Physical Progress(Phase 1) District Wise

S.No   District         Name of Firm/Agency Scheme Id Scheme Name Villages Alloted
Start Date of Trail Run
Operational and Maintenance Details
ROAD DISMENTLING/RESTORATION(KM) Intake WTP T/W OHT
Automation Integration Status
Connectivity Status
Pump Status
EE E&M Verification Status
  Last 7 days         Automation Alert
Automation Integration OHT Status Functional OHT Water Demand OHT Water Supply CWR Distribution System INCL RWRM/CWRM(km) HGJ Status FHTC Electricity Comissioning of Village IMIS Scheme Completed
As Build Drawing Submitted
Final As Executed BOQ Submitted
Incoming Complaints Received Feedback from Gram Pradhan On Call Balance Work Scheme Completion Plan(Agency) U.P.Jal Nigam UP Jal Nigam Old Scheme Status
Initiated By Agency (scheme)
Finalized By Agency (scheme)
Approved By TPI (scheme)
Approved By EE (scheme)
Covered village
Regular water supply (Filled by pump operator)
Monthly O&M Charges(in Rs)
Yearly O&M Charges(in Rs)
Dismental(Filled by EE) Restored(Filled by EE) Restored %(Filled by EE) Villages where 100% road restoration completed(Filled by TPI) Restored(%) In progress(%) Functional Images/Videos In progress(%) Functional Images/Videos Required /completed (LAST WEEK ) Images/Videos Required Started (Filled by Agency) Started(Filled by EE) Progress 0 to 25% Progress 26% to 50% Progress 51% to 75% Progress 76% to 99%
OHT completed
EE | Agency
OHT Fuctional(By ADM)
OHT with less manpower
EE | TPI
OHT and Signage Board Images/Videos OHT Logo Intake(Previous Status) WTP(Previous Status) No Of CWR(Previous Status) No Of OHT(Previous Status) Intake(Current Status) WTP(Current Status) No Of CWR(Current Status) No Of OHT(Current Status) O&M Verification Remark Total Alerts Action Taken Alerts Total OHT Not Integrated OHT Disconnected OHT (No water supply received in the last two days) Functional OHT Water supply less than 75% percent (Average water supply over 2 days) Water supply greater than 150% percent (Average water supply over 2 days) Water supply Issues OHT 1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Water supply Issues Village
1.Theft
2.Power/Electrical Issue
3.Tullu Pump
4.Road Widening
5.Local Repairing
Daily Weekly Monthly Yesterday Yesterday(%) Weekly Monthly Required Started Completed Completed
Required Laid Villages Alloted Household HGJ (100% Completed) HGJ Certified Villages FHTC Given as on Today FHTC Given as on Yesterday FHTC Given (last Week) FHTC % Connection Required/Completed Comissioned/Regular water supply(Verified by EE) Estimated Cost(Lacs)
Last Week / Last Month
Expenditure(Lacs)
Expenditure(%) All Complaints Close Complaints Pending Complaints All Complaints Close Complaints Pending Complaints
  • 0 T/W
  • 62 OHT
  • 2 CWR
  • 464.53 D.System
  • 606 Comissioning
  • 21 Electricity
  • 27911 FHTC
  • 1233 HGJ
  • 2329 HGJ CERT
  • 6169 HOV
  • Scheme Wise Category A
  • 789 No. of Schemes
  • 1397 No. of Villages
  • Scheme Wise Category B
  • 3260 No. of Schemes
  • 5963 No. of Villages
  • Scheme Wise Category C
  • 1582 No. of Schemes
  • 2418 No. of Villages
  • Scheme Wise Total
  • 5631 Total No. of Schemes
  • 9778 Total No. of Villages
  • Village Wise Category A
  • 1536 No. of Villages
  • Village Wise Category B
  • 5015 No. of Villages
  • Village Wise Category C
  • 3167 No. of Villages
  • Village Wise Total
  • 9718 Total No. of Villages
  • 4087 Agreement Done Scheme
  • 7338 Agreement Done Village
Total 6566 45 47 39 35 35 3081 3034 0 0 9283 8968 97%
+0
5644
86 98.99 61 165 / 15 100.00 62 358 / 16
+0
550 / 550
213 / 83 1697
+0
1784
839 6 1 8 134
  +0
1556 | 1635
1533 0 / 0 1309 / 104 1136 -- -- -- 40 39 139 402 37 38 130 385 -- 7721 767 1697 555 316 826 295 135 6 + 41 + 18 + 31 + 26 = 122 6 + 121 + 22 + 77 + 27 = 253 301009 2107063 9030270 290776 96.60% 1704179 7322655 455
+0
412
+0
453
445 58095.78
+0.00
57631.25
6566 1697436 5332
+ 9
4236
1669529 0 366 98.36
+0
900 / 879
+0
5920 / 4812
1624724.00
+0.00 / +0.00
1313309.03
80.83% 3 6 7 10555 7946 2609 310 5 305
1 Banda Larsen & Toubro Ltd


8044758 Khatan GOV 342 01-May-2025 1 0 0 0 0 0 0 0 691 676 98%
+0
325
95 100.00 Yes 19 / 3 100.00 Yes 94 / 2
+0
0 / 0
0 / 0 116
+0
116
116 0 0 0 0
  +0
116 | 116
116 0 / 0 116 / 1 116 Integrated Verified Verified 5 52 Verified Verified 5 52 Verification Remarks Minutes of Meeting 647 261 116 0 11 105 87 0 1 + 14 + 0 + 1 + 2 = 18 1 + 14 + 0 + 1 + 2 = 18 37301 261107 1119030 32534 87.22% 169376 801503 39
+0
39
+0
39
39 4215.00
+0.00
4215.00
342 127889 302
+ 3
218
127736 0 0 99.88
+0
41 / 41
+0
342 / 335
156314.00
+0.00 / +0.00
132067.98
84.49% 824 602 222 58 0 58
  • 153 FHTC
  • 40 HGJ
  • 124 HGJ CERT
  • 333 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Sep-2023
Comissioning
0
  • 31-Jul-2024 OHT
  • 31-Mar-2024 CWR
  • 30-Sep-2023 D.System
  • 30-Jun-2024 Comissioning
  • 91 Villages
  • 54807 Households
  • 0 Last Week FHTC Given
  • 54739 FHTC Given
  • 99 FHTC(%)
  • 68 Balance FHTC
  • 90 HGJ
  • 90 HGJ Certified
  • 98.90 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 47 Handed Over Villages(before Portal)
  • 37 Handed Over Initiated/Approved On Portal
  • 92.31 Handed Over %
  • 89 OHT Required
  • 89 OHT Completed
  • Scheme Wise Category A
  • 30 No. of Schemes
  • 45 No. of Villages
  • Scheme Wise Category B
  • 19 No. of Schemes
  • 44 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 40 No. of Villages
  • Village Wise Category B
  • 49 No. of Villages
  • Village Wise Category C
  • 1 No. of Villages
  • Village Wise Total
  • 90 Total No. of Villages
  • 50 Total No. of Schemes
  • 90 Total No. of Villages
  • 88 Total No. of OHT
  • 47 Schemes Sent to O&M
  • 85 No. of OHT in O&M Schemes
  • 26889 Water Demand(M3)
  • 34556.50 Water Supply (M3)
  • 50 Agreement Done Scheme
  • 90 Agreement Done Village
NCC Ltd.


8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 202 15-May-2024 1 1 1 1 202 202 0 0 580 578 100%
+0
200
99 100.00 Yes 18 / 0 100.00 Yes 75 / 0
+0
31 / 31
32 / 0 80
+0
80
80 0 0 0 0
  +0
80 | 80
80 0 / 0 103 / 0 103 Integrated Verified Verified 12 70 Verified Verified 12 70 Verification Remarks Minutes of Meeting 191 161 80 0 1 79 15 9 0 + 4 + 0 + 1 + 0 = 5 0 + 4 + 0 + 1 + 0 = 5 27684 193788 830520 26241 94.79% 180436 799745 13
+0
13
+0
13
13 2581.60
+0.00
2581.60
202 82266 202
+ 1
201
82266 0 0 100.00
+0
34 / 34
+0
202 / 202
93222.00
+0.00 / +0.00
81825.54
87.77% 1285 1056 229 29 0 29
  • 1 HGJ CERT
  • 200 HOV
Intake
Approach Road Completed
WTP
Campus Development Completed
T/W
Completed
OHT
Completed
CWR
1 No. CWR Shall be Completed in 25-Sept-2024 ( New additional Scope).
D.System
15-Feb-2024
Comissioning
0
  • 15-Dec-2023 Intake
  • 30-Nov-2023 WTP
  • 15-Sep-2023 T/W
  • 25-Nov-2023 OHT
  • 15-Apr-2024 CWR
  • 15-Feb-2024 D.System
  • 15-Sep-2024 Comissioning
Total Banda 544 2 2 1 1 1 202 202 0 0 1271 1254 99%
+0
525
96.51 100.00 2 37 / 3 100.00 2 169 / 2
+0
31 / 31
32 / 0 196
+0
196
196 0 0 0 0
  +0
196 | 196
196 0 / 0 219 / 1 219 -- -- -- 2 2 17 122 2 2 17 122 -- 838 422 196 0 12 184 102 9 1 + 18 + 0 + 2 + 2 = 23 1 + 18 + 0 + 2 + 2 = 23 64985 454895 1949550 58775 90.44% 349812 1601248 52
+0
52
+0
52
52 6796.60
+0.00
6796.60
544 210155 504
+ 4
419
210002 0 0 99.93
+0
75 / 75
+0
544 / 537
249536.00
+0.00 / +0.00
213893.52
85.72% 0 0 0 2109 1658 451 87 0 87
2 Chitrakoot GVPR


8135453 Raipura GOV 69 0 0 0 0 0 0 0 0 72 58 81%
+0
57
83 100.00 Yes 2 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 28
+3
28
28 1 1 1 0
  +0
25 | 25
24 0 / 0 4 / 0 3 Integrated Verified Verified 0 4 Verified Verified 0 4 Verification Remarks Minutes of Meeting 153 0 28 8 10 10 2 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2531 17717 75930 2986 117.98% 19829 35937 11
+0
11
+0
11
11 882.90
+0.00
840.50
69 19570 69
+ 0
44
19570 0 0 100.00
+0
13 / 13
+0
65 / 57
30332.00
+0.00 / +0.00
20318.72
66.99% 102 81 21 14 1 13
  • 3 OHT
  • 42 D.System
  • 4 COV
  • 25 HGJ CERT
  • 68 HOV
Intake
0
WTP
operational
T/W
0
OHT
june-24
CWR
June-24
D.System
30-Dec-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 31-Oct-2023 WTP
  • 10-Apr-2024 OHT
  • 10-Mar-2024 CWR
  • 30-Dec-2024 D.System
  • 15-Feb-2025 Comissioning
  • 140 Villages
  • 44632 Households
  • 0 Last Week FHTC Given
  • 44623 FHTC Given
  • 99 FHTC(%)
  • 9 Balance FHTC
  • 140 HGJ
  • 121 HGJ Certified
  • 86.43 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 37 Handed Over Villages(before Portal)
  • 90 Handed Over Initiated/Approved On Portal
  • 90.71 Handed Over %
  • 70 OHT Required
  • 70 OHT Completed
  • Scheme Wise Category A
  • 24 No. of Schemes
  • 117 No. of Villages
  • Scheme Wise Category B
  • 23 No. of Schemes
  • 27 No. of Villages
  • Scheme Wise Category C
  • 0 No. of Schemes
  • 0 No. of Villages
  • Village Wise Category A
  • 117 No. of Villages
  • Village Wise Category B
  • 27 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 144 Total No. of Villages
  • 47 Total No. of Schemes
  • 144 Total No. of Villages
  • 82 Total No. of OHT
  • 43 Schemes Sent to O&M
  • 78 No. of OHT in O&M Schemes
  • 16000 Water Demand(M3)
  • 18276.67 Water Supply (M3)
  • 46 Agreement Done Scheme
  • 97 Agreement Done Village
Larsen & Toubro Ltd


