All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bajpur Kumarikha scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Bajpur Kumarikha scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of BARENG scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Bareng scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
ANWAS DUGAIYA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME
2
2
2420
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Anwas Dugaiya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Anwas Digaiya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Astoli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Astoli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bamrauli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Bamrauli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Barilalpur scheme have been checked and verified. The submitted records are recommended and forwarded for further
All information on the portal for the completion certificate of Barilalpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bauri scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Bauri scheme has been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
BHARTAPUR GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME
2
2
2269
2022
2037
2052
24-Dec-2023
31-Dec-2024
24-Mar-2024
06-Dec-2024
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhartapur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Bhartapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhatiura scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Bhatiura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
BHAWALKHERA GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME
1
1
2260
2022
2037
2052
31-Dec-2024
20-Aug-2024
19-Nov-2024
06-Dec-2024
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhawalkhera scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Bhawalkhera scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Biharipur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Biharipur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Birhampur Jhajharia scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Birahampur Jhajharia scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Chaharpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Chaharpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
CHHIDKURI GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME
1
6
2790
2022
2037
2052
19-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Chidkuri scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Chhidkuri scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Chikatiya scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Chikatiya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Daulatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Daulatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Dhakia Elaqua Parwaizpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
As per SWSM letter no. 3331/SE/QAP/2023-24, dated- 26.10.2023. Instead of Single curved sheet TKC has used twins sheets During erection of Zi-Al Tanks, replace the same with in 15 days.
As per TKC undertaking letter no.NCC/DWSM/SHAHJAHANPUR /69/2025-26.TKC has assured the pendency of work will be completed by 15.09.25.
All information on the portal for the completion certificate of Dhakiya Elaqua Parwaizpurscheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Dharampur Kanja scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Dharmpur Kanja scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Diuras scheme have been checked and verified. The submitted records are recommended and forwarded for further.
As per SWSM letter no. 3331/SE/QAP/2023-24, dated- 26.10.2023. Instead of Single curved sheet TKC has used twins sheets During erection of Zi-Al Tanks, replace the same with in 15 days
All information on the portal for the completion certificate of Diuras scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Dudhauna scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Dudhauna scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of ENDEYPUR W/S scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Endeypur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Etaura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Etaura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Gariya Chhavi scheme have been checked and verified. The submitted records are recommended and forwarded for further
All information on the portal for the completion certificate of Gariya Chhavi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Gowar Sanda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Project completion certificate of Gowar Sanda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Gulam khera scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Gulam Kheda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of GURGAVA scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Gurgawan scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Husenpur Kavra scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Husenpur Kavra scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Janyuri scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Janyuri scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Jathiura scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Jathiura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kajri Noorpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Kajri Noorpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kapoor Nagla scheme have been checked and verified. The submitted records are recommended and forwarded for further
All information on the portal for the completion certificate of Kapoor Nagla scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kari Makuapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Kari Makuapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kathpura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Kathpura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Katia Rajjab scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Katiya Rajjab scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Khandsar scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Khandsar scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of MAHMOODPUR scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Mahmoodpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mahau Durgu scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Mahau Durgu scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
MALUAPUR GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME
1
2
3230
2022
2037
2052
19-Aug-2024
21-Dec-2024
18-Nov-2024
06-Dec-2024
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Maluapur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Malupur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Manorathpur Sah Sowari scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Manorathpur Shah Sowari scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mareena scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Mareena scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Miyuna scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Miyuna scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of MOHAMADPUR GULERIYA scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Mohammadpur Guleriya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mohanpur Kaluapur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of MOHANPUR KALUAPUR scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
MUDIA KALAN GRAM PANCHAYAT I VILLAGE WATER SUPPLY SCHEME
1
2
1840
2022
2037
2052
17-Aug-2024
31-Dec-2024
16-Nov-2024
06-Dec-2024
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mudia Kalan scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Mudiya Kalan scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Munavwar Ganj Urf Barenda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Munawarganj urf barenda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mundiya Aas scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Mundiya Aas scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
MURHA HARIS GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME
1
1
2260
2022
2037
2052
09-Aug-2023
31-Dec-2024
08-Nov-2023
06-Dec-2024
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Murha Haris scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Murha Haris scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Nadiaya Rampur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of NADIAYA RAMPUR Jatipur W/s scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Nagariya Bujurg have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Nagariya Bujurg scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Noorpur Nursuiya scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Noorpur Narsuiya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Paliya Patti scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Paliya Patti scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Panthi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Panthi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Raghunathpur J Rampur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Raghunathpur J. Rampur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of RAGHUNATHPUR KHAS scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Raghunathpur Khas scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Rajepur Raipur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Rajepur Raipur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Rampur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Rampur W/s scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Rujaari scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Rpujari scheme has been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of SAFTYARA scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Saftyara scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sahora scheme have been checked and verified. The submitted records are recommended and forwarded for further
All information on the portal for the completion certificate of Sahora scheme has been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
SALEMPUR BUZURG GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME
4
4
2000
2022
2037
2052
31-Dec-2024
30-Sep-2023
30-Dec-2023
06-Dec-2024
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Salempur Buzurg scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Salempur Bujurg scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of SALLIA scheme have been checked and verified. The submitted records are recommended and forwarded for further.
As per SWSM letter no. 3331/SE/QAP/2023-24, dated- 26.10.2023. Instead of Single curved sheet TKC has used twins sheets During erection of Zi-Al Tanks, replace the same with in 15 days.
As per TKC undertaking letter no.NCC/DWSM/SHAHJAHANPUR /69/2025-26.TKC has assured the pendency of work will be completed by 15.09.25.
All information on the portal for the completion certificate of Sallia scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sisnai scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All information on the portal for the completion certificate of Sisnai scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sisori scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Sisori scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sujatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Sujatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
SUTHA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME
2
2
2745
2022
2037
2052
30-Sep-2023
31-Dec-2024
30-Dec-2023
06-Dec-2024
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sutha scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Sutha scheme has been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Tihar Ajanpur scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Tihar Ajanpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.
All documents uploaded on the portal for the Operation and Maintenance (O&M) of Umraha scheme have been checked and verified. The submitted records are recommended and forwarded for further.
All information on the portal for the completion certificate of Umraha scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions.