Project Completion Certificate Details

Sr. No. District Name Agency Name Scheme Code Scheme Name Covered Villages Covered Habitations Covered Population Base Year Intermediate Year Design Year Contract Completion Date Actual Completion Date Trial Run Date O&M Start Date TPI Fill Status TPI Remark EE Status EE Remark View
1 Kanpur Dehat GVPR 20065049 ASAI 3 7 3311 2023 2038 2053 18-Jan-2024 03-Dec-2023 17-Apr-2024 18-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
2 Kanpur Dehat Indian Hume Pipe 20064126 Pur 1 3 3000 2022 2037 2052 12-Jan-2023 31-Dec-2024 30-Sep-2023 01-Oct-2023 FORWARD FOR FURTHER NECESSARY ACTION PLS. All work of scheme found satisfactory View
3 Shahjahanpur NCC Ltd. 20024959 Aurangabad Wss 1 1 2420 2022 2037 2052 31-Dec-2024 14-Dec-2023 14-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Aurangabad WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Dharampur Aurangabad Wss have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
4 Etawah Indian Hume Pipe 20024538 Ayara Luhia PWS 1 5 3185 2022 2037 2052 22-Sep-2023 06-Jun-2024 06-Jun-2024 07-Jun-2024 Forwarded for further action All work of scheme found satisfactory. View
5 Shahjahanpur NCC Ltd. 20015926 Bajpur Kumarikha 1 1 1820 2022 2037 2052 31-Dec-2024 29-Jul-2024 28-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bajpur Kumarikha scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Bajpur Kumarikha scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
6 Kanpur Dehat GVPR 20065061 Balai Bujurg 1 2 2361 2023 2038 2053 18-Jan-2024 31-Dec-2023 09-Apr-2024 10-Apr-2024 TKC unable to submit the calibration certificate and other report for O&M and Some road restoration and Leakage found Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work. All work of scheme found satisfactory View
7 Shahjahanpur NCC Ltd. 20019664 Bareng 1 1 2330 2022 2037 2052 20-Sep-2023 31-Dec-2024 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of BARENG scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Bareng scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
8 Mau LC INFRA 20044958 Chaliswan GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME 1 4 2980 2022 2037 2052 29-May-2023 06-Nov-2025 25-Aug-2025 06-Nov-2025 Approved Approved.. View
9 Kannauj GVPR 20067333 DALUPUR SULTANPUR & HARKARANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 3 3246 2023 2038 2053 16-Aug-2024 30-Apr-2024 03-Aug-2024 04-Aug-2024 FORWARDED FOR FURTER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
10 Ambedkar Nagar Vindhya-GAJA (JV) 20062640 DEVRIYA PANDIT Water supply scheme 4 8 4280 2023 2038 2053 19-Jan-2024 15-Dec-2024 17-May-2025 18-May-2025 Scheme completed and ready for O&M Scheme Completed View
11 Shahjahanpur NCC Ltd. 20014795 Diwali 1 1 3000 2022 2037 2052 31-Dec-2024 04-Jun-2024 03-Sep-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Diwali scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Diwali scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
12 Kanpur Dehat GVPR 20065111 Gaijumau 1 6 2957 2023 2038 2053 18-Jan-2024 16-Nov-2023 31-Mar-2024 01-Apr-2024 Forward for further action All work of scheme found satisfactory View
13 Etawah Indian Hume Pipe 20026316 Ikaghara PWS 1 3 1900 2022 2037 2052 22-Sep-2023 26-Feb-2024 07-Jul-2024 08-Apr-2024 Dear Sir, the above data has been verified and forwarded to you for further action. All work of scheme found satisfactory View
14 Kanpur Dehat GVPR 20053242 Kasmara 1 2 2964 2023 2038 2053 18-Nov-2023 27-Dec-2023 11-May-2024 12-May-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
15 Shahjahanpur NCC Ltd. 20014702 Majhila 1 1 4190 2022 2037 2052 31-Dec-2024 20-Dec-2023 20-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of the Majhila scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Majhila scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
16 Etawah Indian Hume Pipe 20026098 Muraitha PWS 1 3 2200 2022 2037 2052 22-Sep-2023 25-Oct-2023 20-May-2023 21-May-2023 Forwarded for further action. All work of scheme found satisfactory. View
17 Etawah Indian Hume Pipe 20026330 Nagaria Bujurg PWS 1 2 1740 2022 2037 2052 22-Sep-2023 15-Dec-2023 16-Apr-2024 17-Apr-2024 Forwarded for further action. All works are satisfactory. View
18 Kanpur Dehat GVPR 20053409 Nonari Bujurg 1 2 3842 2023 2038 2053 18-Nov-2023 24-Nov-2023 08-Apr-2024 09-Apr-2024 Forward for further necessary action pls All work of scheme found satisfactory View
19 Kanpur Dehat GVPR 20053335 Paharipur 1 6 3833 2023 2038 2053 18-Nov-2023 16-Oct-2023 29-Feb-2024 01-Mar-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
20 Kanpur Dehat GVPR 20025294 Sunasi 1 8 4981 2023 2038 2053 06-Sep-2023 02-Nov-2023 17-Mar-2024 18-Mar-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
21 Fatehpur Power Mech Projects Ltd 20079148 1.MANSOORPUR 1 1 3100 2023 2038 2053 13-Mar-2024 03-Jan-2025 03-Jan-2025 04-Jan-2025 Trial & Run completed. It was initiated in the month of October (04.10.2024) and Regular water supply is given to the consumers. Verified View
22 Ambedkar Nagar Vindhya-GAJA (JV) 20019804 Aama & Kardaspur 2 6 2230 2023 2038 2053 03-Aug-2023 20-Jul-2024 05-Dec-2024 06-Dec-2024 Checked and found ok Scheme completed View
23 Ambedkar Nagar Vindhya-GAJA (JV) 20062455 AAMI WSS 2 3 2630 2023 2038 2053 17-Jan-2024 15-Jun-2025 12-Oct-2025 13-Oct-2025 Scheme completed and ready for O&M Scheme Completed View
24 Sultanpur Vindhya-GAJA (JV) 20084221 AANAPURNARAYANGANJ WSS 1 5 2220 2022 2037 2052 23-Mar-2023 21-Mar-2024 30-Mar-2025 28-Apr-2026 All uploaded documents has been checked and found as per requirements. This is sending for further action All uploaded documents have been checked and verified, found as per requirements View
25 Sultanpur UNIVERSAL MEP 20066908 AARDIH & BAHALOLPUR GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME 4 11 4450 2023 2038 2053 12-Jan-2024 12-Jan-2024 26-Nov-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
26 Meerut Power Mech Projects Ltd 20016936 AASSAA 1 1 3815 2021 2037 2052 31-Dec-2024 05-Feb-2023 25-Jun-2023 17-Feb-2025 Recommended for Further Approval approved View
27 Bijnor LC INFRA 20087642 Abdullapur Dahana water supply scheme 1 1 2850 2022 2037 2052 13-Mar-2023 15-Dec-2024 15-Dec-2024 16-Dec-2024 Every thing completed. all document complete View
28 Bijnor LC INFRA 20011835 Abdulpur Munna Water Supply Scheme 1 1 2647 2022 2037 2052 09-Feb-2022 08-Aug-2024 08-Aug-2024 09-Aug-2024 Every thing completed. all document complete View
29 Bijnor Vindhya-GAJA (JV) 20100194 ABIDNAGAR HARBANS WSS 2 2 1343 2023 2038 2053 06-Jul-2023 28-Apr-2025 28-Oct-2025 29-Oct-2025 Every thing complete. check View
30 Farrukhabad Vindhya-GAJA (JV) 20092689 ACHARIYA BAKARPUR MVS 3 5 2236 2023 2038 2053 31-Mar-2025 08-Oct-2024 01-Feb-2025 02-Feb-2025 OK ok View
31 Fatehpur Power Mech Projects Ltd 20097762 ACHINTPUR PITAI 2 7 4460 2023 2038 2053 24-Jan-2025 01-Sep-2025 08-Jan-2026 09-Jan-2026 Trial & Run completed. It was initiated in the month of october (10.10.2025) and Regular water supply is given to the consumers. HGJ certificate not signed by Panchayat secretary. Verified View
32 Farrukhabad Vindhya-GAJA (JV) 20091701 ADDUPUR DEHAMAFI & DALELGANG MVS 2 5 4542 2023 2038 2053 30-May-2025 14-Jun-2024 14-Jun-2024 15-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
33 Ambedkar Nagar Vindhya-GAJA (JV) 20019914 Adhanpur 1 10 5390 2023 2038 2053 03-Aug-2023 20-Dec-2024 20-Mar-2025 21-Mar-2025 checked and found ok Scheme completed View
34 Kanpur Dehat Indian Hume Pipe 20070121 afasariya 1 2 4255 2022 2037 2052 04-Mar-2023 31-Dec-2024 23-Jun-2023 24-Jun-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
35 Shahjahanpur NCC Ltd. 20015579 Afatipur 2 2 2070 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Afatiyapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Afatipur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
36 Ghaziabad LC INFRA 20100525 AFJALNAGAR SITI VILLAGE WATER SUPPLY SCHEME 1 1 348 2022 2037 2052 25-May-2023 30-Sep-0202 01-Jan-2025 01-Mar-2025 Actual Executed Cost Verified based on approved variation statement. All work completed View
37 Ambedkar Nagar Vindhya-GAJA (JV) 20026066 AFJALPUR WATER SUPPLY SCHEME 1 1 3970 2023 2038 2053 28-Sep-2023 07-Feb-2026 07-Feb-2026 08-Feb-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
38 Bijnor Vindhya-GAJA (JV) 20021849 Afzalpur Bhau & Jamlpur Dikli Gram Panchayat Water Supply 3 3 2511 2023 2038 2053 06-Jul-2023 21-May-2025 21-Nov-2025 22-Nov-2025 Every thing complete. Document complete View
39 Meerut Power Mech Projects Ltd 20011230 AFZALPUR PAWATI 1 1 3482 2022 2037 2052 31-Dec-2024 07-May-2024 27-Sep-2024 14-Oct-2024 Recommended for further Approvals. Approved View
40 Sultanpur UNIVERSAL MEP 20067235 AGAI & BAHUBARA & KHADAR BASANTPUR & PRATAPPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 5 40 18160 2022 2037 2052 18-Jul-2024 10-Feb-2025 14-May-2025 01-Jul-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
41 Auraiya Indian Hume Pipe 20014495 AGHARA PWS 2 6 3900 2022 2037 2052 08-May-2023 19-Dec-2022 25-Mar-2023 26-Mar-2023 Forwarded for further action. All work of scheme found satisfactory. View
42 Kannauj GVPR 20100926 AGOUS GRAMM PANCHAYAT WATER SUPPLY SCHEME 1 7 7444 2023 2038 2053 14-Nov-2024 16-Apr-2024 19-Jul-2024 20-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
43 Kannauj GVPR 20067296 AHER GRAM PANCHAYAT WATER SUPPLY SCHEME 1 13 8890 2023 2038 2053 08-Sep-2024 07-May-2024 10-Aug-2024 11-Aug-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
44 Fatehpur Power Mech Projects Ltd 20097449 AHINDA 1 2 1950 2023 2038 2053 18-Mar-2025 30-Jun-2025 07-Dec-2024 08-Dec-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of September(08.09.2024) and Regular water supply is given to the consumers. Verified View
45 Bahraich PNC-SPML-JV 20031352 AHIRAURA CHITTAURA PWS 1 6 5557 2022 2037 2052 31-Mar-2028 05-Feb-2026 01-Dec-2025 06-Feb-2026 scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/02/0266. kindly complete it scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/02/0266. kindly complete it View
46 Ambedkar Nagar Vindhya-GAJA (JV) 20026028 AHLADA WATER SUPPLY SCHEME 4 13 5370 2023 2038 2053 28-Sep-2023 06-Apr-2026 06-Apr-2026 07-Apr-2026 Scheme completed and ready for O&M SCHEME COMPLETED View
47 Bijnor LC INFRA 20051480 AHMADPUR CHANDAR URF GADANA 1 1 2232 2022 2037 2052 31-Jan-2026 01-Dec-2024 28-Feb-2025 01-Mar-2025 Every thing complete. Check View
48 Meerut Power Mech Projects Ltd 20076648 AHMADPUR URF DANDOOPUR 1 1 2334 2023 2038 2053 31-Dec-2024 13-Sep-2024 03-Feb-2025 04-Feb-2025 Recommended for further Approvals. Approved View
49 Meerut Power Mech Projects Ltd 20010897 AHMADPURI URF AMANPURI 1 1 2364 2022 2037 2052 31-Dec-2024 11-Feb-2023 30-Jun-2023 31-Dec-2024 Recommended for further Approval approved View
50 Farrukhabad Vindhya-GAJA (JV) 20091795 AHMILAPUR MVS 3 3 2767 2023 2038 2053 31-Mar-2025 01-Nov-2024 01-Nov-2024 12-May-2025 Ok.. OK View
51 Kanpur Dehat Indian Hume Pipe 20025556 Ahrauli Ghat 1 2 1980 2022 2037 2052 25-Aug-2022 31-Dec-2024 08-Jun-2023 09-Jun-2023 FORWARD FOR FURTHER NECESSARY ACTION PLS. All work of scheme found satisfactory View
52 Ayodhya UNIVERSAL MEP 20029752 AIHAR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 9 7150 2023 2038 2053 12-Oct-2023 18-Feb-2024 18-Feb-2024 15-Nov-2024 Found ok Found Correct View
53 Shahjahanpur NCC Ltd. 20093775 AINTHAPUR GP MULTI VILLAGE WSS 2 2 2240 2022 2037 2052 31-Dec-2024 29-Aug-2024 28-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of AINTHAPUR scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Aithapur W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
54 Ambedkar Nagar Vindhya-GAJA (JV) 20026068 AINWA WATER SUPPLY SCHEME 1 3 3600 2023 2038 2053 28-Sep-2023 28-Sep-2024 18-Feb-2025 19-Feb-2025 Scheme completed and ready for O&M Scheme completed View
55 Kannauj GVPR 20077070 AIRHO GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 3409 2023 2038 2053 16-Aug-2024 31-Mar-2024 03-Jul-2024 04-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
56 Auraiya GVPR 20041728 AIRWA TIKTA PWS 1 6 4267 2023 0 0 01-Jun-2022 01-Jul-2024 30-Jun-2024 01-Jul-2024 Forwarded for further action. All work of scheme fond satisfactory. View
57 Ambedkar Nagar Vindhya-GAJA (JV) 20019676 Ajanpara 1 12 5550 2023 2038 2053 03-Aug-2023 20-Jun-2025 09-Oct-2025 10-Oct-2025 Scheme completed and ready for O&M Scheme Completed View
58 Fatehpur Power Mech Projects Ltd 20095816 AJARAULI 2 2 3788 2023 2038 2053 15-May-2023 30-Jun-2025 12-Mar-2025 13-Mar-2025 Trial & Run completed. It was initiated in the month of January (13.01.2025) and Regular water supply is given to the consumers. Verified View
59 Bijnor LC INFRA 20011272 Ajdev 1 1 1525 2022 2037 2052 10-Feb-2024 20-Dec-2024 18-Jun-2024 19-Jun-2024 Every thing completed. Everything Complete. View
60 Fatehpur Power Mech Projects Ltd 20097720 AJDUPUR 3 4 2190 2023 2038 2058 15-May-2023 14-May-2024 13-Oct-2024 13-Jan-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of October(13.10.2024) and Regular water supply is given to the consumers. Verified View
61 Sultanpur UNIVERSAL MEP 20064753 AJHUIE GRAM PANCHAYAT WATER SUPPLY SCHEME 1 8 8040 2023 2038 2053 18-Jul-2024 27-Feb-2025 01-Jun-2025 01-Jul-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action All uploaded documents have been checked and verified, found as per requirements. View
62 Auraiya GVPR 20039031 Ajnapur pws 3 2 3391 2023 2038 2053 19-Nov-2022 18-Nov-2023 22-Dec-2023 01-Nov-2024 Forwarded for further action. All work of scheme fond satisfactory. View
63 Jaunpur AFCONS 20057252 AJORPUR AND ATRAURA VILLAGE WATER SUPPLY SCHEME 2 7 3305 2023 2038 2053 23-Jan-2024 15-Aug-2025 15-Aug-2025 15-Aug-2025 Checked and found ok. Ok View
64 Shahjahanpur NCC Ltd. 20096500 AKABARI GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME 1 1 3040 2022 2037 2052 31-Dec-2024 20-Jul-2024 19-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Akabari scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Akabari scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
65 Kannauj GVPR 20036550 AKABARPUR & KHURWAHA GRAMIN PEYJAL YOJNA 2 2 6296 2023 2038 2053 13-May-2024 22-Apr-2024 26-Jul-2024 27-Jul-2024 forwarded for further action. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
66 Hardoi NCC Ltd. 8362203 AKABARPUR PASNAMAU 1 3 2662 2022 2037 2052 05-Mar-2023 20-Apr-2023 19-Jul-2023 24-Dec-2024 ok OK View
67 Kanpur Dehat Indian Hume Pipe 20012613 Akana 1 5 3580 2022 2037 2052 15-Sep-2021 31-Dec-2024 31-Mar-2024 01-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
68 Fatehpur Power Mech Projects Ltd 20089241 Akbarabad 1 2 1560 2023 2038 2053 13-Mar-2024 28-Feb-2025 15-Jul-2025 16-Jul-2025 Trial & Run completed. It was initiated in the month of April (13.04.2025) and Regular water supply is given to the consumers. Verified View
69 Shahjahanpur NCC Ltd. 20017193 Akbarabad Urf Khairpu 1 1 2900 2022 2037 2052 31-Dec-2024 22-Jul-2024 21-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the Akbarabad Urf Khairpur WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. SWSM/BLG/JJM/26-27/338 for further necessary action. All information on the portal for the completion certificate of Akbarabad Urf Khairpu have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
70 Shahjahanpur NCC Ltd. 20053379 AKBARPUR 2 2 2100 2022 2037 2052 31-Dec-2024 05-Oct-2023 04-Jan-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of AKBARPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of AKBARPUR Wss have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
71 Bijnor Vindhya-GAJA (JV) 20100227 AKBARPUR DEVDAS WALA WSS 2 2 1911 2023 2038 2053 06-Jul-2023 02-Jan-2025 02-Jul-2025 03-Jul-2025 Every thing complete. Complete View
72 Bijnor Vindhya-GAJA (JV) 20025383 Akbarpur Devmal Gram Panchayat Water Supply 4 4 2369 2023 2038 2053 06-Jul-2023 15-May-2025 15-Nov-2025 16-Nov-2025 Every thing complete. Check Document View
73 Meerut Power Mech Projects Ltd 20020275 AKBARPUR GARHI 1 1 3531 2022 2037 2052 04-Feb-2024 23-Oct-2024 24-Jul-2024 06-Apr-2025 Recommended for further Approval approved View
74 Meerut Power Mech Projects Ltd 20068690 AKBARPUR ICCHABAD & HIMAUPUR 2 2 2387 2023 2038 2053 15-Sep-2024 26-Mar-2024 12-Aug-2024 13-Oct-2024 Recommended for further Approvals. approved View
75 Meerut Power Mech Projects Ltd 20025394 Akbarpur sadat 1 1 5052 2022 2037 2052 31-Dec-2024 25-Jan-2023 13-Jun-2023 10-Dec-2024 CHECKED AND VERIFIED.... approved View
76 Bijnor LC INFRA 20026241 Akbarpurasha Village Water Supply 1 1 4533 2022 2037 2052 18-Aug-2022 11-Jun-2024 11-Jun-2024 12-Jun-2024 Approve Everything Complete. View
77 Shahjahanpur NCC Ltd. 20026259 AKHTIYAR NAGAR URF EKNAURA 1 1 4010 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the AKHTIYAR NAGAR URF EKNAURA WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. JJM/BLG/CLU-05/2026-27/46 for further necessary action. All information on the portal for the completion certificate of AKHTIYAR NAGAR URF EKNAURA have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
78 Meerut Power Mech Projects Ltd 20074084 AKHTYARPUR 1 1 1989 2022 2037 2052 31-Dec-2024 05-May-2024 21-Sep-2024 01-Oct-2024 Recommended for further Approvals. approved View
79 Mau LC INFRA 20014753 AKOLHI MUBARAKPUR GP WATER SUPPLY SCHEME 4 10 3510 2022 2037 2052 20-Sep-2023 23-Mar-2026 21-Dec-2025 23-Mar-2026 Approved Approved View
80 Kanpur Dehat Indian Hume Pipe 20014684 Akorhi 1 5 4290 2022 2037 2052 04-Feb-2023 31-Dec-2026 28-Feb-2024 01-Mar-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
81 Shahjahanpur NCC Ltd. 20026246 AKRRA RASOOLPUR 2 2 3950 2022 2037 2052 31-Dec-2024 24-Dec-2023 24-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Akrra Rasoolpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Akrra Rasoolpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
82 Ambedkar Nagar Vindhya-GAJA (JV) 20026106 AKTHARA NARAYANPUR WATER SUPPLY SCHEME 3 3 2630 2023 2038 2053 28-Sep-2023 28-Sep-2024 08-Feb-2025 09-Feb-2025 Checked and found ok SCHEME COMPLETED View
83 Bijnor LC INFRA 20093550 Aladinpur Bhatpura Village Wss 1 1 2217 2022 2037 2052 13-Mar-2023 12-Jan-2025 12-Jan-2025 13-Jan-2025 Every thing complete. Check Document View
84 Sultanpur UNIVERSAL MEP 20071527 ALAHADADPUR&LAKHANPUR GROUP OF PANCHAYAT WATER SUPPLY SCHEME 2 5 4730 2023 2038 2053 22-Mar-2024 22-Mar-2024 02-Mar-2025 01-Apr-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
85 Sultanpur UNIVERSAL MEP 20067207 ALAMAU, MAHAULI & PATELA GRAM PANCHAYAT WATER SUPPLY SCHEME 3 13 8320 2023 2038 2053 12-Jan-2024 28-Oct-2024 28-Jan-2025 01-Apr-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action All uploaded documents have been checked and verified, found as per requirements. View
86 Meerut Power Mech Projects Ltd 20078463 ALAMGIRPUR BADHLA 1 1 4546 2023 2038 2053 31-Dec-2024 06-Sep-2024 31-Jan-2025 01-Feb-2026 Recommended for further Approvals. Approved View
87 Meerut Power Mech Projects Ltd 20031779 ALAMGIRPUR FARIDPUR & RAJPUR MOMIN 2 2 2398 2023 2038 2053 31-Dec-2024 22-Mar-2024 08-Aug-2024 02-Mar-2025 Recommended for Further Approval approved View
88 Meerut Power Mech Projects Ltd 20082926 ALAMGIRPUR KALYANPUR UKHLEENA 3 3 6254 2022 2037 2053 31-Dec-2024 05-Aug-2024 01-Jan-2025 02-Jan-2025 Recommended for further Approvals. approved View
89 Bijnor Vindhya-GAJA (JV) 20059308 ALAMPUR ADWA & NAWADA RAVANA WATER SUPPLY SCHEME 2 2 1450 2023 2038 2053 06-Jul-2023 25-Jan-2025 25-Jul-2025 26-Jul-2025 Every thing complete. Check Document View
90 Meerut Power Mech Projects Ltd 8362074 ALAMPUR BUZURG 1 1 2274 2022 2037 2052 07-Mar-2023 10-Dec-2022 28-Apr-2023 30-Jan-2025 Recommended for further Approval approved View
91 Mainpuri NCC Ltd. 8361881 ALAMPUR DEHAT VILLAGE WATER SUPPLY SCHEME 1 2 5662 2022 2037 2052 17-Apr-2023 15-Apr-2023 15-Jul-2023 22-Nov-2024 Recommended for approval. ok View
92 Fatehpur Power Mech Projects Ltd 20097495 ALAMPUR GAURIYA 1 2 2980 2023 2038 2053 15-May-2023 30-Jun-2025 07-Dec-2024 08-Dec-2024 Trial & Run completed. It was initiated in the month of September(08.09.2024) and Regular water supply is given to the consumers. Verified View
93 Kanpur Dehat GVPR 20077590 ALAMPUR KHERA 2 6 2403 2023 2038 2053 17-Feb-2024 22-Jul-2024 05-Dec-2024 06-Dec-2024 Forward for further necessary action pls All work of scheme found satisfactory View
94 Hardoi NCC Ltd. 20011375 ALAPUR 1 1 1390 2022 2037 2052 26-Jul-2023 17-Jan-2023 16-Apr-2023 24-Dec-2024 ok OK View
95 Kanpur Dehat Indian Hume Pipe 20012654 Alapur 1 2 2820 2022 2037 2052 12-Oct-2022 20-Dec-2022 31-Mar-2023 01-Apr-2023 Forward for further action pls All work of scheme found satisfactory View
96 Gautam Buddha Nagar LC INFRA 20013513 ALAUDDINNPUR URF DUDHERA VILLAGE WATER SUPPLY SCHEME 1 1 1832 2022 2037 2052 07-Feb-2024 01-Nov-2024 01-Aug-2024 01-Nov-2024 Project certificate is verified all work has been completed. View
97 Gautam Buddha Nagar LC INFRA 20126316 ALAWALPUR VILLAGE WATER SUPPLY SCHEME 1 1 651 2019 2037 2052 27-Dec-2023 31-Dec-2024 31-Dec-2024 01-Jan-2024 Actual Executed Cost Verified based on Approved Variation Statement. all work has been completed. View
98 Ambedkar Nagar Vindhya-GAJA (JV) 20026069 ALAWALPUR WATER SUPPLY SCHEME 1 6 2340 2023 2038 2053 28-Sep-2023 30-Jun-2024 30-Sep-2023 01-Oct-2024 Checked and found OK Scheme completed View
99 Bijnor LC INFRA 20068069 ALEALIPUR WATER SUPPLY SCHEME 3 3 2180 2022 2037 2052 23-Jan-2023 16-May-2025 16-May-2025 17-May-2025 Every thing complete. Every thing is Completed. View
100 Farrukhabad Vindhya-GAJA (JV) 20092769 ALHADADPUR BHATULI, BIRSINGH PUR & CHIRIYA MAHOLIYA MVS 3 8 4359 2023 2038 2053 30-May-2025 29-Jun-2024 29-Jun-2024 30-Jun-2024 All the parameters of scheme verified can take in O&M. Ok View
101 Bijnor Vindhya-GAJA (JV) 20022082 Alhaidadpur Khajwa & Benipur Gram Panchayat Water Supply 2 2 2977 2023 2038 2053 06-Jul-2023 10-Nov-2024 10-May-2025 11-May-2025 Every thing complete. Check Document View
102 Kannauj GVPR 20050191 ALHANAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 3 5 2688 2023 2038 2053 15-Jun-2024 16-Mar-2024 19-Jun-2024 20-Jun-2024 Forwarded for further action. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
103 Kannauj GVPR 20067733 ALIPUR & BAHADURPUR MAJHGAWAN GRAM PANCHAYAT WATER SUPPLY SCHEME 2 12 11410 2023 2038 2053 08-Sep-2024 15-Feb-2025 03-Feb-2025 04-Feb-2025 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
104 Kannauj GVPR 20100934 ALIPUR AHANA GRAMM PANCHAYAT WATER SUPPLY SCHEME 1 2 682 2023 2038 2053 14-Nov-2024 07-Apr-2024 10-Jul-2024 11-Jul-2024 forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
105 Bijnor LC INFRA 20011662 Alipur Damodar Village Water Supply Scheme 2 2 2454 2022 2037 2052 10-Feb-2024 10-Dec-2023 08-Jun-2024 09-Jun-2024 Every thing completed. Everything Completed View
106 Bijnor Vindhya-GAJA (JV) 20090447 ALIPUR GANGA WSS 2 2 1810 2023 2038 2053 06-Jul-2023 04-Nov-2025 04-May-2026 05-May-2026 All Documents Completed. check View
107 Meerut Power Mech Projects Ltd 20058121 ALIPUR MORNA & GAJROLA 2 2 4940 2023 2038 2053 31-Dec-2024 16-Aug-2024 05-Jan-2025 06-Jan-2025 Recommended for further Approvals. Approved View
108 Auraiya GVPR 20064155 Alipur PWS 2 5 4040 2023 2038 2053 06-Jan-2022 05-Dec-2024 04-Dec-2024 06-Dec-2024 Forwarded for further action. All work of scheme found satisfactory. View
109 Kanpur Dehat GVPR 20065029 ALIPUR RAMHAR 2 3 2980 2023 2038 2053 18-Jan-2024 20-Nov-2023 25-Feb-2024 26-Feb-2024 TKC unable to submit the calibration certificate and other report for O&M and some work pending ( Painting work {Pump House, Boundary wall & Gate}, Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work. All work of scheme found satisfactory View
110 Kanpur Dehat GVPR 20069947 Aliyapur 1 1 1840 2023 2038 2053 17-Feb-2024 20-Nov-2023 25-Feb-2024 26-Feb-2024 Forward for necessary action All work of scheme found satisfactory View
111 Shahjahanpur NCC Ltd. 20016336 ALIYAPUR 3 3 2420 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Aliyapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Aliyapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
112 Bijnor LC INFRA 20038629 Aliyarpur Gram Panchayat Water Supply 2 2 1490 2022 2037 2052 20-Nov-2025 01-May-2025 31-Jul-2025 01-Aug-2025 Every thing complete. Check document View
113 Bijnor LC INFRA 20016956 ALLEHYARPUR WATER SUPPLY SCHEME 4 4 6300 2022 2037 2052 10-Feb-2024 12-Sep-2024 12-Mar-2025 13-Mar-2025 Every thing complete. All document complete View
114 Gautam Buddha Nagar LC INFRA 20017811 ALLI AHAMADPUR URF GRAHI 1 1 1298 2022 2037 2052 07-Feb-2024 10-Jul-2025 10-Apr-2025 10-Jul-2025 Project certificate is verified all work has been completed. View
115 Fatehpur Power Mech Projects Ltd 20095164 ALLIPUR 1 3 4630 2023 2038 2053 14-May-2024 30-Jun-2024 12-Jan-2024 12-Feb-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of September (19.09.2024). Verified View
116 Mau GA INFRA-VPL 20102138 Allipur Water Supply Scheme 1 1 810 2023 2038 2053 20-Oct-2024 20-Oct-2024 20-Jan-2025 20-Jan-2025 Approved.. Approved View
117 Kannauj GVPR 20100937 ALMAPUR GAHLAUT GRAMM PANCHAYAT WATER SUPPLY SCHEME 1 1 1090 2023 2038 2053 14-Nov-2024 07-Apr-2024 10-Jul-2024 11-Jul-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
118 Bijnor Vindhya-GAJA (JV) 20102309 AMANATPUR WSS 1 1 1831 2023 2038 2053 06-Jul-2023 09-Jul-2024 09-Jan-2025 10-Jan-2025 Every thing complete. everything complete View
119 Bijnor Vindhya-GAJA (JV) 20058935 AMANGAR WATER SUPPLY SCHEME 2 2 2057 2023 2038 2053 06-Jul-2023 20-Dec-2024 20-Jun-2025 21-Jun-2025 Every thing complete. Check Document View
120 Meerut Power Mech Projects Ltd 20098079 AMANULLAPUR 1 1 2415 2023 2038 2053 31-Dec-2024 05-Sep-2024 24-Jan-2025 25-Jan-2025 Recommended for further Approvals. Approved View
121 Gautam Buddha Nagar LC INFRA 20017813 AMANULLAPUR URF MAHARA 1 1 4770 2022 2037 2052 20-Mar-2023 30-Apr-2023 31-Oct-2024 01-Nov-2024 Project certificate is verified Verified View
122 Mau LC INFRA 20080869 AMARHAT VILLAGE WATER SUPPLY SCHEME 1 4 2069 2022 2037 2052 12-Aug-2024 10-Mar-2024 14-Jun-2024 18-Dec-2024 All Documents verified & Checked Approve for O&M View
123 Meerut Power Mech Projects Ltd 20011307 AMARPUR MAZRA KHANDAWLI 1 1 2760 2022 2037 2052 31-Dec-2024 28-Feb-2024 20-Mar-2023 10-Nov-2024 Recommended for further Approvals. approved View
124 Meerut Power Mech Projects Ltd 20082551 AMARSINGHPUR DAYALPUR 2 2 4920 2023 2038 2053 31-Dec-2024 05-Jun-2024 23-Oct-2024 24-Oct-2024 Recommended for further Approvals. approved View
125 Ambedkar Nagar Vindhya-GAJA (JV) 20067357 AMARTAL Water Supply Scheme 3 11 7580 2023 2038 2053 08-Mar-2024 25-Apr-2026 25-Apr-2026 27-Apr-2026 Scheme completed and ready for O&M SCHEME COMPLETED View
126 Sultanpur UNIVERSAL MEP 20064942 AMATHA GRAM PANCHAYAT WATER SUPPLY 2 5 3450 2023 2038 2053 12-Jan-2024 12-Jan-2024 30-Mar-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
127 Ambedkar Nagar Vindhya-GAJA (JV) 20026029 AMAULI MOHIDDINPUR WATER SUPPLY SCHEME 2 7 4910 2023 2038 2053 28-Sep-2024 12-Jun-2025 12-Jun-2025 13-Jun-2025 Scheme completed and ready for O&M CHECKED AND FOUND OK View
128 Kanpur Dehat GVPR 20025235 AMAULI THAKURAN 2 4 3807 2023 2038 2053 26-Sep-2023 20-Nov-2023 05-Apr-2024 06-Apr-2024 Forward for further necessary action pls All work of scheme found satisfactory View
129 Fatehpur Power Mech Projects Ltd 20097763 AMBI, HARI RAMPUR KAITHOLA 4 5 3840 2023 2038 2053 14-May-2024 30-Jun-2025 29-Apr-2025 30-Apr-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of January(30.01.2025) and Regular water supply is given to the consumers. Verified View
130 Hardoi NCC Ltd. 20012430 Amethiya Msinha 2 5 2680 2022 2037 2052 26-Jul-2023 28-Jun-2023 27-Sep-2023 25-Dec-2024 ok OK View
131 Meerut Power Mech Projects Ltd 20020200 AMHERA ADIPUR 1 1 6489 2022 2037 2052 31-Dec-2024 15-Sep-2024 01-Feb-2025 20-Jun-2025 Recommended for further Approvals. approved View
132 Fatehpur Power Mech Projects Ltd 20100814 AMILIHA PAL 2 9 4830 2023 2038 2053 14-May-2024 30-Jun-2025 12-Mar-2025 13-Mar-2025 Trial & Run completed. It was initiated in the month of December (13.12.2024) and Regular water supply is given to the consumers. Verified View
133 Hardoi NCC Ltd. 20012379 AMIRATA BADARAIYA 5 9 4420 2022 2037 2052 14-Jun-2023 17-Jan-2023 16-Apr-2023 24-Dec-2024 ok OK View
134 Bahraich PNC-SPML-JV 20018160 AMKOLWA VISESHWARGANJ PWS 1 21 8180 2022 2037 2052 31-Dec-2025 25-Nov-2025 25-Nov-2025 26-Nov-2025 scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/01/0329 kindly complete it. scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/01/0329 kindly complete it. View
135 Banda NCC Ltd. 8134904 Amlikaur GOV and Tubewell Scheme 28 Nos. 202 202 959697 2023 2038 2053 08-Nov-2022 28-Feb-2025 28-Feb-2025 03-Mar-2025 Checked & OK as per TPI recommendation forwarded View
136 Mau LC INFRA 20064173 Amma Bhelaur Gram Panchayat Water Supply Scheme 6 7 3130 2022 2037 2052 05-Jul-2024 23-Dec-2025 08-Dec-2025 23-Dec-2025 Approved Approved View
137 Meerut Power Mech Projects Ltd 20020202 AMROLI URF BARAGOAN 1 1 4936 2023 2038 2053 31-Dec-2024 09-Dec-2023 26-Apr-2024 17-Feb-2025 Recommended for Further Approval approved View
138 Shahjahanpur NCC Ltd. 20023894 Anawa Wss 1 1 3000 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Anawa scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Anawa Wss scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
139 Fatehpur Power Mech Projects Ltd 20097498 AND MAW 1 1 1640 2023 2038 2053 20-Sep-2024 16-Feb-2025 15-Feb-2025 16-Feb-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of November (14.11.2024) and Regular water supply is given to the consumers. Verified View
140 Meerut Power Mech Projects Ltd 20031774 ANDAWALI & BEHTA 2 2 2256 2022 2037 2052 31-Dec-2024 16-Mar-2024 02-Aug-2024 26-Dec-2024 Recommended for further Approval approved View
141 Ambedkar Nagar Vindhya-GAJA (JV) 20096252 ANDHIYARWA Water Supply Scheme 2 4 4080 2023 2038 2053 23-Nov-2023 20-Mar-2026 20-Mar-2026 21-Mar-2026 Scheme completed and ready for O&M SCHEME COMPLETED View
142 Fatehpur Power Mech Projects Ltd 20106718 ANDMAU GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 1750 2023 2033 2053 25-Sep-2024 30-Jun-2025 26-Jan-2025 27-Jan-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of October (27.10.2024) and Regular water supply is given to the consumers. Verified View
143 Bijnor LC INFRA 20038186 Anesnangli Gram Panchayat Water Supply 1 1 2371 2022 2037 2052 14-Nov-2022 30-Dec-2024 31-Mar-2025 01-Apr-2025 Every thing complete. Every thing is Completed. View
144 Kanpur Dehat Indian Hume Pipe 20012981 Angadpur 2 3 2640 2022 2037 2052 05-Feb-2022 31-Dec-2024 31-Aug-2023 01-Sep-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
145 Amethi Vindhya-GAJA (JV) 20085692 ANI BAIJAL WATER SUPPLY SCHEME 1 5 3687 2023 2038 2053 29-Apr-2024 14-Aug-2024 15-Nov-2024 16-Feb-2025 Hardcopy submiited and all documents found okay.. Hardcopy submitted and found okay as per the submitted documents.. View
146 Sultanpur Vindhya-GAJA (JV) 20089890 ANIRUDHHAPUR WATER SUPPLY SCHEME 1 8 1580 2023 2038 2053 22-Mar-2024 04-Oct-2025 04-Jan-2026 01-Feb-2026 All uploaded documents checked and found as per requirements. This is sending for further process. All uploaded documents have been checked and verified, found as per requirements. View
147 Auraiya GVPR 20065266 Aniso PWS 3 5 2861 2023 2038 2053 12-Jan-2024 10-Jun-2024 09-Jun-2024 11-Jun-2024 Forwarded for further action. All work of scheme fond satisfactory. View
148 Fatehpur Power Mech Projects Ltd 20102034 Anjana Bhairo 1 1 1810 2023 2038 2053 20-Sep-2024 21-Dec-2024 07-May-2025 08-May-2025 Trial & Run completed. It was initiated in the month of February (06.02.2025) and Regular water supply is given to the consumers. Verified View
149 Fatehpur Power Mech Projects Ltd 20095819 ANJANA KABIR 3 3 3490 2023 2038 2053 14-May-2024 30-Jun-2025 12-Mar-2025 13-Mar-2025 Trial & Run completed. It was initiated in the month of December(12.12.2024) and Regular water supply is given to the consumers. Verified View
150 Kanpur Dehat Indian Hume Pipe 20031408 Ant Village water supply scheme 3 5 4000 2022 2037 2052 22-Sep-2023 31-Dec-2024 11-Apr-2024 12-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
151 Auraiya GVPR 20065264 Antol PWS 1 3 2143 2023 2038 2053 31-Dec-2024 09-Feb-2024 08-Feb-2024 10-Feb-2024 Forwarded for further action. All work of scheme fond satisfactory. View
152 Shahjahanpur NCC Ltd. 8361712 ANWAS DUGAIYA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 2 2 2420 2022 2037 2052 30-Sep-2023 31-Dec-2024 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Anwas Dugaiya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Anwas Digaiya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
153 Fatehpur Power Mech Projects Ltd 20100813 Aoreai 1 15 10050 2023 2038 2053 25-Oct-2024 12-Mar-2025 19-Jul-2025 20-Jul-2025 Trial & Run completed. It was initiated in the month of April (20.04.2025) and Regular water supply is given to the consumers. Verified View
154 Fatehpur Power Mech Projects Ltd 20079154 ARAIPUR & NANDAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 5 4350 2023 2038 2053 13-Mar-2024 02-Oct-2024 17-Jan-2025 18-Jan-2025 Trial & Run completed. It was initiated in the month of October (18.10.2024) and Regular water supply is given to the consumers. Verified View
155 Fatehpur Power Mech Projects Ltd 20095172 ARAMPUR,BASAI 1 2 3430 2023 2053 2053 15-May-2023 30-Jun-2025 13-Mar-2025 14-Mar-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of December (14.12.2024) and Regular water supply is given to the consumers. Verified View
156 Balrampur Larsen & Toubro Ltd 20016384 Ararpakar water supply scheme 2 10 4974 2022 2037 2052 30-Dec-2021 05-May-2025 05-Aug-2025 05-Aug-2025 Vide letter no.: ceinsys/OPR/Devipatan/BLP/O&M/UPJN/2o26-27/07/210 mentioning that scheme is partially commissioned and not yet ready for O&M handover. Major deficiencies remain in FHTC coverage, commissioning of four habitations, tail-end water pressure, leakage, chlorination, SCADA/instrument calibration, automation, and essential civil/E&M works. All pending works, testing, calibration, water-quality assurance, and rectification should be completed before O&M handover. Some FHTCs and other minor campus related works to be rectified. View
157 Ambedkar Nagar Vindhya-GAJA (JV) 20026109 AREEFPUR SARI WATER SUPPLY SCHEME 2 2 3150 2023 2038 2053 28-Sep-2023 14-Nov-2024 05-Dec-2024 06-Dec-2025 Scheme completed and ready for O&M Scheme completed View
158 Amethi Vindhya-GAJA (JV) 20085680 ARGWAN & SAKRAWA WATER SUPPLY SCHEME 4 8 4459 2023 2038 2053 28-Apr-2024 20-Jun-2024 20-Sep-2024 21-Dec-2024 Hardcopy submitted and found okay as per the submitted documents. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance... View
159 Kanpur Dehat Indian Hume Pipe 20012955 Arhariyamau 2 2 2580 2022 2037 2052 05-Feb-2022 31-Dec-2023 31-Mar-2023 01-Apr-2023 Forward for further necessary action All work of scheme found satisfactory View
160 Kannauj GVPR 20066523 ARIFPUR & SARAI BHAMAL GRAM PANCHAYAT WATER SUPPLY SCHEME 2 3 3135 2023 2038 2053 16-Aug-2024 10-Nov-2024 14-Feb-2025 15-Feb-2025 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
161 Auraiya Indian Hume Pipe 20014526 ariyari 4 4 2900 2022 2037 2052 08-May-2023 01-Jul-2023 09-Oct-2023 10-Oct-2023 Forwarded for further action. All work of scheme fond satisfactory. View
162 Mau LC INFRA 8359725 ARIYASO VILLAGE RURAL WATER SUPPLY SCHEME 2 3 2301 2022 2037 2052 26-Aug-2023 10-Dec-2024 09-Dec-2024 10-Dec-2024 Approved Approved. View
163 Bijnor Vindhya-GAJA (JV) 20024327 Arjanipur Gram Panchayat Water Supply 2 2 2006 2023 2038 2058 06-Jul-2023 05-Oct-2024 05-Apr-2025 06-Apr-2025 Every thing complete. Check document View
164 Ambedkar Nagar Vindhya-GAJA (JV) 20067488 ARKHAPUR Water Supply Scheme 8 8 6840 2023 2038 2053 20-Feb-2024 24-Jul-2025 25-Oct-2025 26-Oct-2025 Checked and found ok SCHEME COMPLETED View
165 Ambedkar Nagar Vindhya-GAJA (JV) 20068934 ARMA WSS 3 6 3800 2023 2038 2053 08-Mar-2024 28-Oct-2025 18-Feb-2026 19-Feb-2026 SCHEME COMPLETED Scheme completed and ready for O&M View
166 Meerut Power Mech Projects Ltd 20010906 ARNAWALI 2 2 3801 2022 2037 2052 31-Dec-2024 11-Dec-2024 07-May-2025 15-Jan-2026 Recommended for further Approvals Approved View
167 Hardoi NCC Ltd. 8360564 ARONGAPUR 1 6 3417 2022 2037 2052 05-Mar-2023 02-Mar-2023 01-Jun-2023 25-Dec-2024 ok OK View
168 Ambedkar Nagar Vindhya-GAJA (JV) 20059419 ARSAWAN Water Supply Scheme 5 7 3770 2023 2038 2053 26-Dec-2023 25-Jul-2025 19-Jan-2026 20-Jan-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
169 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20008850 Arusa Azampur 2 5 2787 2022 2037 2052 07-Jul-2023 20-Dec-2025 20-Nov-2025 20-Dec-2025 Scheme completed and ready for O&M Scheme completed and ready for O&M View
170 Sultanpur UNIVERSAL MEP 20092610 ARWAL& CHAK SHIVPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 5 5010 2023 2038 2053 12-Jan-2024 31-Dec-2024 01-Mar-2025 01-Apr-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
171 Etawah Indian Hume Pipe 20024498 ASADPUR PWS 2 2 2900 2022 2037 2052 22-Sep-2023 19-Dec-2024 16-May-2024 17-May-2024 Forwarded to you for further action. All work of scheme found satisfactory. View
172 Kannauj GVPR 20100936 ASAFPUR PATTI GRAMM PANCHAYAT WATER SUPPLY SCHEME 1 1 753 2023 2038 2053 14-Nov-2024 22-Mar-2024 24-Jun-2024 25-Jun-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
173 Kannauj GVPR 20067304 ASALTABAD GRAM PANCHAYAT WATER SUPPLY SCHEME 1 12 6548 2023 2038 2053 08-Sep-2024 04-Apr-2024 07-Jul-2024 08-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
174 Kannauj GVPR 20090114 ASEH GRAM PANCHAYAT WATER SUPPY SCHEME 1 7 4095 2023 2038 2053 08-Sep-2024 03-May-2024 07-Aug-2024 08-Aug-2024 Forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
175 Kanpur Dehat Indian Hume Pipe 20025498 Asewa 1 1 2100 2022 2037 2052 24-Aug-2023 31-Dec-2024 05-Aug-2023 06-Aug-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
176 Meerut Power Mech Projects Ltd 20058475 ASFABAD & SHAMASPUR 2 2 4439 2023 2038 2053 31-Dec-2024 06-Sep-2024 24-Oct-2025 10-Mar-2025 Recommended for further Approval approved View
177 Hardoi NCC Ltd. 20012353 Asgarpur 2 4 2240 2022 2037 2052 26-Jul-2023 13-Dec-2023 14-Mar-2024 07-Dec-2024 ok OK View
178 Farrukhabad Vindhya-GAJA (JV) 20076793 ASGARPUR & KALUVAPUR SANI MVS 4 5 5312 2023 2038 2053 30-May-2025 13-May-2024 13-May-2024 14-May-2024 ok Ok View
179 Auraiya Indian Hume Pipe 8362915 ASHA 1 6 2530 2022 2037 2052 12-Oct-2022 10-Mar-2023 19-Jun-2023 20-Jun-2023 Forwarded for further action. All work of scheme fond satisfactory. View
180 Ghaziabad LC INFRA 20025889 ASHALATNAGAR PWS SCHEME 1 1 9865 2022 2037 2052 06-Aug-2022 30-Sep-2025 31-Dec-2025 01-Jan-2026 Actual Executed Cost Verified based on approved variation statement. all work has been completed. View
181 Ambedkar Nagar Vindhya-GAJA (JV) 20033756 ASHARFABAD WATER SUPPLY SCHEME 2 7 4220 2023 2038 2053 21-Oct-2023 30-Jun-2024 30-Sep-2024 01-Oct-2024 Checked and found OK Scheme completed View
182 Raebareli NCC Ltd. 20064085 Ashrafabad WATER SUPPLY SCHEME 2 4 1410 2022 2037 2052 16-Sep-2024 21-Jul-2024 23-Jun-2024 21-Nov-2024 Ok Ok View
183 Auraiya GVPR 20076358 Ashu PWS 1 8 3543 2023 2038 2053 01-Jun-2022 16-Jun-2024 15-Jun-2024 17-Jun-2024 Forwarded for further action. All work of scheme found satisfactory. View
184 Auraiya Indian Hume Pipe 8359399 Asjana 1 5 3610 2022 2037 2052 14-Sep-2022 15-Nov-2023 05-Dec-2023 05-Mar-2024 Forwarded for further action. All work of scheme fond satisfactory. View
185 Bijnor Vindhya-GAJA (JV) 20089146 Aslatpur Water Supply Scheme 3 3 4074 2023 2038 2053 06-Jul-2023 20-Oct-2024 20-Apr-2025 21-Apr-2025 Every thing complete. All document complete View
186 Bahraich PNC-SPML-JV 20092591 ASMANPUR MAHSI RETRO PWS 1 4 3450 2022 2037 2052 31-Dec-2025 21-Nov-2025 21-Nov-2025 22-Nov-2025 scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/12/0363 kindly complete it. scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/02/0226 kindly complete it. View
187 Amethi Vindhya-GAJA (JV) 20066626 ASNI1 WATER SUPPLY SCHEME 1 3 2728 2023 2038 2053 06-Jan-2024 19-Jun-2024 19-Sep-2024 20-Dec-2024 All Document not provided by EPC hence returns to the EPC All things found satisfactory in the Scheme and finalized for Operation And Maintenance View
188 Sultanpur UNIVERSAL MEP 20066080 ASRAFPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 5 3040 2023 2038 2053 12-Jan-2024 12-Jan-2024 04-Dec-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
189 Ambedkar Nagar Vindhya-GAJA (JV) 20041463 ASTABAD WSS 3 5 3890 2023 2038 2053 23-Nov-2023 23-Dec-2024 23-Dec-2024 24-Dec-2024 Scheme completed and ready for O&M Scheme completed View
190 Shahjahanpur NCC Ltd. 20015760 Astoli 1 3 3390 2022 2037 2052 31-Aug-2023 31-Dec-2024 30-Nov-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Astoli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Astoli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
191 Kanpur Dehat Indian Hume Pipe 20094237 asvi 1 1 1550 2022 2037 2052 03-Apr-2023 31-Dec-2024 31-Mar-2024 01-Apr-2024 FORWARD FOR FURTHER NECESSARY ACTION PLS. All work of scheme found satisfactory View
192 Farrukhabad Vindhya-GAJA (JV) 20076806 ATAIPUR JADID SVS 1 3 6984 2023 2038 2053 30-May-2025 03-Jul-2024 03-Jul-2024 04-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
193 Sultanpur UNIVERSAL MEP 20066093 ATAR SUMA KALAN GRAM PANCHAYAT WATER SUPPLY SCHEME 1 6 2725 2023 2038 2053 12-Jan-2024 12-Jan-2024 29-Jun-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
194 Meerut Power Mech Projects Ltd 20076613 ATAULA 1 1 2550 2023 2038 2053 31-Dec-2024 10-Oct-2024 26-Feb-2025 27-Feb-2025 Recommended for further Approvals. approved View
195 Meerut Power Mech Projects Ltd 8362367 ATERNA 1 1 3375 2022 2037 2052 31-Dec-2024 15-Mar-2023 01-Aug-2023 01-Nov-2024 Recommended for further Approval approved View
196 Bijnor Vindhya-GAJA (JV) 20021919 Athai Jamruddin Gram Panchayat Water Supply 1 1 3159 2022 2037 2052 06-Jul-2023 11-May-2025 11-Nov-2025 12-Nov-2025 Every thing complete. All document complete View
197 Kanpur Dehat GVPR 20053176 ATIYA RAIPUR 1 2 2875 2023 2038 2053 18-Nov-2023 26-Dec-2023 10-May-2024 11-May-2024 Forward for further necessary action pls All work of scheme found satisfactory View
198 Fatehpur Power Mech Projects Ltd 20097499 ATRAHA 1 2 2310 2023 2038 2053 20-Sep-2024 28-Apr-2025 27-Apr-2025 28-Apr-2025 Trial & Run completed. It was initiated in the month of January (27.01.2025) and Regular water supply is given to the consumers. Verified View
199 Kannauj GVPR 20090158 ATRAULI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 1289 2023 2038 2053 16-Aug-2024 20-Mar-2024 22-Jun-2024 23-Jun-2024 forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
200 Hardoi NCC Ltd. 20000036 ATWA ASIGAON 0111 1 6 5460 2022 2037 2052 29-Apr-2023 02-Oct-2023 01-Jan-2024 30-Nov-2024 ok OK View
201 Mau LC INFRA 20021117 AUDEDIH WATER SUPPLY SCHEME 2 5 3017 2022 2037 2052 20-Sep-2023 22-Apr-2026 15-Apr-2026 22-Apr-2026 Approved Approved View
202 Kanpur Dehat Indian Hume Pipe 8362825 AUNDERI 1 1 3260 2022 2037 2052 15-Sep-2021 31-Dec-2024 30-Sep-2023 01-Oct-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
203 Kanpur Dehat Indian Hume Pipe 20025482 Aurangabad Bhola Hulash 1 2 2520 2022 2037 2052 24-Aug-2023 31-Dec-2024 31-Mar-2024 01-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
204 Kanpur Dehat GVPR 20053080 AURANGABAD DALCHAND 1 6 3055 2023 2038 2053 18-Nov-2023 15-Dec-2023 22-Mar-2024 23-Mar-2024 Forward for Further action All work of scheme found satisfactory View
205 Ghaziabad LC INFRA 20017652 Aurangabad dateri PWS scheme 1 1 3251 2022 2037 2052 27-Mar-2022 31-Oct-2024 28-Feb-2025 01-Mar-2025 Actual Executed Cost Verified based on approved variation statement. all work has been completed View
206 Kanpur Dehat GVPR 20077371 AURANGABAD HEERAMANSHA ANANATPUR DHAUKAL 2 4 3381 2023 2038 2053 17-Feb-2024 28-Jan-2024 01-May-2024 02-May-2024 Forward for further action All work of scheme found satisfactory View
207 Gautam Buddha Nagar LC INFRA 20035303 AURANGABAD URF HUMYAUNPUR WATER SUPPLY SCHEME 1 1 790 2022 2037 2052 20-Mar-2024 30-Jan-2024 30-Mar-2024 01-Apr-2024 Project certificate is verified. Verified View
208 Bijnor LC INFRA 20051583 AURANGJEBPUR MAHMUD 3 3 6318 2022 2037 2052 18-Jan-2025 18-Jan-2025 18-Jan-2025 19-Jan-2025 Every thing completed. Everything Completed View
209 Bijnor Vindhya-GAJA (JV) 20058869 AURANGPUR BHIKKO WATER SUPPLY SCHEME 2 2 3027 2023 2038 2053 06-Jul-2023 19-May-2025 19-Nov-2025 20-Nov-2025 Every thing complete. all document complete View
210 Auraiya GVPR 20084705 Auton PWS 1 4 3243 2023 2038 2053 01-Jun-2022 14-Dec-2024 13-Dec-2024 15-Dec-2024 Forwarded for further action All work of scheme fond satisfactory. View
211 Bijnor LC INFRA 20016840 AZAMABAD & NAIBPUR SADAT WATER SUPPLY SCHEME 2 2 1988 2022 2037 2052 02-Nov-2021 16-Dec-2024 16-Dec-2024 17-Dec-2024 Every thing complete. Everything Completed. View
212 Meerut Power Mech Projects Ltd 20066830 AZAMPUR 1 1 2033 2023 2038 2053 31-Dec-2024 02-Jun-2024 19-Oct-2024 20-Oct-2024 Recommended for further Approvals..................................... Approved View
213 Shahjahanpur NCC Ltd. 20016550 babauri 2 2 2810 2022 2037 2052 31-Dec-2024 24-Dec-2023 24-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Babauri scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Babauri scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
214 Auraiya GVPR 20099295 Babayan PWS 1 2 1601 2023 2038 2053 31-Dec-2024 18-Feb-2025 17-Feb-2025 19-Feb-2025 Forwarded for further action. All work of scheme fond satisfactory. View
215 Sultanpur UNIVERSAL MEP 20064718 BABHANGOAN GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 2740 2023 2038 2053 12-Jan-2024 12-Jan-2024 12-Feb-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
216 Auraiya GVPR 20091181 Babina sukhchainpur PWS 2 2 1704 2023 2038 2053 06-Jan-2022 06-Jul-2024 06-Jun-2024 07-Jun-2024 Forwarded for further action. All work of scheme found satisfactory. View
217 Amethi Vindhya-GAJA (JV) 20066413 babu pur Sharia water supply Scheme 1 5 3301 2023 2038 2053 06-Jan-2024 12-Nov-2024 12-Feb-2025 13-May-2025 All Document not provided by EPC hence returns to the EPC All things found satisfactory in the Scheme and finalized for Operation And Maintenance View
218 Shahjahanpur NCC Ltd. 20015921 Babupur Buzurg 3 4 5210 2022 2037 2052 31-Dec-2024 26-Jun-2024 25-Sep-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Babupur Buzurg scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Babupur Bujurg W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
219 Jaunpur Welspun Kaveri Infraprojects JV 8360930 Babura 2 9 2591 2022 2037 2052 22-May-2023 21-Mar-2026 21-Mar-2026 22-Mar-2026 Checked and found ok..... ok View
220 Kanpur Dehat GVPR 20065041 BACHEET BHARTHU 1 1 2633 2023 2038 2053 18-Jan-2024 27-Jul-2023 12-Dec-2023 13-Dec-2023 Forward for further necessary action pls All work of scheme found satisfactory View
221 Jhansi NCC Ltd. 8009988 Bacholi Bauzurg GOV 37 7596 80591 2023 2038 2053 30-Jun-2022 30-Aug-2023 20-Jan-2025 21-Jan-2025 checked checked View
222 Amethi Vindhya-GAJA (JV) 20065721 BADAGAON WATER SUPPLY SCHEME 1 5 4132 2023 2038 2053 09-Jan-2023 04-Jun-2024 04-Sep-2024 05-Dec-2024 Hardcopy submitted and found okay as per the submitted documents. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance.. View
223 Amethi Vindhya-GAJA (JV) 20066484 BADALGARH & BAKHTWARNAGAR WATER SUPPLY SCHEME 1 8 3510 2023 2038 2053 06-Jan-2024 14-May-2024 13-Sep-2024 14-Dec-2024 Hardcopy submitted and found okay as per the submitted documents. Hardcopy submitted and found okay as per the submitted documents.. View
224 Jaunpur AFCONS 20033336 BADALPUR 3 8 3000 2023 2038 2053 31-Dec-2024 04-Jun-2025 04-Jun-2025 04-Jun-2025 Checked and found ok ok View
225 Sultanpur UNIVERSAL MEP 20066301 BADHANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 7 2436 2023 2038 2053 12-Jan-2024 12-Jan-2024 28-Jun-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
226 Shamli JMC - Lakshmi (JV) 8362284 Badhupura & Gajipura GOV Water Supply Scheme 2 2 3076 2022 2037 2052 03-Mar-2025 11-Jun-2025 11-Jun-2025 12-Jun-2025 work found satisfactory......... Approved for O and M View
227 Auraiya GVPR 20025452 BADIN PWS 3 8 5430 2023 2038 2053 01-Jun-2024 29-Nov-2023 12-Oct-2023 30-Nov-2023 Forwarded for further action. All work of scheme found satisfactory. View
228 Etawah Indian Hume Pipe 20024485 Badri Pooth PWS 2 4 3330 2022 2037 2052 22-Sep-2023 15-Mar-2024 21-Jun-2024 22-Jun-2024 Forwarded for further action. All work of scheme found satisfactory. View
229 Shahjahanpur NCC Ltd. 20015209 BADRIPUR HADIRA 1 1 2540 2022 2037 2052 31-Dec-2024 31-Aug-2023 30-Nov-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the BADRIPUR HADIRA WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. JJM/BLG/CLU-05/2026-2027/48 for further necessary action. All information on the portal for the completion certificate of BADRIPUR HADIRA have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
230 Auraiya GVPR 20065263 Badshahpur chhonk PWS 2 6 2640 2023 2038 2053 01-Jun-2022 24-Aug-2024 07-Jul-2024 25-Aug-2024 Forwarded for further action. All work of scheme found satisfactory. View
231 Auraiya GVPR 20088695 Badua Maharaj pur bhadursingh, Phaphund dehat PWS 1 3 3254 2023 2033 2053 06-Jan-2022 26-Jan-2025 25-Jan-2025 27-Jan-2025 Forwarded for further action. All work of scheme found satisfactory. View
232 Meerut Power Mech Projects Ltd 20066756 BAFAR 1 1 2881 2023 2038 2053 31-Dec-2024 20-Jul-2024 06-Dec-2024 07-Dec-2024 Recommended for further Approvals approved View
233 Bijnor LC INFRA 20026226 Bagaina Village Water Supply 2 2 3283 2022 2037 2052 09-Feb-2022 11-Feb-2025 12-May-2025 13-May-2025 Every thing complete Check Document View
234 Bijnor LC INFRA 20017124 Bagarpur Grahi Water Supply 1 1 3404 2022 2037 2052 02-Nov-2021 06-Jul-2024 05-Jan-2025 06-Jan-2025 Every thing complete. Complete document View
235 Auraiya Indian Hume Pipe 8361962 BAGHAIPUR 1 4 2965 2022 2037 2052 15-Sep-2022 01-Nov-2023 14-Feb-2024 15-Feb-2024 Forwarded for further action. All work of scheme fond satisfactory. View
236 Bijnor LC INFRA 20017058 Bahadarpur Sharfuddin Husain Water Supply 1 1 3393 2022 2037 2052 02-Nov-2023 12-Sep-2024 12-Mar-2025 13-Mar-2025 Every thing complete Every thing complete View
237 Kanpur Dehat GVPR 20053135 Bahadurpur 1 7 2679 2023 2038 2053 18-Nov-2023 15-Jan-2024 30-May-2024 31-May-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
238 Meerut Power Mech Projects Ltd 8362075 BAHADURPUR 1 1 3080 2022 2037 2052 31-Dec-2024 30-Jan-2023 18-Jun-2023 19-Dec-2024 Recommended for further Approval approved View
239 Meerut Power Mech Projects Ltd 20098085 BAHADURPUR 1 1 3229 2023 2038 2053 11-Jun-2025 15-Jun-2024 01-Nov-2024 02-Nov-2024 Recommended for further Approvals. Approved View
240 Hardoi NCC Ltd. 20012558 Bahadurpur 2 3 1690 2022 2037 2052 26-Jul-2023 13-Oct-2023 12-Jan-2024 24-Dec-2024 ok OK View
241 Auraiya GVPR 20025226 Bahadurpur Inguthiya 1 3 3024 2023 2038 2053 06-Jan-2022 08-Sep-2023 13-May-2023 28-Jun-2023 Forwarded for further action. All work of scheme found satisfactory. View
242 Kannauj GVPR 20077131 BAHADURPUR MAJHGAWAN GRAM PANCHAYAT WATER SUPPLY SCHEME 1 6 4590 2023 2038 2053 08-Sep-2024 22-Apr-2024 26-Jul-2024 27-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
243 Jaunpur Welspun Kaveri Infraprojects JV 20068622 Baharaicha 6 10 4364 2022 2037 2052 26-Jul-2024 13-Oct-2025 13-Oct-2025 14-Oct-2025 Testing & Commissioning certificate, Road restoration, trial & run certificate and Final BOQ not signed by EE but TPIA checked and signed all document for further process. ok View
244 Fatehpur Power Mech Projects Ltd 20043841 Baharoli 1 2 3610 2023 2038 2053 28-Nov-2023 12-Mar-2025 05-Aug-2025 06-Aug-2025 Trial & Run completed. It was initiated in the month of May (04.05.2025) and Regular water supply is given to the consumers. Verified View
245 Mau LC INFRA 20085348 BAHARWAR AND BASTI PANCHAYAT WATER SUPPLY SCHEME 3 9 3183 2022 2037 2052 03-Sep-2024 08-Dec-2025 23-Apr-2025 08-Dec-2025 Approved Approved View
246 Farrukhabad Vindhya-GAJA (JV) 20093117 BAHATASA & NARSINGAPUR MVS 3 4 3855 2023 2038 2053 30-May-2025 03-Jul-2024 03-Jul-2024 04-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
247 Kanpur Dehat Indian Hume Pipe 20096871 Bahbalpur 2 2 1925 2022 2037 2052 03-Mar-2024 31-Dec-2024 31-Aug-2023 01-Sep-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
248 Auraiya GVPR 20025453 BAHDHMAU 1 1 3047 2023 2038 2053 06-Jan-2022 31-Dec-2024 24-Nov-2023 10-Jan-2024 Forwarded for further action. All work of scheme found satisfactory. View
249 Kannauj GVPR 20090084 BAHERA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 5 1514 2023 2038 2053 08-Sep-2024 16-Jan-2025 17-Apr-2025 18-Apr-2025 Forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
250 Kanpur Dehat Indian Hume Pipe 20025550 Baherimah 1 2 2420 2022 2037 2052 25-Aug-2022 31-Dec-2024 30-Jun-2023 01-Jul-2023 FORWARD FOR FURTHER NECESSARY ACTION PLS. All work of scheme found satisfactory View
251 Kannauj GVPR 20077121 BAHISHAR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 6 4309 2023 2038 2053 08-Sep-2024 04-Apr-2024 07-Jul-2024 08-Jul-2024 forwarded for further action. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
252 Ambedkar Nagar Vindhya-GAJA (JV) 20026118 BAHLOLPUR WATER SUPPLY SCHEME 2 4 2790 2023 2038 2053 29-Sep-2022 28-Sep-2023 23-Mar-2025 24-Mar-2025 checked and verified Scheme completed View
253 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20007059 Bahloulpur 3 10 4681 2022 2037 2052 22-Mar-2023 26-Nov-2025 10-Jul-2025 24-Nov-2025 Scheme completed and ready for O&M Scheme Completed View
254 Meerut Power Mech Projects Ltd 20020833 BAHRALA & IKLAUTA 2 2 3080 2022 2037 2052 04-Feb-2024 24-Dec-2023 12-May-2024 06-Apr-2025 Recommended for further Approval approved View
255 Sultanpur UNIVERSAL MEP 20066059 BAHU RAWAN GRAM PANCHAYAT WATER SUPPLY SCHEME 1 12 4300 2023 2038 2053 12-Jan-2024 12-Jan-2024 06-Mar-2025 01-Apr-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
256 Jaunpur AFCONS 20034256 BAIJAPUR VILLAGE WATER SUPPLY SCHEME 1 11 2575 2023 2038 2053 18-Nov-2023 12-Oct-2025 12-Oct-2025 12-Oct-2025 checked and found ok ok View
257 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20009905 BAIJUPUR 1 8 2080 2022 2037 2052 11-Apr-2023 08-Apr-2025 08-Apr-2025 02-Jul-2025 SCHEME COMPLETED BAIJPUR SCHEME COMPLETED View
258 Farrukhabad Vindhya-GAJA (JV) 20092448 BAIRAMPUR MVS 2 2 1755 2023 2038 2053 31-Mar-2025 20-Apr-2024 01-Aug-2024 12-May-2025 All the parameters of scheme verified can take in O&M ok View
259 Ambedkar Nagar Vindhya-GAJA (JV) 20067277 BAIRI BUJURG Water Supply Scheme 5 15 2880 2023 2035 2053 22-Feb-2023 18-Aug-2025 28-Feb-2026 01-Mar-2026 scheme ready for o&m SCHEME COMPLETED View
260 Kanpur Dehat Indian Hume Pipe 20034277 BAIRI DARIYON 1 4 3170 2022 2037 2052 24-Nov-2022 23-Nov-2023 31-Mar-2023 01-Apr-2023 Forward for further action All work of scheme found satisfactory View
261 Kanpur Dehat GVPR 20025219 Bairisal 1 3 4740 2023 2038 2053 26-Sep-2023 10-Nov-2023 17-Feb-2024 18-Feb-2024 TKC unable to submit the calibration certificate and other report for O&M . Ref. SWSM/BLG/TPI/KD/NS/2025-26/6653 DT.18.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's All work of scheme found satisfactory View
