Project Completion Certificate Details

Sr. No. District Name Agency Name Scheme Code Scheme Name Covered Villages Covered Habitations Covered Population Base Year Intermediate Year Design Year Contract Completion Date Actual Completion Date Trial Run Date O&M Start Date TPI Fill Status TPI Remark EE Status EE Remark View
1 Ambedkar Nagar Vindhya-GAJA (JV) 20019804 Aama & Kardaspur 2 6 2230 2023 2038 2053 03-Aug-2023 20-Jul-2024 05-Dec-2024 06-Dec-2024 Checked and found ok Scheme completed View
2 Ambedkar Nagar Vindhya-GAJA (JV) 20019914 Adhanpur 1 10 5390 2023 2038 2053 03-Aug-2023 20-Dec-2024 20-Mar-2025 21-Mar-2025 checked and found ok Scheme completed View
3 Ambedkar Nagar Vindhya-GAJA (JV) 20026068 AINWA WATER SUPPLY SCHEME 1 3 3600 2023 2038 2053 28-Sep-2023 28-Sep-2024 18-Feb-2025 19-Feb-2025 Scheme completed and ready for O&M Scheme completed View
4 Ambedkar Nagar Vindhya-GAJA (JV) 20026106 AKTHARA NARAYANPUR WATER SUPPLY SCHEME 3 3 2630 2023 2038 2053 28-Sep-2023 28-Sep-2024 08-Feb-2025 09-Feb-2025 Checked and found ok SCHEME COMPLETED View
5 Ambedkar Nagar Vindhya-GAJA (JV) 20026069 ALAWALPUR WATER SUPPLY SCHEME 1 6 2340 2023 2038 2053 28-Sep-2023 30-Jun-2024 30-Sep-2023 01-Oct-2024 Checked and found OK Scheme completed View
6 Ambedkar Nagar Vindhya-GAJA (JV) 20026029 AMAULI MOHIDDINPUR WATER SUPPLY SCHEME 2 7 4910 2023 2038 2053 28-Sep-2024 12-Jun-2025 12-Jun-2025 13-Jun-2025 Scheme completed and ready for O&M CHECKED AND FOUND OK View
7 Ambedkar Nagar Vindhya-GAJA (JV) 20026109 AREEFPUR SARI WATER SUPPLY SCHEME 2 2 3150 2023 2038 2053 28-Sep-2023 14-Nov-2024 05-Dec-2024 06-Dec-2025 Scheme completed and ready for O&M Scheme completed View
8 Ambedkar Nagar Vindhya-GAJA (JV) 20033756 ASHARFABAD WATER SUPPLY SCHEME 2 7 4220 2023 2038 2053 21-Oct-2023 30-Jun-2024 30-Sep-2024 01-Oct-2024 Checked and found OK Scheme completed View
9 Ambedkar Nagar Vindhya-GAJA (JV) 20041463 ASTABAD WSS 3 5 3890 2023 2038 2053 23-Nov-2023 23-Dec-2024 23-Dec-2024 24-Dec-2024 Scheme completed and ready for O&M Scheme completed View
10 Ambedkar Nagar Vindhya-GAJA (JV) 20026118 BAHLOLPUR WATER SUPPLY SCHEME 2 4 2790 2023 2038 2053 29-Sep-2022 28-Sep-2023 23-Mar-2025 24-Mar-2025 checked and verified Scheme completed View
11 Ambedkar Nagar Vindhya-GAJA (JV) 20041590 BASAHIYA 3 16 3780 2023 2038 2053 23-Nov-2023 24-Dec-2024 28-Mar-2025 29-Mar-2025 Checked and found ok CHECKED AND FOUND OK View
12 Ambedkar Nagar Vindhya-GAJA (JV) 20035108 BASIA WSS 2 6 3680 2023 2038 2053 21-Nov-2023 14-Aug-2024 02-Dec-2024 03-Dec-2024 checked and found ok SCHEME COMPLETED View