8134589 Silauta Mustkil GOV 59 0 0 0 0 0 0 0 0 51 50 98%
+0
54
92 100.00 Yes 4 / 0 100.00 Yes 12 / 1
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 22 / 0 11 Integrated Off Verified Verified 5 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 169 0 17 0 6 11 3 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2621 18347 78630 2633 100.46% 14637 34245 6
+0
6
+0
6
6 576.00
+0.00
567.05
59 11925 59
+ 0
53
11925 0 0 100.00
+0
7 / 7
+0
59 / 59
21359.00
+0.00 / +0.00
20347.62
95.26% 98 69 29 7 0 7
  • 8 D.System
  • 6 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Oct-2023
Comissioning
0
  • 30-Nov-2023 Intake
  • 15-Dec-2023 WTP
  • 15-Oct-2024 OHT
  • 31-Aug-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Aug-2023 Comissioning
8134609 Chandi Bangar GOV 286 0 0 0 0 0 0 0 0 287 236 82%
+0
187
65 100.00 Yes 9 / 0 100.00 Yes 9 / 0
+0
0 / 0
0 / 0 91
+0
91
91 0 0 0 5
  +0
86 | 86
69 0 / 0 29 / 0 4 Integrated Off Not Verified Not Verified 5 0 Not Verified Not Verified 5 0 Verification Remarks Minutes of Meeting 756 0 91 2 89 0 0 0 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 1 = 1 0 0 0 0 0% 0 19668 20
+0
20
+0
20
20 3052.00
+0.00
2846.86
286 86157 284
+ 2
61
86114 0 0 99.95
+0
21 / 21
+0
233 / 150
95975.00
+0.00 / +0.00
65930.69
68.70% 376 274 102 34 1 33
  • 5 OHT
  • 205 D.System
  • 51 COV
  • 43 FHTC
  • 2 HGJ
  • 225 HGJ CERT
  • 284 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Aug-2025
Comissioning
0
  • 15-Dec-2023 Intake
  • 15-Dec-2023 WTP
  • 30-Jun-2025 OHT
  • 30-Jun-2024 CWR
  • 31-Aug-2025 D.System
  • 31-Jul-2025 Comissioning
Agency Total 345 0 0 0 0 0 0 0 0 338 286 85% 241 200.00 13 / 0 200.00 21 / 1
+0
0 / 0
0 / 0 108
+0
108
108 0 0 0 5
  +0
103 | 103
86 0 / 0 51 / 0 15 -- -- -- 1 1 10 7 1 1 8 7 -- 925 0 108 2 95 11 3 5 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 1 = 1 2621 18347 78630 2633 100.46% 14637 53913 26
+0
26
+0
26
26 3628.00
+0.00
3413.91
345 98082 343
+ 2
114
98039 0 0 100
+0
28 / 28
+0
292 / 209
117334.00
+0.00
86278.31
74% 474 343 131 41 1 40
Total Chitrakoot 414 0 0 0 0 0 0 0 0 0 408 343 84%
+0
298
71.98 100.00 3 15 / 0 100.00 3 22 / 1
+0
0 / 0
0 / 0 136
+0
136
136 1 1 1 5
  +0
128 | 128
110 0 / 0 55 / 0 18 -- -- -- 2 2 10 11 2 2 8 11 -- 1078 0 136 10 105 21 5 10 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 1 = 1 5152 36064 154560 5619 109.06% 34466 89850 37
+0
37
+0
37
37 4510.90
+0.00
4254.41
414 117652 412
+ 2
158
117609 0 0 99.96
+0
41 / 41
+0
357 / 266
147666.00
+0.00 / +0.00
106597.03
72.19% 0 0 0 576 424 152 55 2 53
3 Hamirpur PNC-SPML-JV


8135500 Haraulipur GOV and Tubewell Scheme 125 Nos. 193 20-Mar-2024 1 1 1 1 193 191 0 0 448 447 100%
+0
191
99 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
123 / 123
0 / 0 130
+0
130
0 0 0 0 0
  +0
130 | 130
130 0 / 0 118 / 0 113 Integrated Verified Verified 0 7 Verified Verified 0 7 Verification Remarks Minutes of Meeting 57 0 130 118 5 7 4 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1227 8589 36810 912 74.33% 5774 21823 6
+0
6
+0
6
6 1327.83
+0.00
1327.83
193 59675 193
+ 0
191
59675 0 0 100.00
+0
73 / 73
+0
193 / 193
27101.00
+0.00 / +0.00
25098.31
92.61% Yes 515 397 118 2 0 2
  • 2 HGJ CERT
  • 191 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Dec-2023
Comissioning
0
  • 28-Feb-2024 T/W
  • 20-Mar-2024 OHT
  • 30-Oct-2023 CWR
  • 30-Dec-2023 D.System
  • 20-Mar-2024 Comissioning
  • 134 Villages
  • 75403 Households
  • 0 Last Week FHTC Given
  • 75384 FHTC Given
  • 99 FHTC(%)
  • 19 Balance FHTC
  • 131 HGJ
  • 124 HGJ Certified
  • 92.54 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 28 Handed Over Villages(before Portal)
  • 53 Handed Over Initiated/Approved On Portal
  • 60.45 Handed Over %
  • 39 OHT Required
  • 39 OHT Completed
  • Scheme Wise Category A
  • 76 No. of Schemes
  • 108 No. of Villages
  • Scheme Wise Category B
  • 24 No. of Schemes
  • 27 No. of Villages
  • Scheme Wise Category C
  • 2 No. of Schemes
  • 2 No. of Villages
  • Village Wise Category A
  • 108 No. of Villages
  • Village Wise Category B
  • 27 No. of Villages
  • Village Wise Category C
  • 2 No. of Villages
  • Village Wise Total
  • 137 Total No. of Villages
  • 102 Total No. of Schemes
  • 137 Total No. of Villages
  • 105 Total No. of OHT
  • 76 Schemes Sent to O&M
  • 79 No. of OHT in O&M Schemes
  • 19612 Water Demand(M3)
  • 19971.25 Water Supply (M3)
  • 102 Agreement Done Scheme
  • 137 Agreement Done Village
JWIL


8135488 Pathyora Danda GOV 134 20-Mar-2024 1 1 1 1 134 129 0 0 412 411 100%
+0
129
96 100.00 Yes 7 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 46
+0
46
0 0 0 0 0
  +0
46 | 46
46 0 / 0 45 / 0 42 Integrated Off Verified Not Verified 4 3 Verified Not Verified 4 3 Verification Remarks Minutes of Meeting 156 0 46 0 42 4 3 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 985 6895 29550 601 61.02% 6080 19606 10
+0
10
+0
10
10 1214.00
+0.00
1213.70
134 48335 134
+ 0
127
48335 0 0 100.00
+0
10 / 10
+0
131 / 130
39878.00
+0.00 / +0.00
35649.70
89.40% 508 369 139 0 0 0
  • 7 HGJ CERT
  • 130 HOV
Intake
Completed and functional
WTP
Completed and functional
T/W
0
OHT
To be completed by March2024
CWR
Completed
Comissioning
0
  • 15-Mar-2024 OHT
Total Hamirpur 327 2 2 2 2 2 327 320 0 0 859 857 100%
+0
320
97.86 100.00 2 11 / 0 100.00 2 5 / 0
+0
123 / 123
0 / 0 176
+0
176
0 0 0 0 0
  +0
176 | 176
176 0 / 0 163 / 0 155 -- -- -- 2 1 4 10 2 1 4 10 -- 213 0 176 118 47 11 7 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2212 15484 66360 1513 68.40% 11854 41429 16
+0
16
+0
16
16 2541.83
+0.00
2541.53
327 108010 327
+ 0
318
108010 0 0 100
+0
83 / 83
+0
324 / 323
66979.00
+0.00 / +0.00
60748.01
90.70% 0 1 0 1023 753 270 2 0 2
4 Jalaun BGCCPL-Ramky (JV)


8135522 Kota Mustakil GOV and Tubewell Scheme 270 Nos. 510 1 0 0 0 0 0 0 0 923 863 93%
+0
214
42 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
256 / 256
0 / 0 272
+0
272
269 0 0 5 25
  +0
190 | 242
181 0 / 0 110 / 0 2 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 272 272 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 5
+0
5
+0
5
4 2511.00
+0.00
2506.25
510 109509 201
+ 0
88
107150 0 0 97.85
+0
129 / 126
+0
505 / 188
52161.00
+0.00 / +0.00
46913.50
89.94% 440 293 147 19 0 19
  • 30 OHT
  • 4 D.System
  • 10 COV
  • 3 Electricity
  • 2359 FHTC
  • 309 HGJ
  • 422 HGJ CERT
  • 509 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Aug-2025
Comissioning
0
  • 31-Aug-2025 Intake
  • 31-Aug-2025 WTP
  • 31-Aug-2025 T/W
  • 31-Aug-2025 OHT
  • 31-Aug-2025 CWR
  • 31-Aug-2025 D.System
  • 31-Aug-2025 Comissioning
  • 60 Villages
  • 26350 Households
  • 0 Last Week FHTC Given
  • 26350 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 60 HGJ
  • 53 HGJ Certified
  • 88.33 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 3 Handed Over Villages(before Portal)
  • 20 Handed Over Initiated/Approved On Portal
  • 38.33 Handed Over %
  • 34 OHT Required
  • 34 OHT Completed
  • Scheme Wise Category A
  • 0 No. of Schemes
  • 0 No. of Villages
  • Scheme Wise Category B
  • 0 No. of Schemes
  • 0 No. of Villages
  • Scheme Wise Category C
  • 56 No. of Schemes
  • 63 No. of Villages
  • Village Wise Category A
  • 34 No. of Villages
  • Village Wise Category B
  • 29 No. of Villages
  • Village Wise Category C
  • 0 No. of Villages
  • Village Wise Total
  • 63 Total No. of Villages
  • 56 Total No. of Schemes
  • 63 Total No. of Villages
  • 60 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 60 No. of OHT in O&M Schemes
  • 11397 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 56 Agreement Done Scheme
  • 63 Agreement Done Village
8135526 Raipur GOV 83 1 0 0 0 0 0 0 0 148 122 82%
+0
39
47 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 17
+0
17
17 0 0 0 0
  +0
17 | 17
14 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 17 17 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 7
+0
7
+0
7
7 495.00
+0.00
494.25
83 18444 10
+ 0
2
17550 0 0 95.15
+0
8 / 8
+0
75 / 7
20745.00
+0.00 / +0.00
4683.15
22.57% 55 32 23 2 0 2
  • 8 COV
  • 894 FHTC
  • 73 HGJ
  • 81 HGJ CERT
  • 82 HOV
Intake
0
WTP
It is Functioning
T/W
0
OHT
Completed
CWR
0
D.System
31-Aug-2025
Comissioning
0
  • 31-Aug-2025 Intake
  • 31-Aug-2025 WTP
  • 31-Aug-2025 T/W
  • 31-Aug-2025 OHT
  • 31-Aug-2025 CWR
  • 31-Aug-2025 D.System
  • 31-Aug-2025 Comissioning
8135545 Madhepura GOV 67 1 0 0 0 0 0 0 0 142 121 85%
+0
34
51 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+1
12
11 0 0 0 1
  +0
9 | 11
9 0 / 0 0 / 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 6
+0
6
+0
6
5 425.00
+0.00
424.25
67 15230 5
+ 0
4
14647 0 0 96.17
+0
7 / 7
+0
61 / 5
13157.00
+0.00 / +0.00
2905.62
22.08% 25 17 8 3 0 3
  • 1 OHT
  • 6 COV
  • 583 FHTC
  • 62 HGJ
  • 63 HGJ CERT
  • 63 HOV
Intake
0
WTP
Completed
T/W
0
OHT
Completed
CWR
0
D.System
31-Aug-2025
Comissioning
0
  • 31-Aug-2025 Intake
  • 31-Aug-2025 WTP
  • 31-Aug-2025 T/W
  • 31-Aug-2025 OHT
  • 31-Jul-2025 CWR
  • 31-Aug-2025 D.System
  • 31-Aug-2025 Comissioning
Agency Total 660 3 0 0 0 0 0 0 0 1213 1106 91% 287 300.00 1 / 0 300.00 0 / 0
+0
256 / 256
0 / 0 301
+1
301
297 0 0 5 26
  +0
216 | 270
204 0 / 0 110 / 0 2 -- -- -- -- 0 0 301 301 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 18
+0
18
+0
18
16 3431.00
+0.00
3424.75
660 143183 216
+ 0
94
139347 0 0 97
+0
144 / 141
+0
641 / 200
86063.00
+0.00
54502.27
63% 520 342 178 24 0 24
GVPR