262 Kannauj GVPR 20050531 BAISABARI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 2725 2023 2038 2053 15-Jun-2024 28-Apr-2024 31-Jul-2024 01-Aug-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
263 Gautam Buddha Nagar LC INFRA 20094851 BAJARPUR VILLAGE WATER SUPPLY SCHEME 1 1 2171 2022 2037 2052 20-Mar-2023 07-Feb-2024 30-Mar-2024 01-Apr-2024 Actual Executed Cost Verified based on Approved Variation Statement. all work has been completed. View
264 Meerut Power Mech Projects Ltd 20023019 BAJAUT PWS 1 1 2395 2022 2037 2052 31-Dec-2024 25-May-2024 13-Oct-2024 14-Oct-2024 Recommended for further Approvals. Approved View
265 Sultanpur Vindhya-GAJA (JV) 20051107 BAJETI WATER SUPPLY SCHEME 2 2 2050 2023 2038 2053 23-Nov-2023 13-Nov-2025 05-Sep-2025 01-Mar-2026 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements. View
266 Shahjahanpur NCC Ltd. 20084380 BAJHERA BAJHERI GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 2 2 1770 2023 2038 2053 31-Dec-2024 20-Jun-2023 19-Sep-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of BAJHERA BAJHERI scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of BAJHERA BAJHERI scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
267 Farrukhabad Vindhya-GAJA (JV) 20093035 BAJHERA MALIK PATTI SVS 1 2 1390 2023 2038 2053 30-May-2025 31-Mar-2025 31-Mar-2025 01-Apr-2025 All the parameters of scheme verified can take in O&M. ok View
268 Farrukhabad Vindhya-GAJA (JV) 20092830 BAJIDPUR & KASIMPUR TARAI MVS 5 12 4036 2023 2038 2053 30-May-2025 23-Jun-2024 23-Jun-2024 24-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
269 Bijnor LC INFRA 8361058 BAJIDPUR VILLAGE WATER SCHEME 1 2 1981 2022 2037 2052 29-Sep-2023 12-Dec-2023 10-Jun-2024 11-Jun-2024 Every thing completed. All document complete View
270 Auraiya GVPR 20089640 Bakarpur & Chandanapur Dayal Singh PWS 1 2 2492 2023 0 0 01-Jun-2022 11-Jun-2024 10-Jun-2024 12-Jun-2024 Forwarded for further action. All work of scheme fond satisfactory. View
271 Azamgarh LC INFRA 20101554 Bakashpur Rural Water Supply Scheme 2 4 3959 2023 2038 2053 10-Aug-2023 11-Jan-2024 11-Apr-2024 12-Apr-2024 Ok OK View
272 Auraiya Indian Hume Pipe 20014587 BAKHARIYA PWS 1 2 1840 2022 2037 2052 08-May-2023 10-Jan-2023 09-Oct-2024 10-Oct-2024 Forwarded for further action. All work of scheme fond satisfactory. View
273 Jaunpur AFCONS 20030855 BAKIYA WATER SUPPLY SCHEME 3 5 3450 2023 2038 2053 29-Sep-2023 26-Sep-2025 26-Sep-2025 26-Sep-2025 Checked and found ok ok View
274 Ambedkar Nagar Vindhya-GAJA (JV) 20075144 BALA PAIKAULI WSS 1 9 3520 2023 2038 2053 08-Mar-2024 20-Jun-2025 14-Oct-2025 15-Oct-2025 Scheme completed and ready for O&M Scheme Completed View
275 Kannauj GVPR 20067295 BALANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 6 2903 2023 2038 2053 16-Aug-2024 31-Mar-2024 03-Jul-2024 04-Jul-2024 Forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
276 Sultanpur UNIVERSAL MEP 20064752 BALAPASHCHIM GRAM PANCHAYAT WATER SUPPLY SCHEME 1 7 4660 2023 2038 2053 12-Jan-2024 12-Jan-2024 12-Feb-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
277 Ambedkar Nagar Vindhya-GAJA (JV) 20093127 BALAYA JAGDISHPUR Water Supply Scheme 2 6 3920 2023 2038 2053 17-May-2024 16-Jul-2025 20-Jan-2026 21-Jan-2026 Scheme completed and ready for O&M SCHEME COMPLETED View
278 Shahjahanpur NCC Ltd. 20084069 BALELI WSS 1 1 2340 2022 2037 2052 31-Dec-2024 20-Aug-2024 19-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Baleli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Baleli W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
279 Meerut Power Mech Projects Ltd 20090047 Bali - Saidipur Urf Ramnagar 2 1 6102 2023 2038 2053 31-Dec-2024 25-Jul-2024 12-Dec-2024 13-Dec-2024 Recommended for further Approvals AS THIS SCHEME IS IN PARTIAL O&M approved View
280 Gautam Buddha Nagar LC INFRA 8389568 BALLABH NAGAR URF KARROL BANGAR GRAM PANCHAYAT WATER SUPPLY 1 1 2023 2022 2037 2052 07-Feb-2024 10-Nov-2024 10-Sep-2024 10-Nov-2024 Project certificate is verified all work has been completed. View
281 Auraiya GVPR 20065255 Ballpur Rajpur 1 2 3071 2023 2038 2053 01-Jun-2022 16-Jun-2024 15-Jun-2024 16-Jun-2024 Forwarded for further action. All work of scheme fond satisfactory. View
282 Kanpur Dehat Indian Hume Pipe 20024374 Bamhanauti 1 1 1900 2022 2037 2052 24-Aug-2023 31-Dec-2024 31-Aug-2023 01-Sep-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
283 Etawah Indian Hume Pipe 20015098 Bamhora 1 6 4560 2022 2037 2052 12-Oct-2022 30-Oct-2024 03-Oct-2024 04-Oct-2024 Forwarded for further action. All work of scheme found satisfactory. View
284 Bijnor LC INFRA 20095825 BAMNOLI VILLAGE WSS 2 2 3531 2022 2037 2052 13-Apr-2023 20-Feb-2025 20-Feb-2025 21-Feb-2025 Every thing complete. All document complete View
285 Shahjahanpur NCC Ltd. 20016412 BAMRAULI 1 2 1640 2022 2037 2052 31-Jul-2023 31-Dec-2024 30-Oct-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bamrauli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Bamrauli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
286 Kanpur Dehat GVPR 20077609 banaralipur & swarooppur 2 2 4551 2023 2038 2053 17-Feb-2024 25-Feb-2024 25-May-2024 26-May-2024 Forward for Necessary action All work of scheme found satisfactory View
287 Ghaziabad LC INFRA 20094886 BANDIPUR VILLAGE WATER SUPPLY SCHEME 1 1 2058 2022 2037 2052 01-Oct-2024 30-Nov-2024 31-Mar-2025 01-Apr-2025 Actual Executed Cost Verified based on approved variation statement. Approved View
288 Shahjahanpur NCC Ltd. 20015066 BANDIYA KALA Jaitipur W/s 1 3 2930 2022 2037 2052 31-Dec-2024 18-Jul-2023 17-Oct-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of BANDIYA KALA Jaitipur W/s scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of BANDIYA KALA Jaitipur W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
289 Amethi Vindhya-GAJA (JV) 20098342 BANDOIYA Water Supply Scheme 1 2 1498 2023 2038 2053 04-Jul-2024 26-Jun-2024 26-Sep-2024 27-Dec-2024 All Document not provided by EPC hence returns to the EPC All things found satisfactory in the Scheme and finalized for Operation And Maintenance View
290 Ambedkar Nagar Vindhya-GAJA (JV) 20019916 Bangaon 1 5 4770 2023 2038 2053 03-Aug-2023 30-Aug-2025 27-Dec-2026 28-Dec-2025 checked and found ok Scheme Completed View
291 Ambedkar Nagar Vindhya-GAJA (JV) 20026073 BANGAON WATER SUPPLY SCHEME 1 7 4120 2023 2038 2053 28-Sep-2023 08-Mar-2026 08-Mar-2026 09-Mar-2026 checked and found ok Scheme Completed View
292 Ayodhya UNIVERSAL MEP 20058408 Bangaona And Firozpur pawaran WSS 2 2 4390 2023 2038 2053 22-Jan-2024 09-May-2024 09-May-2024 01-Feb-2025 FOUND OK ok View
293 Amethi Gayatri Projects LTD 20085728 BANHAPUR WATER SUPPLY SCHEME 2 4 2431 2023 2038 2052 22-Sep-2024 07-Jun-2024 10-Sep-2024 21-Dec-2024 Hardcopy submitted and found okay as per the submitted documents.. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance View
294 Bahraich PNC-SPML-JV 20017926 BANIA HARI CHITTAURA PWS 1 6 3610 2022 2037 2052 31-Dec-2025 16-Oct-2025 16-Oct-2025 17-Oct-2025 scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/11/0064 kindly complete it. Scheme Completed View
295 Kanpur Dehat GVPR 20077456 BANIPARA DAGRAHA 2 4 3696 2023 2038 2053 17-Feb-2024 22-Dec-2023 06-May-2024 07-May-2024 Forward for further necessary action pls All work of scheme found satisfactory View
296 Kanpur Dehat Indian Hume Pipe 20034273 BANIPARA JINAI 1 4 2960 2022 2037 2052 23-Nov-2023 31-Dec-2024 09-Feb-2024 01-Mar-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
297 Mau LC INFRA 8375486 BANIYAPAR GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME 2 4 2500 2022 2037 2052 02-May-2023 06-Jul-2023 07-Jun-2024 26-Nov-2024 All Documents verified & Checked Approved View
298 Sultanpur Vindhya-GAJA (JV) 20050628 BANMAIE WATER SUPPLY SCHEME 1 3 2500 2023 2038 2053 02-Dec-2023 10-Nov-2025 02-Feb-2026 03-Feb-2026 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
299 Kannauj GVPR 20067615 BANPUR RUDAULI NARAYANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 2278 2023 2038 2053 16-Aug-2024 14-Mar-2024 14-Jun-2024 15-Jun-2024 Forwarded for further action. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
300 Auraiya Indian Hume Pipe 8359436 Banshi 1 8 4015 2022 2037 2052 14-Sep-2022 31-Dec-2024 01-Jun-2023 01-Sep-2023 Forwarded for further action. All work of scheme fond satisfactory. View
301 Sultanpur UNIVERSAL MEP 20066527 BANSI & UTARDAHA GRAM PANCHAYAT WATER SUPPLY SCHEME 2 3 4900 2023 2038 2053 12-Jan-2024 12-Jan-2024 21-Jan-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
302 Lakhimpur Kheri NCC Ltd. 8360567 Banstali 1 6 2211 2022 2037 2052 09-Apr-2023 04-Feb-2023 20-May-2023 20-Nov-2024 Approved as per check list Found Ok View
303 Hardoi NCC Ltd. 20008678 Banta Kamalpur 1 1 2160 2022 2037 2052 05-Mar-2023 01-Dec-2022 01-Mar-2023 25-Dec-2024 ok OK View
304 Fatehpur Power Mech Projects Ltd 20089213 BANTHARA 1 2 4600 2023 2038 2053 14-Mar-2024 30-Oct-2025 28-Sep-2025 29-Sep-2025 Trial & Run completed. It was initiated in the month of June (29.06.2025) and Regular water supply is given to the consumers. HGJ Certificate not signed by Gram pradhan and panchayat secretary. Verified View
305 Auraiya GVPR 20038720 BANTHARA PWS 1 3 1448 2023 2038 2053 31-Dec-2024 09-Sep-2024 08-Sep-2024 10-Sep-2024 Forwarded for further action All work of scheme fond satisfactory. View
306 Shahjahanpur NCC Ltd. 20016522 BANTHARA URF NAGLA 2 4 3260 2022 2037 2052 31-Dec-2024 24-Dec-2023 24-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Banthra urf Nagla scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Banthara Urf Nagla scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
307 Jaunpur AFCONS 20050775 BANUADEEH VILLAGE WATER SUPPLY SCHEME 1 9 3125 2023 2038 2053 30-Dec-2026 30-Jun-2025 30-Jun-2025 30-Jun-2025 Checked and found ok. OK View
308 Meerut Power Mech Projects Ltd 20092218 BAPARSA 1 1 3105 2022 2037 2052 31-Dec-2024 14-Aug-2024 02-Jan-2025 03-Jan-2025 Recommended for further Approvals. approved View
309 Meerut Power Mech Projects Ltd 20067091 BAPARSI 1 1 4118 2022 2037 2052 31-Dec-2024 01-Aug-2024 20-Dec-2024 21-Dec-2024 Recommended for further Approvals....................... APPROVED View
310 Kanpur Dehat GVPR 20077333 Baragaon & khalakpur 3 6 4328 2023 2038 2053 17-Feb-2024 14-Nov-2023 29-Mar-2024 30-Mar-2024 Forward for further necessary action pls All work of scheme found satisfactory View
311 Kanpur Dehat GVPR 20065069 BARAGAON BHIKKI 2 4 3204 2023 2038 2053 18-Jan-2024 12-Oct-2023 29-Mar-2024 30-Mar-2024 Forward for further necessary action pls All work of scheme found satisfactory View
312 Bahraich PNC-SPML-JV 20014069 BARAGUNNU CHITTAURA PWS MVS 2 5 5534 2022 2037 2052 31-Dec-2025 20-Nov-2025 20-Nov-2025 21-Nov-2025 Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/01/0204, kindly complete it. Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/01/0204, View
313 Fatehpur Power Mech Projects Ltd 20095835 BARAHATA 1 2 2210 2023 2038 2053 15-May-2023 30-Jun-2025 12-Dec-2024 13-Mar-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of December (12.12.2024) Verified View
314 Fatehpur Power Mech Projects Ltd 20097775 BARAICHA 2 2 2360 2023 2038 2058 14-Aug-2023 30-Jun-2025 04-Dec-2024 05-Dec-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of September (05.09.2024) and Regular water supply is given to the consumers. Verified View
315 Fatehpur Power Mech Projects Ltd 20102049 BARAICHI 1 1 1950 2023 2038 2053 20-Sep-2024 19-Mar-2025 18-Mar-2025 19-Mar-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of December (19.12.2024) and Regular water supply is given to the consumers. Verified View
316 Jaunpur AFCONS 20059705 BARAIYA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 14 3370 2023 2038 2053 26-Jan-2024 27-May-2025 27-May-2025 28-May-2025 Checked and found ok.. Ok View
317 Farrukhabad Vindhya-GAJA (JV) 20091265 BARAKASUR URF RANIGARH 2 4 2926 2023 2038 2053 06-Jun-2024 30-May-2025 06-Jun-2024 07-Jun-2024 Water supply is being provided to households, and therefore, the scheme may be taken up under Operation & Maintenance (O&M) Ok View
318 Meerut Power Mech Projects Ltd 20067044 BARAM REORANISATION 1 1 3202 2022 2037 2052 14-Aug-2024 05-Sep-2024 22-Jan-2025 25-Jan-2025 Recommended for further Approvals. approved View
319 Ambedkar Nagar Vindhya-GAJA (JV) 20075128 BARAMADPUR JARIYARI WSS 1 12 6670 2023 2038 2053 22-Feb-2024 22-Jun-2025 15-Oct-2025 16-Oct-2025 scheme completed for O&M Scheme Completed and Ready For O&M View
320 Kannauj GVPR 20036218 BARAMAU BANGER PEYJAL YOJNA 1 5 3422 2023 2038 2053 13-May-2024 22-Apr-2024 26-Jul-2024 27-Jul-2024 forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
321 Bijnor LC INFRA 8388820 BARAMJITPUR CHANDA GRAMPANCHAYAT WATER SUPPLY SCHEME 2 2 2478 2022 2037 2052 29-Sep-2021 10-Jun-2024 08-Jun-2024 09-Jun-2024 every thing completed every thing completed View
322 Fatehpur Power Mech Projects Ltd 20097451 BARANPUR 1 1 2360 2023 2038 2053 20-Sep-2024 19-Jan-2025 18-Jan-2025 19-Jan-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of October (17.10.2024) and Regular water supply is given to the consumers. Verified View
323 Kanpur Dehat GVPR 20095626 Barar 2 2 1730 2023 2038 2053 30-Nov-2023 02-Jan-2024 03-Apr-2024 04-Apr-2024 Forward for further action All work of scheme found satisfactory View
324 Fatehpur Power Mech Projects Ltd 20097777 BARAR,GAZIPUR 3 17 4970 2023 2038 2053 14-May-2024 30-Jun-2025 12-Sep-2024 12-Oct-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of September (10.09.2024) Verified View
325 Auraiya GVPR 20099164 Barau PWS 1 2 1448 2023 2038 2053 21-Jun-2024 06-Apr-2024 19-Feb-2024 07-Apr-2024 Forwarded for further action. All work of scheme found satisfactory. View
326 Auraiya GVPR 20093727 Baraua PWS 1 1 1698 2023 0 0 01-Jun-2022 02-May-2026 01-May-2025 02-May-2025 Forwarded for further action. All work of scheme fond satisfactory. View
327 Ayodhya UNIVERSAL MEP 20031481 BARAULI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 2950 2023 2038 2053 12-Oct-2023 26-Oct-2023 26-Oct-2023 15-Nov-2024 Found ok Found Correct View
328 Kannauj GVPR 20098265 BARAULI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 7 3935 2023 2038 2053 14-Nov-2024 22-Apr-2024 26-Jul-2024 27-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
329 Auraiya GVPR 20065261 Barauli PWS 1 4 2820 2023 0 0 01-Jun-2022 18-Dec-2024 17-Dec-2024 19-Dec-2024 Forwarded for further action. All work of scheme fond satisfactory. View
330 Shahjahanpur NCC Ltd. 20015633 Baraura 1 1 2720 2022 2037 2052 31-Dec-2024 04-Jun-2024 03-Sep-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Baraura WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Baraura WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
331 Kannauj GVPR 20099739 BARGAWA GRAMM PANCHAYAT WATER SUPPLY SCHEME 1 5 3861 2023 2038 2053 08-Sep-2024 16-Apr-2024 19-Jul-2024 20-Jul-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
332 Kanpur Dehat VSA 20094193 Bargawan 1 1 1691 2023 2038 2023 30-Apr-2023 31-Dec-2023 07-May-2024 08-May-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
333 Meerut Power Mech Projects Ltd 8362768 BARHANPUR 1 1 2192 2022 2037 2052 31-Dec-2024 27-Feb-2024 20-Mar-2023 07-Oct-2024 Recommended for further Approvals. approved View
334 Hardoi NCC Ltd. 20011901 BARI 5 5 2780 2022 2037 2052 14-Jun-2023 25-Dec-2022 01-Apr-2023 30-Nov-2024 ok OK View
335 Kannauj GVPR 20050543 BARIA MAU GRAM PANCHAYAT WATER SUPPLY SCHEME 1 4 2434 2023 2038 2053 15-Jun-2024 16-Apr-2024 19-Jul-2024 20-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
336 Shahjahanpur NCC Ltd. 20013439 Barilalpur water supply scheme 3 4 2970 2022 2037 2052 30-Sep-2023 31-Dec-2024 26-Oct-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Barilalpur scheme have been checked and verified. The submitted records are recommended and forwarded for further All information on the portal for the completion certificate of Barilalpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
337 Auraiya GVPR 20093415 Baripur maphi PWS 1 2 1617 2023 2038 2053 01-Jun-2022 08-Apr-2025 07-Apr-2025 09-Apr-2025 Forwarded for further action. All work of scheme found satisfactory. View
338 Sultanpur UNIVERSAL MEP 20071514 BARIYAONA& GARTHULI GRAM PANCHAYAT WATER SUPPLY SCHEME 4 13 7405 2023 2038 2053 18-Jul-2024 02-Mar-2025 30-May-2025 01-Aug-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
339 Auraiya GVPR 20091174 Bariyare Mau PWS 1 4 2537 2023 0 0 01-Jun-2022 03-Oct-2024 02-Oct-2024 04-Oct-2024 Forwarded for further action. All work of scheme fond satisfactory. View
340 Auraiya Indian Hume Pipe 20014838 BARKAPUR PWS 2 2 1400 2022 2037 2052 08-May-2023 01-Apr-2023 10-May-2023 10-Aug-2023 Forwarded for further action. All work of scheme fond satisfactory. View
341 Auraiya GVPR 20089651 Barkasi PWS 1 1 2526 2023 2038 2053 06-Jan-2022 05-Mar-2024 26-Nov-2023 11-Jan-2024 Forwarded for further action. All work of scheme found satisfactory. View
342 Bijnor Vindhya-GAJA (JV) 20053412 Barkatpur Water supply scheme 1 1 3903 2023 2038 2053 06-Jul-2023 02-Apr-2024 05-Oct-2024 06-Oct-2024 Every thing complete. Everything Complete View
343 Kannauj VSA 20064259 BARKHAGAWAN KANNAUJ GRAMIN PEYJAL YOJNA 1 1 1390 2022 2037 2052 06-Jun-2024 24-Apr-2025 19-Aug-2025 01-Jan-2026 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
344 Bijnor LC INFRA 20019385 Barkhrabad Urf Khatai Water Supply 1 1 2059 2022 2037 2052 09-Feb-2024 06-Apr-2024 14-Oct-2024 15-Oct-2024 Every thing completed. complete View
345 Auraiya GVPR 20089664 Barmupur PWS 1 2 1616 2023 0 0 01-Jun-2022 13-Jan-2025 12-Jan-2025 14-Jan-2025 Forwarded for further action. All work of scheme fond satisfactory. View
346 Farrukhabad Vindhya-GAJA (JV) 20091663 BARNA BUJURG & WAHIDPUR MVS 2 3 4002 2023 2038 2053 30-May-2025 14-Jun-2024 14-Jun-2024 15-Jun-2024 All the parameters of scheme verified can take in O&M ok View
347 Shahjahanpur NCC Ltd. 20015880 Barnai 2 3 3340 2022 2037 2052 31-Dec-2024 19-Mar-2024 18-Jun-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Barnai WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Barnai WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
348 Fatehpur Power Mech Projects Ltd 20097505 BAROUN 1 1 2860 2023 2038 2053 25-Sep-0024 30-Jun-0025 23-Feb-2024 24-Apr-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of January (23.01.2024) Verified View
349 Kanpur Dehat GVPR 20025211 BARRA THARRA 2 4 3941 2023 2038 2053 26-Sep-2023 01-Nov-2023 17-Mar-2024 18-Mar-2024 Forward for necessary action pls. All work of scheme found satisfactory View
350 Auraiya Indian Hume Pipe 20061844 Barru kulasar PWS 1 2 3000 2022 2037 2052 22-Sep-2023 20-Jan-2025 30-Apr-2025 01-May-2025 Forwarded for further action. All work of scheme fond satisfactory. View
351 Auraiya Indian Hume Pipe 20055904 Barru phaphund 1 1 2020 2022 2037 2052 22-Sep-2023 20-Jan-2024 09-May-2024 10-May-2024 Forwarded for further action. All work of scheme fond satisfactory. View
352 Ambedkar Nagar Vindhya-GAJA (JV) 20019746 Barsari 1 12 4640 2023 2038 2053 03-Aug-2023 25-Feb-2025 31-Oct-2025 01-Nov-2025 checked and found ok Scheme Completed View
353 Sultanpur Gayatri Projects LTD 20015740 BARSAWAN WATER SUPPLY SCHEME 3 7 2650 2022 2037 2052 02-Mar-2023 31-Mar-2025 31-May-2024 12-Aug-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
354 Ayodhya UNIVERSAL MEP 20031498 BARTARA & MOHAMMADPUR DAUDPUR GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME 3 6 4000 2023 2038 2053 12-Oct-2023 19-Oct-2023 19-Oct-2023 15-Nov-2024 Found ok Found Correct View
355 Auraiya Indian Hume Pipe 20014839 BARUA pws 2 2 1500 2022 2037 2052 08-May-2023 10-Oct-2024 19-Jan-2025 20-Jan-2025 Forwarded for further action. All work of scheme fond satisfactory. View
356 Kannauj GVPR 20067597 BARUASABAL PUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 6 5427 2023 2038 2053 16-Aug-2024 16-Apr-2024 19-Jul-2024 20-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
357 Jhansi Unipro 8135681 Barwar GOV 58 37 88387 2023 2038 2053 04-Nov-2022 31-Jul-2024 29-Dec-2024 30-Dec-2024 checked checked View
358 Ambedkar Nagar Vindhya-GAJA (JV) 20041590 BASAHIYA 3 16 3780 2023 2038 2053 23-Nov-2023 24-Dec-2024 28-Mar-2025 29-Mar-2025 Checked and found ok CHECKED AND FOUND OK View
359 Amethi Vindhya-GAJA (JV) 20085694 BASAIKPUR WATER SUPPLY SCHEME 1 6 2135 2023 2038 2053 29-Apr-2024 05-Nov-2024 05-Feb-2025 06-May-2025 Hardcopy submitted and found okay as per the submitted documents.. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance View
360 Gautam Buddha Nagar LC INFRA 20100520 BASANTPUR BANGAR VILLAGE WATER SUPPLY SCHEME 1 1 688 2022 2037 2052 18-Nov-2024 30-Nov-2024 30-Nov-2024 01-Dec-2024 Actual Executed Cost Verified based on Approved Variation Statement. all work has been completed. View
361 Ambedkar Nagar Vindhya-GAJA (JV) 20047631 BASANTPUR CHHOTU Water Supply Scheme 6 6 2968 2023 2038 2053 25-Nov-2023 15-Aug-2025 01-Jan-2026 02-Jan-2026 Checked and found ok. Scheme completed and ready for O&M View
362 Sultanpur UNIVERSAL MEP 20067088 BASANTPUR TIVARIPUR & MADHOPUR ACHARYA & MARHA GRAM PANCHAYAT WATER SUPPLY SCHEME 3 8 8580 2023 2038 2053 18-Jul-2024 27-Feb-2025 01-Jun-2025 01-Aug-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
363 Bijnor LC INFRA 8361017 BASANTPUR VILLAGE WATER SCHEME 1 1 4356 2022 2037 2052 30-Sep-2023 27-Feb-2024 26-Aug-2024 27-Aug-2024 Every thing completed. Everything Complete. View
364 Ambedkar Nagar Vindhya-GAJA (JV) 20026076 BASANTPUR WATER SUPPLY SCHEME 1 12 4950 2023 2038 2053 28-Sep-2023 01-Jul-2025 19-Oct-2025 20-Oct-2025 checked and found ok Scheme Completed View
365 Shahjahanpur NCC Ltd. 20014821 BASARY 3 3 2360 2022 2037 2052 31-Dec-2024 24-Dec-2023 24-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of BASARY WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Dharampur BASARY Wss have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
366 Auraiya Indian Hume Pipe 20014865 BASHAI PWS 1 3 1885 2022 2037 2052 08-May-2023 01-Apr-2024 18-Apr-2024 18-Jul-2024 Forwarded for further action. All work of scheme fond satisfactory. View
367 Ambedkar Nagar Vindhya-GAJA (JV) 20035108 BASIA WSS 2 6 3680 2023 2038 2053 21-Nov-2023 14-Aug-2024 02-Dec-2024 03-Dec-2024 checked and found ok SCHEME COMPLETED View
368 Hardoi NCC Ltd. 20011927 BASIT NAGAR 2 5 5530 2022 2037 2052 14-Jun-2023 13-May-2023 12-Aug-2023 25-Dec-2024 ok OK View
369 Fatehpur Gayatri Projects LTD 20026263 BASOHANI 1 3 3755 2022 2037 2052 25-Mar-2024 26-Aug-2023 26-Nov-2023 27-Nov-2023 Work has been completed. Trial & Run also completed. It was initiated in the month of August (26.08.2023) and Regular water supply is given to the consumers. Work has been completed. Verified View
370 Ambedkar Nagar Vindhya-GAJA (JV) 20081358 BASOHARI WSS 3 7 2824 2023 2038 2053 09-Mar-2024 19-Nov-2024 20-Mar-2025 21-Mar-2025 checked and found ok Scheme completed View
371 Kannauj GVPR 20036605 BASTA & BHAHSORA GRAMIN PEYJAL YOJNA 2 12 7823 2023 2038 2053 13-May-2024 06-Apr-2024 08-Jul-2024 09-Jul-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
372 Meerut Power Mech Projects Ltd 20010927 BASTORA NORANG 2 2 3022 2022 2037 2052 31-Dec-2024 25-Sep-2024 14-Feb-2025 15-Feb-2025 Recommended for further Approvals. Approved View
373 Shahjahanpur NCC Ltd. 20016434 Basulia 1 1 1910 2022 2037 2052 31-Dec-2024 12-Jul-2023 11-Oct-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Basulia scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Basulia W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
374 Fatehpur Power Mech Projects Ltd 20097933 BASVA&GURSANDI 2 3 6980 2023 2038 2053 26-Sep-2023 30-Jun-2025 10-Jun-2025 11-Jun-2025 Trial & Run completed. It was initiated in the month of March (11.03.2025) and Regular water supply is given to the consumers. Verified View
375 Meerut Power Mech Projects Ltd 20074091 BATJEORA 1 1 2743 2022 2037 2052 31-Dec-2024 05-Jun-2024 22-Oct-2024 23-Oct-2024 Recommended for further Approvals. Approved View
376 Shahjahanpur NCC Ltd. 20084141 BAURI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 7 5910 2022 2037 2052 31-Aug-2024 31-Dec-2024 30-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bauri scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Bauri scheme has been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
377 Hardoi NCC Ltd. 8360559 BAUSRA 1 3 2790 2022 2037 2052 05-Mar-2023 29-Jun-2023 28-Sep-2023 25-Dec-2024 ok OK View
378 Kannauj GVPR 20036243 BAUTHAM GRAMIN PEYJAL YOJNA 1 5 3988 2023 2038 2053 13-May-2024 10-Apr-2024 13-Jul-2024 14-Jul-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
379 Bijnor LC INFRA 8360904 BAWAN SARAI (112578) GRAMPANCHAYAT WATER SUPPLY SCHEME 2 2 3219 2022 2037 2052 02-Nov-2021 01-Feb-2025 30-Apr-2025 01-May-2025 Every thing complete. Check Document View
380 Bijnor LC INFRA 8388702 BAZIDPUR VILLAGE WATER SUPPLY SCHEME 1 1 2600 2022 2037 2052 23-Jul-2024 23-Jul-2024 24-Oct-2024 25-Oct-2024 Every thing complete. Check View
381 Bijnor Vindhya-GAJA (JV) 20058738 Bedar bakthpur Jado Water Supply Scheme 3 3 4515 2023 2038 2053 06-Jul-2023 25-Jan-2025 25-Jul-2025 26-Jul-2025 Every thing complete. Check document View
382 Etawah Indian Hume Pipe 20015033 Beedhupura 4 6 2350 2022 2037 2052 08-May-2023 11-Aug-2023 31-Mar-2024 01-Apr-2024 All work has been completed as per approved departmental design and drawing. No any leakage or pressure drop found during the final inspection. Water supply is continue from last 1 year. All work of scheme found satisfactory View
383 Farrukhabad Vindhya-GAJA (JV) 20074527 BEEGHAMAU MVS 3 5 4265 2023 2038 2053 30-May-2025 25-May-2024 25-May-2024 26-May-2024 All the parameters of scheme verified can take in O&M. ok View
384 Ambedkar Nagar Vindhya-GAJA (JV) 20067153 BEERKHET Water Supply Scheme 4 8 4500 2023 2038 2053 21-Feb-2023 21-Feb-2024 28-Apr-2025 29-Apr-2025 Scheme completed and ready for O&M Scheme Completed View
385 Farrukhabad Vindhya-GAJA (JV) 20092383 BEG & HUSAINPUR BANGER MVS 5 5 3446 2023 2038 2053 31-Mar-2025 08-Oct-2024 01-Feb-2025 02-Feb-2025 All the parameters of scheme verified can take in O&M ok View
386 Bijnor LC INFRA 8360405 BEGAMPUR SHADI GRAMPANCHAYAT WATER SUPPLY SCHEME 1 1 5526 2022 2037 2052 29-Sep-2024 10-Dec-2023 08-Jun-2024 09-Jun-2024 Every thing complete. All document checked. View
387 Kannauj GVPR 20067688 BEHARAPUR GAISAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 8 3024 2023 2038 2053 16-Aug-2024 09-Jun-2024 10-Jun-2024 11-Jun-2024 Forwarded for further action. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
388 Kanpur Dehat Indian Hume Pipe 20034276 BEHATA 1 4 2210 2022 2037 2052 24-Nov-2022 31-Dec-2024 28-Feb-2024 01-Mar-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
389 Meerut Power Mech Projects Ltd 20037256 BEHJADKA 2 2 4172 2022 2037 2052 31-Dec-2024 20-Sep-2024 04-Feb-2025 21-Apr-2025 Recommended for further Approval approved View
390 Kannauj GVPR 20077084 BEHTA GRAM PANCHAYAT WATER SUPPLY SCHEME 2 2 2912 2023 2038 2053 08-Sep-2024 22-Apr-2024 26-Jul-2024 27-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
391 Kannauj GVPR 20067602 BEHTA KHAS GRAM PANCHAYAT WATER SUPPLY SCHEME 1 5 5502 2023 2038 2053 08-Sep-2024 03-May-2024 07-Aug-2024 08-Aug-2024 Forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
392 Amethi Vindhya-GAJA (JV) 20085686 BEHTA MURTAJAPUR WATER SUPPLY SCHEME 3 5 2777 2023 2038 2053 29-Apr-2024 25-May-2024 26-Sep-2024 05-Dec-2024 Hardcopy submitted and found okay as per the submitted documents. Hardcopy submitted and found okay as per the submitted documents.. View
393 Farrukhabad Vindhya-GAJA (JV) 20093040 BEHTABALLU SVS 1 4 1510 2023 2038 2053 30-May-2025 18-Jun-2024 18-Jun-2024 19-Jun-2024 All the parameters of scheme verified can take in O&M ok View
394 Shahjahanpur NCC Ltd. 20015134 BELA CHHEDA W/s 3 3 2280 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bela Chedda scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Bela Chheda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
395 Ambedkar Nagar Vindhya-GAJA (JV) 20056708 BELA PARSA WSS 1 7 6940 2023 2038 2053 26-Dec-2023 28-Sep-2025 29-Dec-2025 01-Jan-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
396 Jaunpur AFCONS 20037441 BELAHATA VILLAGE WATER SUPPLY SCHEME 2 15 2947 2023 2038 2053 18-Nov-2023 16-Dec-0026 16-Jan-2026 16-Jan-2026 Checked and found ok. ok View
397 Auraiya GVPR 20093723 Belpur bela PWS 2 1 1853 2023 2038 2053 06-Jan-2022 10-Aug-2024 09-Aug-2024 10-Aug-2024 Forwarded for further action. All work of scheme found satisfactory. View
398 Ambedkar Nagar Vindhya-GAJA (JV) 20035039 BERGA WSS 2 6 4450 2023 2038 2053 21-Oct-2023 02-Dec-2025 21-Mar-2026 22-Mar-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
399 Bijnor LC INFRA 20026238 Berkhera-Niyamtabad_Rananangla Village Water Supply 3 3 1838 2022 2037 2052 09-Feb-2022 05-Jun-2024 05-Jun-2024 06-Jun-2024 Every thing completed EVERY THING COMPLETED View
400 Farrukhabad Vindhya-GAJA (JV) 20091259 BESERPUR TARAI 1 7 3126 2023 2038 2053 30-May-2025 07-Jul-2024 07-Jul-2024 08-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
401 Ambedkar Nagar Vindhya-GAJA (JV) 20098231 BHABHAURA Water Supply Scheme 4 10 4390 2023 2038 2053 09-Mar-2023 21-Apr-2024 15-May-2025 16-May-2025 CHECKED AND FOUND OK Scheme completed View
402 Shahjahanpur NCC Ltd. 20023905 Bhabhi Wss 1 1 2260 2022 2037 2052 31-Dec-2024 31-Jul-2024 30-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhabhi scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Bhabhi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
403 Gautam Buddha Nagar LC INFRA 8389537 BHABOKARA GRAM PANCHAYAT WATER SUPPLY 1 1 1856 2022 2037 2052 20-Sep-2021 20-Mar-2023 10-Apr-2023 11-Apr-2023 Actual Executed Cost Verified based on Approved Variation Statement. all work has been completed. View
404 Sultanpur UNIVERSAL MEP 20066964 BHADA & PAKARI GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME 4 12 8820 2023 2038 2053 12-Jan-2024 31-Dec-2024 01-Mar-2025 01-Apr-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
405 Fatehpur Power Mech Projects Ltd 20097721 BHADAUHA ,CHANDPUR 1 3 4010 2023 2033 2053 14-May-2024 30-Jun-2025 04-Dec-2024 05-Dec-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of September (05.09.2024) and Regular water supply is given to the consumers. Verified View
406 Ghaziabad LC INFRA 8389818 BHADAULA VILLAGE WATER SUPPLY SCHEME 1 1 2193 2022 2037 2052 27-Mar-2022 31-Oct-2024 28-Feb-2025 01-Mar-2025 Actual Executed Cost Verified based on approved variation statement. all work has been completed View
407 Ghaziabad LC INFRA 20024681 BHADAULI PWS SCHEME 1 1 2522 2022 2037 2052 27-Mar-2022 31-Oct-2024 28-Feb-2025 01-Mar-2025 Actual Executed Cost Verified based on approved variation statement. all work has been completed View
408 Meerut Power Mech Projects Ltd 20020211 BHADAURA 1 1 3723 2022 2037 2052 31-Dec-2024 10-Jul-2024 26-Nov-2024 28-Nov-2024 Recommended for further Approvals. approved View
409 Auraiya GVPR 20093726 Bhadaura PWS 1 3 1448 2023 0 0 01-Jun-2022 21-Nov-2024 20-Nov-2024 22-Nov-2024 Forwarded for further action. All work of scheme fond satisfactory. View
410 Auraiya GVPR 20099294 Bhadaura PWS 2 5 300 2023 2038 2053 01-Jun-2022 19-Jun-2025 18-Mar-2025 18-Jun-2025 Forwarded for further action. All work of scheme found satisfactory. View
411 Auraiya Indian Hume Pipe 20014518 bhadaurpur sahar pws 2 4 2200 2022 2037 2052 08-May-2023 21-Aug-2023 04-Feb-2024 05-Feb-2024 Forwarded for further action. All work of scheme found satisfactory. View
412 Kanpur Dehat GVPR 20025218 BHADHAWAL 2 1 3159 2023 2038 2053 26-Sep-2023 21-Nov-2023 19-Mar-2024 20-Mar-2024 Forward for further necessary action All work of scheme found satisfactory View
413 Kannauj GVPR 20067605 BHADOUSI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 3145 2023 2038 2053 16-Aug-2024 22-Apr-2024 26-Jul-2024 27-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
414 Auraiya GVPR 20088685 Bhadsan & Warwai PWS 1 5 6056 2023 0 0 01-Jun-2022 03-Jan-2025 02-Mar-2025 04-Mar-2025 Forwarded for further action. All work of scheme found satisfactory. View
415 Auraiya GVPR 20065627 Bhadsiya & bamrauliya 1 6 3254 2023 2038 2053 06-Jan-2022 12-Sep-2024 11-Sep-2024 13-Sep-2024 Forwarded for further action. All work of scheme found satisfactory. View
416 Ambedkar Nagar Vindhya-GAJA (JV) 20047607 BHADYA Water Supply Scheme 5 5 3220 2023 2038 2053 25-Nov-2023 31-Dec-2024 16-May-2025 17-May-2025 Checked and Found Ok Scheme completed View
417 Jaunpur AFCONS 20026712 BHAGAMALPUR 2 6 2493 2023 2038 2053 31-Dec-2024 26-Mar-2025 26-Mar-2025 26-Mar-2025 Checked and found ok. Ok View
418 Ambedkar Nagar Vindhya-GAJA (JV) 20047223 BHAGAUTI PUR Water Supply Scheme 2 10 3306 2023 2038 2053 23-Nov-2023 09-Jan-2025 09-Jan-2025 10-Jan-2025 Scheme completed and ready for O&M Scheme completed View
419 Auraiya Indian Hume Pipe 8361896 BHAGAUTIPUR 1 1 1960 2022 2037 2052 08-May-2023 25-Apr-2023 29-Sep-2023 30-Sep-2023 Forwarded for further action. All work of scheme found satisfactory. View
420 Meerut Power Mech Projects Ltd 20067135 BHAGWANPUR 1 1 2736 2023 2038 2053 31-Dec-2024 03-Jun-2024 23-Oct-2024 24-Oct-2024 Recommended for further Approvals. Approved View
421 Meerut Power Mech Projects Ltd 20068807 BHAGWANPUR BANGAR & ISSAPUR 2 2 2243 2022 2037 2052 31-Dec-2024 14-Mar-2025 14-Mar-2025 15-Mar-2025 Recommended for further Approvals. approved View
422 Kannauj GVPR 20050192 BHAGWANTPUR & PRANPUR PULYRA GRAM PANCHAYAT WATER SUPPLY SCHEME 2 7 4643 2023 2038 2053 15-Jun-2024 16-Mar-2024 19-Jun-2024 20-Jun-2024 Forwarded for further action. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
423 Sultanpur UNIVERSAL MEP 20066048 BHAIE GRAM PANCHAYAT WATER SUPPLY SCHEME 1 11 11790 2023 2038 2053 12-Jan-2024 05-Dec-2024 07-Mar-2025 01-Apr-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements. View
424 Farrukhabad Vindhya-GAJA (JV) 20092700 BHAINSARI & RAUKRI MVS 2 3 4728 2023 2038 2053 30-Jun-2027 20-Jul-2026 20-Jul-2026 02-Aug-2026 All the parameters of scheme verified can take in O&M. ok View
425 Auraiya GVPR 20088689 Bhainsol & Rampur baish PWS 1 6 6095 2023 0 0 01-Jun-2022 20-Jul-2024 19-Jul-2024 21-Jul-2024 Forwarded for further action. All work of scheme fond satisfactory. View
426 Shahjahanpur NCC Ltd. 20085002 BHAINSTA KALA GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME 1 1 2100 2022 2037 2052 31-Dec-2024 04-Jun-2024 03-Sep-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the BHAINSTA KALAWSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. SWSM/BLG/JJM/26-27/364 for further necessary action. All information on the portal for the completion certificate of BHAINSTA KALA GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
427 Kanpur Dehat Indian Hume Pipe 20048682 Bhairon Shahjahanpur 3 3 3030 2022 2037 2052 24-Nov-2022 31-Dec-2024 31-Mar-2024 01-Apr-2024 Forward for necessary action pls. All work of scheme found satisfactory View
428 Kanpur Dehat Indian Hume Pipe 20034282 BHAISAYNA 1 6 5000 2022 2037 2052 23-Nov-2023 31-Dec-2024 30-Jun-2023 01-Jul-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
429 Auraiya Indian Hume Pipe 20033784 BHAISODI (MANYODA) PWS 2 4 2670 2022 2037 2052 22-Sep-2023 21-Mar-2023 01-Apr-2023 01-Jul-2023 Forwarded for further action. All work of scheme fond satisfactory. View
430 Kannauj GVPR 20067287 BHAKRAULI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 7 2986 2023 2038 2053 16-Aug-2024 30-Apr-2024 03-Aug-2024 04-Aug-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
431 Jaunpur Welspun Kaveri Infraprojects JV 20020891 Bhakura 1 5 4202 2022 2037 2052 22-May-2023 28-Mar-2026 28-Mar-2026 29-Mar-2026 Checked and found ok. ok View
432 Meerut Power Mech Projects Ltd 20011233 BHALSONA 1 1 2714 2022 2037 2052 31-Dec-2024 12-Dec-2022 02-May-2023 07-Oct-2024 Recommended for further Approvals. Approved View
433 Sultanpur UNIVERSAL MEP 20066112 BHANDAR PARASRAMPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 13 10790 2023 2038 2053 18-Jul-2024 16-Feb-2025 21-May-2025 01-Jul-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements. View
434 Shahjahanpur NCC Ltd. 20026206 BHANDERI 1 1 2910 2022 2037 2052 31-Dec-2024 31-Aug-2024 30-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of BHANDERI scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Bhanderi WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
435 Ghaziabad LC INFRA 8360447 BHANERA KHURD 1 1 4367 2022 2037 2052 30-Mar-2023 31-Dec-2024 30-Apr-2025 01-May-2025 Actual Executed Cost Verified based on approved variation statement All work completed and approved View
436 Kannauj GVPR 20036145 BHANWAR GARH GRAMIN PEYJAL YOJNA 2 4 2657 2023 2038 2053 13-May-2024 21-Jan-2025 23-Apr-2025 24-Apr-2025 forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
437 Kanpur Dehat GVPR 20053362 Bhanwarpur 1 3 2963 2023 2038 2053 18-Nov-2023 30-Nov-2023 27-Mar-2024 28-Mar-2024 Forward for further action All work of scheme found satisfactory View
438 Etawah Indian Hume Pipe 20026313 Bharaipur PWS 1 4 2715 2022 2037 2052 22-Sep-2023 20-Feb-2024 21-May-2024 22-May-2024 Forwarded for further action. All works are satisfactory. View
439 Kanpur Dehat GVPR 20065072 BHARAMAU 3 6 2699 2023 2038 2053 18-Jan-2024 01-Jan-2024 10-Apr-2024 11-Apr-2024 TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI/KD/O&M/2025-26/6655 dt.29/07/2028. we can go to O&M through conditional, TKC submit the require document within 15 day's. All work of scheme found satisfactory View
440 Auraiya Indian Hume Pipe 20056129 Bhararipur PWS 2 2 2050 2022 2037 2052 22-Sep-2023 12-Mar-2024 30-Jun-2024 01-Jul-2024 Forwarded for further action. All work of scheme found satisfactory. View
441 Kanpur Dehat Indian Hume Pipe 20034285 BHARATPUR PIYASI 1 6 2990 2022 2037 2052 24-Nov-2022 31-Dec-2024 30-Jun-2023 01-Jul-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
442 Bijnor LC INFRA 20019390 Bhareka Water Supply 3 3 2481 2022 2037 2052 10-Feb-2024 11-Dec-2023 10-Jun-2024 11-Jun-2024 Every thing complete. All Documents checked and verified View
443 Shahjahanpur NCC Ltd. 20015763 Bhargawan dadrol W/s 2 2 3430 2022 2037 2052 31-Dec-2024 31-Aug-2024 30-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the Bhargawan WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. SWSM/BLG/JJM/26-27/447 for further necessary action. All information on the portal for the completion certificate of Bhargawan dadrol W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
444 Sultanpur Vindhya-GAJA (JV) 20084762 BHARKHARE WSS 1 8 2540 2022 2037 2052 23-Mar-2023 23-Mar-2024 28-Oct-2025 01-Nov-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
445 Shahjahanpur NCC Ltd. 8362049 BHARTAPUR GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 2 2 2269 2022 2037 2052 24-Dec-2023 31-Dec-2024 24-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhartapur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Bhartapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
446 Farrukhabad Vindhya-GAJA (JV) 20097823 BHARTHRI SVS 1 3 1219 2023 2038 2053 30-May-2025 15-Jun-2024 15-Jun-2024 16-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
447 Bijnor Vindhya-GAJA (JV) 20102294 BHARUKA WSS 1 1 2328 2023 2038 2053 06-Jul-2023 02-Jan-2025 02-Jul-2025 03-Jul-2025 Every thing complete. Check Document View
448 Ambedkar Nagar Vindhya-GAJA (JV) 20035105 BHASMA WSS 1 4 3910 2023 2038 2053 21-Oct-2023 28-Oct-2025 28-Feb-2026 01-Apr-2026 Scheme completed and ready for O&M Scheme Completed View
449 Auraiya GVPR 20065254 Bhasora&Purwa makai 3 7 4827 2023 2038 2053 01-Jun-2022 20-Jan-2025 19-Jan-2025 21-Jan-2025 Forwarded for further action. All work of scheme fond satisfactory. View
450 Ambedkar Nagar Vindhya-GAJA (JV) 20019933 Bhasra 1 2 2490 2023 2038 2053 03-Aug-2023 25-Sep-2024 27-Dec-2024 28-Dec-2024 Checked and found ok Scheme completed View
451 Farrukhabad Vindhya-GAJA (JV) 20092428 BHATASA & CHILSARI MVS 2 4 4363 2023 2038 2053 30-May-2025 02-Jul-2024 02-Jul-2024 03-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
452 Amethi Vindhya-GAJA (JV) 20085677 BHATGAWAN WATER SUPPLY SCHEME 2 9 5311 2023 2038 2053 29-Apr-2024 17-Dec-2024 17-Mar-2025 18-Jun-2025 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
453 Sultanpur UNIVERSAL MEP 20091256 BHATI & SANICHARA GRAM PANCHAYAT WATER SUPPLY SCHEME 2 13 5880 2023 2038 2053 22-Mar-2024 31-Dec-2024 31-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
454 Mau LC INFRA 20045020 BHATIKALA WATER SUPPLY SCHEME 2 12 2889 2022 2037 2052 14-Mar-2023 14-Jan-2025 14-Jan-2025 15-Jan-2025 Approved. Approved. View
455 Shahjahanpur NCC Ltd. 8388655 BHATIURA 3 3 2830 2022 2037 2052 30-Aug-2023 31-Dec-2024 30-Nov-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhatiura scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Bhatiura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
456 Shahjahanpur NCC Ltd. 20015124 BHATIURIYA BUZURG 3 3 2880 2022 2037 2052 31-Dec-2024 14-Jan-2024 14-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of BHATIURIYA BUZURG scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of BHATIURIYA BUZURG W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
457 Auraiya Indian Hume Pipe 20014864 bhatoli pws 1 5 3420 2022 2037 2052 08-May-2023 26-Dec-2022 09-Apr-2023 10-Apr-2023 Forwarded for further action. All work of scheme fond satisfactory. View
458 Auraiya GVPR 20100445 Bhatpura PWS 2 6 2357 2023 2038 2053 01-Jun-2022 31-Mar-2025 30-Mar-2025 01-Apr-2025 Forwarded for further action. All work of scheme found satisfactory. View
459 Bijnor LC INFRA 20076096 BHATPURA WATER SUPPLY SCHEME 2 2 2340 2022 2037 2052 03-Feb-2023 30-Oct-2024 31-Jan-2025 01-Apr-2024 Every thing complete. Complete document View
460 Sultanpur UNIVERSAL MEP 20066542 BHATTHI JARAULI & PAIGAPUR GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME 3 3 5430 2023 2038 2053 12-Jan-2024 31-Dec-2024 16-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
461 Meerut Power Mech Projects Ltd 20037253 BHATTIPURA 2 2 8385 2022 2037 2052 31-Dec-2024 02-Feb-2024 20-Jun-2024 07-Oct-2024 Recommended for further Approvals. approved View
462 Kannauj GVPR 20077092 BHAU KHURD GRAM PANCHAYAT WATER SUPPLY SCHEME 2 5 1698 2023 2038 2053 08-Sep-2024 16-Apr-2024 19-Jul-2024 20-Jul-2024 forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
463 Farrukhabad Vindhya-GAJA (JV) 20080827 BHAUPUR CHAURASI SVS 1 3 1993 2023 2038 2053 30-May-2025 28-Jun-2024 28-Jun-2024 29-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
464 Kanpur Dehat GVPR 20053104 Bhaura 1 2 3000 2023 2038 2053 18-Nov-2023 04-Nov-2023 19-Mar-2024 20-Mar-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
465 Kannauj GVPR 20036642 BHAURAJPUR & JAGDISHPUR GRAMIN PEYJAL YOJNA 3 10 5101 2023 2038 2053 13-May-2024 25-Mar-2024 27-Jun-2024 28-Jun-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
466 Amethi Gayatri Projects LTD 20100938 BHAVALPUR & AMBARPUR WATER SUPPLY SCHEME 3 16 4698 2022 2037 2053 25-Jun-2025 02-Sep-2024 05-Dec-2024 15-Mar-2025 Hardcopy submitted and found okay as per the submitted documents.. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance... View
467 Sultanpur UNIVERSAL MEP 20066798 BHAVANIGARH & HASAI MUKUNDPUR GRAM PANCHYAT WATER SUPPLY SCHEME 2 12 2965 2023 2038 2053 12-Jan-2024 14-Jan-2024 21-Nov-2024 01-Dec-2024 All uploaded documents checked and found as per requirements. This is sending for further process. All uploaded documents have been checked and verified as per requirements View
468 Bahraich PNC-SPML-JV 20014712 BHAVANIYAPUR RAMGHADHI RISIYA MVS PWS 2 3 6289 2022 2037 2052 31-Dec-2025 27-Nov-2025 27-Nov-2025 28-Nov-2025 scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/02/0225 kindly complete it. scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/02/0225 kindly complete it. View
469 Shahjahanpur NCC Ltd. 20084093 BHAWALKHERA GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME 1 1 2260 2022 2037 2052 31-Dec-2024 20-Aug-2024 19-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhawalkhera scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Bhawalkhera scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
470 Sultanpur UNIVERSAL MEP 20066947 BHEEKHARPUR & ETWA MALNA GRAM PANCHAYAT WATER SUPPLY SCHEME 4 12 2990 2023 2038 2053 12-Jan-2024 31-Dec-2024 04-Jul-2024 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
471 Mau LC INFRA 20058577 Bhelaur Changeri Rural Water Supply Scheme 1 8 5088 2022 2037 2052 08-Aug-2024 24-Feb-2026 16-Dec-2025 24-Feb-2026 Approved Approved View
472 Sultanpur Vindhya-GAJA (JV) 20069268 BHEURA & GHATAMPUR WATER SUPPLY SCHEME 2 3 4250 2023 2038 2053 08-Aug-2024 10-Nov-2024 10-Jan-2025 01-Nov-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements. View
473 Kanpur Dehat Indian Hume Pipe 20063806 Bhevan 1 8 4240 2022 2037 2052 11-Jan-2024 31-Dec-2024 12-Sep-2023 13-Sep-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
474 Bijnor LC INFRA 20095095 Bhikawala Islamnagar (Zone-2) 2 2 2781 2022 2037 2052 13-Mar-2023 28-Apr-2024 27-Jul-2024 28-Jul-2024 Every thing complete. Complete View
475 Kannauj GVPR 20067319 BHIKHAMPUR SANI GRAM PANCHAYAT WATER SUPPLY SCHEME 2 4 2452 2023 2038 2053 16-Aug-2024 30-Apr-2024 03-Aug-2024 04-Aug-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
476 Kanpur Dehat GVPR 20099403 Bhikhdev 1 4 3973 2023 2038 2053 15-Apr-2024 25-Nov-2023 09-Apr-2024 10-Apr-2024 Forward for further necessary action pls All work of scheme found satisfactory View
477 Auraiya GVPR 20065252 Bhikhepur &Sekhupur Jainpur PWS 2 5 4896 2023 2038 2053 31-Dec-2024 22-Apr-2025 21-Apr-2025 23-Apr-2025 Forwarded for further action. All work of scheme fond satisfactory. View
478 Ambedkar Nagar Vindhya-GAJA (JV) 20019774 Bhikhpur Khurd 3 13 6270 2023 2038 2053 03-Aug-2023 14-Aug-2024 02-Dec-2024 03-Dec-2024 checked and verified and found OK Scheme completed View
479 Shahjahanpur NCC Ltd. 20015871 bhilandpur 2 3 3100 2022 2037 2052 31-Dec-2024 31-Aug-2023 30-Nov-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhilandpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of bhilandpur W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
480 Ambedkar Nagar Vindhya-GAJA (JV) 20026063 BHISVA CHITAUNA SUPPLY SCHEME 3 7 6340 2023 2038 2053 28-Sep-2023 25-Jun-2025 12-Oct-2025 13-Oct-2025 checked and found ok Scheme Completed View
481 Hardoi NCC Ltd. 20000031 BHITI NEWADA 1 3 2040 2022 2037 2052 29-Apr-2023 25-Mar-2023 24-Jun-2023 24-Dec-2024 ok OK View
482 Ambedkar Nagar Vindhya-GAJA (JV) 20058343 BHITI WSS 2 3 1780 2023 2038 2053 26-Dec-2023 24-Sep-2025 17-Jan-2026 18-Jan-2026 Scheme completed and ready for O&M Scheme Completed View
483 Ambedkar Nagar Vindhya-GAJA (JV) 20075106 BHIURA WSS 1 5 2200 2023 2038 2053 08-Mar-2024 04-Aug-2025 24-Nov-2025 25-Nov-2025 Checked and found ok Scheme Completed View
484 Hardoi NCC Ltd. 20000027 BHOGIPUR GRANT 1 5 2110 2022 2037 2052 29-Apr-2023 26-May-2023 25-Aug-2023 25-Dec-2024 ok OK View
485 Bijnor Vindhya-GAJA (JV) 20101906 BHOGPUR WSS 1 1 4538 2023 2038 2053 06-Jul-2023 17-Jun-2025 17-Dec-2025 18-Dec-2025 Every thing complete. check View
486 Shahjahanpur NCC Ltd. 20019812 Bhojpur 2 2 2310 2022 2037 2052 31-Dec-2024 21-Jan-2024 21-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhojpur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Bhojpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
487 Kannauj GVPR 20050528 BHOJPUR NIGOH GRAM PANCHAYAT WATER SUPPLY SCHEME 1 4 2219 2023 2038 2053 15-Jun-2024 28-Mar-2024 30-Jun-2024 01-Jul-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
488 Meerut Power Mech Projects Ltd 20010918 BHOLA 1 1 6162 2022 2037 2052 31-Dec-2024 18-Jun-2024 05-Nov-2024 06-Nov-2024 Recommended for further Approval Approved View
489 Auraiya GVPR 20084715 Bhontapur & kunwardeopur & dhanaupur PWS 4 8 3965 2023 2038 2053 06-Jan-2022 31-Dec-2024 13-May-2024 15-May-2024 Forwarded for further action. All work of scheme found satisfactory. View
490 Auraiya GVPR 20099283 Bhorajpur pws 1 1 488 2023 2038 2053 06-Jan-2022 29-Sep-2024 28-Sep-2024 30-Sep-2024 Forwarded for further action. All work of scheme found satisfactory. View
491 Hardoi NCC Ltd. 20011908 BHORAPUR 4 5 2450 2022 2037 2052 14-Jun-2023 20-May-2023 24-Aug-2023 13-Dec-2024 ok OK View
492 Ambedkar Nagar Vindhya-GAJA (JV) 20026078 BHUJAGI WATER SUPPLY SCHEME 1 5 4290 2023 2038 2053 28-Sep-2023 25-Jul-2025 14-Oct-2025 15-Oct-2025 Checked and found ok Scheme Completed View
493 Mau LC INFRA 20024466 BHUJAHI WATER SUPPLY SCHEME 2 8 2056 2022 2037 2052 19-Mar-2023 23-Dec-2025 22-Dec-2025 23-Dec-2025 Approved Approved View
494 Mau GA INFRA-VPL 20101186 BHULAIDEEH GRAM PANCHAYAT WATER SUPPLY SCHEME 3 5 1680 2023 2038 2053 18-Oct-2024 18-Oct-2024 19-Jan-2025 20-Jan-2025 Approved. Approved View
495 Auraiya Indian Hume Pipe 20022987 Bhulainpur water supply scheme 3 3 1700 2022 2037 2052 08-May-2023 01-May-2024 09-Aug-2024 10-Aug-2024 Forwarded for further action. All work of scheme fond satisfactory. View
496 Farrukhabad Vindhya-GAJA (JV) 20092455 BHULANPUR CHIRPURA MVS 2 5 1996 2023 2038 2053 31-Mar-2025 26-Dec-2024 09-Apr-2025 10-Apr-2025 All the parameters of scheme verified can take in O&M. ok View
497 Etawah Indian Hume Pipe 20024510 BHULPUR PWS 2 2 1650 2022 2037 2052 22-Sep-2023 14-Jun-2024 14-Jun-2024 15-Jun-2024 Forwarded for further action All works are satisfactory. View
498 Shahjahanpur NCC Ltd. 20105022 BHUNDI GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 2 2 2731 2022 2037 2052 31-Dec-2024 04-Dec-2023 04-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bhundi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Bhundi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
499 Sambhal PNC SPML- JV Moradabad 20070418 Bhura Begampur W/S Scheme 1 1 1630 2022 2037 2052 03-Aug-2024 14-Jun-2024 14-Sep-2024 15-Sep-2024 Trial Run Successfully Completed on 14-12-24 Approved View
500 Auraiya GVPR 20101892 Bhurepur PWS 1 4 2652 2023 2038 2053 01-Jun-2022 16-Aug-2023 15-Aug-2023 17-Aug-2023 Forwarded for further action. All work of scheme found satisfactory. View
501 Shahjahanpur NCC Ltd. 20084352 BHURIA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 2 2 2330 2022 2037 2052 31-Dec-2024 21-Jun-2024 20-Sep-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of BHURIA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of BHURIA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
502 Meerut Power Mech Projects Ltd 20090308 BHURPUR SALARPUR JALALPUR 2 1 4940 2022 2037 2052 31-Dec-2024 26-Nov-2024 14-Apr-2025 15-Apr-2025 Recommended for further Approvals. approved View
503 Farrukhabad Vindhya-GAJA (JV) 20076870 BHUSERA SVS 1 1 1692 2023 2038 2053 30-May-2025 31-May-2024 31-May-2024 01-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
504 Shamli Gayatri Projects LTD 1732401 Bhutrada PWS 1 1 8000 2022 2037 2052 31-Dec-2024 20-Dec-2024 01-Aug-2024 30-Oct-2024 As per JMR by JE found ok.................... variation and documents done View
505 Jaunpur AFCONS 20071743 BIBAN MAU VILLAGE WATER SUPPLY SCHEME 1 11 4178 2023 2038 2053 21-Feb-2023 10-Oct-2024 10-Oct-2024 10-Oct-2024 Testing & Commissioning certificate, Road restoration, trial & run certificate and Final BOQ not signed by EE but TPIA checked and signed all document for further process. ok View
506 Kanpur Dehat Indian Hume Pipe 20096865 Bibapur 2 3 1845 2022 2037 2052 04-Mar-2023 31-Dec-2024 05-Dec-2023 06-Dec-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
507 Sultanpur UNIVERSAL MEP 20077646 BIBIGANJ & KHAICHILAKALA GRAM PANCHAYAT WATER SUPPLY SCHEME 4 8 5560 2023 2038 2053 12-Jan-2024 12-Jan-2024 30-Mar-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
508 Auraiya GVPR 20084716 Bibipur PWS 4 4 3159 2023 2038 2053 31-Dec-2024 25-Jan-2024 24-Jan-2024 25-Jan-2024 Forwarded for further action. All work of scheme found satisfactory. View
509 Ambedkar Nagar Vindhya-GAJA (JV) 20026121 BIBIPUR RANDAULI WATER SUPPLY SCHEME 2 4 3120 2023 2038 2053 29-Sep-2022 28-Sep-2022 24-Feb-2026 02-Mar-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
510 Farrukhabad GVPR 20018313 BIBIPUR W/S Scheme 1 2 1805 2022 2037 2052 08-Mar-2023 27-Jun-2024 27-Jun-2024 28-Jul-2025 All the parameters of scheme verified can take in O&M. ok View
511 Azamgarh LC INFRA 20101579 BIBIPUR WATER SUPPLY SCHEME 3 7 2946 2023 2038 2053 10-Aug-2023 05-Jan-2024 09-Apr-2024 10-Apr-2024 OK OK View
512 Farrukhabad GVPR 8359203 BIDAIL W/S SCHEME 1 2 3428 2022 2037 2037 26-Aug-2022 20-Jun-2024 19-Sep-2024 20-Sep-2024 All the parameters of scheme verified can take in O&M. ok View
513 Kanpur Dehat Indian Hume Pipe 20025488 Bigahi 1 1 2455 2022 2037 2052 24-Aug-2023 31-Dec-2024 02-Jun-2023 03-Jun-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
514 Auraiya GVPR 20091172 Bighepur PWS 1 2 1986 2023 0 0 01-Jun-2022 17-Oct-2025 16-Oct-2025 18-Oct-2025 Forwarded for further action. All work of scheme fond satisfactory. View
515 Shahjahanpur NCC Ltd. 20018011 Biharipur 2 2 1908 2022 2037 2052 31-Jul-2023 31-Dec-2024 30-Oct-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Biharipur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Biharipur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
516 Auraiya GVPR 20091073 Bijhalpur PWS 1 2 1775 2023 2038 2053 01-Jun-2022 29-May-2024 25-May-2024 30-May-2024 Forwarded for further action. All work of scheme found satisfactory. View
517 Fatehpur Gayatri Projects LTD 8361684 BIJHAULI 2 2 1859 2022 2037 2052 30-Jun-2025 26-Jun-2024 26-Jun-2023 27-Jun-2023 Trial & Run completed. It was initiated in the month of March (26.03.2023) and Regular water supply is given to the consumers. Verified View
518 Meerut Power Mech Projects Ltd 8362351 BIJOLI 1 1 6873 2022 2037 2052 31-Dec-2024 16-Sep-2024 02-Feb-2025 03-Feb-2025 Recommended for further Approvals. APPROVED View
519 Amethi Vindhya-GAJA (JV) 20070881 BIKHANPUR WATER SUPPLY SCHEME 1 6 2031 2023 2038 2053 23-Mar-2024 19-Jun-2024 19-Sep-2024 20-Dec-2024 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
520 Shahjahanpur NCC Ltd. 20015597 Bikrampur 1 3 3240 2022 2037 2052 31-Dec-2024 24-Jul-2024 23-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bikrampur WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Bikrampur WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
521 Kannauj GVPR 20067388 BILANDPUR & GADIA BALIDATPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 2 2293 2023 2038 2053 16-Aug-2024 22-Apr-2024 26-Jul-2024 27-Jul-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
522 Shahjahanpur NCC Ltd. 20015553 Bilandpur gaddipur 2 2 3310 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bilandpur gaddipur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Bilandpur gaddipur W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
523 Farrukhabad Vindhya-GAJA (JV) 20092402 BILHA MVS 2 5 2966 2023 2038 2053 30-May-2025 05-Feb-2024 20-May-2024 21-May-2024 All the parameters of scheme verified can take in O&M. ok View
524 Shahjahanpur NCC Ltd. 20014800 Bilhari 1 1 2273 2022 2037 2052 31-Dec-2024 31-Jul-2023 30-Oct-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Bilhari scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Bilhari scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
525 Shahjahanpur NCC Ltd. 20015934 BILSANDI BUZURG 2 2 2450 2022 2037 2052 31-Dec-2024 21-Jul-2024 20-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of BILSANDI BUZURG WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of BILSANDI BUZURG WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
526 Kanpur Dehat Indian Hume Pipe 20034287 BILSARAYAN 1 2 2630 2022 2037 2052 24-Nov-2022 23-Nov-2023 31-Jan-2024 01-Feb-2024 Forward for further action All work of scheme found satisfactory View
