Total Scheme : 63
O&M Scheme : 41
Under Trial Run Scheme : 8
In-Progress Scheme : 14

Physical Progress(Phase 1) All Scheme

S.No   District         Name of Firm/Agency Scheme Id Scheme Name Villages Alloted
Start Date of Trail Run
Operational and Maintenance Details
ROAD DISMENTLING/RESTORATION(KM) Intake WTP T/W OHT
Automation Integration Status
Connectivity Status
Pump Status
EE E&M Verification Status
  Last 7 days         Automation Alert
Automation Integration OHT Status Functional OHT Water Demand OHT Water Supply Regular Water Supply Villages(Village Wise) CWR Distribution System INCL RWRM/CWRM(km) HGJ Status FHTC Electricity Comissioning of Village IMIS Scheme Completed
As Build Drawing Submitted
Final As Executed BOQ Submitted
Incoming Complaints Received Feedback from Gram Pradhan On Call Balance Work Scheme Completion Plan(Agency) U.P.Jal Nigam UP Jal Nigam Old Scheme Status
Initiated By Agency (scheme)
Finalized By Agency (scheme)
Approved By TPI (scheme)
Approved By EE (scheme)
Covered village
Regular water supply (Filled by pump operator)
Monthly O&M Charges(in Rs)
Yearly O&M Charges(in Rs)
Dismental(Filled by EE) Restored(Filled by EE) Restored %(Filled by EE) Villages where 100% road restoration completed(Filled by TPI) Restored(%) In progress(%) Functional Images/Videos In progress(%) Functional Images/Videos Required /completed (LAST WEEK ) Images/Videos Required Started (Filled by Agency) Started(Filled by EE) Progress 0 to 25% Progress 26% to 50% Progress 51% to 75% Progress 76% to 99%
OHT completed
EE | Agency
OHT Fuctional(By ADM)
OHT with less manpower
EE | TPI
OHT and Signage Board Images/Videos OHT Logo Intake(Previous Status) WTP(Previous Status) No Of CWR(Previous Status) No Of OHT(Previous Status) Intake(Current Status) WTP(Current Status) No Of CWR(Current Status) No Of OHT(Current Status) O&M Verification Remark Total Alerts Action Taken Alerts Total OHT Not Integrated OHT Disconnected OHT (No water supply received in the last two days) Accurate data(EE E&M) Functional OHT Water supply less than 75% percent (Average water supply over 2 days) Water supply greater than 150% percent (Average water supply over 2 days) Last Month AVG Water Supply Days = [(Total Integrated OHT × Month Days) − (Disconnected OHT × Disconnected Days)] ÷ Total Integrated OHT Current Month AVG Water Supply Days = [(Total Integrated OHT × Month Days) − (Disconnected OHT × Disconnected Days)] ÷ Total Integrated OHT Regular water supply disruption(OHT) 1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Regular water supply disruption(Village)
1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Villages with pending complaints. Villages with complaints pending for more than 15 days. Daily Weekly Monthly Yesterday Yesterday(%) Weekly Monthly Regular water supply Villages Below 50% 50% to 75% 76% to 90% Above 90% 100% Household with RWS Required Started Completed Completed
Required Laid Villages Alloted Household HGJ (100% Completed) HGJ Certified Villages FHTC Given as on Today FHTC Given as on Yesterday FHTC Given (last Week) FHTC % Connection Required/Completed Comissioned/Regular water supply(Verified by EE) Estimated Cost(Lacs)
Last Week / Last Month
Expenditure(Lacs)
Expenditure(%) All Complaints Close Complaints Pending Complaints All Complaints Close Complaints Pending Complaints
  • 0 T/W
  • 52 OHT
  • 2 CWR
  • 381.14 D.System
  • 245 Comissioning
  • 2 Electricity
  • 20897 FHTC
  • 1134 HGJ
  • 2065 HGJ CERT
  • 6158 HOV
  • Scheme Wise Category A
  • 731 No. of Schemes
  • 1212 No. of Villages
  • Scheme Wise Category B
  • 3619 No. of Schemes
  • 6717 No. of Villages
  • Scheme Wise Category C
  • 1337 No. of Schemes
  • 1993 No. of Villages
  • Scheme Wise Total
  • 5687 Total No. of Schemes
  • 9922 Total No. of Villages
  • Village Wise Category A
  • 1084 No. of Villages
  • Village Wise Category B
  • 5627 No. of Villages
  • Village Wise Category C
  • 3142 No. of Villages
  • Village Wise Total
  • 9853 Total No. of Villages
  • 4666 Agreement Done Scheme
  • 8365 Agreement Done Village
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106
Total Schemes : 63 6548 48 50 42 41 41 3472 3397 0 0 10006 9434 94%
+0
5687
87 98.99 61 166 / 16 100.00 62 359 / 17
+0
550 / 550
213 / 83 1697
+0
1684
837 5 1 6 27
  +0
1600 | 1645
1567 0 / 0 1307 / 104 1136 -- -- -- 48 47 225 842 46 44 218 804 -- 4281 1850 1697 513 134 804 1050 234 215 -- -- 2 + 0 + 0 + 44 + 7 = 53 2 + 0 + 0 + 80 + 8 = 90 1471 1281 374810 2623670 11244300 401094 107.01% 2604181 11515683 5225 270 263 534 1109 3049 455
+0
412
+0
453
453 58095.78
+0.69
57714.64
6548 1685261 5413
+ 0
4482
1664368 0 0 98.76
+0
900 / 898
+9
6260 / 5097
1624724.00
+0.00 / +-609.64
1386769.67
85.35% 4 6 6 17388 14338 3050 1897 638 1259
1 Banda Larsen & Toubro Ltd


8044758 Khatan GOV 342 01-May-2025 1 0 0 0 0 0 0 0 691 676 98%
+0
331
97 100.00 Yes 19 / 3 100.00 Yes 94 / 2
+0
0 / 0
0 / 0 116
+0
116
116 0 0 0 0
  +0
116 | 116
116 0 / 0 116 / 1 116 Integrated Off Verified Verified 20 112 Verified Verified 16 107 Verification Remarks Minutes of Meeting 285 206 116 1 2 107 113 7 1 0 0 0 + 0 + 0 + 0 + 2 = 2 0 + 0 + 0 + 0 + 2 = 2 152 139 41256 288792 1237680 34257 83.04% 239067 846727 342 0 4 32 158 148 39
+0
39
+0
39
39 4215.00
+0.00
4215.00
342 127889 342
+ 0
320
127889 0 0 100.00
+0
41 / 41
+0
342 / 338
156314.00
+0.00 / +0.00
136622.31
87.40% 1306 976 330 113 79 34
  • 22 HGJ CERT
  • 333 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2023
Comissioning
0
  • 31-Jul-2024 OHT
  • 31-Mar-2024 CWR
  • 30-Sep-2023 D.System
  • 30-Jun-2024 Comissioning
  • 90 Villages
  • 54725 Households
  • 0 Last Week FHTC Given
  • 54725 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 90 HGJ
  • 89 HGJ Certified
  • 98.89 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 46 Handed Over Villages(before Portal)
  • 37 Handed Over Initiated/Approved On Portal
  • 92.22 Handed Over %
  • 89 OHT Required
  • 89 OHT Completed
  • Scheme Wise Category A
  • 35 No. of Schemes
  • 59 No. of Villages
  • Scheme Wise Category B
  • 21 No. of Schemes
  • 46 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 59 No. of Villages
  • Village Wise Category B
  • 46 No. of Villages
  • Village Wise Category C
  • 1 No. of Villages
  • Village Wise Total
  • 106 Total No. of Villages
  • 57 Total No. of Schemes
  • 106 Total No. of Villages
  • 102 Total No. of OHT
  • 52 Schemes Sent to O&M
  • 97 No. of OHT in O&M Schemes
  • 29813 Water Demand(M3)
  • 31218.55 Water Supply (M3)
  • 51 Agreement Done Scheme
  • 97 Agreement Done Village
NCC Ltd.


8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 202 15-May-2024 1 1 1 1 202 202 0 0 580 579 100%
+0
200
99 100.00 Yes 18 / 0 100.00 Yes 75 / 0
+0
31 / 31
32 / 0 80
+0
80
80 0 0 0 0
  +0
80 | 80
80 0 / 0 103 / 0 103 Integrated Verified Verified 12 70 Verified Verified 12 65 Verification Remarks Minutes of Meeting 129 95 80 0 0 65 80 6 22 0 0 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 2 + 0 = 2 96 80 27904 195328 837120 33384 119.64% 252336 1058151 202 0 0 32 49 121 13
+0
13
+0
13
13 2581.60
+0.00
2581.60
202 82266 202
+ 0
201
82266 0 0 100.00
+0
34 / 34
+0
202 / 202
93222.00
+0.00 / +0.00
87435.51
93.79% 2075 1868 207 85 35 50
  • 1 HGJ CERT
  • 200 HOV
Intake
Approach Road Completed
WTP
Campus Development Completed
T/W
Completed
OHT
Completed
CWR
1 No. CWR Shall be Completed in 25-Sept-2024 ( New additional Scope).
D.System
15-Feb-2024
Comissioning
0
  • 15-Dec-2023 Intake
  • 30-Nov-2023 WTP
  • 15-Sep-2023 T/W
  • 25-Nov-2023 OHT
  • 15-Apr-2024 CWR
  • 15-Feb-2024 D.System
  • 15-Sep-2024 Comissioning
Total Banda 544 2 2 2 1 1 202 202 0 0 1271 1255 99%
+0
531
97.61 100.00 2 37 / 3 100.00 2 169 / 2
+0
31 / 31
32 / 0 196
+0
196
196 0 0 0 0
  +0
196 | 196
196 0 / 0 219 / 1 219 -- -- -- 2 2 32 182 2 2 28 182 -- 414 301 196 1 2 172 193 13 23 -- -- 0 + 0 + 0 + 2 + 2 = 4 0 + 0 + 0 + 2 + 2 = 4 248 219 69160 484120 2074800 67641 97.80% 491403 1904878 544 0 4 64 207 269 52
+0
52
+0
52
52 6796.60
+0.00
6796.60
544 210155 544
+ 0
521
210155 0 0 100
+0
75 / 75
+0
544 / 540
249536.00
+0.00 / +0.00
224057.82
89.79% 0 0 0 3381 2844 537 198 114 84
2 Chitrakoot GVPR


8135453 Raipura GOV 69 0 0 0 0 0 0 0 0 92 75 82%
+0
57
83 100.00 Yes 2 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 28
+3
28
28 0 1 0 1
  +0
26 | 26
25 0 / 0 4 / 0 3 Integrated Off Verified Verified 0 26 Verified Verified 0 25 Verification Remarks Minutes of Meeting 204 0 28 5 1 25 22 12 0 0 0 1 + 0 + 0 + 0 + 0 = 1 1 + 0 + 0 + 0 + 0 = 1 19 18 5033 35231 150990 6623 131.59% 25406 99019 61 9 3 4 17 28 11
+0
11
+0
11
11 882.90
+0.00
855.50
69 19570 69
+ 0
48
19570 0 0 100.00
+0
13 / 13
+0
65 / 61
30332.00
+0.00 / +0.00
22158.51
73.05% 159 125 34 31 2 29
  • 2 OHT
  • 27 D.System
  • 4 COV
  • 21 HGJ CERT
  • 68 HOV
Intake
0
WTP
operational
T/W
0
OHT
May-26
CWR
June-24
D.System
30-Dec-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 31-Oct-2023 WTP
  • 31-May-2026 OHT
  • 10-Mar-2024 CWR
  • 30-Dec-2024 D.System
  • 15-Feb-2025 Comissioning
  • 140 Villages
  • 44632 Households
  • 0 Last Week FHTC Given
  • 44623 FHTC Given
  • 99 FHTC(%)
  • 9 Balance FHTC
  • 140 HGJ
  • 122 HGJ Certified
  • 87.14 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 37 Handed Over Villages(before Portal)
  • 90 Handed Over Initiated/Approved On Portal
  • 90.71 Handed Over %
  • 71 OHT Required
  • 71 OHT Completed
  • Scheme Wise Category A
  • 42 No. of Schemes
  • 55 No. of Villages
  • Scheme Wise Category B
  • 4 No. of Schemes
  • 42 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 55 No. of Villages
  • Village Wise Category B
  • 42 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 97 Total No. of Villages
  • 46 Total No. of Schemes
  • 97 Total No. of Villages
  • 74 Total No. of OHT
  • 19 Schemes Sent to O&M
  • 28 No. of OHT in O&M Schemes
  • 5482 Water Demand(M3)
  • 15618.83 Water Supply (M3)
  • 46 Agreement Done Scheme
  • 97 Agreement Done Village
Larsen & Toubro Ltd


