in O&M Schemes
  • 11888 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 58 Agreement Done Scheme
  • 114 Agreement Done Village
Megha


8152518 Talar GOV 86 01-Aug-2024 1 1 1 1 86 85 0 0 54 54 100%
+0
86
100 100.00 Yes 2 / 1 100.00 Yes 4 / 1
+0
0 / 0
0 / 0 15
+15
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 25 / 1 15 Integrated Off Verified Verified 5 7 Verified Verified 5 7 Verification Remarks Minutes of Meeting 176 0 15 0 15 7 0 0 0 27 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6 2 0 0 0 0 0% 22655 179297 86 0 1 6 5 74 6
+0
6
+0
6
6 0 972.11
+0.00
972.11
86 20367 86
+ 0
86
20367 0 0 100.00
+0
8 / 8
+0
86 / 85
20345.00
+0.00 / +0.00
19327.19
95.00% Yes 241 234 7 20 9 11
  • 78 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
20-May-2023
Comissioning
0
  • 27-Jul-2022 Intake
  • 10-Oct-2022 WTP
  • 22-Apr-2023 OHT
  • 17-May-2023 CWR
  • 20-May-2023 D.System
  • 20-Dec-2023 Comissioning
8153309 Gothaura GOV 141 01-Aug-2024 1 1 1 1 141 138 0 0 149 149 100%
+0
141
100 0.00 No 3 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 5 / 0 12 Integrated Off Verified Verified 5 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 149 0 12 0 12 9 0 0 0 29 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 1 0 0 0 0 0% 0 194196 138 3 2 4 9 120 7
+0
7
+0
7
7 0 723.50
+0.00
723.50
141 29745 141
+ 0
141
29745 0 0 100.00
+0
8 / 8
+0
141 / 139
20152.00
+0.00 / +0.00
17788.70
88.27% Yes 350 339 11 38 1 37
  • 118 HOV
Intake
0
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
29-Apr-2023
Comissioning
0
  • 24-Jul-2023 WTP
  • 11-Jul-2023 T/W
  • 08-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 29-Apr-2023 D.System
  • 29-Feb-2024 Comissioning
8153338 Dhauha GOV 213 01-Aug-2024 1 1 1 1 213 211 0 0 276 276 100%
+0
213
100 100.00 Yes 5 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 10 / 0 25 Integrated Off Verified Verified 6 10 Verified Verified 6 10 Verification Remarks Minutes of Meeting 275 0 25 0 25 10 0 0 0 27 1 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 3 + 0 = 3 6 2 0 0 0 0 0% 37283 337421 207 1 3 2 2 199 11
+0
11
+0
11
11 0 1327.06
+0.00
1327.06
213 42736 212
+ 0
207
42734 0 0 100.00
+0
13 / 13
+0
213 / 213
40622.00
+0.00 / +0.00
40194.44
98.95% Yes 487 472 15 54 6 48
  • 2 FHTC
  • 1 HGJ
  • 6 HGJ CERT
  • 173 HOV
Intake
Functional
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
24-Sep-2023
Comissioning
0
  • 22-Jul-2022 Intake
  • 13-Oct-2022 WTP
  • 11-Jul-2023 T/W
  • 20-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 24-Sep-2023 D.System
  • 29-Feb-2024 Comissioning
Agency Total 440 3 3 3 3 440 434 0 0 479 479 100% 440 200.00 10 / 3 300.00 6 / 3
+0
0 / 0
0 / 0 52
+15
52
0 0 0 0 0
  +0
52 | 52
52 0 / 0 40 / 1 52 -- -- -- 3 3 16 26 3 3 15 26 -- 600 0 52 0 52 26 0 0 0 -- -- 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 3 + 0 = 3 17 5 0 0 0 0 0% 59938 710914 431 4 6 12 16 393 24
+0
24
+0
24
24 0 3022.67
+0.00
3022.67
440 92848 439
+ 0
434
92846 0 0 100
+0
29 / 29
+0
440 / 437
81119.00
+0.00
77310.33
95% 1078 1045 33 112 16 96
NCC Ltd.