8135513 Sala GOV 197 0 0 0 0 0 0 0 0 496 490 99%
+0
162
82 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 56
+0
56
56 0 0 0 0
  +0
56 | 56
56 0 / 0 59 / 0 22 Integrated Off Verified Verified 4 1 Verified Verified 3 1 Verification Remarks Minutes of Meeting 171 0 56 33 8 15 8 6 0 + 0 + 0 + 1 + 5 = 6 0 + 0 + 0 + 1 + 5 = 6 4995 34965 149850 5159 103.28% 55068 196032 11
+0
11
+0
11
11 1715.00
+0.00
1715.00
197 43098 176
+ 0
122
43076 0 0 99.95
+0
12 / 12
+0
197 / 197
50599.00
+0.00 / +0.00
38461.26
76.01% 134 97 37 0 0 0
  • 22 FHTC
  • 21 HGJ
  • 75 HGJ CERT
  • 195 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Total Jalaun 857 0 3 0 0 0 0 0 0 0 1709 1595 93%
+0
449
52.39 100.00 4 3 / 0 100.00 4 4 / 0
+0
256 / 256
0 / 0 357
+0
357
353 0 0 5 26
  +0
272 | 326
260 0 / 0 169 / 0 24 -- -- -- 1 1 4 1 1 1 3 1 -- 171 0 357 334 8 15 8 6 0 + 0 + 0 + 1 + 5 = 6 0 + 0 + 0 + 1 + 5 = 6 4995 34965 149850 5159 103.28% 55068 196032 29
+0
29
+0
29
27 5146.00
+0.00
5139.75
857 184499 392
+ 0
216
180645 0 0 97.91
+0
156 / 153
+0
838 / 397
136662.00
+0.00 / +0.00
92963.53
68.02% 0 0 0 644 433 211 24 0 24
5 Jhansi BGCCPL-Ramky (JV)


8009955 Imlota GOV 87 0 0 0 0 0 0 0 0 192 163 85%
+0
13
15 100.00 Yes 1 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 4 / 0 7 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 13 13 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 8
+0
8
+0
8
8 899.95
+0.00
894.94
87 32259 71
+ 0
5
32189 0 0 99.78
+0
9 / 9
+0
82 / 55
29730.00
+0.00 / +0.00
19944.33
67.08% 150 82 68 11 0 11
  • 5 D.System
  • 5 COV
  • 70 FHTC
  • 16 HGJ
  • 82 HGJ CERT
  • 86 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Jul-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Apr-2024 OHT
  • 14-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
  • 122 Villages
  • 49324 Households
  • 0 Last Week FHTC Given
  • 47809 FHTC Given
  • 96 FHTC(%)
  • 1515 Balance FHTC
  • 104 HGJ
  • 95 HGJ Certified
  • 77.87 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 31 Handed Over Villages(before Portal)
  • 46 Handed Over Initiated/Approved On Portal
  • 63.11 Handed Over %
  • 15 OHT Required
  • 13 OHT Completed
  • Scheme Wise Category A
  • 24 No. of Schemes
  • 26 No. of Villages
  • Scheme Wise Category B
  • 41 No. of Schemes
  • 84 No. of Villages
  • Scheme Wise Category C
  • 4 No. of Schemes
  • 13 No. of Villages
  • Village Wise Category A
  • 39 No. of Villages
  • Village Wise Category B
  • 63 No. of Villages
  • Village Wise Category C
  • 21 No. of Villages
  • Village Wise Total
  • 123 Total No. of Villages
  • 69 Total No. of Schemes
  • 123 Total No. of Villages
  • 75 Total No. of OHT
  • 56 Schemes Sent to O&M
  • 58 No. of OHT in O&M Schemes
  • 10784 Water Demand(M3)
  • 0.00 Water Supply (M3)
  • 63 Agreement Done Scheme
  • 91 Agreement Done Village
8135947 Teharka GOV 93 0 0 0 0 0 0 0 0 162 130 80%
+0
27
29 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 4 / 0 6 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 12 12 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 9
+0
9
+0
9
9 786.55
+0.00
782.23
93 27437 29
+ 0
4
27273 0 0 99.40
+0
10 / 9
+0
66 / 39
29676.00
+0.00 / +0.00
17935.36
60.44% 127 50 77 14 0 14
  • 4 D.System
  • 27 COV
  • 1 Electricity
  • 164 FHTC
  • 64 HGJ
  • 89 HGJ CERT
  • 93 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 31-May-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jul-2024 Comissioning
8135956 Barthari GOV 106 0 0 0 0 0 0 0 0 177 161 91%
+0
27
25 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
12 0 / 0 4 / 0 10 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 15 15 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 11
+0
11
+0
11
10 868.26
+0.00
863.85
106 27423 27
+ 0
1
27171 0 0 99.08
+0
12 / 12
+0
56 / 16
29490.00
+0.00 / +0.00
15529.98
52.66% 82 50 32 19 0 19
  • 4 D.System
  • 50 COV
  • 252 FHTC
  • 79 HGJ
  • 105 HGJ CERT
  • 106 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Jul-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 20-Mar-2024 WTP
  • 30-Jun-2024 OHT
  • 30-Jun-2024 CWR
  • 15-Jul-2024 D.System
  • 15-Jun-2024 Comissioning
Agency Total 286 0 0 0 0 0 0 0 0 531 454 85% 67 300.00 3 / 0 300.00 8 / 0
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
37 0 / 0 12 / 0 23 -- -- -- -- 0 0 40 40 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 28
+0
28
+0
28
27 2554.76
+0.00
2541.02
286 87119 127
+ 0
10
86633 0 0 99
+0
31 / 30
+0
204 / 110
88896.00
+0.00
53409.67
60% 359 182 177 44 0 44
Indian Hume Pipe


8010037 Kuraicha GOV 72 05-Feb-2024 1 1 1 1 74 71 0 0 289 288 100%
+0
69
96 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 14
+14
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 14 / 0 24 Integrated Verified Verified 10 14 Verified Verified 9 8 Verification Remarks Minutes of Meeting 161 117 14 0 0 14 0 10 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 3 + 0 = 3 8491 59437 254730 14661 172.67% 80096 372080 11
+0
0
+0
11
11 859.73
+0.00
859.37
72 29415 73
+ 0
70
29406 0 0 99.97
+0
19 / 19
+0
72 / 69
28180.00
+0.00 / +0.00
27190.73
96.49% Yes 203 185 18 10 0 10
  • 9 FHTC
  • 2 HGJ CERT
  • 72 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
NCC Ltd.


8009966 Tilaitha GOV 25 01-Sep-2023 1 1 1 1 25 25 0 0 65 64 98%
+0
25
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 10 / 0 5 Integrated Off Verified Verified 3 5 Verified Verified 3 5 Verification Remarks Minutes of Meeting 61 45 5 0 0 5 0 3 0 + 1 + 1 + 0 + 1 = 3 0 + 1 + 1 + 0 + 1 = 3 1930 13510 57900 2645 137.05% 12477 69965 4
+0
4
+0
4
4 248.18
+0.00
248.18
25 6725 25
+ 0
24
6725 0 0 100.00
+0
7 / 7
+0
25 / 25
7517.00
+0.00 / +0.00
6337.08
84.30% Yes 85 72 13 0 0 0
  • 1 HGJ CERT
  • 25 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8009988 Bacholi Bauzurg GOV 37 01-Sep-2023 1 1 1 1 37 37 0 0 75 74 99%
+0
36
97 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 15 / 0 7 Integrated Off Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 38 32 7 0 0 7 1 3 0 + 0 + 0 + 0 + 1 = 1 0 + 0 + 0 + 0 + 1 = 1 3419 23933 102570 4293 125.56% 26151 95809 4
+0
4
+0
4
4 297.97
+0.00
297.97
37 11549 37
+ 0
36
11549 0 0 100.00
+0
10 / 10
+0
37 / 37
12643.00
+0.00 / +0.00
11389.03
90.08% Yes 86 72 14 0 0 0
  • 1 HGJ CERT
  • 37 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 15-Oct-2023 Comissioning
8009992 Gulara GOV 42 01-Sep-2023 1 1 1 1 42 40 0 0 99 99 100%
+0
42
100 100.00 Yes 4 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
7 0 / 0 14 / 0 7 Integrated Off Verified Verified 3 7 Verified Verified 3 7 Verification Remarks Minutes of Meeting 27 24 7 0 0 7 0 1 0 + 1 + 0 + 0 + 0 = 1 0 + 1 + 0 + 0 + 0 = 1 3346 23422 100380 4048 120.98% 18248 97938 4
+0
4
+0
4
4 309.37
+0.00
309.37
42 11437 42
+ 0
42
11437 0 0 100.00
+0
10 / 10
+0
42 / 42
11037.00
+0.00 / +0.00
9463.11
85.74% Yes 48 42 6 8 1 7
  • 42 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
8010048 Burhpura GOV 59 01-Sep-2023 1 1 1 1 59 59 0 0 189 188 99%
+0
57
97 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 14
+0
14
0 0 0 0 0
  +0
14 | 14
14 0 / 0 32 / 0 14 Integrated Off Verified Verified 7 14 Verified Verified 7 14 Verification Remarks Minutes of Meeting 106 92 14 0 2 12 0 5 1 + 0 + 0 + 0 + 1 = 2 1 + 0 + 0 + 0 + 1 = 2 7169 50183 215070 10027 139.87% 57797 261746 8
+0
8
+0
8
8 869.06
+0.00
869.06
59 26650 59
+ 0
52
26650 0 0 100.00
+0
19 / 19
+0
59 / 59
27993.00
+0.00 / +0.00
26006.12
92.90% Yes 168 153 15 0 0 0
  • 7 HGJ CERT
  • 59 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 163 4 4 4 4 163 161 0 0 428 425 99% 160 400.00 14 / 0 400.00 8 / 0
+0
0 / 0
0 / 0 33
+0
33
0 0 0 0 0
  +0
33 | 33
33 0 / 0 71 / 0 33 -- -- -- 4 4 16 33 4 4 16 33 -- 232 193 33 0 2 31 1 12 1 + 2 + 1 + 0 + 3 = 7 1 + 2 + 1 + 0 + 3 = 7 15864 111048 475920 21013 132.46% 114673 525458 20
+0
20
+0
20
20 1724.58
+0.00
1724.58
163 56361 163
+ 0
154
56361 0 0 100
+0
46 / 46
+0
163 / 163
59190.00
+0.00
53195.34
90% 387 339 48 8 1 7
DARA ENGINEERING


8135931 Purwa GOV 32 01-Jan-2024 1 1 1 1 32 32 0 0 75 75 100%
+0
31
97 100.00 Yes 2 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 6
+6
6
0 0 0 0 0
  +0
6 | 6
6 0 / 0 6 / 0 10 Integrated Verified Verified 3 6 Verified Verified 3 6 Verification Remarks Minutes of Meeting 21 1 6 0 0 6 0 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4025 28175 120750 5554 137.99% 33871 138294 3
+0
0
+0
3
3 292.54
+0.00
292.54
32 12762 32
+ 0
32
12762 0 0 100.00
+0
8 / 8
+0
32 / 32
9704.00
+0.00 / +0.00
8034.62
82.80% Yes 103 101 2 0 0 0
  • 32 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Unipro


8135681 Barwar GOV 57 05-Feb-2024 1 1 1 1 56 56 0 0 257 257 100%
+0
56
98 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 9
+100
109
0 0 0 0 100
  +0
9 | 9
9 0 / 0 9 / 0 9 Integrated Verified Verified 4 9 Verified Verified 4 9 Verification Remarks Minutes of Meeting 117 26 9 0 0 9 0 5 0 + 0 + 0 + 0 + 2 = 2 0 + 0 + 0 + 0 + 2 = 2 4211 29477 126330 6830 162.19% 34626 141397 5
+0
5
+0
5
5 458.49
+0.00
458.49
57 15726 56
+ 0
56
15726 0 0 100.00
+0
13 / 13
+0
57 / 57
14645.00
+0.00 / +0.00
11976.40
81.78% Yes 123 120 3 5 0 5
  • 1 HGJ
  • 1 HGJ CERT
  • 57 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 30-Aug-2023 D.System
  • 30-Aug-2023 Comissioning
Total Jhansi 611 7 7 7 7 7 325 320 0 0 1577 1497 95%
+0
383
62.68 100.00 10 21 / 0 100.00 10 22 / 0
+0
0 / 0
0 / 0 102
+0
202
0 0 0 0 100
  +0
102 | 102
99 0 / 0 112 / 0 99 -- -- -- 7 7 33 62 7 7 32 62 -- 531 337 102 40 2 60 1 30 1 + 2 + 1 + 1 + 5 = 10 1 + 2 + 1 + 3 + 5 = 12 32592 228144 977760 48058 147.45% 263265 1177230 67
+0
53
+0
67
66 5890.10
+0.00
5876.00
611 201383 451
+ 0
322
200888 0 0 99.75
+0
117 / 116
+0
528 / 431
200615.00
+0.00 / +0.00
153806.76
76.67% 0 0 3 1175 927 248 67 1 66
6 Lalitpur M/s Sudhakara Infratech Pvt. Ltd