13 Ambedkar Nagar Vindhya-GAJA (JV) 20081358 BASOHARI WSS 3 7 2824 2023 2038 2053 09-Mar-2024 19-Nov-2024 20-Mar-2025 21-Mar-2025 checked and found ok Scheme completed View
14 Ambedkar Nagar Vindhya-GAJA (JV) 20098231 BHABHAURA Water Supply Scheme 4 10 4390 2023 2038 2053 09-Mar-2023 21-Apr-2024 15-May-2025 16-May-2025 CHECKED AND FOUND OK Scheme completed View
15 Ambedkar Nagar Vindhya-GAJA (JV) 20047607 BHADYA Water Supply Scheme 5 5 3220 2023 2038 2053 25-Nov-2023 31-Dec-2024 16-May-2025 17-May-2025 Checked and Found Ok Scheme completed View
16 Ambedkar Nagar Vindhya-GAJA (JV) 20047223 BHAGAUTI PUR Water Supply Scheme 2 10 3306 2023 2038 2053 23-Nov-2023 09-Jan-2025 09-Jan-2025 10-Jan-2025 Scheme completed and ready for O&M Scheme completed View
17 Ambedkar Nagar Vindhya-GAJA (JV) 20019933 Bhasra 1 2 2490 2023 2038 2053 03-Aug-2023 25-Sep-2024 27-Dec-2024 28-Dec-2024 Checked and found ok Scheme completed View
18 Ambedkar Nagar Vindhya-GAJA (JV) 20019774 Bhikhpur Khurd 3 13 6270 2023 2038 2053 03-Aug-2023 14-Aug-2024 02-Dec-2024 03-Dec-2024 checked and verified and found OK Scheme completed View
19 Ambedkar Nagar Vindhya-GAJA (JV) 20026078 BHUJAGI WATER SUPPLY SCHEME 1 5 4290 2023 2038 2053 28-Sep-2023 25-Jul-2025 14-Oct-2025 15-Oct-2025 Checked and found ok Scheme Completed View
20 Ambedkar Nagar Vindhya-GAJA (JV) 20067161 BISUNPUR BAJDAHA Water Supply Scheme 5 9 4220 2023 2038 2053 21-Feb-2023 21-Feb-2024 28-Apr-2025 29-Apr-2025 CHECK AND FOUND OK Scheme completed View
21 Ambedkar Nagar Vindhya-GAJA (JV) 20067349 BUDHANPUR Water Supply Scheme 1 2 2140 2023 2038 2052 08-Mar-2024 12-Jan-2025 12-Jan-2025 13-Jan-2025 Checked and Verified Scheme completed View
22 Ambedkar Nagar Vindhya-GAJA (JV) 20019794 Chandapur 1 12 4680 2023 2038 2053 03-Aug-2023 02-Sep-2024 19-Mar-2025 20-Mar-2025 Checked and Verified Scheme completed View
23 Ambedkar Nagar Vindhya-GAJA (JV) 20056458 CHANDPUR BHATPURA Water Supply Scheme 1 6 2520 2023 2038 2053 27-Dec-2022 26-Dec-2023 25-Mar-2025 26-Mar-2025 checked and verified Scheme completed View
24 Ambedkar Nagar Vindhya-GAJA (JV) 20041701 CHATURI PATTI WSS 2 3 3930 2023 2038 2053 23-Nov-2023 14-Jul-2024 02-Dec-2024 03-Dec-2024 Checked and found OK SCHEME COMPLETED View
25 Ambedkar Nagar Vindhya-GAJA (JV) 20083841 CHHITUNI WSS 1 8 2190 2023 2038 2053 26-Dec-2023 20-May-2025 19-May-2025 20-May-2025 Scheme completed and ready for O&M Scheme Completed View
26 Ambedkar Nagar Vindhya-GAJA (JV) 20084934 DANDI MAHMOODPUR WSS 3 3 2450 2023 2038 2053 20-Feb-2024 27-Nov-2024 27-Feb-2025 28-Feb-2025 scheme checked and verified DANDI MAHMOODPUR SCHEME COMPLETED View
27 Ambedkar Nagar Vindhya-GAJA (JV) 20019823 Daudpur 1 7 4470 2023 2038 2053 03-Aug-2023 23-Dec-2024 04-Apr-2025 05-Apr-2025 Checked and found ok CHECKED AND FOUND OK View