8010572 Ahugi Kalan GOV 159 01-Jan-2024 1 1 1 1 159 159 0 0 33 33 100%
+0
159
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 30
+5
30
0 0 0 0 0
  +0
30 | 30
25 0 / 0 25 / 0 25 Integrated Verified Verified 9 29 Verified Verified 9 29 Verification Remarks Minutes of Meeting 53 35 30 0 1 29 29 25 0 28 4 0 + 1 + 0 + 1 + 0 = 2 0 + 1 + 0 + 1 + 0 = 2 3 2 11180 78260 335400 0 0% 78413 366031 159 0 0 4 17 138 9
+0
9
+0
9
9 0 1582.00
+0.00
1582.00
159 31881 159
+ 0
158
31881 0 0 100.00
+0
9 / 9
+0
159 / 159
32828.00
+0.00 / +0.00
29948.30
91.23% Yes Yes 368 363 5 26 26 0
  • 1 HGJ CERT
  • 130 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
31-Jul-2023
Comissioning
Commissioning under progress
  • 09-Aug-2022 Intake
  • 17-Aug-2022 WTP
  • 31-Jul-2023 OHT
  • 02-Mar-2023 CWR
  • 31-Jul-2023 D.System
  • 15-Jul-2024 Comissioning
8011637 Mahadev GOV 254 01-Jan-2024 1 1 1 1 254 254 0 0 14 14 100%
+0
254
100 100.00 Yes 2 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 25 / 0 25 Integrated Verified Verified 6 24 Verified Verified 6 23 Verification Remarks Minutes of Meeting 41 31 25 0 0 23 25 11 0 29 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 1 11579 81053 347370 0 0% 117101 470138 254 0 0 3 20 231 7
+0
7
+0
7
7 0 1464.00
+0.00
1464.00
254 35318 254
+ 0
251
35318 0 0 100.00
+0
7 / 7
+0
254 / 254
33415.00
+0.00 / +0.00
31276.44
93.60% Yes Yes 443 440 3 43 43 0
  • 3 HGJ CERT
  • 189 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
30-Jun-2023
Comissioning
Trial run is U/P.
  • 31-Aug-2022 Intake
  • 31-Aug-2022 WTP
  • 30-Jun-2023 OHT
  • 30-Dec-2022 CWR
  • 30-Jun-2023 D.System
  • 15-May-2024 Comissioning
Agency Total 413 2 2 2 2 413 413 0 0 47 47 100% 413 200.00 4 / 0 200.00 8 / 0
+0
0 / 0
0 / 0 55
+5
55
0 0 0 0 0
  +0
55 | 55
50 0 / 0 50 / 0 50 -- -- -- 2 2 15 53 2 2 15 52 -- 94 66 55 0 1 52 54 36 0 -- -- 0 + 1 + 0 + 1 + 0 = 2 0 + 1 + 0 + 1 + 0 = 2 6 3 22759 159313 682770 0 0% 195514 836169 413 0 0 7 37 369 16
+0
16
+0
16
16 0 3046.00
+0.00
3046.00
413 67199 413
+ 0
409
67199 0 0 100
+0
16 / 16
+0
413 / 413
66243.00
+0.00
61224.74
92% 811 803 8 69 69 0
GA INFRA


8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 305 01-Feb-2024 1 1 1 1 305 296 0 0 234 234 100%
+0
298
98 100.00 Yes 4 / 0 100.00 Yes 6 / 0
+0
98 / 98
97 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 100 / 0 99 Integrated Verified Verified 1 89 Verified Verified 1 89 Verification Remarks Minutes of Meeting 226 164 102 0 9 89 93 82 0 24 4 1 + 0 + 0 + 14 + 0 = 15 1 + 0 + 0 + 24 + 0 = 25 6 1 22901 160307 687030 0 0% 126145 488197 305 5 6 15 29 250 2
+0
2
+0
2
2 0 1851.89
+0.00
1810.28
305 75783 303
+ 0
296
75306 0 0 99.37
+0
101 / 101
+0
302 / 296
6563.00
+0.00 / +0.00
6563.00
100.00% 1300 1289 11 107 105 2
  • 41 D.System
  • 3 COV
  • 477 FHTC
  • 2 HGJ
  • 9 HGJ CERT
  • 279 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
01-Feb-2024
Comissioning
0
  • 25-Aug-2023 OHT
  • 01-Feb-2024 D.System
  • 20-Aug-2023 Comissioning