8134589 Silauta Mustkil GOV 59 0 0 0 0 0 0 0 0 59 57 97%
+0
54
92 100.00 Yes 4 / 0 100.00 Yes 12 / 1
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 22 / 0 11 Integrated Off Verified Verified 5 17 Verified Verified 3 17 Verification Remarks Minutes of Meeting 79 46 17 0 1 17 16 5 2 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 19 17 3884 27188 116520 4307 110.89% 28552 122614 59 0 1 4 10 44 6
+0
6
+0
6
6 576.00
+0.00
567.05
59 11925 59
+ 0
57
11925 0 0 100.00
+0
7 / 7
+0
59 / 59
21359.00
+0.00 / +-609.64
19737.98
92.41% 137 103 34 22 1 21
  • 8 D.System
  • 2 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Oct-2023
Comissioning
0
  • 30-Nov-2023 Intake
  • 15-Dec-2023 WTP
  • 15-Oct-2024 OHT
  • 31-Aug-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Aug-2023 Comissioning
8134609 Chandi Bangar GOV 286 0 0 0 0 0 0 0 0 304 221 73%
+0
187
65 100.00 Yes 9 / 0 100.00 Yes 9 / 0
+0
0 / 0
0 / 0 91
+0
91
91 0 0 0 0
  +0
91 | 91
85 0 / 0 29 / 0 4 Integrated Off Verified Not Verified 5 17 Verified Not Verified 5 17 Verification Remarks Minutes of Meeting 244 118 91 7 41 17 43 18 2 0 0 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 2 = 2 132 128 14495 101465 434850 12389 85.47% 82934 295449 165 54 25 29 12 45 20
+0
20
+0
20
20 3052.00
+0.00
2846.86
286 86157 284
+ 0
80
86114 0 0 99.95
+0
21 / 21
+0
240 / 166
95975.00
+0.00 / +0.00
73359.78
76.44% 598 356 242 118 2 116
  • 205 D.System
  • 44 COV
  • 43 FHTC
  • 2 HGJ
  • 206 HGJ CERT
  • 284 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Nov-2025
Comissioning
0
  • 15-Dec-2023 Intake
  • 15-Dec-2023 WTP
  • 31-Dec-2025 OHT
  • 30-Jun-2024 CWR
  • 30-Nov-2025 D.System
  • 30-Jun-2026 Comissioning
Agency Total 345 0 0 0 0 0 0 0 0 363 278 77% 241 200.00 13 / 0 200.00 21 / 1
+0
0 / 0
0 / 0 108
+0
108
108 0 0 0 0
  +0
108 | 108
102 0 / 0 51 / 0 15 -- -- -- 2 1 10 34 2 1 8 34 -- 323 164 108 7 42 34 59 23 4 -- -- 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 2 = 2 151 145 18379 128653 551370 16696 90.84% 111486 418063 224 54 26 33 22 89 26
+0
26
+0
26
26 3628.00
+0.00
3413.91
345 98082 343
+ 0
137
98039 0 0 100
+0
28 / 28
+0
299 / 225
117334.00
+0.00
93097.76
79% 735 459 276 140 3 137
Total Chitrakoot 414 0 0 0 0 0 0 0 0 0 455 353 78%
+0
298
71.98 100.00 3 15 / 0 100.00 3 22 / 1
+0
0 / 0
0 / 0 136
+0
136
136 0 1 0 1
  +0
134 | 134
127 0 / 0 55 / 0 18 -- -- -- 3 2 10 60 3 2 8 60 -- 527 164 136 12 43 59 81 35 4 -- -- 1 + 0 + 0 + 0 + 1 = 2 1 + 0 + 0 + 0 + 2 = 3 170 163 23413 163891 702390 23319 99.60% 136892 517082 285 63 29 37 39 117 37
+0
37
+0
37
37 4510.90
+0.00
4269.41
414 117652 412
+ 0
185
117609 0 0 99.96
+0
41 / 41
+0
364 / 286
147666.00
+0.00 / +-609.64
115256.27
78.05% 0 0 0 894 584 310 171 5 166
3 Hamirpur PNC-SPML-JV


8135500 Haraulipur GOV and Tubewell Scheme 125 Nos. 193 20-Mar-2024 1 1 1 1 193 191 0 0 448 447 100%
+0
191
99 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
123 / 123
0 / 0 130
+0
130
0 0 0 0 0
  +0
130 | 130
130 0 / 0 118 / 0 113 Integrated Not Verified Not Verified 0 3 Not Verified Not Verified 0 3 Verification Remarks Minutes of Meeting 45 30 130 123 0 3 7 4 1 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 81 72 1227 8589 36810 1036 84.43% 7237 30759 193 0 0 18 43 132 6
+0
6
+0
6
6 1327.83
+0.00
1327.83
193 59675 193
+ 0
191
59675 0 0 100.00
+0
73 / 73
+0
193 / 193
27101.00
+0.00 / +0.00
25719.52
94.90% Yes 988 736 252 88 10 78
  • 2 HGJ CERT
  • 191 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Dec-2023
Comissioning
0
  • 28-Feb-2024 T/W
  • 20-Mar-2024 OHT
  • 30-Oct-2023 CWR
  • 30-Dec-2023 D.System
  • 20-Mar-2024 Comissioning
  • 143 Villages
  • 79974 Households
  • 0 Last Week FHTC Given
  • 79974 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 143 HGJ
  • 130 HGJ Certified
  • 90.91 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 28 Handed Over Villages(before Portal)
  • 57 Handed Over Initiated/Approved On Portal
  • 59.44 Handed Over %
  • 60 OHT Required
  • 60 OHT Completed
  • Scheme Wise Category A
  • 76 No. of Schemes
  • 114 No. of Villages
  • Scheme Wise Category B
  • 27 No. of Schemes
  • 31 No. of Villages
  • Scheme Wise Category C
  • 2 No. of Schemes
  • 2 No. of Villages
  • Village Wise Category A
  • 106 No. of Villages
  • Village Wise Category B
  • 39 No. of Villages
  • Village Wise Category C
  • 2 No. of Villages
  • Village Wise Total
  • 147 Total No. of Villages
  • 105 Total No. of Schemes
  • 147 Total No. of Villages
  • 108 Total No. of OHT
  • 76 Schemes Sent to O&M
  • 79 No. of OHT in O&M Schemes
  • 20351 Water Demand(M3)
  • 22805.53 Water Supply (M3)
  • 105 Agreement Done Scheme
  • 147 Agreement Done Village
JWIL


8135488 Pathyora Danda GOV 134 20-Mar-2024 1 1 1 1 129 128 0 0 412 411 100%
+0
129
96 100.00 Yes 7 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 46
+0
46
0 0 0 0 0
  +0
46 | 46
46 0 / 0 45 / 0 42 Integrated Verified Verified 6 42 Verified Verified 6 42 Verification Remarks Minutes of Meeting 146 52 46 0 3 42 43 17 9 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 3 + 0 = 3 48 39 12352 86464 370560 11881 96.19% 68818 323007 129 0 0 13 29 87 10
+0
10
+0
10
10 1214.00
+0.00
1213.70
134 45475 129
+ 0
127
45475 0 0 100.00
+0
10 / 10
+0
131 / 129
39878.00
+0.00 / +0.00
36621.43
91.83% 847 750 97 58 24 34
  • 5 HGJ
  • 7 HGJ CERT
  • 132 HOV
Intake
Completed and functional
WTP
Completed and functional
T/W
0
OHT
To be completed by March2024
CWR
Completed
Comissioning
0
  • 15-Mar-2024 OHT
Total Hamirpur 322 2 2 2 2 2 322 319 0 0 859 857 100%
+0
320
99.38 100.00 2 11 / 0 100.00 2 5 / 0
+0
123 / 123
0 / 0 176
+0
176
0 0 0 0 0
  +0
176 | 176
176 0 / 0 163 / 0 155 -- -- -- 1 1 6 45 1 1 6 45 -- 191 82 176 123 3 45 50 21 10 -- -- 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 3 + 0 = 3 129 111 13579 95053 407370 12917 95.12% 76055 353766 322 0 0 31 72 219 16
+0
16
+0
16
16 2541.83
+0.00
2541.53
322 105150 322
+ 0
318
105150 0 0 100
+0
83 / 83
+0
324 / 322
66979.00
+0.00 / +0.00
62340.95
93.08% 0 1 0 1835 1486 349 146 34 112
4 Jalaun BGCCPL-Ramky (JV)


8135522 Kota Mustakil GOV and Tubewell Scheme 270 Nos. 515 1 0 0 0 0 0 0 0 1123 863 77%
+0
229
44 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
256 / 256
0 / 0 272
+0
272
269 0 0 5 25
  +0
223 | 242
181 0 / 0 110 / 0 2 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 272 272 0 0 0 0 0 0 0 + 0 + 0 + 8 + 1 = 9 0 + 0 + 0 + 8 + 1 = 9 161 154 0 0 0 0 0% 0 0 207 95 49 22 16 25 5
+0
5
+0
5
5 2511.00
+0.00
2507.80
515 109509 201
+ 0
88
107150 0 0 97.85
+0
129 / 127
+0
505 / 128
52161.00
+0.00 / +0.00
49382.21
94.67% 671 355 316 103 6 97
  • 30 OHT
  • 3 D.System
  • 10 COV
  • 2 Electricity
  • 2359 FHTC
  • 314 HGJ
  • 427 HGJ CERT
  • 514 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2026
Comissioning
0
  • 31-Mar-2026 Intake
  • 31-Mar-2026 WTP
  • 31-Mar-2026 T/W
  • 31-Mar-2026 OHT
  • 31-Mar-2026 CWR
  • 31-Mar-2026 D.System
  • 31-Mar-2026 Comissioning
  • 61 Villages
  • 26484 Households
  • 0 Last Week FHTC Given
  • 26484 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 61 HGJ
  • 55 HGJ Certified
  • 90.16 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 3 Handed Over Villages(before Portal)
  • 19 Handed Over Initiated/Approved On Portal
  • 36.07 Handed Over %
  • 60 OHT Required
  • 60 OHT Completed
  • Scheme Wise Category A
  • 31 No. of Schemes
  • 34 No. of Villages
  • Scheme Wise Category B
  • 25 No. of Schemes
  • 29 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 34 No. of Villages
  • Village Wise Category B
  • 29 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 63 Total No. of Villages
  • 56 Total No. of Schemes
  • 63 Total No. of Villages
  • 59 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 59 No. of OHT in O&M Schemes
  • 11083 Water Demand(M3)
  • 2290.55 Water Supply (M3)
  • 56 Agreement Done Scheme
  • 63 Agreement Done Village
8135526 Raipur GOV 83 1 0 0 0 0 0 0 0 168 122 73%
+0
39
47 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
15 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 17 17 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 22 22 0 0 0 0 0% 0 0 21 13 1 0 7 0 7
+0
7
+0
7
7 495.00
+0.19
494.49
83 18444 10
+ 0
2
17550 0 0 95.15
+0
8 / 8
+0
79 / 5
20745.00
+0.00 / +0.00
5948.65
28.68% 76 39 37 16 0 16
  • 4 COV
  • 894 FHTC
  • 73 HGJ
  • 81 HGJ CERT
  • 82 HOV
Intake
0
WTP
It is Functioning
T/W
0
OHT
Completed
CWR
0
D.System
31-Mar-2026
Comissioning
0
  • 31-Mar-2026 Intake
  • 31-Mar-2026 WTP
  • 31-Mar-2026 T/W
  • 31-Mar-2026 OHT
  • 31-Mar-2026 CWR
  • 31-Mar-2026 D.System
  • 31-Mar-2026 Comissioning
8135545 Madhepura GOV 74 1 0 0 0 0 0 0 0 162 121 75%
+0
34
46 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+1
12
12 0 0 0 1
  +0
10 | 11
9 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 23 22 0 0 0 0 0% 0 0 19 10 3 0 5 1 6
+0
6
+0
6
6 425.00
+0.00
424.25
74 15230 5
+ 0
4
14647 0 0 96.17
+0
7 / 7
+0
61 / 6
13157.00
+0.00 / +0.00
3770.43
28.66% 47 20 27 22 3 19
  • 1 OHT
  • 6 COV
  • 583 FHTC
  • 69 HGJ
  • 70 HGJ CERT
  • 70 HOV
Intake
0
WTP
Completed
T/W
0
OHT
Completed
CWR
0
D.System
31-Mar-2026
Comissioning
0
  • 31-Mar-2026 Intake
  • 31-Mar-2026 WTP
  • 31-Mar-2026 T/W
  • 31-Mar-2026 OHT
  • 31-Mar-2026 CWR
  • 31-Mar-2026 D.System
  • 31-Mar-2026 Comissioning
Agency Total 672 3 0 0 0 0 0 0 0 1453 1106 76% 302 300.00 1 / 0 300.00 0 / 0
+0
256 / 256
0 / 0 301
+1
301
298 0 0 5 26
  +0
250 | 270
205 0 / 0 110 / 0 2 -- -- -- -- 0 0 301 301 0 0 0 0 -- -- 0 + 0 + 0 + 8 + 1 = 9 0 + 0 + 0 + 8 + 1 = 9 206 198 0 0 0 0 0% 0 0 247 118 53 22 28 26 18
+0
18
+0
18
18 3431.00
+0.19
3426.54
672 143183 216
+ 0
94
139347 0 0 97
+0
144 / 142
+0
645 / 139
86063.00
+0.00
59101.29
69% 794 414 380 141 9 132
GVPR


8135513 Sala GOV 197 15-Jul-2025 1 1 1 1 197 158 0 0 496 495 100%
+0
179
91 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 56
+0
56
56 0 0 0 0
  +0
56 | 56
56 0 / 0 59 / 0 22 Integrated Verified Verified 9 50 Verified Verified 9 50 Verification Remarks Minutes of Meeting 141 140 56 4 6 50 46 26 10 0 0 0 + 0 + 0 + 2 + 0 = 2 0 + 0 + 0 + 2 + 0 = 2 55 54 12023 84161 360690 11248 93.55% 78799 343926 196 1 6 39 61 89 11
+0
11
+0
11
11 1715.00
+0.00
1715.00
197 43098 197
+ 0
169
43098 0 0 100.00
+0
12 / 12
+0
197 / 197
50599.00
+0.00 / +0.00
41240.12
81.50% 322 197 125 42 42 0
  • 28 HGJ CERT
  • 195 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Total Jalaun 857 1 4 1 1 1 197 158 0 0 1949 1600 82%
+0
481
56.13 100.00 4 3 / 0 100.00 4 4 / 0
+0
256 / 256
0 / 0 357
+0
357
354 0 0 5 26
  +0
306 | 326
261 0 / 0 169 / 0 24 -- -- -- 1 1 9 50 1 1 9 50 -- 141 140 357 305 6 50 46 26 10 -- -- 0 + 0 + 0 + 10 + 1 = 11 0 + 0 + 0 + 10 + 1 = 11 261 252 12023 84161 360690 11248 93.55% 78799 343926 443 119 59 61 89 115 29
+0
29
+0
29
29 5146.00
+0.19
5141.54
857 184499 413
+ 0
263
180667 0 0 97.92
+0
156 / 154
+0
842 / 336
136662.00
+0.00 / +0.00
100341.41
73.42% 0 0 0 1106 601 505 181 50 131
5 Jhansi BGCCPL-Ramky (JV)


8009955 Imlota GOV 91 0 0 0 0 0 0 0 0 192 163 85%
+0
13
14 100.00 Yes 1 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 4 / 0 7 Integrated Off Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 36 0 13 12 1 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 48 47 0 0 0 0 0% 0 0 59 29 10 3 9 8 8
+0
8
+0
8
8 899.95
+0.00
899.00
91 32259 75
+ 0
9
32201 0 0 99.82
+0
9 / 9
+0
85 / 59
29730.00
+0.00 / +0.00
25851.08
86.95% 288 173 115 33 19 14
  • 2 COV
  • 58 FHTC
  • 16 HGJ
  • 82 HGJ CERT
  • 90 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Jul-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Apr-2024 OHT
  • 14-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
  • 124 Villages
  • 49613 Households
  • 0 Last Week FHTC Given
  • 48096 FHTC Given
  • 96 FHTC(%)
  • 1517 Balance FHTC
  • 105 HGJ
  • 95 HGJ Certified
  • 76.61 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 31 Handed Over Villages(before Portal)
  • 47 Handed Over Initiated/Approved On Portal
  • 62.90 Handed Over %
  • 14 OHT Required
  • 14 OHT Completed
  • Scheme Wise Category A
  • 34 No. of Schemes
  • 58 No. of Villages
  • Scheme Wise Category B
  • 35 No. of Schemes
  • 64 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 53 No. of Villages
  • Village Wise Category B
  • 52 No. of Villages
  • Village Wise Category C
  • 12 No. of Villages
  • Village Wise Total
  • 117 Total No. of Villages
  • 70 Total No. of Schemes
  • 123 Total No. of Villages
  • 77 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 58 No. of OHT in O&M Schemes
  • 10674 Water Demand(M3)
  • 14371.30 Water Supply (M3)
  • 70 Agreement Done Scheme
  • 123 Agreement Done Village
8135947 Teharka GOV 93 0 0 0 0 0 0 0 0 162 132 81%
+0
27
29 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 4 / 0 6 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 0 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 3 + 0 = 3 53 48 0 0 0 0 0% 0 0 53 7 6 18 15 7 9
+0
9
+0
9
9 786.55
+0.00
786.00
93 27437 31
+ 0
8
27279 0 0 99.42
+0
10 / 10
+0
81 / 53
29676.00
+0.00 / +0.00
18958.13
63.88% 215 91 124 34 15 19
  • 12 COV
  • 158 FHTC
  • 62 HGJ
  • 85 HGJ CERT
  • 93 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 31-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
8135956 Barthari GOV 106 0 0 0 0 0 0 0 0 184 171 93%
+0
30
28 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 4 / 0 10 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 15 15 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 42 39 0 0 0 0 0% 0 0 30 6 7 8 7 2 11
+0
11
+0
11
11 868.26
+0.00
863.85
106 27423 28
+ 0
1
27176 0 0 99.10
+0
12 / 12
+0
74 / 30
29490.00
+0.00 / +0.00
19962.03
67.69% 117 64 53 41 20 21
  • 4 D.System
  • 32 COV
  • 247 FHTC
  • 78 HGJ
  • 105 HGJ CERT
  • 106 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 30-Jun-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jun-2024 Comissioning
Agency Total 290 0 0 0 0 0 0 0 0 538 466 87% 70 300.00 3 / 0 300.00 8 / 0
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 12 / 0 23 -- -- -- -- 36 0 40 39 1 0 0 0 -- -- 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 3 + 0 = 3 143 134 0 0 0 0 0% 0 0 142 42 23 29 31 17 28
+0
28
+0
28
28 2554.76
+0.00
2548.85
290 87119 134
+ 0
18
86656 0 0 99
+0
31 / 31
+0
240 / 142
88896.00
+0.00
64771.24
73% 620 328 292 108 54 54
Indian Hume Pipe


8010037 Kuraicha GOV 72 05-Feb-2024 1 1 1 1 74 72 0 0 289 288 100%
+0
69
96 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 14
+14
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 14 / 0 24 Integrated Off Verified Verified 10 14 Verified Verified 10 14 Verification Remarks Minutes of Meeting 88 0 14 0 0 14 14 0 1 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 3 + 0 = 3 9 5 8491 59437 254730 10030 118.13% 67827 330709 71 0 1 8 11 51 11
+0
0
+0
11
11 859.73
+0.00
859.37
72 29415 73
+ 0
70
29406 0 0 99.97
+0
19 / 19
+0
72 / 69
28180.00
+0.00 / +0.00
27954.08
99.20% Yes 308 293 15 25 17 8
  • 9 FHTC
  • 2 HGJ CERT
  • 72 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
NCC Ltd.


8009966 Tilaitha GOV 25 01-Sep-2023 1 1 1 1 25 25 0 0 65 65 100%
+0
25
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 10 / 0 5 Integrated Verified Verified 3 5 Verified Verified 3 5 Verification Remarks Minutes of Meeting 44 44 5 0 0 5 5 2 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 1930 13510 57900 2839 147.10% 5849 84984 25 1 0 5 7 12 4
+0
4
+0
4
4 248.18
+0.00
248.18
25 6725 25
+ 0
24
6725 0 0 100.00
+0
7 / 7
+0
25 / 25
7517.00
+0.00 / +0.00
6605.35
87.87% Yes 109 107 2 5 4 1
  • 1 HGJ CERT
  • 25 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8009988 Bacholi Bauzurg GOV 37 01-Sep-2023 1 1 1 1 37 37 0 0 75 75 100%
+0
37
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 15 / 0 7 Integrated Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 52 52 7 0 0 7 7 5 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6 6 3419 23933 102570 4705 137.61% 8076 118042 37 1 1 7 7 21 4
+0
4
+0
4
4 297.97
+0.00
297.97
37 11549 37
+ 0
36
11549 0 0 100.00
+0
10 / 10
+0
37 / 37
12643.00
+0.00 / +0.00
11763.97
93.05% Yes 133 125 8 6 5 1
  • 1 HGJ CERT
  • 37 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 15-Oct-2023 Comissioning
8009992 Gulara GOV 42 01-Sep-2023 1 1 1 1 42 40 0 0 99 99 100%
+0
42
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 14 / 0 7 Integrated Off Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 52 52 7 0 0 7 7 6 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 3346 23422 100380 3691 110.31% 7558 112034 42 0 0 4 6 32 4
+0
4
+0
4
4 309.37
+0.00
309.37
42 11437 42
+ 0
42
11437 0 0 100.00
+0
10 / 10
+0
42 / 42
11037.00
+0.00 / +0.00
10864.98
98.44% Yes 59 59 0 19 10 9
  • 42 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8010048 Burhpura GOV 59 01-Sep-2023 1 1 1 1 59 59 0 0 189 188 99%
+0
57
97 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 14
+0
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 32 / 0 14 Integrated Verified Verified 7 14 Verified Verified 7 14 Verification Remarks Minutes of Meeting 54 54 14 0 0 14 14 1 7 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 12 11 8009 56063 240270 13997 174.77% 83851 377261 59 3 3 12 23 18 8
+0
8
+0
8
8 869.06
+0.00
869.06
59 26650 59
+ 0
52
26650 0 0 100.00
+0
19 / 19
+0
59 / 59
27993.00
+0.00 / +0.00
26800.71
95.74% Yes 266 234 32 16 11 5
  • 7 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 163 4 4 4 4 163 161 0 0 428 427 100% 161 400.00 14 / 0 400.00 8 / 0
+0
0 / 0
0 / 0 33
+0
33
0 0 0 0 0
  +0
33 | 33
33 0 / 0 71 / 0 33 -- -- -- 4 4 16 33 4 4 16 33 -- 202 202 33 0 0 33 33 14 7 -- -- 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 20 19 16704 116928 501120 25232 151.05% 105334 692321 163 5 4 28 43 83 20
+0
20
+0
20
20 1724.58
+0.00
1724.58
163 56361 163
+ 0
154
56361 0 0 100
+0
46 / 46
+0
163 / 163
59190.00
+0.00
56035.01
95% 567 525 42 46 30 16
DARA ENGINEERING


8135931 Purwa GOV 32 01-Jan-2024 1 1 1 1 32 32 0 0 75 75 100%
+0
31
97 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 6
+6
6
0 0 0 0 0
  +0
6 | 6
6 0 / 0 6 / 0 10 Integrated Verified Verified 3 6 Verified Verified 3 6 Verification Remarks Minutes of Meeting 27 21 6 0 0 6 6 0 5 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 0 4025 28175 120750 6870 170.68% 49187 187710 32 0 0 2 6 24 3
+0
0
+0
3
3 292.54
+0.00
292.54
32 12762 32
+ 0
32
12762 0 0 100.00
+0
8 / 8
+0
32 / 32
9704.00
+0.00 / +0.00
8586.65
88.49% Yes 195 193 2 5 4 1
  • 32 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Unipro


8135681 Barwar GOV 57 05-Feb-2024 1 1 1 1 57 57 0 0 257 257 100%
+0
57
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 9 / 0 9 Integrated Verified Verified 4 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 68 68 9 0 0 9 9 1 4 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 1 4211 29477 126330 5341 126.83% 49061 197541 57 0 0 2 20 35 5
+0
5
+0
5
5 458.49
+0.00
458.49
57 15848 57
+ 0
57
15848 0 0 100.00
+0
13 / 13
+0
57 / 57
14645.00
+0.00 / +0.00
12732.70
86.94% Yes 176 171 5 14 6 8
  • 57 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 30-Aug-2023 D.System
  • 30-Aug-2023 Comissioning
Total Jhansi 612 7 7 7 7 7 326 322 0 0 1583 1510 95%
+0
388
63.40 100.00 10 21 / 0 100.00 10 22 / 0
+0
0 / 0
0 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 112 / 0 99 -- -- -- 7 7 33 62 7 7 33 62 -- 421 291 102 39 1 62 62 15 17 -- -- 0 + 0 + 0 + 5 + 0 = 5 0 + 0 + 0 + 7 + 0 = 7 177 159 33432 234024 1002960 47474 142.00% 271409 1408280 465 47 28 69 111 210 67
+0
53
+0
67
67 5890.10
+0.00
5883.83
612 201505 459
+ 0
331
201033 0 0 99.77
+0
117 / 117
+0
564 / 463
200615.00
+0.00 / +0.00
170079.68
84.78% 0 0 3 1866 1510 356 198 111 87
6 Lalitpur M/s Sudhakara Infratech Pvt. Ltd


8010072 Lagaon GOV 50 15-Jan-2024 1 1 1 1 50 50 0 0 115 115 100%
+0
50
100 100.00 Yes 1 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 13
+13
13
13 0 0 0 0
  +0
13 | 13
13 0 / 0 13 / 0 13 Integrated Verified Verified 7 13 Verified Verified 7 13 Verification Remarks Minutes of Meeting 79 36 13 0 0 13 13 2 9 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 5 4106 28742 123180 7746 188.65% 49638 171555 50 0 0 1 9 40 9
+0
9
+0
9
9 381.75
+0.00
409.16
50 12964 50
+ 0
50
12964 0 0 100.00
+0
10 / 10
+0
50 / 50
17608.00
+0.00 / +0.00
17443.84
99.07% Yes 116 110 6 25 24 1
  • 49 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
9 CWR Completed
D.System
30-Sep-2023
Comissioning
30/12/2023
  • 14-Aug-2023 Intake
  • 31-Aug-2023 WTP
  • 14-Jun-2023 OHT
  • 17-May-2023 CWR
  • 30-Sep-2023 D.System
  • 30-Dec-2023 Comissioning
  • 105 Villages
  • 46145 Households
  • 0 Last Week FHTC Given
  • 46145 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 105 HGJ
  • 94 HGJ Certified
  • 89.52 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 7 Handed Over Villages(before Portal)
  • 45 Handed Over Initiated/Approved On Portal
  • 49.52 Handed Over %
  • 37 OHT Required
  • 37 OHT Completed
  • Scheme Wise Category A
  • 5 No. of Schemes
  • 9 No. of Villages
  • Scheme Wise Category B
  • 11 No. of Schemes
  • 93 No. of Villages
  • Scheme Wise Category C
  • 15 No. of Schemes
  • 16 No. of Villages
  • Village Wise Category A
  • 11 No. of Villages
  • Village Wise Category B
  • 49 No. of Villages
  • Village Wise Category C
  • 58 No. of Villages
  • Village Wise Total
  • 118 Total No. of Villages
  • 31 Total No. of Schemes
  • 118 Total No. of Villages
  • 51 Total No. of OHT
  • 13 Schemes Sent to O&M
  • 29 No. of OHT in O&M Schemes
  • 11185 Water Demand(M3)
  • 11090.69 Water Supply (M3)
  • 16 Agreement Done Scheme
  • 102 Agreement Done Village
8063544 Kachnauda Kala GOV 61 01-Apr-2024 1 1 1 1 61 61 0 0 171 171 100%
+0
61
100 100.00 Yes 1 / 1 100.00 Yes 8 / 1
+0
0 / 0
0 / 0 17
+16
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 17 / 0 19 Integrated Off Verified Verified 5 17 Verified Verified 5 15 Verification Remarks Minutes of Meeting 60 32 17 0 0 15 17 2 3 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 21 21 6661 46627 199830 9530 143.07% 51280 226493 60 0 0 3 13 44 8
+0
8
+0
8
8 578.14
+0.00
594.56
61 22452 61
+ 0
59
22452 0 0 100.00
+0
9 / 9
+0
61 / 60
24598.00
+0.00 / +0.00
21258.09
86.42% 278 240 38 24 24 0
  • 2 HGJ CERT
  • 58 HOV
Intake
100% structure completed work done by 30/10/2023
WTP
100% WTP structure done remaining work done by 30/10/2023
T/W
0
OHT
remaining work completed by 30/11/2023
CWR
remaining work done by 15/12/2023
D.System
30-Oct-2023
Comissioning
comissioning start by 30/10/2023
  • 30-Sep-2023 Intake
  • 23-Oct-2023 WTP
  • 13-Nov-2023 OHT
  • 30-Nov-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Oct-2023 Comissioning
8134917 Jakhlaun Birdha GOV 60 03-Dec-2024 1 1 1 1 60 60 0 0 116 116 100%
+0
60
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+13
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 11 / 0 14 Integrated Verified Verified 2 11 Verified Verified 2 11 Verification Remarks Minutes of Meeting 45 25 15 0 0 11 15 1 7 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 23 23 5836 40852 175080 10135 173.66% 57702 233624 58 0 0 3 12 43 5
+0
5
+0
5
5 462.02
+0.00
520.82
60 17590 60
+ 0
53
17590 0 0 100.00
+0
6 / 6
+0
60 / 58
23368.00
+0.00 / +0.00
22027.38
94.26% 165 125 40 26 26 0
  • 7 HGJ CERT
  • 51 HOV
Intake
remaining work done by 20/10/2023
WTP
remaining work done by 30/01/2024
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 15/11/2023
D.System
15-Feb-2024
Comissioning
comissioning 03/03/2024
  • 20-Oct-2023 Intake
  • 20-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 30-Nov-2023 CWR
  • 15-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134922 Dhoora Balabehat GOV 58 03-Dec-2024 1 1 1 1 58 58 0 0 55 54 98%
+0
57
98 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 11
+10
11
11 0 0 0 0
  +0
11 | 11
11 0 / 0 6 / 0 6 Integrated Off Verified Verified 2 10 Verified Verified 2 9 Verification Remarks Minutes of Meeting 42 19 11 0 0 9 11 3 5 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 11 11 2917 20419 87510 4812 164.96% 32970 137581 58 0 0 3 18 37 5
+0
5
+0
5
5 332.97
+0.00
372.33
58 9685 58
+ 0
55
9685 0 0 100.00
+0
6 / 6
+0
58 / 57
15059.00
+0.00 / +0.00
14818.61
98.40% 86 69 17 12 12 0
  • 3 HGJ CERT
  • 48 HOV
Intake
remaining work done by 30/10/2023
WTP
remaining work done by 30/10/2023
T/W
0
OHT
remaining work done by 30/10/2023
CWR
Work has started on 5 CWR, No one Complete.
D.System
21-Feb-2024
Comissioning
comissioning 15/10/2024
  • 06-Jan-2024 Intake
  • 16-Jan-2024 WTP
  • 30-Dec-2023 OHT
  • 30-Oct-2023 CWR
  • 21-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134938 Kadesra Kalan GOV 7 20-Jun-2024 1 1 1 1 7 7 0 0 62 61 98%
+0
6
86 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 5 10 Verified Verified 5 10 Verification Remarks Minutes of Meeting 29 15 4 0 0 10 4 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 1696 11872 50880 3169 186.85% 21664 96697 7 1 0 0 1 5 2
+0
2
+0
2
2 130.13
+0.00
160.49
7 7371 7
+ 0
6
7371 0 0 100.00
+0
3 / 3
+0
7 / 7
5977.00
+0.00 / +0.00
5804.70
97.12% 50 46 4 3 3 0
  • 1 HGJ CERT
  • 7 HOV
Intake
remaining work done by31/10/2023
WTP
remaining work done by 30/12/2023
T/W
0
OHT
15/10/2023
CWR
15/10/2023
D.System
30-Jan-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Dec-2023 WTP
  • 15-Oct-2023 OHT
  • 15-Oct-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
8134955 Mau GOV 15 20-Jun-2024 1 1 1 1 15 14 0 0 38 38 100%
+0
15
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 6
+5
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 0 / 0 3 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 0 0 6 0 0 6 0 1 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 923 6461 27690 0 0% 0 0 15 0 0 0 3 12 3
+0
3
+0
3
3 120.25
+0.00
162.11
15 3347 15
+ 0
14
3347 0 0 100.00
+0
3 / 3
+0
15 / 15
5996.00
+0.00 / +0.00
4735.34
78.97% 52 52 0 6 6 0
  • 1 HGJ CERT
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 31/10/2023
D.System
30-Jan-2024
Comissioning
comissioning 30/10/2023
  • 20-Oct-2023 Intake
  • 30-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 31-Aug-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
Agency Total 251 6 6 6 6 251 250 0 0 557 555 100% 249 600.00 9 / 1 600.00 24 / 1
+0
0 / 0
0 / 0 66
+61
66
66 0 0 0 0
  +0
66 | 66
66 0 / 0 47 / 0 59 -- -- -- 5 5 21 61 5 5 21 58 -- 255 127 66 0 0 58 66 8 25 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 62 62 22139 154973 664170 35392 159.86% 213254 865950 248 1 0 10 56 181 32
+0
32
+0
32
32 2005.26
+0.00
2219.47
251 73409 251
+ 0
237
73409 0 0 100
+0
37 / 37
+0
251 / 247
92606.00
+0.00
86087.96
93% 747 642 105 96 95 1
Brija Banco Pvt. Ltd


8282117 Chandawali GOV 16 25-Mar-2024 1 1 1 1 15 15 0 0 18 18 100%
+0
15
94 100.00 Yes 2 / 0 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 6
+6
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 1 / 1 6 Integrated Verified Verified 1 1 Verified Verified 1 1 Verification Remarks Minutes of Meeting 48 0 6 0 0 1 6 3 1 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1 1 1417 9919 42510 1467 103.53% 4399 34197 15 0 0 3 3 9 3
+0
3
+0
3
3 108.90
+0.00
108.90
16 3501 15
+ 0
15
3501 0 0 100.00
+0
4 / 4
+0
16 / 15
4615.00
+0.00 / +0.00
3545.95
76.84% 44 43 1 5 4 1
  • 1 HGJ
  • 1 HGJ CERT
  • 16 HOV
Intake
0
WTP
0
T/W
0
OHT
civil work is done and E&M work is onging
CWR
All civil work finished and E&M work will be finished on 15 december
D.System
29-Jun-2023
Comissioning
0
  • 31-Oct-2023 Intake
  • 31-Oct-2023 WTP
  • 30-Sep-2023 OHT
  • 30-Sep-2023 CWR
  • 29-Jun-2023 D.System
  • 30-Nov-2023 Comissioning
DARA ENGINEERING