28 Ambedkar Nagar Vindhya-GAJA (JV) 20068240 DAYAMPUR WSS 2 2 3200 2023 2038 2053 19-Feb-2024 28-Jul-2024 19-Mar-2025 20-Mar-2025 Checked and found ok Scheme completed View
29 Ambedkar Nagar Vindhya-GAJA (JV) 20035121 DHARMA MUBARAK PATTI WSS 2 7 4750 2023 2038 2053 21-Oct-2023 20-Jun-2025 13-Oct-2025 14-Oct-2025 Checked and Found ok CHECKED AND FOUND OK View
30 Ambedkar Nagar Vindhya-GAJA (JV) 20026122 FATTEPUR KAKARDILA WATER SUPPLY SCHEME 2 12 3310 2023 2038 2053 28-Sep-2023 12-Oct-2024 11-Jan-2025 12-Jan-2025 checked and verified SCHEME COMPLETED View
31 Ambedkar Nagar Vindhya-GAJA (JV) 20081283 HAJPURA WSS 1 2 2180 2023 2038 2053 15-Mar-2024 22-Dec-2024 23-Mar-2025 24-Mar-2025 Checked and found OK Scheme completed View
32 Ambedkar Nagar Vindhya-GAJA (JV) 20058508 HARAKPUR KAURAHA Water Supply Scheme 3 8 2310 2023 2038 2052 16-Jul-2023 19-May-2025 19-May-2025 20-May-2025 Scheme completed and ready for O&M Scheme Completed View
33 Ambedkar Nagar Vindhya-GAJA (JV) 20019768 Harinathpur 3 6 2480 2023 2038 2053 03-Aug-2023 22-Jun-2023 30-Nov-2024 01-Dec-2024 Approved by TPI Scheme completed View
34 Ambedkar Nagar Vindhya-GAJA (JV) 20058532 HASANPUR SUNTHAR Water Supply Scheme 1 7 2270 2023 2038 2053 26-Dec-2023 22-Aug-2024 24-Nov-2024 25-Nov-2024 Scheme completed and ready for O&M HASANPUR SUNTHAR SCHEME COMPLETED View
35 Ambedkar Nagar Vindhya-GAJA (JV) 20035268 HATHINARAJ WSS 1 2 6270 2023 2038 2053 22-Oct-2022 21-Oct-2023 05-Dec-2024 06-Dec-2024 Checked and found ok Scheme completed View
36 Ambedkar Nagar Vindhya-GAJA (JV) 20026085 ITWAN WATER SUPPLY SCHEME 1 3 3440 2023 2038 2053 04-Aug-2023 20-Jul-2024 02-Dec-2024 03-Dec-2024 Checked and found OK SCHEME COMPLETED View
37 Ambedkar Nagar Vindhya-GAJA (JV) 20058509 JAINAPUR Water Supply Scheme 3 10 4220 2023 2038 2053 26-Dec-2023 30-Jun-2024 30-Sep-2024 01-Oct-2024 Ok SCHEME COMPLETED View
38 Ambedkar Nagar Vindhya-GAJA (JV) 20026145 JAITI WATER SUPPLY SCHEME 2 2 2230 2023 2038 2053 28-Sep-2023 10-Mar-2025 20-Mar-2025 21-Mar-2025 Scheme completed and ready for O&M Scheme completed View
39 Ambedkar Nagar Vindhya-GAJA (JV) 20083855 JOGAPUR WSS 1 3 1800 2023 2038 2053 22-Mar-2024 14-Mar-2024 14-Jun-2024 15-Jun-2024 Checked and found ok SCHEME COMPLETED View
40 Ambedkar Nagar Vindhya-GAJA (JV) 20058490 KANAK PATTI Water Supply Scheme 1 3 1690 2023 2038 2053 26-Dec-2023 30-Jun-2024 30-Sep-2024 01-Oct-2024 Checked and found ok Scheme completed View
41 Ambedkar Nagar Vindhya-GAJA (JV) 20072738 KARTORA WSS 1 5 3300 2023 2038 2053 08-Mar-2024 02-Jul-2025 02-Jul-2025 03-Jul-2025 Scheme completed and ready for O&M Scheme Completed View