Multiurban


8282154 Manikpur GOV 63 01-Mar-2024 1 1 1 1 63 60 0 0 23 23 100%
+0
58
92 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 4 / 2 0 Integrated Off Verified Verified 1 3 Verified Not Verified 1 2 Verification Remarks Minutes of Meeting 30 0 5 0 1 2 4 2 0 21 4 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 3 2530 17710 75900 0 0% 18277 69326 63 0 1 4 12 46 1
+0
1
+0
1
1 0 248.50
+0.00
248.50
63 9280 62
+ 0
60
9134 0 0 98.43
+0
2 / 2
+0
61 / 57
6498.00
+0.00 / +0.00
6413.97
98.71% 90 87 3 11 3 8
  • 2 COV
  • 146 FHTC
  • 1 HGJ
  • 3 HGJ CERT
  • 63 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 30-Jul-2023 OHT
  • 31-Dec-2023 Comissioning
Ramky baba


8152635 Danti GOV and Tubewell Scheme 42 Nos. 263 15-Feb-2024 1 1 1 1 263 262 0 0 168 168 100%
+0
257
98 100.00 Yes 2 / 2 100.00 Yes 2 / 2
+0
42 / 42
84 / 83 48
+48
48
0 0 0 0 0
  +0
48 | 48
48 0 / 0 97 / 96 95 Integrated Verified Verified 0 35 Verified Verified 0 34 Verification Remarks Minutes of Meeting 85 0 48 0 1 34 47 42 0 18 4 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 2 + 0 = 2 3 1 15604 109228 468120 0 0% 93549 293098 262 1 1 0 34 226 2
+0
2
+0
2
2 0 1344.50
+0.00
1344.50
263 43416 259
+ 0
250
43280 0 0 99.69
+0
46 / 46
+0
259 / 241
12983.00
+0.00 / +0.00
12393.12
95.46% 625 622 3 61 59 2
  • 2 COV
  • 136 FHTC
  • 4 HGJ
  • 13 HGJ CERT
  • 242 HOV
Intake
100% Complete
WTP
100% Complete
T/W
All complete
OHT
Completed
CWR
completed
D.System
15-Aug-2023
Comissioning
Commissioning under progress
  • 26-Apr-2023 Intake
  • 02-Mar-2023 WTP
  • 20-Jun-2023 T/W
  • 10-Aug-2023 OHT
  • 18-Jun-2022 CWR
  • 15-Aug-2023 D.System
  • 30-Sep-2023 Comissioning
Total Mirzapur 1608 9 9 9 9 9 1608 1589 0 0 1069 1069 100%
+0
1590
98.88 94.44 8 23 / 6 100.00 9 23 / 6
+0
140 / 140
181 / 83 274
+0
274
0 0 0 0 0
  +0
274 | 274
269 0 / 0 291 / 99 296 -- -- -- 9 9 34 208 8 7 33 208 -- 1176 230 274 0 70 203 204 167 0 -- -- 1 + 1 + 0 + 20 + 0 = 22 1 + 1 + 0 + 31 + 0 = 33 40 14 67757 474299 2032710 0 0% 518244 2511131 1597 10 17 40 147 1383 50
+0
50
+0
50
50 0 10277.99
+0.00
10351.79
1608 311056 1600
+ 0
1573
310295 0 0 99.76
+0
200 / 200
+0
1599 / 1568
200307.00
+0.00 / +0.00
189875.73
94.79% 2 0 0 4140 4076 64 375 253 122
9 Sonbhadra GVPR


8175161 Jhilo/ Bijpur GOV 179 05-Jan-2026 1 1 1 1 179 97 0 0 20 20 100%
+0
170
95 100.00 Yes 9 / 1 100.00 Yes 23 / 1
+0
0 / 0
0 / 0 27
+3
27
0 0 0 0 0
  +0
27 | 27
27 0 / 0 30 / 0 22 Integrated Off Not Verified Verified 12 22 Not Verified Verified 12 22 Verification Remarks Minutes of Meeting 238 0 27 3 14 22 10 8 0 12 2 0 + 0 + 0 + 7 + 0 = 7 0 + 0 + 0 + 20 + 0 = 20 7 4 7902 55314 237060 0 0% 43746 197713 151 5 1 2 4 139 16
+0
16
+0
16
16 0 3904.00
+0.00
3904.00
179 66179 178
+ 0
136
66172 0 0 99.99
+0
14 / 14
+0
171 / 73
74794.00
+0.00 / +0.00
65085.22
87.02% 503 494 9 68 68 0
  • 7 FHTC
  • 1 HGJ
  • 43 HGJ CERT
  • 175 HOV
Intake
0
WTP
0
T/W
0
OHT
All OHT complete
CWR
2 nos CWR new locations as per revised DPR.