527 Kanpur Dehat Indian Hume Pipe 20025553 Bilti 1 2 2250 2022 2037 2052 25-Aug-2022 24-Aug-2023 30-Apr-2023 01-May-2023 Forward for further action All work of scheme found satisfactory View
528 Etawah Indian Hume Pipe 20026423 Binayakpupr 2 3 2550 2022 2037 2052 22-Sep-2023 23-Jul-2024 23-Jul-2024 24-Jul-2024 Forwarded for further action. All work of scheme found satisfactory. View
529 Sultanpur UNIVERSAL MEP 20066283 BINGI GRAM PANCHAYAT WATER SUPPLY SCHEME 2 11 2810 2023 2038 2053 12-Jan-2024 31-Dec-2024 30-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
530 Kannauj GVPR 20066409 BINORARAMPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 9 4615 2023 2038 2053 06-Aug-2024 07-Apr-2024 11-Jul-2024 12-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
531 Farrukhabad Vindhya-GAJA (JV) 20075209 BIRAHAMPUR JAGIR,RASHIDABAD DARAPUR MVS 2 3 4540 2023 2038 2053 30-May-2025 02-Jul-2024 02-Jul-2024 03-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
532 Shahjahanpur NCC Ltd. 20015536 Birahampur Jhajharia Banda 1 1 2640 2022 2037 2052 31-Aug-2023 31-Dec-2024 30-Nov-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Birhampur Jhajharia scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Birahampur Jhajharia scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
533 Bahraich PNC-SPML-JV 20099238 BIRAHIMDIHA TEJWAPUR RF PWS 1 8 2370 2022 2037 2052 31-Dec-2025 13-Oct-2025 13-Oct-2025 14-Oct-2025 Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/10/0144, kindly complete it. Scheme Completed View
534 Bijnor Vindhya-GAJA (JV) 20100230 BIRDO NANGLI WSS 2 2 2888 2022 2037 2052 06-Jul-2023 04-Mar-2025 04-Sep-2025 05-Sep-2025 Every thing complete. All document complete View
535 Kanpur Dehat Indian Hume Pipe 20025505 Biriya Derapur 1 1 2235 2022 2037 2052 24-Aug-2022 31-Dec-2024 28-Feb-2024 01-Mar-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
536 Kannauj GVPR 20067626 BIRPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 5 3049 2023 2038 2053 16-Aug-2024 03-May-2024 07-Aug-2024 08-Aug-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
537 Kannauj GVPR 20066532 BISANDHUA & JASPURAPUR SARAIA GRAM PANCHAYAT WATER SUPPLY SCHEME 3 4 4538 2023 2038 2053 16-Aug-2024 16-Apr-2024 19-Jul-2024 20-Jul-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
538 Azamgarh LC INFRA 20024753 Bisauli Rural Water Supply Scheme 1 7 3480 2022 2037 2052 10-Aug-2023 17-Jan-2024 17-Apr-2024 18-Apr-2024 ok OK View
539 Jaunpur Welspun Kaveri Infraprojects JV 20020086 Bishambhara 2 3 1871 2022 2037 2021 22-May-2022 31-Dec-2024 20-Jun-2025 21-Jun-2025 Checked and found ok ok View
540 Kanpur Dehat GVPR 20065092 Bisoha 1 4 3398 2023 2038 2053 18-Jan-2024 08-Aug-2023 12-Nov-2023 13-Nov-2023 TKC unable to submit the calibration certificate and other report for O&M and some work pending (Road restoration, MDPE Pipe Open & Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work. All work of scheme found satisfactory View
541 Meerut Power Mech Projects Ltd 20082540 BISOLA AKHEYPUR PWS 2 2 5967 2023 2038 2053 31-Dec-2024 05-Jun-2024 22-Oct-2024 23-Oct-2024 Recommended for further Approvals. approved View
542 Ambedkar Nagar Vindhya-GAJA (JV) 20067161 BISUNPUR BAJDAHA Water Supply Scheme 5 9 4220 2023 2038 2053 21-Feb-2023 21-Feb-2024 28-Apr-2025 29-Apr-2025 CHECK AND FOUND OK Scheme completed View
543 Shahjahanpur NCC Ltd. 20057350 BITAUNIJ KARANAPUR & KARNAPUR J BITAUNI WSS 5 5 7143 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the BITAUNIJ KARANAPUR & KARNAPUR J BITAUNI WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. SWSM/BLG/JJM/26-27/457 for further necessary action. All information on the portal for the completion certificate of BITAUNIJ KARANAPUR & KARNAPUR J BITAUNI WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
544 Azamgarh LC INFRA 20058024 Bithalpur WATER SUPPLY SCHEME 4 7 3371 2023 2038 2053 09-May-2024 21-Jul-2024 20-Oct-2024 21-Oct-2024 OK OK View
545 Ambedkar Nagar Vindhya-GAJA (JV) 20019695 Bodara 1 8 2320 2023 2038 2053 03-Aug-2023 24-Jan-2026 06-May-2026 20-Jun-2026 Scheme completed and ready for O&M SCHEME COMPLETED View
546 Jaunpur AFCONS 20026139 Bodhipur Water Supply Scheme 4 6 2460 2023 2038 2053 03-Sep-2023 29-Oct-2025 29-Oct-2025 30-Oct-2025 Checked and found ok. ok View
547 Farrukhabad Vindhya-GAJA (JV) 20097980 BOHARANPUR TAPPA HAWELI MVS 2 7 3461 2023 2038 2053 30-May-2025 26-May-2024 25-May-2024 26-May-2024 All the parameters of scheme verified can take in O&M. Ok View
548 Auraiya Indian Hume Pipe 20056132 Bondepur grameen PWS 3 5 4000 2022 2037 2052 22-Sep-2023 07-Jan-2024 31-May-2024 01-Jun-2024 Forwarded for further action. All work of scheme fond satisfactory. View
549 Meerut Power Mech Projects Ltd 20098169 BONDRA-NAGLA SALEMPUR 2 2 3902 2022 2037 2052 31-Jan-2025 03-Sep-2024 27-Jan-2025 28-Jan-2025 Recommended for further Approvals. approved View
550 Bijnor Vindhya-GAJA (JV) 20101800 BOREKI WSS 1 1 2611 2023 2038 2053 06-Jul-2023 20-May-2025 20-Nov-2025 21-Nov-2025 Every thing complete. all document complete View
551 Sultanpur UNIVERSAL MEP 20066826 BRAHIMPUR & SARIYA MAFI GRAM PANCHAYAT WATER SUPPLY SCHEME 2 6 4153 2023 2038 2053 12-Jan-2024 12-Jan-2024 04-Mar-2025 05-Mar-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
552 Sultanpur UNIVERSAL MEP 20071520 BRASIN WATER SUPPLY SCHEME 2 11 7789 2023 2035 2053 18-Jul-2024 23-Feb-2025 27-May-2025 01-Aug-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
553 Bijnor LC INFRA 20087867 Buapur Nathu Viullage Water Supply Scheme 1 2 3287 2022 2037 2052 31-Oct-2025 25-Feb-2025 31-Oct-2025 01-Nov-2025 Every thing complete. check Document View
554 Meerut Power Mech Projects Ltd 20077321 BUBAKPUR 1 1 1629 2022 2037 2052 31-Dec-2024 25-Jun-2024 11-Nov-2024 12-Nov-2024 CHECKED AND VERIFIED.... approved View
555 Bijnor LC INFRA 8360406 BUDGARI GRAMPANCHAYAT WATER SUPPLY SCHEME 1 1 3112 2022 2037 2052 02-Nov-2023 10-Dec-2023 08-Jun-2024 09-Jun-2024 Every thing completed. Everything Complete View
556 Sambhal LC INFRA 20096544 BUDH NAGAR KHANDWA SVS WSS 1 1 6490 2022 2037 2052 02-Oct-2025 27-Sep-2025 26-Dec-2025 27-Dec-2025 Trial Run Successfully Completed On: 26-Dec-2025 Approved View
557 Ambedkar Nagar Vindhya-GAJA (JV) 20067349 BUDHANPUR Water Supply Scheme 1 2 2140 2023 2038 2052 08-Mar-2024 12-Jan-2025 12-Jan-2025 13-Jan-2025 Checked and Verified Scheme completed View
558 Kanpur Dehat VSA 20099345 Budhera Derapur 2 3 1415 2023 2038 2023 30-Apr-2023 31-Dec-2023 18-Apr-2024 19-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
559 Bijnor LC INFRA 20026176 Budhpur Nainsingh Village Water Supply 3 3 2899 2022 2037 2052 18-Aug-2024 18-Apr-2024 24-Jul-2024 25-Jul-2024 every thing completed. Everything Completed View
560 Mau LC INFRA 20045132 Budhve WATER SUPPLY SCHEME 2 5 2187 2022 2037 2052 17-Apr-2024 02-Feb-2026 08-Jul-2025 02-Feb-2026 Approved Approved.. View
561 Jaunpur AFCONS 20051475 BUMKAHA VILLAGE WATER SUPPLY SCHEME 3 9 4319 2023 2038 2053 17-Dec-2023 10-Jul-2025 10-Jul-2025 10-Jul-2025 checked and found ok............... ok View
562 Kannauj GVPR 20098274 BUNDHA NAGARIYA GRAM PANCHAYAT WATER SUPPLY SCHEME 5 6 2282 2023 2038 2053 14-Nov-2024 02-Aug-2024 26-Jul-2024 27-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
563 Bijnor LC INFRA 8360394 BUNDRA KALAN VILLAGE WATER SCHEME 1 1 2270 2022 2037 2052 14-Nov-2024 11-Apr-2024 21-Oct-2024 22-Oct-2024 Every thing complete. Check document View
564 Auraiya GVPR 20089646 Buradana PWS 1 2 3364 2023 0 0 01-Jun-2022 28-Jan-2024 27-Jan-2024 29-Jan-2024 Forwarded for further action. All work of scheme fond satisfactory. View
565 Shahjahanpur NCC Ltd. 20096529 BURHANPUR GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 2 2 4080 2022 2037 2052 31-Dec-2024 30-Aug-2024 29-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the BURHANPUR WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. SWSM/BLG/JJM/26-27/329 for further necessary action. All information on the portal for the completion certificate of BURHANPUR GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
566 Jhansi NCC Ltd. 8010048 Burhpura GOV 59 21965 171000 2023 2038 2053 30-Jun-2022 30-Aug-2023 21-Apr-2025 22-Apr-2025 checked and forwarded approved View
567 Shahjahanpur NCC Ltd. 20015959 CHAANDA WSS 2 2 3180 2022 2037 2052 31-Dec-2024 24-Dec-2023 24-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of CHAANDA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of CHAANDA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
568 Shahjahanpur NCC Ltd. 20014889 CHAHARPUR Madnapur W/s 2 3 2460 2022 2037 2052 30-Sep-2024 31-Dec-2024 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Chaharpur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Chaharpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
569 Shahjahanpur NCC Ltd. 20014796 CHAK BAKAINIYA 4 4 2117 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of CHAK BAKAINIYA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of CHAK BAKAINIYA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
570 Fatehpur Power Mech Projects Ltd 20097779 CHAK SHAHPIRPUR 2 3 2450 2023 2038 2053 14-May-2024 30-Jun-2025 12-Jul-2024 12-Aug-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of September (08.09.2024) Verified View
571 Mau LC INFRA 20011981 Chakjafri GP WATER SUPPLY SCHEME 1 4 2095 2022 2037 2052 20-Sep-2023 02-Feb-2026 01-Aug-2025 02-Feb-2026 Approved Approved.. View
572 Gautam Buddha Nagar LC INFRA 8389564 Chaksenpur Urf Dhanibas Water Supply Scheme 1 1 2339 2022 2037 2052 20-Mar-2023 30-Apr-2023 31-Oct-2024 01-Nov-2024 Project certificate is verified Verified View
573 Gautam Buddha Nagar LC INFRA 20023418 CHANCHALI 1 1 2504 2022 2037 2052 20-Mar-2023 07-Feb-2024 30-Mar-2024 01-Apr-2024 Actual Executed Cost Verified based on Approved Variation Statement. all work has been completed. View
574 Farrukhabad Vindhya-GAJA (JV) 20076918 CHAND PUR SVS 1 3 3701 2023 2038 2053 30-Jun-2026 09-Jun-2025 09-Jun-2025 10-Jun-2025 All the parameters of scheme verified can take in O&M. ok View
575 Azamgarh LC INFRA 20014621 CHANDA BHARI WATER SUPPLY SCHEME 1 7 3697 2022 2037 2052 10-Aug-2023 25-Dec-2023 29-Mar-2024 30-Mar-2024 OK OK View
576 Amethi Vindhya-GAJA (JV) 20085683 CHANDAIPUR WATER SUPPLY SCHEME 2 7 2835 2023 2038 2053 29-Apr-2024 18-Jun-2024 18-Sep-2024 19-Dec-2024 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
577 Ambedkar Nagar Vindhya-GAJA (JV) 20060069 CHANDANPARA WSS 1 4 4393 2023 2038 2053 18-Jan-2024 06-Oct-2025 06-Oct-2025 07-Nov-2025 Scheme completed and ready for O&M SCHEME COMPLETED View
578 Farrukhabad Vindhya-GAJA (JV) 20093172 CHANDANPUR & MAKRAND NAGAR BASAHA MVS 4 9 4875 2023 2038 2053 30-May-2025 11-Jul-2024 11-Jul-2024 12-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
579 Ambedkar Nagar Vindhya-GAJA (JV) 20019794 Chandapur 1 12 4680 2023 2038 2053 03-Aug-2023 02-Sep-2024 19-Mar-2025 20-Mar-2025 Checked and Verified Scheme completed View
580 Shahjahanpur NCC Ltd. 20015964 CHANDAPUR BARKATPUR 2 2 2540 2022 2037 2052 27-Jul-2023 31-Dec-2024 27-Oct-2023 16-Nov-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Chandapur Barkatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Chandapur Barkatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
581 Shahjahanpur NCC Ltd. 20016554 CHANDARI 2 2 2010 2022 2037 2052 31-Dec-2024 31-Aug-2023 30-Nov-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of CHANDARI WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Mahmadpur CHANDARI WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
582 Etawah Indian Hume Pipe 20101085 Chandarpur Khurd 2 4 1430 2022 2037 2052 15-Mar-2024 04-Jan-2024 04-Jan-2024 05-Jan-2024 Forwarded for further action All work of the scheme found satisfactory View
583 Bijnor LC INFRA 20011741 Chandat TurakVillage Water Supply Scheme 5 5 4464 2021 2037 2052 10-Feb-2024 12-Dec-2024 10-Jun-2024 11-Jun-2024 Every thing complete. Every thing is completed. View
584 Jaunpur AFCONS 20050630 CHANDAUKI WATER SUPPLY SCHEME 2 9 3250 2023 2038 2053 31-Dec-2024 04-May-2024 10-Mar-2025 11-Mar-2025 Ok approved View
585 Auraiya GVPR 20084711 Chandauli PWS 1 6 2061 2023 2038 2053 01-Jun-2022 05-Aug-2025 04-Aug-2025 06-Aug-2025 Forwarded for further action. All work of scheme fond satisfactory. View
586 Ambedkar Nagar Vindhya-GAJA (JV) 20092788 CHANDAULI Water Supply Scheme 1 2 1370 2023 2038 2053 17-May-2024 29-Mar-2026 29-Mar-2026 30-Mar-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
587 Kannauj GVPR 20066504 CHANDIAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 8 3965 2023 2038 2053 16-Aug-2024 31-Mar-2024 07-Mar-2024 07-Apr-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
588 Meerut Power Mech Projects Ltd 20020216 CHANDLAWAR URF MAHALWALA 1 1 4999 2022 2037 2052 31-Dec-2024 20-Jan-2024 07-Jun-2024 03-Nov-2024 CHECKED AND VERIFIED.... approved View
589 Sultanpur UNIVERSAL MEP 20076895 CHANDOUR GRAM PANCHAYAT WATER SUPPLY SCHEME 3 20 15000 2023 2035 2053 18-Jul-2024 02-Mar-2025 29-May-2025 01-Aug-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action All uploaded documents have been checked and verified as per requirements. View
590 Ambedkar Nagar Vindhya-GAJA (JV) 20056458 CHANDPUR BHATPURA Water Supply Scheme 1 6 2520 2023 2038 2053 27-Dec-2022 26-Dec-2023 25-Mar-2025 26-Mar-2025 checked and verified Scheme completed View
591 Etawah Indian Hume Pipe 20026426 Chandpura PWS 2 3 3339 2022 2037 2052 22-Sep-2023 21-Sep-2024 23-Dec-2024 24-Dec-2024 Dear Sir, the above data has been verified and forwarded to you for further action. All work of scheme found satisfactory View
592 Ayodhya UNIVERSAL MEP 20031487 CHANDRAMAU MANGA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 1 3090 2023 2038 2053 12-Oct-2023 05-Oct-2023 05-Oct-2023 15-Nov-2024 Found ok Found Correct View
593 Gautam Buddha Nagar LC INFRA 20097843 CHANGAULI VILLAGE WATER SUPPLY SCHEME 1 1 1031 2022 2037 2052 25-Apr-2023 25-Oct-2024 09-Nov-2024 10-Nov-2024 Actual Executed Cost Verified based on Approved Variation Statement. all work has been completed. View
594 Auraiya GVPR 20065634 Chanpur kakraiya PWS 1 5 4454 2023 0 0 01-Jun-2022 08-Jun-2025 07-Sep-2025 08-Sep-2025 Forwarded for further action. All work of scheme found satisfactory. View
595 Auraiya GVPR 20084723 Chapauli PWS 1 2 2112 2023 2038 2053 01-Jun-2024 12-Aug-2024 01-Mar-2025 02-Mar-2025 Forwarded for further action. All work of scheme found satisfactory. View
596 Meerut Power Mech Projects Ltd 8362440 CHARLA 1 1 1529 2023 2038 2053 11-Jun-2025 14-Jan-2025 07-Jun-2025 08-Jun-2025 Recommended for further Approvals. approved View
597 Hardoi NCC Ltd. 20000040 CHATHIYA DHAFRAPUR 2 4 2030 2022 2037 2052 29-Apr-2023 01-Jun-2023 01-Sep-2023 17-Dec-2024 ok OK View
598 Bahraich PNC-SPML-JV 8375767 CHATTARPUR MAHASI PWS 1 5 4422 2022 2037 2052 31-Dec-2025 18-Sep-2025 18-Sep-2025 19-Sep-2025 Scheme send to O&M, but rectify all issues identify by TPI with in 15 days. Scheme completed. View
599 Ambedkar Nagar Vindhya-GAJA (JV) 20041701 CHATURI PATTI WSS 2 3 3930 2023 2038 2053 23-Nov-2023 14-Jul-2024 02-Dec-2024 03-Dec-2024 Checked and found OK SCHEME COMPLETED View
600 Ambedkar Nagar Vindhya-GAJA (JV) 20096180 CHAUDHARYPUR BAURAW Water Supply Scheme 4 7 6610 2023 2038 2053 22-Mar-2024 20-Jun-2025 14-Oct-2025 15-Oct-2025 Scheme completed and ready for O&M Scheme Completed View
601 Fatehpur GA INFRA - BABA (JV) 20087348 CHAUHATA WATER SUPPLY SCHEME RO 1 3 1320 2023 2037 2052 18-Jul-2023 17-Jul-2024 15-Jan-2026 16-Jan-2026 Trial & Run completed. It was initiated in the month of October (16.10.2025) and Regular water supply is given to the consumers. Verified View
602 Jaunpur AFCONS 20026111 Chauki kalan Water Supply Scheme 2 5 3200 2023 2038 2053 03-Sep-2023 10-Oct-2024 10-Oct-2024 11-Oct-2024 Checked and found ok. ok View
603 Farrukhabad Vindhya-GAJA (JV) 20097825 CHAUKI MOHAMMAD PUR SVS 1 1 2608 2023 2038 2053 30-May-2025 03-Feb-2024 18-May-2024 19-May-2024 All the parameters of scheme verified can take in O&M. ok View
604 Bijnor Vindhya-GAJA (JV) 20067422 Chaukpuri water supply scheme 1 1 2842 2022 2037 2052 06-Jul-2023 28-Nov-2023 04-Jun-2024 05-Jun-2024 every thing completed Everything Completed View
605 Gautam Buddha Nagar LC INFRA 20094784 CHAUNA VILLAGE WATER SUPPLY SCHEME 1 1 2860 2022 2036 2052 20-Mar-2024 30-Jan-2024 30-Mar-2024 01-Apr-2024 Project certificate is verified. Verified View
606 Farrukhabad Vindhya-GAJA (JV) 20074158 CHAUSPUR SVS 1 4 3202 2023 2038 2053 30-May-2025 30-Jul-2024 30-Jul-2024 01-Aug-2024 All the parameters of scheme verified can take in O&M. ok View
607 Shahjahanpur NCC Ltd. 20015525 Chavar Khas WSS 3 3 2410 2022 2037 2052 31-Dec-2024 25-Dec-2023 25-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Chavar Khas WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Chavar Khas WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
608 Bahraich PNC-SPML-JV 6993692 Chetra SVS solar 1 7 3390 2022 2037 2052 30-Jun-2025 01-May-2024 01-May-2024 02-May-2024 OK Scheme send to O&M, but rectify all issues identify by TPI with in 15 days. View
609 Meerut Power Mech Projects Ltd 20013248 CHHAJMALPUR URF CHAJJUPUR 1 1 4502 2022 2037 2052 31-Dec-2024 31-Dec-2025 01-Jan-2025 02-Jan-2025 Recommended for further Approvals. approved View
610 Bijnor LC INFRA 20068032 CHHAKARA WATER SUPPLY SCHEME 2 2 2435 2022 2037 2052 23-Jan-2023 30-Sep-2024 31-Aug-2025 01-Sep-2025 Every thing complete. Check Document View
611 Sultanpur Vindhya-GAJA (JV) 20051718 CHHARAULI WATER SUPPLY SCHEME 2 2 2130 2023 2038 2053 23-Nov-2023 06-Apr-2025 05-Apr-2025 01-Sep-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements. View
612 Kanpur Dehat Indian Hume Pipe 20025500 Chhateni 1 2 1900 2022 2037 2052 25-Aug-2022 31-Dec-2024 30-Sep-2023 01-Oct-2023 forward for further necessary action pls. All work of scheme found satisfactory View
613 Meerut Power Mech Projects Ltd 20012907 CHHATRI 1 1 2046 2022 2037 2052 31-Dec-2024 04-Mar-2024 20-Mar-2024 08-Oct-2024 Recommended for further Approvals. approved View
614 Gautam Buddha Nagar LC INFRA 8389553 CHHAYANSA GRAM PANCHAYAT WATER SUPPLY SCHEME 2 2 3593 2022 2037 2052 20-Mar-2024 30-Jan-2024 30-Mar-2024 01-Apr-2024 Project certificate is verified. Verified View
615 Fatehpur Power Mech Projects Ltd 20097540 CHHICHHINI 1 2 3420 2023 2038 2053 25-Sep-2024 30-Jun-2025 23-Mar-2025 24-Mar-2025 Trial & Run completed. It was initiated in the month of December(24.12.2024) and Regular water supply is given to the consumers. Verified View
616 Shahjahanpur NCC Ltd. 8362287 CHHIDKURI GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 1 6 2790 2022 2037 2052 19-Sep-2023 31-Dec-2024 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Chidkuri scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Chhidkuri scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
617 Fatehpur Power Mech Projects Ltd 20100812 Chhitampur 1 3 3190 2023 2038 2053 20-Sep-2024 06-Oct-2024 06-Oct-2024 07-Oct-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of July (7.07.2024) and Regular water supply is given to the consumers. Verify View
618 Ambedkar Nagar Vindhya-GAJA (JV) 20083841 CHHITUNI WSS 1 8 2190 2023 2038 2053 26-Dec-2023 20-May-2025 19-May-2025 20-May-2025 Scheme completed and ready for O&M Scheme Completed View
619 Kanpur Dehat Indian Hume Pipe 20070117 chiauna 1 3 2870 2022 2037 2052 04-Mar-2023 31-Dec-2024 31-May-2024 01-Jun-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
620 Auraiya GVPR 20084708 Chichauli PWS 1 2 2015 2023 0 0 01-Jun-2022 14-Mar-2025 13-Mar-2025 15-Mar-2025 Forwarded for further action. All work of scheme fond satisfactory. View
621 Shahjahanpur NCC Ltd. 20015653 chikatiya 2 2 2270 2022 2037 2052 30-Sep-2023 31-Dec-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Chikatiya scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Chikatiya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
622 Auraiya GVPR 20094349 CHIKTA PWS 1 2 1975 2023 2038 2053 06-Jan-2022 31-Dec-2024 19-Feb-2024 07-Apr-2024 Forwarded for further action. All work of scheme found satisfactory. View
623 Ambedkar Nagar Vindhya-GAJA (JV) 20041597 CHILVANIA WSS 2 2 2760 2023 2038 2053 23-Nov-2023 28-Jul-2025 12-Oct-2025 13-Oct-2025 Checked and found ok Scheme Completed View
624 Auraiya Indian Hume Pipe 8360958 Chimkuni, Surkhipur 2 4 2965 2022 2037 2052 12-Oct-2022 04-Dec-2024 31-Mar-2025 01-Apr-2025 Forwarded for further action. All work of scheme found satisfactory. View
625 Meerut Power Mech Projects Ltd 8362365 CHINDAURI TAPPA LAWAR 1 1 4271 2022 2037 2052 31-Dec-2024 16-Sep-2024 02-Feb-2025 03-Feb-2025 Recommended for further Approvals. APPROVED View
626 Meerut Power Mech Projects Ltd 20098174 CHINDORI KHAS-CHINDORI PATTI DALU 2 2 5287 2023 2038 2053 31-Dec-2024 26-Nov-2024 27-Aug-2024 28-Nov-2024 CHECKED AND VERIFIED.... approved View
627 Auraiya Indian Hume Pipe 20014161 chirauli 1/3 PWS 2 5 2500 2022 2037 2052 08-May-2023 01-Apr-2023 09-Jul-2023 10-Jul-2023 Forwarded for further action. All work of scheme fond satisfactory. View
628 Kanpur Dehat Indian Hume Pipe 20025495 Chirkhiri 1 6 2675 2022 2037 2052 25-Aug-2022 31-Dec-2024 31-Aug-2023 01-Sep-2023 FORWARD FOR FURTHER NECESSARY ACTION PLS. All work of scheme found satisfactory View
629 Auraiya Indian Hume Pipe 8359384 Chiruhuli 1 1 3315 2022 2037 2052 22-Sep-2023 29-Sep-2024 04-Jan-2025 05-Jan-2025 Forwarded for further action. All work of scheme fond satisfactory. View
630 Mau GA INFRA-VPL 20096162 CHISTIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 4 1147 2023 2038 2053 20-Jan-2025 20-Jan-2025 19-Jan-2025 20-Jan-2025 APPROVED APPROVED View
631 Sambhal LC INFRA 20016898 CHITAWALI WATER SUPPLY SCHEME 2 2 2020 2022 2037 2052 31-Dec-2025 16-Sep-2025 15-Dec-2025 16-Dec-2025 Trial Run Successfully Completed On: 15-Dec-2025 approved View
632 Ambedkar Nagar Vindhya-GAJA (JV) 20033795 CHITWAI water Supply Scheme 1 7 2620 2023 2038 2053 21-Oct-2023 20-Dec-2025 30-Mar-2026 31-Mar-2026 Scheme completed and ready for O&M Scheme Completed View
633 Jaunpur AFCONS 20030802 CHITWAN WATER SUPPLY SCHEME 1 12 3140 2023 2038 2053 28-Sep-2023 10-Oct-2024 10-Oct-2024 11-Oct-2024 Checked and found ok. OK View
634 Meerut Power Mech Projects Ltd 20066815 CHITWANA SHERPUR 1 1 3303 2023 2038 2053 31-Dec-2024 12-Nov-2024 31-Mar-2025 01-Apr-2025 Recommended for further Approvals. approved View
635 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20035487 Chormara Kamalpur 6 12 4442 2022 2037 2052 17-Feb-2024 22-Apr-2024 09-Feb-2025 26-Feb-2025 Scheme completed and ready for O&M Scheme Completed View
636 Meerut Power Mech Projects Ltd 20075258 CHUCHAI & SALAH RASULPUR PANH 2 2 4668 2022 2037 2052 31-Dec-2024 19-May-2024 14-Oct-2024 15-Oct-2024 Recommended for further Approvals. approved View
637 Gautam Buddha Nagar LC INFRA 8361671 CHUHARPUR BANGAR VILLAGE WATER SUPPLY SCHEME 1 1 3690 2022 2037 2052 20-Mar-2023 31-Mar-2024 31-Oct-2024 01-Nov-2024 Project certificate is verified Verified View
638 Fatehpur Power Mech Projects Ltd 20044162 Churaman Kheda 2 3 2550 2023 2038 2053 13-Mar-2024 10-Mar-2025 05-Aug-2025 06-Aug-2025 Trial & Run completed. It was initiated in the month of April (05.04.2025) and Regular water supply is given to the consumers. HGJ certificate not signed by Gram pradhan and Panchayat secretary. Verified View
639 Jaunpur Welspun Kaveri Infraprojects JV 8362123 CHURAWANPUR 1 12 2160 2022 2037 2052 22-May-2023 22-Mar-2026 22-Mar-2026 23-Mar-2026 Checked and found ok. ok View
640 Meerut Power Mech Projects Ltd 20100948 DABATHUWA GARHI 1 1 1091 2023 2038 2053 31-Dec-2024 14-Sep-2024 31-Jan-2025 01-Feb-2025 Recommended for further Approvals. approved View
641 Meerut Power Mech Projects Ltd 20020841 DABTHLA & MAVI 2 2 4448 2022 2037 2052 31-Dec-2024 17-Sep-2024 03-Feb-2025 04-Feb-2025 Recommended for further Approvals. approved View
642 Etawah Indian Hume Pipe 20015036 Dadra 3 5 3050 2022 2037 2052 08-May-2023 14-Jan-2024 29-Apr-2024 30-Apr-2024 Forwarded for further action. All work of scheme found satisfactory View
643 Meerut Power Mech Projects Ltd 20058231 DADRI 1 1 5636 2022 2037 2052 31-Dec-2024 07-Aug-2024 24-Dec-2024 25-Dec-2024 Recommended for further Approvals. Approved View
644 Meerut Power Mech Projects Ltd 20098083 DAHAR 1 1 4648 2023 2038 2053 31-Jan-2025 14-Aug-2024 31-Dec-2024 01-Jan-2025 Recommended for further Approvals Approved View
645 Hardoi NCC Ltd. 20012365 DAHEE 1 4 3470 2022 2037 2052 26-Jul-2023 20-Aug-2023 22-Nov-2023 07-Dec-2024 ok OK View
646 Kanpur Dehat GVPR 20053196 DAHELI 2 0 2597 2023 2038 2053 18-Nov-2023 10-Dec-2023 20-Mar-2024 21-Mar-2024 TKC unable to submit the calibration certificate and other report for O&M and some work pending (Road restoration & Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work. All work of scheme found satisfactory View
647 Kannauj GVPR 20036649 DAHLEPUR BANGER & MAHAM BALIPUR GRAMIN PEYJAL YOJNA 2 3 2415 2023 2038 2053 13-May-2024 10-Apr-2024 13-Jul-2024 14-Jul-2024 forw.arded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
648 Auraiya GVPR 20099290 Dahnanang PWS 1 3 3105 2023 2038 2053 21-Jun-2024 03-Nov-2024 02-Nov-2024 04-Nov-2024 Forwarded for further action. All work of scheme fond satisfactory. View
649 Etawah Indian Hume Pipe 20024531 Daipur PWS 1 2 1450 2022 2037 2052 22-Sep-2023 11-Oct-2023 11-Jan-2024 12-Jan-2024 Forwarded for further action. All work of scheme found satisfactory View
650 Jaunpur AFCONS 20057273 DAKHIN PATTI & MAHIMAPUR DEEH VILLAGE WATER SUPPLY SCHEME 4 18 3389 2023 2038 2053 23-Jan-2024 12-Dec-2024 12-Dec-2024 12-Dec-2024 checked & found ok ok View
651 Auraiya GVPR 20091138 Dakhnai PWS 1 1 2408 2023 2038 2053 01-Jun-2022 22-Aug-2023 21-Aug-2023 23-Aug-2023 Forwarded for further action. All work of scheme found satisfactory. View
652 Auraiya GVPR 20076359 Dalel Nagar PWS 1 3 5186 2023 2038 2053 01-Jun-2022 11-Nov-2024 10-Nov-2024 12-Nov-2024 Forwarded for further action All work of scheme fond satisfactory. View
653 Hardoi NCC Ltd. 8360562 DALELPUR 1 2 2839 2022 2037 2052 05-Mar-2023 10-Jan-2023 09-Apr-2023 25-Dec-2024 ok OK View
654 Jaunpur AFCONS 20071056 DALHANPUR VILLAGE WATER SUPPLY SCHEME 3 8 2295 2023 2038 2053 20-Feb-2024 27-May-2025 27-May-2025 27-May-2025 Testing & Commissioning certificate, Road restoration, trial & run certificate and Final BOQ not signed by EE but TPIA checked and signed all document for further process. ok View
655 Kanpur Dehat GVPR 20077276 Dalikpur Maharajpur & Bhitargaon 2 4 2496 2023 2038 2053 17-Feb-2024 13-Nov-2023 28-Mar-2024 29-Mar-2024 Forward for further necessary action pls All work of scheme found satisfactory View
656 Auraiya GVPR 20099288 Damarpur PWS 1 1 3024 2023 2038 2053 06-Jan-2022 08-Sep-2023 18-Jul-2024 20-Jul-2024 Forwarded for further action. All work of scheme found satisfactory. View
657 Fatehpur Power Mech Projects Ltd 20089220 DANDA AMAULI 1 3 3750 2023 2038 2053 13-Mar-2024 06-Nov-2024 30-Sep-2024 01-Oct-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of June (01.06.2024) and Regular water supply is given to the consumers. Verified View
658 Balrampur Larsen & Toubro Ltd 20018772 Dandav water supply scheme 1 3 3784 2022 2037 2052 30-Jun-2023 05-May-2025 05-Aug-2025 05-Aug-2025 Vide letter no. ceinsys/OPR/Devipatan/BLP/O&M/UPJN/2026-27 /07/309 dated 28.07.2026 mentioning that the scheme is partially commissioned and presently offer for O&M handover. Although FHTCs and automation systems are largely installed and water supply with chlorination is operational in two habitations, significant deficiencies remain in leakage rectification, pressure management, OHT hydrotesting, civil/campus works, calibration, SCADA integration, safety provisions, and the pending OHT honeycomb NC. All open NCs and deficiencies should be rectified, tested, and duly verified before final commissioning and O&M handover. Some FHTCs and other minor campus related works to be rectified. View
659 Ambedkar Nagar Vindhya-GAJA (JV) 20084934 DANDI MAHMOODPUR WSS 3 3 2450 2023 2038 2053 20-Feb-2024 27-Nov-2024 27-Feb-2025 28-Feb-2025 scheme checked and verified DANDI MAHMOODPUR SCHEME COMPLETED View
660 Fatehpur Power Mech Projects Ltd 20097508 DANIYALPUR 1 2 355 2023 2038 2053 25-Sep-2024 24-Jul-2025 23-Nov-2025 24-Nov-2025 Trial & Run completed. It was initiated in the month of August (25.08.2025) and Regular water supply is given to the consumers. HGJ certificate not signed by Gram pradhan and Panchayat secretary. Verified View
661 Ambedkar Nagar Vindhya-GAJA (JV) 20062642 DANPUR Water supply scheme 6 8 3440 2023 2038 2053 17-Jan-2024 08-Aug-2025 18-Jan-2026 19-Jan-2026 Scheme completed and ready for O&M SCHEME COMPLETED View
662 Amethi Gayatri Projects LTD 20072845 Daranagar & Sewara GP water supply scheme 2 7 4800 2022 2037 2052 10-Aug-2024 14-Jun-2024 14-Sep-2024 15-Dec-2024 Hardcopy submitted and found okay as per the submitted documents. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance... View
663 Kannauj GVPR 20036716 DARAUNA GRAMIN PEYJAL YOJNA 2 11 5988 2023 2038 2053 13-May-2024 06-Apr-2024 08-Jul-2024 09-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
664 Bijnor LC INFRA 20011551 Darbar Water Supply Scheme 1 1 2661 2022 2037 2052 09-Feb-2022 12-Feb-2024 21-Aug-2024 22-Aug-2024 Every thing completed. Everything Completed View
665 Bijnor LC INFRA 20013992 DARBARA WATER SUPPLY SCHEME 1 2 2927 2022 2037 2052 10-Feb-2024 27-Feb-2024 26-Aug-2024 27-Aug-2024 Every thing complete All Documents checked and verified. View
666 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20008823 Daredeha 2 2 4095 2022 2037 2052 07-Jul-2023 11-Feb-2026 11-Jan-2026 11-Feb-2026 scheme ready for o&m scheme Completed for o&m View
667 Fatehpur Gayatri Projects LTD 20026268 DARI BUZURG 1 1 3660 2022 2037 2052 25-Mar-2024 23-Jan-2025 23-Jan-2025 24-Jan-2025 Trial & Run completed. It was initiated in the month of October (23.10.2024) and Regular water supply is given to the consumers. Verified View
668 Mau LC INFRA 20064258 Dariyabad Village Water Supply Scheme 1 3 1671 2022 2037 2052 27-Jul-2024 20-Apr-2025 02-Apr-2025 03-Apr-2025 Approved Approved. View
669 Sultanpur UNIVERSAL MEP 20066401 DARIYAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 4 10 6650 2023 2038 2053 18-Jul-2024 11-Feb-2025 21-May-2025 01-Aug-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
670 Jaunpur AFCONS 20030817 DARUNPUR WATER SUPPLY SCHEME 3 10 4060 2023 2038 2053 31-Dec-2024 25-Feb-2025 25-Feb-2025 25-Feb-2025 Checked and found ok. ok View
671 Fatehpur Power Mech Projects Ltd 20097510 DASAULI 1 9 4070 2023 2038 2053 14-May-2024 30-Jun-2025 27-May-2025 28-May-2025 Trial & Run completed. It was initiated in the month of February(28.02.2025) and Regular water supply is given to the consumers. Verified View
672 Auraiya Indian Hume Pipe 8361892 DASEHARA 1 5 3375 2022 2037 2052 14-Sep-2022 20-Aug-2022 24-Nov-2022 25-Nov-2022 Forwarded for further action All work of scheme fond satisfactory. View
673 Kanpur Dehat GVPR 20069899 dashahara sujanpur 1 4 4201 2023 2038 2053 17-Mar-2024 19-Dec-2023 03-May-2024 04-May-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
674 Ambedkar Nagar Vindhya-GAJA (JV) 20062643 DASHRATHPUR Water supply scheme 7 11 4660 2023 2038 2053 17-Jan-2024 27-Apr-2025 29-Oct-2025 30-Oct-2025 Scheme completed and ready for O&M Scheme Completed and Ready For O&M View
675 Auraiya GVPR 20091074 Daspur PWS 1 2 2530 2023 2038 2053 01-Jun-2022 24-Feb-2024 07-Mar-2024 25-Apr-2024 Forwarded for further action. All work of scheme found satisfactory. View
676 Auraiya Indian Hume Pipe 20096562 DASRAURA PWS 1 1 1215 2022 2037 2052 19-Mar-2024 18-Oct-2023 31-Jan-2024 01-Feb-2024 Forwarded for further action. All work of scheme fond satisfactory. View
677 Azamgarh LC INFRA 20101583 DASU PATTI WATER SUPPLY SCHEME 4 7 3274 2023 2038 2053 31-May-2023 14-Oct-2023 31-Jan-2024 01-Feb-2024 OK OK View
678 Ambedkar Nagar Vindhya-GAJA (JV) 20019823 Daudpur 1 7 4470 2023 2038 2053 03-Aug-2023 23-Dec-2024 04-Apr-2025 05-Apr-2025 Checked and found ok CHECKED AND FOUND OK View
679 Kanpur Dehat Indian Hume Pipe 20016926 Daulatpur 1 1 3140 2022 2037 2052 05-Feb-2022 04-Feb-2023 30-Apr-2023 01-May-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
680 Shahjahanpur NCC Ltd. 20084102 DAULATPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 1 2210 2022 2037 2052 31-Dec-2024 29-Aug-2024 28-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Daulatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Daulatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
681 Ambedkar Nagar Vindhya-GAJA (JV) 20084935 DAULATPUR IKSARA WSS 5 14 4600 2023 2038 2053 20-Feb-2024 27-Jul-2025 22-Jul-2026 23-Jul-2026 SCHEME READY FOR O&M SCHEME COMPLETED View
682 Sultanpur UNIVERSAL MEP 20097011 DAUNO AND JAGDISHPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 3 5 2600 2023 2038 2053 10-May-2024 31-Dec-2024 31-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
683 Ambedkar Nagar Vindhya-GAJA (JV) 20068240 DAYAMPUR WSS 2 2 3200 2023 2038 2053 19-Feb-2024 28-Jul-2024 19-Mar-2025 20-Mar-2025 Checked and found ok Scheme completed View
684 Kannauj GVPR 20067638 DEBIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 3 1078 2023 2038 2053 16-Aug-2024 07-Apr-2024 11-Jul-2024 12-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
685 Kannauj GVPR 20077117 DEDAURA KHURD GRAM PANCHAYAT WATER SUPPLY SCHEME 1 1 2278 2023 2038 2053 08-Sep-2024 20-Nov-2024 19-Feb-2025 20-Feb-2025 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
686 Bahraich PNC-SPML-JV 20099558 DEEHA ASHOKA CHITTAURA RF MVS PWS 5 10 8330 2022 2037 2052 30-Jun-2025 25-Feb-2025 14-Nov-2023 25-Feb-2025 OK ! SCHEME COMPLETED View
687 Jaunpur AFCONS 20050638 DEEPAKPUR WATER SUPPLY SCHEME 1 8 3470 2023 2038 2053 17-Dec-2023 31-Dec-2026 24-Feb-2025 25-Feb-2025 checked and found ok. ok View
688 Farrukhabad Vindhya-GAJA (JV) 20093045 DEEPPUR NAGRIYA & HAKIKAT PUR MVS 5 6 4423 2023 2038 2053 30-May-2025 24-May-2024 24-May-2024 25-May-2024 All the parameters of scheme verified can take in O&M. ok View
689 Sultanpur UNIVERSAL MEP 20066559 DEHALI MUBARKAPUR & KANUPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 5 8270 2023 2038 2053 12-Jan-2024 12-Jan-2024 07-Oct-2024 07-Jan-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements and O&M Start Date 01/04/2025 View
690 Jaunpur AFCONS 20051332 DEHARI VILLAGE WATER SUPPLY SCHEME 2 12 3021 2023 2038 2053 17-Dec-2023 26-Feb-2025 26-Feb-2025 26-Feb-2025 Checked and found ok. ok View
691 Jaunpur Welspun Kaveri Infraprojects JV 20018508 Dehjuri 3 14 2642 2022 2037 2052 22-May-2023 21-Mar-2026 21-Mar-2026 22-Mar-2026 Checked and found ok................. ok View
692 Ambedkar Nagar Vindhya-GAJA (JV) 20083429 DEIPUR WSS 2 3 2670 2023 2038 2053 08-Mar-2024 27-Jul-2025 20-Jan-2026 21-Jan-2026 Scheme completed and ready for O&M Scheme Completed View
693 Lakhimpur Kheri NCC Ltd. 8360568 Demouhra 1 4 3845 2022 2037 2052 09-Apr-2023 20-Jan-2023 19-Apr-2023 19-Nov-2024 Approved as per check list Found ok View
694 Ambedkar Nagar Vindhya-GAJA (JV) 20067245 DEVCHAND PUR Water Supply Scheme 4 6 2880 2023 2038 2053 22-Feb-2024 31-Dec-2024 12-Sep-2025 13-Sep-2025 Scheme completed and ready for O&M Scheme completed and ready for O&M View
695 Kanpur Dehat GVPR 20053230 Devgaon Chakkar Urf Nibhoo 1 2 2527 2023 2038 2053 18-Nov-2023 30-Nov-2023 23-Mar-2024 24-Mar-2024 Forward for further action pls All work of scheme found satisfactory View
696 Ambedkar Nagar Vindhya-GAJA (JV) 20034611 DEVHAT WATER SUPPLY SCHEME 1 7 4470 2023 2033 2053 21-Oct-2023 15-Feb-2026 14-Aug-2026 15-Aug-2026 Scheme completed and ready for O&M SCHEME COMPLETED View
697 Kanpur Dehat GVPR 20077335 Devipur & Jugrajpur Shiwali 4 4 3963 2023 2038 2053 17-Feb-2024 10-Jan-2024 15-Apr-2024 16-Apr-2024 Forward for further action All work of scheme found satisfactory View
698 Mau LC INFRA 20023558 DEVKHARI WATER SUPPLY SCHEME 9 13 2760 2022 2037 2052 08-Aug-2023 30-Dec-2025 20-Apr-2025 30-Dec-2025 Approved Approved.. View
699 Ambedkar Nagar Vindhya-GAJA (JV) 20067208 DEVLAR, Water Supply Scheme 3 10 4170 2023 2038 2053 23-Mar-2024 14-Aug-2025 17-Nov-2025 18-Nov-2025 found okk.... Scheme completed and ready for O&M View
700 Sultanpur Vindhya-GAJA (JV) 20084399 DEVRAHAR & CHANDELPUR WSS 2 6 2170 2022 2037 2052 23-Mar-2023 22-Mar-2024 31-Dec-2025 01-Feb-2026 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements. View
701 Ambedkar Nagar Vindhya-GAJA (JV) 20067263 DEVRIYA BUJURG Water Supply Scheme 2 9 5350 2023 2038 2053 21-Feb-2024 31-Dec-2024 23-Jul-2025 24-Jul-2025 APPROVED Scheme Completed View
702 Fatehpur Power Mech Projects Ltd 20097453 DEWARA 1 2 1310 2023 2038 2053 25-Sep-2024 30-Jun-2025 18-Dec-2024 19-Dec-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of September(19.09.2024) and Regular water supply is given to the consumers. Verified View
703 Mau LC INFRA 20064262 Dewariya Bujurg village water Supply Scheme 1 8 1433 2022 2037 2052 22-Mar-2025 16-Apr-2025 16-Apr-2025 17-Apr-2025 All mentioned details found ok. Approved View
704 Sultanpur UNIVERSAL MEP 20064733 DHAHA FIROJPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 2180 2023 2038 2053 12-Jan-2024 12-Jan-2024 16-Jan-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
705 Auraiya GVPR 20040118 Dhakhli pur PWS 1 5 2492 2023 2038 2053 06-Jan-2024 05-Mar-2024 17-Apr-2024 19-Apr-2024 Forwarded for further action. All work of scheme found satisfactory. View
706 Shahjahanpur NCC Ltd. 20019672 Dhakia Elaqua Parwaizpur 2 2 2140 2022 2037 2052 31-Dec-2024 12-Apr-2024 12-Jul-2024 16-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Dhakia Elaqua Parwaizpur scheme have been checked and verified. The submitted records are recommended and forwarded for further. As per SWSM letter no. 3331/SE/QAP/2023-24, dated- 26.10.2023. Instead of Single curved sheet TKC has used twins sheets During erection of Zi-Al Tanks, replace the same with in 15 days. As per TKC undertaking letter no.NCC/DWSM/SHAHJAHANPUR /69/2025-26.TKC has assured the pendency of work will be completed by 15.09.25. All information on the portal for the completion certificate of Dhakiya Elaqua Parwaizpurscheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
707 Shahjahanpur NCC Ltd. 20058804 DHAKIA HAMID NAGAR WSS 1 1 2522 2023 2038 2053 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of DHAKIA HAMID NAGAR scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of DHAKIA HAMID NAGAR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
708 Shahjahanpur NCC Ltd. 20014805 DHAKIYA RAGHA 2 2 2400 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Dhakiya Ragha scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Dhakiya Ragha scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
709 Auraiya GVPR 20089668 Dhamseni PWS 1 2 1500 2023 2038 2053 06-Jan-2022 26-Jul-2024 25-Jul-2024 27-Jul-2024 Forwarded for further action. All work of scheme found satisfactory. View
710 Jaunpur AFCONS 20056939 DHANARKHA AND MARIKPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 3 13 3810 2023 2038 2053 23-Jan-2024 25-May-2025 25-May-2025 25-May-2025 Checked and found ok. Ok View
711 Sultanpur Vindhya-GAJA (JV) 20051916 DHANECH & JAKHANI KALAN WATER SUPPLY SCHEME 6 21 3190 2023 2038 2053 03-Dec-2022 02-Dec-2023 28-Dec-2024 01-Aug-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
712 Meerut Power Mech Projects Ltd 20078466 DHANPURA 1 1 1654 2023 2038 2053 31-Dec-2024 01-Jun-2024 21-Oct-2024 22-Oct-2024 Recommended for further Approvals. Approved View
713 Auraiya Indian Hume Pipe 8359407 Dhanwali 1 3 3040 2022 2037 2052 14-Sep-2022 20-Dec-2023 31-Mar-2024 01-Apr-2024 Forwarded for further action. All work of scheme fond satisfactory. View
714 Shahjahanpur NCC Ltd. 20014806 DHARAMPUR KANJA 1 2 2150 2022 2037 2052 24-Dec-2023 31-Dec-2024 24-Mar-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Dharampur Kanja scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Dharmpur Kanja scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
715 Farrukhabad Vindhya-GAJA (JV) 20074587 DHARAMPUR MVS 4 6 4069 2023 2038 2053 30-May-2025 02-Jul-2024 02-Jul-2024 03-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
716 Shahjahanpur NCC Ltd. 20014793 Dharampur Sathaara 2 3 3460 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Dharampur Sathaara WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Dharampur Sathaara WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
717 Fatehpur Power Mech Projects Ltd 20097512 DHARAMPUR SATO 1 21 9380 2023 2038 2053 25-Oct-2024 05-Sep-2024 24-Jan-2025 25-Jan-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of October(25.10.2024) and Regular water supply is given to the consumers. Verified View
718 Auraiya Indian Hume Pipe 20014498 DHARKAN PWS 1 3 2200 2022 2037 2052 08-May-2023 25-Jun-2023 14-Oct-2023 15-Oct-2023 Forwarded for further action. All work of scheme found satisfactory. View
719 Ambedkar Nagar Vindhya-GAJA (JV) 20035121 DHARMA MUBARAK PATTI WSS 2 7 4750 2023 2038 2053 21-Oct-2023 20-Jun-2025 13-Oct-2025 14-Oct-2025 Checked and Found ok CHECKED AND FOUND OK View
720 Auraiya Indian Hume Pipe 20022725 Dharmangadpur 2 7 2900 2022 2037 2052 08-May-2023 21-Jul-2024 09-Nov-2024 10-Nov-2024 Forwarded for further action. All work of scheme fond satisfactory. View
721 Fatehpur Power Mech Projects Ltd 20102035 DHARMGADPUR 1 1 1250 2023 2038 2053 20-Sep-2024 04-Sep-2024 04-Sep-2024 05-Sep-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of June (05.06.2024) and Regular water supply is given to the consumers. Verify View
722 Shahjahanpur NCC Ltd. 20015121 DHASA KALYANPUR Jaitipur W/s 1 2 2575 2022 2037 2052 31-Dec-2024 24-Dec-2023 24-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the DHASA KALYANPUR WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. SWSM/BLG/JJM/26-27/370 for further necessary action. All information on the portal for the completion certificate of DHASA KALYANPUR Jaitipur W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
723 Bijnor Vindhya-GAJA (JV) 20037588 Dhaumanpur Gram Panchayat Water Supply 2 2 2851 2023 2038 2053 06-Jul-2023 15-May-2025 15-Nov-2025 16-Nov-2025 Every thing complete. Check Document View
724 Bijnor LC INFRA 8360890 DHELA AHIR VILLAGE WATER SCHEME 2 2 4074 2022 2037 2052 29-Sep-2023 08-Dec-2023 06-Jun-2024 07-Jun-2024 Every thing complete. Everything is Completed. View
725 Auraiya GVPR 20034856 DHIKIYA PUR 1 3 3420 2023 0 0 01-Jun-2022 15-Aug-2024 14-Aug-2024 16-Aug-2024 Forwarded for further action. All work of scheme fond satisfactory. View
726 Meerut Power Mech Projects Ltd 20031858 DHINDALA 1 1 2917 2023 2038 2053 31-Dec-2024 12-Mar-2024 29-Jul-2024 07-Oct-2024 Recommended for further Approvals. Approved View
727 Bijnor Vindhya-GAJA (JV) 20026561 Dhingarpur Gram Panchayat Water Supply 2 2 2032 2023 2038 2053 06-Jul-2023 04-Jun-2025 04-Dec-2025 05-Dec-2025 Every thing complete. Document complete View
728 Meerut Power Mech Projects Ltd 20058211 DHIRKHERA 1 1 2893 2022 2037 2052 11-Jun-2025 28-Jan-2025 16-Jun-2025 17-Jun-2025 Recommended for further Approvals. approved View
729 Auraiya Indian Hume Pipe 20055688 Dhorera PWS 1 2 2150 2022 2037 2052 22-Sep-2023 25-Sep-2024 20-Dec-2025 03-Jan-2025 Forwarded for further action. All work of scheme found satisfactory. View
730 Shahjahanpur NCC Ltd. 20016383 DHUKURI BUZURG 1 1 2480 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Dhukuri Buzurg scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of DHUKURI BUZURG scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
731 Sultanpur UNIVERSAL MEP 20066510 DHUSIYARIYA & RAMPUR MATHA GRAM PANCHAYAT WATER SUPPLY SCHEME 2 9 4210 2023 2038 2053 12-Jan-2024 31-Dec-2025 05-Mar-2025 01-Apr-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
732 Hardoi NCC Ltd. 20012540 DIGHIA 2 7 2290 2022 2037 2052 26-Jul-2023 23-Sep-2023 22-Dec-2023 25-Dec-2024 ok OK View
733 Sultanpur UNIVERSAL MEP 20092633 DIH & MEGHMAU GRAM PANCHAYAT WATER SUPLLY SCHEME 2 22 14904 2023 2038 2053 18-Jul-2024 02-Feb-2025 24-May-2025 01-Aug-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
734 Ambedkar Nagar Vindhya-GAJA (JV) 20092959 DILAWALPUR Water Supply Scheme 1 6 2070 2023 2038 2053 17-May-2024 08-Oct-2025 31-Jan-2026 01-Feb-2026 Scheme completed and ready for O&M Scheme completed View
735 Shahjahanpur NCC Ltd. 20020796 DILAWARPUR 2 2 2430 2022 2037 2052 31-Dec-2024 30-Nov-2023 29-Feb-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Dilawarpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Dilawarpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
736 Meerut Power Mech Projects Ltd 20011064 DIMOLI 1 1 2543 2022 2037 2052 31-Dec-2024 05-Mar-2024 16-Jul-2023 29-Oct-2024 Recommended for further Approvals. approved View
737 Shahjahanpur NCC Ltd. 20026234 DINGURPUR ELAQUA SAHERAMAU 3 5 2980 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of DINGURPUR ELAQUA SAHERAMAU WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of DINGURPUR ELAQUA SAHERAMAU WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
738 Muzaffarnagar Gayatri Projects LTD 20022067 Dinkarpur 1 1 3691 2022 2037 2053 16-Sep-2022 25-Sep-2023 25-Dec-2023 26-Dec-2023 The details given by the contractor are correct at the time of approval. OK View
739 Kannauj GVPR 20077099 DISARAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 1718 2023 2038 2053 08-Sep-2024 13-Apr-2024 16-Jul-2024 17-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
740 Shahjahanpur NCC Ltd. 20084152 DIURAS GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME 1 1 3000 2022 2037 2052 31-Dec-2024 09-Mar-2023 06-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Diuras scheme have been checked and verified. The submitted records are recommended and forwarded for further. As per SWSM letter no. 3331/SE/QAP/2023-24, dated- 26.10.2023. Instead of Single curved sheet TKC has used twins sheets During erection of Zi-Al Tanks, replace the same with in 15 days All information on the portal for the completion certificate of Diuras scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
741 Auraiya GVPR 20025455 DIVARI PWS 1 4 3049 2023 2038 2053 01-Jun-2022 09-Feb-2023 24-Jun-2023 09-Mar-2023 Forwarded for further action. All work of scheme found satisfactory. View
742 Auraiya GVPR 20065250 Divariya PWS 4 4 4953 2023 2038 0 01-Jun-2022 04-May-2025 02-Feb-2025 05-May-2025 Forwarded for further action. All work of scheme fond satisfactory. View
743 Kannauj GVPR 20090097 DIYORA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 7 4035 2023 2038 2053 08-Sep-2024 07-May-2024 10-Aug-2024 11-Aug-2024 forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
744 Auraiya GVPR 20088702 Dobaa Mafi PWS 1 9 6146 2023 2038 2053 01-Jun-2024 13-Apr-2024 25-Feb-2024 13-Apr-2024 Forwarded for further action. All work of scheme found satisfactory. View
745 Kanpur Dehat Indian Hume Pipe 20024873 Doharapur 1 1 2600 2022 2037 2052 24-Aug-2023 31-Dec-2024 31-Aug-2023 01-Sep-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
746 Shahjahanpur NCC Ltd. 20017995 dolapur 4 4 2790 2022 2037 2052 31-Dec-2024 30-Nov-2023 29-Feb-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Dolapur WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Dolapur WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
747 Auraiya Indian Hume Pipe 8362100 DONDAPUR 1 2 2435 2022 2037 2052 12-Oct-2021 20-May-2023 04-Sep-2023 05-Sep-2023 Forwarded for further action All work of scheme fond satisfactory. View
748 Kanpur Dehat GVPR 20086224 Duda Mahua 1 2 1210 2023 2038 2053 17-Feb-2024 01-Jan-2024 10-Apr-2024 11-Apr-2024 forward for further action All work of scheme found satisfactory View
749 Meerut Power Mech Projects Ltd 20068707 DUDHALI KHADAR, JALAPUR MAQBULPUR & RUSTAMPUR BHIKUND 3 3 2551 2022 2037 2052 31-Dec-2024 07-Dec-2024 30-Apr-2025 01-May-2025 Recommended for further Approvals. approved View
750 Shahjahanpur NCC Ltd. 20077474 DUDHAUNA WSS 1 3 2810 2022 2037 2052 20-Sep-2023 31-Dec-2024 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Dudhauna scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Dudhauna scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
751 Sant Ravidas Nagar Welspun Kaveri Infraprojects JV 20016905 Duguna Uparwar Multi Village Water Supply Scheme 2 2 2994 2022 2037 2022 30-Jul-2025 30-Jul-2025 31-Oct-2025 01-Nov-2025 All related documents reviewed and found in accordance to the guide line of JJM. All documents reviewed and found in compliance with JJM guidelines. View
752 Ambedkar Nagar Vindhya-GAJA (JV) 20034383 DUHIYA WATER SUPPLY SCHEME 2 4 3110 2023 2038 2053 20-Oct-2023 24-Dec-2025 30-Mar-2026 31-Mar-2026 Scheme completed and ready for O&M SCHEME COMPLETED View
753 Amethi Welspun Kaveri Infraprojects JV 20013655 DulariNagar Water Supply Scheme 1 6 4540 2022 2037 2052 11-Oct-2021 10-Apr-2023 04-May-2025 05-May-2025 All things found satisfactory in the Scheme and finalized for Operation And Maintenance Approved View
754 Balrampur Larsen & Toubro Ltd 20025961 Dulhapur Hanumant Nagar water supply scheme 2 13 3599 2022 2037 2052 17-Mar-2024 26-Mar-2022 26-Jun-2026 26-Jun-2026 Some Works are pending including commissioning of some houses Some FHTCs and other minor campus related works to be rectified. View
755 Meerut Power Mech Projects Ltd 20012879 DULHERA CHAUHAN 1 1 5288 2022 2037 2052 31-Dec-2024 07-Sep-2024 24-Jan-2025 25-Jan-2025 Recommended for further Approvals. approved View
756 Ambedkar Nagar Vindhya-GAJA (JV) 20042858 DULHUPUR KALA WSS 1 5 4640 2023 2038 2053 23-Nov-2023 20-Jun-2025 14-Oct-2025 15-Oct-2025 Checked and found ok Scheme Completed View
757 Bijnor LC INFRA 8388706 DULI CHANDPUR VILLAGE WATER SUPPLY SCHEME 1 1 2810 2022 2037 2052 23-Sep-2021 24-Oct-2024 25-Jan-2025 26-Jan-2025 Every thing complete. Everything Completed. View
758 Kanpur Dehat Indian Hume Pipe 20096866 Dundiyamau 2 2 1480 2022 2037 2052 04-Mar-2023 31-Dec-2024 05-Jun-2023 06-Jun-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
759 Meerut Power Mech Projects Ltd 20085472 DUNGAR RO 1 1 3100 2022 2037 2052 31-Dec-2024 10-Feb-2024 26-Jun-2024 10-Oct-2024 Recommended for further Approvals. approved View
760 Kanpur Dehat GVPR 20077488 DURGA PURWA 2 3 2129 2023 2038 2053 17-Feb-2024 14-Nov-2023 29-Mar-2024 30-Mar-2024 Forward for further necessary action pls All work of scheme found satisfactory View
761 Farrukhabad Vindhya-GAJA (JV) 20097902 DURGU PUR SVS 1 1 1284 2023 2038 2053 30-May-2025 20-Jan-2024 04-May-2024 05-May-2025 All the parameters of scheme verified can take in O&M. Ok View
762 Meerut Power Mech Projects Ltd 20098105 DURJANPUR 1 1 943 2022 2037 2052 31-Dec-2024 12-Apr-2024 30-Aug-2024 01-Jan-2025 Recommended for further Approval approved View
763 Meerut Power Mech Projects Ltd 20020225 DUVESHPUR 1 1 3998 2022 2037 2052 31-Dec-2024 13-Jun-2024 01-Nov-2024 02-Nov-2024 Recommended for further Approvals. approved View
764 Fatehpur Power Mech Projects Ltd 20097455 EKDALA 1 1 2572 2023 2038 2058 15-May-2023 30-Jun-2025 18-Dec-2024 19-Dec-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of September (19.09.2024) and Regular water supply is given to the consumers. Verified View
765 Ambedkar Nagar Vindhya-GAJA (JV) 20058784 EKDALLA, SABUKPUR WSS 2 8 6820 2023 2038 2053 26-Dec-2025 24-Jul-2025 09-Nov-2025 10-Nov-2025 Scheme completed and ready for O&M Scheme Completed View
766 Auraiya GVPR 20089638 Ekgara bidhuna PWS 1 8 3718 2023 2038 2053 01-Jun-2024 08-Jul-2024 07-Jul-2024 09-Jul-2024 Forwarded for further action. All work of scheme found satisfactory. View
767 Farrukhabad Vindhya-GAJA (JV) 20091383 EKLAHRA & RAIPUR CHINGHATPUR MVS 2 2 4111 2023 2038 2053 30-May-2025 28-May-2024 28-May-2024 29-May-2024 All the parameters of scheme verified can take in O&M. ok View
768 Sultanpur UNIVERSAL MEP 20066895 EKLAKHI & SEVKARI GRAM PANCHAYAT WATER SUPPLY SCHEME 5 14 4160 2023 2038 2053 12-Jan-2024 31-Dec-2024 10-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
769 Shahjahanpur NCC Ltd. 20015359 ENDEYPUR WSSS 3 3 2790 2022 2037 2052 13-Aug-2023 31-Dec-2024 30-Nov-2023 16-Nov-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of ENDEYPUR W/S scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Endeypur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
770 Kanpur Dehat GVPR 20069958 enjua rampur 1 0 1846 2023 2038 2053 17-Feb-2024 19-Dec-2023 03-May-2024 04-May-2024 Forward for further necessary action pls All work of scheme found satisfactory View
771 Sultanpur Vindhya-GAJA (JV) 20051650 ERUL WATER SUPPLY SCHEME 3 3 2410 2023 2038 2053 12-Dec-2023 03-May-2025 02-May-2025 01-Sep-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. Approved for o&m View
772 Auraiya Indian Hume Pipe 8359424 Etaili 1 17 4370 2022 2037 2052 12-Sep-2022 10-Nov-2023 28-Feb-2024 01-Mar-2024 Forwarded for further action. All work of scheme fond satisfactory. View
773 Shahjahanpur NCC Ltd. 20015311 ETAURA DADROL w/s 1 2 2140 2022 2037 2052 31-Aug-2023 31-Dec-2024 30-Nov-2023 16-Nov-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Etaura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Etaura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
774 Bijnor LC INFRA 20076008 Etawa Village Water Supply 3 3 3664 2022 2037 2052 03-Feb-2023 30-Oct-2024 31-Jan-2025 01-Feb-2025 Every thing complete. Check Document View
775 Meerut Power Mech Projects Ltd 20058352 FAIZABAD PACHGAON ,SALEH NAGAR & JOHRA 3 3 3886 2023 2038 2053 31-Dec-2024 12-Aug-2024 29-Dec-2024 31-Dec-2024 CHECKED AND VERIFIED.... approved View
776 Auraiya Indian Hume Pipe 20033764 Faizullapur PWS 3 3 2200 2022 2037 2052 22-Sep-2023 25-Jul-2023 16-Nov-2023 17-Nov-2023 Forwarded for further action. All work of scheme found satisfactory. View
777 Shahjahanpur NCC Ltd. 20018436 Fajilpur 1 3 2390 2022 2037 2052 31-Dec-2024 23-Feb-2024 24-May-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Fajilpur WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Fajilpur WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
778 Meerut Power Mech Projects Ltd 20013156 FAKARPUR KURI GANGHERI 3 3 4475 2022 2037 2052 31-Dec-2024 20-Dec-2022 10-May-2023 17-Feb-2025 Recommended for further Approval approved View
779 Bijnor Vindhya-GAJA (JV) 20067903 FAREEDPUR DURGA WATER SUPPLY SCHEME 2 2 1938 2023 2038 2053 06-Jul-2023 19-May-2025 19-Nov-2025 20-Nov-2025 Every thing complete. All documents checked View
780 Ambedkar Nagar Vindhya-GAJA (JV) 20059444 Fareedpur Kutub Water Supply Scheme 6 9 4190 2023 2038 2053 26-Dec-2023 24-Mar-2026 25-Jul-2026 26-Jul-2026 scheme ready for o&m SCHEME COMPLETED View
781 Bijnor LC INFRA 20088633 Fareedpur Nizam Water Supply Scheme 3 3 2250 2022 2037 2052 13-Mar-2023 18-Oct-2024 19-Jan-2025 20-Jan-2025 Every thing complete. complete document View
782 Auraiya GVPR 20091173 Fareha PWS 1 3 1834 2023 2038 2053 01-Jun-2022 17-Oct-2024 16-Oct-2024 18-Oct-2024 Forwarded for further action. All work of scheme found satisfactory. View
783 Fatehpur Power Mech Projects Ltd 20097487 FARIDPUR 1 1 2140 2023 2038 2053 25-Sep-2024 02-Sep-2025 14-Jul-2025 15-Jul-2025 Trial & Run completed. It was initiated in the month of April(14.04.2025) and Regular water supply is given to the consumers. Verified View
784 Kannauj GVPR 20067612 FARIKAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 3728 2023 2038 2053 16-Aug-2024 28-Apr-2024 31-Jul-2024 01-Aug-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
785 Bijnor LC INFRA 20026179 Fatahpur Ahtmali Village Water Supply 5 5 2514 2022 2037 2052 18-Aug-2022 18-Sep-2024 19-Dec-2024 20-Dec-2024 Every thing complete. Every thing is Completed. View