8136125 Sukul Guwan GOV 16 10-Jan-2024 1 1 1 1 16 16 0 0 15 15 100%
+0
16
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 3 4 Verified Verified 3 4 Verification Remarks Minutes of Meeting 20 16 4 0 0 4 4 0 4 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 1117 7819 33510 2439 218.35% 13602 53187 16 0 0 0 4 12 3
+0
3
+0
3
3 80.80
+0.00
80.80
16 3297 16
+ 0
16
3297 0 0 100.00
+0
4 / 4
+0
16 / 16
4614.00
+0.00 / +0.00
3765.78
81.62% Yes 27 23 4 7 7 0
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136173 Billa Mogan GOV 23 05-Aug-2025 0 0 0 0 0 0 0 0 54 50 93%
+0
11
48 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 8 / 0 8 Integrated Verified Verified 4 8 Verified Verified 4 8 Verification Remarks Minutes of Meeting 18 15 8 0 0 8 8 2 3 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 15 13 2551 17857 76530 3769 147.75% 28044 112896 23 0 2 1 8 12 4
+0
4
+0
4
4 148.83
+0.00
148.78
23 8735 23
+ 0
15
8735 0 0 100.00
+0
5 / 5
+0
23 / 23
8794.00
+0.00 / +0.00
7277.77
82.76% 99 46 53 12 10 2
  • 8 HGJ CERT
  • 23 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Jul-2023
Comissioning
0
  • 31-Jul-2023 Intake
  • 31-Aug-2023 WTP
  • 31-Jul-2023 OHT
  • 31-Jul-2023 CWR
  • 31-Jul-2023 D.System
  • 31-Aug-2023 Comissioning
8136187 Badanpur GOV 31 10-Jan-2024 1 1 1 1 31 29 0 0 33 33 100%
+0
31
100 100.00 Yes 0 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Verified Verified 4 8 Verified Verified 4 8 Verification Remarks Minutes of Meeting 21 17 8 0 0 8 8 0 3 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 3 1989 13923 59670 2817 141.63% 21629 96842 31 0 0 1 22 8 4
+0
4
+0
4
4 157.92
+0.00
157.92
31 6972 31
+ 0
31
6972 0 0 100.00
+0
5 / 5
+0
31 / 31
8836.00
+0.00 / +0.00
8056.90
91.18% Yes 36 30 6 9 9 0
  • 29 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136199 Sojana Gurgha GOV 32 10-Feb-2024 1 1 1 1 32 32 0 0 58 58 100%
+0
32
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 12
+12
12
12 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 12 Integrated Verified Verified 3 12 Verified Verified 3 12 Verification Remarks Minutes of Meeting 12 11 12 0 0 12 12 1 2 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 14 13 3126 21882 93780 3399 108.73% 26963 122191 31 0 1 3 7 20 3
+0
3
+0
3
3 169.97
+0.00
169.90
32 9621 32
+ 0
32
9621 0 0 100.00
+0
4 / 4
+0
32 / 31
9528.00
+0.00 / +0.00
8843.68
92.82% 163 125 38 18 16 2
  • 31 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136210 Mandawara GOV 17 10-Jan-2024 1 1 1 1 17 16 0 0 55 55 100%
+0
17
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Off Verified Verified 2 4 Verified Verified 2 4 Verification Remarks Minutes of Meeting 16 12 4 0 0 4 4 2 1 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 8 5 1875 13125 56250 1473 78.56% 17545 77495 17 0 0 1 4 12 2
+0
2
+0
2
2 125.40
+0.00
125.30
17 7306 17
+ 0
16
7306 0 0 100.00
+0
3 / 3
+0
17 / 17
6007.00
+0.00 / +0.00
4589.43
76.40% 60 48 12 6 6 0
  • 1 HGJ CERT
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
Agency Total 119 4 4 4 4 96 93 0 0 215 211 98% 107 500.00 4 / 1 500.00 3 / 1
+0
0 / 0
0 / 0 36
+36
36
36 0 0 0 0
  +0
36 | 36
36 0 / 0 8 / 0 36 -- -- -- 5 5 16 36 5 5 16 36 -- 87 71 36 0 0 36 36 5 13 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 44 36 10658 74606 319740 13897 130.39% 107783 462611 118 0 3 6 45 64 16
+0
16
+0
16
16 682.92
+0.00
682.70
119 35931 119
+ 0
110
35931 0 0 100
+0
21 / 21
+0
119 / 118
37779.00
+0.00
32533.56
86% 385 272 113 52 48 4
JMC-JWIL (JV)


8010056 Saidpur Kumheri GOV 47 01-Nov-2023 1 1 1 1 47 46 0 0 109 109 100%
+0
47
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 7
+7
7
7 0 0 0 0
  +0
7 | 7
7 0 / 0 7 / 0 7 Integrated Off Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 15 10 7 0 0 7 7 0 1 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 3 + 0 = 3 4 2 4365 30555 130950 6144 140.76% 36690 182879 44 1 2 3 11 27 5
+0
5
+0
5
5 385.45
+0.00
385.45
47 13818 47
+ 0
47
13818 0 0 100.00
+0
6 / 6
+0
46 / 43
14171.00
+0.00 / +0.00
12582.41
88.79% 185 181 4 17 13 4
  • 47 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010063 Gona Narhat GOV 54 01-Nov-2023 1 1 1 1 54 53 0 0 115 115 100%
+0
54
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 10
+10
10
10 0 0 0 0
  +0
10 | 10
10 0 / 0 10 / 0 10 Integrated Verified Verified 4 8 Verified Verified 4 8 Verification Remarks Minutes of Meeting 22 19 10 0 1 8 9 4 1 0 0 0 + 0 + 0 + 2 + 1 = 3 0 + 0 + 0 + 5 + 1 = 6 9 8 3896 27272 116880 3948 101.33% 25664 128298 48 1 4 2 15 26 6
+0
6
+0
6
6 378.00
+0.00
378.00
54 12897 54
+ 0
54
12897 0 0 100.00
+0
7 / 7
+0
54 / 50
13299.00
+0.00 / +0.00
11569.42
86.99% 252 232 20 23 11 12
  • 50 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010076 Masora Sindwaha GOV 45 01-Mar-2024 1 1 1 1 45 44 0 0 98 98 100%
+0
45
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 15
+8
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 15 Integrated Off Verified Verified 7 15 Verified Verified 7 15 Verification Remarks Minutes of Meeting 23 19 15 0 0 15 15 7 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 4 4790 33530 143700 3046 63.59% 33703 164168 45 1 0 1 2 41 7
+0
7
+0
7
7 512.43
+0.00
512.41
45 14057 45
+ 0
45
14057 0 0 100.00
+0
8 / 8
+0
45 / 44
16681.00
+0.00 / +0.00
15409.87
92.38% 156 148 8 20 19 1
  • 40 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 07-May-2024 OHT
  • 18-Jul-2023 CWR
  • 30-Aug-2023 D.System
  • 29-Jan-2025 Comissioning
Agency Total 146 3 3 3 3 146 143 0 0 322 322 100% 146 300.00 3 / 0 300.00 3 / 0
+0
0 / 0
0 / 0 32
+25
32
32 0 0 0 0
  +0
32 | 32
32 0 / 0 32 / 0 32 -- -- -- 3 3 14 30 3 3 14 30 -- 60 48 32 0 1 30 31 11 2 -- -- 0 + 0 + 0 + 3 + 1 = 4 0 + 0 + 0 + 8 + 1 = 9 18 14 13051 91357 391530 13138 100.67% 96057 475345 137 3 6 6 28 94 18
+0
18
+0
18
18 1275.88
+0.00
1275.86
146 40772 146
+ 0
146
40772 0 0 100
+0
21 / 21
+0
145 / 137
44151.00
+0.00
39561.70
90% 593 561 32 60 43 17
Banko Ganga


8282120 Tori GOV 19 15-Jan-2024 1 1 1 1 19 19 0 0 35 35 100%
+0
19
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 7 / 0 8 Integrated Verified Verified 2 8 Verified Not Verified 2 8 Verification Remarks Minutes of Meeting 30 0 8 0 0 8 8 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 1277 8939 38310 1319 103.29% 9218 40813 19 0 0 0 2 17 2
+0
2
+0
2
2 133.36
+0.00
133.36
19 3984 19
+ 0
19
3984 0 0 100.00
+0
3 / 3
+0
19 / 19
4036.00
+0.00 / +0.00
3434.39
85.09% Yes 36 36 0 6 6 0
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 20-May-2023 Intake
  • 25-May-2023 WTP
  • 05-Dec-2022 OHT
  • 15-Mar-2023 CWR
Total Lalitpur 550 16 15 15 15 15 527 520 0 0 1143 1137 99%
+0
536
97.45 100.00 16 20 / 2 100.00 16 33 / 3
+0
0 / 0
0 / 0 148
+0
148
148 0 0 0 0
  +0
148 | 148
148 0 / 0 95 / 1 141 -- -- -- 15 15 54 136 15 14 54 136 -- 480 246 148 0 1 133 147 27 41 -- -- 0 + 0 + 0 + 3 + 1 = 4 0 + 0 + 0 + 8 + 1 = 9 124 113 48549 339843 1456470 65213 134.32% 430710 1878917 536 4 8 25 134 365 71
+0
71
+0
71
71 4206.32
+0.00
4420.29
550 156973 549
+ 0
526
156973 0 0 100
+0
86 / 86
+0
550 / 536
183187.00
+0.00 / +0.00
165163.56
90.16% 0 2 0 1799 1549 250 214 191 23
7 Mahoba Larsen & Toubro Ltd


8009844 Shivhar GOV 61 01-Dec-2023 1 1 1 1 60 60 0 0 201 201 100%
+0
60
98 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 18
+0
18
0 0 0 0 0
  +0
18 | 18
18 0 / 0 18 / 0 18 Integrated Off Verified Verified 6 18 Verified Verified 6 6 Verification Remarks Minutes of Meeting 77 37 18 0 0 6 18 8 6 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 14 10 6444 45108 193320 6901 107.09% 50168 217751 58 0 2 9 7 40 6
+0
6
+0
6
6 672.57
+0.00
672.20
61 20449 60
+ 0
60
20449 0 0 100.00
+0
7 / 7
+0
61 / 60
27118.00
+0.00 / +0.00
26341.47
97.14% Yes Yes Yes 346 298 48 11 0 11
  • 1 HGJ
  • 1 HGJ CERT
  • 61 HOV
Intake
Completed
WTP
Completed
T/W
0
OHT
0
CWR
Completed
Comissioning
0
  • 31-Aug-2023 OHT
  • 31-Aug-2023 Comissioning
  • 73 Villages
  • 26427 Households
  • 0 Last Week FHTC Given
  • 26427 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 73 HGJ
  • 63 HGJ Certified
  • 86.30 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 45 Handed Over Villages(before Portal)
  • 4 Handed Over Initiated/Approved On Portal
  • 67.12 Handed Over %
  • 59 OHT Required
  • 59 OHT Completed
  • Scheme Wise Category A
  • 2 No. of Schemes
  • 4 No. of Villages
  • Scheme Wise Category B
  • 34 No. of Schemes
  • 59 No. of Villages
  • Scheme Wise Category C
  • 10 No. of Schemes
  • 10 No. of Villages
  • Village Wise Category A
  • 1 No. of Villages
  • Village Wise Category B
  • 62 No. of Villages
  • Village Wise Category C
  • 10 No. of Villages
  • Village Wise Total
  • 73 Total No. of Villages
  • 46 Total No. of Schemes
  • 73 Total No. of Villages
  • 58 Total No. of OHT
  • 35 Schemes Sent to O&M
  • 37 No. of OHT in O&M Schemes
  • 6579 Water Demand(M3)
  • 7103.52 Water Supply (M3)
  • 46 Agreement Done Scheme
  • 73 Agreement Done Village
JMC-JWIL (JV)