D.System
31-Aug-2025
Comissioning
0
  • 28-Feb-2023 Intake
  • 20-Mar-2023 WTP
  • 25-Oct-2025 OHT
  • 31-Aug-2025 CWR
  • 31-Aug-2025 D.System
  • 30-Jul-2026 Comissioning
  • 82 Villages
  • 18169 Households
  • 0 Last Week FHTC Given
  • 17571 FHTC Given
  • 96 FHTC(%)
  • 598 Balance FHTC
  • 79 HGJ
  • 52 HGJ Certified
  • 63.41 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 11 Handed Over Villages(before Portal)
  • 34 Handed Over Initiated/Approved On Portal
  • 54.88 Handed Over %
  • 0 OHT Required
  • 0 OHT Completed
  • Scheme Wise Category A
  • 0 No. of Schemes
  • 0 No. of Villages
  • Scheme Wise Category B
  • 10 No. of Schemes
  • 55 No. of Villages
  • Scheme Wise Category C
  • 15 No. of Schemes
  • 27 No. of Villages
  • Village Wise Category A
  • 0 No. of Villages
  • Village Wise Category B
  • 38 No. of Villages
  • Village Wise Category C
  • 44 No. of Villages
  • Village Wise Total
  • 82 Total No. of Villages
  • 25 Total No. of Schemes
  • 82 Total No. of Villages
  • 30 Total No. of OHT
  • 1 Schemes Sent to O&M
  • 1 No. of OHT in O&M Schemes
  • 87 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 25 Agreement Done Scheme
  • 82 Agreement Done Village
Larsen & Toubro Ltd


8010143 Parasi GOV 29 27-Aug-2024 1 1 1 1 29 29 0 0 83 83 100%
+0
29
100 100.00 Yes 2 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 5 Integrated Verified Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 189 125 15 0 0 0 15 14 0 30 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 0 6425 44975 192750 0 0% 32838 176262 29 1 0 0 0 28 9
+0
9
+0
9
9 0 744.00
+0.00
744.00
29 19081 29
+ 0
25
19081 0 0 100.00
+0
9 / 9
+0
29 / 29
13244.00
+0.00 / +0.00
13244.00
100.00% 114 112 2 11 9 2
  • 4 HGJ CERT
  • 28 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Aug-2023
Comissioning
0
  • 30-Apr-2023 Intake
  • 30-Jul-2023 WTP
  • 30-Nov-2023 OHT
  • 31-Aug-2023 D.System
  • 15-Dec-2023 Comissioning
8175086 Amawar GOV 52 0 0 0 0 0 0 0 0 63 63 100%
+0
52
100 100.00 No 1 / 1 100.00 No 1 / 1
+0
0 / 0
0 / 0 9
+0
7
2 0 0 0 0
  +0
7 | 7
3 0 / 0 7 / 0 7 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 9 9 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 2 0 0 0 0 0% 0 0 8 0 1 4 0 3 3
+0
3
+0
3
3 0 616.21
+0.00
602.40
52 15616 21
+ 0
1
10981 0 0 70.32
+0
4 / 4
+0
16 / 7
23765.00
+0.00 / +0.00
15430.89
64.93% 44 41 3 22 4 18
  • 2 OHT
  • 13 D.System
  • 36 COV
  • 4635 FHTC
  • 31 HGJ
  • 51 HGJ CERT
  • 52 HOV
Intake
Completed
WTP
Completed.