8010072 Lagaon GOV 50 15-Jan-2024 1 1 1 1 50 50 0 0 59 59 100%
+0
50
100 100.00 Yes 1 / 0 100.00 Yes 4 / 0
+0
0 / 0
0 / 0 13
+13
13
13 0 0 0 0
  +0
13 | 13
13 0 / 0 13 / 0 13 Integrated Off Verified Verified 5 10 Verified Verified 5 9 Verification Remarks Minutes of Meeting 128 0 13 0 0 13 0 0 0 + 0 + 2 + 0 + 0 = 2 0 + 0 + 3 + 0 + 0 = 3 4106 28742 123180 3975 96.81% 26213 111419 9
+0
9
+0
9
9 381.75
+0.00
409.16
50 12964 50
+ 0
50
12964 0 0 100.00
+0
10 / 10
+0
50 / 50
17608.00
+0.00 / +0.00
17282.02
98.15% Yes 72 62 10 6 0 6
  • 49 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
9 CWR Completed
D.System
30-Sep-2023
Comissioning
30/12/2023
  • 14-Aug-2023 Intake
  • 31-Aug-2023 WTP
  • 14-Jun-2023 OHT
  • 17-May-2023 CWR
  • 30-Sep-2023 D.System
  • 30-Dec-2023 Comissioning
  • 103 Villages
  • 44833 Households
  • 0 Last Week FHTC Given
  • 44833 FHTC Given
  • 100 FHTC(%)
  • 0 Balance FHTC
  • 103 HGJ
  • 93 HGJ Certified
  • 90.29 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 7 Handed Over Villages(before Portal)
  • 44 Handed Over Initiated/Approved On Portal
  • 49.51 Handed Over %
  • 13 OHT Required
  • 11 OHT Completed
  • Scheme Wise Category A
  • 5 No. of Schemes
  • 9 No. of Villages
  • Scheme Wise Category B
  • 9 No. of Schemes
  • 90 No. of Villages
  • Scheme Wise Category C
  • 16 No. of Schemes
  • 17 No. of Villages
  • Village Wise Category A
  • 11 No. of Villages
  • Village Wise Category B
  • 48 No. of Villages
  • Village Wise Category C
  • 57 No. of Villages
  • Village Wise Total
  • 116 Total No. of Villages
  • 30 Total No. of Schemes
  • 116 Total No. of Villages
  • 50 Total No. of OHT
  • 12 Schemes Sent to O&M
  • 25 No. of OHT in O&M Schemes
  • 9510 Water Demand(M3)
  • 4861.72 Water Supply (M3)
  • 12 Agreement Done Scheme
  • 64 Agreement Done Village
8063544 Kachnauda Kala GOV 61 01-Apr-2024 1 1 1 1 61 61 0 0 89 88 99%
+0
60
98 100.00 Yes 1 / 1 100.00 Yes 8 / 1
+0
0 / 0
0 / 0 17
+16
17
17 0 0 0 0
  +0
17 | 17
17 0 / 0 17 / 0 19 Integrated Off Verified Verified 4 7 Not Verified Verified 4 7 Verification Remarks Minutes of Meeting 94 0 17 0 0 17 1 2 0 + 0 + 6 + 0 + 0 = 6 0 + 0 + 7 + 0 + 0 = 7 6661 46627 199830 5769 86.61% 32887 97372 8
+0
8
+0
8
8 578.14
+0.00
594.56
61 22452 61
+ 0
59
22452 0 0 100.00
+0
9 / 9
+0
61 / 57
24598.00
+0.00 / +0.00
20239.18
82.28% 178 134 44 5 0 5
  • 2 HGJ CERT
  • 58 HOV
Intake
100% structure completed work done by 30/10/2023
WTP
100% WTP structure done remaining work done by 30/10/2023
T/W
0
OHT
remaining work completed by 30/11/2023
CWR
remaining work done by 15/12/2023
D.System
30-Oct-2023
Comissioning
comissioning start by 30/10/2023
  • 30-Sep-2023 Intake
  • 23-Oct-2023 WTP
  • 13-Nov-2023 OHT
  • 30-Nov-2023 CWR
  • 30-Oct-2023 D.System
  • 31-Oct-2023 Comissioning
8134917 Jakhlaun Birdha GOV 60 03-Dec-2024 1 0 0 0 0 0 0 0 45 44 98%
+0
59
98 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 15
+13
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 11 / 0 14 Integrated Off Verified Verified 0 0 Verified Verified 0 0 Verification Remarks Minutes of Meeting 119 0 15 0 3 12 7 4 0 + 0 + 2 + 0 + 1 = 3 0 + 0 + 2 + 0 + 1 = 3 5409 37863 162270 5442 100.61% 29277 67640 5
+0
5
+0
5
5 462.02
+0.00
520.82
60 17590 60
+ 0
53
17590 0 0 100.00
+0
6 / 6
+0
60 / 51
23368.00
+0.00 / +0.00
21529.95
92.13% 89 49 40 7 0 7
  • 7 HGJ CERT
  • 51 HOV
Intake
remaining work done by 20/10/2023
WTP
remaining work done by 30/01/2024
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 15/11/2023
D.System
15-Feb-2024
Comissioning
comissioning 03/03/2024
  • 20-Oct-2023 Intake
  • 20-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 30-Nov-2023 CWR
  • 15-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134922 Dhoora Balabehat GOV 58 03-Dec-2024 1 0 0 0 0 0 0 0 30 28 93%
+0
55
95 100.00 Yes 1 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 11
+10
11
11 0 0 0 0
  +0
11 | 11
11 0 / 0 6 / 0 6 Integrated Off Verified Verified 2 4 Verified Verified 2 2 Verification Remarks Minutes of Meeting 107 0 11 0 0 11 6 1 0 + 0 + 3 + 0 + 0 = 3 0 + 0 + 4 + 0 + 0 = 4 2917 20419 87510 2938 100.72% 16886 48317 5
+0
5
+0
5
5 332.97
+0.00
372.33
58 9685 58
+ 0
55
9685 0 0 100.00
+0
6 / 5
+0
58 / 56
15059.00
+0.00 / +0.00
12657.68
84.05% 59 46 13 6 0 6
  • 1 Electricity
  • 3 HGJ CERT
  • 48 HOV
Intake
remaining work done by 30/10/2023
WTP
remaining work done by 30/10/2023
T/W
0
OHT
remaining work done by 30/10/2023
CWR
Work has started on 5 CWR, No one Complete.
D.System
21-Feb-2024
Comissioning
comissioning 15/10/2024
  • 06-Jan-2024 Intake
  • 16-Jan-2024 WTP
  • 30-Dec-2023 OHT
  • 30-Oct-2023 CWR
  • 21-Feb-2024 D.System
  • 18-Mar-2024 Comissioning
8134938 Kadesra Kalan GOV 7 20-Jun-2024 1 1 1 1 7 7 0 0 10 9 90%
+0
6
86 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Verified Verified 5 7 Verified Verified 5 7 Verification Remarks Minutes of Meeting 83 8 4 0 0 4 2 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1696 11872 50880 2507 147.82% 17358 85233 2
+0
2
+0
2
2 130.13
+0.00
160.49
7 7371 7
+ 0
6
7371 0 0 100.00
+0
3 / 3
+0
7 / 7
5977.00
+0.00 / +0.00
5103.02
85.38% 31 22 9 0 0 0
  • 1 HGJ CERT
  • 7 HOV
Intake
remaining work done by31/10/2023
WTP
remaining work done by 30/12/2023
T/W
0
OHT
15/10/2023
CWR
15/10/2023
D.System
30-Jan-2024
Comissioning
0
  • 30-Sep-2023 Intake
  • 30-Dec-2023 WTP
  • 15-Oct-2023 OHT
  • 15-Oct-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
8134955 Mau GOV 15 20-Jun-2024 1 1 1 1 15 14 0 0 12 12 100%
+0
15
100 100.00 Yes 2 / 0 100.00 Yes 3 / 0
+0
0 / 0
0 / 0 6
+5
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 0 / 0 3 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 0 0 6 0 0 6 2 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 923 6461 27690 0 0% 0 0 3
+0
3
+0
3
3 120.25
+0.00
162.11
15 3347 15
+ 0
14
3347 0 0 100.00
+0
3 / 3
+0
15 / 8
5996.00
+0.00 / +0.00
4307.07
71.83% 43 37 6 1 0 1
  • 1 HGJ CERT
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
remaining work done by 15/10/2023
CWR
remaining work done by 31/10/2023
D.System
30-Jan-2024
Comissioning
comissioning 30/10/2023
  • 20-Oct-2023 Intake
  • 30-Dec-2023 WTP
  • 30-Dec-2023 OHT
  • 31-Aug-2023 CWR
  • 30-Jan-2024 D.System
  • 30-Jan-2024 Comissioning
Agency Total 251 6 4 4 4 133 132 0 0 245 240 98% 245 600.00 9 / 1 600.00 24 / 1
+0
0 / 0
0 / 0 66
+61
66
66 0 0 0 0
  +0
66 | 66
66 0 / 0 47 / 0 59 -- -- -- 5 5 16 28 4 5 16 25 -- 531 8 66 0 3 63 18 8 0 + 0 + 13 + 0 + 1 = 14 0 + 0 + 16 + 0 + 1 = 17 21712 151984 651360 20631 95.02% 122621 409981 32
+0
32
+0
32
32 2005.26
+0.00
2219.47
251 73409 251
+ 0
237
73409 0 0 100
+0
37 / 36
+0
251 / 229
92606.00
+0.00
81118.92
88% 472 350 122 25 0 25
Brija Banco Pvt. Ltd


8282117 Chandawali GOV 16 25-Mar-2024 1 0 0 0 0 0 0 0 18 18 100%
+0
16
100 100.00 Yes 2 / 0 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 6
+6
6
6 0 0 0 0
  +0
6 | 6
6 0 / 0 1 / 1 6 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 92 0 6 0 6 0 0 0 0 + 0 + 0 + 0 + 3 = 3 0 + 0 + 0 + 0 + 4 = 4 0 0 0 0 0% 12 136 3
+0
3
+0
3
3 108.90
+0.00
108.90
16 4454 16
+ 0
16
4454 0 0 100.00
+0
4 / 4
+0
16 / 12
4615.00
+0.00 / +0.00
3439.95
74.54% 38 21 17 0 0 0
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
civil work is done and E&M work is onging
CWR
All civil work finished and E&M work will be finished on 15 december
D.System
29-Jun-2023
Comissioning
0
  • 31-Oct-2023 Intake
  • 31-Oct-2023 WTP
  • 30-Sep-2023 OHT
  • 30-Sep-2023 CWR
  • 29-Jun-2023 D.System
  • 30-Nov-2023 Comissioning
DARA ENGINEERING