42 Ambedkar Nagar Vindhya-GAJA (JV) 20086834 KEWTALI WSS 6 9 4270 2023 2038 2053 23-Mar-2024 22-Mar-2025 22-Mar-2025 23-Mar-2025 CHECKED AND FOUND OK Scheme completed View
43 Ambedkar Nagar Vindhya-GAJA (JV) 20019943 Khajuri 2 3 3780 2023 2038 2053 04-Aug-2022 03-Aug-2023 02-Dec-2024 03-Dec-2024 Checked and found OK SCHEME COMPLETED View
44 Ambedkar Nagar Vindhya-GAJA (JV) 20033707 KODRA WATER SUPPLY SCHEME 1 1 4250 2023 2038 2053 21-Oct-2023 14-Sep-2024 18-Feb-2025 19-Feb-2025 Checked and found OK SCHEME COMPLETED View
45 Ambedkar Nagar Vindhya-GAJA (JV) 20019925 Lakhanpur 2 3 3830 2023 2038 2053 03-Aug-2023 02-Sep-2024 19-Mar-2025 20-Mar-2025 Checked and found ok Scheme completed View
46 Ambedkar Nagar Vindhya-GAJA (JV) 20019923 Lavaiya 1 6 2570 2023 2038 2053 03-Aug-2023 23-Jun-2025 14-Oct-2025 15-Oct-2025 SCHEME COMPLETED Scheme Completed View
47 Ambedkar Nagar Vindhya-GAJA (JV) 20033820 Madarpur Water supply scheme 1 2 2650 2023 2038 2053 21-Oct-2023 05-Sep-2024 07-Dec-2024 08-Dec-2024 Checked and found OK Scheme completed View
48 Ambedkar Nagar Vindhya-GAJA (JV) 20026090 MADHOPUR WATER SUPPLY SCHEME 1 3 3800 2023 2038 2053 28-Sep-2023 14-Jun-2024 05-Dec-2024 06-Dec-2024 Checked and found OK SCHEME COMPLETED View
49 Ambedkar Nagar Vindhya-GAJA (JV) 20067758 MAKDOOMPUR Water Supply Scheme 2 3 5280 2023 2038 2053 23-Mar-2024 19-May-2025 19-May-2025 20-May-2025 Checked and found ok Scheme completed View
50 Ambedkar Nagar Vindhya-GAJA (JV) 20035086 MATHIYA WSS 1 8 6150 2023 2037 2053 21-Oct-2023 14-Jun-2024 02-Dec-2024 03-Dec-2024 Checked and found ok SCHEME COMPLETED View
51 Ambedkar Nagar Vindhya-GAJA (JV) 20019936 Mdarbhari 2 6 5550 2023 2038 2053 03-Aug-2023 20-Dec-2024 20-Mar-2025 21-Mar-2025 checked and found ok Scheme completed View
52 Ambedkar Nagar Vindhya-GAJA (JV) 20019789 Medhi Sulempur 3 6 4800 2023 2038 2053 03-Aug-2023 10-Sep-2024 19-Mar-2025 20-Mar-2025 checked and verified and found OK Scheme completed View
53 Ambedkar Nagar Vindhya-GAJA (JV) 20041720 MIJHAURA WSS 1 1 7250 2023 2038 2053 23-Nov-2023 23-Jun-2025 08-Jul-2025 08-Jul-2025 Approved Checked and found ok CHECKED AND FOUND OK View
54 Ambedkar Nagar Vindhya-GAJA (JV) 20047599 MUBARAKPUR MARAILA Water Supply Scheme 2 2 2190 2023 2038 2053 24-Nov-2023 21-Sep-2024 20-Dec-2024 21-Dec-2024 checked and verified SCHEME COMPLETED View
55 Ambedkar Nagar Vindhya-GAJA (JV) 20019657 Mujahidpur 1 5 2790 2023 2038 2053 03-Aug-2023 07-Sep-2024 09-Dec-2024 10-Dec-2024 Checked and found OK Scheme completed View
56 Ambedkar Nagar Vindhya-GAJA (JV) 20083477 NASIRPUR CHITTAUNA WSS 4 6 3240 2023 2038 2053 08-Mar-2024 08-Mar-2025 08-Feb-2025 09-Feb-2025 Checked and found ok SCHEME COMPLETED View