T/W
NA
OHT
All OHT works completed.
CWR
Completed.
D.System
31-Jan-2024
Comissioning
Phase wise commissioning works will start after the availability of Water in the Kanhar Dam.
  • 31-Dec-2022 Intake
  • 15-Dec-2023 WTP
  • 31-Oct-2023 OHT
  • 28-Feb-2023 CWR
  • 31-Jan-2024 D.System
  • 16-Jun-2026 Comissioning
8177926 Gurmura GOV 8 0 0 0 0 0 0 0 0 10 10 100%
+0
8
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+2
7
2 2 0 0 0
  +0
5 | 5
5 0 / 0 5 / 0 5 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 10 10 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0 0 0% 0 0 1 0 0 1 0 0 4
+0
3
+0
3
3 0 610.00
+0.00
610.00
8 8051 3
+ 0
0
7223 0 0 89.72
+0
4 / 4
+0
2 / 1
12483.00
+0.00 / +0.00
9174.10
73.49% 23 23 0 1 0 1
  • 5 OHT
  • 1 CWR
  • 6 COV
  • 828 FHTC
  • 5 HGJ
  • 8 HGJ CERT
  • 8 HOV
Intake
Completed. It is also in functional stage. Commissioning has been started.
WTP
Work Is In Progress. It is also in functional stage.
T/W
NA
OHT
5 Nos OHTs Completed. Commissioning works also completed.
CWR
3 Nos Completed. 3 Nos Commissioning works also Completed.
D.System
31-Dec-2023
Comissioning
2 Village is commissioned.
  • 30-Jun-2023 Intake
  • 31-Jan-2024 WTP
  • 30-Jun-2023 OHT
  • 30-Jul-2023 CWR
  • 31-Dec-2023 D.System
  • 16-Aug-2023 Comissioning
8182027 Panari GOV 6 0 0 0 0 0 0 0 0 1 1 100%
+0
6
100 100.00 Yes 3 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 11
+1
6
1 3 0 0 0
  +0
3 | 3
3 0 / 0 3 / 0 3 Integrated Off Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 53 33 11 8 3 0 0 0 25 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0 0 0% 4088 51096 2 0 1 1 0 0 3
+0
2
+0
2
2 0 306.24
+0.00
306.24
6 8465 1
+ 0
0
7538 0 0 89.05
+0
3 / 3
+0
2 / 2
11871.00
+0.00 / +0.00
7419.11
62.50% 15 15 0 1 1 0
  • 8 OHT
  • 1 CWR
  • 4 COV
  • 927 FHTC
  • 5 HGJ
  • 6 HGJ CERT
  • 6 HOV
Intake
Completed. Intake Well is in functional stage.
WTP
Finishing works in progress. Pre Commissioning Completed. Water Supply is in progress.
T/W
0
OHT
Commissioning works completed.
CWR
Commissioning Completed.
D.System
16-Aug-2023
Comissioning
Panari & Bairpur Villages are Commissioned.
  • 31-Jul-2023 Intake
  • 30-Sep-2023 WTP
  • 30-Sep-2023 OHT
  • 16-Aug-2023 D.System
  • 31-Jul-2023 Comissioning
Agency Total 95 1 1 1 1 29 29 0 0 157 157 100% 95 400.00 6 / 1 400.00 17 / 1
+0
0 / 0
0 / 0 45
+3
35
5 5 0 0 0
  +0
30 | 30
26 0 / 0 30 / 0 20 -- -- -- 1 1 0 0 0 0 0 0 -- 242 158 45 27 3 0 15 14 0 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 2 6425 44975 192750 0 0% 36926 227358 40 1 2 6 0 31 19
+0
17
+0
17
17 0 2276.45
+0.00
2262.64
95 51213 54
+ 0
26
44823 0 0 88
+0
20 / 20
+0
49 / 39
61363.00
+0.00
45268.10
74% 196 191 5 35 14 21
NCC Ltd.