8009837 Lahchura Kashipura GOV 78 15-Mar-2024 1 1 1 1 75 74 0 0 235 235 100%
+0
75
96 100.00 Yes 10 / 1 100.00 Yes 11 / 1
+0
0 / 0
0 / 0 32
+0
32
0 0 0 0 0
  +0
32 | 32
32 0 / 0 23 / 0 27 Integrated Verified Verified 8 31 Verified Verified 8 30 Verification Remarks Minutes of Meeting 90 90 32 0 0 30 32 1 9 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 19 11 5652 39564 169560 7386 130.68% 52527 213989 74 0 1 8 8 57 10
+0
10
+0
10
10 601.08
+0.00
599.17
78 21622 75
+ 0
75
21622 0 0 100.00
+0
11 / 11
+0
78 / 74
23602.00
+0.00 / +0.00
22934.14
97.17% Yes Yes Yes 344 279 65 22 1 21
  • 1 D.System
  • 3 HGJ
  • 3 HGJ CERT
  • 78 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Apr-2024
Comissioning
0
  • 15-Apr-2024 OHT
  • 15-Apr-2024 D.System
8009841 Salaiya Khalsa Nathupura GOV 77 15-Mar-2024 1 1 1 1 77 77 0 0 232 232 100%
+0
77
100 100.00 Yes 1 / 1 100.00 Yes 16 / 1
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 16 / 3 40 Integrated Verified Verified 22 40 Verified Verified 22 40 Verification Remarks Minutes of Meeting 116 116 40 0 0 40 40 0 5 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 26 18 6961 48727 208830 7735 111.12% 58588 278416 77 3 1 14 31 28 22
+0
22
+0
22
22 785.00
+0.00
784.25
77 28072 77
+ 0
76
28072 0 0 100.00
+0
23 / 23
+0
77 / 76
26009.00
+0.00 / +0.00
25934.64
99.71% 286 229 57 20 1 19
  • 1 HGJ CERT
  • 77 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
29-Feb-2024
Comissioning
0
  • 29-Feb-2024 OHT
  • 29-Feb-2024 CWR
  • 29-Feb-2024 D.System
Agency Total 155 2 2 2 2 152 151 0 0 467 467 100% 152 200.00 11 / 2 200.00 27 / 2
+0
0 / 0
0 / 0 72
+0
72
0 0 0 0 0
  +0
72 | 72
72 0 / 0 39 / 3 67 -- -- -- 2 2 30 71 2 2 30 70 -- 206 206 72 0 0 70 72 1 14 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 45 29 12613 88291 378390 15121 119.88% 111115 492405 151 3 2 22 39 85 32
+0
32
+0
32
32 1386.08
+0.00
1383.42
155 49694 152
+ 0
151
49694 0 0 100
+0
34 / 34
+0
155 / 150
49611.00
+0.00
48868.78
99% 630 508 122 42 2 40
N.K. Gupta & K.B. Gupta Contractors


8175353 kabrai GOV 38 01-Jul-2024 1 1 1 1 37 35 0 0 158 157 99%
+0
35
92 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 11 / 0 8 Integrated Verified Verified 0 11 Verified Verified 0 11 Verification Remarks Minutes of Meeting 57 0 13 0 2 11 11 9 1 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 10 7 3055 21385 91650 1155 37.81% 6714 54613 36 0 1 10 19 6 9
+0
9
+0
9
9 349.51
+0.00
349.35
38 11976 36
+ 0
35
11800 0 0 98.53
+0
9 / 9
+0
38 / 36
15787.00
+0.00 / +0.00
13546.69
85.81% Yes 0 0 0 0 0 0
  • 176 FHTC
  • 2 HGJ
  • 3 HGJ CERT
  • 38 HOV
Intake
28/02/2023
WTP
30/6/2023
T/W
0
OHT
30/04/2024
CWR
16/04/2024
D.System
14-Jul-2023
Comissioning
10/06/2024
  • 28-Feb-2023 Intake
  • 30-Jun-2023 WTP
  • 30-May-2023 OHT
  • 15-Jun-2023 CWR
  • 14-Jul-2023 D.System
  • 16-Jul-2023 Comissioning
SLC-SMC (JV)


8152383 Dhawarra GOV 95 13-Sep-2024 1 0 0 0 0 0 0 0 305 293 96%
+0
90
95 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 29
+0
29
0 0 0 0 0
  +0
29 | 29
29 0 / 0 29 / 0 19 Integrated Verified Verified 0 21 Verified Verified 0 18 Verification Remarks Minutes of Meeting 154 0 29 0 7 18 22 15 2 0 0 1 + 0 + 0 + 1 + 2 = 4 1 + 0 + 0 + 2 + 2 = 5 34 33 6927 48489 207810 2766 39.93% 21176 113905 85 0 7 25 24 29 9
+0
9
+0
9
9 782.93
+0.00
781.27
95 30104 95
+ 0
82
30104 0 0 100.00
+0
9 / 9
+0
95 / 92
33301.00
+0.00 / +0.00
27390.79
82.25% 545 405 140 4 0 4
  • 1 D.System
  • 13 HGJ CERT
  • 95 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
23-Jul-2024
Comissioning
0
  • 27-Mar-2024 CWR
  • 23-Jul-2024 D.System
  • 25-Jul-2024 Comissioning
Total Mahoba 344 5 5 4 4 4 249 246 0 0 1131 1115 99%
+0
337
97.97 100.00 5 15 / 3 100.00 5 30 / 3
+0
0 / 0
0 / 0 132
+0
132
0 0 0 0 0
  +0
132 | 132
132 0 / 0 97 / 3 112 -- -- -- 5 5 36 121 5 5 36 121 -- 494 243 132 0 9 105 123 33 23 -- -- 1 + 0 + 0 + 2 + 2 = 5 1 + 0 + 0 + 3 + 2 = 6 103 79 29040 203280 871200 25943 89.34% 189173 878674 330 3 12 66 89 160 56
+0
56
+0
56
56 3191.09
+0.00
3186.24
344 112223 343
+ 0
328
112047 0 0 99.84
+0
59 / 59
+0
349 / 338
125817.00
+0.00 / +0.00
116147.73
92.31% 2 2 3 1521 1211 310 57 2 55
8 Mirzapur GVPR


8152576 Leduki GOV 124 01-Jan-2024 1 1 1 1 124 124 0 0 120 120 100%
+0
124
100 100.00 Yes 2 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 0 Integrated Off Verified Verified 1 2 Not Verified Not Verified 1 1 Verification Remarks Minutes of Meeting 59 0 12 0 2 1 10 4 4 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 12 10 6635 46445 199050 7995 120.50% 48961 213143 121 0 11 6 50 54 5
+0
5
+0
5
5 764.43
+0.00
879.84
124 22530 124
+ 0
124
22530 0 0 100.00
+0
6 / 6
+0
124 / 124
26901.00
+0.00 / +0.00
25282.10
93.98% 189 166 23 17 0 17
  • 100 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Oct-2023
Comissioning
0
  • 31-Jul-2023 WTP
  • 15-Oct-2023 OHT
  • 31-Oct-2023 CWR
  • 31-Oct-2023 D.System
  • 31-Dec-2023 Comissioning
  • 128 Villages
  • 33860 Households
  • 0 Last Week FHTC Given
  • 33726 FHTC Given
  • 99 FHTC(%)
  • 134 Balance FHTC
  • 124 HGJ
  • 122 HGJ Certified
  • 95.31 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 49 Handed Over Villages(before Portal)
  • 43 Handed Over Initiated/Approved On Portal
  • 71.88 Handed Over %
  • 81 OHT Required
  • 78 OHT Completed
  • Scheme Wise Category A
  • 1 No. of Schemes
  • 2 No. of Villages
  • Scheme Wise Category B
  • 51 No. of Schemes
  • 100 No. of Villages
  • Scheme Wise Category C
  • 20 No. of Schemes
  • 31 No. of Villages
  • Village Wise Category A
  • 2 No. of Villages
  • Village Wise Category B
  • 86 No. of Villages
  • Village Wise Category C
  • 45 No. of Villages
  • Village Wise Total
  • 133 Total No. of Villages
  • 72 Total No. of Schemes
  • 133 Total No. of Villages
  • 74 Total No. of OHT
  • 52 Schemes Sent to O&M
  • 53 No. of OHT in O&M Schemes
  • 11094 Water Demand(M3)
  • 11971.00 Water Supply (M3)
  • 52 Agreement Done Scheme
  • 102 Agreement Done Village
Megha


8152518 Talar GOV 86 01-Aug-2024 1 1 1 1 86 85 0 0 54 54 100%
+0
86
100 100.00 Yes 2 / 1 100.00 Yes 4 / 1
+0
0 / 0
0 / 0 15
+15
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 25 / 1 15 Integrated Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 81 29 15 0 0 7 15 1 10 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4 3 4720 33040 141600 7183 152.18% 50366 212633 86 0 1 8 6 71 6
+0
0
+0
6
6 972.11
+0.00
972.11
86 20367 86
+ 0
86
20367 0 0 100.00
+0
8 / 8
+0
86 / 85
20345.00
+0.00 / +0.00
19327.19
95.00% Yes 189 183 6 20 0 20
  • 78 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
20-May-2023
Comissioning
0
  • 27-Jul-2022 Intake
  • 10-Oct-2022 WTP
  • 22-Apr-2023 OHT
  • 17-May-2023 CWR
  • 20-May-2023 D.System
  • 20-Dec-2023 Comissioning
8153309 Gothaura GOV 142 01-Aug-2024 1 1 1 1 141 138 0 0 149 149 100%
+0
141
99 0.00 No 3 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 5 / 0 12 Integrated Off Verified Verified 5 5 Verified Verified 4 5 Verification Remarks Minutes of Meeting 35 22 12 0 0 5 12 2 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 12 10 9559 66913 286770 9112 95.32% 63123 288550 138 4 4 9 27 94 7
+0
0
+0
7
7 723.50
+0.00
723.50
142 29745 141
+ 0
141
29745 0 0 100.00
+0
8 / 8
+0
142 / 139
20152.00
+0.00 / +0.00
17788.70
88.27% Yes 242 229 13 38 0 38
  • 1 HGJ
  • 1 HGJ CERT
  • 119 HOV
Intake
0
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
29-Apr-2023
Comissioning
0
  • 24-Jul-2023 WTP
  • 11-Jul-2023 T/W
  • 08-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 29-Apr-2023 D.System
  • 29-Feb-2024 Comissioning
8153338 Dhauha GOV 215 01-Aug-2024 1 1 1 1 213 211 0 0 276 276 100%
+0
213
99 100.00 Yes 5 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 10 / 0 25 Integrated Off Verified Verified 6 10 Verified Verified 6 10 Verification Remarks Minutes of Meeting 116 38 25 0 0 10 25 8 11 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 16 11 14505 101535 435150 13099 90.31% 90342 383230 206 1 4 2 9 190 11
+0
0
+0
11
11 1327.06
+0.00
1327.06
215 42736 212
+ 0
207
42734 0 0 100.00
+0
13 / 13
+0
215 / 213
40622.00
+0.00 / +0.00
40194.44
98.95% Yes 367 343 24 54 0 54
  • 2 FHTC
  • 3 HGJ
  • 8 HGJ CERT
  • 175 HOV
Intake
Functional
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
24-Sep-2023
Comissioning
0
  • 22-Jul-2022 Intake
  • 13-Oct-2022 WTP
  • 11-Jul-2023 T/W
  • 20-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 24-Sep-2023 D.System
  • 29-Feb-2024 Comissioning
Agency Total 443 3 3 3 3 440 434 0 0 479 479 100% 440 200.00 10 / 3 300.00 6 / 3
+0
0 / 0
0 / 0 52
+15
52
0 0 0 0 0
  +0
52 | 52
52 0 / 0 40 / 1 52 -- -- -- 3 3 14 22 3 3 13 22 -- 232 89 52 0 0 22 52 11 21 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 32 24 28784 201488 863520 29394 102.12% 203831 884413 430 5 9 19 42 355 24
+0
0
+0
24
24 3022.67
+0.00
3022.67
443 92848 439
+ 0
434
92846 0 0 100
+0
29 / 29
+0
443 / 437
81119.00
+0.00
77310.33
95% 798 755 43 112 0 112
NCC Ltd.