8136125 Sukul Guwan GOV 16 10-Jan-2024 1 1 1 1 16 16 0 0 15 15 100%
+0
16
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Off Verified Verified 3 4 Verified Verified 3 4 Verification Remarks Minutes of Meeting 27 0 4 0 0 4 1 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1117 7819 33510 1168 104.57% 8344 39154 3
+0
3
+0
3
3 80.80
+0.00
80.80
16 3297 16
+ 0
16
3297 0 0 100.00
+0
4 / 4
+0
16 / 16
4614.00
+0.00 / +0.00
3505.52
75.98% Yes 20 19 1 0 0 0
  • 15 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136173 Billa Mogan GOV 23 0 0 0 0 0 0 0 0 37 27 73%
+0
4
17 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 8 / 0 8 Integrated Off Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 117 0 8 0 2 6 4 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2017 14119 60510 1219 60.44% 3719 11695 4
+0
4
+0
4
4 148.83
+0.00
148.78
23 8735 23
+ 0
0
8735 0 0 100.00
+0
5 / 4
+0
22 / 13
8794.00
+0.00 / +0.00
7180.87
81.66% 30 16 14 2 0 2
  • 1 COV
  • 1 Electricity
  • 23 HGJ CERT
  • 23 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Jul-2023
Comissioning
0
  • 31-Jul-2023 Intake
  • 31-Aug-2023 WTP
  • 31-Jul-2023 OHT
  • 31-Jul-2023 CWR
  • 31-Jul-2023 D.System
  • 31-Aug-2023 Comissioning
8136187 Badanpur GOV 31 10-Jan-2024 1 1 1 1 31 30 0 0 23 23 100%
+0
31
100 100.00 Yes 0 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Verified Verified 2 8 Verified Verified 2 8 Verification Remarks Minutes of Meeting 53 0 8 0 0 8 1 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1989 13923 59670 3433 172.60% 11856 65654 4
+0
4
+0
4
4 157.92
+0.00
157.92
31 6972 31
+ 0
31
6972 0 0 100.00
+0
5 / 5
+0
31 / 31
8836.00
+0.00 / +0.00
7608.96
86.11% Yes 18 11 7 3 0 3
  • 29 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136199 Sojana Gurgha GOV 32 10-Feb-2024 1 0 0 0 0 0 0 0 37 36 97%
+0
31
97 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 12
+12
12
12 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 12 Integrated Off Verified Verified 0 8 Verified Verified 0 8 Verification Remarks Minutes of Meeting 31 0 12 0 0 12 2 1 0 + 0 + 1 + 0 + 0 = 1 0 + 0 + 1 + 0 + 0 = 1 3126 21882 93780 3326 106.40% 21316 94563 3
+0
3
+0
3
3 169.97
+0.00
169.90
32 9621 32
+ 0
32
9621 0 0 100.00
+0
4 / 4
+0
31 / 31
9528.00
+0.00 / +0.00
8655.22
90.84% 116 89 27 2 0 2
  • 31 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 T/W
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
8136210 Mandawara GOV 17 10-Jan-2024 1 1 1 1 17 16 0 0 45 45 100%
+0
17
100 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 4
+4
4
4 0 0 0 0
  +0
4 | 4
4 0 / 0 0 / 0 4 Integrated Off Verified Verified 1 4 Verified Verified 1 4 Verification Remarks Minutes of Meeting 28 0 4 0 0 4 0 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1875 13125 56250 2810 149.87% 16995 73639 2
+0
2
+0
2
2 125.40
+0.00
125.30
17 7306 17
+ 0
16
7306 0 0 100.00
+0
3 / 3
+0
17 / 17
6007.00
+0.00 / +0.00
4285.91
71.35% 37 25 12 0 0 0
  • 1 HGJ CERT
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Mar-2023
Comissioning
0
  • 31-Mar-2023 Intake
  • 31-Mar-2023 WTP
  • 31-Mar-2023 OHT
  • 31-Mar-2023 CWR
  • 31-Mar-2023 D.System
  • 31-Mar-2023 Comissioning
Agency Total 119 4 3 3 3 64 62 0 0 157 146 93% 99 500.00 3 / 0 500.00 2 / 0
+0
0 / 0
0 / 0 36
+36
36
36 0 0 0 0
  +0
36 | 36
36 0 / 0 8 / 0 36 -- -- -- 5 4 6 24 4 4 6 24 -- 256 0 36 0 2 34 8 4 0 + 0 + 1 + 0 + 0 = 1 0 + 0 + 1 + 0 + 0 = 1 10124 70868 303720 11956 118.10% 62230 284705 16
+0
16
+0
16
16 682.92
+0.00
682.70
119 35931 119
+ 0
95
35931 0 0 100
+0
21 / 20
+0
117 / 108
37779.00
+0.00
31236.48
83% 221 160 61 7 0 7
JMC-JWIL (JV)


8010056 Saidpur Kumheri GOV 47 01-Nov-2023 1 1 1 1 47 44 0 0 93 93 100%
+0
47
100 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 7
+7
7
7 0 0 0 0
  +0
7 | 7
7 0 / 0 7 / 0 7 Integrated Off Verified Verified 3 6 Verified Not Verified 3 6 Verification Remarks Minutes of Meeting 101 0 7 0 0 7 5 0 0 + 0 + 0 + 3 + 0 = 3 0 + 0 + 0 + 11 + 0 = 11 4365 30555 130950 4089 93.68% 13634 67797 5
+0
5
+0
5
5 385.45
+0.00
385.45
47 13818 47
+ 0
47
13818 0 0 100.00
+0
6 / 6
+0
46 / 33
14171.00
+0.00 / +0.00
11945.21
84.29% 125 97 28 2 0 2
  • 47 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010063 Gona Narhat GOV 54 01-Nov-2023 1 1 1 1 54 52 0 0 93 92 99%
+0
53
98 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 10
+10
10
10 0 0 0 0
  +0
10 | 10
10 0 / 0 10 / 0 10 Integrated Off Verified Verified 4 7 Verified Verified 4 5 Verification Remarks Minutes of Meeting 56 0 10 0 2 8 2 0 0 + 0 + 1 + 2 + 1 = 4 0 + 0 + 1 + 12 + 1 = 14 3554 24878 106620 3712 104.45% 27192 111816 6
+0
6
+0
6
6 378.00
+0.00
378.00
54 12897 54
+ 0
54
12897 0 0 100.00
+0
7 / 7
+0
54 / 40
13299.00
+0.00 / +0.00
10816.41
81.33% 167 135 32 0 0 0
  • 50 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Jun-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 28-Feb-2023 OHT
  • 28-Feb-2023 CWR
  • 30-Jun-2023 D.System
  • 10-Sep-2023 Comissioning
8010076 Masora Sindwaha GOV 45 01-Mar-2024 1 1 1 1 45 37 0 0 90 89 99%
+0
44
98 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 15
+8
15
15 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 15 Integrated Off Verified Verified 6 11 Verified Verified 6 10 Verification Remarks Minutes of Meeting 83 0 15 0 0 15 4 1 0 + 3 + 0 + 0 + 1 = 4 0 + 5 + 0 + 0 + 1 = 6 4600 32200 138000 5050 109.78% 33472 117889 7
+0
7
+0
7
7 512.43
+0.00
512.41
45 14057 45
+ 0
45
14057 0 0 100.00
+0
8 / 6
+0
45 / 38
16681.00
+0.00 / +0.00
14549.20
87.22% 95 79 16 8 1 7
  • 2 Electricity
  • 40 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
30-Aug-2023
Comissioning
0
  • 28-Feb-2023 Intake
  • 28-Feb-2023 WTP
  • 07-May-2024 OHT
  • 18-Jul-2023 CWR
  • 30-Aug-2023 D.System
  • 29-Jan-2025 Comissioning
Agency Total 146 3 3 3 3 146 133 0 0 276 274 99% 144 300.00 3 / 0 300.00 3 / 0
+0
0 / 0
0 / 0 32
+25
32
32 0 0 0 0
  +0
32 | 32
32 0 / 0 32 / 0 32 -- -- -- 3 3 13 24 3 2 13 21 -- 240 0 32 0 2 30 11 1 0 + 3 + 1 + 5 + 2 = 11 0 + 5 + 1 + 23 + 2 = 31 12519 87633 375570 12851 102.65% 74298 297502 18
+0
18
+0
18
18 1275.88
+0.00
1275.86
146 40772 146
+ 0
146
40772 0 0 100
+0
21 / 19
+0
145 / 111
44151.00
+0.00
37310.82
85% 387 311 76 10 1 9
Banko Ganga


8282120 Tori GOV 19 15-Jan-2024 1 1 1 1 19 19 0 0 26 26 100%
+0
19
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 8
+8
8
8 0 0 0 0
  +0
8 | 8
8 0 / 0 7 / 0 8 Integrated Off Verified Verified 2 8 Verified Verified 2 8 Verification Remarks Minutes of Meeting 48 0 8 0 0 8 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 1277 8939 38310 1322 103.52% 7891 26354 2
+0
2
+0
2
2 133.36
+0.00
133.36
19 3984 19
+ 0
19
3984 0 0 100.00
+0
3 / 3
+0
19 / 19
4036.00
+0.00 / +0.00
3073.85
76.16% Yes 27 20 7 0 0 0
  • 17 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 20-May-2023 Intake
  • 25-May-2023 WTP
  • 05-Dec-2022 OHT
  • 15-Mar-2023 CWR
Total Lalitpur 551 15 15 14 11 11 362 346 0 0 719 701 97%
+0
523
94.92 100.00 16 19 / 1 100.00 16 32 / 2
+0
0 / 0
0 / 0 148
+0
148
148 0 0 0 0
  +0
148 | 148
148 0 / 0 95 / 1 141 -- -- -- 14 13 37 84 12 12 37 84 -- 1167 8 148 0 13 135 37 13 0 + 3 + 15 + 5 + 6 = 29 0 + 5 + 18 + 23 + 7 = 53 45638 319466 1369140 46760 102.46% 267052 1018679 71
+0
71
+0
71
71 4206.32
+0.00
4420.29
551 157926 550
+ 0
512
157926 0 0 100
+0
86 / 82
+0
548 / 479
183187.00
+0.00 / +0.00
156180.02
85.26% 0 2 0 1141 859 282 41 1 40
7 Mahoba Larsen & Toubro Ltd


8009844 Shivhar GOV 61 01-Dec-2023 1 1 1 1 61 61 0 0 201 201 100%
+0
61
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 18
+0
18
0 0 0 0 0
  +0
18 | 18
18 0 / 0 18 / 0 18 Integrated Off Verified Verified 6 18 Verified Verified 6 18 Verification Remarks Minutes of Meeting 124 0 18 0 0 18 0 17 0 + 0 + 1 + 0 + 0 = 1 0 + 0 + 1 + 0 + 0 = 1 6444 45108 193320 11499 178.45% 49917 176522 6
+0
6
+0
6
6 672.57
+0.00
672.20
61 22511 61
+ 0
61
22511 0 0 100.00
+0
7 / 7
+0
61 / 61
27118.00
+0.00 / +0.00
25169.58
92.82% Yes Yes Yes 201 166 35 6 0 6
  • 60 HOV
Intake
Completed
WTP
Completed
T/W
0
OHT
0
CWR
Completed
Comissioning
0
  • 31-Aug-2023 OHT
  • 31-Aug-2023 Comissioning
  • 68 Villages
  • 20375 Households
  • 0 Last Week FHTC Given
  • 20308 FHTC Given
  • 99 FHTC(%)
  • 67 Balance FHTC
  • 64 HGJ
  • 59 HGJ Certified
  • 86.76 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 42 Handed Over Villages(before Portal)
  • 3 Handed Over Initiated/Approved On Portal
  • 66.18 Handed Over %
  • 0 OHT Required
  • 0 OHT Completed
  • Scheme Wise Category A
  • 2 No. of Schemes
  • 4 No. of Villages
  • Scheme Wise Category B
  • 30 No. of Schemes
  • 55 No. of Villages
  • Scheme Wise Category C
  • 9 No. of Schemes
  • 9 No. of Villages
  • Village Wise Category A
  • 4 No. of Villages
  • Village Wise Category B
  • 55 No. of Villages
  • Village Wise Category C
  • 9 No. of Villages
  • Village Wise Total
  • 68 Total No. of Villages
  • 41 Total No. of Schemes
  • 68 Total No. of Villages
  • 53 Total No. of OHT
  • 39 Schemes Sent to O&M
  • 41 No. of OHT in O&M Schemes
  • 5163 Water Demand(M3)
  • 4804.11 Water Supply (M3)
  • 41 Agreement Done Scheme
  • 68 Agreement Done Village
JMC-JWIL (JV)