8338933 Patwadh GOV 650 0 0 0 0 0 0 0 0 194 191 98%
+0
597
92 100.00 Yes 5 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 55
+4
55
0 0 0 0 0
  +0
55 | 55
55 0 / 0 45 / 0 0 Integrated Verified Verified 1 5 Verified Verified 1 4 Verification Remarks Minutes of Meeting 337 0 55 0 38 4 17 4 0 9 1 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 5 + 0 = 5 27 9 4474 31318 134220 0 0% 42968 220799 606 132 53 47 39 335 15
+0
15
+0
15
15 0 3885.16
+26.85
3690.10
650 101050 557
+ 3
146
100692 0 0 99.65
+0
16 / 16
+1
635 / 371
99181.00
+0.00 / +0.00
83938.49
84.63% 1031 996 35 181 102 79
  • 195 D.System
  • 15 COV
  • 358 FHTC
  • 93 HGJ
  • 504 HGJ CERT
  • 646 HOV
Intake
With all finishing work 30/04/2025
WTP
With all finishing work 30/04/2025
T/W
0
OHT
With all finishing work 15/09/2025 (WL)
CWR
With all finishing work 20/06/2025 (WL)
D.System
31-Oct-2026
Comissioning
31/10/2026
  • 30-Apr-2025 Intake
  • 30-Apr-2025 WTP
  • 30-Apr-2024 T/W
  • 15-Sep-2025 OHT
  • 20-Jun-2025 CWR
  • 31-Oct-2026 D.System
  • 31-Oct-2026 Comissioning
Jain Const.


8175315 Kewatha GOV 12 01-Apr-2024 1 1 1 1 12 12 0 0 8 8 100%
+0
12
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 228 0 12 0 12 0 0 0 0 20 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0 0 0% 0 35963 12 0 0 1 0 11 7
+0
7
+0
7
7 0 645.00
+0.00
645.00
12 9045 12
+ 0
11
9045 0 0 100.00
+0
8 / 8
+0
12 / 12
11940.00
+0.00 / +0.00
10929.93
91.54% Yes 38 38 0 4 4 0
  • 1 HGJ CERT
  • 11 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Mar-2023 Comissioning
VPRPL


8175013 Nagawan GOV 46 15-Jul-2024 1 0 0 0 0 0 0 0 21 21 100%
+0
46
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 8
+0
8
0 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Off Verified Verified 2 2 Not Verified Verified 1 2 Verification Remarks Minutes of Meeting 93 0 8 0 4 2 4 3 0 9 1 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 0 0 956 6692 28680 0 0% 4621 23065 45 0 1 3 0 41 4
+0
4
+0
4
4 0 1808.21
+0.00
1808.21
46 7268 46
+ 1
36
7268 0 0 100.00
+0
5 / 5
+0
44 / 37
9472.00
+0.00 / +0.00
9191.10
97.03% 34 34 0 11 11 0
  • 10 HGJ CERT
  • 44 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 19-Feb-2023 Intake
  • 19-Feb-2023 WTP
  • 31-Aug-2023 Comissioning
8175050 Tenduahi GOV 80 15-Jul-2024 1 1 1 1 80 42 0 0 64 64 100%
+0
80
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 5 Integrated Off Verified Verified 1 9 Not Verified Not Verified 1 8 Verification Remarks Minutes of Meeting 91 0 9 0 1 8 8 4 0 19 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 0 3019 21133 90570 0 0% 19327 99420 79 0 1 1 0 77 4
+0
4
+0
4
4 0 573.87
+0.00
571.68
80 12757 79
+ 2
73
12743 0 0 99.89
+0
5 / 5
+0
80 / 78
12858.00
+0.00 / +0.00
11482.31
89.30% 115 113 2 18 18 0
  • 2 D.System
  • 14 FHTC
  • 1 HGJ
  • 7 HGJ CERT