57 Ambedkar Nagar Vindhya-GAJA (JV) 20056723 NAURAHANI RAMPUR WSS 3 9 6820 2023 2038 2053 26-Dec-2023 24-Feb-2025 14-Jul-2025 15-Jul-2025 Approved Checked and found ok CHECKED AND FOUND OK View
58 Ambedkar Nagar Vindhya-GAJA (JV) 20041820 PAHARPUR SULTANPUR WSS 2 3 2510 2023 2038 2053 23-Nov-2023 21-Dec-2024 21-Mar-2025 22-Mar-2025 Scheme completed and ready for O&M Scheme completed View
59 Ambedkar Nagar Vindhya-GAJA (JV) 20041625 PANDEY PAIKAULI 1 7 4750 2023 2038 2053 23-Oct-2023 14-Aug-2024 09-Jul-2025 10-Oct-2025 Checked and Found OK CHECKED AND FOUND OK View
60 Ambedkar Nagar Vindhya-GAJA (JV) 20047603 PARAS KATUI Water Supply Scheme 3 7 3460 2023 2038 2053 23-Nov-2023 03-Apr-2025 03-Apr-2025 04-Apr-2025 Checked and Verifiyed Scheme completed View
61 Ambedkar Nagar Vindhya-GAJA (JV) 20068319 PARIYAI WSS 2 5 2970 2023 2038 2053 20-Feb-2024 30-Jun-2025 25-Oct-2025 26-Oct-2025 Checked and found ok Scheme Completed View
62 Ambedkar Nagar Vindhya-GAJA (JV) 20068332 PICHAWARA WSS 2 3 1580 2023 2038 2053 08-Mar-2024 15-Jun-2025 14-Oct-2025 15-Oct-2025 Checked and found ok Scheme Completed View
63 Ambedkar Nagar Vindhya-GAJA (JV) 20019810 Pipri Mohammadi 2 7 2053 2023 2038 2053 03-Aug-2023 17-Feb-2025 17-May-2025 18-May-2025 Scheme completed and ready for O&M Scheme completed View
64 Ambedkar Nagar Vindhya-GAJA (JV) 20042925 PRATAPIPUR WSS 1 5 4010 2023 2037 2053 23-Nov-2023 14-Jun-2024 02-Dec-2024 03-Dec-2024 Checked and found ok SCHEME COMPLETED View
65 Ambedkar Nagar Vindhya-GAJA (JV) 20019826 Rahimpur Patti 2 7 3250 2023 2038 2053 03-Aug-2023 20-Jul-2024 02-Dec-2024 03-Dec-2029 Checked and found ok Scheme completed View
66 Ambedkar Nagar Vindhya-GAJA (JV) 20033823 RAMNAGAR NARSINGHPUR WATER SUPPLY SCHEME 2 8 4666 2023 2038 2053 22-Oct-2022 21-Oct-2023 14-Jan-2025 15-Jan-2025 checked and found ok Scheme completed View
67 Ambedkar Nagar Vindhya-GAJA (JV) 20026107 RAMPUR INDI-PINDI WATER SUPPLY SCHEME 1 1 2200 2023 2038 2053 26-Dec-2023 23-Dec-2024 26-Mar-2025 27-Mar-2025 CHECKED AND FOUND OK Scheme completed View
68 Ambedkar Nagar Vindhya-GAJA (JV) 20033825 RAMPUR SAKARWARI WATER SUPPLY SCHEME 4 13 5088 2023 2038 2053 21-Oct-2023 09-Apr-2025 09-Apr-2025 10-Apr-2025 Scheme completed and ready for O&M Scheme Completed View
69 Ambedkar Nagar Vindhya-GAJA (JV) 20056396 REWALI WSS 1 4 3850 2023 2038 2053 28-Jun-2023 25-Dec-2024 31-Mar-2025 01-Apr-2025 checked and found ok Scheme completed View
70 Ambedkar Nagar Vindhya-GAJA (JV) 20084870 ROHAN PARA WSS 2 2 3380 2023 2038 2053 20-Mar-2024 23-Dec-2024 26-Mar-2025 27-Mar-2025 checked and found ok Scheme completed View