8009837 Lahchura Kashipura GOV 78 15-Mar-2024 1 1 1 1 78 77 0 0 235 235 100%
+0
78
100 100.00 Yes 10 / 1 100.00 Yes 11 / 1
+0
0 / 0
0 / 0 32
+0
32
0 0 0 0 0
  +0
32 | 32
32 0 / 0 23 / 0 27 Integrated Off Verified Verified 4 21 Verified Verified 4 20 Verification Remarks Minutes of Meeting 165 0 32 0 0 32 0 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6637 46459 199110 7128 107.40% 43381 203046 10
+0
10
+0
10
10 601.08
+0.00
599.17
78 25257 78
+ 0
78
25257 0 0 100.00
+0
11 / 11
+0
78 / 78
23602.00
+0.00 / +0.00
22306.07
94.51% Yes Yes 138 71 67 12 0 12
  • 1 D.System
  • 75 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
15-Apr-2024
Comissioning
0
  • 15-Apr-2024 OHT
  • 15-Apr-2024 D.System
8009841 Salaiya Khalsa Nathupura GOV 77 15-Mar-2024 1 1 1 1 77 77 0 0 232 232 100%
+0
77
100 100.00 Yes 1 / 1 100.00 Yes 16 / 1
+0
0 / 0
0 / 0 40
+0
40
0 0 0 0 0
  +0
40 | 40
40 0 / 0 16 / 3 40 Integrated Off Verified Verified 5 27 Verified Verified 1 24 Verification Remarks Minutes of Meeting 418 0 40 0 0 40 25 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 6642 46494 199260 6744 101.54% 34414 157799 22
+0
22
+0
22
22 785.00
+0.00
784.25
77 28072 77
+ 0
76
28072 0 0 100.00
+0
23 / 23
+0
77 / 77
26009.00
+0.00 / +0.00
24826.82
95.45% 130 83 47 14 1 13
  • 1 HGJ CERT
  • 77 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
29-Feb-2024
Comissioning
0
  • 29-Feb-2024 OHT
  • 29-Feb-2024 CWR
  • 29-Feb-2024 D.System
Agency Total 155 2 2 2 2 155 154 0 0 467 467 100% 155 200.00 11 / 2 200.00 27 / 2
+0
0 / 0
0 / 0 72
+0
72
0 0 0 0 0
  +0
72 | 72
72 0 / 0 39 / 3 67 -- -- -- 2 2 9 48 2 2 5 44 -- 583 0 72 0 0 72 25 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 13279 92953 398370 13872 104.47% 77795 360845 32
+0
32
+0
32
32 1386.08
+0.00
1383.42
155 53329 155
+ 0
154
53329 0 0 100
+0
34 / 34
+0
155 / 155
49611.00
+0.00
47132.89
95% 268 154 114 26 1 25
N.K. Gupta & K.B. Gupta Contractors


8175353 kabrai GOV 38 01-Jul-2024 1 0 0 0 0 0 0 0 158 157 99%
+0
36
95 100.00 Yes 1 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 13
+0
13
0 0 0 0 0
  +0
13 | 13
13 0 / 0 11 / 0 8 Integrated Off Verified Verified 0 8 Verified Verified 0 8 Verification Remarks Minutes of Meeting 89 0 13 0 3 10 8 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2863 20041 85890 764 26.69% 9449 36681 9
+0
9
+0
9
9 349.51
+0.00
349.35
38 12331 37
+ 0
35
12155 0 0 98.57
+0
9 / 9
+0
38 / 36
15787.00
+0.00 / +0.00
13344.22
84.53% Yes 0 0 0 0 0 0
  • 176 FHTC
  • 1 HGJ
  • 3 HGJ CERT
  • 38 HOV
Intake
28/02/2023
WTP
30/6/2023
T/W
0
OHT
30/04/2024
CWR
16/04/2024
D.System
14-Jul-2023
Comissioning
10/06/2024
  • 28-Feb-2023 Intake
  • 30-Jun-2023 WTP
  • 30-May-2023 OHT
  • 15-Jun-2023 CWR
  • 14-Jul-2023 D.System
  • 16-Jul-2023 Comissioning
SLC-SMC (JV)


8152383 Dhawarra GOV 95 13-Sep-2024 1 0 0 0 0 0 0 0 300 293 98%
+0
90
95 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 29
+0
29
0 0 0 0 0
  +0
29 | 29
29 0 / 0 29 / 0 19 Integrated Off Verified Verified 0 2 Verified Verified 0 2 Verification Remarks Minutes of Meeting 191 0 29 0 8 21 7 6 3 + 0 + 0 + 0 + 3 = 6 3 + 0 + 0 + 0 + 3 = 6 7169 50183 215070 5608 78.23% 39947 126793 9
+0
9
+0
9
9 782.93
+0.00
781.27
95 30104 95
+ 0
81
30104 0 0 100.00
+0
9 / 9
+0
95 / 85
33301.00
+0.00 / +0.00
24906.45
74.79% Yes 343 110 233 2 0 2
  • 1 D.System
  • 14 HGJ CERT
  • 95 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
23-Jul-2024
Comissioning
0
  • 27-Mar-2024 CWR
  • 23-Jul-2024 D.System
  • 25-Jul-2024 Comissioning
Total Mahoba 349 5 5 4 3 3 216 215 0 0 1125 1115 99%
+0
342
97.99 100.00 5 15 / 3 100.00 5 30 / 3
+0
0 / 0
0 / 0 132
+0
132
0 0 0 0 0
  +0
132 | 132
132 0 / 0 97 / 3 112 -- -- -- 5 5 15 76 5 5 11 76 -- 987 0 132 0 11 121 40 26 3 + 0 + 1 + 0 + 3 = 7 3 + 0 + 1 + 0 + 3 = 7 29755 208285 892650 31743 106.68% 177108 700842 56
+0
56
+0
56
56 3191.09
+0.00
3186.24
349 118275 348
+ 0
331
118099 0 0 99.85
+0
59 / 59
+0
349 / 337
125817.00
+0.00 / +0.00
110553.14
87.87% 1 2 4 812 430 382 34 1 33
8 Mirzapur GVPR


8152576 Leduki GOV 124 01-Jan-2024 1 1 1 1 124 124 0 0 120 120 100%
+0
124
100 100.00 Yes 2 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 0 Integrated Not Verified Verified 0 2 Not Verified Verified 0 2 Verification Remarks Minutes of Meeting 87 0 12 0 1 11 7 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 7061 49427 211830 5904 83.61% 20888 105799 5
+0
5
+0
5
5 764.43
+0.00
879.84
124 22530 124
+ 0
124
22530 0 0 100.00
+0
6 / 6
+0
124 / 124
26901.00
+0.00 / +0.00
24195.69
89.94% 137 100 37 0 0 0
  • 100 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Oct-2023
Comissioning
0
  • 31-Jul-2023 WTP
  • 15-Oct-2023 OHT
  • 31-Oct-2023 CWR
  • 31-Oct-2023 D.System
  • 31-Dec-2023 Comissioning
  • 125 Villages
  • 33724 Households
  • 0 Last Week FHTC Given
  • 33649 FHTC Given
  • 99 FHTC(%)
  • 75 Balance FHTC
  • 122 HGJ
  • 120 HGJ Certified
  • 96.00 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 49 Handed Over Villages(before Portal)
  • 43 Handed Over Initiated/Approved On Portal
  • 73.60 Handed Over %
  • 0 OHT Required
  • 0 OHT Completed
  • Scheme Wise Category A
  • 1 No. of Schemes
  • 2 No. of Villages
  • Scheme Wise Category B
  • 53 No. of Schemes
  • 89 No. of Villages
  • Scheme Wise Category C
  • 23 No. of Schemes
  • 34 No. of Villages
  • Village Wise Category A
  • 2 No. of Villages
  • Village Wise Category B
  • 85 No. of Villages
  • Village Wise Category C
  • 38 No. of Villages
  • Village Wise Total
  • 125 Total No. of Villages
  • 77 Total No. of Schemes
  • 125 Total No. of Villages
  • 79 Total No. of OHT
  • 1 Schemes Sent to O&M
  • 1 No. of OHT in O&M Schemes
  • 161 Water Demand(M3)
  • 5765.00 Water Supply (M3)
  • 53 Agreement Done Scheme
  • 90 Agreement Done Village
Megha


8152518 Talar GOV 86 01-Aug-2024 1 1 1 1 86 85 0 0 54 54 100%
+0
86
100 100.00 Yes 2 / 1 100.00 Yes 4 / 1
+0
0 / 0
0 / 0 15
+15
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 25 / 1 15 Integrated Off Verified Verified 3 0 Verified Verified 3 0 Verification Remarks Minutes of Meeting 135 0 15 0 0 15 6 5 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 4720 33040 141600 3607 76.42% 22209 101776 6
+0
0
+0
6
6 972.11
+0.00
972.11
86 20367 86
+ 0
86
20367 0 0 100.00
+0
8 / 8
+0
86 / 85
20345.00
+0.00 / +0.00
19327.19
95.00% Yes 140 128 12 0 0 0
  • 78 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
20-May-2023
Comissioning
0
  • 27-Jul-2022 Intake
  • 10-Oct-2022 WTP
  • 22-Apr-2023 OHT
  • 17-May-2023 CWR
  • 20-May-2023 D.System
  • 20-Dec-2023 Comissioning
8153309 Gothaura GOV 142 01-Aug-2024 1 1 1 1 141 138 0 0 149 149 100%
+0
141
99 0.00 No 3 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 5 / 0 12 Integrated Off Verified Verified 0 0 Verified Verified 0 0 Verification Remarks Minutes of Meeting 172 0 12 0 2 10 6 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 8458 59206 253740 6244 73.82% 33456 153185 7
+0
0
+0
7
7 723.50
+0.00
723.50
142 29745 141
+ 0
141
29745 0 0 100.00
+0
8 / 8
+0
142 / 139
20152.00
+0.00 / +0.00
17788.70
88.27% Yes 122 107 15 0 0 0
  • 1 HGJ
  • 1 HGJ CERT
  • 119 HOV
Intake
0
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
29-Apr-2023
Comissioning
0
  • 24-Jul-2023 WTP
  • 11-Jul-2023 T/W
  • 08-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 29-Apr-2023 D.System
  • 29-Feb-2024 Comissioning
8153338 Dhauha GOV 215 01-Aug-2024 1 1 1 1 213 211 0 0 276 276 100%
+0
213
99 100.00 Yes 5 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 10 / 0 25 Integrated Off Verified Verified 0 0 Verified Verified 0 0 Verification Remarks Minutes of Meeting 184 0 25 0 1 24 18 1 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 14225 99575 426750 6330 44.50% 44652 217306 11
+0
0
+0
11
11 1327.06
+0.00
1327.06
215 42736 212
+ 0
203
42734 0 0 100.00
+0
13 / 13
+0
215 / 213
40622.00
+0.00 / +0.00
39537.71
97.33% Yes 231 208 23 0 0 0
  • 2 FHTC
  • 3 HGJ
  • 12 HGJ CERT
  • 175 HOV
Intake
Functional
WTP
Functional
T/W
Not available
OHT
Completed
CWR
Completed
D.System
24-Sep-2023
Comissioning
0
  • 22-Jul-2022 Intake
  • 13-Oct-2022 WTP
  • 11-Jul-2023 T/W
  • 20-Aug-2023 OHT
  • 31-Mar-2023 CWR
  • 24-Sep-2023 D.System
  • 29-Feb-2024 Comissioning
Agency Total 443 3 3 3 3 440 434 0 0 479 479 100% 440 200.00 10 / 3 300.00 6 / 3
+0
0 / 0
0 / 0 52
+15
52
0 0 0 0 0
  +0
52 | 52
52 0 / 0 40 / 1 52 -- -- -- 3 3 3 0 3 3 3 0 -- 491 0 52 0 3 49 30 6 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 27403 191821 822090 16181 59.05% 100317 472267 24
+0
0
+0
24
24 3022.67
+0.00
3022.67
443 92848 439
+ 0
430
92846 0 0 100
+0
29 / 29
+0
443 / 437
81119.00
+0.00
76653.60
94% 493 443 50 0 0 0
NCC Ltd.


8010572 Ahugi Kalan GOV 159 01-Jan-2024 1 1 1 1 159 159 0 0 33 33 100%
+0
159
100 100.00 Yes 2 / 0 100.00 Yes 2 / 0
+0
0 / 0
0 / 0 30
+0
25
0 0 0 0 0
  +0
0 | 25
25 0 / 0 25 / 0 25 Integrated Verified Verified 9 25 Verified Verified 9 25 Verification Remarks Minutes of Meeting 41 0 30 0 0 30 0 0 0 + 1 + 0 + 0 + 0 = 1 0 + 1 + 0 + 0 + 0 = 1 11587 81109 347610 10984 94.80% 75960 345942 9
+0
9
+0
9
9 1582.00
+0.00
1582.00
159 31881 159
+ 0
158
31881 0 0 100.00
+0
9 / 9
+0
159 / 159
32828.00
+0.00 / +0.00
29161.44
88.83% Yes Yes 159 111 48 0 0 0
  • 5 OHT
  • 1 HGJ CERT
  • 130 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
31-Jul-2023
Comissioning
Commissioning under progress
  • 09-Aug-2022 Intake
  • 17-Aug-2022 WTP
  • 31-Jul-2023 OHT
  • 02-Mar-2023 CWR
  • 31-Jul-2023 D.System
  • 15-Jul-2024 Comissioning
8011637 Mahadev GOV 255 01-Jan-2024 1 1 1 1 254 254 0 0 14 14 100%
+0
254
100 100.00 Yes 2 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 25
+0
25
0 0 0 0 0
  +0
25 | 25
25 0 / 0 25 / 0 25 Integrated Verified Verified 6 5 Verified Verified 6 4 Verification Remarks Minutes of Meeting 54 0 25 0 0 25 0 2 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 11812 82684 354360 12501 105.83% 71083 333800 7
+0
7
+0
7
7 1464.00
+0.00
1464.00
255 35318 254
+ 0
251
35318 0 0 100.00
+0
7 / 7
+0
255 / 255
33415.00
+0.00 / +0.00
29965.10
89.68% Yes Yes 251 199 52 0 0 0
  • 1 HGJ
  • 4 HGJ CERT
  • 190 HOV
Intake
Functional
WTP
Functional
T/W
0
OHT
Functional
CWR
Functional
D.System
30-Jun-2023
Comissioning
Trial run is U/P.
  • 31-Aug-2022 Intake
  • 31-Aug-2022 WTP
  • 30-Jun-2023 OHT
  • 30-Dec-2022 CWR
  • 30-Jun-2023 D.System
  • 15-May-2024 Comissioning
Agency Total 414 2 2 2 2 413 413 0 0 47 47 100% 413 200.00 4 / 0 200.00 8 / 0
+0
0 / 0
0 / 0 55
+0
50
0 0 0 0 0
  +0
25 | 50
50 0 / 0 50 / 0 50 -- -- -- 2 2 15 30 2 2 15 29 -- 95 0 55 0 0 55 0 2 0 + 1 + 0 + 0 + 0 = 1 0 + 1 + 0 + 0 + 0 = 1 23399 163793 701970 23485 100.37% 147043 679742 16
+0
16
+0
16
16 3046.00
+0.00
3046.00
414 67199 413
+ 0
409
67199 0 0 100
+0
16 / 16
+0
414 / 414
66243.00
+0.00
59126.54
89% 410 310 100 0 0 0
GA INFRA


8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 305 01-Feb-2024 1 1 1 1 305 297 0 0 234 234 100%
+0
298
98 100.00 Yes 4 / 0 100.00 Yes 6 / 0
+0
98 / 98
97 / 0 102
+0
102
0 0 0 0 0
  +0
102 | 102
102 0 / 0 100 / 0 99 Integrated Off Verified Not Verified 1 2 Not Verified Not Verified 0 2 Verification Remarks Minutes of Meeting 305 0 102 14 12 76 22 9 0 + 1 + 0 + 3 + 0 = 4 0 + 1 + 0 + 5 + 0 = 6 18295 128065 548850 15558 85.04% 96708 338852 2
+0
2
+0
2
2 1851.89
+0.00
1810.28
305 75783 303
+ 0
296
75306 0 0 99.37
+0
101 / 101
+0
302 / 296
6563.00
+0.00 / +0.00
5783.01
88.12% 733 565 168 0 0 0
  • 41 D.System
  • 3 COV
  • 477 FHTC
  • 2 HGJ
  • 9 HGJ CERT
  • 279 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
01-Feb-2024
Comissioning
0
  • 25-Aug-2023 OHT
  • 01-Feb-2024 D.System
  • 20-Aug-2023 Comissioning
Multiurban


8282154 Manikpur GOV 63 01-Mar-2024 1 1 1 1 63 60 0 0 23 23 100%
+0
58
92 100.00 Yes 1 / 1 100.00 Yes 1 / 1
+0
0 / 0
0 / 0 5
+0
5
0 0 0 0 0
  +0
5 | 5
5 0 / 0 4 / 2 0 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 65 0 5 0 5 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 1
+0
0
+0
1
1 248.50
+0.00
248.50
63 9280 61
+ 0
58
9111 0 0 98.18
+0
2 / 2
+0
61 / 57
6498.00
+0.00 / +0.00
5588.21
86.00% 37 21 16 0 0 0
  • 2 COV
  • 169 FHTC
  • 2 HGJ
  • 5 HGJ CERT
  • 63 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 30-Jul-2023 OHT
  • 31-Dec-2023 Comissioning
Ramky baba


8152635 Danti GOV and Tubewell Scheme 42 Nos. 261 15-Feb-2024 1 1 1 1 263 262 0 0 168 168 100%
+0
257
98 100.00 Yes 2 / 2 100.00 Yes 2 / 2
+0
42 / 42
84 / 83 48
+48
48
0 0 0 0 0
  +0
48 | 48
48 0 / 0 97 / 96 95 Integrated Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 160 0 48 0 0 48 14 13 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 16245 113715 487350 18468 113.68% 129274 548582 2
+0
0
+0
2
2 1344.50
+0.00
1344.50
261 43416 259
+ 0
250
43280 0 0 99.69
+0
46 / 46
+0
259 / 241
12983.00
+0.00 / +0.00
12143.57
93.53% 373 250 123 0 0 0
  • 2 COV
  • 136 FHTC
  • 2 HGJ
  • 11 HGJ CERT
  • 240 HOV
Intake
100% Complete
WTP
100% Complete
T/W
All complete
OHT
Completed
CWR
completed
D.System
15-Aug-2023
Comissioning
Commissioning under progress
  • 26-Apr-2023 Intake
  • 02-Mar-2023 WTP
  • 20-Jun-2023 T/W
  • 10-Aug-2023 OHT
  • 18-Jun-2022 CWR
  • 15-Aug-2023 D.System
  • 30-Sep-2023 Comissioning
Total Mirzapur 1608 9 9 9 9 9 1608 1590 0 0 1069 1065 100%
+0
1590
98.88 94.44 8 23 / 6 100.00 9 23 / 6
+0
140 / 140
181 / 83 274
+0
269
0 0 0 0 0
  +0
244 | 269
269 0 / 0 291 / 99 296 -- -- -- 6 6 19 34 5 6 18 34 -- 1203 0 274 14 21 239 73 31 0 + 2 + 0 + 3 + 0 = 5 0 + 2 + 0 + 5 + 0 = 7 92404 646828 2772120 79596 86.14% 494231 2145243 50
+0
23
+0
50
50 10277.99
+0.00
10351.79
1608 311056 1599
+ 0
1567
310272 0 0 99.75
+0
200 / 200
+0
1603 / 1569
200307.00
+0.00 / +0.00
183490.62
91.60% 2 0 0 2183 1689 494 0 0 0
9 Sonbhadra GVPR


8175161 Jhilo/ Bijpur GOV 179 0 0 0 0 0 0 0 0 20 19 95%
+0
161
90 100.00 Yes 9 / 1 100.00 Yes 23 / 1
+0
0 / 0
0 / 0 27
+3
27
0 0 0 0 1
  +0
26 | 26
25 0 / 0 30 / 0 22 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 385 0 27 4 11 12 12 0 0 + 10 + 0 + 6 + 0 = 16 0 + 88 + 0 + 15 + 0 = 103 7708 53956 231240 508 6.59% 812 3183 16
+0
16
+0
16
14 3904.00
+0.00
3893.00
179 66179 147
+ 0
64
60664 0 1052 91.67
+0
14 / 14
+0
145 / 61
74794.00
+0.00 / +0.00
56485.42
75.52% 191 142 49 0 0 0
  • 1 OHT
  • 11 D.System
  • 26 COV
  • 5515 FHTC
  • 32 HGJ
  • 115 HGJ CERT
  • 175 HOV
Intake
0
WTP
0
T/W
0
OHT
3 Nos New OHTs work as per Revised DPR.
CWR
2 nos CWR new locations as per revised DPR.
D.System
31-Aug-2025
Comissioning
0
  • 28-Feb-2023 Intake
  • 20-Mar-2023 WTP
  • 31-Jan-2025 OHT
  • 30-May-2025 CWR
  • 31-Aug-2025 D.System
  • 30-Sep-2025 Comissioning
  • 81 Villages
  • 18019 Households
  • 0 Last Week FHTC Given
  • 17374 FHTC Given
  • 96 FHTC(%)
  • 645 Balance FHTC
  • 78 HGJ
  • 51 HGJ Certified
  • 62.96 HGJ Certified %
  • 0 Last Week HGJ Certified
  • 11 Handed Over Villages(before Portal)
  • 33 Handed Over Initiated/Approved On Portal
  • 54.32 Handed Over %
  • 1 OHT Required
  • 1 OHT Completed
  • Scheme Wise Category A
  • 0 No. of Schemes
  • 0 No. of Villages
  • Scheme Wise Category B
  • 19 No. of Schemes
  • 53 No. of Villages
  • Scheme Wise Category C
  • 1 No. of Schemes
  • 1 No. of Villages
  • Village Wise Category A
  • 0 No. of Villages
  • Village Wise Category B
  • 43 No. of Villages
  • Village Wise Category C
  • 11 No. of Villages
  • Village Wise Total
  • 54 Total No. of Villages
  • 20 Total No. of Schemes
  • 54 Total No. of Villages
  • 23 Total No. of OHT
  • 0 Schemes Sent to O&M
  • 0 No. of OHT in O&M Schemes
  • 0 Water Demand(M3)
  • 2466.58 Water Supply (M3)
  • 19 Agreement Done Scheme
  • 53 Agreement Done Village
Larsen & Toubro Ltd