  • 71 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175110 Belahai GOV 186 20-Mar-2026 1 0 0 0 0 0 0 0 33 33 100%
+0
186
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+2
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 7 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 128 0 9 2 0 0 7 0 0 23 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 0 5597 39179 167910 0 0% 17918 155744 178 0 1 14 4 159 5
+0
5
+0
5
5 0 1421.64
+0.00
1418.76
186 19691 184
+ 0
153
19595 0 0 99.51
+0
6 / 6
+0
185 / 174
23145.00
+0.00 / +0.00
20488.45
88.52% 379 375 4 41 41 0
  • 2 D.System
  • 96 FHTC
  • 2 HGJ
  • 33 HGJ CERT
  • 130 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175262 Harra GOV 45 20-Jun-2024 1 0 0 0 0 0 0 0 51 51 100%
+0
42
93 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+0
10
0 0 0 0 0
  +0
10 | 10
10 0 / 0 0 / 0 10 Integrated Off Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 112 0 10 0 6 0 4 2 0 4 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 0 2570 17990 77100 0 0% 9786 52307 26 1 8 11 1 5 6
+0
6
+0
6
6 0 918.46
+0.00
918.46
45 17677 44
+ 0
43
17669 0 0 99.95
+0
7 / 7
+0
44 / 0
18231.00
+0.00 / +0.00
16072.90
88.16% 70 67 3 10 8 2
  • 8 FHTC
  • 1 HGJ
  • 2 HGJ CERT
  • 33 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Jul-2023 Comissioning
8175280 Kadara GOV 4 1 0 0 0 0 0 0 0 0 0 0%
+0
0
0 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 3
+0
3
0 0 0 0 0
  +0
3 | 3
3 0 / 0 1 / 0 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 3 3 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 1 0 0 0 0 0% 0 0 3 2 0 1 0 0 1
+0
1
+0
1
1 0 102.16
+0.00
102.16
4 1168 1
+ 0
0
596 0 0 51.03
+0
2 / 2
+0
3 / 0
2971.00
+0.00 / +0.00
2812.91
94.68% 6 5 1 0 0 0
  • 1 COV
  • 572 FHTC
  • 3 HGJ
  • 4 HGJ CERT
  • 4 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 361 5 1 1 1 80 42 0 0 169 169 100% 354 500.00 1 / 0 500.00 1 / 0
+0
0 / 0
0 / 0 39
+2
39
0 0 0 0 0
  +0
39 | 39
39 0 / 0 1 / 0 30 -- -- -- 3 2 3 11 0 1 2 10 -- 424 0 39 5 11 10 23 9 0 -- -- 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 9 1 12142 84994 364260 0 0% 51652 330536 331 3 11 30 5 282 20
+0
20
+0
20
20 0 4824.34
+0.00
4819.27
361 58561 354
+ 3
305
57871 0 0 99
+0
25 / 25
+0
356 / 289
66677.00
+0.00
60047.67
90% 604 594 10 80 78 2
Total Sonbhadra 1297 7 8 4 4 4 300 180 0 0 546 543 99%
+0
1228
94.68 100.00 11 21 / 2 100.00 11 51 / 2
+0
0 / 0
0 / 0 178
+0
168
5 5 0 0 0
  +0
163 | 163
159 0 / 0 106 / 0 72 -- -- -- 5 5 16 38 1 3 15 38 -- 1469 158 178 35 78 36 65 35 0 -- -- 0 + 0 + 0 + 11 + 0 = 11 0 + 0 + 0 + 26 + 0 = 26 48 16 30945 216615 928350 0 0% 175291 1012368 1140 141 67 86 48 798 77
+0
75
+0
75
75 0 15534.95
+26.85
15321.01
1297 286048 1155
+ 6
624
278603 0 0 97.40
+0
83 / 83
+1
1223 / 784
313955.00
+0.00 / +0.00
265269.41
84.49% 0 1 0 2372 2313 59 363 261 102
Project Completion Plan

Minutes of Meeting Date -