71 Ambedkar Nagar Vindhya-GAJA (JV) 20047661 SAHABUDDINPUR Water Supply Scheme 1 2 2310 2023 2038 2053 19-Sep-2023 21-Mar-2025 21-Mar-2025 22-Mar-2025 CHECKED AND FOUND OK Scheme completed View
72 Ambedkar Nagar Vindhya-GAJA (JV) 20026097 SAHJANA HAMJAPUR WATER SUPPLY SCHEME 1 2 4320 2023 2038 2053 28-Sep-2023 14-Aug-2024 05-Dec-2024 06-Dec-2024 Checked and found ok SCHEME COMPLETED View
73 Ambedkar Nagar Vindhya-GAJA (JV) 20058740 SAIDPUR RASEEDPUR WSS 4 16 4420 2023 2038 2053 26-Dec-2023 28-Jun-2025 21-Oct-2025 22-Oct-2025 Scheme completed and ready for O&M Scheme Completed View
74 Ambedkar Nagar Vindhya-GAJA (JV) 20100682 Salahuddinpur Water Supply Scheme 1 2 1610 2023 2038 2053 17-May-2024 24-Nov-2024 24-Feb-2025 25-Feb-2025 Scheme completed and ready for O&M Scheme completed View
75 Ambedkar Nagar Vindhya-GAJA (JV) 20059385 SALARPUR Water Supply Scheme 2 3 2230 2023 2038 2053 26-Dec-2023 27-Nov-2024 27-Feb-2025 28-Feb-2025 checked and verified and found OK Scheme completed View
76 Ambedkar Nagar Vindhya-GAJA (JV) 20072736 SATRAHI WSS 1 4 2685 2023 2038 2053 22-Mar-2024 05-Apr-2025 05-Apr-2025 06-Apr-2025 Scheme completed and ready for O&M Scheme completed View
77 Ambedkar Nagar Vindhya-GAJA (JV) 20026061 SETHA KALA WATER SUPPLY SCHEME 2 7 4530 2023 2038 2053 28-Sep-2023 12-Feb-2024 30-Jun-2024 01-Jul-2024 Checked and found ok Scheme completed View
78 Ambedkar Nagar Vindhya-GAJA (JV) 20041828 SHEKHPUR MALPURA WSS 1 5 5980 2023 2038 2053 23-Nov-2023 23-Dec-2024 02-Apr-2025 03-Apr-2025 Scheme completed and ready for O&M Scheme completed View
79 Ambedkar Nagar Vindhya-GAJA (JV) 20058306 SONGAWN WSS 1 6 3260 2023 2038 2053 26-Dec-2023 26-Dec-2024 26-Mar-2025 27-Mar-2025 checked and found ok Scheme completed View
80 Ambedkar Nagar Vindhya-GAJA (JV) 20072514 SUBARPUR WSS 1 3 2180 2023 2038 2053 15-Mar-2024 30-Apr-2025 30-Apr-2025 01-May-2025 SCHEME COMPLETED AND READY FOR O&M Scheme completed View
81 Ambedkar Nagar Vindhya-GAJA (JV) 20035148 SURJUPUR WSS 4 4 2910 2023 2038 2053 21-Oct-2023 08-Sep-2024 19-Mar-2025 20-Mar-2025 Checked and Veryfied Scheme completed View
82 Ambedkar Nagar Vindhya-GAJA (JV) 20067460 TAJPUR Water Supply Scheme 4 8 3460 2023 2038 2053 20-Feb-2024 25-Jan-2025 26-Apr-2025 27-Apr-2025 checked and verified and found OK Scheme completed View
83 Ambedkar Nagar Vindhya-GAJA (JV) 20026062 THATTA WATER SUPPLY SCHEME 3 16 5040 2023 2038 2053 28-Sep-2023 23-Dec-2024 23-Mar-2025 24-Mar-2025 Scheme completed and ready for O&M CHECKED AND FOUND OK View
84 Ambedkar Nagar Vindhya-GAJA (JV) 20026103 UKRA WATER SUPPLY SCHEME 1 6 3152 2023 2038 2053 28-Sep-2023 01-Jan-2025 01-Jan-2025 02-Jan-2025 checked and verified Scheme completed View