786 Farrukhabad Vindhya-GAJA (JV) 20092574 FATANPUR MVS 2 3 1513 2023 2038 2053 30-May-2025 14-Apr-2024 14-Apr-2024 15-Apr-2024 All the parameters of scheme verified can take in O&M. ok View
787 Auraiya GVPR 20091162 Fatehpur Karam & prayagpur & Karampur PWS 1 6 3761 2023 0 0 01-Jun-2022 09-Jun-2024 08-Jun-2024 10-Jun-2024 Forwarded for further action. All work of scheme fond satisfactory. View
788 Auraiya GVPR 20099291 Fatehpur lakhmi PWS 1 1 822 2023 2038 2053 01-Jun-2022 06-Sep-2025 05-Sep-2025 07-Sep-2025 Forwarded for further action. All work of scheme fond satisfactory View
789 Meerut Power Mech Projects Ltd 20098984 FATEHPUR WATER SUPPLY SCHEME 1 1 597 2023 2038 2053 31-Dec-2024 06-May-2024 24-Sep-2024 17-Feb-2025 Recommended for further Approval approved View
790 Bijnor LC INFRA 20011559 Fatehullahpur Dargoo Village Water Supply Scheme 2 2 2231 2022 2037 2052 10-Feb-2024 11-Dec-2023 10-Jun-2024 11-Jun-2024 Every thing complete. Everything Complete. View
791 Auraiya GVPR 20025618 FATEPUR&BANSAI 1 6 4123 2023 0 0 01-Jun-2022 03-Aug-2024 02-Aug-2024 04-Aug-2024 Forwarded for further action. All work of scheme fond satisfactory. View
792 Sultanpur UNIVERSAL MEP 20066850 FATTEPUR & USKA MAU GRAM PANCHAYAT WATER SUPPLY SCHEME 3 17 13100 2023 2038 2053 12-Jan-2024 05-Oct-2024 06-Jan-2025 01-Apr-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
793 Ambedkar Nagar Vindhya-GAJA (JV) 20026122 FATTEPUR KAKARDILA WATER SUPPLY SCHEME 2 12 3310 2023 2038 2053 28-Sep-2023 12-Oct-2024 11-Jan-2025 12-Jan-2025 checked and verified SCHEME COMPLETED View
794 Kannauj GVPR 20067643 FEEROJPUR TERAN GRAM PANCHAYAT WATER SUPPLY SCHEME 1 1 2508 2023 2038 2053 16-Aug-2024 20-Mar-2024 22-Jun-2024 23-Jun-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory,scheme finalized for operation & maintenance View
795 Mau LC INFRA 20098951 FEROZEPUR VILLAGE WATER SUPPLY SCHEME 2 3 1822 2022 2037 2052 04-Oct-2024 03-Dec-2025 01-Dec-2025 03-Dec-2025 Approved Approved.. View
796 Sultanpur UNIVERSAL MEP 20066860 FIROJPUR KALA & DULAHAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 3 3 7580 2023 2038 2053 18-Jul-2025 01-Mar-2025 02-Jun-2025 01-Jul-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action All uploaded documents have been checked and verified, found as per requirements. View
797 Hardoi NCC Ltd. 8368530 Fool Behta 2 2 3039 2022 2037 2052 05-Mar-2023 11-Apr-2023 10-Jul-2023 24-Dec-2024 ok OK View
798 Ambedkar Nagar Vindhya-GAJA (JV) 20026125 FULWARI WATER SUPPLY SCHEME 3 9 3420 2023 2038 2053 28-Sep-2023 21-Sep-2025 03-Jan-2026 04-Jan-2026 SCHEME COMPLETED AND READY FOR O&M Scheme Completed View
799 Auraiya GVPR 20039829 Gadanpur &singlamau pws 3 4 3646 2033 2038 2053 06-Jan-2022 05-Jun-2024 04-Jun-2024 05-Jun-2024 Forwarded for further action. All work of scheme found satisfactory. View
800 Farrukhabad Vindhya-GAJA (JV) 20074163 GADANPUR DEVRAJPUR SVS 1 4 4794 2023 2038 2053 30-May-2025 12-Jun-2024 12-Jun-2024 13-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
801 Kannauj GVPR 20098277 GADANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 3 4 2568 2023 2038 2053 14-Nov-2024 23-Jan-2025 23-Apr-2025 24-Apr-2025 forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
802 Ayodhya VSA 20061550 GADAULI WSS 2 7 3060 2023 2038 2053 20-Feb-2024 05-Jun-2024 05-Jun-2024 15-Dec-2024 Found OK Found Correct View
803 Shahjahanpur NCC Ltd. 20073281 GADCHAPPA WSS 3 3 1936 2022 2037 2052 31-Dec-2024 14-Aug-2024 13-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of GADCHAPPA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of GADCHAPPA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
804 Azamgarh LC INFRA 20014130 GADHAN KHURD WATER SUPPLY SCHEME 1 5 2962 2022 2037 2052 31-May-2023 15-Jan-2024 17-Apr-2024 18-Apr-2024 OK OK View
805 Kannauj GVPR 20036192 GADIA BALIDATPUR GRAMIN PEYJAL YOJNA 3 6 4408 2023 2038 2053 13-May-2024 25-Mar-2024 27-Jun-2024 28-Jun-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
806 Farrukhabad Vindhya-GAJA (JV) 20093053 GADIYA HAIBATPUR SVS 1 4 2604 2023 2038 2053 30-May-2025 07-Feb-2024 22-May-2024 23-May-2024 All the parameters of scheme verified can take in O&M. ok View
807 Mau LC INFRA 20058572 Gagaupur Rural Village Water Supply Scheme 2 6 2701 2022 2037 2052 02-Aug-2024 01-Apr-2025 01-Apr-2025 02-Apr-2025 Approved approve View
808 Meerut Power Mech Projects Ltd 20031795 GAGSONA - NAGORI 2 2 4590 2023 2038 2053 31-Dec-2024 15-Sep-2024 03-Feb-2025 04-Feb-2025 Recommended for further Approvals. Approved View
809 Meerut Power Mech Projects Ltd 20066802 GAGUAL REORGANISATION 1 1 8897 2022 2037 2052 31-Dec-2024 11-Sep-2024 08-Jan-2025 29-Jan-2025 Recommended for further Approvals. approved View
810 Jaunpur Welspun Kaveri Infraprojects JV 20089187 Gahlai 4 20 5620 2022 2037 2052 14-Sep-2024 18-Sep-2025 18-Sep-2025 19-Sep-2025 Checked and found ok. Ok View
811 Kanpur Dehat Indian Hume Pipe 20034280 GAHLOO 1 3 2210 2022 2037 2052 24-Nov-2022 31-Dec-2024 18-Apr-2024 01-May-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
812 Amethi Vindhya-GAJA (JV) 20070878 GAIMAU WATER SUPPLY SCHEME 1 6 1965 2023 2038 2053 23-Mar-2024 07-Jun-2024 07-Sep-2024 08-Dec-2024 All Document not provided by EPC hence returns to the EPC All things found satisfactory in the Scheme and finalized for Operation And Maintenance View
813 Farrukhabad Vindhya-GAJA (JV) 20076678 GAISINGHPUR SVS 1 2 2592 2023 2038 2053 30-May-2025 23-May-2025 23-May-2024 24-May-2024 All the parameters of scheme verified can take in O&M. ok View
814 Bijnor LC INFRA 20018248 Gajipur Water Supply Scheme 2 2 3256 2022 2037 2052 26-Jan-2025 26-Jan-2025 26-Jan-2025 27-Jan-2025 Every thing completed. Everything Complete. View
815 Bahraich PNC-SPML-JV 7620547 Gajpatipur Pws 1 22 6290 2022 2037 2052 30-Jun-2025 14-Jun-2025 19-May-2024 15-Jun-2025 approved scheme completed View
816 Kanpur Dehat Indian Hume Pipe 20025512 Galuapur 1 1 2390 2022 2037 2052 25-Aug-2022 31-Dec-2024 31-Mar-2024 01-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
817 Shahjahanpur NCC Ltd. 20057007 GANDHARPUR WSS 1 1 2430 2023 2038 2053 31-Dec-2024 31-Jul-2024 30-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Gandharpur WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of GANDHARPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
818 Farrukhabad Vindhya-GAJA (JV) 20076915 GANDHI SVS 1 4 4460 2023 2038 2053 30-May-2025 27-May-2024 27-May-2024 28-May-2024 All the parameters of scheme verified can take in O&M ok View
819 Meerut Power Mech Projects Ltd 20020769 GANESHPUR 2 2 5688 2022 2037 2052 31-Dec-2024 26-May-2024 30-Oct-2024 31-Oct-2024 Recommended for further Approval Approved View
820 Gorakhpur NCC Ltd. 8361112 Ganeshpur WATER SUPPLY SCHEME 4 4 2142 2022 2037 2052 11-Feb-2023 10-Oct-2022 06-Oct-2022 06-Jan-2023 testttt Approved View
821 Farrukhabad Vindhya-GAJA (JV) 20081341 GANGAICH & NARAINPUR MVS 2 4 3408 2023 2038 2053 31-Mar-2025 18-Dec-2024 31-Mar-2025 01-Apr-2025 All the parameters of scheme verified can take in O&M OK View
822 Kanpur Dehat Indian Hume Pipe 20063805 Gangauli 2 4 4150 2022 2037 2052 11-Jan-2024 31-Dec-2024 31-Dec-2023 01-Jan-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
823 Amethi Vindhya-GAJA (JV) 20068067 GANGAULI & GHAGUGHAR WATER SUPPLY SCHEME 1 13 4152 2023 2038 2053 23-Mar-2023 20-Jun-2024 20-Sep-2024 21-Dec-2024 Hardcopy submitted and found okay as per the submitted documents. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance.. View
824 Farrukhabad Vindhya-GAJA (JV) 20091285 GANGLAU PARMNAGAR & SADIKPUR MVS 2 3 2741 2023 2038 2053 30-May-2025 13-Jun-2024 13-Jun-2024 14-Jun-2024 All the parameters of scheme verified can take in O&M ok View
825 Mau GA INFRA-VPL 20100987 GANGUWABARI & TIGHARA GRAM PANCHAYAT WATER SUPPLY SCHEME 3 9 3240 2023 2038 2053 30-May-2025 14-Apr-2025 14-Apr-2025 15-Apr-2025 Approved Approved View
826 Auraiya GVPR 20088639 Ganupur PWS 1 7 1792 2023 0 0 01-Jun-2022 02-Mar-2025 01-Mar-2025 03-Mar-2025 Forwarded for further action. All work of scheme fond satisfactory. View
827 Bijnor LC INFRA 8388856 GANURA JALALPUR SULTAN GRAMPANCHAYAT WATER SUPPLY SCHEME 2 2 3029 2022 2037 2052 29-Sep-2023 10-Dec-2023 08-Jun-2024 09-Jun-2024 every thing completed every thing completed View
828 Balrampur Larsen & Toubro Ltd 20092907 Ganveria Bujurg Water Supply Scheme 1 3 2512 2022 2039 2052 28-Oct-2024 06-Sep-2025 06-Dec-2025 06-Dec-2025 • Distribution: -Total scope of laying is 7986 km, total pipe laid is 8312 km, which is beyond the scope. • FHTC: -Total scope is 283 no’s, in which 243 Executed on sit as per list attached. • Automation & Chlorination: -Automation System was found functional, but Calibration was not done & Chlorine was in function. All Installed Automation Equipment were Successfully displayed on the SCADA/HMI Platforms. • Water is being supplied through OHT and chlorination unit functional during site inspection. • Water is being supplied only for 2 Habitation out of 3 habitations, with chlorination treatment. • Water is being Supplied by OHT, Hydrotest of OHT has not been Performed. Campus development: - Campus development is not done but Housekeeping is required. Some FHTCs and other minor campus related works to be rectified. View
829 Amethi Vindhya-GAJA (JV) 20101973 GARHA MAFI WATER SUPPLY SCHEME 1 6 1883 2023 2038 2053 04-Jul-2024 13-Nov-2024 13-Feb-2025 13-May-2025 Hardcopy submitted and found okay as per the submitted documents.. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance.. View
830 Etawah Indian Hume Pipe 20073790 Garhaiya 1 4 1875 2022 2037 2052 15-Mar-2024 26-Feb-2024 07-Jun-2024 08-Jun-2024 Forwarded for further action. All work of scheme found satisfactory. View
831 Kanpur Dehat GVPR 20086506 garhi mahera 1 4 2453 2023 2038 2053 15-Apr-2024 25-Jan-2024 02-May-2024 03-May-2024 Forward for further action All work of scheme found satisfactory View
832 Shahjahanpur NCC Ltd. 20015547 Garhia Sareli 2 3 3110 2022 2037 2052 31-Dec-2024 31-Aug-2023 30-Nov-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Garhia Sareli WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Garhia Sareli WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
833 Kannauj GVPR 20036142 GARHIYA PAH GRAMIN PEYJAL YOJNA 2 5 2988 2023 2038 2053 16-May-2024 15-Nov-2024 19-Feb-2025 20-Feb-2025 Forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
834 Meerut Power Mech Projects Ltd 20037230 GARINA 1 1 4765 2022 2037 2052 31-Dec-2024 06-Feb-2024 25-Jun-2024 21-Jan-2025 Recommended for further Approval approved View
835 Shahjahanpur NCC Ltd. 20014024 Gariya Chhavi W/s 1 8 2797 2022 2037 2052 30-Aug-2023 31-Dec-2024 30-Nov-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Gariya Chhavi scheme have been checked and verified. The submitted records are recommended and forwarded for further All information on the portal for the completion certificate of Gariya Chhavi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
836 Ambedkar Nagar Vindhya-GAJA (JV) 20019703 Garopur 2 8 3290 2023 2038 2053 03-Aug-2023 27-Sep-2025 18-Jan-2026 29-Jan-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
837 Amethi Vindhya-GAJA (JV) 20068335 GARTHOLIYA & LOHANG PUR WATER SUPPLY SCHEME 2 13 4186 2023 2038 2053 08-Feb-2024 06-Jun-2024 06-Sep-2024 07-Dec-2024 d All things found satisfactory in the Scheme and finalized for Operation And Maintenance All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance.. View
838 Sultanpur UNIVERSAL MEP 20066936 GAUHAI & BAHAROULI GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME 3 7 6740 2023 2038 2053 18-Jul-2024 17-Mar-2025 19-Jun-2025 01-Aug-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action All uploaded documents have been checked and verified as per requirements. View
839 Fatehpur Power Mech Projects Ltd 20097782 GAURA 2 3 3260 2023 2038 2053 15-May-2023 30-Jun-2025 27-May-2025 28-May-2025 Trial & Run completed. It was initiated in the month of Februarys (28.02.2025) and Regular water supply is given to the consumers. Verified View
840 Sultanpur UNIVERSAL MEP 20066978 GAURA BARAMAU & BHAKHARI GRAM PANCHAYAT WATER SUPPLY SCHEME 2 13 5847 2023 2038 2053 12-Jan-2024 12-Jan-2024 28-Jun-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
841 Fatehpur Power Mech Projects Ltd 20097810 GAURI , KESHOPUR MALAHIA 6 14 4030 2023 2038 2053 14-May-2024 30-Jun-2025 01-Sep-2025 10-Jan-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of October (11.10.2024). Verified View
842 Auraiya GVPR 20084717 Gauri ganga prasad 3 5 2931 2023 2038 2053 01-Jun-2022 04-Apr-2025 03-Apr-2025 05-Apr-2025 Forwarded for further action. All work of scheme fond satisfactory. View
843 Kanpur Dehat Indian Hume Pipe 20025490 Gauri Karan 2 3 2410 2022 2037 2052 24-Aug-2023 31-Dec-2024 08-Oct-2023 09-Oct-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
844 Ambedkar Nagar Vindhya-GAJA (JV) 20084940 GAUSPUR KAKRAHIYA WSS 2 13 4930 2023 2038 2053 21-Feb-2023 20-Feb-2024 31-Mar-2026 01-Jun-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
845 Jaunpur AFCONS 20041587 GAUSPUR VILLAGE WATER SUPPLY SCHEMEGRAM PANCHAYAT 3 4 3165 2038 2038 2053 18-Nov-2022 31-Dec-2026 10-Oct-2024 11-Oct-2024 Checked and found ok OK View
846 Shahjahanpur NCC Ltd. 20057442 GAUTIYA DUGRAUCHI WSS 1 2 1500 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Gautiya Dugrauchi WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of GAUTIYA DUGRAUCHI WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
847 Auraiya GVPR 20089626 Gazipur ishawari prasad 1 3 1230 2023 0 0 01-Jun-2022 02-Jun-2025 01-Jun-2025 03-Jun-2025 Forwarded for further action. All work of scheme found satisfactory. View
848 Auraiya Indian Hume Pipe 20022735 Gazipur Water Supply Schem 2 4 1740 2022 2037 2052 08-May-2023 09-Aug-2024 14-Nov-2024 15-Nov-2024 Forwarded for further action. All work of scheme fond satisfactory. View
849 Meerut Power Mech Projects Ltd 20090134 GAZIPUR-RAMPUR SADHU NAGLI 2 2 3299 2023 2038 2053 31-Dec-2024 06-Sep-2024 23-Jan-2025 24-Jan-2025 Recommended for further Approvals. approved View
850 Fatehpur Power Mech Projects Ltd 20097459 GEDURI 1 1 1880 2023 2038 2053 20-Sep-2024 02-Oct-2024 02-Oct-2024 03-Oct-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of July (03.07.2024) and Regular water supply is given to the consumers. Verified View
851 Meerut Power Mech Projects Ltd 20010902 GEJHA 1 1 3540 2022 2019 2052 20-Jul-2024 31-Dec-2024 13-Dec-2024 14-Dec-2024 Recommended for further Approvals. Approved View
852 Bijnor LC INFRA 20026113 Genda jud And Alipura Village Water Supply 3 3 3730 2022 2037 2052 31-Dec-2025 25-Feb-2024 26-May-2024 27-May-2024 Every thing complete. Check Document View
853 Kanpur Dehat Indian Hume Pipe 20025609 Genda Mau 1 2 2350 2022 2037 2052 25-Aug-2022 31-Dec-2024 31-Mar-2024 01-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
854 Meerut Power Mech Projects Ltd 20076654 GESUPUR BAPHAWAT 1 1 2363 2023 2038 2053 31-Dec-2024 14-Aug-2024 03-Jan-2025 04-Jan-2025 Recommended for further Approvals. Approved View
855 Meerut Power Mech Projects Ltd 20098094 GESUPUR JANVI 1 1 2552 2023 2038 2053 31-Dec-2024 12-Aug-2024 04-Jan-2025 05-Jan-2025 Recommended for further Approvals. 258/JJM/O&M-2024-25 View
856 Meerut Power Mech Projects Ltd 20083009 GESUPUR SUMARLI 1 1 3037 2022 2037 2052 11-Jun-2025 05-May-2024 20-Sep-2024 11-Apr-2025 Recommended for further Approval approved View
857 Fatehpur Power Mech Projects Ltd 20100806 GHANGHAOL 1 1 3970 2023 2038 2053 20-Sep-2024 19-Feb-2025 19-Feb-2025 20-Feb-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of November (20.11.2024) and Regular water supply is given to the consumers. Verify View
858 Bijnor LC INFRA 8388774 GHANSURPUR VILLAGE WATER SCHEME 3 3 4695 2022 2037 2052 28-Sep-2023 27-Feb-2024 26-Aug-2024 27-Aug-2024 Every thing complete. All document complete View
859 Fatehpur Power Mech Projects Ltd 20097460 GHARWASIPUR 1 1 1820 2023 2038 2058 14-Aug-2023 30-Jun-2025 11-Nov-2024 12-Nov-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of August (12.08.2024) and Regular water supply is given to the consumers. Verified View
860 Meerut Power Mech Projects Ltd 20020237 GHAT PWS 1 1 6040 2022 2037 2052 31-Dec-2024 12-Jun-2024 31-Oct-2024 01-Nov-2024 Recommended for further Approvals. approved View
861 Shahjahanpur NCC Ltd. 20018057 ghoor khera 3 3 2380 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Ghoor khera WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of ghoor khera SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
862 Jaunpur AFCONS 20066554 GHORDAUR VILLAGE WATER SUPPLY SCHEME 1 13 4214 2023 2038 2053 27-Jan-2024 18-Jan-2026 18-Jan-2026 19-Jan-2026 Checked and found ok.. Ok View
863 Farrukhabad Vindhya-GAJA (JV) 20075288 GHUMAIYA RASULPUR & NAGLA DAMU MVS 3 5 3961 2023 2038 2053 30-May-2025 17-Jun-2024 17-Jun-2024 18-Jun-2024 All the parameters of scheme verified can take in O&M ok View
864 Fatehpur Power Mech Projects Ltd 20097813 GHURI BUJURG 2 2 1840 2023 2038 2053 23-Jan-2025 22-Sep-2024 07-Feb-2025 08-Feb-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of November (08.11.2024) and Regular water supply is given to the consumers. Verify View
865 Sultanpur Vindhya-GAJA (JV) 20069780 GHURIPUR WATER SUPPLY SCHEME 2 2 2290 2023 2038 2053 05-Feb-2024 23-Mar-2025 23-Mar-2025 21-Jun-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
866 Kannauj GVPR 20067381 GIRGHARPUR & SIKANDERPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 3141 2023 2038 2053 16-Aug-2024 04-Nov-2024 07-Feb-2025 08-Feb-2025 forwarded for Further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
867 Balrampur Larsen & Toubro Ltd 20018767 Gobari water supply scheme 2 4 3697 2022 2037 2052 30-Dec-2021 31-Aug-2024 31-Aug-2024 31-Aug-2024 vide letter no. Lette r No.- Cei nsys/o PR/Devi pata n/B LP /o&m /UP JN /2026-27/ 07/102 dated 8.07.2026 mentioning The most critical concern is that water supply is not reaching three out of four habitations, while major leakages and low pressure are affecting the distribution network. In addition, the automation and SCADA systems are not functional, the chlorine dosing system is not demonstrating the approved dosing level, and essential testing, calibration, earthing, lightning protection, and documentation remain incomplete. Some FHTCs and other minor campus related works to be rectified. View
868 Sultanpur UNIVERSAL MEP 20066948 GODVA & RAMNAGAR KOT GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME 2 13 4090 2023 2038 2053 12-Jan-2024 12-Jan-2024 22-Nov-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
869 Kannauj GVPR 20036497 GOORA & MURAIYA GRAMIN PEYJAL YOJNA 2 5 6441 2023 2038 2053 13-May-2024 07-Apr-2024 11-Jul-2024 12-Jul-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
870 Kannauj GVPR 20077094 GOORA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 3340 2023 2038 2053 08-Sep-2024 07-Apr-2024 11-Jul-2024 12-Jul-2024 FORWRDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
871 Bijnor Vindhya-GAJA (JV) 20048030 Gopalpur & Lalpur Water Supply Scheme 7 7 3437 2023 2038 2053 06-Jul-2023 05-Apr-2025 05-Oct-2025 06-Oct-2025 Every thing complete. check View
872 Auraiya GVPR 20099255 Gopalpur & Ranipur PWS 1 2 3390 2023 2038 2053 01-Jun-2024 30-Apr-2024 29-Apr-2024 01-May-2024 Forwarded for further action. All work of scheme found satisfactory. View
873 Shahjahanpur NCC Ltd. 20085020 GOPALPUR TA. NAGARIYA GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME 1 1 2520 2022 2037 2052 31-Dec-2024 08-Aug-2024 07-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of GOPALPUR TA. NAGARIYA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of GOPALPUR TA. NAGARIYA GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
874 Kanpur Dehat Indian Hume Pipe 20034281 GOPALPUR TALUKA 1 3 2270 2022 2037 2052 23-Nov-2023 31-Dec-2024 28-Feb-2024 01-Mar-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
875 Jaunpur AFCONS 20094941 GOPALPUR VILLAGE WATER SUPPLY SCHEME 3 5 1465 2023 2038 2053 25-May-2024 14-Aug-2025 14-Aug-2025 14-Aug-2025 checked & found OK ok View
876 Bijnor LC INFRA 20014035 GOPALPUR WATER SUPPLY SCHEME 1 3 2647 2022 2037 2052 02-Nov-2023 01-Jul-2024 29-Dec-2024 30-Dec-2024 Every thing complete. all document comepete View
877 Hardoi NCC Ltd. 20011931 GOPAR 2 11 5420 2022 2037 2052 26-Jul-2023 11-Jan-2023 10-Apr-2023 24-Dec-2024 ok OK View
878 Jaunpur AFCONS 20026728 GOPIPUR 3 14 3959 2023 2038 2053 29-Sep-2023 16-Jan-2026 16-Jan-2026 17-Jan-2026 Checked and found ok.. Ok View
879 Etawah Indian Hume Pipe 20097816 GOPIYAGANJ 1 1 1835 2022 2037 2052 02-Apr-2024 20-Jul-2024 20-Jul-2024 21-Jul-2024 Forwarded for further action. All work of scheme found satisfactory View
880 Shahjahanpur NCC Ltd. 20084200 GORA MAHUA GAD GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 2 2 2560 2022 2037 2052 31-Dec-2024 03-Aug-2024 02-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of GORA MAHUA GAD WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Mahmadpur GORA MAHUA GAD GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
881 Kannauj GVPR 20043932 GORAKHPUR HARBHANPUR GRAMIN PEYJAL YOJNA 1 7 5504 2023 2038 2053 13-May-2024 28-Apr-2024 31-Jul-2024 01-Aug-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
882 Bijnor LC INFRA 20038882 Goshpur Taupri-Sarangpur-Rampur Naubad Gram Panchayat Water Supply 7 7 2560 2022 2037 2052 31-Jan-2026 01-Dec-2024 28-Feb-2025 01-Mar-2025 Every thing complete. Check document View
883 Meerut Power Mech Projects Ltd 20082936 GOTKA DHANAWALI 2 2 4477 2022 2037 2052 31-Dec-2024 31-Oct-2024 01-Aug-2024 01-Nov-2024 Recommended for further Approvals. approved View
884 Ambedkar Nagar Vindhya-GAJA (JV) 20059953 GOURA WSS 2 6 3150 2023 2038 2053 17-Jan-2024 08-May-2026 08-May-2026 11-May-2026 SCHEME READY FOR OM SCHEME COMPLETED View
885 Bahraich PNC-SPML-JV 20017934 GOVINDAPUR CHITTAURA PWS 1 3 3478 2022 2037 2052 31-Dec-2025 25-Nov-2025 25-Nov-2025 26-Nov-2025 scheme completed, minor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/01/0412 kindly complete it. scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/01/0412 View
886 Ambedkar Nagar Vindhya-GAJA (JV) 20087006 GOVINDAPUR WSS 3 9 4760 2023 2038 2053 15-Mar-2024 02-Dec-2025 19-Mar-2026 20-Mar-2026 Scheme completed and ready for O&M Scheme Completed View
887 Meerut Power Mech Projects Ltd 20068678 GOVINDPUR & KHARKHARI 2 2 3616 2022 2037 2052 31-Dec-2024 05-Sep-2024 22-Jan-2025 23-Jan-2025 Recommended for further Approvals. Approved View
888 Meerut Power Mech Projects Ltd 20011580 GOVINDPUR URF GHASAULI 1 1 4953 2022 2037 2052 31-Dec-2024 04-Feb-2023 23-Jun-2023 15-Nov-2024 Recommended for further Approvals. Approved View
889 Bijnor Vindhya-GAJA (JV) 20102306 GOVINDPUR WSS 1 1 1974 2023 2038 2053 06-Jul-2023 14-May-2025 14-Nov-2025 15-Nov-2025 Every thing complete. Document complete View
890 Fatehpur Power Mech Projects Ltd 20095838 GOVINDPUR&GHOSHI 5 5 4200 2023 2038 2053 15-May-2023 30-Jun-2025 23-Mar-2025 24-Mar-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of December (24.12.2024) and Regular water supply is given to the consumers. Verified View
891 Meerut Power Mech Projects Ltd 20076748 GOVINDPURI 1 1 2838 2022 2037 2052 31-Dec-2024 30-Jun-2024 16-Nov-2024 17-Nov-2024 Recommended for further Approvals. approved View
892 Shahjahanpur NCC Ltd. 20019675 Gowar Sanda 1 2 2780 2022 2037 2052 31-Aug-2023 31-Dec-2024 30-Nov-2023 16-Nov-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Gowar Sanda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All documents uploaded on the portal for the Project completion certificate of Gowar Sanda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
893 Fatehpur Power Mech Projects Ltd 20078953 GUASPUR 4 6 2990 2023 2038 2053 15-May-2023 30-Jun-2025 07-Feb-2025 08-Feb-2025 Trial & Run completed. It was initiated in the month of (08.11.2024) and Regular water supply is given to the consumers. Verified View
894 Fatehpur Power Mech Projects Ltd 20097513 GUDAURA 1 2 3500 2023 2038 2053 18-Mar-2025 30-Jun-2025 26-Jan-2025 27-Jan-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of October (27.10.2024) and Regular water supply is given to the consumers. Verified View
895 Farrukhabad Vindhya-GAJA (JV) 20076924 GUDERA SVS 1 5 3020 2023 2038 2053 30-May-2025 13-Feb-2024 28-May-2024 29-May-2024 All the parameters of scheme verified can take in O&M. water supply regular in all villages View
896 Kannauj GVPR 20067673 GUDHANI GRAM PANCHAYAT WATER SUPPLY SCHEME 3 3 2500 2023 2038 2053 16-Aug-2024 22-Apr-2024 26-Jul-2024 27-Jul-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
897 Auraiya GVPR 20089632 Guhani khurd PWS 1 2 914 2023 0 0 01-Jun-2022 07-Jan-2025 06-Jan-2025 08-Jan-2025 Forwarded for further action. All work of scheme fond satisfactory. View
898 Shahjahanpur NCC Ltd. 20019678 Gulam Khera 1 1 2430 2022 2037 2052 14-Dec-2023 31-Dec-2024 14-Mar-2024 16-Nov-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Gulam khera scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Gulam Kheda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
899 Gautam Buddha Nagar LC INFRA 20017810 GULAOTI KHURD GRAM PANCHAYAT WATER SUPPLY REORGANIZATION SCHEME 1 1 2380 2022 2037 2052 21-Feb-2023 21-Aug-2024 10-Sep-2024 11-Sep-2024 Actual Executed Cost Verified based on Approved Variation Statement. all work has been completed. View
900 Jhansi NCC Ltd. 8009992 Gulara GOV 42 10600 63447 2023 2038 2053 30-Jun-2022 30-Aug-2023 19-Nov-2024 20-Nov-2024 Checked checked and approved View
901 Shahjahanpur NCC Ltd. 20015138 GULAULI POWAYAN W/S 3 4 1926 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Gulauli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of GULAULI POWAYAN W/S scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
902 Shahjahanpur NCC Ltd. 20097906 GULDA URF NUGAVA GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME 1 1 1570 2022 2037 2052 31-Dec-2024 14-Aug-2024 13-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of GULDA URF NUGAVA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of GULDA URF NUGAVA GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
903 Bahraich PNC-SPML-JV 20099230 GULHARIYA GAZIPUR KAISARGANJ RF PWS 1 29 7540 2022 2037 2052 31-Dec-2025 05-Nov-2025 05-Nov-2025 06-Nov-2025 Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/11/0312, kindly complete it. Scheme completed with observation View
904 Shahjahanpur NCC Ltd. 20089032 GUMTA, JHAPKA DILWARPUR GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME 3 3 2400 2022 2037 2052 31-Dec-2024 18-Oct-2023 17-Jan-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of GUMTA, JHAPKA DILWARPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of GUMTA, JHAPKA DILWARPUR GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
905 Auraiya Indian Hume Pipe 20014861 GURA PWS 2 6 1750 2022 2037 2052 08-May-2023 01-Aug-2023 07-Nov-2023 01-Nov-2024 Forwarded for further action. All work of scheme found satisfactory. View
906 Hardoi NCC Ltd. 20092452 GURAULI 1 2 3300 2022 2037 2052 05-Mar-2023 22-Mar-2023 21-Jun-2023 24-Dec-2024 ok OK View
907 Shahjahanpur NCC Ltd. 20018478 Guravava 1 1 2820 2022 2037 2052 20-Jul-2023 31-Dec-2024 27-Oct-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of GURGAVA scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Gurgawan scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
908 Kanpur Dehat Indian Hume Pipe 20012625 Gurgaon 1 3 5150 2022 2037 2052 14-Sep-2021 31-Dec-2024 31-Jul-2023 01-Aug-2023 FORWARD FOR FURTHER NECESSARY ACTION PLS. All work of scheme found satisfactory View
909 Meerut Power Mech Projects Ltd 20076738 GURHA 1 1 2586 2022 2037 2052 31-Dec-2024 15-Nov-2024 03-Apr-2025 04-Apr-2025 Recommended for further Approvals. approved View
910 Shahjahanpur NCC Ltd. 20020800 GURTHNA 2 2 2590 2022 2037 2052 31-Dec-2024 30-Nov-2023 29-Feb-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of GURTHNA scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Gurthna scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
911 Farrukhabad Vindhya-GAJA (JV) 20076874 GUTHINA SVS 1 1 3345 2023 2038 2053 30-May-2025 02-Jul-2024 02-Jul-2024 03-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
912 Baghpat LC INFRA 8362576 GWALI KHERA 1 1 2269 2022 2037 2052 31-Dec-2024 06-Nov-2023 06-Nov-2023 07-Nov-2023 Check and found Satisfactory. OK View
913 Meerut Power Mech Projects Ltd 8362167 GYANPUR 1 1 3288 2022 2037 2052 17-Jan-2023 31-Dec-2024 05-May-2023 07-Oct-2024 Recommended for further Approval Approved View
914 Kannauj GVPR 20036274 GYANPUR GRAMIN PEYJAL YOJNA 1 5 2801 2023 2038 2053 13-May-2024 04-Nov-2024 07-Feb-2025 08-Feb-2025 forwarded for Further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
915 Fatehpur Power Mech Projects Ltd 20079055 HAFIJPUR HARKARAN 3 3 2400 2023 2038 2053 13-Mar-2024 06-Nov-2024 29-Apr-2025 30-Apr-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of January (30.01.2025) and Regular water supply is given to the consumers. Verified View
916 Shahjahanpur NCC Ltd. 20015560 Haidalpur sww 3 3 2530 2022 2037 2052 31-Dec-2024 14-Jul-2024 13-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Haidalpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Haidalpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
917 Hardoi NCC Ltd. 20012213 Haidarpur 2 3 2510 2022 2037 2052 26-Jul-2023 03-May-2023 04-Aug-2023 13-Dec-2024 ok OK View
918 Kanpur Dehat Indian Hume Pipe 20013113 Haidarpur 2 3 4550 2022 2037 2052 05-Feb-2022 04-Feb-2023 31-Jul-2023 01-Aug-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
919 Sultanpur UNIVERSAL MEP 20064688 HAJIPATTI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 7 7170 2023 2038 2053 12-Jan-2024 31-Dec-2024 31-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
920 Ambedkar Nagar Vindhya-GAJA (JV) 20081283 HAJPURA WSS 1 2 2180 2023 2038 2053 15-Mar-2024 22-Dec-2024 23-Mar-2025 24-Mar-2025 Checked and found OK Scheme completed View
921 Bijnor Vindhya-GAJA (JV) 20067440 Hakumatpur Kesho water supply scheme 2 2 1717 2023 2038 2053 06-Jul-2023 10-Oct-2025 10-Apr-2026 11-Apr-2026 All documents completed. check View
922 Ayodhya UNIVERSAL MEP 20030159 HALIM NAGAR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 5 5140 2023 2038 2053 12-Oct-2023 30-Oct-2023 30-Oct-2023 15-Nov-2024 Found ok Found Correct View
923 Etawah Indian Hume Pipe 20024534 Haluhrjipur 1 3 1900 2022 2037 2052 22-Sep-2023 26-Feb-2024 06-Jun-2024 07-Jun-2024 Forwarded for further action. All work of scheme found satisfactory View
924 Bahraich PNC-SPML-JV 20013704 HAMIRPUR CHIDKURI HUZOORPUR PWS 1 14 4908 2022 2037 2052 31-Dec-2025 14-Nov-2025 01-May-2024 15-Nov-2025 Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/12/0037, kindly complete it. Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/12/0037, kindly complete it View
925 Kannauj GVPR 20036200 HAMIRPUR GRAMIN PEYJAL YOJNA 4 5 2965 2023 2038 2053 13-May-2024 25-Mar-2024 27-Jun-2024 28-Jun-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
926 Farrukhabad Vindhya-GAJA (JV) 20076885 HAMIRPUR KHAS SVS 1 4 4364 2023 2038 2053 31-Mar-2025 21-Jan-2024 05-Jun-2024 06-Jun-2024 All the parameters of scheme verified can take in O&M. water supply i regular in all connected villages View
927 Auraiya GVPR 20084713 Hamirpur ruru 3 6 2872 2023 2038 2053 06-Jan-2022 28-Mar-2024 27-Mar-2024 28-Mar-2024 Forwarded for further action. All work of scheme found satisfactory. View
928 Sultanpur UNIVERSAL MEP 20091198 HANNA HARAURA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 14 5495 2023 2038 2053 22-Mar-2024 22-Mar-2024 06-Mar-2025 07-Mar-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements and O&M Start Date 01/04/2025 View
929 Sultanpur Vindhya-GAJA (JV) 20106941 HANSAPUR WATER SUPPLY SCHEME 1 1 1460 2023 2038 2053 15-Jun-2024 03-Apr-2025 03-Apr-2025 01-Sep-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements View
930 Bijnor LC INFRA 8359688 HANSU PURA HARKISHANPUR VILLAGE WATER SCHEME 1 1 7489 2022 2037 2052 26-Aug-2023 19-Dec-2023 07-Jun-2024 08-Jun-2024 Every thing completed. Everything Complete. View
931 Bijnor LC INFRA 20011793 Hara Ahmad Pur Jalal Water Supply Scheme 1 1 1532 2022 2037 2052 10-Feb-2024 12-Dec-2023 09-Jun-2024 10-Jun-2024 Every thing completed. Everything Completed View
932 Sultanpur Vindhya-GAJA (JV) 20078808 HARAHA WSS 2 7 1573 2023 2038 2053 25-Mar-2023 23-Mar-2024 30-Jan-2025 01-Aug-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
933 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20010589 HARAIYA 4 14 5001 2022 2037 2052 22-May-2023 16-Feb-2026 09-Jan-2026 16-Feb-2026 Scheme completed and ready for O&M Scheme Completed View
934 Ambedkar Nagar Vindhya-GAJA (JV) 20058508 HARAKPUR KAURAHA Water Supply Scheme 3 8 2310 2023 2038 2052 16-Jul-2023 19-May-2025 19-May-2025 20-May-2025 Scheme completed and ready for O&M Scheme Completed View
935 Hamirpur PNC-SPML-JV 8135500 Haraulipur GOV and Tubewell Scheme 125 Nos. 39 51 57818 2023 2038 2053 14-Oct-2022 30-Sep-2024 18-Nov-2024 19-Nov-2024 Approved ,checklist of doc’c Uploaded at portal Approve View
936 Kannauj GVPR 20098272 HARBALLABH PUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 3123 2023 2038 2053 14-Nov-2024 06-Apr-2024 08-Jul-2024 09-Jul-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
937 Auraiya GVPR 20041744 HARBANSHPUR PWS 2 1 2325 2023 2038 2053 01-Jun-2023 06-Dec-2024 30-Apr-2024 16-Jun-2024 Forwarded for further action. All work of scheme found satisfactory. View
938 Fatehpur Power Mech Projects Ltd 20044197 Hardauli 1 2 2310 2023 2038 2053 27-Nov-2023 15-Mar-2026 05-Aug-2025 06-Aug-2025 Trial & Run completed. It was initiated in the month of May (04.05.2025) and Regular water supply is given to the consumers. HGJ Certificate not signed by Gram pradhan and panchayat secretary. Verified View
939 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20008680 Hardiha 6 9 4430 2022 2037 2052 07-Jan-2022 30-May-2025 27-Jan-2025 28-Jan-2025 SCHEME COMPLETED Scheme completed View
940 Shahjahanpur NCC Ltd. 20015131 HARDUA Powayan W/s 2 3 2310 2022 2037 2052 31-Dec-2024 31-Aug-2023 30-Nov-2023 06-Dec-2023 All documents uploaded on the portal for the Operation and Maintenance (O&M) of HARDUA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Dharampur HARDUA Powayan W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
941 Shahjahanpur NCC Ltd. 20016377 HARHARPUR SIMRA 3 3 2270 2022 2037 2052 31-Dec-2024 01-Dec-2023 01-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Harharpur Simra scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Harharpur Simra scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
942 Baghpat LC INFRA 20014202 Haria Khera W/S SCHEME 1 1 4301 2022 2037 2052 31-Dec-2024 06-Nov-2023 06-Nov-2023 07-Nov-2023 Found ok OK View
943 Ayodhya UNIVERSAL MEP 20030707 HARIBANDHAN PUR & ISMAIL NAGAR SINHORA GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME 5 19 3870 2023 2038 2053 12-Oct-2023 23-Oct-2023 23-Oct-2023 15-Nov-2024 Found ok Found Correct View
944 Ayodhya UNIVERSAL MEP 20030102 HARIHARPUR BALIYA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 3950 2023 2038 2053 12-Oct-2023 05-Oct-2023 05-Oct-2023 15-Nov-2024 Found ok Found Correct View
945 Ambedkar Nagar Vindhya-GAJA (JV) 20019768 Harinathpur 3 6 2480 2023 2038 2053 03-Aug-2023 22-Jun-2023 30-Nov-2024 01-Dec-2024 Approved by TPI Scheme completed View
946 Bijnor Vindhya-GAJA (JV) 20053151 HARIYANA & BAKSHANPUR WATER SUPPLY SCHEME 2 2 5318 2023 2038 2053 06-Jul-2023 26-Oct-2024 26-Apr-2025 27-Apr-2025 Every thing complete. Check Document View
947 Sultanpur UNIVERSAL MEP 20066127 HARKHI DOULATPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 4 2330 2023 2038 2053 12-Jan-2024 12-Jan-2024 30-Jun-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
948 Shahjahanpur NCC Ltd. 20014657 Harna Ja Nagra 2 3 2310 2022 2037 2052 31-Dec-2024 09-Oct-2023 08-Jan-2024 16-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Harna J Nagla scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Harna Ja. Nagra scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
949 Auraiya GVPR 20025447 Harpura PWS 1 4 3710 2023 0 0 01-Jun-2022 23-Apr-2024 20-Jul-2023 09-Oct-2023 Forwarded for further action. All work of scheme fond satisfactory. View
950 Ambedkar Nagar Vindhya-GAJA (JV) 20035262 HARSAMHAR WSS 1 4 3200 2023 2038 2053 17-Jan-2024 01-Dec-2025 17-Mar-2026 01-Apr-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
951 Farrukhabad Vindhya-GAJA (JV) 20091271 HARSINGH PUR GAUA & DHADHULIYA PATTI MVS 2 2 4131 2023 2038 2053 30-May-2025 14-Jul-2024 14-Jul-2024 15-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
952 Farrukhabad Vindhya-GAJA (JV) 20081706 HARSINGHPUR GAHILWAR & GALAR PUR MVS 2 2 3209 2023 2038 2053 30-May-2025 10-Feb-2024 25-May-2024 26-May-2024 All the parameters of scheme verified can take in O&M. ok View
953 Farrukhabad Vindhya-GAJA (JV) 20092461 HARSINGHPUR KAYSTH MVS 2 2 1342 2023 2038 2053 30-May-2025 01-May-2024 01-May-2024 02-May-2024 All the parameters of scheme verified can take in O&M. ok View
954 Fatehpur Power Mech Projects Ltd 20079120 HASANAPUR 1 1 2400 2023 2038 2053 13-Mar-2024 10-Dec-2024 24-Apr-2025 25-Apr-2025 Trial & Run completed. It was initiated in the month of January (25.01.2025) and Regular water supply is given to the consumers. Verified View
955 Auraiya Indian Hume Pipe 20056131 Hasanpur ahiran 2 4 2070 2022 2037 2052 22-Sep-2023 15-Jul-2024 25-Jul-2024 25-Oct-2025 Forwarded for further action. All work of scheme fond satisfactory. View
956 Bijnor LC INFRA 8361850 HASANPUR BILLOCH VILLAGE WATER SCHEME 1 1 3435 2022 2037 2052 26-Aug-2021 10-Dec-2023 08-Jun-2024 09-Jun-2024 Every thing complete. Complete Check View
957 Meerut Power Mech Projects Ltd 20019643 HASANPUR KALAN 1 1 4990 2022 2037 2052 31-Dec-2024 16-May-2024 05-Oct-2024 07-Oct-2024 Recommended for further Approvals. O&M amount 2.82 approved View
958 Bijnor LC INFRA 20017182 HASANPUR PALKI WATER SUPPLY SCHEME 1 1 1159 2022 2037 2052 10-Feb-2022 07-Dec-2023 05-Jun-2024 06-Jun-2024 every thing completed Everything Completed View
959 Meerut Power Mech Projects Ltd 20016924 HASANPUR QADIM 1 1 5729 2022 2037 2052 31-Dec-2024 15-Dec-2022 06-May-2023 05-Nov-2024 checked and verified................................... approved View
960 Meerut Power Mech Projects Ltd 20100956 HASANPUR RAZAPUR 1 1 2423 2023 2038 2053 31-Dec-2024 16-Aug-2024 05-Jan-2025 06-Jan-2025 Recommended for further Approvals. approved View
961 Ambedkar Nagar Vindhya-GAJA (JV) 20058532 HASANPUR SUNTHAR Water Supply Scheme 1 7 2270 2023 2038 2053 26-Dec-2023 22-Aug-2024 24-Nov-2024 25-Nov-2024 Scheme completed and ready for O&M HASANPUR SUNTHAR SCHEME COMPLETED View
962 Azamgarh LC INFRA 20058071 Hasanpur water supply scheme 2 3 3208 2023 2038 2053 09-May-2024 22-Jul-2024 21-Oct-2024 22-Oct-2024 ok OK View
963 Fatehpur Power Mech Projects Ltd 20097818 HASIMPUR MADEPUR 2 3 754 2023 2038 2059 25-Sep-2024 30-Jun-2025 23-Mar-2025 24-Mar-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of December(24.12.2024) and Regular water supply is given to the consumers. Verified View
964 Auraiya Indian Hume Pipe 20061858 Hasuliya PWS 1 2 1650 2022 2037 2052 22-Sep-2023 06-Jan-2026 14-Apr-2026 15-Apr-2026 Forwarded for further action. All work of scheme fond satisfactory. View
965 Fatehpur Power Mech Projects Ltd 20097515 HASWA 1 6 12130 2023 2038 2053 20-Sep-2024 25-Mar-2025 01-Aug-2025 02-Aug-2025 Trial & Run completed. It was initiated in the month of May (03.05.2025) and Regular water supply is given to the consumers. HGJ certificate not signed by Panchayat secretary. Verified View
966 Ambedkar Nagar Vindhya-GAJA (JV) 20035268 HATHINARAJ WSS 1 2 6270 2023 2038 2053 22-Oct-2022 21-Oct-2023 05-Dec-2024 06-Dec-2024 Checked and found ok Scheme completed View
967 Shahjahanpur NCC Ltd. 20101884 HATHOURA BUJURG GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY 2 2 1330 2022 2037 2052 31-Dec-2024 24-Aug-2024 23-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Hathoura Bujurg scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of HATHOURA BUJURG GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
968 Jaunpur AFCONS 20026308 Hatiya Ram Nath 2 8 3023 2023 2038 2053 02-Sep-2023 25-Feb-2025 25-Feb-2025 26-Feb-2025 Testing & Commissioning certificate, Road restoration, trial & run certificate and Final BOQ not signed by EE but TPIA checked and signed all document for further process. ok View
969 Shahjahanpur NCC Ltd. 20070954 HAWAASPUR WSS 4 4 1810 2022 2037 2052 31-Dec-2024 14-Jan-0024 14-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of HAWAASPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of HAWAASPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
970 Ambedkar Nagar Vindhya-GAJA (JV) 20062637 HAZIPUR MARUAI Water supply scheme 1 2 2220 2023 2038 2053 17-Jan-2023 14-Nov-2025 15-Nov-2025 09-Dec-2025 Scheme completed and ready for O&M Scheme completed and ready for O&M View
971 Auraiya GVPR 20088693 Hazratpur & Hafizpur & Shahpur vaindi 1 2 7037 2023 2038 2053 01-Jun-2022 15-Jun-2024 14-Feb-2024 16-Jun-2024 Forwarded for further action. All work of scheme fond satisfactory. View
972 Kanpur Dehat GVPR 20069940 Hike pur 1 4 1760 2023 2038 2053 17-Feb-2024 30-Dec-2023 03-Apr-2024 04-Apr-2024 Forward for further action pls All work of scheme found satisfactory View
973 Jaunpur AFCONS 20026301 Hinauti Water Supply Scheme 2 5 3020 2023 2038 2053 03-Sep-2023 12-Mar-2026 12-Mar-2026 13-Mar-2026 Checked and found ok. ok View
974 Hardoi NCC Ltd. 20012221 Hinguapur 1 1 1490 2022 2037 2052 27-Jan-2022 11-Sep-2023 11-Dec-2023 30-Nov-2024 ok OK View
975 Ghaziabad LC INFRA 20018966 HIRDAYPUR MADAULA PWS SCHEME 1 1 3100 2022 2037 2052 27-Aug-2021 31-Oct-2024 27-Mar-2025 01-Apr-2025 Actual Executed Cost Verified based on approved variation statement. Approved View
976 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20007051 Horilpur 5 13 5212 2022 2037 2052 07-Jul-2023 03-Jan-2026 15-Dec-2025 03-Feb-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
977 Farrukhabad Vindhya-GAJA (JV) 20093133 HOTEPUR MVS 1 3 2488 2023 2038 2053 30-May-2025 09-Feb-2024 24-May-2024 25-May-2024 All the parameters of scheme verified can take in O&M. ok View
978 Bahraich PNC-SPML-JV 20016644 HTWA GOPAL PAYAGPUR PWS 1 4 3817 2022 2037 2052 31-Dec-2025 09-Nov-2025 01-May-2024 10-Nov-2025 Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/11/0313, kindly complete it. Scheme completed with observation View
979 Ayodhya UNIVERSAL MEP 20031474 Hunhuna Gram Panchayat Water Supply Scheme 1 2 2450 2023 2038 2053 12-Oct-2023 30-Dec-2023 30-Dec-2024 15-Nov-2024 Found ok Found Correct View
980 Kannauj VSA 20015022 HUSAIN NAGAR GRAMIN PEYJAL YOJNA 2 2 2163 2022 2037 2052 06-Jan-2024 20-Jan-2025 16-Apr-2025 17-Apr-2025 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
981 Shahjahanpur NCC Ltd. 20057485 HUSAINPUR DAULATPUR WSS 1 4 2360 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of HUSAINPUR DAULATPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of HUSAINPUR DAULATPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
982 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20023533 Husainpur Hede 7 15 3884 2022 2037 2052 03-Sep-2022 15-Mar-2026 12-Mar-2026 15-Mar-2026 scheme ready for O&M Scheme Completed & Ready For O&M View
983 Bijnor LC INFRA 8360398 HUSAINPUR KALA VILLAGE WATER SUPPLY SCHEME 1 1 2755 2022 2037 2052 02-Nov-2021 25-Apr-2024 24-Oct-2024 25-Oct-2024 Every thing complete. complete document View
984 Ambedkar Nagar Vindhya-GAJA (JV) 20075138 HUSAINPUR MUSALMAN 1 5 4300 2023 2038 2053 08-Aug-2024 30-Aug-2025 24-Dec-2026 05-Jan-2026 Scheme completed and ready for O&M Scheme Completed View
985 Farrukhabad Vindhya-GAJA (JV) 20076661 HUSAINPUR NAUKHANDA SVS 1 14 5596 2023 2038 2053 30-May-2025 11-Jul-2024 11-Jul-2024 12-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
986 Shahjahanpur NCC Ltd. 8388648 HUSENPUR KAVRA 1 1 2590 2022 2037 2052 31-Jul-2023 31-Dec-2024 30-Oct-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Husenpur Kavra scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Husenpur Kavra scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
987 Bijnor LC INFRA 8360397 HUSENPUR KHASA VILLAGE WATER SCHEME 1 1 3266 2022 2037 2052 30-Sep-2024 12-Dec-2023 10-Jun-2024 11-Jun-2024 Every thing completed. Everything Complete. View
988 Azamgarh LC INFRA 20057908 Husenpur water supply scheme 4 8 2706 2023 2038 2053 09-May-2024 20-Aug-2024 20-Nov-2024 21-Nov-2024 ok OK View
989 Kannauj GVPR 20067729 HUSHE PUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 1 1463 2023 2038 2053 08-Sep-2024 22-Mar-2024 24-Jun-2024 25-Jun-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
990 Kannauj GVPR 20067365 IBRAHIMPUR BANGER & AKBARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 7 5346 2023 2038 2053 16-Aug-2024 22-Apr-2024 26-Jul-2024 27-Jul-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
991 Meerut Power Mech Projects Ltd 20066835 IDRISPUR 1 1 2384 2023 2038 2053 31-Dec-2024 09-Aug-2024 01-Jan-2025 02-Jan-2025 Recommended for further Approvals. Approved View
992 Meerut Power Mech Projects Ltd 20078428 IKLA 1 1 1618 2022 2037 2052 31-Dec-2024 25-May-2024 09-Oct-2024 01-Jan-2025 Recommended for further Approval approved View
993 Auraiya Indian Hume Pipe 8359385 Ikorapur 1 1 2870 2022 2037 2052 14-Sep-2022 15-May-2023 28-Oct-2023 29-Oct-2023 Forwarded for further action. All work of scheme found satisfactory. View
994 Meerut Power Mech Projects Ltd 20098082 IKWARA 1 1 2319 2023 2038 2053 31-Jan-2025 28-May-2024 15-Oct-2024 01-Nov-2024 Recommended for further Approval approved View
995 Farrukhabad Vindhya-GAJA (JV) 20092389 IMADPUR SAMAICHAPUR MVS 3 7 4741 2023 2038 2053 30-May-2025 19-Jun-2024 19-Jun-2024 20-Jun-2024 All the parameters of scheme verified can take in O&M ok View
996 Sultanpur UNIVERSAL MEP 20066569 IMILIYA KALAN & IMILIYA KHURD GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME 2 15 4320 2023 2038 2053 12-Jan-2024 31-Dec-2024 10-Jan-2025 01-Feb-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements. View
997 Mau LC INFRA 20012739 IMILIYADIH GP WATER SUPPLY SCHEME 1 2 1647 2022 2037 2052 23-Sep-2024 22-Apr-2025 22-Apr-2025 23-Apr-2025 Approved Approved. View
998 Bijnor Vindhya-GAJA (JV) 20024325 Inampura Gram Panchayat Water Supply 3 3 3288 2023 2038 2053 06-Jul-2023 19-May-2025 19-Nov-2025 20-Nov-2025 Every thing complete. check View
999 Ambedkar Nagar Vindhya-GAJA (JV) 20033698 INDAIPUR WATER SUPPLY SCHEME 1 1 2760 2023 2038 2053 21-Oct-2023 01-Oct-2025 21-Oct-2025 22-Oct-2025 Scheme completed and ready for O&M SCHEME COMPLETED View
1000 Auraiya Indian Hume Pipe 8359409 Indapamau 1 1 1920 2022 2037 2052 08-May-2023 25-Feb-2023 05-Apr-2023 05-Jul-2023 Forwarded for further action. All work of scheme fond satisfactory. View
1001 Ambedkar Nagar Vindhya-GAJA (JV) 20067173 INDAURPUR GHINHAPUR Water Supply Scheme 3 9 5100 2023 2038 2053 23-Mar-2024 21-Jun-2025 17-Nov-2025 18-Nov-2025 Scheme completed and ready for O&M Scheme Completed View
1002 Etawah Indian Hume Pipe 20015040 Indrokhi 1 3 2950 2022 2037 2052 08-May-2023 11-Apr-2024 15-Oct-2024 16-Oct-2024 Forwarded for further action. All work of scheme found satisfactory. View
1003 Kanpur Dehat Indian Hume Pipe 20050279 Ingwara 2 2 1730 2022 2037 2052 24-Nov-2022 31-Dec-2024 30-Sep-2023 01-Oct-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
1004 Fatehpur Power Mech Projects Ltd 20100815 IRADADPUR DHARMGADPUR 3 4 2330 2023 2038 2058 14-Aug-2023 30-Jun-2025 01-Dec-2024 02-Dec-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of September(02.09.2024) and Regular water supply is given to the consumers. Verified View
1005 Bijnor Vindhya-GAJA (JV) 20102290 ISAPUR WSS 1 1 1803 2023 2038 2053 06-Jul-2023 04-Jun-2025 04-Dec-2025 05-Dec-2025 Every thing complete. Complete document View
1006 Ghaziabad LC INFRA 8360450 ISHAQ NAGAR 1 1 3972 2022 2033 2052 20-Sep-2021 01-May-2025 31-Aug-2025 01-Sep-2025 Actual Executed Cost Verified based on approved variation statement. all work has been completed. Approved View
1007 Fatehpur Power Mech Projects Ltd 20079021 ISHEPUR 2 2 1760 2023 2038 2053 13-Mar-2024 01-Dec-2024 14-Apr-2025 15-Apr-2025 Trial & Run completed. It was initiated in the month of January (15.01.2025) and Regular water supply is given to the consumers. Verified View
1008 Muzaffarnagar JMC - Lakshmi (JV) 8360313 Islamabad 1 1 1968 2022 2037 2052 16-Mar-2021 07-Jul-2024 07-Oct-2024 08-Oct-2024 The details given by the contractor are correct at the time of approval. APPROVED View
1009 Meerut Power Mech Projects Ltd 20022185 Islamabad Chilora Water Supply Scheme 1 1 4575 2022 2037 2052 31-Dec-2024 05-May-2024 21-Sep-2024 11-Oct-2024 Recommended for further Approvals. approved View
1010 Gautam Buddha Nagar LC INFRA 20097847 ISLAMABAD KALDA VILLAGE WATER SUPPLY SCHEME 1 1 1432 2022 2037 2052 25-Apr-2023 25-Oct-2024 09-Nov-2024 10-Nov-2024 Actual Executed Cost Verified based on Approved Variation Statement. all work has been completed. View
1011 Bijnor Vindhya-GAJA (JV) 20024322 Islampur Tambachau Gram Panchayat Water Supply 2 2 2242 2023 2038 2053 06-Jul-2023 15-May-2025 15-Nov-2025 16-Nov-2025 Every thing complete. Check Document View
1012 Gautam Buddha Nagar LC INFRA 20017812 ISMAIL NAGAR URF BHOYRA 1 1 2811 2022 2037 2052 20-Mar-2023 31-Mar-2024 31-Oct-2024 01-Nov-2024 Project certificate is verified all work has been completed. View
1013 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20023261 Ismailganj 1 5 2500 2022 2037 2052 03-Mar-2024 02-Jan-2026 20-Dec-2025 02-Jan-2026 Scheme completed and ready for O&M Scheme Completed View
1014 Ambedkar Nagar Vindhya-GAJA (JV) 20019921 Ismailpur 1 6 6429 2023 2038 2053 04-Aug-2023 26-Jul-2025 21-Nov-2025 01-Dec-2025 Scheme completed and ready for O&M Scheme Completed View
1015 Kannauj GVPR 20036253 ISMAILPUR DIGAN GRAMIN PEYJAL YOJNA 2 5 3233 2023 2038 2053 13-May-2024 25-Mar-2024 27-Jun-2024 28-Jun-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1016 Amethi Gayatri Projects LTD 20099327 ISMAILPUR WATER SUPPLY SCHEME 3 5 2799 2022 2037 2052 24-Nov-2024 17-Jun-2024 19-Sep-2024 28-Nov-2024 Hardcopy submitted and found okay as per the submitted documents.. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance View
1017 Kanpur Dehat Indian Hume Pipe 20050755 Itaili 3 6 3660 2022 2037 2052 23-Nov-2023 31-Dec-2024 31-Mar-2024 01-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1018 Shahjahanpur NCC Ltd. 20019349 ITAULI 2 2 2260 2022 2037 2052 31-Dec-2024 24-May-2024 23-Aug-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of the Itauli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Itauli scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1019 Ambedkar Nagar Vindhya-GAJA (JV) 20067915 ITAURI BUJURG Water Supply Scheme 2 3 1730 2023 2038 2053 23-Mar-2024 15-May-2025 11-Nov-2025 12-Nov-2025 Scheme completed and ready for O&M Scheme Completed View
1020 Meerut Power Mech Projects Ltd 20019647 ITAYIRA 1 1 2759 2022 2037 2052 31-Dec-2024 09-Mar-2024 08-Feb-2024 11-Nov-2024 Recommended for further Approvals. approved View
1021 Auraiya GVPR 20065632 Itha&Nauli PWS 1 5 4078 2023 0 0 01-Jun-2022 22-Jun-2024 21-Jun-2024 23-Jun-2024 Forwarded for further action. All work of scheme fond satisfactory. View
1022 Ambedkar Nagar Vindhya-GAJA (JV) 20026085 ITWAN WATER SUPPLY SCHEME 1 3 3440 2023 2038 2053 04-Aug-2023 20-Jul-2024 02-Dec-2024 03-Dec-2024 Checked and found OK SCHEME COMPLETED View
1023 Kannauj VSA 20023982 IZILPUR GRAMIN PEYJAL YOJNA 1 2 2270 2022 2037 2052 06-Jul-2023 15-Jan-2025 18-May-2025 01-Jan-2026 forwarded for further action. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
1024 Shahjahanpur NCC Ltd. 20015637 Jadopur Kalan 1 1 3490 2022 2037 2052 31-Dec-2024 12-Jul-2024 11-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the Jadopur Kalan WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. JJM/BLG/CLU-05/2026-2027/49 for further necessary action. All information on the portal for the completion certificate of Jadopur Kalan have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1025 Meerut Power Mech Projects Ltd 20098089 JAFARNAGAR BEGAN 1 1 2174 2023 2038 2053 31-Dec-2024 06-Aug-2024 23-Dec-2024 24-Dec-2024 Recommended for further Approvals. Approved View
1026 Kannauj GVPR 20036157 JAFRABAD GRAMIN PEYJAL YOJNA 1 6 4144 2023 2038 2053 13-May-2024 07-Mar-2024 10-Jun-2024 11-Jun-2024 forwarded for further action. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
1027 Auraiya GVPR 20064605 Jaganpur and bhureypur kalan PWS 3 1 3370 2023 2038 2053 06-Jan-2022 03-May-2024 17-Mar-2024 03-May-2024 Forwarded for further action. All work of scheme found satisfactory. View
1028 Auraiya GVPR 20093717 Jagatpur & harchandpur PWS 1 1 2676 2023 2038 2053 06-Jan-2022 20-Jun-2024 03-May-2024 21-Jun-2024 Forwarded for further action. All work of scheme found satisfactory. View
1029 Kanpur Dehat Indian Hume Pipe 20096867 Jagdishpur 2 3 2340 2022 2037 2052 03-Mar-2024 31-Dec-2024 24-Feb-2024 26-Feb-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1030 Kanpur Dehat GVPR 20077379 JAGDISHPUR & RAMPUR TAPPEWAN 4 7 3164 2023 2038 2053 17-Feb-2024 06-Dec-2023 20-Jan-2024 21-Jan-2024 Forward for further necessary action pls All work of scheme found satisfactory View
1031 Ambedkar Nagar Vindhya-GAJA (JV) 20043878 JAGDISHPUR KAPLESHVAR WSS 1 4 4950 2023 2038 2053 23-Nov-2023 27-Jul-2025 16-Nov-2025 17-Nov-2025 Scheme completed and ready for O&M Scheme Completed View
1032 Jaunpur AFCONS 20059640 JAGDISHPUR KHAS VILLAGE WATER SUPPLY SCHEME 2 17 2500 2023 2038 2053 17-Dec-2022 04-May-2024 12-Oct-2024 12-Jul-2024 checked and found ok......... Ok View
1033 Bijnor LC INFRA 20026244 Jagdishpur Village Water Supply 1 1 1967 2022 2037 2052 10-Feb-2022 26-Apr-2024 25-Jan-2025 26-Jan-2025 Every thing complete. Every thing is completed. View
1034 Sultanpur Vindhya-GAJA (JV) 20078074 JAGDISHPUR WSS 1 5 3800 2023 2038 2053 12-Sep-2024 02-Dec-2024 06-Feb-2025 01-Nov-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. O&M start date 01/11/2025 View
1035 Hardoi NCC Ltd. 20012228 Jagrauli 1 2 2060 2022 2037 2052 26-Jul-2023 28-May-2023 29-Aug-2023 07-Dec-2024 ok OK View
1036 Auraiya GVPR 20089628 Jagupur & Purwa Patti PWS 2 9 3447 2023 2038 2053 06-Jan-2022 24-Apr-2024 21-Apr-2024 23-Apr-2024 Forwarded for further action. All work of scheme found satisfactory. View
1037 Farrukhabad Vindhya-GAJA (JV) 20091347 JAHANGIRPUR & RAYPUR MVS 2 3 3452 2023 2038 2053 30-May-2025 28-Jun-2024 11-Oct-2024 12-Oct-2024 All the parameters of scheme verified can take in O&M. ok View
1038 Bijnor LC INFRA 20026115 Jahangirpur khas Village Water Supply 1 3 2323 2022 2037 2052 31-Dec-2024 26-Nov-2023 28-May-2024 29-May-2024 every thing is completed Every thing is completed View
1039 Ghaziabad LC INFRA 20021552 JAHANGIRPUR PWS SCHEME 1 1 6459 2022 2037 2052 20-Sep-2021 30-Sep-2024 31-Jan-2025 01-Feb-2025 Actual Executed Cost Verified based on approved variation statement. All work checked and recommended for O&M View
1040 Mau GA INFRA-VPL 20092462 JAHANIYAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 8 2960 2023 2038 2053 30-May-2025 14-Feb-2025 13-Feb-2025 14-Feb-2025 Approved Approved View
1041 Amethi Gayatri Projects LTD 20034334 Jainagara water supply scheme 1 2 1850 2022 2037 2052 03-Nov-2024 02-Jun-2024 05-Sep-2024 10-Dec-2024 Hardcopy submitted and found okay as per the submitted documents.. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance... View