8010572 Ahugi Kalan GOV 159 01-Jan-2024 1 1 1 1 159 159 0 0 33 33 100%
+0
159
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 30
+0
25
0 0 0 0 0
  +0
0 | 25
25 0 / 0 25 / 0 25 Integrated Verified Verified 9 29 Verified Verified 9 29 Verification Remarks Minutes of Meeting 0 0 30 0 0 29 30 0 2 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 8 2 11587 81109 347610 12815 110.60% 86469 392106 159 0 1 11 17 130 9
+0
9
+0
9
9 1582.00
+0.00
1582.00
159 31881 159
+ 0
158
31881 0 0 100.00
+0
9 / 9
+0
159 / 159
32828.00
+0.00 / +0.00
29622.54
90.24% Yes Yes 262 252 10 26 0 26
  • 5 OHT
  • 1 HGJ CERT
  • 130 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
31-Jul-2023
Comissioning
Commissioning under progress
  • 09-Aug-2022 Intake
  • 17-Aug-2022 WTP
  • 31-Jul-2023 OHT
  • 02-Mar-2023 CWR
  • 31-Jul-2023 D.System
  • 15-Jul-2024 Comissioning
8011637 Mahadev GOV 254 01-Jan-2024 1 1 1 1 254 254 0 0 14 14 100%
+0
254
100 100.00 Yes 2 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 25 / 0 25 Integrated Off Verified Verified 6 24 Verified Verified 6 23 Verification Remarks Minutes of Meeting 24 24 25 0 0 23 25 0 1 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 13 8 11812 82684 354360 13498 114.27% 93915 402226 254 0 2 7 26 219 7
+0
7
+0
7
7 1464.00
+0.00
1464.00
254 35318 254
+ 0
251
35318 0 0 100.00
+0
7 / 7
+0
254 / 255
33415.00
+0.00 / +0.00
31088.78
93.04% Yes Yes 342 325 17 43 1 42
  • 3 HGJ CERT
  • 189 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
30-Jun-2023
Comissioning
Trial run is U/P.
  • 31-Aug-2022 Intake
  • 31-Aug-2022 WTP
  • 30-Jun-2023 OHT
  • 30-Dec-2022 CWR
  • 30-Jun-2023 D.System
  • 15-May-2024 Comissioning
Agency Total 413 2 2 2 2 413 413 0 0 47 47 100% 413 200.00 4 / 0 200.00 8 / 0
+0
0 / 0
0 / 0 55
+0
50
0 0 0 0 0
  +0
25 | 50
50 0 / 0 50 / 0 50 -- -- -- 2 2 15 53 2 2 15 52 -- 24 24 55 0 0 52 55 0 3 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 21 10 23399 163793 701970 26313 112.45% 180384 794332 413 0 3 18 43 349 16
+0
16
+0
16
16 3046.00
+0.00
3046.00
413 67199 413
+ 0
409
67199 0 0 100
+0
16 / 16
+0
413 / 414
66243.00
+0.00
60711.32
92% 604 577 27 69 1 68
GA INFRA


8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 305 01-Feb-2024 1 1 1 1 305 296 0 0 234 234 100%
+0
298
98 100.00 Yes 4 / 0 100.00 Yes 6 / 0
+0
98 / 98
97 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 100 / 0 99 Integrated Verified Verified 1 55 Verified Verified 1 51 Verification Remarks Minutes of Meeting 257 178 102 0 0 51 102 27 29 0 0 0 + 0 + 0 + 4 + 0 = 4 0 + 0 + 0 + 5 + 0 = 5 15 6 25320 177240 759600 24277 95.88% 142091 570352 305 5 7 23 88 182 2
+0
2
+0
2
2 1851.89
+0.00
1810.28
305 75783 303
+ 0
296
75306 0 0 99.37
+0
101 / 101
+0
302 / 296
6563.00
+0.00 / +0.00
6563.00
100.00% 1014 993 21 107 3 104
  • 41 D.System
  • 3 COV
  • 477 FHTC
  • 2 HGJ
  • 9 HGJ CERT
  • 279 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
01-Feb-2024
Comissioning
0
  • 25-Aug-2023 OHT
  • 01-Feb-2024 D.System
  • 20-Aug-2023 Comissioning
Multiurban


8282154 Manikpur GOV 63 01-Mar-2024 1 1 1 1 63 60 0 0 23 23 100%
+0
58
92 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 4 / 2 0 Integrated Off Verified Verified 0 2 Verified Verified 0 2 Verification Remarks Minutes of Meeting 30 0 5 0 2 2 3 1 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7 6 1930 13510 57900 709 36.74% 8952 99386 63 0 2 4 20 37 1
+0
0
+0
1
1 248.50
+0.00
248.50
63 9280 62
+ 0
60
9134 0 0 98.43
+0
2 / 2
+0
61 / 57
6498.00
+0.00 / +0.00
5943.68
91.47% 64 55 9 11 0 11
  • 2 COV
  • 146 FHTC
  • 1 HGJ
  • 3 HGJ CERT
  • 63 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 30-Jul-2023 OHT
  • 31-Dec-2023 Comissioning
Ramky baba


8152635 Danti GOV and Tubewell Scheme 42 Nos. 261 15-Feb-2024 1 1 1 1 263 262 0 0 168 168 100%
+0
257
98 100.00 Yes 2 / 2 100.00 Yes 2 / 2
+0
42 / 42
84 / 83 48
+48
48
0 0 0 0 0
  +0
48 | 48
48 0 / 0 97 / 96 95 Integrated Verified Verified 0 15 Verified Verified 0 14 Verification Remarks Minutes of Meeting 135 0 48 0 2 14 46 5 8 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 4 1 14071 98497 422130 14589 103.68% 81727 460831 261 3 11 3 88 156 2
+0
0
+0
2
2 1344.50
+0.00
1344.50
261 43416 259
+ 0
250
43280 0 0 99.69
+0
46 / 46
+0
259 / 241
12983.00
+0.00 / +0.00
12360.43
95.20% 541 536 5 61 38 23
  • 2 COV
  • 136 FHTC
  • 2 HGJ
  • 11 HGJ CERT
  • 240 HOV
Intake
100% Complete
WTP
100% Complete
T/W
All complete
OHT
Completed
CWR
completed
D.System
15-Aug-2023
Comissioning
Commissioning under progress
  • 26-Apr-2023 Intake
  • 02-Mar-2023 WTP
  • 20-Jun-2023 T/W
  • 10-Aug-2023 OHT
  • 18-Jun-2022 CWR
  • 15-Aug-2023 D.System
  • 30-Sep-2023 Comissioning
Total Mirzapur 1608 9 9 9 9 9 1608 1589 0 0 1069 1065 100%
+0
1590
98.88 94.44 8 23 / 6 100.00 9 23 / 6
+0
140 / 140
181 / 83 274
+0
269
0 0 0 0 0
  +0
244 | 269
269 0 / 0 291 / 99 296 -- -- -- 9 9 31 149 8 8 30 149 -- 737 291 274 0 6 142 268 48 65 -- -- 0 + 0 + 0 + 5 + 0 = 5 0 + 0 + 0 + 6 + 0 = 6 91 57 100140 700980 3004200 103277 103.13% 665947 3022458 1593 13 43 73 331 1133 50
+0
23
+0
50
50 10277.99
+0.00
10351.79
1608 311056 1600
+ 0
1573
310295 0 0 99.76
+0
200 / 200
+0
1602 / 1569
200307.00
+0.00 / +0.00
188170.86
93.94% 2 0 0 3210 3082 128 375 42 333
9 Sonbhadra GVPR


8175161 Jhilo/ Bijpur GOV 179 05-Jan-2026 0 0 0 0 0 0 0 0 20 19 95%
+0
161
90 100.00 Yes 9 / 1 100.00 Yes 23 / 1
+0
0 / 0
0 / 0 27
+3
27
0 0 0 0 0
  +0
27 | 27
27 0 / 0 30 / 0 22 Integrated Off Not Verified Verified 12 22 Not Verified Verified 12 22 Verification Remarks Minutes of Meeting 127 92 27 3 4 22 20 6 2 0 0 0 + 0 + 0 + 7 + 0 = 7 0 + 0 + 0 + 21 + 0 = 21 39 35 15298 107086 458940 15778 103.14% 59769 312653 136 4 5 23 5 99 16
+0
16
+0
16
16 3904.00
+0.00
3904.00
179 66179 155
+ 0
100
63739 0 0 96.31
+0
14 / 14
+0
153 / 136
74794.00
+0.00 / +0.00
60493.96
80.88% 396 323 73 67 0 67
  • 18 COV
  • 2440 FHTC
  • 24 HGJ
  • 79 HGJ CERT
  • 175 HOV
Intake
0
WTP
0
T/W
0
OHT
All OHT complete
CWR
2 nos CWR new locations as per revised DPR.
D.System
31-Aug-2025
Comissioning
0
  • 28-Feb-2023 Intake
  • 20-Mar-2023 WTP
  • 25-Oct-2025 OHT
  • 31-Aug-2025 CWR
  • 31-Aug-2025 D.System
  • 31-Mar-2026 Comissioning
  • 82 Villages
  • 18169 Households
  • 0 Last Week FHTC Given
  • 17524 FHTC Given
  • 96 FHTC(%)
  • 645 Balance FHTC
  • 79 HGJ
  • 52 HGJ Certified
  • 63.41 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 11 Handed Over Villages(before Portal)
  • 34 Handed Over Initiated/Approved On Portal
  • 54.88 Handed Over %
  • 0 OHT Required
  • 0 OHT Completed
  • Scheme Wise Category A
  • 0 No. of Schemes
  • 0 No. of Villages
  • Scheme Wise Category B
  • 10 No. of Schemes
  • 55 No. of Villages
  • Scheme Wise Category C
  • 15 No. of Schemes
  • 27 No. of Villages
  • Village Wise Category A
  • 0 No. of Villages
  • Village Wise Category B
  • 38 No. of Villages
  • Village Wise Category C
  • 44 No. of Villages
  • Village Wise Total
  • 82 Total No. of Villages
  • 25 Total No. of Schemes
  • 82 Total No. of Villages
  • 30 Total No. of OHT
  • 1 Schemes Sent to O&M
  • 1 No. of OHT in O&M Schemes
  • 87 Water Demand(M3)
  • 2938.90 Water Supply (M3)
  • 25 Agreement Done Scheme
  • 82 Agreement Done Village
Larsen & Toubro Ltd