8010143 Parasi GOV 29 27-Aug-2024 1 1 1 1 29 29 0 0 83 83 100%
+0
29
100 100.00 Yes 2 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 15
+0
15
0 0 0 0 0
  +0
15 | 15
15 0 / 0 15 / 0 5 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 270 0 15 1 3 11 6 0 0 + 2 + 0 + 0 + 0 = 2 0 + 2 + 0 + 0 + 0 = 2 6899 48293 206970 3185 46.17% 8630 77009 9
+0
9
+0
9
9 744.00
+0.00
744.00
29 19081 29
+ 0
23
19081 0 0 100.00
+0
9 / 9
+0
29 / 29
13244.00
+0.00 / +0.00
12038.37
90.90% 60 46 14 0 0 0
  • 6 HGJ CERT
  • 28 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
D.System
31-Aug-2023
Comissioning
0
  • 30-Apr-2023 Intake
  • 30-Jul-2023 WTP
  • 30-Nov-2023 OHT
  • 31-Aug-2023 D.System
  • 15-Dec-2023 Comissioning
8175086 Amawar GOV 58 0 0 0 0 0 0 0 0 63 63 100%
+0
52
90 100.00 No 1 / 1 100.00 No 1 / 1
+0
0 / 0
0 / 0 7
+0
7
0 0 0 0 0
  +0
7 | 7
3 0 / 0 7 / 0 7 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 7 7 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 3
+0
3
+0
3
3 616.21
+0.00
602.40
58 15616 18
+ 0
0
10361 0 0 66.35
+0
4 / 4
+0
0 / 0
23765.00
+0.00 / +0.00
14554.39
61.24% 19 19 0 0 0 0
  • 13 D.System
  • 58 COV
  • 5255 FHTC
  • 40 HGJ
  • 58 HGJ CERT
  • 58 HOV
Intake
Completed
WTP
Completed.
T/W
NA
OHT
All OHT works completed.
CWR
Completed.
D.System
31-Jan-2024
Comissioning
Phase wise commissioning works will start after the availability of Water in the Kanhar Dam.
  • 31-Dec-2022 Intake
  • 15-Dec-2023 WTP
  • 31-Oct-2023 OHT
  • 28-Feb-2023 CWR
  • 31-Jan-2024 D.System
8177926 Gurmura GOV 8 0 0 0 0 0 0 0 0 10 10 100%
+0
8
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+2
7
2 2 0 0 0
  +0
5 | 5
5 0 / 0 5 / 0 5 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 10 10 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 4
+0
3
+0
3
3 610.00
+0.00
610.00
8 8051 0
+ 0
0
6607 0 0 82.06
+0
4 / 4
+0
2 / 1
12483.00
+0.00 / +0.00
9158.15
73.36% 15 10 5 0 0 0
  • 5 OHT
  • 1 CWR
  • 6 COV
  • 1444 FHTC
  • 8 HGJ
  • 8 HGJ CERT
  • 8 HOV
Intake
Completed. It is also in functional stage. Commissioning has been started.
WTP
Work Is In Progress. It is also in functional stage.
T/W
NA
OHT
5 Nos OHTs Completed. Commissioning works also completed.
CWR
3 Nos Completed. 3 Nos Commissioning works also Completed.
D.System
31-Dec-2023
Comissioning
2 Village is commissioned.
  • 30-Jun-2023 Intake
  • 31-Jan-2024 WTP
  • 30-Jun-2023 OHT
  • 30-Jul-2023 CWR
  • 31-Dec-2023 D.System
  • 16-Aug-2023 Comissioning
8182027 Panari GOV 6 0 0 0 0 0 0 0 0 1 1 100%
+0
6
100 100.00 Yes 3 / 0 100.00 Yes 6 / 0
+0
0 / 0
0 / 0 11
+1
6
1 3 0 0 0
  +0
3 | 3
3 0 / 0 3 / 0 3 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 11 11 0 0 0 0 1 + 1 + 0 + 0 + 0 = 2 1 + 1 + 0 + 0 + 0 = 2 0 0 0 0 0% 0 0 3
+0
2
+0
2
2 306.24
+0.00
306.24
6 8465 0
+ 0
0
6055 0 0 71.53
+0
3 / 3
+0
2 / 2
11871.00
+0.00 / +0.00
6990.66
58.89% 6 5 1 0 0 0
  • 8 OHT
  • 1 CWR
  • 4 COV
  • 2410 FHTC
  • 6 HGJ
  • 6 HGJ CERT
  • 6 HOV
Intake
Completed. Intake Well is in functional stage.
WTP
Finishing works in progress. Pre Commissioning Completed. Water Supply is in progress.
T/W
0
OHT
Commissioning works completed.
CWR
Commissioning Completed.
D.System
16-Aug-2023
Comissioning
Panari & Bairpur Villages are Commissioned.
  • 31-Jul-2023 Intake
  • 30-Sep-2023 WTP
  • 30-Sep-2023 OHT
  • 16-Aug-2023 D.System
  • 31-Jul-2023 Comissioning
Agency Total 101 1 1 1 1 29 29 0 0 157 157 100% 95 400.00 6 / 1 400.00 17 / 1
+0
0 / 0
0 / 0 43
+3
35
3 5 0 0 0
  +0
30 | 30
26 0 / 0 30 / 0 20 -- -- -- 0 0 0 0 0 0 0 0 -- 270 0 43 29 3 11 6 0 1 + 3 + 0 + 0 + 0 = 4 1 + 3 + 0 + 0 + 0 = 4 6899 48293 206970 3185 46.17% 8630 77009 19
+0
17
+0
17
17 2276.45
+0.00
2262.64
101 51213 47
+ 0
23
42104 0 0 82
+0
20 / 20
+0
33 / 32
61363.00
+0.00
42741.57
70% 100 80 20 0 0 0
NCC Ltd.


8338933 Patwadh GOV 658 0 0 0 0 0 0 0 0 194 191 98%
+0
604
92 100.00 Yes 5 / 0 100.00 Yes 10 / 0
+0
0 / 0
0 / 0 55
+4
55
1 0 0 0 1
  +0
54 | 54
46 0 / 0 47 / 0 0 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 355 0 55 1 52 2 0 2 0 + 0 + 0 + 6 + 0 = 6 0 + 0 + 0 + 9 + 0 = 9 148 1036 4440 269 181.76% 1393 21841 15
+0
15
+0
15
12 3885.16
+0.00
3451.05
658 103482 190
+ 3
18
96484 0 1690 93.24
+0
16 / 5
+0
273 / 45
99181.00
+0.00 / +0.00
69197.25
69.77% 260 247 13 0 0 0
  • 1 OHT
  • 434 D.System
  • 388 COV
  • 11 Electricity
  • 6998 FHTC
  • 468 HGJ
  • 640 HGJ CERT
  • 654 HOV
Intake
With all finishing work 30/04/2025
WTP
With all finishing work 30/04/2025
T/W
0
OHT
With all finishing work 30/08/2025 (WL)
CWR
With all finishing work 20/06/2025 (WL)
D.System
30-Aug-2025
Comissioning
30/09/2025
  • 30-Apr-2025 Intake
  • 30-Apr-2025 WTP
  • 30-Apr-2024 T/W
  • 30-Aug-2025 OHT
  • 20-Jun-2025 CWR
  • 30-Aug-2025 D.System
  • 30-Sep-2025 Comissioning
Jain Const.


8175315 Kewatha GOV 12 01-Apr-2024 1 1 1 1 12 12 0 0 8 8 100%
+0
12
100 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 12
+0
12
0 0 0 0 0
  +0
12 | 12
12 0 / 0 0 / 0 Integrated Off Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 221 0 12 0 12 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 2822 4383 7
+0
7
+0
7
7 645.00
+0.00
645.00
12 9045 12
+ 0
11
9045 0 0 100.00
+0
8 / 8
+0
12 / 12
11940.00
+0.00 / +0.00
10327.61
86.50% Yes 21 14 7 0 0 0
  • 1 HGJ CERT
  • 11 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Mar-2023 Comissioning
VPRPL


8175013 Nagawan GOV 46 15-Jul-2024 1 0 0 0 0 0 0 0 21 21 100%
+0
42
91 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 8
+0
8
0 0 0 0 0
  +0
8 | 8
8 0 / 0 0 / 0 8 Integrated Off Verified Verified 0 2 Verified Verified 0 2 Verification Remarks Minutes of Meeting 111 0 8 0 5 3 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 2 + 0 = 2 886 6202 26580 274 30.93% 2149 8357 4
+0
4
+0
4
4 1808.21
+0.00
1808.21
46 7268 46
+ 0
33
7268 0 0 100.00
+0
5 / 5
+0
44 / 37
9472.00
+0.00 / +0.00
8107.35
85.59% 16 14 2 0 0 0
  • 13 HGJ CERT
  • 44 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 19-Feb-2023 Intake
  • 19-Feb-2023 WTP
  • 31-Aug-2023 Comissioning
8175050 Tenduahi GOV 80 15-Jul-2024 0 0 0 0 0 0 0 0 64 63 98%
+0
78
98 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+0
9
0 0 0 0 0
  +0
9 | 9
9 0 / 0 0 / 0 5 Integrated Off Not Verified Verified 0 0 Not Verified Verified 0 0 Verification Remarks Minutes of Meeting 98 0 9 0 3 6 2 3 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 2865 20055 85950 3945 137.70% 17574 75763 4
+0
4
+0
4
4 573.87
+0.00
571.68
80 12757 79
+ 0
68
12743 0 0 99.89
+0
5 / 5
+0
80 / 76
12858.00
+0.00 / +0.00
11273.82
87.68% 58 50 8 0 0 0
  • 2 D.System
  • 14 FHTC
  • 1 HGJ
  • 12 HGJ CERT
  • 71 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175110 Belahai GOV 206 0 0 0 0 0 0 0 0 33 33 100%
+0
180
87 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 9
+2
9
2 0 0 1 1
  +0
7 | 7
7 0 / 0 0 / 0 7 Integrated Off Not Verified Not Verified 0 0 Not Verified Not Verified 0 0 Verification Remarks Minutes of Meeting 93 0 9 2 1 6 2 4 0 + 3 + 1 + 5 + 4 = 13 0 + 3 + 2 + 15 + 4 = 24 4768 33376 143040 5372 112.67% 17943 161566 5
+0
5
+0
5
5 1421.64
+0.00
1418.76
206 19691 183
+ 0
133
19586 0 0 99.47
+0
6 / 6
+0
197 / 168
23145.00
+0.00 / +0.00
18389.59
79.45% 201 187 14 0 0 0
  • 2 OHT
  • 2 D.System
  • 9 COV
  • 105 FHTC
  • 23 HGJ
  • 73 HGJ CERT
  • 150 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Aug-2023 Comissioning
8175262 Harra GOV 44 20-Jun-2024 0 0 0 0 0 0 0 0 51 51 100%
+0
42
95 100.00 Yes 0 / 0 100.00 Yes 0 / 0
+0
0 / 0
0 / 0 10
+0
10
0 0 0 0 0
  +0
10 | 10
10 0 / 0 0 / 0 10 Integrated Not Verified Not Verified Not Verified Not Verified Verification Remarks Minutes of Meeting 0 0 10 0 10 0 0 0 0 + 0 + 0 + 1 + 0 = 1 0 + 0 + 0 + 2 + 0 = 2 0 0 0 0 0% 0 0 6
+0
6
+0
6
6 918.46
+0.00
918.46
44 17677 44
+ 0
43
17669 0 0 99.95
+0
7 / 7
+0
44 / 42
18231.00
+0.00 / +0.00
15740.88
86.34% 42 37 5 0 0 0
  • 8 FHTC
  • 1 HGJ CERT
  • 32 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
  • 31-Jul-2023 Comissioning
8175280 Kadara GOV 4 1 0 0 0 0 0 0 0 0 0 0%
+0
0
0 100.00 Yes 1 / 0 100.00 Yes 1 / 0
+0
0 / 0
0 / 0 3
+0
3
0 0 0 1 0
  +0
2 | 2
0 0 / 0 1 / 0 0 Not Integrated Not Verified Not Verified Not Verified Not Verified Minutes of Meeting 0 0 3 3 0 0 0 0 0 + 0 + 0 + 0 + 0 = 0 0 + 0 + 0 + 0 + 0 = 0 0 0 0 0 0% 0 0 1
+0
1
+0
1
1 102.16
+0.00
95.84
4 1168 1
+ 0
0
515 0 0 44.09
+0
2 / 0
+0
1 / 0
2971.00
+0.00 / +0.00
2812.91
94.68% 3 2 1 0 0 0
  • 1 OHT
  • 6 D.System
  • 3 COV
  • 2 Electricity
  • 653 FHTC
  • 3 HGJ
  • 4 HGJ CERT
  • 4 HOV
Intake
0
WTP
0
T/W
0
OHT
0
CWR
0
Comissioning
0
Agency Total 380 2 0 0 0 0 0 0 0 169 168 99% 342 500.00 1 / 0 500.00 1 / 0
+0
0 / 0
0 / 0 39
+2
39
2 0 0 2 1
  +0
36 | 36
34 0 / 0 1 / 0 30 -- -- -- 1 2 0 2 1 2 0 2 -- 302 0 39 5 19 15 4 7 0 + 3 + 1 + 7 + 4 = 15 0 + 3 + 2 + 19 + 4 = 28 8519 59633 255570 9591 112.58% 37666 245686 20
+0
20
+0
20
20 4824.34
+0.00
4812.95
380 58561 353
+ 0
277
57781 0 0 99
+0
25 / 23
+0
366 / 323
66677.00
+0.00
56324.55
84% 320 290 30 0 0 0
Total Sonbhadra 1305 5 4 2 2 2 41 41 0 0 546 541 99%
+0
1214
93.03 100.00 11 21 / 2 100.00 11 51 / 2
+0
0 / 0
0 / 0 176
+0
168
6 5 0 2 3
  +0
158 | 158
143 0 / 0 108 / 0 72 -- -- -- 1 2 0 2 1 2 0 2 -- 1533 0 176 39 97 40 22 9 1 + 16 + 1 + 19 + 4 = 41 1 + 94 + 2 + 43 + 4 = 144 23276 162932 698280 13553 58.23% 51323 352102 77
+0
75
+0
75
70 15534.95
+0.00
15064.64
1305 288480 749
+ 3
393
266078 0 366 92.23
+0
83 / 70
+0
829 / 473
313955.00
+0.00 / +0.00
235076.40
74.88% 0 1 0 892 773 119 0 0 0
Project Completion Plan

Minutes of Meeting Date -