1042 Ambedkar Nagar Vindhya-GAJA (JV) 20058509 JAINAPUR Water Supply Scheme 3 10 4220 2023 2038 2053 26-Dec-2023 30-Jun-2024 30-Sep-2024 01-Oct-2024 Ok SCHEME COMPLETED View
1043 Mau LC INFRA 20064306 Jairamgarh Gram Panchayat Water Supply Scheme 1 2 1550 2022 2037 2052 29-Jun-2024 23-Apr-2025 23-Apr-2025 25-Apr-2025 Approved approve View
1044 Jaunpur Welspun Kaveri Infraprojects JV 20066194 Jairampwur 5 14 3880 2022 2037 2052 26-Jul-2024 24-Aug-2026 24-Aug-2026 25-Aug-2026 Checked and found ok................. ok View
1045 Auraiya Indian Hume Pipe 20055684 Jaitapur PWS 1 1 2105 2022 2037 2052 22-Sep-2023 15-Oct-2024 31-Jan-2025 01-Feb-2025 Forwarded for further action All work of scheme fond satisfactory. View
1046 Ambedkar Nagar Vindhya-GAJA (JV) 20026145 JAITI WATER SUPPLY SCHEME 2 2 2230 2023 2038 2053 28-Sep-2023 10-Mar-2025 20-Mar-2025 21-Mar-2025 Scheme completed and ready for O&M Scheme completed View
1047 Etawah Indian Hume Pipe 20022491 JAITPUR JAMANAPAR PWS 1 2 1850 2022 2037 2052 22-Sep-2023 17-Feb-2024 17-Feb-2024 18-Feb-2024 Forwarded for further action. All work of scheme found satisfactory. View
1048 Etawah Indian Hume Pipe 20094053 Jaitpur Totaram 1 1 1275 2022 2037 2052 02-Apr-2024 11-Mar-2024 14-Jun-2024 15-Jun-2024 Forwarded to you for further action. All work of scheme found satisfactory. View
1049 Gautam Buddha Nagar LC INFRA 20013499 JAITWARPUR W/S SCHEME 1 1 3856 2022 2037 2052 23-Sep-2023 30-Oct-2023 31-Oct-2024 01-Nov-2024 Project certificate is verified Verified View
1050 Fatehpur Power Mech Projects Ltd 20089346 JAJAMOIYA 2 2 2000 2023 2038 2053 13-Mar-2024 20-Mar-2025 05-Aug-2025 06-Aug-2025 Trial & Run completed. It was initiated in the month of May (04.05.2025) and Regular water supply is given to the consumers. HGJ certificate not signed by Gram pradhan and Panchayat secretary. Verified View
1051 Kanpur Dehat GVPR 20069905 jajmuiya 1 4 1941 2023 2038 2053 17-Feb-2024 08-Nov-2023 23-Mar-2024 24-Mar-2024 Forward for further necessary action pls All work of scheme found satisfactory View
1052 Jaunpur AFCONS 20026141 Jakhaniya Water Supply Scheme 2 5 2711 2023 2038 2053 03-Sep-2023 29-Oct-2025 29-Oct-2025 29-Oct-2025 Testing & Commissioning certificate, Road restoration, trial & run certificate and Final BOQ not signed by EE but TPIA checked and signed all document for further process. ok View
1053 Ayodhya UNIVERSAL MEP 20058762 JALAL PUR & MUZZAFFARPUR WSS 2 2 4280 2023 2038 2053 19-Mar-2024 03-Jul-2024 03-Jul-2024 01-Feb-2025 FOUND OK Found Correct View
1054 Hardoi NCC Ltd. 20088748 JALALPUR 2 3 2370 2022 2037 2052 26-Jul-2023 15-Apr-2023 14-Aug-2023 22-Nov-2024 OK OK View
1055 Hardoi NCC Ltd. 20012236 Jalalpur 2 2 1810 2022 2037 2052 26-Jul-2023 10-Jan-2023 13-Apr-2023 07-Dec-2024 ok OK View
1056 Meerut Power Mech Projects Ltd 20011295 JALALPUR AKKHEPUR 1 1 2513 2022 2037 2052 31-Dec-2024 25-Jun-2024 16-Nov-2024 17-Nov-2024 Recommended for further Approvals. Approved View
1057 Auraiya GVPR 20089644 Jalalpur bidhuna PWS 1 1 1420 2023 2038 2053 06-Jan-2022 25-Jan-2024 24-Nov-2023 25-Nov-2023 Forwarded for further action. All work of scheme found satisfactory. View
1058 Ghaziabad LC INFRA 8359714 JALALPUR DIDHAR 1 1 4600 2022 2037 2052 27-Aug-2021 31-Oct-2024 27-Mar-2025 01-Apr-2025 Actual Executed Cost Verified based on approved variation statement. Approved View
1059 Meerut Power Mech Projects Ltd 20082605 JALALPUR JORA & HATOOPURA 2 2 1347 2023 2038 2053 31-Dec-2024 12-Aug-2024 31-Dec-2024 01-Jan-2025 Recommended for further Approvals. approved View
1060 Kannauj GVPR 20050185 JALALPUR KATRI BANGER GRAM PANCHAYAT WATER SUPPLY SCHEME 3 5 3402 2023 2038 2053 15-Jun-2024 28-Apr-2024 31-Jul-2024 01-Aug-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1061 Kanpur Dehat Indian Hume Pipe 20034284 JALALPUR NAGIN 1 8 4790 2022 2037 2052 24-Nov-2022 23-Nov-2023 31-Jul-2023 01-Aug-2023 forward for further action All work of scheme found satisfactory View
1062 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20008736 Jalalpur Sabakpur 2 4 4808 2022 2037 2052 07-Jul-2023 30-Jun-2025 17-Jun-2025 15-Jul-2025 Checked and Found Ok Scheme completed View
1063 Kannauj GVPR 20077048 JALALPUR SARWAN & ANTI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 3205 2023 2038 2053 16-Aug-2024 15-Nov-2024 19-Feb-2025 20-Feb-2025 forwarded for Further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1064 Meerut Power Mech Projects Ltd 20094310 JALALUDDINPUR MASOODPUR GAWRI 1 1 1001 2022 2037 2052 31-Dec-2024 14-Aug-2024 02-Jan-2025 02-Dec-2024 Recommended for further Approval approved View
1065 Hardoi NCC Ltd. 20012249 Jalihapur (GOGP) 2 2 3360 2022 2037 2052 26-Jul-2023 20-Jan-2024 24-Apr-2024 30-Nov-2024 ok OK View
1066 Kanpur Dehat VSA 20092640 jallapur sikandra 1 1 2185 2023 2038 2023 30-Apr-2023 31-Dec-2023 10-May-2024 11-May-2025 Forward to further necessary action pls. All work of scheme found satisfactory View
1067 Auraiya GVPR 20091078 Jalokhar PWS 2 1 1893 2023 2038 2053 01-Jun-2022 03-Oct-2024 23-Jan-2024 10-Mar-2025 Forwarded for further action. All work of scheme found satisfactory. View
1068 Kanpur Dehat Indian Hume Pipe 20061497 Jalpura1 2 2 2100 2022 2037 2052 24-Nov-2022 31-Dec-2024 31-Mar-2024 01-Apr-2024 FORWARD FOR FURTHER NECESSARY ACTION PLS. All work of scheme found satisfactory View
1069 Bijnor Vindhya-GAJA (JV) 20022077 Jamalpur Banger Gram Panchayat Water Supply 2 2 2209 2023 2038 2053 06-Jul-2023 06-Oct-2025 06-Apr-2026 07-Apr-2026 Every thing complete. check View
1070 Meerut Power Mech Projects Ltd 8359773 JAMALPUR JALALPUR 1 1 3352 2022 2037 2052 07-Mar-2023 06-Jun-2024 22-Oct-2024 01-Dec-2024 Recommended for further Approvals. approved View
1071 Meerut Power Mech Projects Ltd 20078458 JAMALPUR MAJRA 1 1 1545 2022 2037 2052 31-Dec-2024 29-Jan-2024 18-Jun-2024 09-Dec-2024 Recommended for further approval approved View
1072 Amethi Gayatri Projects LTD 20085725 JAMALPUR RAMPUR & TARAUNA WATER SUPPLY SCHEME 2 16 4652 2022 2037 2052 12-Jul-2024 07-Jun-2024 08-Jun-2024 15-Dec-2024 All Document not provided by EPC hence returns to the EPC All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance... View
1073 Gautam Buddha Nagar LC INFRA 20094809 JAMALPUR VILLAGE WATER SUPPLY SCHEME 1 1 2428 2022 2037 2052 20-Mar-2023 07-Feb-2024 30-Mar-2024 01-Apr-2024 Actual Executed Cost Verified based on Approved Variation Statement. Approved View
1074 Jaunpur AFCONS 20056616 JAMALPUR VILLAGE WATER SUPPLY SCHEME 6 19 3745 2023 2038 2053 31-Dec-2024 26-Sep-2025 26-Sep-2024 26-Sep-2025 Checked and found ok. ok View
1075 Auraiya GVPR 20065630 Jamauli PWS 1 7 4544 2023 2038 2053 06-Jan-2022 06-Jan-2024 11-Feb-2024 12-Feb-2024 Forwarded for further action. All work of scheme found satisfactory. View
1076 Shahjahanpur NCC Ltd. 20026243 JAMAUR 1 1 4220 2022 2037 2052 31-Dec-2024 20-Mar-2024 19-Jun-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of JAMAUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Jamaur W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1077 Mau LC INFRA 20015834 Jamdra gp water supply Scheme 3 9 3152 2022 2037 2052 03-Aug-2023 02-Apr-2025 20-Apr-2025 25-Apr-2025 Approved...... approve View
1078 Ambedkar Nagar Vindhya-GAJA (JV) 20068424 JAMEEN SURJUPUR WSS 3 9 2890 2023 2038 2053 08-Mar-2024 09-Oct-2025 31-Jan-2026 01-Mar-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
1079 Bahraich PNC-SPML-JV 20099241 JAMLAJOT TEJWAPUR RF PWS 1 6 1600 2022 2037 2052 31-Dec-2025 13-Nov-2025 13-Nov-2025 14-Nov-2025 Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/11/0477, kindly complete it. Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/11/0477, kindly complete it. View
1080 Balrampur Larsen & Toubro Ltd 20019344 Jamuni Kalan water supply scheme 1 3 2262 2022 2037 2052 26-Jun-2023 06-Feb-2024 06-May-2024 07-May-2024 Approved as per theTKC agreement. ok View
1081 Shahjahanpur NCC Ltd. 20057091 JAMUNIA KHANPUR & MUDIGAON & SABALPUR WSS 4 4 5040 2023 2038 2053 31-Dec-2024 04-Sep-2024 04-Dec-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of JAMUNIA KHANPUR & MUDIGAON & SABALPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of JAMUNIA KHANPUR & MUDIGAON & SABALPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1082 Jaunpur Welspun Kaveri Infraprojects JV 20020923 Jamunipur 3 7 3314 2022 2037 2052 22-May-2023 13-Oct-2025 13-Oct-2025 14-Oct-2025 Checked and found ok. Okay View
1083 Ayodhya UNIVERSAL MEP 20030486 JAMUNIYA MAU GRAM PANCHAYAT WATER SUPPLY SCHEME 2 2 3210 2023 2038 2053 12-Oct-2023 21-Sep-2023 21-Sep-2023 15-Nov-2024 Found ok Found Correct View
1084 Meerut Power Mech Projects Ltd 20058471 JANDHERI & KHERI JADID 2 2 4709 2023 2038 2053 31-Dec-2024 25-Aug-2024 11-Jan-2025 12-Jan-2025 Recommended for further Approvals. approved View
1085 Meerut Power Mech Projects Ltd 20011220 JANGETHI 1 1 5364 2022 2037 2052 31-Dec-2024 02-Feb-2023 21-Jun-2023 15-Oct-2024 Recommended for further Approvals.................................... APPROVED View
1086 Jaunpur Welspun Kaveri Infraprojects JV 20013339 Jangipur Khurd 1 5 3477 2022 2037 2052 22-May-2023 30-Jul-2026 30-Jul-2026 31-Jul-2026 Checked and found ok................. ok View
1087 Fatehpur Power Mech Projects Ltd 20043844 Janta 1 3 3374 2023 2038 2053 28-Nov-2023 10-Mar-2025 05-Aug-2025 06-Aug-2025 Trial & Run completed. It was initiated in the month of May (04.05.2025) and Regular water supply is given to the consumers. HGJ certificate not signed by Gram Pradhan. Verified View
1088 Shahjahanpur NCC Ltd. 20058837 JANYURI WSS 1 2 2060 2022 2037 2052 31-Dec-2024 20-Feb-2024 21-May-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Janyuri scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Janyuri scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1089 Auraiya Indian Hume Pipe 20101403 Jaohar PWS 1 3 1660 2022 2037 2052 12-Oct-2022 02-Jan-2024 04-May-2024 05-May-2024 Forwarded for further action. All work of scheme fond satisfactory. View
1090 Hardoi NCC Ltd. 20000029 JAPRA 1 5 5078 2022 2037 2052 29-Apr-2023 10-Oct-2023 09-Jan-2024 06-May-2025 ok OK View
1091 Auraiya GVPR 20091157 Jaraon PWS 1 4 1632 2023 2038 2053 22-Mar-2024 01-Aug-2025 31-Jul-2025 02-Aug-2025 Forwarded for further action. All work of scheme fond satisfactory. View
1092 Jaunpur Welspun Kaveri Infraprojects JV 20020928 Jarauta 3 3 2580 2022 2037 2052 22-May-2023 13-Oct-2025 13-Oct-2025 14-Oct-2025 Checked and found ok. Ok View
1093 Amethi Vindhya-GAJA (JV) 20066597 JARAUTA VILLAGE WATER SUPPLY SCHEME 2 8 2614 2023 2038 2053 06-Jan-2024 08-Nov-2024 08-Feb-2025 09-May-2025 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
1094 Farrukhabad Vindhya-GAJA (JV) 20092017 JARHARI MVS 2 3 2543 2023 2038 2053 30-May-2025 11-Oct-2024 11-Oct-2024 12-Oct-2024 All the parameters of scheme verified can take in O&M. ok View
1095 Auraiya Indian Hume Pipe 20033773 Jarhuliya PWS 1 2 2000 2022 2037 2052 14-Sep-2022 30-Dec-2024 20-Sep-2023 21-Sep-2023 Forwarded for further action. All work of scheme fond satisfactory. View
1096 Bijnor LC INFRA 20068049 JARIFPUR CHATAR WATER SUPPLY SCHEME 2 2 2246 2022 2037 2052 23-Jan-2023 26-Nov-2024 26-Nov-2024 27-Nov-2024 Every thing complete. Everything Completed. View
1097 Meerut Power Mech Projects Ltd 20098103 JASAR SULTANNAGAR 1 1 9048 2022 2037 2052 31-Dec-2024 13-Jul-2024 03-Dec-2024 04-Dec-2024 Recommended for further Approvals. Approved View
1098 Kannauj VSA 20100991 JASAURA GRAMM PANCHAYAT WATER SUPPLY SCHEME 1 2 1960 2023 2038 2053 15-Jun-2025 05-Apr-2025 11-Aug-2025 15-Aug-2025 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1099 Farrukhabad Vindhya-GAJA (JV) 20074152 Jasmai SVS 1 4 3322 2023 2038 2053 30-May-2025 17-Jan-2024 01-May-2024 02-May-2024 All the parameters of scheme verified can take in O&M. ok View
1100 Hardoi NCC Ltd. 20012257 Jasoo 2 4 2710 2022 2037 2052 26-Jul-2023 20-Sep-2023 19-Dec-2023 24-Dec-2024 ok OK View
1101 Meerut Power Mech Projects Ltd 20011232 JASORI 1 1 3533 2022 2037 2052 31-Dec-2024 10-Mar-2025 27-Jul-2025 28-Jul-2025 Recommended for further Approvals. approved View
1102 Fatehpur Gayatri Projects LTD 20030741 JASRAJPUR 1 1 2910 2022 2037 2052 18-Mar-2024 26-Aug-2025 26-Nov-2025 27-Nov-2025 Trial & Run completed. It was initiated in the month of August(27.08.2025) and Regular water supply is given to the consumers. Verified View
1103 Hardoi NCC Ltd. 20012264 Jasrathpur 2 2 2420 2022 2037 2052 26-Jul-2023 15-Jul-2023 14-Oct-2023 25-Dec-2024 ok OK View
1104 Meerut Power Mech Projects Ltd 20058047 JASRATHPUR & JAMALPUR GOMA 3 3 3372 2023 2038 2053 31-Dec-2024 26-Sep-2024 15-Feb-2025 16-Feb-2025 Recommended for further Approvals. approved View
1105 Kannauj GVPR 20050183 JASUA MAI GRAM PANCHAYAT WATER SUPPLY SCHEME 2 3 1861 2023 2038 2053 15-Jun-2024 06-Nov-2024 10-Nov-2024 10-Feb-2025 forwarded for Further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1106 Auraiya Indian Hume Pipe 20033779 Jaswantpur PWS 1 2 2490 2022 2037 2052 22-Sep-2023 16-Nov-2024 01-Dec-2024 03-Mar-2025 Forwarded for further action. All work of scheme found satisfactory. View
1107 Meerut Power Mech Projects Ltd 20098111 JATAULA 1 1 1332 2023 2038 2053 31-Dec-2024 28-Apr-2024 14-Sep-2024 21-Apr-2025 Recommended for further Approval approved View
1108 Shahjahanpur NCC Ltd. 20015006 Jathiura W/s 1 2 3010 2022 2037 2052 09-Jul-2024 31-Dec-2024 08-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Jathiura scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Jathiura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1109 Kanpur Dehat Indian Hume Pipe 20020312 Jatiapur 1 1 2150 2022 2037 2052 25-Aug-2022 31-Dec-2024 31-Mar-2024 01-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1110 Meerut Power Mech Projects Ltd 20066858 JATPURA 1 1 2654 2022 2037 2052 31-Dec-2024 09-Feb-2024 28-Jun-2024 10-Oct-2024 Recommended for further Approvals. approved View
1111 Bijnor Vindhya-GAJA (JV) 20059134 jatpura bhaunda water supply scheme 2 2 3385 2022 2037 2052 06-Jul-2023 10-Jan-2025 10-Jul-2025 11-Jul-2025 Every thing complete. All document complete View
1112 Etawah Indian Hume Pipe 20026412 Jatupur Khwajgi PWS 2 5 2150 2022 2037 2052 22-Sep-2023 30-Oct-2024 07-Feb-2025 08-Feb-2025 Forwarded for further action. All work of scheme found satisfactory. View
1113 Bijnor Vindhya-GAJA (JV) 20063380 JAWALILALA WATER SUPPLY SCHEME 1 1 3250 2022 2037 2052 06-Jul-2023 25-Mar-2025 25-Sep-2025 26-Sep-2025 Every thing complete. All document complete View
1114 Meerut Power Mech Projects Ltd 8359772 JEORI 1 1 4287 2022 2037 2052 31-Dec-2024 17-Dec-2022 05-May-2023 07-Nov-2024 Recommended for further Approval approved View
1115 Amethi Vindhya-GAJA (JV) 20101945 JETHU MAWAI WATER SUPPLY SCHEME 1 2 1248 2023 2038 2053 04-Jul-2024 06-Nov-2024 06-Feb-2025 07-May-2025 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
1116 Kannauj GVPR 20067620 JEWAN GRAM PANCHAYAT WATER SUPPLY SCHEME 1 5 3885 2023 2038 2053 16-Aug-2024 30-Apr-2024 03-Aug-2024 04-Aug-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1117 Shahjahanpur NCC Ltd. 20015142 JEWAN W/s 1 1 4597 2022 2037 2052 31-Dec-2024 14-Dec-2023 14-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of JEWAN scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of JEWAN W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1118 Farrukhabad Vindhya-GAJA (JV) 20076896 JHABBUPUR SVS 1 4 2851 2023 2038 2053 30-May-2025 27-Mar-2024 09-Jul-2024 10-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
1119 Bahraich PNC-SPML-JV 20016161 JHALA KALAN SHIVPUR PWS 1 7 8267 2022 2037 2052 31-Dec-2025 17-Sep-2025 17-Sep-2025 18-Sep-2025 Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/01/0121, kindly complete it. Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/01/0121, View
1120 Bijnor Vindhya-GAJA (JV) 20089154 JHALRI & NASIRI WATER SUPPLY SCHEME 5 5 2415 2023 2038 2053 06-Jul-2023 10-Nov-2024 10-May-2025 11-May-2025 Every thing complete. Check Document View
1121 Bijnor LC INFRA 8360401 JHIRAN VILLAGE WATER SCHEME 1 1 3467 2022 2037 2052 02-Nov-2023 10-Dec-2023 08-Jun-2024 09-Jun-2024 Every thing complete. Everything is Completed. View
1122 Meerut Power Mech Projects Ltd 20076732 JHUNJUNEE 1 1 3210 2023 2038 2053 31-Dec-2024 10-Aug-2024 27-Dec-2024 28-Dec-2024 Recommended for further Approvals. Approved View
1123 Kannauj GVPR 20100935 JHUSI NAGAR GRAMM PANCHAYAT WATER SUPPLY SCHEME 1 1 762 2023 2038 2053 14-Nov-2024 07-Apr-2024 10-Jul-2024 11-Jul-2024 forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1124 Kanpur Dehat GVPR 20077384 JIGNISH 2 0 2179 2023 2038 2053 17-Feb-2024 07-Nov-2023 22-Mar-2024 23-Mar-2024 Forward for further necessary action pls All work of scheme found satisfactory View
1125 Bahraich PNC-SPML-JV 20014725 JIHURA MAFI TEJWAPUR PWS 1 9 8236 2022 2037 2052 30-Jun-2025 07-Mar-2025 23-Jun-2024 08-Mar-2025 Approved . Scheme completed View
1126 Farrukhabad Vindhya-GAJA (JV) 20092582 JIJAUTA BUJURG MVS 2 2 3115 2023 2038 2053 30-May-2025 17-Jun-2024 17-Jun-2024 18-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
1127 Farrukhabad Vindhya-GAJA (JV) 20076815 JIRAU SVS 1 3 3027 2023 2038 2053 30-May-2025 31-May-2024 31-May-2024 01-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
1128 Meerut Power Mech Projects Ltd 20011008 JITHAULI 1 1 2845 2023 2038 2053 31-Dec-2024 16-Mar-2023 01-Aug-2023 07-Oct-2024 Recommended for further Approval Approved View
1129 Kanpur Dehat Indian Hume Pipe 20031458 Jithrauli 2 3 2290 2022 2037 2052 23-Sep-2023 31-Dec-2024 30-Apr-2023 01-May-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
1130 Meerut Power Mech Projects Ltd 20077312 JITPUR 1 1 2019 2022 2037 2052 31-Dec-2024 05-May-2024 21-Sep-2024 02-Mar-2025 Recommended for further Approval approved View
1131 Auraiya GVPR 20025458 JiwaSirsani PWS 1 4 3322 2023 2038 2053 03-Dec-2021 09-Dec-2022 30-Nov-2023 01-Dec-2024 Forwarded for further action. All work of scheme fond satisfactory. View
1132 Ambedkar Nagar Vindhya-GAJA (JV) 20083855 JOGAPUR WSS 1 3 1800 2023 2038 2053 22-Mar-2024 14-Mar-2024 14-Jun-2024 15-Jun-2024 Checked and found ok SCHEME COMPLETED View
1133 Farrukhabad Vindhya-GAJA (JV) 20093061 JOURA SVS 1 1 3071 2023 2038 2053 30-May-2025 05-Jun-2024 05-Jun-2024 06-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
1134 Auraiya GVPR 20084700 Juan PWS 1 1 3590 2023 2038 2053 06-Jan-2022 28-Mar-2024 27-Mar-2024 28-Mar-2024 Forwarded for further action. All work of scheme found satisfactory. View
1135 Sultanpur Vindhya-GAJA (JV) 20050998 JUDARA WATER SUPPLY SCHEME 5 5 2840 2023 2038 2053 02-Dec-2023 04-Jun-2025 04-Jun-2025 01-Sep-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. Approve for o&m View
1136 Kanpur Dehat GVPR 20070068 JUGRAJPUR BITHOOR 1 2 1879 2023 2038 2053 17-Feb-2024 30-Dec-2024 07-May-2024 08-May-2024 Forward for further action All work of scheme found satisfactory View
1137 Hardoi NCC Ltd. 20012123 JUJVAMAU 2 2 2180 2022 2037 2052 14-Jun-2023 08-Oct-2023 17-Jan-2024 24-Dec-2024 ok OK View
1138 Kanpur Dehat Indian Hume Pipe 8361907 JUNEDPUR 1 3 2710 2022 2037 2052 14-Sep-2022 31-Dec-2024 14-Jun-2023 15-Jun-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
1139 Hardoi NCC Ltd. 8388606 Jura 1 11 4590 2022 2037 2052 05-Mar-2023 01-Dec-2023 29-Feb-2024 25-Dec-2024 ok OK View
1140 Meerut Power Mech Projects Ltd 20100949 JURRANPUR 1 1 1332 2023 2038 2053 11-Jun-2025 13-Aug-2024 03-Jan-2025 04-Jan-2025 Recommended for further Approvals. Approved View
1141 Auraiya Indian Hume Pipe 20014862 Kaba PWS 2 4 1950 2022 2037 2052 08-May-2023 26-Jul-2023 09-Nov-2023 10-Nov-2023 Forwarded for further action. All work of scheme found satisfactory. View
1142 Sultanpur UNIVERSAL MEP 20066706 KABARI & DHAKHVA GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME 2 9 5700 2023 2038 2053 12-Jan-2024 31-Dec-2024 10-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements. View
1143 Azamgarh LC INFRA 20101522 KABIRUDDINPUR WATER SUPPLY SCHEME 2 4 4811 2022 2037 2052 31-May-2023 15-Oct-2024 23-Oct-2024 24-Oct-2024 OK OK View
1144 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20008679 Kabye Anjanpur 3 9 4167 2022 2037 2052 07-Jul-2023 20-Oct-2026 18-Jan-2026 24-Jan-2026 Scheme completed and ready for O&M Scheme COMPLETED View
1145 Sultanpur UNIVERSAL MEP 20064704 KACHANAYA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 4 2600 2023 2038 2053 12-Jan-2024 12-Jan-2024 11-Oct-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
1146 Kanpur Dehat Indian Hume Pipe 20025510 Kachhgaon 1 1 2210 2022 2037 2052 25-Aug-2022 31-Dec-2024 31-Jul-2023 01-Aug-2023 FORWARD FOR FURTHER NECESSARY ACTION PLS. All work of scheme found satisfactory View
1147 Shahjahanpur NCC Ltd. 20015957 Kadardadpur WSS 1 5 2600 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kadardadpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Kadardadpur WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1148 Kanpur Dehat Indian Hume Pipe 20034278 KADARI 1 2 1600 2022 2037 2052 23-Nov-2023 31-Dec-2023 30-Oct-2023 01-Nov-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
1149 Ambedkar Nagar Vindhya-GAJA (JV) 20067762 KADI FARIDPUR Water Supply Scheme 6 9 3730 2023 2038 2053 10-Mar-2024 09-Jul-2025 19-Aug-2025 18-Nov-2025 Scheme completed and ready for O&M Scheme Completed View
1150 Jaunpur Welspun Kaveri Infraprojects JV 20020894 Kafarpur 3 9 3718 2022 2037 2052 22-May-2023 20-Dec-2025 21-Mar-2026 22-Mar-2026 Checked and found ok. ok View
1151 Kanpur Dehat Indian Hume Pipe 20034279 KAILAI 1 2 1960 2022 2037 2052 23-Nov-2023 31-Dec-2024 31-May-2023 01-Jun-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
1152 Meerut Power Mech Projects Ltd 20068658 KAILIRAMPUR & AMINABAD URF BARAGAON 2 1 5254 2023 2038 2053 31-Dec-2024 07-Jun-2024 28-Oct-2024 29-Oct-2024 Recommended for further Approvals. approved View
1153 Amethi Gayatri Projects LTD 20085825 KAIMA WATER SUPPLY SCHEME 1 7 2762 2022 2037 2052 22-Mar-2025 14-Sep-2024 20-Dec-2024 10-Mar-2025 Hardcopy submitted and found okay as per the submitted documents.. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance... View
1154 Shahjahanpur NCC Ltd. 20015847 Kaimahara Matlookpur 2 3 3570 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kaimahara Matlookpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Kaimahara Matlookpur W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1155 Kannauj GVPR 20066556 KAIRDA & USMANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 3 8 3413 2023 2038 2053 16-Aug-2024 06-Nov-2024 09-Feb-2025 10-Feb-2025 forwarded for Further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1156 Auraiya Indian Hume Pipe 20022745 Kaithawa Water Supply Schem 1 3 2530 2022 2037 2052 08-May-2023 15-Apr-2023 20-May-2024 21-May-2024 Forwarded for further action. All work of scheme fond satisfactory. View
1157 Meerut Power Mech Projects Ltd 20011223 KAITHWARI 1 1 3867 2022 2037 2052 31-Dec-2024 05-Feb-2023 28-Jun-2023 15-Oct-2024 Recommended for further Approvals. Approved View
1158 Shahjahanpur NCC Ltd. 8388653 KAJRI NOORPUR 1 1 2440 2022 2037 2052 31-Jul-2023 31-Dec-2024 30-Oct-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kajri Noorpur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Kajri Noorpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1159 Muzaffarnagar Gayatri Projects LTD 20058586 KAKRA WATER SUPPLY SCHEME CHANDPUR BASDHARA (PART I) 1 2 8670 2022 2037 2052 16-Sep-2022 02-Aug-2024 02-Aug-2024 03-Aug-2024 The details given by the contractor are correct at the time of approval. OK View
1160 Bijnor LC INFRA 8388783 KAKRALA VILLAGE WATER SCHEME 1 2 2269 2022 2037 2052 30-Sep-2023 12-Dec-2023 10-Jun-2024 11-Jun-2024 Every thing completed. All document complete View
1161 Bahraich PNC-SPML-JV 20012357 KAKRI BALAHA PWS 1 4 7884 2022 2037 2052 31-Dec-2025 09-Nov-2025 15-May-2025 10-Nov-2025 Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/11/0314, kindly complete it. Scheme Completed with observation View
1162 Meerut Power Mech Projects Ltd 20067097 KALAND 1 1 4983 2022 2037 2052 31-Dec-2024 23-Jul-2024 12-Dec-2024 13-Dec-2024 Recommended for further Approvals. Approved View
1163 Meerut Power Mech Projects Ltd 20011111 KALANJARI 1 1 4672 2022 2037 2052 31-Dec-2024 11-Feb-2023 01-Jul-2023 07-Oct-2024 Recommended for further Approval Approved View
1164 Bijnor LC INFRA 8360938 KALANPUR BUZURG (111951) GRAMPANCHAYAT WATER SUPPLY SCHEME 2 1 1812 2022 2037 2052 29-Sep-2023 10-Dec-2023 08-Jun-2024 09-Jun-2024 Every thing completed Everything Completed View
1165 Jaunpur AFCONS 20050909 KALAPUR VILLAGE WATER SUPPLY SCHEME 1 7 3904 2023 2038 2053 17-Dec-2023 26-Feb-2025 26-Feb-2025 26-Feb-2025 checked and found ok............ Ok View
1166 Ambedkar Nagar Vindhya-GAJA (JV) 20041574 KALAYANPUR UDYANPUR 2 11 2960 2023 2038 2053 23-Nov-2024 30-Aug-2025 17-Dec-2025 01-Jan-2026 SCHEME COMPLETED AND READY FOR O&M SCHEME COMPLETED AND READY FOR O&M View
1167 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20009014 Kalesar 3 16 4925 2022 2037 2052 22-May-2023 05-Jan-2026 11-Dec-2025 05-Jan-2026 Scheme completed and ready for O&M Scheme Completed & Ready For O&M View
1168 Mau LC INFRA 20082303 KALFANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 1 2020 2022 2037 2052 09-Feb-2025 02-Apr-2025 01-Apr-2025 02-Apr-2025 All Documents checked and found OK All documents found ok. View
1169 Sant Ravidas Nagar Welspun Kaveri Infraprojects JV 20025619 kalika nagar koirana 1 1 3143 2022 2037 2022 17-Jan-2025 17-Jan-2025 17-Apr-2025 18-Apr-2025 All related documents reviewed and found in accordance to the guide line of JJM. All documents reviewed and found in compliance with JJM guidelines. View
1170 Sultanpur UNIVERSAL MEP 20071418 KALKHURA & MOHMADPUR GRAM PANCHYAT WATER SUPPLY SCHEME 4 12 7960 2023 2038 2053 18-Jul-2024 26-Feb-2025 30-May-2025 01-Jul-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
1171 Kanpur Dehat Indian Hume Pipe 20065249 Kalla 2 2 2700 2022 2037 2052 23-Sep-2022 31-Dec-2024 31-Mar-2023 01-Apr-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
1172 Farrukhabad Vindhya-GAJA (JV) 20097907 KALULI MAHBULLA PUR SVS 1 1 1598 2023 2038 2053 30-May-2025 17-May-2024 17-May-2024 18-May-2024 All the parameters of scheme verified can take in O&M. Ok View
1173 Auraiya Indian Hume Pipe 8362909 KALYANPUR JAGOO 1 3 2255 2022 2037 2052 12-Oct-2022 05-May-2023 20-May-2023 20-Aug-2023 Forwarded for further action. All work of scheme fond satisfactory. View
1174 Kannauj GVPR 20090087 KALYANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 1 1714 2023 2038 2053 08-Sep-2024 04-Apr-2024 07-Jul-2024 08-Jul-2024 forwarded for Further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1175 Ambedkar Nagar Vindhya-GAJA (JV) 20092652 KALYANPUR LALA Water Supply Scheme 5 6 3220 2023 2038 2053 19-May-2024 27-Jun-2025 11-Nov-2025 12-Nov-2025 Checked and found OK Scheme Completed and Ready For O&M View
1176 Bijnor Vindhya-GAJA (JV) 20102090 KALYANPUR WSS 3 3 997 2023 2038 2053 06-Jul-2023 05-Feb-2025 05-Aug-2025 06-Aug-2025 Every thing complete. all document complete View
1177 Hardoi NCC Ltd. 20012208 Kamalpur 1 3 3240 2022 2037 2052 26-Jul-2023 10-Nov-2023 09-Feb-2024 24-Dec-2024 ok OK View
1178 Bijnor LC INFRA 20016841 KAMALPUR WATER SUPPLY SCHEME 2 2 2478 2022 2037 2051 10-Feb-2024 11-Apr-2024 13-Oct-2024 14-Oct-2024 Every thing complete. Everything Complete. View
1179 Meerut Power Mech Projects Ltd 20078484 KAMARUDDINNAGAR MADHIYAI 1 1 3757 2023 2038 2053 31-Dec-2024 10-Aug-2024 27-Dec-2024 28-Dec-2024 Recommended for further Approvals.................................. APPROVED View
1180 Kanpur Dehat GVPR 20053215 KAMIR 2 2 3401 2023 2038 2053 14-Sep-2023 09-Dec-2023 09-Jan-2024 10-Dec-2024 Forward for further action All work of scheme found satisfactory View
1181 Sultanpur UNIVERSAL MEP 20066583 KAMOLIYA & PIKOURA GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME 3 8 5060 2023 2038 2053 12-Jan-2024 31-Dec-2024 25-Jul-2024 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements. View
1182 Ambedkar Nagar Vindhya-GAJA (JV) 20058490 KANAK PATTI Water Supply Scheme 1 3 1690 2023 2038 2053 26-Dec-2023 30-Jun-2024 30-Sep-2024 01-Oct-2024 Checked and found ok Scheme completed View
1183 Amethi Vindhya-GAJA (JV) 20068372 KANAK SINGHPUR & KORARI HEERSHAH WATER SUPPLY SCHEME 2 7 3844 2023 2038 2053 23-Mar-2024 10-Nov-2024 10-Feb-2025 11-May-2025 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
1184 Ghaziabad LC INFRA 20018959 KANAKPUR PWS SCHEME 1 1 3523 2022 2037 2052 21-Mar-2022 31-Oct-2024 28-Feb-2025 01-Mar-2025 Actual Executed Cost Verified based on approved variation statement. All work checked and recommended for O&M View
1185 Mau GA INFRA-VPL 20092557 KANDHERI MUNGESAR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 7 3060 2023 2038 2053 30-Jun-2025 16-Jun-2025 16-Jun-2025 17-Jun-2025 Approved Approved View
1186 Fatehpur Power Mech Projects Ltd 20097517 KANDHIYA 1 3 4290 2023 2038 2053 25-Sep-2024 16-Aug-2025 15-Aug-2025 16-Aug-2025 Trial & Run completed. It was initiated in the month of May(16.05.2025) and Regular water supply is given to the consumers. Verified View
1187 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20008669 kandipur 1 12 4110 2022 2037 2052 07-Jul-2023 08-May-2026 15-Feb-2026 08-May-2026 Scheme completed and ready for O&M Scheme Completed View
1188 Ambedkar Nagar Vindhya-GAJA (JV) 20026146 KANDRIYAWAN WATER SUPPLY SCHEME 2 6 4420 2023 2038 2053 28-Sep-2023 02-Jul-2025 27-Oct-2026 28-Oct-2026 Scheme completed and ready for O&M Scheme Completed View
1189 Muzaffarnagar Gayatri Projects LTD 20098069 KANHAERI GP RO WSS 2 2 3452 2023 2038 2053 16-Sep-2022 14-Jan-2024 14-Apr-2024 15-Apr-2024 The details given by the contractor are correct at the time of approval. OK View
1190 Auraiya Indian Hume Pipe 8362912 KANHON 1 5 2835 2022 2037 2052 14-Sep-2022 20-Apr-2024 14-Aug-2024 15-Aug-2024 Forwarded for further action. All work of scheme fond satisfactory. View
1191 Bahraich PNC-SPML-JV 20034905 KANJARWA MIHIPURWA GRAM PANCHAYAT WATER SCHEME 1 4 4197 2022 2037 2052 31-Dec-2025 27-Nov-2025 27-Nov-2025 28-Nov-2025 scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/02/0226 kindly complete it. scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/02/0226 kindly complete it. View
1192 Kannauj GVPR 20067448 KANKAR KUYIN GRAM PANCHAYAT WATER SUPPLY SCHEME 1 7 3866 2023 2038 2053 16-Aug-2024 16-Apr-2024 19-Jul-2024 20-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1193 Amethi Vindhya-GAJA (JV) 20066620 KANKOO PUR WATE SUPPLY SCHEME 1 5 2406 2023 2038 2053 17-Feb-2024 22-Jun-2024 22-Sep-2024 23-Dec-2024 All Document not provided by EPC hence returns to the EPC All things found satisfactory in the Scheme and finalized for Operation And Maintenance View
1194 Kannauj GVPR 20067400 KANNAUJ KACHHOHA & CHAUDHARIAPUR KACHHOHA GRAM PANCHAYAT WATER SUPPLY SCHEME 2 2 2840 2023 2038 2053 16-Aug-2024 13-Apr-2024 16-Jul-2024 17-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1195 Amethi Vindhya-GAJA (JV) 20070858 KANOO WATER SUPPLY SCHEME 1 14 2176 2023 2038 2053 07-Feb-2024 24-Jun-2024 27-Sep-2024 28-Dec-2024 All Document not provided by EPC hence returns to the EPC . View
1196 Kannauj GVPR 20077119 KANOULI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 5 2692 2023 2038 2053 08-Sep-2024 10-Apr-2024 13-Jul-2024 14-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1197 Bijnor Vindhya-GAJA (JV) 20058937 KANSHI RAMPUR WATER SUPPLY SCHEME 1 1 2592 2023 2038 2053 06-Jul-2023 28-Apr-2025 28-Oct-2025 29-Oct-2025 Every thing complete. check View
1198 Kanpur Dehat Indian Hume Pipe 20016928 Kapasi 2 3 3100 2022 2037 2052 05-Feb-2022 31-Dec-2024 31-Mar-2024 01-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1199 Shahjahanpur NCC Ltd. 8388651 KAPOOR NAGLA 3 3 3300 2022 2037 2052 24-Dec-2023 31-Dec-2024 24-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kapoor Nagla scheme have been checked and verified. The submitted records are recommended and forwarded for further All information on the portal for the completion certificate of Kapoor Nagla scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1200 Kannauj GVPR 20036892 KAPOOR PUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 2943 2023 2038 2053 15-Jun-2024 07-Apr-2024 11-Jul-2024 12-Jul-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1201 Kannauj GVPR 20066423 KAPOORPUR KATRI & JALALPUR AMARA GRAM PANCHAYAT WATER SUPPLY SCHEME 5 10 4246 2023 2038 2053 16-Aug-2024 31-Mar-2024 03-Jul-2024 04-Jul-2024 forwarded for Further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1202 Kanpur Dehat GVPR 20053094 Kaprahat 1 4 4703 2023 2038 2053 18-Nov-2023 15-Dec-2023 22-Mar-2024 23-Mar-2024 Forward for further action All work of scheme found satisfactory View
1203 Meerut Power Mech Projects Ltd 8362615 KAPSARH 1 1 7979 2022 2037 2052 31-Dec-2024 25-May-2024 14-Oct-2024 15-Oct-2024 Recommended for further Approvals AT SOME FHTC POINTS PRESSURE IS LOW approved View
1204 Amethi Vindhya-GAJA (JV) 20065165 KAPURIPUR Water Supply Scheme 2 8 2387 2022 2038 2052 17-Feb-2024 07-May-2024 10-Aug-2024 13-Nov-2024 Hardcopy submitted All things found satisfactory in the Scheme and finalized for Operation And Maintenance View
1205 Auraiya GVPR 20084718 Karahi PWS 1 4 3085 2023 2038 2053 01-Jun-2022 31-Dec-2024 17-Mar-2025 19-Mar-2025 Forwarded for further action. All work of scheme found satisfactory. View
1206 Bahraich PNC-SPML-JV 20098744 KARAILA SAHBAJPUR RF PWS 2 15 5290 2022 2037 2052 31-Dec-2025 28-Aug-2025 12-Oct-2023 29-Aug-2025 scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/09/0145 kindly complete it. Scheme completed. View
1207 Farrukhabad GVPR 20019920 Karamchand Pur W/S Scheme 1 1 1724 2022 2037 2052 26-Aug-2022 10-Jun-2024 15-May-2024 28-Jul-2025 All the parameters of scheme verified can take in O&M. ok View
1208 Ambedkar Nagar Vindhya-GAJA (JV) 20083436 KARAMPUR BARSAWAN WSS 3 7 4090 2023 2038 2053 08-Mar-2024 01-Aug-2025 20-Jan-2026 21-Jan-2026 Scheme completed and ready for O&M Scheme Completed View
1209 Sultanpur Vindhya-GAJA (JV) 20084305 KARAMPUR PARVARBHAR WSS 1 2 2230 2022 2037 2052 23-Mar-2023 22-Mar-2024 30-Jan-2025 01-Aug-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
1210 Bijnor Vindhya-GAJA (JV) 20020685 Karaunda Chaudhar Gram Panchayat Water Supply 2 2 3962 2023 2038 2053 06-Jul-2023 24-Oct-2025 24-Apr-2026 25-Apr-2026 Every thing complete. check View
1211 Jaunpur AFCONS 20066788 KARDAHA VILLAGE WATER SUPPLY SCHEME 2 9 3070 2023 2038 2053 27-Jan-2024 30-Oct-2025 30-Oct-2025 31-Oct-2025 Checked and found ok.. Ok View
1212 Kannauj GVPR 20077112 KAREEM NAGAR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 5 2001 2023 2038 2053 08-Sep-2024 04-Apr-2024 07-Jul-2024 08-Jul-2024 Forwarded for further action. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
1213 Meerut Power Mech Projects Ltd 20067205 KAREEMPUR & BHANDORA 2 2 3092 2023 2038 2053 31-Dec-2024 06-Jan-2025 30-May-2025 31-May-2025 Recommended for further Approvals. approved View
1214 Azamgarh LC INFRA 20101559 KARENDUA GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME 3 13 4859 2022 2037 2052 21-Mar-2023 29-Oct-2023 31-Jan-2024 01-Feb-2024 OK OK View
1215 Kanpur Dehat GVPR 20053345 Kari Kalwari 1 3 3337 2023 2038 2053 18-Nov-2023 22-Nov-2023 06-Apr-2024 07-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1216 Shahjahanpur NCC Ltd. 20057572 KARI MAKUAPUR WSS 2 3 2160 2022 2037 2052 30-Nov-2023 31-Dec-2024 29-Feb-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kari Makuapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Kari Makuapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1217 Bijnor LC INFRA 20038864 Karimnangar Urf Uleda Gram Panchayat Water Supply 1 2 2914 2022 2037 2052 25-Feb-2026 01-May-2026 31-Jul-2025 01-Aug-2025 Every thing complete. Check View
1218 Bijnor LC INFRA 20018420 Karimpur Mubarak Water Supply 1 1 2416 2022 2037 2052 10-Feb-2022 29-Dec-2024 30-Mar-2025 01-Apr-2025 Every thing complete. Check Document View
1219 Fatehpur Power Mech Projects Ltd 20097723 KARIYAMAU & RAMPUR 4 4 5130 2023 2038 2053 18-Mar-2025 07-Mar-2025 14-Jul-2025 15-Jul-2025 Trial & Run completed. It was initiated in the month of April (15.04.2025) and Regular water supply is given to the consumers. Verified View
1220 Jaunpur AFCONS 20072467 KARMAHI VILLAGE WATER SUPPLY SCHEME 3 13 3752 2023 2038 2053 21-Feb-2024 13-Sep-2024 09-Mar-2025 10-Mar-2025 Checked and Found ok. ok View
1221 Ambedkar Nagar Vindhya-GAJA (JV) 20084938 KARMAINI WSS 3 6 2800 2023 2038 2053 20-Feb-2024 14-Dec-2025 14-Apr-2026 15-Apr-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
1222 Ambedkar Nagar Vindhya-GAJA (JV) 20019815 Karmishirpur 2 7 3190 2023 2038 2053 03-Aug-2023 25-Sep-2025 14-Jan-2026 15-Jan-2026 Scheme completed and ready for O&M SCHEME COMPLETED AND READY FOR O&M View
1223 Bahraich PNC-SPML-JV 20017959 KARNAI JARWAL PWS 1 12 3538 2022 2037 2052 31-Dec-2025 25-Jul-2025 25-Jul-2025 26-Jul-2025 scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/08/1952 kindly complete it. SCHEME COMPLETED View
1224 Kanpur Dehat Indian Hume Pipe 20025503 Karom 1 5 2400 2022 2037 2052 24-Aug-2022 31-Dec-2024 07-Nov-2023 01-Dec-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
1225 Ambedkar Nagar Vindhya-GAJA (JV) 20068979 KAROUDILALA WSS 5 7 4680 2023 2038 2053 08-Mar-2024 01-Sep-2025 31-Dec-2025 01-Feb-2026 Scheme completed and ready for O&M SCHEME COMPLETED View
1226 Farrukhabad Vindhya-GAJA (JV) 20094978 KARRAKA MVS 2 5 5002 2023 2038 2053 30-May-2025 20-Jul-2024 20-Jul-2024 21-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
1227 Fatehpur Gayatri Projects LTD 8360793 Karsawa 2 2 2278 2022 2037 2052 30-Jun-2025 26-Jun-2024 26-Aug-2023 27-Aug-2023 Trial & Run completed. It was initiated in the month of May (26.05.2023) and Regular water supply is given to the consumers. Verified View
1228 Ambedkar Nagar Vindhya-GAJA (JV) 20072738 KARTORA WSS 1 5 3300 2023 2038 2053 08-Mar-2024 02-Jul-2025 02-Jul-2025 03-Jul-2025 Scheme completed and ready for O&M Scheme Completed View
1229 Etawah Indian Hume Pipe 20021997 Karwa Bujurg pws 1 4 4250 2022 2037 2052 22-Sep-2023 10-Feb-2024 13-May-2024 14-May-2024 Forwarded for further action. All work of the scheme found satisfactory View
1230 Sultanpur Vindhya-GAJA (JV) 20069822 KASAIPUR WATER SUPPLY SCHEME 2 2 3020 2023 2038 2053 05-Feb-2024 28-Dec-2024 01-Apr-2025 02-Apr-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements and O&M start date 01/08/2025 View
1231 Amethi Vindhya-GAJA (JV) 20066590 KASARA&PATAPUR VILLAGE WATER SUPLLY SCHEME 2 19 3847 2023 2038 2053 06-Jan-2024 09-Nov-2024 09-Feb-2025 10-May-2025 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
1232 Auraiya GVPR 20091177 Kasba senganpur & Aima senganpur 3 3 5791 2023 2038 2053 06-Jan-2022 31-Dec-2024 25-May-2024 27-May-2024 Forwarded for further action. All work of scheme found satisfactory. View
1233 Fatehpur Power Mech Projects Ltd 20102050 KASERUWA 1 10 2670 2023 2038 2053 23-Jan-2025 27-Oct-2025 27-Feb-2026 28-Feb-2026 Trial & Run completed. It was initiated in the month of November (28.11.2025) and Regular water supply is given to the consumers. HGJ certificate not signed by Panchayat secretary. Verified View
1234 Auraiya GVPR 20084721 Kashari 2 1 1705 2023 2038 2053 01-Jun-2022 30-Jun-2024 13-May-2024 30-Jun-2024 Forwarded for further action. All work of scheme found satisfactory. View
1235 Bijnor LC INFRA 20019380 Kashmiri Abbunasarpur Water Supply 1 1 4356 2022 2037 2052 10-Feb-2022 17-Oct-2024 17-Oct-2024 18-Oct-2024 Everything is completed. All document complete View
1236 Meerut Power Mech Projects Ltd 20020256 KASIMPUR 1 1 3464 2022 2037 2052 31-Dec-2024 11-Dec-2023 26-Apr-2024 10-Oct-2024 Recommended for further Approvals. Approved View
1237 Raebareli NCC Ltd. 20062144 KASNA WATER SUPPLY SCHEME 1 2 1272 2022 2037 2052 04-Aug-2024 21-Jul-2024 21-Dec-2023 21-Nov-2024 Ok Ok View
1238 Shahjahanpur NCC Ltd. 20084148 KASRAK GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 1 2 2810 2022 2037 2052 31-Dec-2024 22-Aug-2024 21-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kasrak scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Kasrak scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1239 Meerut Power Mech Projects Ltd 20076633 KASTALA SHAMSHERNAGAR 1 1 4102 2022 2037 2052 31-Dec-2024 06-Jun-2025 05-Jun-2025 06-Jun-2025 Recommended for further Approvals. approved View
1240 Etawah Indian Hume Pipe 20022492 Katahara PWS 1 6 2635 2022 2037 2052 22-Sep-2023 29-Feb-2024 29-Feb-2024 01-Mar-2024 Forwarded for further action. All work of scheme found satisfactory View
1241 Shahjahanpur NCC Ltd. 20019814 Kataiya 2 2 2900 2022 2037 2052 31-Dec-2024 03-May-2024 06-Aug-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the Kataiya WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. SWSM/BLG/JJM/26-27/371 for further necessary action. All information on the portal for the completion certificate of Kataiya have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1242 Kanpur Dehat GVPR 20077252 KATEHI 1 3 1501 2023 2038 2053 17-Feb-2024 27-Nov-2023 11-Apr-2024 12-Apr-2024 Forward for further necessary action pls All work of scheme found satisfactory View
1243 Kanpur Dehat Indian Hume Pipe 20012659 Katethi 1 2 2960 2022 2037 2052 13-Oct-2021 31-Dec-2024 31-Aug-2023 01-Sep-2023 FORWARD FOR FURTHER NECESSRY ACTION PLS. All work of scheme found satisfactory View
1244 Etawah Indian Hume Pipe 20015034 Kathamau 3 7 3455 2022 2037 2052 08-May-2023 17-Jul-2024 17-Jul-2024 18-Jul-2024 Forwarded for further action. All work of scheme found satisfactory. View
1245 Etawah Indian Hume Pipe 20026398 Kathgawan PWS 3 7 2975 2022 2037 2052 22-Sep-2023 25-Jan-2024 01-May-2024 02-May-2024 Forwarded for further action. All work of scheme found satisfactory View
1246 Kanpur Dehat GVPR 20077446 KATHIKA 2 2 1729 2023 2038 2053 17-Feb-2024 18-Dec-2023 02-May-2024 03-May-2024 Forward for further necessary action pls All work of scheme found satisfactory View
1247 Shahjahanpur NCC Ltd. 20015647 kathpura 3 3 1820 2022 2037 2052 04-Jan-2024 31-Dec-2024 04-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kathpura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Kathpura scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1248 Kanpur Dehat Indian Hume Pipe 20064922 Kathra 1 2 1800 2022 2037 2052 11-Jan-2024 31-Dec-2024 12-Aug-2023 13-Aug-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
1249 Shahjahanpur NCC Ltd. 20019484 Katia Bujurg 1 2 4081 2022 2037 2052 31-Dec-2024 13-Apr-2024 13-Jul-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the Katia Bujurg WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. JJM/BLG/CLU-05/2026-2027/50 for further necessary action. All information on the portal for the completion certificate of Katia Bujurg have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1250 Shahjahanpur NCC Ltd. 20015877 Katia Rajjab 2 2 2890 2022 2037 2052 04-Jan-2024 31-Dec-2024 04-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Katia Rajjab scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Katiya Rajjab scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1251 Hardoi NCC Ltd. 8388602 KATKA 1 4 2667 2022 2037 2052 05-Mar-2023 29-Apr-2023 28-Jul-2023 24-Dec-2024 ok OK View
1252 Farrukhabad Vindhya-GAJA (JV) 20092014 KATRA RAHMAT KHAN SVS 1 1 3915 2023 2038 2053 30-May-2024 30-Jun-2024 30-Jun-2024 01-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
1253 Kannauj GVPR 20050202 KATRI AMINABAD & MAHAM BALIPUR & JALALPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 4 7 4142 2023 2038 2053 15-Jun-2024 28-Mar-2024 30-Jun-2024 01-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1254 Kannauj GVPR 20100928 KATRI GANGPUR GRAMM PANCHAYAT WATER SUPPLY SCHEME 2 2 1607 2023 2038 2053 14-Nov-2024 15-Nov-2024 19-Feb-2025 20-Feb-2025 forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1255 Meerut Power Mech Projects Ltd 20068993 KAUL & TIGRI 2 2 5344 2023 2038 2053 31-Dec-2024 25-May-2024 11-Oct-2024 12-Oct-2024 Recommended for further Approvals..... Approved View
1256 Meerut Power Mech Projects Ltd 20090144 KAUL RO 1 1 3396 2022 2037 2052 31-Dec-2024 15-Sep-2024 01-Feb-2025 02-Feb-2025 Recommended for further Approvals. approved View
1257 Kanpur Dehat Indian Hume Pipe 20034288 KAUSUM 1 3 3180 2022 2037 2052 24-Nov-2022 31-Dec-2024 30-Nov-2023 01-Dec-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
1258 Muzaffarnagar Gayatri Projects LTD 20022997 KAZI KHERA RO WSS 1 2 5417 2022 2037 2052 16-Sep-2022 25-Oct-2023 25-Jan-2024 26-Jan-2024 The details given by the contractor are correct at the time of approval. OK View
1259 Shahjahanpur NCC Ltd. 20019645 Kazipur 1 1 3830 2022 2037 2052 31-Dec-2024 16-Nov-2023 15-Feb-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kazipur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Kazipur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1260 Meerut Power Mech Projects Ltd 20012923 KAZMABAD GOON 1 1 5441 2052 2037 2052 31-Dec-2024 10-Mar-2023 27-Jul-2023 28-Nov-2024 CHECKED AND VERIFIED.... approved View
1261 Ambedkar Nagar Vindhya-GAJA (JV) 20047639 KEDRUPUR Water Supply Scheme 2 3 2340 2023 2038 2053 24-Nov-2022 24-Nov-2023 27-Jul-2025 28-Jul-2025 Scheme completed and ready for O&M Scheme Completed and Ready For O&M View
1262 Etawah Indian Hume Pipe 20026092 Kelamau PWS 1 2 1405 2022 2037 2052 22-Sep-2023 08-Jan-2024 16-Apr-2024 17-Apr-2024 Forwarded for further action. All work of scheme found satisfactory. View
1263 Mau LC INFRA 20064365 Keshour Sultanipur Village Water Supply Scheme 5 9 2269 2022 2037 2052 20-Jul-2024 02-May-2025 02-May-2025 05-May-2025 Approved. Approved. View
1264 Sultanpur UNIVERSAL MEP 20076900 KEVTLI WATER SUPPLY SCHEME 1 10 3570 2023 2038 2053 12-Jan-2024 12-Jan-2024 19-Mar-2025 02-Apr-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements and O&M Start Date 01/04/2025 View
1265 Jaunpur Welspun Kaveri Infraprojects JV 20023704 Kewatli Kalan 8 20 5840 2022 2037 2052 02-Mar-2024 28-May-2026 28-May-2026 29-May-2026 Checked and found ok............... ok View
1266 Ambedkar Nagar Vindhya-GAJA (JV) 20086834 KEWTALI WSS 6 9 4270 2023 2038 2053 23-Mar-2024 22-Mar-2025 22-Mar-2025 23-Mar-2025 CHECKED AND FOUND OK Scheme completed View
1267 Hardoi NCC Ltd. 20012368 KHAD KHRDA 1 7 6910 2022 2037 2052 26-Jul-2023 15-Apr-2023 14-Jul-2023 24-Dec-2024 ok OK View
1268 Kannauj GVPR 20067646 KHADANI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 7 6788 2023 2038 2053 08-Sep-2024 07-May-2024 10-Aug-2024 11-Aug-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1269 Fatehpur Power Mech Projects Ltd 20043846 Khadara 1 1 2985 2023 2038 2053 27-Nov-2023 20-Mar-2025 12-Aug-2025 13-Aug-2025 Trial & Run completed. It was initiated in the month of May (10.05.2025) and Regular water supply is given to the consumers. Verified View
1270 Balrampur Larsen & Toubro Ltd 20069285 Khagaijot Water Supply 1 6 4814 2022 2037 2052 27-Feb-2023 16-Dec-2025 16-Mar-2026 16-Mar-2026 After completion of all rectification works, the scheme should undergo a joint re-inspection and functional performance test by the Executing Agency/TKC, TPI, and UPJN Engineer. The O&M handover should be considered only after satisfactory closure of all observations, successful commissioning, verification of water supply in all intended habitations, confirmation of proper chlorination and pressure, and submission of all requisite technical documents and test certificates. Some FHTCs and other minor campus related works to be rectified. View
1271 Auraiya Indian Hume Pipe 8362634 KHAGIPUR 1 2 1455 2022 2037 2052 12-Oct-2022 20-Oct-2022 05-Nov-2022 05-Feb-2023 Forwarded for further action. All work of scheme fond satisfactory. View
1272 Shahjahanpur NCC Ltd. 20019225 Khai Kheda 3 3 2470 2022 2037 2052 31-Dec-2024 17-Oct-2023 16-Jan-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Khai Kheda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Khai Kheda W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1273 Meerut Power Mech Projects Ltd 20075252 KHAIKHERA & JAISINGHPUR 2 2 4309 2023 2038 2053 31-Dec-2024 14-Sep-2024 31-Jan-2025 01-Feb-2025 Recommended for further Approvals. Approved View
1274 Mau LC INFRA 20085366 KHAIRA NASIR PANCHAYAT WATER SUPPLY SCHEME 2 2 2440 2022 2037 2052 22-Mar-2025 05-May-2025 04-May-2025 05-May-2025 Approved.. Approved.. View
1275 Fatehpur Power Mech Projects Ltd 20089931 KHAIRABAD 2 2 2600 2023 2038 2053 13-Mar-2024 30-Jun-2025 12-Aug-2025 13-Aug-2025 Trial & Run completed. It was initiated in the month of May (10.05.2025) and Regular water supply is given to the consumers. HGJ certificate not signed by panchayat secretary. Verified View
1276 Bijnor Vindhya-GAJA (JV) 20020694 Khairullapur Bila Ahatmali Gram Panchayat Water Supply 2 2 3491 2022 2037 2052 06-Jul-2023 25-Oct-2023 30-Apr-2024 01-May-2024 every thing completed Everything Completed View
1277 Kannauj GVPR 20100932 KHAJUHA GRAMM PANCHAYAT WATER SUPPLY SCHEME 1 1 1271 2023 2038 2053 14-Nov-2024 16-Apr-2024 19-Jul-2024 20-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1278 Ambedkar Nagar Vindhya-GAJA (JV) 20019943 Khajuri 2 3 3780 2023 2038 2053 04-Aug-2022 03-Aug-2023 02-Dec-2024 03-Dec-2024 Checked and found OK SCHEME COMPLETED View
1279 Kanpur Dehat Indian Hume Pipe 20034272 KHAJURRA 1 3 2845 2022 2037 2052 24-Nov-2022 31-Dec-2024 31-Mar-2024 01-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1280 Meerut Power Mech Projects Ltd 20090411 KHALIDPUR - DEDUPUR 2 2 3083 2023 2038 2053 31-Dec-2024 02-Apr-2024 19-Aug-2024 07-Nov-2024 checked and verified approved View
1281 Bijnor Vindhya-GAJA (JV) 20048038 Khalilullahpur Water Supply Scheme 1 1 3142 2023 2038 2053 06-Jul-2023 19-May-2024 19-Nov-2024 20-Nov-2024 Every thing complete. Everything Complete View
1282 Ambedkar Nagar Vindhya-GAJA (JV) 20073277 KHALISHPUR BHATAULI WSS 1 15 6210 2023 2038 2053 20-Feb-2024 25-May-2026 04-Sep-2026 25-Sep-2026 Checked and found ok. Scheme completed and ready for O&M View
1283 Jaunpur AFCONS 20056817 KHALISPUR KHURD VILLAGE WATER SUPPLY SCHEME 2 7 3492 2023 2038 2053 22-Jan-2024 12-Mar-2026 12-Mar-2026 13-Mar-2026 Checked and found ok.. Ok View
1284 Farrukhabad Vindhya-GAJA (JV) 20093064 KHAN PUR SVS 1 3 6004 2023 2038 2053 30-May-2025 03-Jul-2024 03-Jul-2024 04-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
1285 Kannauj GVPR 20036138 KHANDE DEWAR GRAMIN PEYJAL YOJNA 1 1 3937 2023 2038 2053 13-May-2024 25-Mar-2024 27-Jun-2024 28-Jun-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1286 Shahjahanpur NCC Ltd. 20014808 Khandsar 1 1 2900 2022 2037 2052 22-Jul-2023 31-Dec-2024 27-Oct-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Khandsar scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Khandsar scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1287 Gautam Buddha Nagar LC INFRA 8368514 Khangauda W/S Scheme 1 1 3203 2022 2037 2052 20-Mar-2023 07-Feb-2024 30-Mar-2024 01-Apr-2024 Actual Executed Cost Verified based on Approved Variation Statement. all work has been completed. View
1288 Hardoi NCC Ltd. 20012358 Khanigawan Kalan 2 3 1900 2022 2037 2052 26-Jul-2023 20-Mar-2023 21-Jun-2023 07-Dec-2024 ok OK View
1289 Meerut Power Mech Projects Ltd 20066703 KHANPUR BANGER 1 1 4338 2023 2038 2053 31-Dec-2024 20-Mar-2024 06-Aug-2024 05-Oct-2024 Recommended for further Approvals. approved View
1290 Kanpur Dehat GVPR 20094174 khanpur chain kamalpur 2 7 4303 2023 2038 2053 14-Mar-2024 24-Dec-2023 08-May-2024 09-May-2024 Forward for further necessary action pls All work of scheme found satisfactory View
1291 Azamgarh LC INFRA 20053493 Khanpur Chitrawal Rural Water Supply Scheme 2 3 3635 2023 2038 2053 28-May-2024 10-Mar-2024 13-Jun-2024 14-Jun-2024 OK OK View
1292 Shahjahanpur NCC Ltd. 20013851 Khanpur Deha 1 1 2380 2022 2037 2052 31-Dec-2024 22-Oct-2023 21-Jan-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Khanpur Deha WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Khanpur Deha WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1293 Bijnor LC INFRA 8360411 KHANPUR KHADAR VILLAGE WATER SCHEME 1 1 8049 2022 2037 2052 02-Nov-2023 26-Jun-2024 24-Dec-2024 25-Dec-2024 Every thing complete. check View
1294 Meerut Power Mech Projects Ltd 20020251 KHANUDA 1 1 2963 2022 2037 2052 31-Dec-2024 15-Jul-2024 01-Dec-2024 17-Dec-2024 Recommended for further Approval approved View
1295 Bahraich PNC-SPML-JV 20016081 KHAPURWA PHAKARPUR PWS 1 6 5301 2022 2037 2052 31-Dec-2025 18-Oct-2025 14-Sep-2024 18-Oct-2025 Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/10/0502, kindly complete it. Scheme Completed with observation View
1296 Sultanpur UNIVERSAL MEP 20066066 KHARA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 11 3965 2023 2038 2053 12-Jan-2024 31-Dec-2024 21-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements. View
1297 Kannauj GVPR 20050190 KHARAULI GRAM PANCHAYAT WATER SUPPLY SCHEME 2 2 2815 2023 2038 2053 15-Jun-2024 11-Mar-2024 12-Jun-2024 13-Jun-2024 forwarded for further action. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
1298 Amethi Gayatri Projects LTD 20034270 Kharawa water supply scheme 2 8 3349 2022 2037 2052 06-May-2024 09-Jun-2024 15-Sep-2024 11-Nov-2024 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
1299 Meerut Power Mech Projects Ltd 20013186 KHARDONI SHEKHPUR 1 1 7293 2022 2037 2052 31-Dec-2024 15-Jun-2023 02-Nov-2023 07-Oct-2024 Recommended for further Approvals. approved View
1300 Shahjahanpur NCC Ltd. 20014811 KHARKHARI 3 3 2480 2022 2037 2052 31-Dec-2024 04-Jan-2024 04-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the KHARKHARI WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. SWSM/BLG/JJM/26-27/416 for further necessary action. All information on the portal for the completion certificate of KHARKHARI Wss have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1301 Ambedkar Nagar Vindhya-GAJA (JV) 20067918 KHARUWAIYA Water Supply Scheme 3 10 3220 2023 2038 2053 10-Mar-2024 15-Aug-2025 04-Jan-2026 05-Jan-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
1302 Fatehpur Power Mech Projects Ltd 20097927 KHASMAU & BRAMANPUR 3 9 9040 2023 2038 2053 26-Sep-2023 25-Sep-2024 18-Dec-2024 19-Dec-2024 Trial & Run completed. It was initiated in the month of September(19.09.2024) and Regular water supply is given to the consumers. Verified View
1303 Bijnor Vindhya-GAJA (JV) 20088836 Khasour Water Supply Scheme 1 1 1826 2023 2038 2053 06-Jul-2023 05-Apr-2025 05-Oct-2025 06-Oct-2025 Every thing complete. Check Document View
1304 Meerut Power Mech Projects Ltd 8362750 KHASPUR 1 1 2653 2022 2037 2052 31-Dec-2024 27-Jan-2023 15-May-2023 30-Jan-2025 Recommended for further Approval approved View
1305 Ambedkar Nagar Vindhya-GAJA (JV) 20026052 KHASPUR DADUPATTI WATER SUPPLY SCHEME 3 5 4630 2023 2038 2053 28-Sep-2023 01-Nov-2025 01-Nov-2025 20-Nov-2025 Scheme completed and ready for O&M Scheme Completed View
1306 Meerut Power Mech Projects Ltd 20082592 KHATA SAKOTI 2 2 6207 2023 2038 2053 31-Dec-2024 25-Sep-2024 15-Feb-2025 16-Feb-2025 Recommended for further Approvals. Approved View
1307 Meerut Power Mech Projects Ltd 20098084 KHATKI 1 1 4251 2023 2038 2053 31-Dec-2024 18-Mar-2024 04-Aug-2024 17-Oct-2024 Recommended for further Approvals. Approved View
1308 Ambedkar Nagar Vindhya-GAJA (JV) 20035272 KHATMIPUR WSS 1 7 2420 2023 2038 2053 21-Oct-2023 28-Dec-2024 26-Dec-2024 28-Mar-2025 Scheme completed and ready for O&M Scheme Completed View
1309 Meerut Power Mech Projects Ltd 20090111 KHAWAJAHANPUR 1 1 964 2023 2038 2053 31-Dec-2024 03-Jun-2025 24-Oct-2024 25-Oct-2024 Recommended for further Approvals. Approved View