8010143 Parasi GOV 29 27-Aug-2024 1 1 1 1 29 29 0 0 83 83 100%
+0
29
100 100.00 Yes 2 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 5 Integrated Off Verified Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 116 0 15 0 0 0 15 2 3 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 15 12 6425 44975 192750 7018 109.23% 49122 216271 29 1 0 4 1 23 9
+0
9
+0
9
9 744.00
+0.00
744.00
29 19081 29
+ 0
24
19081 0 0 100.00
+0
9 / 9
+0
29 / 29
13244.00
+0.00 / +0.00
12520.47
94.54% 97 63 34 11 0 11
  • 5 HGJ CERT
  • 28 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Aug-2023
Comissioning
0
  • 30-Apr-2023 Intake
  • 30-Jul-2023 WTP
  • 30-Nov-2023 OHT
  • 31-Aug-2023 D.System
  • 15-Dec-2023 Comissioning
8175086 Amawar GOV 58 0 0 0 0 0 0 0 0 63 63 100%
+0
52
90 100.00 No 1 / 1 100.00 No 1 / 1
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
3 0 / 0 7 / 0 7 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 7 7 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 17 17 0 0 0 0 0% 0 0 0 0 0 0 0 0 3
+0
3
+0
3
3 616.21
+0.00
602.40
58 15616 18
+ 0
0
10361 0 0 66.35
+0
4 / 4
+0
0 / 0
23765.00
+0.00 / +0.00
14928.46
62.82% 40 19 21 22 0 22
  • 13 D.System
  • 58 COV
  • 5255 FHTC
  • 40 HGJ
  • 58 HGJ CERT
  • 58 HOV
Intake
Completed
WTP
Completed.
T/W
NA
OHT
All OHT works completed.
CWR
Completed.
D.System
31-Jan-2024
Comissioning
Phase wise commissioning works will start after the availability of Water in the Kanhar Dam.
  • 31-Dec-2022 Intake
  • 15-Dec-2023 WTP
  • 31-Oct-2023 OHT
  • 28-Feb-2023 CWR
  • 31-Jan-2024 D.System
8177926 Gurmura GOV 8 0 0 0 0 0 0 0 0 10 10 100%
+0
8
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+2
7
2 2 0 0 0
  +0
5 | 5
5 0 / 0 5 / 0 5 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 10 10 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 3 3 0 0 0 0 0% 0 0 1 0 0 1 0 0 4
+0
3
+0
3
3 610.00
+0.00
610.00
8 8051 0
+ 0
0
6607 0 0 82.06
+0
4 / 4
+0
2 / 1
12483.00
+0.00 / +0.00
9158.15
73.36% 21 10 11 1 0 1
  • 5 OHT
  • 1 CWR
  • 6 COV
  • 1444 FHTC
  • 8 HGJ
  • 8 HGJ CERT
  • 8 HOV
Intake
Completed. It is also in functional stage. Commissioning has been started.
WTP
Work Is In Progress. It is also in functional stage.
T/W
NA
OHT
5 Nos OHTs Completed. Commissioning works also completed.
CWR
3 Nos Completed. 3 Nos Commissioning works also Completed.
D.System
31-Dec-2023
Comissioning
2 Village is commissioned.
  • 30-Jun-2023 Intake
  • 31-Jan-2024 WTP
  • 30-Jun-2023 OHT
  • 30-Jul-2023 CWR
  • 31-Dec-2023 D.System
  • 16-Aug-2023 Comissioning
8182027 Panari GOV 6 0 0 0 0 0 0 0 0 1 1 100%
+0
6
100 100.00 Yes 3 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 11
+1
6
1 3 0 0 0
  +0
3 | 3
3 0 / 0 3 / 0 3 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 15 0 11 8 0 3 2 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 2710 18970 81300 1202 44.35% 11748 45795 2 0 1 1 0 0 3
+0
2
+0
2
2 306.24
+0.00
306.24
6 8465 0
+ 0
0
6055 0 0 71.53
+0
3 / 3
+0
2 / 2
11871.00
+0.00 / +0.00
7233.26
60.93% 12 6 6 1 1 0
  • 8 OHT
  • 1 CWR
  • 4 COV
  • 2410 FHTC
  • 6 HGJ
  • 6 HGJ CERT
  • 6 HOV
Intake
Completed. Intake Well is in functional stage.
WTP
Finishing works in progress. Pre Commissioning Completed. Water Supply is in progress.
T/W
0
OHT
Commissioning works completed.
CWR
Commissioning Completed.
D.System
16-Aug-2023
Comissioning
Panari & Bairpur Villages are Commissioned.
  • 31-Jul-2023 Intake
  • 30-Sep-2023 WTP
  • 30-Sep-2023 OHT
  • 16-Aug-2023 D.System
  • 31-Jul-2023 Comissioning
Agency Total 101 1 1 1 1 29 29 0 0 157 157 100% 95 400.00 6 / 1 400.00 17 / 1
+0
0 / 0
0 / 0 43
+3
35
3 5 0 0 0
  +0
30 | 30
26 0 / 0 30 / 0 20 -- -- -- 1 1 0 0 0 0 0 0 -- 131 0 43 25 0 0 18 4 3 -- -- 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 37 34 9135 63945 274050 8220 89.98% 60870 262066 32 1 1 6 1 23 19
+0
17
+0
17
17 2276.45
+0.00
2262.64
101 51213 47
+ 0
24
42104 0 0 82
+0
20 / 20
+0
33 / 32
61363.00
+0.00
43840.34
71% 170 98 72 35 1 34
NCC Ltd.


8338933 Patwadh GOV 650 0 0 0 0 0 0 0 0 194 191 98%
+0
596
92 100.00 Yes 5 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 55
+4
55
0 0 0 0 0
  +0
55 | 55
55 0 / 0 45 / 0 0 Integrated Verified Verified 1 4 Verified Verified 1 3 Verification Remarks Minutes of Meeting 245 0 55 0 42 3 13 0 7 0 0 0 + 0 + 0 + 4 + 0 = 4 0 + 0 + 0 + 6 + 0 = 6 44 17 3879 27153 116370 5472 141.07% 37962 157612 238 14 72 64 25 63 15
+0
15
+0
15
15 3885.16
+0.50
3494.47
650 101050 204
+ 0
25
97770 0 0 96.75
+0
16 / 16
+9
572 / 238
99181.00
+0.00 / +0.00
73000.43
73.60% 679 612 67 180 80 100
  • 390 D.System
  • 89 COV
  • 3280 FHTC
  • 446 HGJ
  • 625 HGJ CERT
  • 646 HOV
Intake
With all finishing work 30/04/2025
WTP
With all finishing work 30/04/2025
T/W
0
OHT
With all finishing work 15/09/2025 (WL)
CWR
With all finishing work 20/06/2025 (WL)
D.System
31-Mar-2026
Comissioning
31/03/2026
  • 30-Apr-2025 Intake
  • 30-Apr-2025 WTP
  • 30-Apr-2024 T/W
  • 15-Sep-2025 OHT
  • 20-Jun-2025 CWR
  • 31-Mar-2026 D.System
  • 31-Mar-2026 Comissioning
Jain Const.


8175315 Kewatha GOV 12 01-Apr-2024 1 1 1 1 12 12 0 0 8 8 100%
+0
12
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 Integrated Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 122 0 12 0 0 0 12 4 5 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 5 4 7826 54782 234780 3686 47.10% 26374 143967 12 0 0 1 0 11 7
+0
7
+0
7
7 645.00
+0.00
645.00
12 9045 12
+ 0
11
9045 0 0 100.00
+0
8 / 8
+0
12 / 12
11940.00
+0.00 / +0.00
10571.84
88.54% Yes 31 14 17 4 1 3
  • 1 HGJ CERT
  • 11 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Mar-2023 Comissioning
VPRPL


8175013 Nagawan GOV 46 15-Jul-2024 1 0 0 0 0 0 0 0 21 21 100%
+0
42
91 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 8
+0
8
0 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Off Verified Verified 0 2 Verified Verified 0 2 Verification Remarks Minutes of Meeting 50 0 8 0 4 2 4 1 0 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 1 + 0 = 1 6 5 936 6552 28080 599 64.00% 4933 41008 37 0 0 0 0 37 4
+0
4
+0
4
4 1808.21
+0.00
1808.21
46 7268 46
+ 0
33
7268 0 0 100.00
+0
5 / 5
+0
44 / 37
9472.00
+0.00 / +0.00
8107.35
85.59% 26 18 8 10 1 9
  • 13 HGJ CERT
  • 44 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 19-Feb-2023 Intake
  • 19-Feb-2023 WTP
  • 31-Aug-2023 Comissioning
8175050 Tenduahi GOV 80 15-Jul-2024 1 0 0 0 0 0 0 0 64 64 100%
+0
78
98 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 5 Integrated Off Verified Verified 1 9 Verified Verified 1 9 Verification Remarks Minutes of Meeting 47 0 9 0 2 9 7 0 4 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 12 11 3030 21210 90900 5428 179.14% 31861 134889 78 0 0 1 0 77 4
+0
4
+0
4
4 573.87
+0.00
571.68
80 12757 79
+ 0
68
12743 0 0 99.89
+0
5 / 5
+0
80 / 78
12858.00
+0.00 / +0.00
11482.31
89.30% 90 68 22 18 1 17
  • 2 D.System
  • 14 FHTC
  • 1 HGJ
  • 12 HGJ CERT
  • 71 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175110 Belahai GOV 186 0 0 0 0 0 0 0 0 33 33 100%
+0
180
97 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+2
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 7 Integrated Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 51 0 9 2 1 0 6 1 1 0 0 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 11 + 0 = 11 20 17 5370 37590 161100 4878 90.84% 41671 154984 174 2 2 13 6 151 5
+0
5
+0
5
5 1421.64
+0.00
1418.76
186 19691 183
+ 0
133
19586 0 0 99.47
+0
6 / 6
+0
182 / 174
23145.00
+0.00 / +0.00
19158.82
82.78% 317 277 40 38 1 37
  • 2 D.System
  • 3 COV
  • 105 FHTC
  • 3 HGJ
  • 53 HGJ CERT
  • 130 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175262 Harra GOV 45 20-Jun-2024 1 0 0 0 0 0 0 0 51 51 100%
+0
42
93 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+0
10
0 0 0 0 0
  +0
10 | 10
10 0 / 0 0 / 0 10 Integrated Off Verified Not Verified 0 0 Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 103 0 10 0 10 0 0 0 0 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 2 + 0 = 2 3 3 0 0 0 0 0% 354 523 0 0 0 0 0 0 6
+0
6
+0
6
6 918.46
+0.00
918.46
45 17677 44
+ 0
43
17669 0 0 99.95
+0
7 / 7
+0
44 / 0
18231.00
+0.00 / +0.00
15743.43
86.36% 63 59 4 10 5 5
  • 8 FHTC
  • 1 HGJ
  • 2 HGJ CERT
  • 33 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Jul-2023 Comissioning
8175280 Kadara GOV 4 1 0 0 0 0 0 0 0 0 0 0%
+0
0
0 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 3
+0
3
0 0 0 1 0
  +0
2 | 2
0 0 / 0 1 / 0 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 3 3 0 0 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2 2 0 0 0 0 0% 0 0 0 0 0 0 0 0 1
+0
1
+0
1
1 102.16
+0.00
100.19
4 1168 1
+ 0
0
515 0 0 44.09
+0
2 / 2
+0
1 / 0
2971.00
+0.00 / +0.00
2812.91
94.68% 4 2 2 0 0 0
  • 1 OHT
  • 1 D.System
  • 3 COV
  • 653 FHTC
  • 3 HGJ
  • 4 HGJ CERT
  • 4 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 361 4 0 0 0 0 0 0 0 169 169 100% 342 500.00 1 / 0 500.00 1 / 0
+0
0 / 0
0 / 0 39
+2
39
0 0 0 1 0
  +0
38 | 38
36 0 / 0 1 / 0 30 -- -- -- 3 2 1 11 3 2 1 11 -- 251 0 39 5 17 11 17 2 5 -- -- 0 + 0 + 0 + 5 + 0 = 5 0 + 0 + 0 + 14 + 0 = 14 43 38 9336 65352 280080 10905 116.81% 78819 331404 289 2 2 14 6 265 20
+0
20
+0
20
20 4824.34
+0.00
4817.30
361 58561 353
+ 0
277
57781 0 0 99
+0
25 / 25
+0
351 / 289
66677.00
+0.00
57304.82
86% 500 424 76 76 8 68
Total Sonbhadra 1297 6 6 2 2 2 41 41 0 0 546 542 99%
+0
1206
92.98 100.00 11 21 / 2 100.00 11 51 / 2
+0
0 / 0
0 / 0 176
+0
168
3 5 0 1 0
  +0
162 | 162
156 0 / 0 106 / 0 72 -- -- -- 5 5 14 37 4 4 14 37 -- 876 92 176 33 63 36 80 16 22 -- -- 0 + 0 + 0 + 16 + 0 = 16 0 + 0 + 0 + 41 + 0 = 41 168 128 45474 318318 1364220 44062 96.89% 263793 1207702 707 21 80 108 37 461 77
+0
75
+0
75
75 15534.95
+0.50
15123.41
1297 286048 771
+ 0
437
270439 0 0 94.54
+0
83 / 83
+9
1121 / 707
313955.00
+0.00 / +0.00
245211.39
78.10% 0 1 0 1776 1471 305 357 89 268
Project Completion Plan

Minutes of Meeting Date -