1310 Fatehpur Power Mech Projects Ltd 20097822 KHAWAJIPUR SEMRAIYA 2 2 2170 2023 2038 2053 20-Sep-2024 11-Nov-2024 11-Nov-2024 12-Nov-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of August (12.08.2024) and Regular water supply is given to the consumers. Verify View
1311 Meerut Power Mech Projects Ltd 20083011 KHEJURI ALYARPUR 1 1 8367 2022 2037 2052 05-Jan-2024 31-Dec-2024 25-May-2024 07-Oct-2024 Recommended for further Approval Approved View
1312 Fatehpur Power Mech Projects Ltd 20095866 KHEOKHARI&BEYOTI 2 3 2910 2023 2033 2058 14-May-2024 30-Jun-2025 29-Apr-2025 30-Apr-2026 Work has been completed. Trial & Run also completed. It was initiated in the month of January(30.01.2025) and Regular water supply is given to the consumers. Verified View
1313 Shahjahanpur NCC Ltd. 20023922 Khera Rath 2 2 2786 2022 2037 2052 31-Dec-2024 21-Feb-2024 22-May-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the Khera Rath WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. SWSM/BLG/JJM/26-27/437 for further necessary action. All information on the portal for the completion certificate of Khera Rath Wss have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1314 Meerut Power Mech Projects Ltd 20011051 KHERI KALAN 1 1 2146 2022 2037 2052 31-Dec-2024 24-Feb-2023 12-Jul-2023 13-Dec-2024 Recommended for further Approval approved View
1315 Meerut Power Mech Projects Ltd 20066793 KHERI MANIHAR 1 1 3806 2023 2038 2053 31-Dec-2024 12-Aug-2024 29-Dec-2024 30-Dec-2024 Recommended for further Approvals. Approved View
1316 Meerut Power Mech Projects Ltd 8362770 KHERI TAPPA LAWAR 1 1 2716 2022 2037 2052 31-Dec-2024 15-Apr-2023 02-Sep-2023 17-Feb-2025 Recommended for Further Approval approved View
1317 Sant Ravidas Nagar Welspun Kaveri Infraprojects JV 20017022 KHETALPUR MULTI VILLAGE WATER SUPPLY SCHEME 3 3 2280 2022 2037 2022 30-Jul-2025 30-Jul-2025 31-Oct-2025 01-Nov-2025 All related documents reviewed and found in accordance to the guide line of JJM. All documents reviewed and found in compliance with JJM guidelines. View
1318 Farrukhabad Vindhya-GAJA (JV) 20091744 KHINMINI & SADIKPUR 2 9 8356 2023 2038 2053 30-May-2025 30-Jun-2024 30-Jun-2024 01-Jul-2024 All the parameters of scheme verified can take in O&M. Ok View
1319 Kannauj GVPR 20036300 KHIRIYA GRAMIN PEYJAL YOJNA 1 7 4841 2023 2038 2053 13-May-2024 25-Mar-2024 27-Jun-2024 28-Jun-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1320 Shahjahanpur NCC Ltd. 20015851 Khiriya pathak 1 1 1870 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Khiriya Pathak WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Khiriya pathak WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1321 Meerut Power Mech Projects Ltd 20098113 KHIRWA JALALPUR 1 1 8473 2022 2037 2052 31-Dec-2024 06-Jul-2024 26-Nov-2024 27-Nov-2024 Recommended for further Approvals. approved View
1322 Meerut Power Mech Projects Ltd 20076746 KHIRWA NAUABAD 1 1 2498 2023 2038 2053 31-Dec-2024 13-Aug-2024 02-Jan-2025 03-Jan-2025 Recommended for further Approvals. approved View
1323 Bijnor LC INFRA 20018238 Khizarpur Water Supply 4 4 3335 2022 2037 2052 02-Sep-2022 18-Nov-2024 18-Nov-2024 19-Nov-2024 Everything Complete. Everything Completed View
1324 Sultanpur UNIVERSAL MEP 20066658 KHOKHIPUR & BUKUNPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 3 9 10050 2023 2038 2053 18-Jul-2024 01-Mar-2025 02-Jun-2025 01-Aug-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
1325 Meerut Power Mech Projects Ltd 20098178 KHORRAI-DAYALPUR 2 2 2705 2023 2038 2053 11-Jun-2025 16-Oct-2024 07-Mar-2025 08-Mar-2025 Recommended for further Approval Approved View
1326 Kannauj GVPR 20036895 KHOZI PUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 4 5767 2023 2038 2053 14-Nov-2024 07-Apr-2024 11-Jul-2024 12-Jul-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1327 Bahraich PNC-SPML-JV 20017532 KHUDA DADBHARI RISIA PWS 1 3 5128 2022 2037 2052 31-Dec-2025 19-Nov-2025 19-Nov-2025 20-Nov-2025 Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/12/0038, kindly complete it. Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/12/0038, kindly complete it. View
1328 Ambedkar Nagar Vindhya-GAJA (JV) 20047651 KHUDA MOHAMMAD GARH Water Supply Scheme 1 7 4270 2023 2038 2053 23-Nov-2023 18-Jan-2026 18-Jan-2026 24-Jan-2026 Scheme completed and ready for O&M Scheme Completed View
1329 Farrukhabad Vindhya-GAJA (JV) 20080824 KHUDNA DHAMGAWAN SVS 1 2 3152 2023 2038 2053 31-Mar-2025 25-Nov-2024 09-Mar-2025 13-May-2025 All the parameters ok ok View
1330 Bijnor LC INFRA 20014032 KHURAHERY WATER SUPPLY SCHEME 2 2 3417 2022 2037 2052 02-Nov-2023 03-Jul-2024 31-Dec-2024 01-Jan-2025 Every thing completed. Everything Complete. View
1331 Bijnor Vindhya-GAJA (JV) 20023889 Khurrampur Dallu Gram Panchayat Water Supply 3 3 2836 2023 2038 2053 06-Jul-2023 19-May-2025 19-Nov-2025 20-Nov-2025 Every thing complete. check View
1332 Farrukhabad Vindhya-GAJA (JV) 20074156 KHWAJA AHMAD PUR KATIYA SVS 1 3 2335 2023 2038 2053 30-May-2025 11-Feb-2024 26-May-2024 27-May-2024 All the parameters of scheme verified can take in O&M. ok View
1333 Etawah Indian Hume Pipe 20015029 Kiratpur 2 2 2530 2022 2037 2052 12-Sep-2022 10-Nov-2023 20-Apr-2024 25-Apr-2024 Forwarded for further action. All work of the scheme found satisfactory View
1334 Auraiya GVPR 20093725 Kiratpur PWS 1 1 1341 2023 0 0 01-Jun-2022 14-Oct-2025 13-Oct-2025 15-Oct-2025 Forwarded for further action. All work of scheme fond satisfactory. View
1335 Bijnor Vindhya-GAJA (JV) 20038639 Kirto Nangli Gram Panchayat Water Supply 1 1 2539 2023 2038 2053 06-Jul-2023 04-May-2025 04-Nov-2024 05-Nov-2025 Every thing complete. check View
1336 Kannauj GVPR 20100930 KISHAI JAGDISH PUR GRAMM PANCHAYAT WATER SUPPLY SCHEME 1 11 5371 2023 2038 2053 14-Nov-2024 07-May-2024 10-Aug-2024 11-Aug-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1337 Meerut Power Mech Projects Ltd 20011296 KISHANPUR BIRANA 1 1 3047 2022 2037 2052 31-Dec-2024 25-Jan-2023 14-Jun-2023 30-Dec-2024 Recommended for further Approval approved View
1338 Meerut Power Mech Projects Ltd 8362954 KISHORPUR 3 3 2366 2022 2037 2052 31-Dec-2024 16-Aug-2024 06-Jan-2005 07-Jan-2025 Recommended for further Approval Approved View
1339 Kanpur Dehat Indian Hume Pipe 20013583 Kishorpur 2 3 2100 2022 2037 2052 05-Feb-2022 04-Feb-2022 31-Aug-2023 01-Sep-2023 Forward for further action All work of scheme found satisfactory View
1340 Kannauj GVPR 20090094 KISHUNPUR BASANT GRAM PANCHAYAT WATER SUPPLY SCHEME 1 5 1677 2023 2038 2053 08-Sep-2024 03-May-2024 07-Aug-2024 08-Aug-2024 forwarded for further action All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
1341 Amethi Welspun Kaveri Infraprojects JV 8362316 KISUNPUR KEWAE 1 7 2970 2022 2037 2052 10-Apr-2023 31-Oct-2024 10-Aug-2024 01-Feb-2025 All things found satisfactory in the Scheme and finalized for Operation And Maintenance Approved View
1342 Meerut Power Mech Projects Ltd 20011048 KITHOLI 1 1 4118 2022 2037 2052 31-Dec-2024 23-Aug-2023 27-Dec-2023 26-Dec-2024 CHECKED AND VERIFIED.... approved View
1343 Meerut Power Mech Projects Ltd 20098986 KITHOR RURAL WATER SUPPLY SCHEME 1 1 3756 2023 2038 2053 12-Aug-2024 11-Jun-2025 31-Dec-2024 01-Jan-2025 Recommended for further Approvals. approved View
1344 Bijnor Vindhya-GAJA (JV) 20091012 KIWAD WSS 1 1 5367 2023 2038 2053 06-Jul-2023 19-May-2025 19-Nov-2025 20-Nov-2025 Every thing complete. check View
1345 Fatehpur Gayatri Projects LTD 20026279 KODARPUR 2 3 1890 2022 2037 2052 29-Mar-2024 22-Mar-2024 22-Jun-2024 23-Jun-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of March (22.03.2024) and Regular water supply is given to the consumers. Verified View
1346 Fatehpur Power Mech Projects Ltd 20097727 KODARWAR ,TAUARA 5 5 4810 2023 2038 2053 14-May-2024 30-Jun-2025 15-Sep-2025 16-Sep-2025 Trial & Run completed. It was initiated in the month of June (16.06.2025) and Regular water supply is given to the consumers. Verified View
1347 Ambedkar Nagar Vindhya-GAJA (JV) 20033707 KODRA WATER SUPPLY SCHEME 1 1 4250 2023 2038 2053 21-Oct-2023 14-Sep-2024 18-Feb-2025 19-Feb-2025 Checked and found OK SCHEME COMPLETED View
1348 Bijnor LC INFRA 20019388 Kodupura Water Supply 1 1 1996 2022 2037 2052 31-Jul-2025 31-Mar-2026 31-Jul-2025 01-Aug-2025 Every thing complete. Check Document View
1349 Meerut Power Mech Projects Ltd 20068971 KOHLA , MUBARIKPUR & SAIDIPUR SETH 3 3 5912 2023 2038 2053 31-Dec-2024 25-Jul-2024 11-Dec-2024 13-Dec-2024 Recommended for further Approvals. approved View
1350 Amethi Vindhya-GAJA (JV) 20070889 KOHRA WATER SUPPLY SCHEME 1 13 5091 2023 2038 2053 08-Feb-2023 16-Dec-2024 16-Mar-2025 17-Jun-2025 Hardcopy submitted and found okay as per the submitted documents. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance.. View
1351 Hardoi NCC Ltd. 20011914 Koilara 3 3 2530 2022 2037 2052 15-Jun-2023 08-Nov-2023 09-Feb-2024 22-Nov-2024 OK OK View
1352 Bahraich PNC-SPML-JV 8362948 KOLUHA GRAM PANCHAYAT RURAL DRINKING WATER SUPPLY SCHEME 1 1 5670 2022 2037 2052 30-Jun-2025 15-Apr-2025 14-Feb-2024 16-Apr-2025 ok SCHEME COMPLETED View
1353 Shahjahanpur NCC Ltd. 20084487 KONP GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 3 3 2080 2022 2037 2052 31-Dec-2024 10-Aug-2024 09-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the KONP WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. SWSM/BLG/JJM/26-27/372 for further necessary action. All information on the portal for the completion certificate of KONP GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1354 Bijnor Vindhya-GAJA (JV) 20048563 Kookara Islampur Village Water Supply Scheme 2 2 2715 2023 2038 2053 06-Jul-2023 20-Nov-2024 20-May-2025 21-May-2025 Every thing complete. Document complete View
1355 Amethi Vindhya-GAJA (JV) 20070871 KORARI GIRDHAR SHAH WATER SUPPLY SCHEME 1 10 3130 2023 2038 2053 08-Feb-2023 22-Dec-2024 23-Mar-2025 16-Jun-2025 d All things found satisfactory in the Scheme and finalized for Operation And Maintenance All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance.. View
1356 Kanpur Dehat Indian Hume Pipe 20034283 KORAUWA 1 1 2600 2022 2037 2052 23-Nov-2023 31-Dec-2024 31-May-2023 01-Jun-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
1357 Kanpur Dehat GVPR 20025222 Korhwa 1 4 3833 2023 2038 2053 26-Sep-2023 02-Feb-2023 18-Jun-2023 19-Jun-2023 Forward for necessary action pls All work of scheme found satisfactory View
1358 Sultanpur UNIVERSAL MEP 20091196 KORO GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 1928 2023 2038 2053 22-Mar-2024 22-Mar-2024 28-Nov-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
1359 Ayodhya UNIVERSAL MEP 20058447 Kotara WSS 2 2 2990 2023 2038 2053 12-Oct-2023 14-Apr-2024 14-Apr-2024 15-Nov-2024 Found ok Found Correct View
1360 Sultanpur Vindhya-GAJA (JV) 20069307 KOTHARAKHURD & PAKARI KALAN WATER SUPPLY SCHEME 3 12 3330 2023 2038 2053 05-Feb-2024 05-Feb-2025 31-Jan-2026 28-Apr-2026 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements View
1361 Amethi Vindhya-GAJA (JV) 20085690 KOTWAR MAU WATER SUPPLY SCHEME 1 8 1969 2023 2038 2053 29-Apr-2024 21-Jun-2024 21-Sep-2024 22-Dec-2024 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
1362 Shahjahanpur NCC Ltd. 20100172 KUAN DANDA GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME 1 1 1330 2022 2037 2052 31-Dec-2024 20-May-2024 19-Aug-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of KUAN DANDA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of KUAN DANDA GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1363 Farrukhabad Vindhya-GAJA (JV) 20076673 KUBERPUR JUNNARDAR SVS 1 4 2479 2023 2038 2053 31-Mar-2025 21-Dec-2024 04-Apr-2025 13-May-2025 Ok.. ok View
1364 Farrukhabad Vindhya-GAJA (JV) 20076921 KUBERPUR SVS 1 2 4333 2023 2038 2053 30-May-2025 04-Jun-2024 04-Jun-2024 05-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
1365 Etawah Indian Hume Pipe 20015144 Kudariya 1 4 3450 2022 2037 2052 12-Oct-2022 29-Dec-2023 14-Apr-2024 15-Apr-2024 Forwarded for further action. All work of the scheme found satisfactory. View
1366 Kanpur Dehat GVPR 20025196 Kudauli Madauli 1 3 3086 2023 2038 2053 26-Sep-2023 05-Dec-2023 19-Mar-2024 20-Mar-2024 TKC unable to submit the calibration certificate and other report for O&M and some work pending (Road restoration, Painting work {Pump House, Boundary wall & Gate}, Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work. All work of scheme found satisfactory View
1367 Kanpur Dehat GVPR 20065136 KUDHAWAL & SALEMPUR 2 0 3198 2023 2038 2053 18-Jan-2024 22-Dec-2023 30-Mar-2024 31-Mar-2024 Forward for further necessary action All work of scheme found satisfactory View
1368 Bijnor LC INFRA 8360410 KUDI BANGAR VILLAGE WATER SUPPLY SCHEME 2 2 3526 2022 2037 2052 10-Feb-2022 11-Apr-2024 09-Jun-2024 10-Jun-2024 Every thing complete. complete Document View
1369 Shahjahanpur NCC Ltd. 20057626 KUDIRNA WSS 1 1 3060 2022 2037 2052 31-Dec-2024 05-Aug-2024 04-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the KUDIRNA WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. SWSM/BLG/JJM/26-27/456 for further necessary action. All information on the portal for the completion certificate of KUDIRNA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1370 Kanpur Dehat GVPR 20053524 KUIT KHEDA 1, SARIYAPUR 3 2 4209 2023 2038 2053 18-Nov-2023 15-Dec-2023 25-Mar-2024 26-Mar-2024 TKC unable to submit the calibration certificate and other report for O&M and some work pending (Road restoration, Grouting. Ref. SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's and complete the Balance work. All work of scheme found satisfactory View
1371 Hardoi NCC Ltd. 20000039 KUIYAN 1 3 2180 2022 2037 2052 29-Apr-2023 12-Jun-2023 11-Sep-2023 24-Dec-2024 ok OK View
1372 Auraiya GVPR 20100433 Kukarkat PWS 1 4 3225 2023 2038 2053 01-Jun-2022 30-Mar-2025 19-Feb-2024 31-Mar-2025 Forwarded for further action. All work of scheme found satisfactory. View
1373 Meerut Power Mech Projects Ltd 20020947 KULANJAN 2 2 6001 2022 2037 2052 31-Dec-2024 24-Jan-2024 11-Jun-2024 31-Dec-2024 Recommended for further Approval approved View
1374 Shahjahanpur NCC Ltd. 20014799 KULUA BOJH 1 2 2199 2022 2037 2052 31-Dec-2024 31-Aug-2023 30-Nov-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kulua Bojh scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of kulua bojh scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1375 Ghaziabad LC INFRA 20023602 KUMHAIDA - AMIRPUR GARHI PWS SCHEME 2 2 6021 2022 2037 2052 30-Aug-2023 31-Dec-2024 30-Apr-2025 01-May-2025 Actual Executed Cost Verified based on approved variation statement All work completed and approved View
1376 Shahjahanpur NCC Ltd. 20016572 KUMHRUA 3 4 2720 2022 2037 2052 31-Dec-2024 04-Jan-2024 04-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Kumhrua WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of KUMHRUA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1377 Amethi Welspun Kaveri Infraprojects JV 20013731 Kundanpur Water Supply Scheme 2 3 2490 2022 2037 2052 10-Apr-2023 01-Oct-2024 01-Oct-2024 25-Aug-2025 All things found satisfactory in the Scheme and finalized for Operation And Maintenance All things found satisfactory in the Scheme and finalized for Operation And Maintenance. View
1378 Bahraich PNC-SPML-JV 20099695 KUNDASAR KAISARGANJ RF PWS 1 5 5990 2022 2037 2052 31-Dec-2025 20-Nov-2025 20-Nov-2025 21-Nov-2025 Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/12/0364, kindly complete it. Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/12/0364. View
1379 Etawah Indian Hume Pipe 20058721 Kundol 1 2 3770 2022 2037 2052 05-Jan-2024 15-Jun-2024 17-Sep-2024 18-Sep-2024 Forwarded for further action. All work of scheme found satisfactory View
1380 Meerut Power Mech Projects Ltd 20010929 KUNEHRA 2 2 3257 2022 2037 2052 31-Dec-2024 15-Sep-2023 02-Feb-2024 16-Sep-2024 Recommended for further Approvals. approved View
1381 Meerut Power Mech Projects Ltd 20011107 KUNKURA 1 1 4012 2022 2037 2052 31-Dec-2024 17-May-2024 10-Oct-2024 11-Oct-2024 Recommended for further Approvals. approved View
1382 Kannauj GVPR 20036523 KUNWAPUR KASHIDIN & TARIND GRAMIN PEYJAL YOJNA 5 7 4605 2023 2038 2053 08-Sep-2024 13-Apr-2024 16-Jul-2024 17-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1383 Kanpur Dehat Indian Hume Pipe 20094243 kunwarpur 1 1 1285 2022 2037 2052 02-Apr-2024 31-Dec-2025 11-Mar-2024 12-Mar-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1384 Kannauj GVPR 20067420 KUNWARPUR BANWARI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 4743 2023 2038 2053 16-Aug-2024 13-Apr-2024 16-Jul-2024 17-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1385 Kannauj GVPR 20067632 KUNWARPUR OR LODHPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 2117 2023 2038 2053 16-Aug-2024 16-Apr-2024 19-Jul-2024 20-Jul-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1386 Jhansi Indian Hume Pipe 8010037 Kuraicha GOV 74 74 164050 2023 2038 2053 30-Jun-2022 30-Sep-2024 06-Jan-2025 07-Jan-2025 checked approved View
1387 Farrukhabad Vindhya-GAJA (JV) 20076887 KURELI SVS 1 3 3200 2023 2038 2053 30-May-2025 18-Jan-2024 02-May-2024 03-May-2024 All the parameters of scheme verified can take in O&M. ok View
1388 Meerut Power Mech Projects Ltd 20011302 KURI KAMALPUR 1 1 1853 2022 2037 2052 31-Dec-2024 02-Feb-2023 20-Jun-2023 26-Dec-2024 Recommended for further Approval approved View
1389 Bahraich PNC-SPML-JV 20100942 KURSANDA JARWAL RF PWS 1 9 5670 2022 2037 2052 31-Mar-2028 09-Feb-2026 09-Feb-2026 10-Feb-2026 scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/12/0120. kindly complete it Scheme completed with observation View
1390 Jaunpur AFCONS 20059467 KUSAILA VILLAGE WATER SUPPLY SCHEME 3 5 3834 2023 2038 2053 16-Dec-2023 31-Dec-2026 25-Feb-2025 26-Feb-2025 Checked and found ok. ok View
1391 Ayodhya UNIVERSAL MEP 20031479 KUSHA HARI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 7 3730 2023 2038 2053 12-Oct-2023 30-Jan-2024 30-Jan-2024 15-Nov-2024 Found ok Found Correct View
1392 Meerut Power Mech Projects Ltd 20011235 KUSHAWALI 1 1 5911 2022 2037 2052 31-Dec-2024 20-May-2023 09-Oct-2023 07-Oct-2024 Recommended for further Approvals. Approved View
1393 Auraiya Indian Hume Pipe 20019894 KUSMARA PWS 1 5 2055 2022 2037 2052 14-Sep-2022 13-Apr-2024 24-Jun-2024 25-Jun-2024 Forwarded for further action. All work of scheme fond satisfactory. View
1394 Farrukhabad Vindhya-GAJA (JV) 20097993 KUTRA MVS 2 3 8122 2023 2038 2053 30-May-2025 11-Apr-2024 11-Apr-2024 12-Apr-2024 All the parameters of scheme verified can take in O&M. ok View
1395 Jaunpur AFCONS 20067233 KUTUBEECHAK & BHEURHA KALAN VILLAGE WATER SUPPLY SCHEME 6 12 6050 2023 2038 2053 04-Feb-2024 10-Jul-2025 10-Jul-2025 11-Jul-2025 Checked and found ok. Ok View
1396 Sultanpur UNIVERSAL MEP 20066874 KUTUBPUR & KATKAWLAI GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME 5 8 5680 2023 2038 2053 12-Jan-2024 31-Dec-2024 26-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements. View
1397 Jaunpur AFCONS 20026128 Kutubpur Wayer Supply Scheme 2 15 3650 2023 2038 2053 02-Sep-2023 28-May-2025 28-May-2025 29-May-2025 Checked and found ok... Ok View
1398 Hardoi NCC Ltd. 20012318 Kuwa Mau Simrauli 3 4 2480 2022 2037 2052 26-Jul-2023 18-Apr-2023 17-Jul-2023 25-Dec-2024 ok OK View
1399 Mau LC INFRA 20082414 KUWARPURWA GRAM PANCHAYAT WATER SUPPLY SCHEME 3 7 3170 2022 2037 2052 08-Aug-2025 29-Jan-2026 17-Sep-2025 29-Jan-2026 Approved Approved.. View
1400 Auraiya GVPR 20087928 Lachhiya Mau PWS 1 5 3918 2023 0 0 01-Jun-2022 08-Jan-2025 07-Feb-2025 09-Jan-2025 Forwarded for further action. All work of scheme fond satisfactory. View
1401 Ambedkar Nagar Vindhya-GAJA (JV) 20092923 LADILAPUR Water Supply Scheme 1 6 2240 2023 2038 2053 24-Mar-2023 31-Dec-2025 14-Apr-2026 01-May-2026 Scheme completed and ready for O&M Scheme Completed View
1402 Kanpur Dehat GVPR 20070043 laharpur 1 0 1433 2023 2038 2053 11-May-2024 10-Apr-2024 18-Jul-2024 19-Jul-2024 TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI KD/O&M/2025-26/6655 dt.29/07/2028/. Forward for further action All work of scheme found satisfactory View
1403 Ayodhya UNIVERSAL MEP 20030695 LAHRAPUR & PRANAPUR GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME 2 6 3620 2023 2038 2053 12-Oct-2023 31-Aug-2023 31-Aug-2023 15-Nov-2024 Found ok Found Correct View
1404 Bahraich PNC-SPML-JV 20035164 LAKHA BAUNDI GRAM PANCHAYAT WATER SCHEME 1 8 3447 2022 2037 2052 31-Dec-2025 27-Nov-2025 27-Nov-2025 28-Nov-2025 scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/02/0188. kindly complete it scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/02/0188. kindly complete it View
1405 Farrukhabad Vindhya-GAJA (JV) 20093157 LAKHAN PUR MVS 1 5 3447 2023 2038 2053 30-May-2025 18-Jan-2024 02-May-2024 03-May-2024 All the parameters of scheme verified can take in O&M. ok View
1406 Etawah Indian Hume Pipe 20026318 Lakhana Dehat PWS 1 4 3875 2022 2037 2052 22-Sep-2023 10-Jun-2024 13-Sep-2024 14-Sep-2024 Forwarded for further action. All work of scheme found satisfactory View
1407 Fatehpur Power Mech Projects Ltd 20085872 LAKHANKHEDA 1 2 2100 2023 2038 2053 14-Mar-2024 03-Dec-2024 10-Mar-2025 11-Mar-2025 Trial & Run completed. It was initiated in the month of December (10.12.2024) and Regular water supply is given to the consumers. Verified View
1408 Ambedkar Nagar Vindhya-GAJA (JV) 20019925 Lakhanpur 2 3 3830 2023 2038 2053 03-Aug-2023 02-Sep-2024 19-Mar-2025 20-Mar-2025 Checked and found ok Scheme completed View
1409 Auraiya GVPR 20084709 Lakhanpur PWS 1 3 3014 2023 2038 2053 01-Jun-2022 08-Jul-2024 06-Jul-2024 08-Jul-2024 Forwarded for further action. All work of scheme fond satisfactory. View
1410 Auraiya Indian Hume Pipe 20101388 Lakhi PWS 2 4 2050 2022 2037 2052 08-May-2023 01-May-2025 09-Aug-2025 10-Aug-2025 Forwarded for further action. All work of scheme fond satisfactory. View
1411 Farrukhabad Vindhya-GAJA (JV) 20091682 LAKHMI PUR & NINAUA MVS 3 3 2662 2023 2038 2053 30-May-2025 08-Jun-2024 08-Jun-2024 09-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
1412 Fatehpur Power Mech Projects Ltd 20100810 LAKHMIPUR 1 8 2530 2023 2038 2058 14-Aug-2023 13-Aug-2024 02-Sep-2024 02-Dec-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of September(02.09.2024) and Regular water supply is given to the consumers. Verified View
1413 Shahjahanpur NCC Ltd. 20077501 LAKHNAPUR WSS 1 1 2030 2023 2038 2053 31-Dec-2024 04-Jul-2024 03-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of LAKHNAPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of LAKHNAPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1414 Farrukhabad Vindhya-GAJA (JV) 20092484 LAKHRAUA MVS 2 2 1718 2023 2038 2053 30-May-2025 17-Jul-2024 17-Jul-2024 18-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
1415 Bijnor Vindhya-GAJA (JV) 20020666 Lalpur Man Gram Panchayat Water Supply 1 1 3300 2023 2038 2053 06-Jul-2023 30-May-2024 29-Nov-2024 30-Nov-2024 Every thing completed all work completed View
1416 Bahraich PNC-SPML-JV 20092602 LALPUR PAYAGPUR RETRO PWS 1 5 3588 2022 2037 2052 31-Dec-2025 07-Oct-2025 01-May-2024 08-Oct-2025 scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/10/0323 kindly complete it. SCHEME COMPLETED View
1417 Shahjahanpur NCC Ltd. 20014819 Lalpur Urf Baragaon 1 3 1950 2022 2037 2052 31-Dec-2024 31-Aug-2023 30-Nov-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Lalpur Urf Badagaon scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Lalpur Urf Baragaon scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1418 Farrukhabad Vindhya-GAJA (JV) 20080822 LALPURPATTI SVS 1 2 1507 2023 2038 2053 30-May-2025 28-Jan-2024 12-May-2024 13-May-2024 All the parameters of scheme verified can take in O&M. ok View
1419 Kanpur Dehat GVPR 20077571 LAMHARA NARSOOJHA 2 8 4031 2023 2038 2053 17-Feb-2024 07-Mar-2024 21-Jul-2024 22-Jul-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1420 Jaunpur Welspun Kaveri Infraprojects JV 20099650 Lapari Scheme-2 1 5 5115 2022 2037 2052 19-Oct-2024 14-Jul-2025 14-Jul-2025 15-Jul-2025 cheked and found ok. ok View
1421 Kanpur Dehat GVPR 20077297 Laruapur & Nandpur 4 4 4059 2023 2038 2053 17-Feb-2024 09-Jan-2024 14-Apr-2024 15-Apr-2024 TKC unable to submit the calibration certificate, our letter SWSM/BLG/TPI KD/O&M/2025-26/6655 dt.29/07/2028/. Forward for further necessary action pls. All work of scheme found satisfactory View
1422 Fatehpur Gayatri Projects LTD 20026282 LATIFPUR 1 1 1940 2022 2037 2052 29-Mar-2024 10-May-2023 10-Aug-2023 11-Aug-2023 Work has been completed. Trial & Run also completed. It was initiated in the month of May (10.05.2023) and Regular water supply is given to the consumers. Verified View
1423 Bijnor LC INFRA 20017125 Latifpur Bila Ahatmali Water Supply 1 1 3287 2022 2037 2052 02-Nov-2022 07-Dec-2023 05-Jun-2024 06-Jun-2024 every thing completed Everything Completed View
1424 Amethi Vindhya-GAJA (JV) 20101948 LAUKAPUR WATER SUPPLY SCHEME 1 1 1395 2023 2038 2053 04-Jul-2024 29-Jun-2024 29-Sep-2024 30-Dec-2024 Hardcopy submitted and found okay as per the submitted documents. Hardcopy submitted and found okay as per the submitted documents.. View
1425 Mau LC INFRA 20083037 LAUSHADH VILLAGE WATER SUPPLY SCHEME 1 5 3426 2022 2036 2052 20-Jul-2024 25-Apr-2025 25-Apr-2025 20-Sep-2025 Approved approve View
1426 Ambedkar Nagar Vindhya-GAJA (JV) 20019923 Lavaiya 1 6 2570 2023 2038 2053 03-Aug-2023 23-Jun-2025 14-Oct-2025 15-Oct-2025 SCHEME COMPLETED Scheme Completed View
1427 Auraiya GVPR 20095136 Lidhaura PWS 1 5 2431 2023 2038 2053 01-Jun-2022 10-Apr-2024 10-Apr-2024 11-Apr-2024 Forwarded for further action. All work of scheme fond satisfactory. View
1428 Fatehpur Power Mech Projects Ltd 20102036 LILRA 1 1 1630 2023 2038 2053 20-Sep-2024 13-Aug-2025 10-Jun-2025 11-Jun-2025 Minor work is pending. undertaking given by TKC. Trial & Run completed. It was initiated in the month of March (11.03.2025) and Regular water supply is given to the consumers. Verified View
1429 Kannauj GVPR 20050541 LILUIYA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 7 5059 2023 2038 2053 15-Jun-2024 28-Mar-2024 30-Jun-2024 01-Jul-2024 FORWRADED FOR FURTHER ACTION All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
1430 Kanpur Dehat Indian Hume Pipe 20034294 LODIPUR 1 3 3900 2022 2037 2052 24-Nov-2022 31-Dec-2024 29-Feb-2024 01-Mar-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1431 Auraiya GVPR 20091159 Lohiyapur PWS 1 2 3476 2023 2038 2053 01-Jun-2022 06-Apr-2025 05-Apr-2025 07-Apr-2025 Forwarded for further action. All work of scheme fond satisfactory. View
1432 Meerut Power Mech Projects Ltd 20058233 LOIYA 1 1 5144 2022 2037 2052 14-Aug-2024 15-Feb-2024 07-Jul-2024 08-Jul-2024 Recommended for further Approvals. approved View
1433 Kannauj GVPR 20067641 LOKPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 1 2692 2023 2038 2053 16-Aug-2024 30-Apr-2024 03-Aug-2024 04-Aug-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1434 Balrampur Larsen & Toubro Ltd 20016392 Luchuiya water supply scheme 1 5 3269 2022 2037 2052 30-Dec-2024 30-May-2024 30-Aug-2024 01-Sep-2024 ok Ok View
1435 Mau LC INFRA 20010884 Luduhi G P Water Supply Scheme 2 6 1844 2022 2037 2052 09-Feb-2024 01-Apr-2025 01-Apr-2025 02-Apr-2025 Approved Approved View
1436 Shahjahanpur NCC Ltd. 20015657 luhichi 3 3 2450 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Luhichi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Luhichi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1437 Meerut Power Mech Projects Ltd 20020258 MACHHRA 1 1 3776 2022 2037 2052 31-Dec-2024 22-May-2024 12-Oct-2024 13-Oct-2024 Recommended for further Approvals. approved View
1438 Meerut Power Mech Projects Ltd 20078495 MACHHRI 1 1 2264 2022 2037 2052 31-Dec-2024 15-Feb-2025 04-Jul-2025 05-Jul-2025 Recommended for further Approvals. approved View
1439 Ghaziabad LC INFRA 20070202 MACHHRI Village water supply scheme 1 1 1137 2022 2037 2052 27-Jan-2023 01-Jan-2025 31-Oct-2025 01-Nov-2025 Actual Executed Cost Verified based on approved variation statement. all work has been completed. Approved View
1440 Kanpur Dehat VSA 20095562 Madanpur 2 2 2258 2023 2038 2023 30-Apr-2023 31-Dec-2023 20-Jun-2024 21-Jun-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1441 Hardoi NCC Ltd. 20020997 MADARA 2 11 5510 2022 2037 2052 26-Jul-2023 17-Mar-2023 16-Jun-2023 24-Dec-2024 ok OK View
1442 Jaunpur AFCONS 20051436 MADARIPUR VILLAGE WATER SUPPLY SCHEME 3 26 3894 2023 2038 2053 17-Dec-2023 10-Jul-2025 10-Jul-2025 10-Jul-2025 checked and found ok..... Ok View
1443 Kanpur Dehat GVPR 20086507 madarpur gajiuddinpur 1 2 1267 2023 2038 2053 14-Mar-2024 23-Dec-2023 07-May-2024 08-May-2024 Forward for further necessary action pls All work of scheme found satisfactory View
1444 Kannauj GVPR 20077118 MADARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 2 1605 2023 2038 2053 08-Sep-2024 02-Nov-2024 04-Feb-2025 05-Feb-2025 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1445 Ambedkar Nagar Vindhya-GAJA (JV) 20033820 Madarpur Water supply scheme 1 2 2650 2023 2038 2053 21-Oct-2023 05-Sep-2024 07-Dec-2024 08-Dec-2024 Checked and found OK Scheme completed View
1446 Fatehpur Power Mech Projects Ltd 20097522 MADAULI 1 3 2213 2023 2033 2053 13-Aug-2024 30-Jun-2025 13-Mar-2025 14-Mar-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of December(14.12.2024) and Regular water supply is given to the consumers. Verified View
1447 Ambedkar Nagar Vindhya-GAJA (JV) 20081305 MADHAVARPUR WSS 1 5 4490 2023 2038 2053 22-Mar-2024 28-Aug-2025 24-Dec-2025 25-Dec-2025 Scheme completed and ready for O&M Scheme Completed View
1448 Sultanpur UNIVERSAL MEP 20091217 MADHAVPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 3 4 2796 2023 2038 2053 22-Mar-2024 29-Nov-2024 28-Feb-2025 01-Apr-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
1449 Auraiya GVPR 20088682 Madhawapur & marnai 1 6 5738 2023 2038 2053 01-Jun-2022 16-Mar-2025 15-Mar-2025 17-Mar-2025 Forwarded for further action. All work of scheme found satisfactory. View
1450 Ambedkar Nagar Vindhya-GAJA (JV) 20026090 MADHOPUR WATER SUPPLY SCHEME 1 3 3800 2023 2038 2053 28-Sep-2023 14-Jun-2024 05-Dec-2024 06-Dec-2024 Checked and found OK SCHEME COMPLETED View
1451 Auraiya Indian Hume Pipe 8361848 MADHUPUR 1 3 2145 2022 2037 2052 15-Sep-2021 25-Aug-2023 09-Dec-2023 10-Dec-2023 Forwarded for further action. All work of scheme found satisfactory. View
1452 Shahjahanpur NCC Ltd. 20026251 MADHWAMAI 2 2 2260 2022 2037 2052 31-Dec-2024 24-Jan-2024 24-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of MADHWAMAI WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of MADHWAMAI WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1453 Fatehpur Power Mech Projects Ltd 20079124 MADURI 2 3 1850 2023 2038 2053 13-Mar-2024 14-Oct-2024 14-Oct-2024 14-Oct-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of July (15.07.2024). Verified View
1454 Meerut Power Mech Projects Ltd 20010925 MAHADEO 1 1 4377 2022 2037 2052 31-Dec-2024 12-Dec-2023 30-Apr-2024 30-Jan-2025 Recommended for further Approval approved View
1455 Amethi Gayatri Projects LTD 20034318 Mahaiya Senduriya water supply scheme 1 6 5499 2022 2037 2052 03-May-2024 16-Jun-2024 19-Sep-2024 26-Nov-2024 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
1456 Meerut Power Mech Projects Ltd 20058252 MAHALKA 1 1 7765 2022 2037 2052 31-Dec-2024 20-Sep-2024 06-Feb-2025 07-Feb-2025 Recommended for further Approval approved View
1457 Meerut Power Mech Projects Ltd 20078402 MAHAMUDPUR SHIKHERA 1 1 2184 2023 2038 2053 31-Dec-2024 27-Jul-2024 14-Dec-2024 25-Jan-2025 Recommended for further Approval approved View
1458 Auraiya GVPR 20099285 Maharajpur Phaphoond PWS 1 1 256 2023 2038 2053 01-Jun-2022 29-Apr-2024 28-Apr-2024 30-Apr-2024 Forwarded for further action. All work of scheme found satisfactory. View
1459 Fatehpur Power Mech Projects Ltd 20097523 MAHAWATPUR ASHAT 1 4 2660 2023 2033 2053 14-May-2024 30-Jun-2025 18-Apr-2025 19-Apr-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of January(19.01.2025) and Regular water supply is given to the consumers. Verified View
1460 Amethi Vindhya-GAJA (JV) 20100650 MAHESH PUR WATER SUPPLY SCHEME 1 2 1632 2023 2038 2053 24-Apr-2024 18-Dec-2024 08-Mar-2025 09-Jun-2025 All things found satisfactory in the Scheme and finalized for Operation And Maintenance All things found satisfactory in the Scheme and finalized for Operation And Maintenance View
1461 Fatehpur Power Mech Projects Ltd 20097475 MAHESHPUR 1 1 558 2023 2038 2053 13-Jun-2023 30-Jun-2025 08-Dec-2024 09-Dec-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of September(09.09.2024) and Regular water supply is given to the consumers. Verified View
1462 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20008733 Maheshpur Mandap 5 9 5440 2022 2037 2052 07-Jul-2023 08-Jul-2025 08-Jul-2025 26-Nov-2025 Scheme completed and ready for O&M Scheme Completed and Ready For O&M View
1463 Ambedkar Nagar Vindhya-GAJA (JV) 20026150 MAHESPUR WATER SUPPLY SCHEME 3 13 3720 2023 2038 2053 28-Sep-2023 28-Oct-2025 30-Nov-2025 15-Feb-2026 Scheme completed and ready for O&M Scheme completed View
1464 Bijnor LC INFRA 20075954 Maheswari Village Water Supply 1 3 4960 2022 2037 2052 07-May-2024 07-May-2024 13-Sep-2024 14-Sep-2024 every thing completed Everything Completed View
1465 Amethi Welspun Kaveri Infraprojects JV 20013734 Mahimanpur Water Supply Scheme 2 6 3007 2022 2037 2052 10-Apr-2023 31-Dec-2024 14-Oct-2024 15-Oct-2024 Hardcopy submitted and found okay as per the submitted documents.. Hardcopy submitted and found okay as per the submitted documents.. View
1466 Farrukhabad Vindhya-GAJA (JV) 20092639 MAHMADPUR AMLAIYA & MEDASYAM PUR MVS 2 6 4333 2023 2038 2053 30-May-2025 24-Jun-2024 24-Jun-2024 25-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
1467 Shahjahanpur NCC Ltd. 20023908 Mahmadpur Saijania 1 1 3100 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mahmadpur Saijania WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Mahmadpur Saijania WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1468 Sultanpur UNIVERSAL MEP 20066375 MAHMANDI PUR GRAM PANCHAYAT WATER SUPPLY SCHEME 4 4 2375 2023 2038 2053 12-Jan-2024 12-Jan-2024 30-Jun-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
1469 Shahjahanpur NCC Ltd. 20015060 MAHMOODPUR 2 2 3010 2022 2037 2052 30-Sep-2023 31-Dec-2024 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of MAHMOODPUR scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Mahmoodpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1470 Hardoi NCC Ltd. 20000034 MAHMOODPUR BAHADURPUR 2 2 1470 2022 2037 2052 26-Jul-2023 11-Sep-2023 09-Dec-2023 30-Nov-2024 ok OK View
1471 Bijnor LC INFRA 20011718 Mahmoodpur Bikka Village Water Supply Scheme 1 2 1801 2022 2037 2052 10-Nov-2023 12-Dec-2023 10-Jun-2024 11-Jun-2024 Every thing complete. every thing completed View
1472 Hardoi NCC Ltd. 20018235 Mahmoodpur Lalta 2 3 2156 2022 2037 2052 29-Apr-2023 12-Oct-2023 11-Jan-2024 24-Dec-2024 ok OK View
1473 Ayodhya UNIVERSAL MEP 20030032 MAHMUD MAU GRAM PANCHAYAT WATER SUPPLY SCHEME 1 5 2779 2023 2038 2053 12-Oct-2023 13-Oct-2023 13-Oct-2023 15-Nov-2024 Found ok Found Correct View
1474 Ayodhya UNIVERSAL MEP 20030266 MAHOLI UPARHAR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 7 5450 2023 2038 2053 12-Oct-2023 16-Jun-2024 16-Jun-2024 15-Nov-2024 Found ok Found Correct View
1475 Shahjahanpur NCC Ltd. 20089084 MAHOLIA BIRAN & BIJAURA BIJAURIA MULTI GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 7 7 3090 2023 2038 2053 31-Dec-2024 24-Jan-2024 24-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of MAHOLIA BIRAN & BIJAURA BIJAURIA scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of MAHOLIA BIRAN & BIJAURA BIJAURIA MULTI GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1476 Meerut Power Mech Projects Ltd 8362865 MAHROLI 1 1 3061 2022 2037 2052 31-Dec-2024 19-Dec-2022 08-May-2023 26-Dec-2024 Recommended for further Approval approved View
1477 Kannauj GVPR 20077096 MAHSAIYAN GRAM PANCHAYAT WATER SUPPLY SCHEME 1 4 3507 2023 2038 2053 09-Aug-2024 10-Nov-2024 14-Feb-2025 15-Feb-2025 forwarded for Further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1478 Auraiya GVPR 20088637 Mahu PWS 1 4 2128 2023 2038 2053 06-Jan-2022 23-Apr-2024 07-Jun-2024 24-Apr-2024 Forwarded for further action. All work of scheme found satisfactory. View
1479 Kanpur Dehat GVPR 20065228 MAHUA & MURRA 3 0 4094 2023 2038 2053 18-Jan-2024 20-Oct-2023 06-Mar-2024 07-Mar-2024 Forward for further necessary action pls All work of scheme found satisfactory View
1480 Shahjahanpur NCC Ltd. 20014003 Mahua durg W/s 1 1 2800 2022 2037 2052 09-Aug-2023 31-Dec-2024 08-Nov-2023 16-Nov-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mahau Durgu scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Mahau Durgu scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1481 Shahjahanpur NCC Ltd. 20019796 Mahua jhala 2 2 2142 2022 2037 2052 31-Dec-2024 24-Feb-2024 25-May-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mahua jhala scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Mahua Jhala WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1482 Hardoi NCC Ltd. 8360561 Mahura Kalan 1 4 2730 2022 2037 2052 05-Mar-2023 12-Mar-2023 11-Jun-2023 25-Dec-2024 ok OK View
1483 Bahraich PNC-SPML-JV 20016192 MAHURI KALAN JARWAL MVS PWS 2 11 9156 2022 2037 2052 31-Dec-2025 20-Nov-2025 20-Nov-2025 21-Nov-2025 Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/10/0461, kindly complete it. Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/10/0461, View
1484 Ambedkar Nagar Vindhya-GAJA (JV) 20067732 MAHUWARI Water Supply Scheme 2 10 5230 2023 2038 2053 08-Mar-2024 29-Apr-2025 29-Jul-2025 30-Jul-2025 Scheme completed and ready for O&M Scheme Completed View
1485 Kanpur Dehat GVPR 20077550 MAIJUSA MASPUR 2 5 2022 2023 2038 2053 17-Feb-2024 17-Dec-2023 01-May-2024 02-May-2024 Forward for further necessary action pls All work of scheme found satisfactory View
1486 Meerut Power Mech Projects Ltd 20011056 MAIL PWS 1 1 6256 2022 2037 2052 31-Dec-2024 25-Jun-2024 11-Nov-2024 17-Feb-2025 Recommended for Further Approval approved View
1487 Meerut Power Mech Projects Ltd 20058278 MAITHAN INDERSINGH 1 1 4277 2022 2037 2052 11-Jun-2025 28-Apr-2025 14-Sep-2025 15-Sep-2025 Recommended for Further Approval Approved approved View 256 Meerut Power Mech Projects Ltd 20058278 MAITHAN INDERSINGH Pending Approved View
1488 Mau LC INFRA 20077595 Majhauli Gram Panchayat Water supply Scheme 3 5 2120 2022 2037 2052 29-Jun-2024 04-Apr-2025 03-Apr-2025 04-Apr-2025 Approved. Approved.. View
1489 Sultanpur UNIVERSAL MEP 20064712 MAJHNA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 14 4050 2023 2038 2053 12-Jan-2024 12-Jan-2024 12-Feb-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
1490 Kannauj GVPR 20066565 MAJHO PUR & DAULTABAD GRAM PANCHAYAT WATER SUPPLY SCHEME 5 9 4225 2023 2038 2053 16-Aug-2024 22-Apr-2025 26-Jul-2024 27-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1491 Bijnor Vindhya-GAJA (JV) 20101751 Makandpur Rajmal WSS 1 1 1755 2023 2038 2053 06-Jul-2023 04-Dec-2025 04-Jun-2026 05-Jun-2026 All Documents Completed check View
1492 Fatehpur Gayatri Projects LTD 20026577 MAKANPUR 1 2 5670 2022 2037 2052 29-Mar-2024 18-Jul-2023 18-Oct-2023 19-Oct-2023 Work has been completed. Trial & Run also completed. It was initiated in the month of July (18.07.2023) and Regular water supply is given to the consumers. Verified View
1493 Bahraich PNC-SPML-JV 20020698 MAKANPUR NAWABGANJ PWS 1 4 7600 2022 2037 2052 31-Dec-2025 13-Oct-2025 13-Oct-2025 14-Oct-2025 Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/11/0062, kindly complete it. Scheme Completed with observation View
1494 Ambedkar Nagar Vindhya-GAJA (JV) 20067758 MAKDOOMPUR Water Supply Scheme 2 3 5280 2023 2038 2053 23-Mar-2024 19-May-2025 19-May-2025 20-May-2025 Checked and found ok Scheme completed View
1495 Hardoi NCC Ltd. 20012175 MAKHADUM PURA 2 2 2240 2022 2037 2052 14-Jun-2023 31-Jan-2023 22-Apr-2023 25-Dec-2024 Approved OK View
1496 Ambedkar Nagar Vindhya-GAJA (JV) 20072753 MAKHDUMPUR WSS 1 2 3130 2023 2038 2053 22-Mar-2024 15-Jan-2026 27-Apr-2026 01-Jun-2026 Scheme completed and ready for O&M SCHEME COMPLETED View
1497 Mau LC INFRA 8360474 MAKHNA GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME 1 5 3146 2022 2037 2052 19-Mar-2023 17-Nov-2025 14-Feb-2025 17-Nov-2025 Approved Approved. View
1498 Ghaziabad LC INFRA 20018255 MAKRAIDA PWS SCHEME 1 1 3024 2022 2033 2055 09-Feb-2022 01-May-2025 31-Aug-2025 01-Sep-2025 Actual Executed Cost Verified based on approved variation statement. All work completed and approved View
1499 Shahjahanpur NCC Ltd. 20059018 MAKRANDA PUR WSS 3 3 1950 2022 2037 2052 31-Dec-2024 18-Mar-2024 17-Jun-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of MAKRANDA PUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of MAKRANDA PUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1500 Kanpur Dehat GVPR 20053260 Makrandpur Kahinjari 1 2 3529 2023 2038 2053 18-Nov-2023 10-Oct-2023 12-Jan-2024 13-Jan-2024 Forward for further action All work of scheme found satisfactory View
1501 Bijnor Vindhya-GAJA (JV) 20100224 Makrandpur Manak WSS 2 2 1411 2023 2038 2053 06-Jul-2023 15-Feb-2025 15-Aug-2025 16-Aug-2025 Every thing complete. Complete document View
1502 Kanpur Dehat GVPR 20077274 Makrandpur Mazra 2 2 1747 2023 2038 2053 17-Feb-2024 20-Dec-2023 29-Mar-2024 30-Mar-2024 TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI KD/O&M/2025-26/6655 dt.29/07/2028 & SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's. All work of scheme found satisfactory View
1503 Shahjahanpur NCC Ltd. 20015075 MALARIYA MIRZAPUR Jaititipur 2 4 2390 2022 2037 2052 31-Dec-2024 24-Dec-2023 24-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Malariya Mirzapur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Malariya Mirzapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1504 Kannauj GVPR 20077102 MALGAWAN GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 3349 2023 2038 2053 08-Sep-2024 04-Apr-2024 07-Jul-2024 08-Jul-2024 Forwarded for further action. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
1505 Auraiya Indian Hume Pipe 20019892 MALHEPUR PWS 2 3 2700 2022 2037 2052 22-Sep-2023 28-Dec-2022 04-Apr-2023 05-Apr-2023 Forwarded for further action. All work of scheme found satisfactory. View
1506 Kanpur Dehat Indian Hume Pipe 20096869 Malhpur 2 5 2600 2022 2037 2052 04-Mar-2022 31-Dec-2024 31-Mar-2024 01-Apr-2024 Forward for further necessary action pls All work of scheme found satisfactory View
1507 Kannauj GVPR 20036539 MALIKPUR & AHAMADPUR RAUNI GRAMIN PEYJAL YOJNA 2 4 6823 2023 2038 2053 13-May-2024 06-Apr-2024 08-Jul-2024 09-Jul-2024 Forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1508 Shahjahanpur NCC Ltd. 20096494 MALUAPUR GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME 1 2 3230 2022 2037 2052 19-Aug-2024 21-Dec-2024 18-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Maluapur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Malupur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1509 Meerut Power Mech Projects Ltd 20077307 MAMIPUR 1 1 2735 2023 2038 2053 31-Dec-2024 25-Dec-2024 16-May-2025 17-May-2025 Recommended for further Approvals. approved View
1510 Kanpur Dehat Indian Hume Pipe 20031466 Manava Rasoolabad 1 3 2510 2022 2037 2052 23-Sep-2022 31-Dec-2024 31-Mar-2024 01-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1511 Bijnor LC INFRA 8360682 MANDAURA VILLAGE WATER SCHEME 3 3 3411 2022 2037 2052 26-Jul-2023 11-Dec-2023 09-Jun-2024 10-Jun-2024 Every thing completed. Everything Complete. View
1512 Bijnor LC INFRA 20019956 Mandora VIP Water Supply Scheme 1 1 3141 2022 2037 2052 09-Feb-2022 21-Dec-2024 22-Mar-2025 23-Mar-2025 Every thing complete. Everything is Completed. View
1513 Gautam Buddha Nagar LC INFRA 20017815 MANDPA VILLAGE WATER SUPPLY SCHEME 1 1 3998 2019 2037 2052 20-Sep-2021 20-Mar-2023 10-Apr-2023 11-Apr-2023 Actual Executed Cost Verified based on Approved Variation Statement. all work has been completed. View
1514 Meerut Power Mech Projects Ltd 20011300 MANDWARI 1 1 2203 2022 2037 2052 31-Dec-2024 10-Jan-2023 29-May-2023 30-Dec-2024 Recommended for further Approval approved View
1515 Ambedkar Nagar Vindhya-GAJA (JV) 20068949 MANERIPUR SARAVA WSS 4 12 7350 2023 2038 2053 08-Mar-2024 06-Nov-2025 31-Dec-2025 01-Jan-2026 Scheme completed and ready for O&M SCHEME COMPLETED AND READY FOR O&M View
1516 Jaunpur Welspun Kaveri Infraprojects JV 20020890 Mangadpur 4 13 2802 2022 2037 2052 22-May-2023 07-Jul-2026 07-Jul-2026 08-Jul-2026 Checked and found ok. ok View
1517 Bijnor LC INFRA 20012021 Mangolpura Roopchand Village Water Supply Scheme 3 3 3681 2022 2037 2052 09-Feb-2022 11-May-2024 10-Nov-2024 11-Nov-2024 Every thing complete. check View
1518 Gautam Buddha Nagar LC INFRA 8389573 MANGROLI GRAM PANCHAYAT WATER SUPPLY 1 1 2939 2022 2037 2052 20-Mar-2023 31-Mar-2024 31-Oct-2024 01-Nov-2024 Project certificate is verified Verified View
1519 Etawah Indian Hume Pipe 20015035 Mangupur 4 10 3550 2022 2037 2052 08-May-2023 20-May-2024 02-Jul-2024 03-Jul-2024 Forwarded for further action. All work of scheme found satisfactory View
1520 Auraiya GVPR 20087932 Mani kothi khash PWS 1 4 1893 2023 2038 2053 01-Jun-2022 14-Jul-2024 12-Jul-2024 15-Jul-2024 Forwarded for further action All work of scheme fond satisfactory. View
1521 Kannauj GVPR 20050538 MANIKAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 6 4048 2023 2038 2053 15-Jun-2024 07-Apr-2024 11-Jul-2024 12-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1522 Bahraich PNC-SPML-JV 20015439 MANIKAPUR VISESHWARGANJ PWS 1 14 6025 2022 2037 2052 31-Dec-2025 26-Nov-2025 25-Nov-2025 26-Nov-2025 scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/01/0426 kindly complete it. scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/01/0426 kindly complete it. View
1523 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20008676 Manikpur 5 5 4050 2022 2037 2052 07-Jan-2022 16-Dec-2025 15-Dec-2025 05-Jan-2026 Scheme completed and ready for O&M SCHEME COMPLETED AND READY FOR O&M View
1524 Etawah Indian Hume Pipe 20024481 MANIKPUR BISU PWS 1 2 5600 2022 2037 2052 22-Sep-2023 26-Jun-2024 26-Jun-2024 27-Jun-2024 Forwarded for further action. All work of scheme found satisfactory. View
1525 Farrukhabad Vindhya-GAJA (JV) 20093087 MANIKPUR DEHLIYA & JALLAPUR MVS 2 8 4647 2023 2038 2053 30-May-2025 01-Jul-2024 01-Jul-2024 02-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
1526 Amethi Vindhya-GAJA (JV) 20066548 MANJH GAON WATER SUPPLY SCHEME 1 6 2534 2023 2038 2053 07-Jan-2024 12-May-2024 04-Sep-2024 16-Dec-2024 Hardcopy submitted All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
1527 Fatehpur Power Mech Projects Ltd 20102043 MANJHANPUR 1 1 2390 2023 2038 2053 20-Sep-2024 25-Apr-2025 24-Apr-2025 25-Apr-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of January (21.01.2025) and Regular water supply is given to the consumers. Verified View
1528 Kanpur Dehat GVPR 20077572 mankapur derapur 2 3 2100 2023 2038 2053 14-Mar-2024 02-Feb-2024 08-May-2024 09-May-2025 Forward for further necessary action pls All work of scheme found satisfactory View
1529 Shahjahanpur NCC Ltd. 20014021 MANORATHPUR SAH SOWARI 1 1 2350 2022 2037 2052 17-Jul-2024 31-Dec-2024 16-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Manorathpur Sah Sowari scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Manorathpur Shah Sowari scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1530 Ghaziabad LC INFRA 20023624 MANOULI CHHAJUPUR PWS SCHEME 1 1 2590 2022 2037 2052 06-Aug-2022 30-Nov-2024 31-Mar-2025 01-Apr-2025 Actual Executed Cost Verified based on approved variation statement. all work has been completed. Approved View
1531 Kanpur Dehat GVPR 20053677 MANPUR GAJEN1 2 1 2515 2023 2038 2053 18-Nov-2023 10-Dec-2023 11-Mar-2024 11-Mar-2024 Forwarded for Further action. All work of scheme found satisfactory View
1532 Meerut Power Mech Projects Ltd 20102362 Mansabgarh 1 1 650 2023 2038 2053 11-Jun-2025 14-Sep-2024 31-Jan-2025 01-May-2025 Recommended for further Approval approved View
1533 Mau GA INFRA-VPL 20088192 MANSDI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 5 2120 2023 2038 2038 21-Mar-2025 21-Mar-2025 20-Mar-2025 21-Mar-2025 Approved Approved View
1534 Auraiya GVPR 20093417 Mansukhpur & Kasbajana 1 7 6150 2023 2038 2053 01-Jun-2022 17-Apr-2025 16-Apr-2025 18-Apr-2025 Forwarded for further action. All work of scheme found satisfactory. View
1535 Shahjahanpur NCC Ltd. 20017205 Manuwawari Wss 3 3 3280 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the Manuwawari WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. SWSM/BLG/JJM/26-27/415 for further necessary action. All information on the portal for the completion certificate of Manuwawari Wss have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1536 Balrampur Larsen & Toubro Ltd 20021243 Mardahwa Kalan Water Supply Scheme 2 3 3151 2022 2037 2052 30-Jun-2023 25-Feb-2026 25-May-2026 25-May-2026 The scheme comprises 01 Gram Panchayats, covering a total of 1 RV and 3 habitations (madhrawa kala basantpur and Bhaggaur) At present, water supply is being provided through the OHT to only two habitations. The Pressure is found less in some connections The scheme comprises 01 Gram Panchayats, covering a total of 1 RV and 3 habitations (madhrawa kala basantpur and Bhaggaur) At present, water supply is being provided through the OHT to only two habitations. The Pressure is found less in some connections View
1537 Shahjahanpur NCC Ltd. 20015096 Mareena 1 1 2420 2022 2037 2052 30-Sep-2023 31-Dec-2024 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mareena scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Mareena scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1538 Shahjahanpur NCC Ltd. 20084239 MARENA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 3 4 3240 2022 2037 2052 31-Dec-2024 24-Jan-2024 24-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of MARENA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Marena W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1539 Jaunpur AFCONS 20101167 MARGUPUR & KASTURIPUR VILLAGE WATER SUPPLY SCHEME 3 20 3760 2023 2038 2053 09-Mar-2024 12-Oct-2024 12-Oct-2024 12-Oct-2024 Checked and found ok. ok View
1540 Auraiya Indian Hume Pipe 20022749 Marha Machhi Jheel Water Supply 2 3 1900 2022 2037 2052 08-May-2023 10-Aug-2024 14-Nov-2024 15-Nov-2024 Forwarded for further action. All work of scheme fond satisfactory. View
1541 Auraiya GVPR 20089662 Marhadaspur PWS 1 2 1755 2023 0 0 01-Jun-2022 03-May-2024 02-May-2024 04-May-2024 Forwarded for further action. All work of scheme fond satisfactory. View
1542 Kanpur Dehat Indian Hume Pipe 20064135 Marhana 3 5 3245 2022 2037 2052 12-Jan-2023 31-Dec-2024 07-May-2024 08-May-2024 FORWARD FOR FURTHER NECESSARY ACTION PLS. All work of scheme found satisfactory View
1543 Kannauj GVPR 20098282 MARHARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 3722 2023 2038 2053 14-Nov-2024 06-Apr-2024 08-Jul-2024 09-Jul-2024 Forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1544 Kannauj GVPR 20036485 MARHI & BAJHERI GRAMIN PEYJAL YOJNA 2 9 3871 2023 2038 2053 13-May-2024 16-Mar-2024 19-Jun-2024 20-Jun-2024 Forwarded for further action. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
1545 Auraiya Indian Hume Pipe 8362638 MAROKH MITI 1 4 3170 2022 2037 2052 14-Sep-2022 23-Jan-2025 30-Apr-2025 01-May-2025 Forwarded for further action. All work of scheme fond satisfactory. View
1546 Ambedkar Nagar Vindhya-GAJA (JV) 20056083 MARTHUWA SARAIYA WSS 1 14 5100 2023 2038 2053 26-Dec-2023 15-Jun-2026 30-Sep-2026 01-Oct-2026 Checked and found ok SCHEME COMPLETED View
1547 Ghaziabad LC INFRA 20021146 MASAUTA PWS SCHEME 1 1 3843 2022 2037 2052 21-Mar-2022 31-Oct-2024 28-Feb-2025 01-Mar-2025 Actual Executed Cost Verified based on approved variation statement. Approved View
1548 Hardoi NCC Ltd. 20012541 MASFANA JJM 2 2 1500 2022 2037 2052 26-Jul-2023 01-Oct-2023 02-Jan-2024 30-Nov-2024 ok OK View
1549 Auraiya Indian Hume Pipe 20055677 Masodpur PWS 1 2 2165 2022 2037 2052 22-Sep-2023 12-Oct-2024 25-Oct-2024 25-Jan-2025 Forwarded for further action. All work of scheme fond satisfactory. View
1550 Ghaziabad LC INFRA 20094905 MATAUR VILLAGE WATER SUPPLY SCHEME 1 1 2329 2022 2037 2052 31-Oct-2024 01-Dec-2024 27-Mar-2025 01-Apr-2025 Actual Executed Cost Verified based on approved variation statement. aprroved View
1551 Auraiya GVPR 20087927 Matera PWS 1 7 3796 2023 0 0 01-Jun-2022 29-Oct-2024 28-Oct-2024 30-Oct-2024 Forwarded for further action. All work of scheme fond satisfactory. View
1552 Ambedkar Nagar Vindhya-GAJA (JV) 20035086 MATHIYA WSS 1 8 6150 2023 2037 2053 21-Oct-2023 14-Jun-2024 02-Dec-2024 03-Dec-2024 Checked and found ok SCHEME COMPLETED View
1553 Jaunpur AFCONS 20074092 MATHURAPUR URF KOTWA VILLAGE WATER SUPPLY SCHEME 1 6 2881 2023 2038 2053 21-Feb-2024 15-Apr-2024 09-Mar-2025 10-Mar-2025 Checked and found ok. ok View
1554 Ghaziabad LC INFRA 20094912 MATIALA VILLAGE WATER SUPPLY SCHEME 1 1 2130 2022 2033 2052 30-Sep-2024 30-Nov-2024 01-Apr-2025 05-Apr-2025 All Civil and mechanical works are completed. All work completed View
1555 Jaunpur AFCONS 20056884 MATIYARI VILLAGE WATER SUPPLY SCHEME 3 11 2154 2023 2038 2053 31-Dec-2024 27-Feb-2025 27-Feb-2025 27-Feb-2025 checked & found ok ok View
1556 Auraiya Indian Hume Pipe 8362646 MAU 1 2 3335 2022 2037 2052 14-Sep-2022 03-Aug-2023 04-Nov-2023 05-Nov-2023 Forwarded for further action. All work of scheme found satisfactory. View
1557 Sultanpur UNIVERSAL MEP 20092876 MAU GRAM PANCHAYAT WATER SUPPLY SCHEME 1 6 2570 2022 2037 2052 18-Jul-2024 27-Nov-2024 28-Feb-2025 01-Apr-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
1558 Shahjahanpur NCC Ltd. 20077482 MAU KHALSA WSS 1 1 3070 2022 2037 2052 31-Dec-2024 19-Aug-2024 18-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of MAU KHALSA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of MAU KHALSA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1559 Auraiya GVPR 20101891 Mau(khidarpur)PWS 1 4 556 2023 2038 2053 06-Jan-2022 03-Oct-2024 02-Oct-2024 04-Oct-2024 Forwarded for further action. All work of scheme found satisfactory. View
1560 Kanpur Dehat Indian Hume Pipe 20025480 Maujpur 1 2 2350 2022 2037 2052 24-Aug-2022 31-Dec-2024 31-Jan-2024 01-Feb-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1561 Kannauj GVPR 20077114 MAUMARPUR MAURARA & RAMPUR MAJAR GANGADARAPOUR GRAM PANCHAYAT WATER SUPPLY SCHEME 3 4 4777 2023 2038 2053 08-Sep-2024 10-Apr-2024 13-Jul-2024 14-Jul-2024 forwarded for futrher action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1562 Kanpur Dehat Indian Hume Pipe 20034274 MAVAIYA 1 3 1900 2022 2037 2052 23-Nov-2023 31-Dec-2024 31-Dec-2024 01-Jan-2025 Forward for further necessary action pls. All work of scheme found satisfactory View
1563 Meerut Power Mech Projects Ltd 20020840 MAVIMIRA 2 2 4819 2022 2038 2052 31-Dec-2024 10-Jul-2024 26-Nov-2024 27-Nov-2024 CHECKED AND VERIFIED.... approved View
1564 Amethi Gayatri Projects LTD 20098295 MAWAIYA RAHMAT GARH WATER SUPPLY SCHEME 1 11 9186 2022 2037 2052 27-Jun-2025 10-Jun-2024 11-Sep-2024 15-Dec-2024 Hardcopy submitted and found okay as per the submitted documents.. Hardcopy submitted and found okay as per the submitted documents.. View
1565 Meerut Power Mech Projects Ltd 20098101 MAWANA KHURD 1 1 7474 2023 2037 2053 11-Jun-2025 10-Jan-2025 29-May-2025 01-Mar-2026 Recommended for further Approvals. Approved View
1566 Amethi Gayatri Projects LTD 20077657 Mayas & Nimi Water Supply Scheme 2 10 4230 2022 2037 2057 10-Aug-2024 27-Jun-2024 29-Sep-2024 18-Dec-2024 All Document not provided by EPC hence returns to the EPC All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance... View
1567 Ambedkar Nagar Vindhya-GAJA (JV) 20019936 Mdarbhari 2 6 5550 2023 2038 2053 03-Aug-2023 20-Dec-2024 20-Mar-2025 21-Mar-2025 checked and found ok Scheme completed View
1568 Ambedkar Nagar Vindhya-GAJA (JV) 20019789 Medhi Sulempur 3 6 4800 2023 2038 2053 03-Aug-2023 10-Sep-2024 19-Mar-2025 20-Mar-2025 checked and verified and found OK Scheme completed View
1569 Meerut Power Mech Projects Ltd 8362147 MEDPUR 1 1 5094 2022 2037 2052 31-Dec-2024 18-Dec-2022 07-May-2023 07-Oct-2024 Recommended for further Approvals. Approved View
1570 Etawah Indian Hume Pipe 20014159 Meerakhpur 1 5 2165 2022 2037 2052 12-Oct-2022 24-Dec-2023 31-Mar-2024 01-Apr-2024 Forwarded for further action. All works are satisfactory. View
1571 Ambedkar Nagar Vindhya-GAJA (JV) 20073278 MEERAPUR WSS 1 1 2700 2023 2038 2053 15-Mar-2024 05-Jan-2026 14-Apr-2026 01-Jun-2026 Scheme completed and ready for O&M SCHEME COMPLETED View
1572 Kannauj GVPR 20067636 MEERPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 1 1535 2024 2038 2053 16-Aug-2024 20-Mar-2024 22-Jun-2023 23-Jun-2023 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory,scheme finalized for operation & maintenance View
1573 Farrukhabad Vindhya-GAJA (JV) 20093150 MEERPUR KAMRUDIN NAGAR MVS 2 2 2028 2023 2038 2053 31-Mar-2025 16-Jan-2025 30-Apr-2025 13-May-2025 All the parameters of scheme verified can take in O&M ok View
1574 Meerut Power Mech Projects Ltd 20037228 MEGHRAJPUR 1 1 2483 2022 2037 2052 31-Dec-2024 12-Feb-2024 02-Jul-2024 04-Dec-2024 Recommended for further approval approved View
1575 Meerut Power Mech Projects Ltd 20067081 MEHARMATI GANESHPUR 1 1 3517 2023 2038 2053 31-Dec-2024 22-Mar-2024 07-Aug-2024 01-Feb-2025 Recommended for further Approval approved View
1576 Meerut Power Mech Projects Ltd 20093527 MEHARMATI MEENA MANPURI (SARDHANA RURAL) 1 1 8240 2022 2037 2052 31-Dec-2024 18-Aug-2024 10-Jan-2025 11-Jan-2025 Recommended for further Approvals. approved View
1577 Bijnor Vindhya-GAJA (JV) 20025521 Mehbulla Pur Dhaki Gram Panchayat Water Supply 3 3 3096 2023 2038 2053 06-Jul-2023 19-Apr-2024 19-Oct-2024 20-Oct-2024 Every thing complete Everything Complete View
1578 Etawah Indian Hume Pipe 20058237 Mehdipur single village scheme 1 4 3240 2022 2037 2052 05-Jan-2024 24-Aug-2024 24-Aug-2024 25-Aug-2024 Forwarded for further action All work of scheme found satisfactory. View
1579 Meerut Power Mech Projects Ltd 20058412 MEHMUDPUR SHERKI & MEHMUDPUR GAWRI 2 2 2292 2023 2038 2053 31-Dec-2024 19-Feb-2024 06-Jul-2024 02-Jan-2025 Recommended for further Approval approved View
1580 Meerut Power Mech Projects Ltd 20100950 MEWA 1 1 6033 2023 2038 2053 25-Jul-2024 25-Jul-2024 12-Dec-2024 13-Dec-2024 Recommended for further Approvals. . View
1581 Ambedkar Nagar Vindhya-GAJA (JV) 20041720 MIJHAURA WSS 1 1 7250 2023 2038 2053 23-Nov-2023 23-Jun-2025 08-Jul-2025 08-Jul-2025 Approved Checked and found ok CHECKED AND FOUND OK View
1582 Kanpur Dehat Indian Hume Pipe 20061477 Milanpur1 3 3 1860 2022 2037 2052 24-Nov-2022 31-Dec-2024 30-Jun-2023 01-Jul-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
1583 Farrukhabad Vindhya-GAJA (JV) 20091277 MILIK MAJMULLA MVS 2 3 2174 2023 2038 2053 31-Mar-2025 30-Dec-2024 11-Mar-2025 12-Mar-2025 Ok OK View
1584 Gautam Buddha Nagar LC INFRA 20013518 MILK KARIMABAD W/S SCHEME 1 2 2367 2022 2037 2052 20-Sep-2021 20-Mar-2023 10-Apr-2023 11-Apr-2023 Actual Executed Cost Verified based on Approved Variation Statement. all work has been completed. View
1585 Kanpur Dehat VSA 20092702 minapur 1 1 1632 2023 2038 2023 30-Apr-2023 31-Dec-2023 15-Apr-2024 16-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1586 Shahjahanpur NCC Ltd. 20070629 MIRGAPUR WSS 4 4 2000 2022 2037 2052 31-Dec-2024 24-Jan-2024 24-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mirgapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Mirgapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1587 Auraiya GVPR 20025586 MIRGAWAN PWS 1 2 3775 2023 2038 2053 01-Jun-2022 01-Mar-2024 27-Nov-2023 02-Mar-2024 Forwarded for further action. All work of scheme fond satisfactory. View
1588 Meerut Power Mech Projects Ltd 20011109 MIRPUR 3 3 4567 2022 2037 2052 31-Dec-2024 10-Nov-2023 30-Mar-2024 10-Nov-2024 CHECKED AND VERIFIED.... approved View
1589 Auraiya GVPR 20099292 Mirzapur Bairamshah 1 1 468 2023 2038 2053 01-Jun-2024 31-Jul-2025 30-Jul-2025 01-Aug-2025 Forwarded for further action. All work of scheme found satisfactory. View
1590 Bijnor Vindhya-GAJA (JV) 20022098 Mirzapur Dhikli Gram Panchayat Water Supply 2 2 3491 2022 2037 2057 06-Jul-2023 21-Nov-2023 30-May-2024 01-Jun-2024 every thing completed. Everything Completed View
1591 Bijnor Vindhya-GAJA (JV) 20025593 Mirzapur Gram Panchayat Water Supply 1 1 3276 2022 2037 2052 06-Jul-2023 05-Feb-2025 05-Aug-2025 06-Aug-2025 Every thing complete. all document complete View
1592 Fatehpur Power Mech Projects Ltd 20097490 MISA 1 1 2420 2023 2038 2053 20-Sep-2024 24-Mar-2025 23-Mar-2025 24-Mar-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of December (24.12.2024) and Regular water supply is given to the consumers. Verified View
1593 Ghaziabad LC INFRA 20102069 MISBAPUR VILLAGE WATER SUPPLY SCHEME 1 1 714 2022 2037 2052 31-May-2023 01-Dec-2024 27-Mar-2025 01-Apr-2025 Actual Executed Cost Verified based on approved variation statement. Approved View
1594 Ayodhya UNIVERSAL MEP 20030466 MISSA GRAM PANCHAYAT WATER SUPPLY SCHEME 2 8 5220 2023 2038 2053 12-Oct-2023 20-Oct-2023 20-Oct-2023 15-Nov-2024 Found ok Found Correct View
1595 Meerut Power Mech Projects Ltd 20037221 MITHEPUR 1 1 3504 2022 2037 2052 31-Dec-2024 03-Feb-2024 21-Jun-2024 10-Dec-2024 Recommended for further approval approved View
1596 Kannauj GVPR 20100931 MITRASENPUR GRAMM PANCHAYAT WATER SUPPLY SCHEME 1 1 1259 2023 2038 2053 14-Nov-2024 03-May-2024 07-Aug-2024 08-Aug-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1597 Kanpur Dehat Indian Hume Pipe 20070115 mitrasenpur kahinjari 1 3 3550 2022 2037 2052 04-Mar-2023 31-Dec-2024 09-Dec-2023 01-Jan-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1598 Kannauj GVPR 20066515 MIYA GANJ GRAM PANCHAYAT WATER SUPPLY SCHEME 1 1 4177 2023 2038 2053 16-Aug-2024 31-Mar-2024 07-Mar-2024 07-Apr-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
1599 Shahjahanpur NCC Ltd. 20015542 Miyuna sww 1 2 2960 2022 2037 2052 31-Dec-2024 04-Jan-2024 04-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Miyuna scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Miyuna scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1600 Bijnor Vindhya-GAJA (JV) 20038784 Mochipura Gram Panchayat Water Supply 2 2 2579 2023 2038 2053 06-Jul-2023 22-Dec-2024 22-Jun-2025 23-Jun-2025 Every thing complete. Check Document View
1601 Bijnor LC INFRA 20011791 Modhia Dhasi Village Water Supply Scheme 1 0 6031 2022 2037 2052 10-Feb-2024 12-Jun-2024 11-Dec-2024 12-Dec-2024 Every thing complete Check Document View
1602 Etawah Indian Hume Pipe 20022015 Mohabbatpurnagla Bhagat PWS 1 1 2245 2022 2037 2052 22-Sep-2023 11-Oct-2023 25-Jan-2024 24-Apr-2024 Forwarded for further action. All work of scheme found satisfactory View
1603 Kannauj GVPR 20100929 MOHADDI NAGAR GRAMM PANCHAYAT WATER SUPPLY SCHEME 2 5 3627 2023 2038 2053 14-Nov-2024 16-Apr-2024 19-Jul-2024 20-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1604 Sultanpur UNIVERSAL MEP 20066278 MOHAMAD KAJIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 4 3872 2023 2038 2053 18-Jul-2024 27-Feb-2025 29-May-2025 01-Jul-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements. View
1605 Shahjahanpur NCC Ltd. 20015943 MOHAMADPUR GULERIYA 1 3 2730 2022 2037 2052 30-Sep-2023 31-Dec-2024 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of MOHAMADPUR GULERIYA scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Mohammadpur Guleriya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1606 Auraiya Indian Hume Pipe 8359394 Mohamdabad 1 5 2745 2022 2037 2052 12-Oct-2022 01-Aug-2023 09-Nov-2023 10-Nov-2023 Forwarded for further action. All work of scheme found satisfactory. View
1607 Bijnor Vindhya-GAJA (JV) 20101795 MOHAMMAD AMI KHANPUR WSS 2 2 2358 2023 2038 2058 06-Jul-2023 19-Feb-2025 19-Aug-2025 20-Aug-2025 Every thing complete. check Document View
1608 Bahraich PNC-SPML-JV 20099559 MOHAMMAD NAGAR CHITTAURA RF MVS PWS 2 16 9780 2022 2037 2052 30-Jun-2025 10-Jun-2025 10-Jun-2025 11-Jun-2025 scheme complete Scheme completed. View
1609 Meerut Power Mech Projects Ltd 20078443 MOHAMMADPUR AKBARPUR CHAKBANDI 1 1 1380 2022 2037 2052 31-Dec-2024 16-Jun-2024 01-Nov-2024 02-Nov-2024 Recommended for further Approvals. Approved View
1610 Ghaziabad LC INFRA 20097918 MOHAMMADPUR AMAD BAGHPAT VILLAGE WATER SUPPLY SCHEME 1 1 1779 2022 2037 2052 31-Oct-2024 01-Dec-2024 27-Mar-2025 01-Apr-2025 Actual Executed Cost Verified based on approved variation statement. all work has been completed View
1611 Meerut Power Mech Projects Ltd 20098124 MOHAMMADPUR HAYAK 1 1 1894 2023 2038 2053 31-Dec-2024 27-May-2024 14-Oct-2024 15-Oct-2024 Recommended for further Approvals. approved View
1612 Ambedkar Nagar Vindhya-GAJA (JV) 20102032 Mohammadpur Musalman Water Supply Scheme 1 1 2800 2023 2038 2053 03-Oct-2024 09-Oct-2025 20-Jan-2026 21-Jan-2026 Scheme completed and ready for O&M SCHEME COMPLETED AND READY FOR O&M View
1613 Meerut Power Mech Projects Ltd 20037267 MOHANIPUR BHAROTA 2 2 2445 2022 2037 2052 31-Dec-2024 03-Apr-2024 20-Aug-2024 31-Jan-2025 Recommended for further Approval approved View
1614 Shahjahanpur NCC Ltd. 20033482 Mohanpur 1 1 2963 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mohanpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Mohanpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1615 Shahjahanpur NCC Ltd. 20016423 MOHANPUR KALUAPUR 2 3 1850 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mohanpur Kaluapur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of MOHANPUR KALUAPUR scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1616 Kannauj GVPR 20050198 MOHANPUR RATANPUR & CHACHASANDA GRAM PANCHAYAT WATER SUPPLY SCHEME 2 9 5670 2023 2038 2053 15-Jun-2024 10-Apr-2024 13-Jul-2024 14-Jul-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1617 Gautam Buddha Nagar LC INFRA 20017819 MOHBALIPUR VILLAGE WATER SUPPLY SCHEME 1 1 1663 2022 2037 2052 20-Mar-2023 30-Mar-2024 30-Mar-2024 01-Apr-2024 Project certificate is verified. Verified View
1618 Meerut Power Mech Projects Ltd 20100955 MOHD.PUR GUMI 1 1 812 2023 2038 2053 31-Dec-2024 08-May-2024 03-Oct-2024 02-Jan-2025 Recommended for further Approval approved View
1619 Meerut Power Mech Projects Ltd 20011061 MOHDPUR DHUMI 1 1 3565 2022 2037 2052 31-Dec-2024 17-May-2023 03-Oct-2023 06-Nov-2024 Recommended for further Approvals. approved View
1620 Ghaziabad LC INFRA 20019990 MOHHAMADPUR HISAULI PWS SCHEME 1 1 3061 2022 2037 2052 01-Feb-2024 31-Dec-2024 31-Jan-2025 01-Feb-2025 Actual Executed Cost Verified based on approved variation statement. All work checked and recommended for O&M View
1621 Meerut Power Mech Projects Ltd 20100954 MOHIUDDINPUR 1 1 6269 2023 2038 2053 11-Jun-2025 15-Aug-2024 09-Jan-2025 10-Jan-2025 Recommended for further Approvals. . View
1622 Farrukhabad Vindhya-GAJA (JV) 20093026 MOHIUDDINPUR & BARKHERA MVS 5 6 4391 2023 2038 2053 30-May-2024 30-Jun-2024 30-Jun-2024 01-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
1623 Meerut Power Mech Projects Ltd 20016932 MOHIUDDINPUR LALSANA 1 1 2029 2022 2037 2052 07-Mar-2023 27-Dec-2022 16-May-2023 18-Dec-2024 Recommended for further Approval approved View
1624 Bijnor LC INFRA 20013270 MOHMADPUR SADA BILA AHATMALI WATER SUPPLY SCHEME 2 2 3051 2022 2037 2052 10-Feb-2024 12-Dec-2023 10-Jun-2024 11-Jun-2024 Every thing complete. Everything is Completed. View
1625 Bijnor LC INFRA 20051622 MOHRA 1 1 2517 2022 2037 2052 03-Dec-2022 05-Jul-2024 13-Jan-2025 14-Jan-2025 Every thing complete Everything is Completed. View
1626 Mau LC INFRA 20098955 MOLANAPUR VILLAGE WATER SUPPLY SCHEME 3 5 1505 2022 2037 2052 04-Oct-2024 19-Jan-2026 25-Dec-2025 19-Jan-2026 Approved Approved.. View
1627 Hardoi NCC Ltd. 8360566 Mona 1 3 4928 2022 2037 2052 05-Mar-2023 06-May-2023 05-Aug-2023 25-Dec-2024 ok OK View
1628 Meerut Power Mech Projects Ltd 20082564 MOR KHURD & SADARPUR 2 2 6615 2023 2038 2053 31-Dec-2024 05-Sep-2024 22-Jan-2025 23-Jan-2025 Recommended for further Approval Approved View
1629 Bijnor Vindhya-GAJA (JV) 20102316 MOTADHAK WSS 3 3 1955 2023 2038 2053 06-Jul-2023 10-Dec-2024 10-Jun-2025 11-Jun-2025 Every thing complete. check View
1630 Ambedkar Nagar Vindhya-GAJA (JV) 20047599 MUBARAKPUR MARAILA Water Supply Scheme 2 2 2190 2023 2038 2053 24-Nov-2023 21-Sep-2024 20-Dec-2024 21-Dec-2024 checked and verified SCHEME COMPLETED View
1631 Meerut Power Mech Projects Ltd 20078419 MUBARIKPUR, PACHGAONPATTI & SANWAL 3 3 4996 2022 2037 2052 31-Dec-2024 27-Mar-2025 13-Aug-2025 14-Aug-2025 Recommended for further Approvals. approved View
1632 Sultanpur UNIVERSAL MEP 20067110 MUDAINAVADA &JUDUPUR & RANKEDIH GRAM PANCHAYAT WATER SUPPLY SCHEME 4 13 15870 2023 2038 2053 18-Jul-2024 08-Feb-2025 12-May-2025 01-Jul-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements. View
1633 Shahjahanpur NCC Ltd. 20096501 MUDIA KALAN GRAM PANCHAYAT I VILLAGE WATER SUPPLY SCHEME 1 2 1840 2022 2037 2052 17-Aug-2024 31-Dec-2024 16-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mudia Kalan scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Mudiya Kalan scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1634 Shahjahanpur NCC Ltd. 20085015 MUDIA PARMAR GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME 1 1 2590 2022 2037 2052 31-Dec-2024 14-Jun-2024 13-Sep-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of MUDIA PARMAR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of MUDIA PARMAR GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1635 Shahjahanpur NCC Ltd. 20015868 Mudiya Kumariya 1 1 3400 2022 2037 2052 31-Dec-2024 24-Jun-2024 23-Sep-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the Mudiya Kumariya WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. JJM/BLG/CLU-05/2026-2027/52 for further necessary action. All information on the portal for the completion certificate of Mudiya Kumariya have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1636 Kannauj GVPR 20036136 MUGARA GRAMIN PEYJAL YOJNA 1 5 2707 2023 2038 2053 13-May-2024 07-Apr-2024 11-Jul-2024 12-Jul-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1637 Auraiya GVPR 20041745 Mughariha&belhupur PWS 2 1 3645 2023 2038 2053 26-Nov-2024 02-Nov-2023 10-Jul-2023 26-Aug-2023 Forwarded for further action. All work of scheme found satisfactory. View
1638 Mau LC INFRA 20064749 Muhammadpur Babupur Gram Panchayat Water Supply Scheme 2 5 2010 2022 2037 2052 05-Jul-2024 29-Jan-2026 19-Sep-2025 29-Jan-2026 Approved Approved.. View
1639 Ambedkar Nagar Vindhya-GAJA (JV) 20019657 Mujahidpur 1 5 2790 2023 2038 2053 03-Aug-2023 07-Sep-2024 09-Dec-2024 10-Dec-2024 Checked and found OK Scheme completed View
1640 Bijnor LC INFRA 20016601 MUKARPUR GUJAR WATER SUPPLY SCHEME 0 2 3601 2022 2037 2052 08-Feb-2024 15-Jan-2024 14-Jul-2024 15-Jul-2024 Every thing complete. check View
1641 Shahjahanpur NCC Ltd. 20096508 MUKEEMPUR GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 3 3 2070 2022 2037 2052 31-Dec-2024 14-Aug-2024 13-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of MUKEEMPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of MUKEEMPUR GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1642 Meerut Power Mech Projects Ltd 20098584 MUKHTYARPUR NAGLA 1 1 1601 2022 2037 2052 11-Jun-2025 25-Sep-2024 11-Feb-2025 13-Feb-2025 Recommended for further Approvals. approved View
1643 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20013401 MUKUNDPUR 4 5 3804 2022 2037 2052 22-May-2023 05-Apr-2026 03-Dec-2025 05-Apr-2026 Scheme completed and ready for O&M Scheme Completed View
1644 Kanpur Dehat GVPR 20053394 MULHI 2 2 2588 2023 2038 2053 18-Nov-2023 27-Jan-2024 14-May-2024 15-May-2024 Forward for further action All work of scheme found satisfactory View
1645 Shahjahanpur NCC Ltd. 20015940 munavwar ganj urf barenda WSS 1 4 4620 2022 2037 2052 30-Sep-2023 31-Dec-2024 30-Dec-2023 16-Nov-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Munavwar Ganj Urf Barenda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Munawarganj urf barenda scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1646 Kanpur Dehat GVPR 20052993 Mundera kinnar singh 2 3 4554 2023 2038 2053 18-Nov-2023 12-Dec-2023 12-Mar-2024 13-Mar-2024 Forward for further action All work of scheme found satisfactory View
1647 Shahjahanpur NCC Ltd. 20033494 Mundiya Aas 1 2 2310 2022 2037 2052 30-Sep-2023 31-Dec-2024 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Mundiya Aas scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Mundiya Aas scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1648 Bijnor Vindhya-GAJA (JV) 20101547 MUNGERPUR WSS 1 1 1918 2023 2038 2053 06-Jul-2023 19-Feb-2025 19-Aug-2025 20-Aug-2025 Every thing complete. Check Document View
1649 Mau LC INFRA 20085354 MUNJDAND PANCHAYAT WATER SUPPLY SCHEME 3 5 1421 2022 2037 2052 22-Mar-2025 02-Apr-2025 02-Apr-2025 02-Apr-2025 Approve. Approved. View
1650 Ghaziabad LC INFRA 20070218 Muradabad Village Water Supply Scheme 1 1 3536 2022 2037 2052 01-Jul-2024 31-Dec-2024 30-Apr-2025 01-May-2025 Actual Executed Cost Verified based on approved variation statement. All work completed and approved View
1651 Ghaziabad LC INFRA 20102064 MURADGAM PUR PURSI VILLAGE WATER SUPPLY SCHEME 1 1 9763 2022 2037 2052 31-May-2023 01-Nov-2024 30-Apr-2025 01-May-2025 Actual Executed Cost Verified based on approved variation statement. All work completed View
1652 Shahjahanpur NCC Ltd. 20014146 Muradpur Nibiakhera 1 1 3308 2022 2037 2052 31-Dec-2024 31-Aug-2023 30-Nov-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Muradpur Nibiakhera scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Muradpur Nibiyakhera scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1653 Farrukhabad Vindhya-GAJA (JV) 20080821 MURAITHI SVS 1 1 3388 2023 2038 2053 30-May-2025 26-Jan-2024 10-May-2024 11-May-2024 All the parameters of scheme verified can take in O&M. ok View
1654 Farrukhabad Vindhya-GAJA (JV) 20091736 MURAN & NAGLA SOODAN MVS 2 2 3391 2023 2038 2053 30-May-2025 09-Feb-2024 24-May-2024 25-May-2024 All the parameters of scheme verified can take in O&M. ok View
1655 Mau GA INFRA-VPL 20088206 MURARPUR GRAM PANCHAYAT WATER VSUPPLY SCHEME 4 10 2170 2023 2038 2053 30-Nov-2024 15-Jan-2025 15-Jan-2025 16-Jan-2025 Approved Approved View
1656 Fatehpur Power Mech Projects Ltd 20097524 MURAWAN 1 4 3770 2023 2038 2053 25-Oct-2024 11-Jun-2025 10-Jun-2025 11-Jun-2025 Minor work is pending. undertaking given by TKC. Trial & Run completed. It was initiated in the month of March (11.03.2025) and Regular water supply is given to the consumers. Verified View
1657 Shahjahanpur NCC Ltd. 20014893 MURCHA Sindhauli W/s 2 2 1910 2022 2037 2052 31-Dec-2024 27-Jun-2024 26-Sep-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Murcha scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Murcha scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1658 Jaunpur Welspun Kaveri Infraprojects JV 20022199 Murela 3 11 4978 2022 2037 2052 06-Jul-2023 13-Oct-2025 13-Oct-2025 14-Oct-2025 Checked and found ok.............. Ok View
1659 Shahjahanpur NCC Ltd. 8361721 MURHA HARIS GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME 1 1 2260 2022 2037 2052 09-Aug-2023 31-Dec-2024 08-Nov-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Murha Haris scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Murha Haris scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1660 Kanpur Dehat Indian Hume Pipe 20016901 Murlipur 2 3 2300 2022 2037 2052 04-Feb-2023 31-Dec-2024 31-Dec-2023 01-Jan-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1661 Meerut Power Mech Projects Ltd 20098087 MURLIPUR PHOOL 1 1 4505 2023 2038 2053 11-Jun-2025 15-Oct-2024 05-Mar-2025 06-Mar-2025 Recommended for further Approvals. Approved View
1662 Kanpur Dehat Indian Hume Pipe 20016899 Murra 2 5 3320 2022 2037 2052 04-Feb-2023 31-Dec-2024 08-Apr-2024 09-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1663 Kannauj GVPR 20067358 MURRA & BAUSIA GRAM PANCHAYAT WATER SUPPLY SCHEME 2 4 3816 2023 2038 2053 16-Aug-2024 20-Mar-2024 22-Jun-2024 23-Jun-2024 Forwarded for further action. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
1664 Azamgarh LC INFRA 20025166 Mustafabad Khas Rural Bad Water Supply Scheme 1 2 5115 2022 2037 2052 21-Mar-2023 15-Mar-2024 16-Jun-2024 17-Jun-2024 OK OK View
1665 Bijnor LC INFRA 20019392 Mustfapuransu Water Supply 1 1 1203 2022 2037 2052 10-Feb-2022 21-Apr-2024 23-Oct-2024 24-Oct-2024 Every thing completed. All Documents checked and verified View
1666 Bijnor LC INFRA 20019982 Muswi Khan pur Water Supply Scheme 1 3 1544 2022 2037 2052 10-Feb-2024 05-Apr-2024 14-Oct-2024 15-Oct-2024 every thing completed Everything Completed View
1667 Shahjahanpur NCC Ltd. 20015102 NADIAYA RAMPUR Jatipur W/s 1 1 2210 2022 2037 2052 30-Sep-2023 31-Dec-2024 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Nadiaya Rampur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of NADIAYA RAMPUR Jatipur W/s scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1668 Amethi Gayatri Projects LTD 20101996 NADIWAN WATER SUPPLY SCHEME 1 13 3024 2022 2037 2052 27-Jun-2025 07-Sep-2024 13-Dec-2024 15-Mar-2025 Hardcopy submitted and found okay as per the submitted documents. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance... View
1669 Ambedkar Nagar Vindhya-GAJA (JV) 20093128 NAGAHARA Water Supply Scheme 1 7 6320 2023 2038 2053 24-Mar-2024 24-Dec-2024 11-Oct-2025 12-Oct-2025 Checked found ok Scheme Completed View
1670 Jaunpur Welspun Kaveri Infraprojects JV 20066479 NAGAHTI 5 20 5331 2022 2037 2052 26-Jul-2024 28-Feb-2025 28-Feb-2025 01-Mar-2025 Testing & Commissioning certificate, Road restoration, trial & run certificate and Final BOQ not signed by EE but TPIA checked and signed all document for further process. ok View
1671 Gautam Buddha Nagar LC INFRA 20102367 NAGALA CHITI VILLAGE WATER SUPPLY SCHEME 1 1 665 2022 2037 2052 07-Feb-2024 01-Oct-2024 01-Jul-2024 01-Oct-2024 Project certificate is verified all work has been completed. View
1672 Kannauj GVPR 20036635 NAGALA KHEM KARAN & DILWARPUR GRAMIN PEYJAL YOJNA 2 2 3754 2023 2038 2053 13-May-2024 13-Apr-2024 16-Jul-2024 17-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1673 Etawah Indian Hume Pipe 20026325 Nagari Lolupur PWS 1 6 2850 2022 2037 2052 22-Sep-2023 29-Sep-2024 14-Jan-2025 15-Jan-2025 Forwarded for further action. All work of scheme found satisfactory. View
1674 Etawah Indian Hume Pipe 20025932 Nagari PWS 1 3 1470 2022 2037 2052 22-Sep-2023 16-Mar-2023 19-Jun-2023 20-Jun-2023 Dear Sir, the above data has been verified and forwarded to you for further action. All work of scheme found satisfactory View
1675 Shahjahanpur NCC Ltd. 20015211 NAGARIYA BUZURG 1 1 1650 2022 2037 2052 19-Dec-2023 31-Dec-2024 19-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Nagariya Bujurg have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Nagariya Bujurg scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1676 Farrukhabad Vindhya-GAJA (JV) 20075132 NAGARIYA GHALBARAN MVS 6 6 4265 2023 2038 2053 30-May-2025 03-Apr-2024 03-Apr-2024 04-Apr-2024 All the parameters of scheme verified can take in O&M. ok View
1677 Farrukhabad Vindhya-GAJA (JV) 20081666 NAGLA BASOLA & BHAGVANPUR MVS 2 10 3113 2023 2038 2053 30-May-2025 01-Jul-2024 01-Jul-2024 02-Jul-2024 All the parameters of scheme verified can take in O&M ok View
1678 Gautam Buddha Nagar LC INFRA 8389561 Nagla chamrooo 1 1 2162 2022 2037 2052 20-Mar-2023 31-Oct-2024 28-Feb-2025 01-Mar-2025 Project certificate is verified. Verified View
1679 Meerut Power Mech Projects Ltd 20058328 NAGLA CHAND & PALI 2 2 3841 2023 2038 2053 31-Dec-2024 16-Jul-2024 02-Dec-2024 03-Dec-2024 Recommended for further Approvals. approved View
1680 Hardoi NCC Ltd. 20012361 Nagla Kallu 3 4 2130 2021 2037 2052 28-Jul-2023 30-Oct-2023 31-Jan-2024 30-Nov-2024 ok OK View
1681 Farrukhabad Vindhya-GAJA (JV) 20076912 NAGLA KHEM RANGAI SVS 1 10 3083 2023 2038 2053 30-May-2025 26-Mar-2024 09-Jul-2024 10-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
1682 Meerut Power Mech Projects Ltd 20077314 NAGLA ORDER 1 1 4216 2022 2037 2052 31-Dec-2024 07-Aug-2024 20-Jan-2025 21-Jan-2025 Recommended for further Approvals. Approved View
1683 Auraiya GVPR 20065300 Nagla Pathak PWS 3 6 3104 2023 2038 2053 12-Jan-2023 04-Jan-2025 03-Jan-2025 04-Jan-2025 Forwarded for further action. All work of scheme fond satisfactory. View
1684 Meerut Power Mech Projects Ltd 20031856 NAGLA PATU - KHANPUR 2 2 2617 2023 2038 2053 31-Dec-2024 10-Mar-2024 27-Jul-2024 21-Jan-2025 Recommended for further Approval approved View
1685 Shahjahanpur NCC Ltd. 20016415 NAGLA PIPERIA 1 2 2770 2022 2037 2052 30-Sep-2023 31-Dec-2024 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Nagla Piperia scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Nagla Piperiya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1686 Shahjahanpur NCC Ltd. 20070988 NAGLA PRITHIVI URF NAGARIA WSS 2 2 2250 2022 2037 2052 31-Dec-2024 26-Oct-2023 25-Jan-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of NAGLA PRITHIVI URF NAGARIA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of NAGLA PRITHIVI URF NAGARIA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1687 Etawah Indian Hume Pipe 20087729 NAGLA SALEHADI 1 2 1710 2022 2037 2052 15-Mar-2024 15-Jun-2024 05-Oct-2024 06-Oct-2024 Forwarded for further action. All work of the scheme found satisfactory View
1688 Auraiya GVPR 20065298 Nagla simar PWS 1 2 1997 2023 2038 2053 01-Jun-2024 16-Jun-2024 15-Jun-2024 17-Jun-2024 Forwarded for further action. All work of scheme found satisfactory. View
1689 Etawah Indian Hume Pipe 20014151 Nagla Sukul 3 3 2070 2022 2037 2052 12-Sep-2022 14-Aug-2023 15-Jan-2024 14-Apr-2024 Forwarded for further action. All work of scheme found satisfactory View
1690 Bijnor LC INFRA 20017102 Naglan Nensi Bila Ahatmali water Supply 1 1 2081 2022 2037 2052 02-Nov-2023 22-Nov-2023 26-May-2024 27-May-2024 every thing completed. Everything Completed View
1691 Meerut Power Mech Projects Ltd 20082823 NAGLI AJAR SALEMPUR 1 1 1687 2023 2038 2053 11-Jun-2025 16-Oct-2024 08-Mar-2025 09-Mar-2025 Recommended for further Approvals. approved View
1692 Meerut Power Mech Projects Ltd 20020264 NAGLI AZAMABAD 1 1 1922 2022 2037 2052 31-Dec-2024 08-Mar-2024 15-Jun-2024 14-Nov-2024 Recommended for further Approvals. approved View
1693 Meerut Power Mech Projects Ltd 20037259 NAGLI ISSA & BANA 2 2 5750 2022 2037 2052 07-Jun-2024 31-Dec-2024 26-Oct-2024 27-Oct-2024 Recommended for further Approvals. approved View
1694 Meerut Power Mech Projects Ltd 20098086 NAGLI KITHAUR 1 1 3855 2023 2038 2053 11-Jun-2025 12-Sep-2024 29-Jan-2025 30-Jan-2025 Recommended for further Approvals. Approved View
1695 Meerut Power Mech Projects Ltd 20076726 NAGLI SADHARAN 1 1 2952 2022 2037 2052 31-Dec-2024 20-Nov-2024 08-Apr-2025 10-Apr-2025 Recommended for further Approval approved View
1696 Bahraich PNC-SPML-JV 20099228 NAGRAUR CHITTAURA RF PWS 1 2 7820 2022 2037 2052 31-Dec-2025 01-Dec-2025 01-Dec-2025 02-Dec-2025 scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/02/0486. kindly complete it Scheme completed with observation View
1697 Farrukhabad Vindhya-GAJA (JV) 20075739 NAGRIYA DEODHRAPUR & KARIMGANJ MVS 2 4 3115 2023 2038 2053 30-May-2025 15-Jun-2024 15-Jun-2024 16-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
1698 Kanpur Dehat Indian Hume Pipe 20034286 NAHI JYUNIYAN 1 2 3790 2022 2037 2052 24-Nov-2022 31-Dec-2024 28-Feb-2024 01-Mar-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1699 Kanpur Dehat GVPR 20086502 Nahili 1 5 1979 2023 2038 2053 14-Mar-2024 31-Jul-2024 14-Dec-2024 15-Dec-2024 Forward for further necessary action pls All work of scheme found satisfactory View
1700 Meerut Power Mech Projects Ltd 20069024 NAIDU & NAGLA KATAR 2 2 4526 2022 2038 2052 31-Dec-2024 11-Mar-2024 30-Jul-2024 01-Feb-2025 Recommended for further Approval approved View
1701 Ambedkar Nagar Vindhya-GAJA (JV) 20081483 NAILI WSS 3 6 3790 2023 2038 2053 08-Mar-2024 17-Jul-2026 17-Jul-2026 18-Jul-2026 Scheme completed and ready for O&M SCHEME COMPLETED View
1702 Ambedkar Nagar Vindhya-GAJA (JV) 20058533 NAIPURA Water Supply Scheme 1 9 3790 2023 2038 2053 26-Dec-2023 29-Jul-2025 27-Feb-2026 28-Feb-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
1703 Fatehpur Power Mech Projects Ltd 20097844 NAKSARA & ROSHANPUR TEKARI 3 4 4970 2023 2038 2053 14-May-2024 30-Jun-2025 04-Dec-2024 05-Dec-2024 Trial & Run completed. It was initiated in the month of September (05.09.2024) and Regular water supply is given to the consumers. Verified View
1704 Bahraich PNC-SPML-JV 20018643 NAKWA MAHASI PWS 1 2 3588 2022 2037 2052 31-Dec-2025 17-Oct-2025 17-Oct-2025 18-Oct-2025 Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/10/0501, kindly complete it. Scheme Completed with observation View
1705 Auraiya Indian Hume Pipe 8360956 Nalhupur, Bhagua 2 8 2575 2022 2037 2052 15-Sep-2022 28-May-2023 02-Dec-2023 03-Dec-2023 Forwarded for further action. All work of scheme found satisfactory. View
1706 Meerut Power Mech Projects Ltd 20011006 NALPUR 1 1 3728 2022 2037 2052 31-Dec-2024 16-Sep-2023 03-Feb-2024 02-Mar-2025 Recommended for further Approval approved View
1707 Bijnor LC INFRA 8360402 NALPURA VILLAGE WATER SCHEME 1 1 1950 2022 2037 2052 30-Sep-2023 12-Dec-2023 10-Jun-2024 11-Jun-2024 Every thing completed. Everything Complete. View
1708 Fatehpur Power Mech Projects Ltd 20079069 NAMA MAU GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 1965 2023 2038 2053 13-Mar-2024 28-Feb-2025 15-Jul-2025 16-Jul-2025 Trial & Run completed. It was initiated in the month of April (13.04.2025) and Regular water supply is given to the consumers. Verified View
1709 Auraiya Indian Hume Pipe 20056125 Nandgaon PWS 3 8 1890 2022 2037 2052 22-Sep-2023 10-Oct-2023 31-Jan-2024 01-Feb-2024 Forwarded for further action. All work of scheme fond satisfactory. View
1710 Kannauj GVPR 20066445 NANDLALPUR & GHILOY KHAS GRAM PANCHAYAT WATER SUPPLY SCHEME 3 3 2061 2023 2038 2053 16-Aug-2024 07-Apr-2024 11-Jul-2024 12-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1711 Bijnor LC INFRA 20087626 Nangla bhajja bila ahatmali village water supply scheme 1 1 2212 2022 2037 2052 04-Mar-2023 05-May-2025 31-Jul-2025 01-Aug-2025 Every thing complete. Check document View
1712 Bijnor LC INFRA 20075930 NANGLA GANNA WATER SUPPLY SCHEME 1 1 2375 2022 2037 2052 31-Dec-2024 28-Jan-2024 03-Aug-2024 04-Aug-2024 every thing completed Compeleted View
1713 Kannauj GVPR 20077123 NANHEPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 2318 2023 2038 2053 09-Aug-2024 07-Apr-2024 11-Jul-2024 12-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1714 Sultanpur UNIVERSAL MEP 20066052 NARAHI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 8 3620 2023 2038 2053 12-Jan-2024 12-Jan-2024 06-Dec-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
1715 Fatehpur Power Mech Projects Ltd 20079161 NARAICHA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 1 4300 2023 2038 2053 13-Mar-2024 06-Nov-2024 07-Aug-2024 07-Nov-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of August (7.08.2024) and Regular water supply is given to the consumers. Verified View
1716 Fatehpur Power Mech Projects Ltd 20097476 NARAINI 1 2 6670 2023 2038 2053 25-Sep-2024 30-Jan-2025 10-Jun-2025 11-Jun-2025 Trial & Run completed. It was initiated in the month of March(11.03.2025) and Regular water supply is given to the consumers. HGJ certificate not signed by Panchayat secretary. Verified View
1717 Hardoi NCC Ltd. 20011355 NARAINPUR GRANT 1 7 1590 2022 2037 2052 26-Jul-2023 11-Feb-2023 12-Aug-2023 30-Nov-2024 ok OK View
1718 Meerut Power Mech Projects Ltd 20066746 NARANGPUR 1 1 3580 2023 2038 2053 31-Dec-2024 06-Nov-2024 25-Mar-2025 06-Apr-2025 Recommended for further Approval approved View
1719 Meerut Power Mech Projects Ltd 20010915 NARANGPUR 3 3 4737 2022 2037 2052 27-May-2024 31-Dec-2024 13-Oct-2024 14-Oct-2024 Recommended for further Approval Approved View
1720 Ambedkar Nagar Vindhya-GAJA (JV) 20092720 NARAYANPUR Water Supply Scheme 1 3 1780 2023 2038 2053 24-Mar-2024 14-Sep-2025 31-Dec-2025 01-Jan-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
1721 Ambedkar Nagar Vindhya-GAJA (JV) 20092701 NARHARIYA KARAMPUR Water Supply Scheme 2 7 3470 2023 2038 2053 24-Mar-2024 01-Jul-2025 17-Oct-2025 18-Oct-2025 Scheme completed and ready for O&M Scheme Completed View
1722 Amethi Vindhya-GAJA (JV) 20068981 NARHARPUR WATER SUPPLY SCHEME 1 4 2270 2023 2038 2053 23-Mar-2024 26-Jun-2024 26-Sep-2024 27-Dec-2024 Hardcopy submitted and found okay as per the submitted documents. Hardcopy submitted and found okay as per the submitted documents.. View
1723 Kanpur Dehat Indian Hume Pipe 20015137 NARIHA 1 1 3825 2022 2037 2052 13-Oct-2021 12-Oct-2020 31-Mar-2024 01-Apr-2024 Forwarded to further action All work of scheme found satisfactory View
1724 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20023318 Naripur Mehnajpur 2 13 4445 2022 2037 2052 03-Mar-2024 12-Jan-2026 10-Jan-2026 12-Jan-2026 Scheme completed and ready for O&M Scheme Completed View
1725 Kanpur Dehat GVPR 20053272 NarKhurd 1 3 2558 2023 2038 2053 18-Nov-2023 27-Apr-2023 10-Sep-2023 11-Sep-2023 Forward for further necessary action pls All work of scheme found satisfactory View
1726 Kannauj GVPR 20077125 NARMAU GRAM PANCHAYAT WATER SUPPLY SCHEME 1 8 4997 2023 2038 2053 08-Sep-2024 07-May-2024 10-Aug-2024 11-Aug-2024 All works of scheme found satisfactory, scheme finalized for operation & maintenance. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
1727 Sultanpur UNIVERSAL MEP 20066074 NARSARA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 4 2670 2023 2038 2053 12-Jan-2024 31-Dec-2024 29-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
1728 Farrukhabad Vindhya-GAJA (JV) 20080825 NARSINGAPUR SVS 1 1 3274 2023 2038 2053 30-May-2024 30-Apr-2024 30-Apr-2024 01-May-2024 All the parameters of scheme verified can take in O&M. ok View
1729 Etawah Indian Hume Pipe 20014153 Naseerpur Bhoja 2 2 2580 2022 2037 2052 13-Sep-2021 09-Apr-2023 09-Apr-2024 10-Apr-2024 All work completed as per approved departmental design and drawing. Water supply is continue from last 1 years. No any leakage or pressure drop found during the final inspection. All work of scheme found satisfactory View
1730 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20007172 Naserpur Tulsepur - 168243 3 9 5058 2022 2037 2052 22-May-2026 12-Jul-2026 20-Feb-2026 12-Jul-2026 Scheme completed and ready for O&M Scheme Completed View
1731 Auraiya Indian Hume Pipe 20056126 Nasirabad 2 2 3200 2022 2037 2052 22-Sep-2023 01-Mar-2024 15-Jul-2024 16-Jul-2024 Forwarded for further action. All work of scheme fond satisfactory. View
1732 Mau LC INFRA 20044997 NASIRPUR KALA WATER SUPPLY SCHEME 4 14 2450 2022 2037 2052 19-Mar-2023 02-Feb-2026 07-Aug-2025 02-Feb-2026 Approved.. Approved View
1733 Ambedkar Nagar Vindhya-GAJA (JV) 20083477 NASIRPUR CHITTAUNA WSS 4 6 3240 2023 2038 2053 08-Mar-2024 08-Mar-2025 08-Feb-2025 09-Feb-2025 Checked and found ok SCHEME COMPLETED View
1734 Ambedkar Nagar Vindhya-GAJA (JV) 20068836 NASIRPUR WSS 5 12 4830 2023 2038 2053 08-Mar-2024 31-Aug-2025 29-Dec-2025 01-Jan-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
1735 Ambedkar Nagar Vindhya-GAJA (JV) 20033821 NASRULLAPUR WATER SUPPLY SCHEME 1 5 3190 2023 2038 2053 21-Oct-2023 24-Jan-2025 24-Apr-2025 25-Apr-2025 Scheme completed and ready for O&M Scheme completed View
1736 Ambedkar Nagar Vindhya-GAJA (JV) 20086811 NATHMALPUR HETHARIYA WSS 6 13 4460 2023 2038 2053 24-Mar-2024 22-Jul-2025 24-Dec-2025 25-Dec-2025 SCHEME READY FOR O&M SCHEME COMPLETED View
1737 Shahjahanpur NCC Ltd. 20015638 nathuapur 6 6 2640 2022 2037 2052 31-Dec-2024 04-Jan-2024 04-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Nathuapur WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of nathuapur WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1738 Farrukhabad Vindhya-GAJA (JV) 20074586 NATWARA MVS 2 6 2600 2023 2038 2053 31-Mar-2025 05-Sep-2024 01-Jan-2025 12-May-2025 Ok.. OK View
1739 Kanpur Dehat VSA 20092709 naubadpur 1 1 1918 2023 2038 2023 31-Mar-2024 15-Jan-2024 25-Apr-2024 26-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1740 Kanpur Dehat GVPR 20077331 Naubsta 2 6 3349 2023 2038 2053 17-Feb-2024 19-Jul-2024 04-Dec-2024 05-Dec-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1741 Etawah Indian Hume Pipe 20023841 Naudhna PWS 1 6 3500 2022 2037 2052 22-Sep-2023 03-Aug-2024 03-Aug-2024 04-Aug-2024 Forwarded for further action. All work of scheme found satisfactory View
1742 Kannauj GVPR 20050177 NAUGAI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 3516 2023 2038 2053 15-Jun-2024 07-Apr-2024 11-Jul-2024 12-Jul-2024 Forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1743 Farrukhabad Vindhya-GAJA (JV) 20076891 NAUGAON SVS 1 4 3531 2023 2038 2053 30-May-2025 03-Jun-2024 16-Sep-2024 17-Sep-2024 All the parameters of scheme verified can take in O&M. ok View
1744 Sultanpur UNIVERSAL MEP 20064699 NAUGVATEER GRAM PANCHAYAT WATER SUPPLY SCHEME 1 14 3460 2023 2038 2053 12-Jan-2024 31-Dec-2024 31-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action All uploaded documents have been checked and verified, found as per requirements. View
1745 Kanpur Dehat GVPR 20053281 Nauha Naugaon 1 7 3284 2023 2038 2053 18-Nov-2023 01-Feb-2024 16-Jun-2024 17-Jun-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1746 Ambedkar Nagar Vindhya-GAJA (JV) 20056723 NAURAHANI RAMPUR WSS 3 9 6820 2023 2038 2053 26-Dec-2023 24-Feb-2025 14-Jul-2025 15-Jul-2025 Approved Checked and found ok CHECKED AND FOUND OK View
1747 Kannauj GVPR 20036325 NAURANGPUR NAGARIYA & TIRWA DEHAT GRAMIN PEYJAL YOJNA 2 6 3802 2023 2038 2053 13-May-2024 25-Mar-2024 27-Jun-2024 28-Jun-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1748 Ghaziabad LC INFRA 20100523 NAURASPUR VILLAGE WATER SUPPLY SCHEME 1 1 1137 2022 2037 2052 30-Nov-2024 01-Jan-2025 31-May-2025 01-Jun-2025 Actual Executed Cost Verified based on approved variation statement. all work has been completed. Approved View
1749 Ambedkar Nagar Vindhya-GAJA (JV) 20096161 NAUSANDA Water Supply Scheme 4 9 5050 2023 2038 2053 20-Feb-2024 16-May-2025 16-Oct-2025 17-Oct-2025 Scheme completed and ready for O&M Scheme Completed and Ready For O&M View
1750 Bijnor Vindhya-GAJA (JV) 20038769 Navada Keso & Umarpur Khadar Gram Panchayat Water Supply 2 2 3710 2023 2038 2053 06-Jul-2023 21-May-2025 21-Nov-2025 22-Nov-2025 Every thing complete. all document complete View
1751 Sant Ravidas Nagar Welspun Kaveri Infraprojects JV 20036403 Navalpur Multi GP Water Supply Scheme 5 5 4460 2022 2037 2022 30-Jul-2025 30-Jul-2025 31-Oct-2025 01-Nov-2025 All related documents reviewed and found in accordance to the guide line of JJM. All documents reviewed and found in compliance with JJM guidelines. View
1752 Auraiya Indian Hume Pipe 20014513 navimohan pws 2 4 3700 2022 2037 2052 08-May-2023 14-Jul-2024 19-Oct-2024 20-Oct-2024 Forwarded for further action. All work of scheme found satisfactory. View
1753 Meerut Power Mech Projects Ltd 20068953 NAVIPUR AMANATNAGAR & NAGLA SAHU 2 1 9160 2022 2037 2052 31-Dec-2024 13-Jul-2024 06-Dec-2024 07-Dec-2024 Recommended for further Approvals. approved View
1754 Auraiya GVPR 20065296 Nawada Dandu 1 7 4117 2023 2038 2053 06-Jan-2022 08-Jan-2024 31-Aug-2023 09-Jan-2024 Forwarded for further action. All work of scheme found satisfactory. View
1755 Shahjahanpur NCC Ltd. 20015639 Nawada j Palia 3 3 2167 2022 2037 2052 31-Dec-2024 23-Jun-2024 22-Sep-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Nawada j Palia scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Nawada j Palia scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1756 Auraiya GVPR 20025449 NAWADA JWALA PRASAD 3 2 3645 2023 2038 2053 06-Jan-2022 12-Sep-2023 04-Jun-2023 21-Jul-2023 Forwarded for further action. All work of scheme found satisfactory. View
1757 Hardoi NCC Ltd. 8362393 NAYA GAON DEORIYA 1 3 2160 2022 2037 2052 05-Mar-2023 05-Feb-2023 04-May-2023 24-Dec-2024 ok OK View
1758 Hardoi NCC Ltd. 20012336 NAYA GAON MUBARAKPUR 1 3 5595 2022 2037 2052 05-Mar-2023 09-Feb-2023 08-May-2023 24-Dec-2024 ok OK View
1759 Farrukhabad Vindhya-GAJA (JV) 20076881 NAYAMATPUR BHUKSI SVS 1 3 1716 2023 2038 2053 31-Mar-2025 30-Jan-2025 14-May-2025 15-May-2025 OK.. OK View
1760 Meerut Power Mech Projects Ltd 20011114 NEEMKA 4 4 2783 2022 2037 2052 31-Dec-2024 19-Feb-2023 10-Jul-2023 30-Dec-2024 Recommended for further Approvals. approved View
1761 Mau LC INFRA 20082324 NEMDAHNR VILLAGE WATER SUPPLY SCHEME 1 4 3303 2022 2037 2052 27-Jul-2024 23-Mar-2026 27-Feb-2026 23-Mar-2026 Approved Approved View
1762 Ayodhya UNIVERSAL MEP 20030434 NEOTI & KOPAKANP GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME 2 5 3404 2023 2038 2053 12-Oct-2023 17-Oct-2023 17-Oct-2023 15-Nov-2024 Found ok Found Correct View
1763 Kanpur Dehat Indian Hume Pipe 20096868 Nera Kripalpur 2 3 2055 2022 2037 2052 03-Mar-2024 31-Dec-2024 31-Jul-2023 01-Aug-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
1764 Jaunpur Welspun Kaveri Infraprojects JV 20022197 Newada 1 5 2660 2022 2037 2052 06-Jul-2023 13-Oct-2025 13-Oct-2025 14-Oct-2025 Checked and found ok... OK View
1765 Hardoi NCC Ltd. 20012481 Newada Chathiya 3 5 2660 2022 2037 2052 26-Jul-2023 24-Feb-2023 23-May-2023 24-Dec-2024 ok OK View
1766 Amethi Vindhya-GAJA (JV) 20085670 NEWADA KISUNPUR GARH WATER SUPPLY SCHEME 2 13 3882 2023 2038 2053 27-Mar-2023 22-Jun-2024 22-Sep-2024 23-Dec-2024 Hardcopy submitted and found okay as per the submitted documents. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance.. View
1767 Azamgarh LC INFRA 20066405 Newada water supply scheme 2 5 3315 2022 2037 2052 04-Aug-2024 22-Jul-2024 22-Oct-2024 23-Oct-2024 OK OK View
1768 Etawah Indian Hume Pipe 20015037 Neware 3 6 2000 2022 2037 2052 08-May-2022 10-May-2024 31-Mar-2024 01-Apr-2024 Forwarded for further action. All work of scheme found satisfactory View
1769 Farrukhabad Vindhya-GAJA (JV) 20097912 NIBALPUR SVS 1 1 1395 2023 2038 2053 30-May-2025 02-Jun-2024 02-Jun-2024 03-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
1770 Kanpur Dehat GVPR 20053031 Nibauli bujurg 2 2 2943 2023 2038 2053 17-Nov-2023 21-Dec-2023 22-Mar-2024 23-Mar-2024 Forward for further action. All work of scheme found satisfactory View
1771 Kanpur Dehat GVPR 20077480 NIGIHIYA 2 4 2203 2023 2038 2053 17-Feb-2024 15-Jan-2024 20-Apr-2024 21-Apr-2024 TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI/KD/O&M/2025-26/6655 dt.29/07/2028. we can go to O&M through conditional, TKC submit the require document within 15 day's. All work of scheme found satisfactory View
1772 Kanpur Dehat VSA 20094274 nigohi 2 2 2043 2023 2038 2023 30-Apr-2023 31-Jan-2024 10-May-2024 11-May-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1773 Amethi Vindhya-GAJA (JV) 20067969 NIHAL GARH SAIDA PATTI WATER SUPPLY SCHEME 2 6 2006 2023 2038 2053 22-Mar-2024 22-Jun-2024 23-Sep-2024 24-Dec-2024 Hardcopy submitted and found okay as per the submitted documents. Hardcopy submitted and found okay as per the submitted documents.. View
1774 Meerut Power Mech Projects Ltd 20078457 NIHORI 1 1 1278 2023 2038 2053 31-Dec-2024 29-Sep-2024 16-Feb-2025 17-Feb-2025 Recommended for further Approvals. approved View
1775 Kanpur Dehat Indian Hume Pipe 20017095 Nihutha 2 2 1460 2022 2037 2052 05-Feb-2022 04-Feb-2022 31-Jan-2024 01-Feb-2024 Forward for Necessary All work of scheme found satisfactory View
1776 Jaunpur Welspun Kaveri Infraprojects JV 20067683 Nikarozpur 3 9 2878 2022 2037 2052 26-Jul-2024 26-Jul-2026 26-Jul-2026 27-Jul-2026 Checked and found ok................. ok View
1777 Ambedkar Nagar Vindhya-GAJA (JV) 20067226 NIKASPUR Water Supply Scheme 8 13 5250 2023 2038 2053 22-Mar-2024 24-Mar-2025 12-Sep-2025 13-Sep-2025 Scheme completed and ready for O&M Scheme Completed and Ready For O&M View
1778 Meerut Power Mech Projects Ltd 20078425 NILOHA RO WATER SUPPLY SCHEME 1 1 5776 2022 2037 2052 31-Dec-2024 10-Sep-2024 27-Jan-2025 28-Jan-2025 Recommended for further Approvals. approved View
1779 Farrukhabad Vindhya-GAJA (JV) 20076656 NINAURA SHANKLAPUR SADARIAPUR MVS 2 3 2229 2023 2038 2053 30-May-2025 04-Apr-2024 04-Apr-2024 05-Apr-2024 All the parameters of scheme verified can take in O&M. ok View
1780 Kanpur Dehat Indian Hume Pipe 8361988 NINHAURA 1 1 3370 2022 2037 2052 15-Sep-2021 14-Sep-2021 30-Jun-2023 01-Jul-2023 Forward for further action All work of scheme found satisfactory View
1781 Hardoi NCC Ltd. 20010582 Nipaniya W/S 2 4 2350 2022 2037 2052 14-Jun-2023 05-Apr-2023 06-Jul-2023 30-Nov-2024 ok OK View
1782 Meerut Power Mech Projects Ltd 20098144 NIRAWALI-DHUMA NAGLI 2 2 2713 2023 2038 2053 31-Dec-2024 08-Oct-2024 24-Feb-2025 25-Feb-2025 Recommended for further Approvals. approved View
1783 Sultanpur UNIVERSAL MEP 20066442 NIRSAHIYA GRAM PANCHAYAT WATER SUPPLY SCHEME 3 8 3720 2023 2038 2053 12-Jan-2024 12-Jan-2024 20-Jan-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
1784 Kanpur Dehat GVPR 20077486 NIWADA ANI BARIGAON 4 9 3290 2023 2038 2053 17-Feb-2024 18-Nov-2023 02-Apr-2024 03-Apr-2024 Forward for further necessary action pls All work of scheme found satisfactory View
1785 Kanpur Dehat Indian Hume Pipe 20031467 Niwada deoray 1 1 2580 2022 2037 2052 23-Sep-2022 31-Dec-2024 31-Dec-2023 01-Jan-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1786 Shahjahanpur NCC Ltd. 20019689 Niwadi 2 2 2950 2022 2037 2052 31-Dec-2024 04-Sep-2024 04-Dec-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Niwadi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Niwadi W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1787 Etawah Indian Hume Pipe 20073324 Niwari Kalan 1 4 6125 2022 2037 2052 15-Mar-2024 25-Jun-2024 25-Jun-2024 26-Jun-2024 Forwarded for further action All work of scheme found satisfactory View
1788 Auraiya Indian Hume Pipe 8362627 Niyamatpur bihari 1 6 3000 2022 2037 2052 13-Oct-2022 25-Jun-2024 24-Jun-2024 25-Jun-2024 Forwarded for further action. All work of scheme fond satisfactory. View
1789 Kannauj GVPR 20050188 NIYAMATPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 3 4 2966 2023 2038 2053 15-Jun-2024 16-Mar-2024 19-Jun-2024 20-Jun-2024 forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1790 Bijnor Vindhya-GAJA (JV) 20101805 NIZAMPUR DEVSI & HAKITHAPUR WSS 2 2 5222 2023 2038 2053 06-Jul-2023 20-May-2025 20-Nov-2025 21-Nov-2025 Every thing complete Documents complete View
1791 Etawah Indian Hume Pipe 20024493 NIZAMPUR PWS 2 3 2185 2022 2037 2052 22-Sep-2023 16-Mar-2024 22-Jun-2024 23-Jun-2024 Forwarded for further action. All works are satisfactory. View
1792 Kanpur Dehat VSA 20099336 Nonapur 1 1 2466 2023 2038 2023 31-Mar-2024 02-Feb-2024 11-Jan-2024 12-Jan-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1793 Ambedkar Nagar Vindhya-GAJA (JV) 20035279 NONHAR WSS 1 7 4380 2023 2038 2053 21-Oct-2023 30-Aug-2025 22-Dec-2025 23-Dec-2025 Checked and found ok Scheme Completed View
1794 Hardoi NCC Ltd. 20011186 NOORPUR HATHAURA 1 8 6310 2022 2037 2052 05-Mar-2023 19-Dec-2023 18-Mar-2024 24-Dec-2024 ok OK View
1795 Shahjahanpur NCC Ltd. 20057974 NOORPUR KARHI WSS 1 5 2720 2022 2037 2052 31-Dec-2024 25-Jul-2024 24-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the NOORPUR KARHI WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. SWSM/BLG/JJM/26-27/436 for further necessary action. All information on the portal for the completion certificate of NOORPUR KARHI WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1796 Shahjahanpur NCC Ltd. 20015952 NOORPUR NURSUIYA 1 1 2210 2022 2037 2052 30-Sep-2023 31-Dec-2024 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Noorpur Nursuiya scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Noorpur Narsuiya scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1797 Kannauj GVPR 20077106 NUNARI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 2216 2023 2038 2053 08-Sep-2024 13-Apr-2024 17-Apr-2024 18-Apr-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1798 Auraiya GVPR 20084701 Nurpur kharagpur 1 4 1578 2023 2038 2053 06-Jan-2022 03-May-2024 25-May-2024 26-May-2024 Forwarded for further action. All work of scheme found satisfactory. View
1799 Bijnor LC INFRA 20068055 ORANGABAD SHAKOORPUR BILA AHAT WATER SUPPLY SCHEME 3 3 2492 2022 2037 2052 23-Jan-2023 31-Jul-2025 31-Aug-2025 01-Sep-2025 Every thing complete. Check document View
1800 Bijnor LC INFRA 20011765 Orangpur Jogipura Water Supply Scheme 1 1 2496 2022 2037 2052 10-Feb-2022 13-May-2024 13-May-2024 14-May-2024 Every thing complete. All document complete View
1801 Fatehpur Power Mech Projects Ltd 20097849 OTI 2 6 2950 2023 2038 2053 25-Sep-2024 28-Dec-2024 14-May-2025 15-May-2025 Trial & Run completed. It was initiated in the month of February(13.02.2025) and Regular water supply is given to the consumers Verified View
1802 Jaunpur Welspun Kaveri Infraprojects JV 20011273 PAAKRI 1 3 2420 2022 2037 2052 23-Sep-2023 13-Oct-2025 13-Oct-2025 14-Oct-2025 Testing & Commissioning certificate, Road restoration, trial & run and Final BOQ not signed by EE but TPIA checked and signed all document for further process. ok View
1803 Meerut Power Mech Projects Ltd 20011596 PABLI KHURD 1 1 2572 2022 2037 2052 31-Dec-2024 28-Dec-2022 31-Mar-2023 11-Nov-2024 Recommended for further Approval approved View
1804 Etawah Indian Hume Pipe 20015038 Pachaya gaon 4 8 3900 2022 2037 2052 08-May-2023 19-Apr-2024 24-Jul-2024 25-Jul-2024 Forwarded for further action. All work of the scheme found satisfactory. View
1805 Auraiya GVPR 20064398 PACHDEORA PWS 1 2 2585 2023 0 0 06-Jan-2022 27-Jun-2024 21-Apr-2024 27-Jun-2024 Forwarded for further action. All work of scheme found satisfactory. View
1806 Meerut Power Mech Projects Ltd 20037233 PACHGAON PATTI AMARSINGH 1 1 4373 2022 2037 2052 31-Dec-2024 17-Jul-2024 05-Jan-2025 06-Jan-2025 Recommended for further Approvals. approved View
1807 Kannauj GVPR 20066526 PACHORE GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 2815 2023 2038 2053 16-Aug-2024 31-Mar-2024 03-Jul-2024 04-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1808 Shahjahanpur NCC Ltd. 20084461 PACHPERA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 2 2 2310 2023 2038 2053 31-Dec-2024 10-May-2024 09-Aug-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of PACHPERA scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of PACHPERA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1809 Farrukhabad Vindhya-GAJA (JV) 20093103 PACHRAULI MAHADEVPUR MVS 3 10 5326 2023 2038 2053 30-May-2025 16-Jun-2024 16-Jun-2024 17-Jun-2024 All the parameters of scheme verified can take in O&M ok View
1810 Maharajganj JMC - Kalpataru 20009809 PACHRUKHI Gram Panchayat Water Supply Scheme 1 11 3440 2022 2037 2052 30-Jul-2024 30-Jul-2024 29-Oct-2024 01-Nov-2024 Ok As per JE/AE/TPIA Recommendation Pachrukhi W/S schemes completed. Water supply was provided regular basis. View
1811 Jaunpur AFCONS 20068206 Pachurakhi Jalim Singh & Sapahi Village water supply scheme 6 15 3880 2023 2038 2053 10-Mar-2024 12-Oct-2024 12-Oct-2024 13-Oct-2024 checked and found ok. OK View
1812 Bijnor LC INFRA 20087917 Padli Village Water Supply Scheme 2 2 1981 2022 2037 2052 13-Apr-2023 24-Feb-2025 23-Feb-2005 24-Feb-2025 Every thing completed. Everything Completed. View
1813 Sultanpur UNIVERSAL MEP 20066919 PADRE & KANEHATI GRAM PANCHAYAT WATER SUPPLY SCHEME 2 19 5320 2023 2038 2053 12-Jan-2024 31-Dec-2024 30-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements View
1814 Fatehpur Power Mech Projects Ltd 20106722 PADRI NBIPUR 1 1 510 2023 2038 2053 18-Mar-2025 30-Jun-2025 15-Sep-2025 16-Sep-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of June(16.06.2025) and Direct Regular water supply is given to the consumers. Verified View
1815 Shahjahanpur NCC Ltd. 20018036 Padria dalelpur 3 3 3620 2022 2037 2052 31-Dec-2024 31-Jul-2023 30-Oct-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Padaria Dalelpur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Padriya Dalelpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1816 Fatehpur Gayatri Projects LTD 20026697 PAHARDPUR 2 3 2610 2022 2037 2052 30-Jun-2025 17-Sep-2024 17-Sep-2024 18-Sep-2024 Trial & Run completed. It was initiated in the month of June (17.06.2024) and Regular water supply is given to the consumers. Verified View
1817 Mau LC INFRA 20035392 PAHARIPUR KHIRIYA WATER SUPPLY SCHEME 2 6 2339 2022 2037 2052 06-Jul-2024 03-Nov-2023 06-Jul-2023 26-Nov-2024 All works of this scheme has been completed and water supply has been start. Approved View
1818 Fatehpur Power Mech Projects Ltd 20099435 PAHARPUR 2 3 2670 2023 2038 2053 13-Aug-2024 30-Jun-2025 18-Apr-2025 19-Apr-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of January(19.01.2025) and Regular water supply is given to the consumers. Verified View
1819 Bijnor LC INFRA 20051648 PAHARPUR & MUZAFFARPUR 4 4 4367 2022 2037 2052 03-Dec-2022 21-May-2024 22-Aug-2024 23-Aug-2024 Every thing complete complete View
1820 Sultanpur Vindhya-GAJA (JV) 20084413 PAHARPUR SHRIRAMPUR & SARAIYA KAMAURA WSS 2 4 3930 2023 2038 2053 22-Jul-2023 25-Sep-2023 02-Feb-2025 01-Nov-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
1821 Ambedkar Nagar Vindhya-GAJA (JV) 20041820 PAHARPUR SULTANPUR WSS 2 3 2510 2023 2038 2053 23-Nov-2023 21-Dec-2024 21-Mar-2025 22-Mar-2025 Scheme completed and ready for O&M Scheme completed View
1822 Meerut Power Mech Projects Ltd 20098172 PAHARPUR-DUDHLI BANGAR 2 2 2459 2023 2038 2053 11-Jun-2025 26-Feb-2025 15-Jul-2025 16-Jul-2025 Recommended for further Approvals. approved View
1823 Sultanpur UNIVERSAL MEP 20066386 PAHATTEPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 3 5 2724 2023 2038 2053 12-Jan-2024 12-Jan-2024 29-Jun-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
1824 Fatehpur Gayatri Projects LTD 20026580 PAHLI CHHICHHU 3 4 2069 2022 2037 2052 29-Mar-2024 12-Jul-2023 12-Oct-2023 13-Oct-2023 Work has been completed. Trial & Run also completed. It was initiated in the month of July (12.07.2023) and Regular water supply is given to the consumers. Verified View
1825 Fatehpur Gayatri Projects LTD 20026590 PAHLI KUTUBPUR 1 2 1530 2022 2037 2052 29-Mar-2024 20-Jun-2023 20-Sep-2023 21-Sep-2023 Work has been completed. Trial & Run also completed. It was initiated in the month of June (20.06.2023) and Regular water supply is given to the consumers. Verified View
1826 Kannauj GVPR 20067621 PAIBANDABAD GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 2687 2023 2038 2053 16-Aug-2024 28-Apr-2024 31-Jul-2024 01-Aug-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1827 Amethi Gayatri Projects LTD 20101987 PAIGA WATER SUPPLY SCHEME 1 5 1248 2022 2037 2052 26-Nov-2025 25-Jun-2024 26-Sep-2024 15-Nov-2024 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
1828 Ambedkar Nagar Vindhya-GAJA (JV) 20019761 Paikauli 1 4 3800 2023 2038 2053 03-Aug-2023 25-Oct-2025 14-Feb-2026 15-Feb-2026 Scheme completed and ready for O&M Scheme Completed View
1829 Shahjahanpur NCC Ltd. 20097967 PAINA KHURD (SUNDAR NAGAR) GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME 1 1 2350 2022 2037 2052 31-Dec-2024 18-Aug-2024 17-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Paina Khurd scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of PAINA KHURD (SUNDAR NAGAR) GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1830 Bahraich PNC-SPML-JV 20100749 PAIRUA MIHIPURWA RF PWS 1 5 2790 2022 2037 2052 31-Dec-2025 21-Nov-2025 21-Nov-2025 22-Nov-2025 scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/02/0116 kindly complete it. scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/02/0116 kindly complete it. View
1831 Auraiya GVPR 20084714 Pakhangoi PWS 1 1 1608 2023 2038 2053 01-Jun-2024 30-Apr-2024 29-Apr-2024 01-May-2024 Forwarded for further action. All work of scheme found satisfactory. View
1832 Bijnor Vindhya-GAJA (JV) 20088642 Pakhanpur & Saidpura Gajju Water Supply Scheme 6 6 4783 2023 2038 2053 06-Jul-2023 20-May-2025 20-Nov-2025 21-Nov-2025 Every thing complete. Document complete View
1833 Ambedkar Nagar Vindhya-GAJA (JV) 20058537 PAKRI BHOJPUR Water Supply Scheme 1 5 4100 2023 2038 2053 26-Dec-2023 09-Nov-2024 09-Feb-2025 10-Feb-2025 Scheme completed and ready for O&M SCHEME COMPLETED View
1834 Ambedkar Nagar Vindhya-GAJA (JV) 20096249 PAKRI NAGAUPUR Water Supply Scheme 1 7 2320 2023 2038 2053 08-Mar-2024 25-Jun-2025 28-Oct-2025 29-Oct-2025 Scheme completed and ready for O&M Scheme Completed View
1835 Kannauj GVPR 20067668 PALA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 2071 2023 2038 2053 16-Aug-2024 10-Nov-2024 15-Nov-2024 15-Feb-2025 forwarded for Further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1836 Shahjahanpur NCC Ltd. 20033489 Palia 1 1 2200 2022 2037 2052 31-Dec-2024 04-Jan-2024 04-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Palia scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Palia scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1837 Kanpur Dehat GVPR 20065233 Paliya Banskhera 1 6 2744 2023 2038 2053 18-Jan-2024 04-Dec-2023 18-Apr-2024 19-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1838 Kannauj GVPR 20066652 PALIYA BUNCHPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 2492 2023 2038 2053 06-Aug-2024 31-Mar-2024 03-Jul-2024 04-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1839 Shahjahanpur NCC Ltd. 20014817 PALIYA PATTI 2 2 2159 2022 2037 2052 01-Dec-2023 31-Dec-2024 01-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Paliya Patti scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Paliya Patti scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1840 Meerut Power Mech Projects Ltd 20071538 PALRA & DARIAPUR 2 2 4322 2023 2038 2053 31-Dec-2024 28-May-2025 14-Oct-2025 15-Oct-2025 Recommended for further Approvals. approved View
1841 Kanpur Dehat Indian Hume Pipe 20111027 Paman 2 3 2405 2022 2037 2052 10-Oct-2023 31-Dec-2024 31-Aug-2024 01-Sep-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1842 Mau LC INFRA 20044480 PANAIL BIHATA WATER SUPPLY SCHEME 2 3 2442 2022 2037 2052 02-Mar-2024 24-Feb-2026 11-Dec-2025 24-Feb-2026 Approved Approved View
1843 Meerut Power Mech Projects Ltd 8362073 PANCHI 1 1 5693 2022 2037 2052 16-Jul-2023 15-Feb-2023 05-Jul-2023 06-Apr-2025 Recommended for further Approvals. approved View
1844 Azamgarh LC INFRA 20058125 Pandaha water supply scheme 4 8 2710 2023 2038 2053 09-May-2024 13-Mar-2024 12-Jun-2024 13-Jun-2024 ok ok View
1845 Ambedkar Nagar Vindhya-GAJA (JV) 20041625 PANDEY PAIKAULI 1 7 4750 2023 2038 2053 23-Oct-2023 14-Aug-2024 09-Jul-2025 10-Oct-2025 Checked and Found OK CHECKED AND FOUND OK View
1846 Fatehpur Power Mech Projects Ltd 20089310 PANERUA 1 2 2550 2023 2038 2053 14-Mar-2024 30-Jun-2025 05-Oct-2025 06-Oct-2025 Trial & Run completed. It was initiated in the month of July (04.07.2025) and Regular water supply is given to the consumers. HGJ certificate not signed by panchayat secretary. Verified View
1847 Amethi Vindhya-GAJA (JV) 20065222 Paniyar Water Supply Scheme 5 17 4114 2023 2038 2053 17-Feb-2024 15-Jun-2025 15-Sep-2024 16-Dec-2024 Hardcopy submitted and found okay as per the submitted documents.. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance.. View
1848 Farrukhabad GVPR 8359381 PANJU KHIRIYA W/S SCHEME 1 1 1913 2022 2037 2037 26-Aug-2022 20-Jun-2024 31-Oct-2025 01-Nov-2025 All the parameters of scheme verified can take in O&M. ok View
1849 Shahjahanpur NCC Ltd. 20019694 Panthi 2 2 2520 2022 2037 2052 31-Aug-2023 31-Dec-2024 11-Nov-2023 16-Nov-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Panthi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Panthi scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1850 Kannauj GVPR 20050181 PANTHRA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 6 4077 2023 2038 2053 15-Jun-2024 10-Apr-2024 13-Jul-2024 14-Jul-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1851 Shahjahanpur NCC Ltd. 20077372 PANWARI WSS 1 1 1550 2022 2037 2052 31-Dec-2024 28-Feb-2024 29-May-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of PANWARI WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of PANWARI WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1852 Amethi Welspun Kaveri Infraprojects JV 8362594 PARA 2 3 1930 2022 2037 2052 10-Apr-2023 02-Feb-2025 04-May-2025 05-May-2025 All things found satisfactory in the Scheme and finalized for Operation And Maintenance Approved View
1853 Amroha OMIL-JWIL (JV) 20023387 PARA KHALSA GRAM PANCHAYAT WATER SUPPLY SCHEME 2 2 2099 2023 2038 2053 31-Dec-2024 30-Nov-2024 08-Mar-2024 30-Nov-2024 Trial run successfully completed on 10-09-2024 Approved View
1854 Fatehpur Power Mech Projects Ltd 20079094 PARADAN Gram Panchayat Water Supply Scheme 1 1 2094 2023 2038 2053 13-Mar-2024 12-Dec-2025 12-Dec-2024 13-Dec-2024 Trial & Run completed. It was initiated in the month of September (13.09.2024) and Regular water supply is given to the consumers. Verified View
1855 Fatehpur Power Mech Projects Ltd 20079058 PARADHANAI 1 2 2150 2023 2038 2053 14-Mar-2024 30-Jun-2025 07-Dec-2025 08-Dec-2025 Trial & Run completed. It was initiated in the month of September(06.09.2025) and Regular water supply is given to the consumers. Verified View
1856 Auraiya GVPR 20084726 Parariya 1 4 2767 2023 0 0 01-Jun-2022 18-Feb-2025 17-Feb-2025 19-Feb-2025 Forwarded for further action. All work of scheme fond satisfactory. View
1857 Ambedkar Nagar Vindhya-GAJA (JV) 20047603 PARAS KATUI Water Supply Scheme 3 7 3460 2023 2038 2053 23-Nov-2023 03-Apr-2025 03-Apr-2025 04-Apr-2025 Checked and Verifiyed Scheme completed View
1858 Hardoi NCC Ltd. 20032097 PARASPUR 1 9 5510 2022 2037 2052 29-Apr-2023 01-Dec-2023 01-Mar-2024 24-Dec-2024 ok OK View
1859 Mau GA INFRA-VPL 20100924 PARASPURA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 850 2023 2038 2053 19-Jan-2025 19-Jan-2025 18-Jan-2025 19-Jan-2025 APPROVED APPROVED View
1860 Auraiya GVPR 20099162 Parghaipur PWS 1 1 1448 2023 2038 2053 01-Jun-2022 15-May-2025 14-May-2025 16-May-2025 Forwarded for further action. All work of scheme found satisfactory. View
1861 Fatehpur Power Mech Projects Ltd 20102042 PARI NARWA 1 1 1920 2023 2038 2053 24-Jan-2024 23-Jan-2025 19-Aug-2025 20-Aug-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of May(20.05.2025) and Regular water supply is given to the consumers. Verified View
1862 Meerut Power Mech Projects Ltd 20020242 PARIKSHITGARH DEHAT 1 1 3638 2022 2037 2052 31-Dec-2024 14-Jan-2024 01-Jun-2024 18-Dec-2024 Recommended for further Approval approved View
1863 Ambedkar Nagar Vindhya-GAJA (JV) 20068319 PARIYAI WSS 2 5 2970 2023 2038 2053 20-Feb-2024 30-Jun-2025 25-Oct-2025 26-Oct-2025 Checked and found ok Scheme Completed View
1864 Hardoi NCC Ltd. 20021753 PARSA MOHADDINPUR 3 12 6560 2022 2037 2052 14-Jun-2023 07-Oct-2023 06-Jan-2024 24-Dec-2024 ok OK View
1865 Sitapur NCC Ltd. 8362975 PARSADA 1 3 3379 2022 2037 2052 11-Mar-2023 30-Aug-2022 25-Dec-2023 18-Nov-2024 Work completed as per filled checklist. APPROVE View
1866 Kannauj GVPR 20036207 PARSARAMAU GRAMIN PEYJAL YOJNA 2 5 3850 2023 2038 2053 13-May-2024 10-Nov-2024 14-Feb-2025 15-Feb-2025 Forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1867 Kanpur Dehat GVPR 20065234 PARSAURA 2 3 1955 2023 2038 2053 18-Jan-2024 22-Jul-2024 05-Dec-2024 06-Dec-2024 Forward for further necessary action pls All work of scheme found satisfactory View
1868 Shahjahanpur NCC Ltd. 20084317 PARSHRAMPUR & POSIL MULTI GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 2 2 3920 2022 2037 2052 31-Dec-2024 25-Aug-2024 24-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Parshurampur Poshil scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of PARSHRAMPUR & POSIL scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1869 Auraiya GVPR 20099158 Parshu PWS 1 3 2551 2023 2038 2053 01-Jun-2022 21-Jan-2025 20-Jan-2025 22-Jan-2025 Forwarded for further action. All work of scheme found satisfactory. View
1870 Kanpur Dehat GVPR 20026303 PARSOLI & BHUJPURA 2 5 3674 2023 2038 2053 26-Sep-2023 08-Nov-2023 22-Mar-2024 23-Mar-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
1871 Amethi Vindhya-GAJA (JV) 20068382 PARSOYIA WATER SUPPLY SCHEME 2 10 2541 2023 2038 2053 23-Mar-2024 27-Jun-2024 27-Sep-2024 28-Dec-2024 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
1872 Ayodhya UNIVERSAL MEP 20030555 PASTAMAPHI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 2590 2023 2038 2053 12-Oct-2023 29-Aug-2023 29-Aug-2023 15-Nov-2024 Found ok Found correct View
1873 Meerut Power Mech Projects Ltd 20012933 PASWARA 1 1 3634 2022 2037 2052 31-Dec-2024 22-Feb-2023 11-Jul-2023 11-Nov-2024 CHECKED AND VERIFIED.... approved View
1874 Auraiya Indian Hume Pipe 8361966 PATA 1 3 4755 2022 2037 2052 14-Sep-2022 01-Jun-2023 24-Sep-2023 25-Sep-2023 Forwarded for further action. All work of scheme fond satisfactory. View
1875 Sultanpur UNIVERSAL MEP 20066498 PATAIPUR & NAAUGVA RAYTASI GRAM PANCHAYAT WATER SUPPLY SCHEME 4 8 5110 2023 2038 2053 12-Jan-2024 12-Jan-2024 25-Mar-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
1876 Ambedkar Nagar Vindhya-GAJA (JV) 20019813 Patauna 1 5 2110 2023 2038 2053 03-Aug-2023 04-Oct-2025 17-Jan-2026 18-Jan-2026 Scheme completed and ready for O&M SCHEME COMPLETED AND READY FOR O&M View
1877 Meerut Power Mech Projects Ltd 20011236 PATHOLI 2 2 3880 2022 2037 2052 31-Dec-2024 08-Jul-2024 04-Dec-2024 05-Dec-2024 Recommended for further Approvals. approved View
1878 Ghaziabad LC INFRA 8360451 PATTI 1 1 2048 2022 2037 2052 31-Mar-2024 10-Mar-2024 10-Mar-2024 01-Apr-2024 Satisfactory on the work & completed all civil works and E&M works. All work checked and recommended for O&M View
1879 Kannauj GVPR 20066667 PATTI & BIBIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 5 6 2905 2023 2038 2053 16-Aug-2024 31-Mar-2024 03-Jul-2024 04-Jul-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
1880 Shahjahanpur NCC Ltd. 20014794 Patti Chhajjupur 1 1 2410 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Patti Chajjupur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Patti Chhajjupur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1881 Farrukhabad Vindhya-GAJA (JV) 20092860 PATTI DARAPUR MVS 3 3 2972 2023 2038 2053 31-Mar-2025 02-Sep-2024 15-Dec-2024 16-Dec-2024 All the parameters of scheme verified can take in O&M ok View
1882 Auraiya GVPR 20065286 Patti gyani &Patti torna 1 4 3218 2023 2038 2053 01-Jun-2022 03-Aug-2024 02-Aug-2024 04-Aug-2024 Forwarded for further action All work of scheme fond satisfactory. View
1883 Meerut Power Mech Projects Ltd 20098181 PATTI KHERKI 1 1 642 2023 2038 2053 31-Dec-2024 05-Apr-2024 21-Aug-2024 02-Mar-2025 Recommended for further Approval approved View
1884 Fatehpur Power Mech Projects Ltd 20100805 PATTISHAH 1 11 5880 2023 2038 2053 18-Mar-2024 30-Jun-2025 11-Nov-2024 12-Nov-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of August (12.08.2025) and Regular water supply is given to the consumers. Verified View
1885 Kannauj GVPR 20050537 PAURAUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 4 4735 2023 2038 2053 15-Jun-2024 04-Nov-2024 07-Feb-2025 08-Feb-2025 Forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1886 Meerut Power Mech Projects Ltd 20066733 PAVLI KHAS 1 1 11083 2022 2037 2052 31-Dec-2024 11-Aug-2024 09-Jan-2025 10-Jan-2025 Recommended for further Approval approved View
1887 Bahraich PNC-SPML-JV 20048334 PEDWA JARWAL MVS PWS 2 9 8653 2022 2037 2052 31-Mar-2028 11-Feb-2026 11-Feb-2026 12-Feb-2026 scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/02/0536. kindly complete it Scheme completed with observation View
1888 Amethi Gayatri Projects LTD 20072819 Peeparpur & Naugirwan GP water supply scheme 2 6 2689 2022 2037 2052 13-Aug-2024 25-Jun-2024 29-Sep-2024 16-Nov-2024 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
1889 Ambedkar Nagar Vindhya-GAJA (JV) 20067299 PEERPUR Water Supply Scheme 1 12 4140 2023 2038 2053 20-Feb-2024 19-Jul-2025 19-Jul-2025 07-Aug-2025 Scheme completed and ready for O&M Scheme completed and ready for O&M View
1890 Ambedkar Nagar Vindhya-GAJA (JV) 20092937 PEETHAPUR Water Supply Scheme 1 1 3040 2023 2038 2053 17-May-2025 02-Dec-2025 19-Mar-2026 20-Mar-2026 scheme completed ready for o&m scheme completed ready for o&m View
1891 Etawah Indian Hume Pipe 20015032 Peharpur 2 2 2395 2022 2037 2052 08-May-2023 11-Dec-2023 11-Dec-2023 12-Dec-2023 Forwarded for further action. All work of scheme found satisfactory. View
1892 Balrampur Larsen & Toubro Ltd 20024855 Peher Water Supply Scheme 2 3 4300 2022 2037 2052 31-Dec-2026 06-Sep-2025 06-Dec-2025 07-Dec-2025 Based on the site inspection and the observations recorded under the Distribution Pipeline & FHTC, Pump House, OHT, Boundary Wall & Campus Development, and E&M works, it is observed that several important construction, finishing, testing, documentation, and functional works are still incomplete or require rectification. After completion of the above rectification works, the scheme should be jointly re-inspected and functionally tested by the concerned TKC/Executing Agency, TPI, and UPJN Engineer. Transfer to the O&M Phase may be considered only after satisfactory verification of the completed works, successful functional testing, submission of all required documents, and confirmation that the scheme is capable of providing continuous and safe water supply to all intended habitations. Some FHTCs and other minor campus related works to be rectified. View
1893 Meerut Power Mech Projects Ltd 20011227 PEPLA 1 1 2911 2022 2037 2052 31-Dec-2024 02-Mar-2023 19-Jul-2023 10-Mar-2025 Recommended for further Approval approved View
1894 Kannauj GVPR 20077071 PHARHAN GRAM PANCHAYAT WATER SUPPLY SCHEME 2 2 1774 2023 2038 2053 16-Aug-2024 21-Jan-2025 23-Apr-2025 24-Apr-2025 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1895 Meerut Power Mech Projects Ltd 20011298 PHITKARI 1 1 5025 2023 2037 2052 31-Dec-2024 17-Mar-2023 05-Aug-2023 10-Mar-2025 Recommended for further Approval approved View
1896 Etawah Indian Hume Pipe 20015030 Phoolpur 1 3 1790 2022 2037 2052 12-Oct-2022 14-Apr-2024 24-Jul-2024 25-Jul-2024 Forwarded for further action. All work of scheme found satisfactory. View
1897 Auraiya GVPR 20064344 Phoolpur PWS 1 6 3085 2023 2038 2053 01-Jun-2024 01-Oct-2024 30-Sep-2024 01-Oct-2024 Forwarded for further action. All work of scheme found satisfactory. View
1898 Jaunpur AFCONS 20044677 PHOOLPUR VILLAGE WATER SUPPLY SCHEME 2 5 2647 2023 2038 2053 18-Nov-2023 15-Feb-2025 15-May-2025 16-May-2025 ok ok View
1899 Ambedkar Nagar Vindhya-GAJA (JV) 20058530 PHOOLPUR Water Supply Scheme 1 7 2600 2023 2038 2053 26-Dec-2023 27-Feb-2025 04-Apr-2026 05-Apr-2026 Scheme completed and ready for O&M SCHEME COMPLETED View
1900 Kannauj GVPR 20077126 PHULANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 2931 2023 2038 2053 08-Sep-2024 10-Apr-2024 13-Jul-2024 14-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1901 Ambedkar Nagar Vindhya-GAJA (JV) 20068332 PICHAWARA WSS 2 3 1580 2023 2038 2053 08-Mar-2024 15-Jun-2025 14-Oct-2025 15-Oct-2025 Checked and found ok Scheme Completed View
1902 Mau LC INFRA 8389108 PIDHWAL 1 10 4349 2022 2037 2052 20-Sep-2023 11-Sep-2024 10-Sep-2024 11-Sep-2024 Approved Approved View
1903 Amethi Gayatri Projects LTD 20035177 PINDARA PARERA WATER SUPPLY SCHEME 1 11 4328 2022 2037 2052 03-Nov-2024 15-May-2024 20-Aug-2024 01-Dec-2024 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
1904 Shahjahanpur NCC Ltd. 20053208 Pipari WSS 2 2 2620 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Pipari scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Pipari scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1905 Shahjahanpur NCC Ltd. 7967856 PIPARIYA KHUSHALI 1 1 2080 2022 2037 2052 31-Dec-2024 24-Jan-2024 24-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of PIPARIYA KHUSHALI WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Mahmadpur PIPARIYA KHUSHALI WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1906 Auraiya GVPR 20065288 Piparpur PWS 1 3 2424 2023 0 0 01-Jun-2022 22-Aug-2024 21-Aug-2024 23-Aug-2024 Forwarded for further action. All work of scheme fond satisfactory. View
1907 Sultanpur UNIVERSAL MEP 20092917 PIPERGAON GRAM PANCHAYAT WATER SUPPLY SCHEME 1 15 8588 2023 2038 2055 18-Jul-2024 01-Mar-2025 01-Jun-2025 01-Jul-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
1908 Ambedkar Nagar Vindhya-GAJA (JV) 20019810 Pipri Mohammadi 2 7 2053 2023 2038 2053 03-Aug-2023 17-Feb-2025 17-May-2025 18-May-2025 Scheme completed and ready for O&M Scheme completed View
1909 Hardoi NCC Ltd. 20011881 PIPRINARAYANPUR 2 4 2320 2022 2037 2052 14-Jun-2023 15-May-2023 17-Aug-2023 17-Dec-2024 ok OK View
1910 Sultanpur UNIVERSAL MEP 20066414 PIROOSARAIYA GRAM PANCHAYAT WATER SUPPLY SCHEME 2 6 3790 2023 2038 2053 12-Jan-2024 31-Dec-2024 20-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements. View
1911 Bijnor Vindhya-GAJA (JV) 20095450 Pirthipur WSS 2 2 2476 2023 2038 2053 06-Jul-2023 10-Jan-2025 10-Jul-2025 11-Jul-2025 Every thing complete. Check Document View
1912 Etawah Indian Hume Pipe 20026341 Pirthverampur pWS 1 3 1575 2022 2037 2052 22-Sep-2023 04-Apr-2024 10-Jul-2024 11-Jul-2024 Dear Sir, the above data has been verified and forwarded to you for further action. All work of scheme found satisfactory View
1913 Kanpur Dehat GVPR 20025202 PITARAPUR 2 4 3415 2023 2038 2053 26-Sep-2023 01-Sep-2023 12-Jan-2024 13-Jan-2024 Forward for further necessary action pls All work of scheme found satisfactory View
1914 Ambedkar Nagar Vindhya-GAJA (JV) 20068829 PITHAPUR SARAIYA WSS 2 9 1960 2023 2038 2053 08-Mar-2024 20-Jul-2024 09-Nov-2025 10-Nov-2025 Scheme completed and ready for O&M Scheme Completed View
1915 Ambedkar Nagar Vindhya-GAJA (JV) 20042967 PIYAREPUR 1 5 2340 2023 2038 2053 23-Nov-2023 14-Oct-2025 31-Jan-2026 01-Mar-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
1916 Meerut Power Mech Projects Ltd 8359771 POHALI 1 1 6287 2022 2037 2052 31-Dec-2024 25-Feb-2024 13-Jul-2024 13-Nov-2024 Recommended for further Approvals. approved View
1917 Sant Ravidas Nagar Welspun Kaveri Infraprojects JV 20016959 POORE BHAN Multi Village Water Supply Scheme 5 5 2740 2022 2037 2022 30-Jul-2025 30-Jul-2025 31-Oct-2025 01-Nov-2025 All related documents reviewed and found in accordance to the guide line of JJM. All documents reviewed and found in compliance with JJM guidelines. View
1918 Meerut Power Mech Projects Ltd 20011059 POOTHI 1 1 2513 2022 2037 2052 31-Dec-2024 21-Jun-2023 06-Nov-2023 28-May-2025 Recommended for further Approvals. approved View
1919 Jaunpur AFCONS 20100669 PORAI KHURD VILLAGE WATER SUPPLY SCHEME 3 6 4830 2023 2038 2053 21-Feb-2024 12-Oct-2024 12-Oct-2024 13-Oct-2024 checked and found ok. ok View
1920 Auraiya GVPR 20091178 Pouthi PWS 2 1 2285 2023 2038 2053 31-Dec-2024 24-Jul-2024 27-Jul-2024 27-Jul-2024 Forwarded for further action. All work of scheme found satisfactory. View
1921 Ambedkar Nagar Vindhya-GAJA (JV) 20042925 PRATAPIPUR WSS 1 5 4010 2023 2037 2053 23-Nov-2023 14-Jun-2024 02-Dec-2024 03-Dec-2024 Checked and found ok SCHEME COMPLETED View
1922 Fatehpur Power Mech Projects Ltd 20079142 PRATAPPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 2 2850 2023 2038 2053 13-Mar-2024 14-Nov-2024 14-Nov-2024 14-Nov-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of August (15.08.2024) and Regular water supply is given to the consumers. Verified View
1923 Sultanpur UNIVERSAL MEP 20066674 PRATAPPUR SECOND & KOTVA GRAM PANCHAYAT WATER SUPPLY SCHEME 3 3 3620 2023 2038 2053 12-Jan-2024 12-Jan-2024 03-Dec-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
1924 Bijnor Vindhya-GAJA (JV) 20100221 PRATAPPUR WSS 2 2 1233 2023 2038 2053 06-Jul-2023 05-Oct-2024 05-Apr-2025 06-Apr-2025 Every thing complete. Check Document View
1925 Jaunpur Welspun Kaveri Infraprojects JV 20020896 Prempur 2 6 3490 2022 2037 2021 22-May-2023 31-Dec-2024 20-Dec-2024 21-Dec-2024 Checked & Found ok ok View
1926 Kannauj GVPR 20043957 PREMPUR GRAMIN PEYJAL YOJNA 2 4 2930 2023 2038 2053 13-May-2024 07-Apr-2024 11-Jul-2024 12-Jul-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1927 Bijnor LC INFRA 20018334 Prempur Water Supply Scheme 1 1 2200 2022 2037 2052 10-Feb-2024 23-Nov-2023 27-May-2024 28-May-2024 every thing completed Compeleted View
1928 Kannauj GVPR 20066493 PULPUR & KHARAGPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 3 9 6684 2023 2038 2053 08-Sep-2024 03-May-2024 07-Aug-2024 08-Aug-2024 FORWRADED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1929 Auraiya GVPR 20041733 Pura kalan PWS 3 2 4154 2023 2038 2053 31-Dec-2024 23-Jun-2023 06-May-2024 23-Jun-2024 Forwarded for further action. All work of scheme found satisfactory. View
1930 Jaunpur AFCONS 20059701 PURA MADHU & RAM CHAUKI VILLAGE WATER SUPPLY SCHEME 2 13 3450 2023 2038 2053 27-Jan-2023 16-Jan-2026 16-Jan-2026 17-Jan-2026 checked and found ok. ok View
1931 Amethi Vindhya-GAJA (JV) 20098338 PURAB DWARA Water Supply Scheme 1 3 1541 2023 2038 2053 04-Jul-2024 11-Nov-2024 11-Feb-2025 10-May-2025 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
1932 Jaunpur AFCONS 20067799 PURALAL Village water supply scheme 1 5 1790 2023 2038 2058 23-Mar-2024 18-Jan-2026 18-Jan-2026 19-Jan-2026 checked and found ok. ok View
1933 Kanpur Dehat GVPR 20069962 puran purwa 1 3 3673 2023 2038 2053 17-Feb-2024 05-Jan-2024 11-Apr-2024 12-Apr-2024 We cane Approve & refer Our letter No.SWSM/BLG/TPI KD/O&M/2025-26/6655 dt.29/07/2028 and SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. All work of scheme found satisfactory View
1934 Amethi Vindhya-GAJA (JV) 20098321 PURE MIHIB SHAH Water Supply Scheme 2 7 3000 2023 2038 2053 04-Jul-2024 05-Jun-2024 05-Sep-2024 06-Dec-2024 All Document not provided by EPC hence returns to the EPC All things found satisfactory in the Scheme and finalized for Operation And Maintenance View
1935 Amethi Vindhya-GAJA (JV) 20067991 PURE PAHAL WAN WATER SUPPLY SCHEME 2 14 2088 2023 2038 2053 07-Feb-2024 22-Jun-2024 22-Sep-2024 23-Dec-2024 All things found satisfactory in the Scheme and finalized for Operation And Maintenance All things found satisfactory in the Scheme and finalized for Operation And Maintenance. View
1936 Sultanpur UNIVERSAL MEP 20066684 PUREPAWAR & MITHNEPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 6 14 9540 2023 2038 2053 18-Jul-2024 23-Feb-2025 27-May-2025 01-Jul-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
1937 Balrampur Larsen & Toubro Ltd 20102005 PUREY CHEETAN WATER SUPPLY SCHEME 1 1 1123 2022 2037 2052 24-Sep-2024 06-Sep-2025 06-Dec-2025 06-Dec-2025 incomplete earthing and lightning protection, pending E&I testing/calibration, and non-submission of required drawings, certificates, and test reports. Some FHTCs and other minor campus related works to be rectified. View
1938 Fatehpur Power Mech Projects Ltd 20097866 PURMAI 1 4 3950 2023 2038 2053 14-May-2024 30-Jun-2025 09-May-2025 10-May-2025 Trial & Run completed. It was initiated in the month of February (08.02.2025) and Regular water supply is given to the consumers. Verified View
1939 Auraiya GVPR 20099159 Purwa balai 3 2 2102 2023 2038 2053 06-Jan-2022 06-Apr-2024 15-Dec-2023 01-Feb-2024 Forwarded for further action. All work of scheme found satisfactory. View
1940 Auraiya GVPR 20099160 Purwa fakire 1 1 1908 2023 0 0 01-Jun-2022 21-Apr-2025 20-Apr-2025 22-Apr-2025 Forwarded for further action. All work of scheme fond satisfactory. View
1941 Jhansi DARA ENGINEERING 8135931 Purwa GOV 32 8 77784 2023 2038 2053 11-Jun-2022 01-Apr-2024 23-Dec-2024 24-Dec-2024 checked approved View
1942 Auraiya Indian Hume Pipe 20025595 PURWA PITARAM PWS 1 3 4560 2022 2037 2052 14-Sep-2022 02-Apr-2023 09-Jul-2023 10-Jul-2023 Forwarded for further action. All work of scheme fond satisfactory. View
1943 Auraiya GVPR 20095101 Purwa Rahat PWS 1 1 1474 2023 2038 2033 31-Dec-2024 19-May-2024 08-May-2024 09-May-2024 Forwarded for further action. All work of scheme found satisfactory. View
1944 Auraiya GVPR 20089648 Purwa rawat PWS 4 8 2311 2023 2038 2053 06-Jan-2022 31-Dec-2024 06-Jun-2024 23-Jul-2024 Forwarded for further action. All work of scheme found satisfactory. View
1945 Hardoi NCC Ltd. 8388443 PURWA WAJI RAO 1 2 3495 2022 2037 2052 05-Mar-2023 16-May-2023 15-Aug-2023 24-Dec-2024 ok OK View
1946 Auraiya Indian Hume Pipe 20022753 Pusauli Village Water Supply Schem 2 2 2350 2022 2037 2052 09-May-2022 07-Nov-2023 29-Feb-2024 01-Mar-2024 Forwarded for further action. All work of scheme found satisfactory. View
1947 Meerut Power Mech Projects Ltd 20011335 PUTHRI 1 1 2513 2022 2037 2052 31-Dec-2024 21-Jun-2023 06-Nov-2023 05-Nov-2024 Recommended for further Approvals. approved View
1948 Gautam Buddha Nagar LC INFRA 20013502 PYAWALI TAJPUR W/S SCHEME 1 1 5726 2022 2037 2052 07-Feb-2024 15-Dec-2024 15-Sep-2024 15-Dec-2024 Project certificate is verified all work has been completed. View
1949 Meerut Power Mech Projects Ltd 20010919 RACHHOTI 1 1 8559 2022 2037 2052 31-Dec-2024 25-Mar-2023 11-Aug-2023 07-Oct-2024 Recommended for further Approvals. approved View
1950 Shahjahanpur NCC Ltd. 20084376 RADHAUPUR SIKANDARPUR & ARELI ISMAILPUR MULTI GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 2 2 3300 2023 2038 2053 31-Dec-2024 30-Jun-2023 29-Sep-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of the RADHAUPUR SIKANDARPUR & ARELI ISMAILPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of RADHAUPUR SIKANDARPUR & ARELI ISMAILPUR MULTI GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1951 Meerut Power Mech Projects Ltd 20098098 RAFAN 1 1 1634 2023 2038 2053 11-Jun-2025 26-Oct-2024 15-Mar-2025 01-May-2025 Recommended for further Approval approved View
1952 Bijnor Vindhya-GAJA (JV) 20021908 Rafipur Mohan Gram Panchayat Water Supply 3 3 3002 2023 2038 2053 06-Jul-2023 20-May-2024 20-Nov-2024 21-Nov-2024 Every thing complete. Check Document View
1953 Shahjahanpur NCC Ltd. 20014017 Raghunathpur 4 4 2500 2022 2037 2052 30-Sep-2023 31-Dec-2024 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Raghunathpur J Rampur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Raghunathpur J. Rampur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1954 Meerut Power Mech Projects Ltd 20098078 RAGHUNATHPUR 1 1 1285 2023 2038 2053 31-Dec-2024 14-Aug-2024 02-Jan-2025 04-Jan-2025 Recommended for further Approvals. approved View
1955 Shahjahanpur NCC Ltd. 20015591 Raghunathpur Khas 1 1 2810 2022 2037 2052 24-Dec-2023 31-Dec-2024 04-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of RAGHUNATHPUR KHAS scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Raghunathpur Khas scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1956 Ghaziabad LC INFRA 20021478 RAGHUNATHPUR PWS SCHEME 1 1 2695 2022 2037 2052 09-Feb-2022 30-Oct-2024 28-Feb-2025 01-Mar-2025 Actual Executed Cost Verified based on approved variation statement. All work checked and recommended for O&M View
1957 Azamgarh LC INFRA 20101578 RAGHUNATHPUR WSS 3 9 4161 2023 2038 2053 31-May-2023 25-Jul-2024 24-Oct-2024 25-Oct-2024 ok ok View
1958 Fatehpur Power Mech Projects Ltd 20097879 RAHALLAPUR 2 2 2360 2023 2033 2058 13-Aug-2024 30-Jun-2025 29-Apr-2025 30-Apr-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of January(30.01.2025) and Regular water supply is given to the consumers. Verified View
1959 Ambedkar Nagar Vindhya-GAJA (JV) 20019826 Rahimpur Patti 2 7 3250 2023 2038 2053 03-Aug-2023 20-Jul-2024 02-Dec-2024 03-Dec-2029 Checked and found ok Scheme completed View
1960 Meerut Power Mech Projects Ltd 20010922 RAHMAPUR 1 1 2701 2022 2037 2052 31-Dec-2024 19-Dec-2023 05-May-2024 06-Nov-2024 Recommended for further Approval approved View
1961 Bijnor LC INFRA 20013983 RAHTI JAGIR WATER SUPPLY SCHEME 1 1 3029 2022 2037 2052 30-Sep-2023 10-Dec-2023 08-Jun-2024 09-Jun-2024 Every thing complete Everything is Completed. View
1962 Farrukhabad Vindhya-GAJA (JV) 20092661 RAIPUR KHAS, BAHLOLPUR & MEDPUR MVS 4 4 4236 2023 2038 2053 30-May-2025 10-Jun-2024 10-Jun-2024 11-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
1963 Bijnor LC INFRA 20100872 Raipur Malihabad WSS 2 2 978 2022 2037 2052 25-Jan-2025 27-Nov-2024 28-Feb-2025 01-Mar-2025 Every thing complete. Check document View
1964 Bijnor LC INFRA 8388868 RAIPUR MAUZAMPUR NARAYAN GRAMPANCHAYAT WATER SUPPLY SCHEME 1 1 2404 2022 2037 2052 13-Sep-2023 14-Nov-2023 27-May-2024 28-May-2024 Every thing completed. EVERY THIS COMPLETED View
1965 Auraiya GVPR 20065285 Raipur Phaphoond PWS 1 6 3603 2023 2038 2053 01-Jun-2022 23-Mar-2025 22-Mar-2025 24-Mar-2025 Forwarded for further action. All work of scheme fond satisfactory. View
1966 Bijnor LC INFRA 20076181 RAIPUR SADAT WATER SUPPLY SCHEME 1 2 8580 2022 2037 2052 31-Oct-2025 25-Feb-2025 31-May-2025 01-Jun-2025 Every thing complete. check View
1967 Mau LC INFRA 20064741 Raisa Gram Panchayat Water Supply Scheme 3 7 2920 2022 2037 2052 05-Jan-2025 01-Apr-2025 01-Apr-2025 05-Apr-2025 Approved.... Approved View
1968 Sultanpur UNIVERSAL MEP 20064683 RAJAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 10 3110 2023 2038 2053 12-Jan-2024 12-Jan-2024 26-Jan-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
1969 Bahraich PNC-SPML-JV 20099231 RAJAPUR KLA MAHSI RF PWS 1 1 2040 2022 2037 2052 31-Dec-2025 22-Nov-2025 22-Nov-2025 23-Nov-2025 Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/12/0365, kindly complete it. Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/12/0365, View
1970 Shahjahanpur NCC Ltd. 20015092 Rajepur Raipur 1 2 2430 2022 2037 2052 31-Dec-2024 04-Jan-2024 04-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Rajepur Raipur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Rajepur Raipur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1971 Farrukhabad Vindhya-GAJA (JV) 20093024 RAJEPUR SARAIMEDA SVS 1 5 6636 2023 2038 2053 30-May-2025 01-Jul-2024 01-Jul-2024 02-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
1972 Farrukhabad Vindhya-GAJA (JV) 20076789 RAJIPUR SVS 1 6 4578 2023 2038 2053 30-May-2025 25-Jun-2024 25-Jun-2024 26-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
1973 Kannauj GVPR 20050182 RAJPUR KARAN GRAM PANCHAYAT WATER SUPPLY SCHEME 2 6 1989 2023 2038 2053 15-Jun-2024 16-Apr-2024 19-Jul-2024 20-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1974 Meerut Power Mech Projects Ltd 20022506 RAJPURA 1 1 5817 2022 2037 2052 31-Dec-2024 12-Feb-2023 03-Jul-2023 07-Oct-2024 Recommended for further Approvals. approved View
1975 Auraiya GVPR 20093428 Rajpura PWS 1 3 1516 2023 0 0 01-Jun-2022 03-Mar-2025 02-Mar-2025 04-Mar-2025 Forwarded for further action. All work of scheme fond satisfactory. View
1976 Etawah Indian Hume Pipe 20058832 Rajpurtameri 3 3 2280 2022 2037 2052 05-Jan-2024 09-Jun-2023 13-Dec-2023 14-Dec-2023 Forwarded for further action. All work of scheme found satisfactory. View
1977 Auraiya GVPR 20091145 Rajuamau PWS 1 2 3254 2033 2038 2053 06-Jan-2022 19-Apr-2024 18-Apr-2025 20-Apr-2025 Forwarded for further action. All work of scheme found satisfactory. View
1978 Jaunpur AFCONS 20056766 RAKSAMA TAKIYARAM VILLAGE WATER SUPPLY SCHEME 5 17 3920 2023 2038 2053 21-Jan-2024 09-Mar-2025 09-Mar-2025 10-Mar-2025 Checked and found ok. ook View
1979 Fatehpur Power Mech Projects Ltd 20097892 RAKSHAPAL&DARIYAMAU 2 3 4810 2023 2038 2053 26-Sep-2023 25-Sep-2024 04-Dec-2024 05-Dec-2024 Trial & Run completed. It was initiated in the month of September (05.09.2024) and Regular water supply is given to the consumers. Verified View
1980 Meerut Power Mech Projects Ltd 8362623 RALI CHAUHAN 1 1 3588 2022 2037 2052 31-Dec-2024 01-Mar-2023 20-Jul-2023 10-Dec-2024 Recommend for Further Approval approved View
1981 Shahjahanpur NCC Ltd. 20015362 Ram Khera WSS 2 2 2600 2022 2037 2052 31-Dec-2024 15-May-2024 14-Aug-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Ram Khera WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Ram Khera WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1982 Auraiya Indian Hume Pipe 20022755 Ram Nagar Village Water Supply Scheme 3 3 1900 2022 2037 2052 08-May-2023 01-Feb-2024 14-Jun-2024 15-Jun-2024 Forwarded for further action. All work of scheme fond satisfactory. View
1983 Bijnor LC INFRA 8388717 RAM NAGER VILLAGE WATER SUPPLY SCHEME 1 1 2430 2022 2037 2052 29-Sep-2023 12-Mar-2024 10-Jun-2024 11-Jun-2024 Every thing complete. All document checked View
1984 Farrukhabad Vindhya-GAJA (JV) 20098004 RAM PURA SVS 1 1 2010 2023 2038 2053 30-May-2025 08-May-2024 08-May-2024 29-Jun-2024 All the parameters of scheme verified can take in O&M. Ok View
1985 Amethi Gayatri Projects LTD 20034985 RAMAE WATER SUPPLY SCHEME 1 4 3002 2022 2037 2052 06-May-2025 21-Jun-2024 24-Sep-2024 06-Nov-2024 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
1986 Kanpur Dehat GVPR 20077563 RAMALNYAI NARSOOJHA 3 4 2808 2023 2038 2053 17-Feb-2024 27-Jan-2024 30-Apr-2024 01-May-2024 Forward for further action All work of scheme found satisfactory View
1987 Shahjahanpur NCC Ltd. 20014815 Ramapur 1 1 2070 2022 2037 2052 31-Dec-2024 30-Dec-2024 29-Sep-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Ramapur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Ramapur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
1988 Farrukhabad Vindhya-GAJA (JV) 20074526 RAMAPUR JASU MVS 3 4 5717 2023 2028 2053 30-May-2025 19-Jun-2024 19-Jun-2024 20-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
1989 Gautam Buddha Nagar LC INFRA 20102361 RAMGARH CHAMRAWALI VILLAGE WATER SUPPLY SCHEME 1 1 1963 2019 2037 2052 28-Jul-2023 30-Jul-2024 30-Jul-2024 01-Aug-2024 Actual Executed Cost Verified based on Approved Variation Statement. all work has been completed. View
1990 Kannauj GVPR 20036627 RAMKHERA & SARAI GOPAL GRAMIN PEYJAL YOJNA 2 3 3882 2023 2038 2053 13-May-2024 25-Mar-2024 27-Jun-2024 28-Jun-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
1991 Sultanpur UNIVERSAL MEP 20066596 RAMNAGAR BANKATH & UGAIPUR GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME 3 5 5460 2023 2038 2053 12-Jan-2024 31-Dec-2024 15-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
1992 Sultanpur UNIVERSAL MEP 20067058 RAMNAGAR FIRST & DHABIA GRAM PANCHAYAT WATER SUPPLY SCHEME 3 10 4005 2023 2038 2053 12-Jan-2024 12-Jan-2024 30-Nov-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
1993 Fatehpur Power Mech Projects Ltd 20097525 RAMNAGAR KAUHAN 1 6 2460 2023 2038 2053 25-Sep-2025 30-Jan-2025 01-Jun-2025 02-Jun-2025 Trial & Run completed. It was initiated in the month of March (03.03.2025) and Regular water supply is given to the consumers. Verified View
1994 Ambedkar Nagar Vindhya-GAJA (JV) 20033823 RAMNAGAR NARSINGHPUR WATER SUPPLY SCHEME 2 8 4666 2023 2038 2053 22-Oct-2022 21-Oct-2023 14-Jan-2025 15-Jan-2025 checked and found ok Scheme completed View
1995 Jaunpur AFCONS 20060618 RAMNAGAR VILLAGE WATER SUPPLY SCHEME 1 12 2860 2023 2038 2053 31-Dec-2026 10-Oct-2024 10-Oct-2024 10-Oct-2024 Checked and found ok. OK View
1996 Sultanpur UNIVERSAL MEP 20077655 RAMPUR & DHARUPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 6 3680 2023 2038 2053 12-Jan-2024 12-Jan-2024 12-Feb-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
1997 Hardoi NCC Ltd. 20011899 RAMPUR ATWA 3 4 3060 2022 2037 2052 14-Jun-2023 24-Jul-2023 23-Oct-2023 24-Dec-2024 ok OK View
1998 Gautam Buddha Nagar LC INFRA 20017814 RAMPUR BANGER GRAM PANCHAYAT WATER SUPPLY 1 1 4293 2022 2037 2052 20-Mar-2023 31-Mar-2024 31-Oct-2024 01-Nov-2024 Project certificate is verified Verified View
1999 Auraiya GVPR 20099251 Rampur bihari PWS 3 8 2995 2023 2038 2053 06-Jan-0222 23-Oct-2023 22-Oct-2023 23-Oct-2023 Forwarded for further action. All work of scheme found satisfactory. All work of scheme found satisfactory. View
2000 Bijnor Vindhya-GAJA (JV) 20024330 Rampur Bishna Gram Panchayat Water Supply 2 2 2631 2023 2038 2053 06-Jul-2023 10-Feb-2025 10-Aug-2025 11-Aug-2025 Every thing complete. check View
2001 Amethi Gayatri Projects LTD 20076471 RAMPUR CHAUDHARI & ALIPUR WATER SUPPLY SCHEME 2 10 3234 2022 2037 2052 22-Mar-2025 02-Sep-2024 05-Dec-2024 10-Mar-2025 Hardcopy submitted and found okay as per the submitted documents. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance... View
2002 Bijnor Vindhya-GAJA (JV) 20020674 Rampur Dass Gram Panchayat Water Supply 2 2 3904 2023 2038 2053 06-Jul-2023 19-Nov-2024 19-May-2025 20-May-2025 Every thing complete. Check Document View
2003 Bijnor LC INFRA 20038886 Rampur Gram Panchayat Water Supply 3 3 1917 2022 2037 2052 14-Nov-2022 06-Jan-2025 06-Jan-2025 07-Jan-2025 Every thing complete. Everything Completed. View
2004 Sultanpur UNIVERSAL MEP 20093114 RAMPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 3 3 3579 2022 2037 2052 18-Jul-2024 09-Nov-2025 09-Feb-2025 01-Apr-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
2005 Shahjahanpur NCC Ltd. 20059070 RAMPUR HIRA WSS 2 2 2040 2023 2038 2053 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Rampur Hira scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Rampur Hira scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2006 Ambedkar Nagar Vindhya-GAJA (JV) 20026107 RAMPUR INDI-PINDI WATER SUPPLY SCHEME 1 1 2200 2023 2038 2053 26-Dec-2023 23-Dec-2024 26-Mar-2025 27-Mar-2025 CHECKED AND FOUND OK Scheme completed View
2007 Ayodhya UNIVERSAL MEP 20031499 RAMPUR JANAK & DEVAIT GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME 2 5 3740 2023 2038 2053 12-Oct-2023 22-May-2024 22-May-2024 15-Nov-2024 Found ok Found Correct View
2008 Farrukhabad Vindhya-GAJA (JV) 20092926 RAMPUR JOGPUR & KANCHAN PUR MVS 5 6 4161 2023 2038 2053 30-May-2025 02-Jul-2024 02-Jul-2024 03-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
2009 Mau LC INFRA 20044981 Rampur Kadhi GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME 2 4 1441 2022 2037 2052 02-May-2023 26-Dec-2024 21-Dec-2024 26-Dec-2024 All Documents Checked $ Verified Approved View
2010 Ambedkar Nagar Vindhya-GAJA (JV) 20073274 RAMPUR KALA WSS 1 8 1580 2023 2038 2053 28-Sep-2023 01-Dec-2025 30-Nov-2025 15-Jan-2026 SCHEME COMPLETED AND READY FOR O&M SCHEME COMPLETED AND READY FOR O&M View
2011 Auraiya GVPR 20064337 Rampur Khash PWS 1 12 3705 2023 2038 2053 04-Jun-2022 07-Jan-2025 06-Jan-2025 08-Jan-2025 Forwarded for further action. All work of scheme found satisfactory. View
2012 Kanpur Dehat Indian Hume Pipe 20034292 RAMPUR KUKHAT 1 2 3600 2022 2037 2052 24-Nov-2022 31-Dec-2024 30-Jun-2023 01-Jul-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
2013 Auraiya GVPR 20089666 Rampur Kunwar PWS 1 1 1989 2023 2038 2053 01-Jun-2022 24-Apr-2024 23-Apr-2024 25-Apr-2024 Forwarded for further action. All work of scheme found satisfactory. View
2014 Kannauj GVPR 20090117 RAMPUR NIGOH & GHILOEE GHAS GRAM PANCHAYAT WATER SUPPLY SCHEME 3 5 3179 2023 2038 2053 08-Sep-2024 04-Nov-2024 07-Feb-2025 08-Feb-2025 forwarded for Further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2015 Ambedkar Nagar Vindhya-GAJA (JV) 20033825 RAMPUR SAKARWARI WATER SUPPLY SCHEME 4 13 5088 2023 2038 2053 21-Oct-2023 09-Apr-2025 09-Apr-2025 10-Apr-2025 Scheme completed and ready for O&M Scheme Completed View
2016 Jaunpur Welspun Kaveri Infraprojects JV 20016242 Rampur Ta Jakhaniyan 1 9 5328 2022 2037 2052 06-Jul-2023 28-Feb-2025 28-Feb-2025 01-Mar-2025 Checked and found ok. Ok View
2017 Shahjahanpur NCC Ltd. 20014723 RAMPUR UTTARI 3 3 4510 2022 2037 2052 31-Dec-2024 20-Jul-2024 20-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the RAMPUR UTTARI WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. SWSM/BLG/JJM/26-27/434 for further necessary action. All information on the portal for the completion certificate of RAMPUR UTTARI Wss have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2018 Shahjahanpur NCC Ltd. 20017965 Rampur W/S 2 2 2340 2022 2037 2052 06-Jul-2024 31-Dec-2024 05-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Rampur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Rampur W/s scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2019 Fatehpur Power Mech Projects Ltd 20097835 RAMWA PANTHUWA 1 7 9620 2023 2038 2053 25-Oct-2024 18-Jul-2024 03-Dec-2024 04-Dec-2024 Trial & Run completed. It was initiated in the month of September (04.09.2025) and Regular water supply is given to the consumers. HGJ Certificate not signed by Gram pradhan. Verified View
2020 Kanpur Dehat Indian Hume Pipe 20096870 Rana Itha 2 5 3200 2022 2037 2052 04-Mar-2022 31-Dec-2024 28-Feb-2024 01-Mar-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
2021 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20008666 Ranev Karamjeet 8 12 4237 2022 2037 2052 07-Jul-2023 01-Jun-2026 17-Feb-2026 01-Jun-2026 Scheme completed and ready for O&M Scheme Completed & Ready For O&M View
2022 Bahraich GA INFRA-VPL 20093221 RANIAPUR GOBRAHI VISHESWARGANJ (VPL) PWS 1 8 4400 2023 2038 2053 01-Oct-2024 18-Jan-2026 12-Jan-2026 18-Jan-2026 scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/02/0117 kindly complete it. scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/02/0117 kindly complete it. View
2023 Fatehpur Power Mech Projects Ltd 20089339 RANMASTPUR 3 4 3450 2023 2038 2053 14-Mar-2024 30-Oct-2025 17-Nov-2025 18-Nov-2025 Trial & Run completed. It was initiated in the month of August (18.08.2025) and Regular water supply is given to the consumers. HGJ certificate not signed by Gram pradhan and Panchayat secretary. Verified View
2024 Kannauj GVPR 20050178 RANVEERPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 8 3048 2023 2038 2053 11-Jun-2024 16-Apr-2024 19-Jul-2024 20-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2025 Hardoi NCC Ltd. 20058225 RARA JJM 1 8 4910 2023 2038 2053 26-Jul-2024 11-Oct-2024 10-Jan-2025 25-Sep-2025 ok Ok View
2026 Fatehpur Power Mech Projects Ltd 20097530 RARI 1 3 4520 2023 2038 2053 15-May-2023 30-Jun-2025 29-Apr-2025 30-Apr-2025 Trial & Run completed. It was initiated in the month of January(30.01.2025) and Regular water supply is given to the consumers. Verified View
2027 Mau LC INFRA 8360470 RASADI GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME 3 5 2728 2022 2037 2052 20-Sep-2023 05-Nov-2024 02-Nov-2024 05-Nov-2024 Approved.... Approved. View
2028 Farrukhabad Vindhya-GAJA (JV) 20075245 RASHIDPUR & SHAMADPUR MVS 2 5 3325 2023 2038 2053 30-May-2025 19-Jan-2024 03-May-2024 04-May-2024 All the parameters of scheme verified can take in O&M. ok View
2029 Amethi Gayatri Projects LTD 20102462 RASOOLABADH WATER SUPPLY SCHEME 1 14 5536 2022 2037 2052 27-Jun-2024 03-Jun-2024 06-Sep-2024 15-Dec-2024 Hardcopy submitted and found okay as per the submitted documents.. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance View
2030 Kanpur Dehat GVPR 20077538 RASOOLPUR RASULABAD 2 4 1849 2023 2038 2053 17-Feb-2024 21-Nov-2023 05-Apr-2024 06-Apr-2024 Forward for further necessary action pls All work of scheme found satisfactory View
2031 Bahraich PNC-SPML-JV 20014668 RASOOLPUR SARRAIYA CHITTAURA PWS 1 7 3588 2022 2037 2052 31-Dec-2025 07-Oct-2025 07-Oct-2025 08-Oct-2025 scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/09/0143 kindly complete it. SCHEME COMPLETED View
2032 Etawah Indian Hume Pipe 20026096 Rasulabad PWS 1 2 1450 2022 2037 2052 22-Sep-2023 27-Feb-2024 08-Jun-2024 09-Jun-2024 Forwarded for further action. All work of scheme found satisfactory View
2033 Fatehpur Power Mech Projects Ltd 20100819 RASULPUR 2 2 1940 2023 2038 2053 14-May-2025 30-Jun-2025 08-Dec-2024 09-Dec-2024 Trial & Run completed. It was initiated in the month of September (09.09.2024) and Regular water supply is given to the consumers. Verified View
2034 Kannauj GVPR 20077066 RASULPUR BIKUPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 5 3054 2023 2038 2053 16-Aug-2024 31-Mar-2024 03-Jul-2024 04-Jul-2024 forwarded for further action. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
2035 Meerut Power Mech Projects Ltd 20020267 RASULPUR DANTLA 1 1 2776 2023 2037 2052 31-Dec-2024 16-Dec-2023 03-May-2024 17-Feb-2025 Recommended for Further Approval approved View
2036 Meerut Power Mech Projects Ltd 20078572 RASULPUR IKLA WATER SUPPLY SCHEME 1 1 5297 2023 2038 2053 31-Dec-2024 05-Apr-2024 21-Aug-2024 07-Oct-2024 Recommended for further Approvals. Approved View
2037 Bijnor Vindhya-GAJA (JV) 20025579 Rasulpur Mujaffar Gram Panchayat Water Supply 1 1 3392 2023 2038 2053 06-Jul-2023 23-Dec-2024 23-Jun-2025 24-Jun-2025 Every thing complete. Complete document View
2038 Meerut Power Mech Projects Ltd 20067224 RASULPUR MURADNAGAR & TANDI 2 2 3235 2022 2037 2052 31-Dec-2024 24-Mar-2024 09-Aug-2024 05-Feb-2025 Recommended for further Approval approved View
2039 Fatehpur Power Mech Projects Ltd 20097478 RASULPUR URF VAISAPUR 1 1 1730 2023 2038 2053 15-Apr-2025 07-Jan-2025 07-Jan-2025 08-Jan-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of October (08.10.2024) and Regular water supply is given to the consumers. Verify View
2040 Bijnor Vindhya-GAJA (JV) 20102321 RASULPUR VEERAN WSS 2 2 370 2022 2037 2052 06-Jul-2023 12-Feb-2025 12-Aug-2025 13-Aug-2025 Every thing complete. All document complete View
2041 Mau LC INFRA 20025893 Rasulpur Water Supply Scheme 4 12 1881 2022 2037 2052 30-Nov-2023 25-Mar-2025 12-Jun-2024 25-Mar-2025 All Documents Checked $ Verified Approved. View
2042 Auraiya GVPR 20065274 Ratanpur gadiya PWS 1 2 2519 0 0 0 01-Jun-2022 05-May-2025 04-May-2025 06-May-2025 Forwarded for further action. All work of scheme fond satisfactory. View
2043 Farrukhabad Vindhya-GAJA (JV) 20093046 RATANPUR PAMARAN SVS 1 1 2001 2023 2038 2053 30-May-2025 31-Jan-2024 15-May-2024 16-May-2024 All the parameters of scheme verified can take in O&M. ok View
2044 Meerut Power Mech Projects Ltd 20090072 RATAULI 1 1 1237 2023 2038 2052 31-Dec-2024 05-Sep-2024 31-Jan-2025 01-Feb-2025 Recommended for further Approvals. approved View
2045 Shahjahanpur NCC Ltd. 20015651 Rath 2 2 2600 2022 2037 2052 31-Dec-2024 20-Jul-2024 19-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of the Rath WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Rath scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2046 Meerut Power Mech Projects Ltd 20098095 RATHAURA KHURD 1 1 1362 2023 2038 2053 31-Jan-2025 28-Sep-2024 14-Feb-2025 15-Feb-2025 Recommended for further Approvals. approved View
2047 Farrukhabad Vindhya-GAJA (JV) 20076894 RATHAURA MUHIUDDINPUR SVS 1 2 2295 2023 2038 2053 31-Mar-2025 11-Oct-2024 02-Feb-2025 03-Feb-2025 All the parameters of scheme verified can take in O&M OK View
2048 Kanpur Dehat GVPR 20065237 RATNIYAPUR 2 3 2680 2023 2038 2053 18-Jan-2024 08-Dec-2023 12-Dec-2023 16-Mar-2024 Forward for further action All work of scheme found satisfactory View
2049 Jaunpur AFCONS 20057008 RATNUPUR VILLAGE WATER SUPPLY SCHEME 4 12 4000 2023 2038 2053 23-Jan-2023 27-Feb-2025 27-May-2025 28-May-2025 checked and found ok..... Ok View
2050 Farrukhabad Vindhya-GAJA (JV) 20097981 RAUKRI & MISTINI MVS 2 2 1808 2023 2038 2053 30-May-2025 17-Feb-2024 01-Jun-2024 02-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
2051 Sultanpur UNIVERSAL MEP 20092599 RAVANIYA PASHCHIM & RAVANIYA PURVA & BAHLOLOUR GRAM PANCHAYAT WATER SUPPLY SCHEME 3 20 15000 2023 2038 2053 18-Jul-2024 08-Feb-2025 12-May-2025 01-Jul-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified, found as per requirements. View
2052 Meerut Power Mech Projects Ltd 20076665 RAWA 1 1 2434 2023 2038 2053 31-Dec-2024 15-Oct-2024 03-Mar-2025 04-Mar-2025 Recommended for further Approvals. approved View
2053 Farrukhabad Vindhya-GAJA (JV) 20081715 RAYPUR & RAJEPUR TAPPA MANDAL MVS 2 4 4231 2023 2038 2053 30-May-2025 09-Jun-2024 09-Jun-2024 10-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
2054 Balrampur Larsen & Toubro Ltd 20094192 Razderwa Tharoo Water Supply Scheme 2 2 2200 2022 2037 2052 25-Mar-2025 06-Dec-2025 06-Dec-2025 06-Dec-2025 Vide letter no. ceinsys/0PR/Devipatan/BLP/O&M/UPJN/202607/07/308 dated 28.07.2026 Distribution :-Total scope of laying is 6427 km, total pipe laid is 7314 km, which is beyond the scope. FHTC: -Total scope is 276 no's, in which 276 Executed on Sit as per list attached. Automation & Chlorination: -Automation System was found non-functional. Water is being Supplied through OHT and chlorination unit non-functional during site inspection. Water is being supplied for 1 habitation out Of 2 habitations. Water is being Supplied by OHT, Hydrotest of OHT has not been Performed. Campus-development: Campus development is not done but Housekeeping is required. Some FHTCs and other minor campus related works to be rectified. View
2055 Hardoi NCC Ltd. 20011614 Rebha Muradpur 2 2 2940 2022 2037 2052 29-Apr-2023 06-Feb-2023 05-May-2023 25-Dec-2024 ok OK View
2056 Kanpur Dehat Indian Hume Pipe 20012664 Reewan 1 2 2185 2022 2037 2052 14-Sep-2022 31-Dec-2024 31-Oct-2023 01-Nov-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
2057 Farrukhabad Vindhya-GAJA (JV) 20074585 REHA KARANPUR MVS 4 5 4507 2023 2038 2053 30-May-2025 26-Apr-2024 26-Apr-2024 27-Apr-2024 All the parameters of scheme verified can take in O&M. ok View
2058 Meerut Power Mech Projects Ltd 20058444 REHADRA & MURADGAON URF KUWAKHEDA 2 2 2720 2022 2037 2052 31-Dec-2024 25-Mar-2024 10-Aug-2024 02-Mar-2025 Recommended for further Approval approved View
2059 Kannauj GVPR 20077109 RERI & RAMPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 2 1976 2023 2038 2053 08-Sep-2024 16-Apr-2024 19-Jul-2024 20-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2060 Ambedkar Nagar Vindhya-GAJA (JV) 20056396 REWALI WSS 1 4 3850 2023 2038 2053 28-Jun-2023 25-Dec-2024 31-Mar-2025 01-Apr-2025 checked and found ok Scheme completed View
2061 Fatehpur Power Mech Projects Ltd 20097479 REY 1 3 3450 2023 2038 2053 25-Sep-2024 11-Jun-2025 10-Jun-2025 11-Jun-2025 Minor work is pending. undertaking given by TKC. Trial & Run completed. It was initiated in the month of March (12.03.2025) and Regular water supply is given to the consumers. HGJ Certificate not signed by Gram pradhan. Verified View
2062 Kannauj GVPR 20077103 RITUKALA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 1746 2023 2038 2053 08-Sep-2024 10-Apr-2024 13-Jul-2024 14-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2063 Mau LC INFRA 8389102 RIYAV 3 5 3472 2022 2036 2052 20-Sep-2023 25-Oct-2024 20-Oct-2024 25-Oct-2024 Approved. Approved.. View
2064 Mau LC INFRA 20058554 RO Bhudsudi Khas Village Water Supply Scheme 2 8 3680 2022 2037 2052 27-May-2024 23-Dec-2025 04-Dec-2025 23-Dec-2025 Approved Approved View
2065 Mau LC INFRA 20085253 RO BIBIPUR UDHARAN GRAM PANCHAYAT WATER SUPPLY SCHEME 1 6 2020 2022 2037 2052 08-Aug-2024 22-Apr-2026 14-Mar-2026 22-Apr-2026 Approved Approved View
2066 Mau LC INFRA 20085245 RO MAIDPUR SAMASTPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 1 1520 2022 2037 2052 02-Mar-2025 02-Apr-2024 02-Apr-2025 03-Apr-2025 Approved.. Approved.. View
2067 Mau LC INFRA 20082426 RO- GAURIDIH GRAM PANCHAYAT WATER SUPPLY SCHEME 4 12 2510 2022 2037 2052 08-Aug-2024 06-Nov-2025 15-Aug-2025 06-Nov-2025 Approved Approved.. View
2068 Ambedkar Nagar Vindhya-GAJA (JV) 20084870 ROHAN PARA WSS 2 2 3380 2023 2038 2053 20-Mar-2024 23-Dec-2024 26-Mar-2025 27-Mar-2025 checked and found ok Scheme completed View
2069 Muzaffarnagar Gayatri Projects LTD 20022060 Roni harjipur 1 1 8632 2023 2038 2053 04-Feb-2024 05-Nov-2023 05-Feb-2024 06-Feb-2024 The details given by the contractor are correct at the time of approval. OK View
2070 Auraiya GVPR 20087930 Rooppur Sahar 2 6 3478 2023 2038 2053 22-Mar-2024 07-Jun-2024 06-Jun-2024 08-Jun-2024 Forwarded for further action. All work of scheme fond satisfactory. View
2071 Kannauj GVPR 20067644 ROOR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 7 3352 2023 2038 2053 16-Aug-2024 03-May-2024 07-Aug-2024 08-Aug-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2072 Ambedkar Nagar Vindhya-GAJA (JV) 20026159 ROSHANGARH WATER SUPPLY SCHEME 1 10 4762 2023 2038 2053 28-Sep-2023 01-May-2026 01-May-2026 02-May-2026 Scheme completed and ready for O&M SCHEME COMPLETED View
2073 Kanpur Dehat Indian Hume Pipe 8361972 ROSHANMAU 1 1 2290 2022 2037 2052 14-Sep-2022 31-Dec-2024 15-Feb-2024 01-Mar-2024 Forward for further action All work of scheme found satisfactory View
2074 Farrukhabad Vindhya-GAJA (JV) 20074155 ROSHNABAD SVS 1 5 3593 2023 2038 2053 31-Mar-2025 18-Sep-2024 31-Dec-2024 13-May-2025 Ok.. ok View
2075 Shahjahanpur NCC Ltd. 20019651 ROURA 2 2 2630 2022 2037 2052 31-Dec-2024 14-May-2024 13-Aug-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of ROURA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of ROURA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2076 Shahjahanpur NCC Ltd. 20014018 Rpujari W/s 1 1 3010 2022 2037 2052 30-Sep-2023 31-Dec-2024 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Rujaari scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Rpujari scheme has been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2077 Auraiya Indian Hume Pipe 20096561 RUDAULI PWS 1 1 1325 2022 2037 2052 19-Mar-2024 25-Sep-2025 09-Jan-2026 10-Jan-2026 Forwarded for further action. All work of scheme fond satisfactory. View
2078 Meerut Power Mech Projects Ltd 20037239 RUHASA 1 1 7182 2022 2037 2052 31-Dec-2024 01-Sep-2024 18-Jan-2025 19-Jan-2025 Recommended for further Approvals. approved View
2079 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20008677 Rukunpur Kasimpur 1 8 4912 2022 2037 2052 06-Jul-2023 27-Apr-2025 15-Jun-2024 28-Apr-2025 checked and found ok Scheme completed View
2080 Farrukhabad Vindhya-GAJA (JV) 20091689 RUP NAGAR MVS 1 6 4096 2023 2038 2053 30-May-2025 04-Mar-2024 17-Jun-2024 18-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
2081 Kanpur Dehat Indian Hume Pipe 20012976 Rurgaon 2 5 4400 2022 2037 2052 05-Feb-2022 31-Dec-2024 30-Jun-2023 01-Jul-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
2082 Bijnor LC INFRA 20012959 RUSTAMPUR SHER WATER SUPPLY SCHEME 1 0 2096 2022 2037 2052 08-Feb-2024 12-Dec-2023 24-Oct-2024 25-Oct-2024 Every thing complete. Check Document View
2083 Bijnor Vindhya-GAJA (JV) 20035001 SABALPUR BITRA VILLAGE WATER SUPPLY SCHEME 2 2 3214 2023 2038 2053 06-Jul-2023 10-Jan-2025 10-Jul-2025 11-Jul-2025 Every thing complete. Check document View
2084 Auraiya Indian Hume Pipe 20014507 SABALPUR PWS 5 5 3225 2022 2037 2052 08-May-2023 22-Nov-2024 09-Mar-2025 10-Mar-2025 Forwarded for further action. All work of scheme fond satisfactory. View
2085 Kanpur Dehat GVPR 20053422 SABDALPUR 2 1 2040 2023 2038 2053 18-Nov-2023 23-Nov-2023 07-Apr-2024 08-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
2086 Etawah Indian Hume Pipe 20024515 SABDALPUR DAUDPUR 3 5 2350 2022 2037 2052 22-Sep-2023 22-Mar-2024 27-Jun-2024 28-Jun-2024 Forwarded for further action. All works are satisfactory. View
2087 Bijnor LC INFRA 8360409 SABDALPUR VILLAGE WATER SUPPLY SCHEME 1 1 2754 2022 2037 2052 23-Sep-2023 05-Dec-2023 08-Jun-2024 09-Jun-2024 every thing completed Everything Completed View
2088 Bijnor LC INFRA 20097124 Sabhachandpur Kesho Village WSS 2 2 3030 2022 2037 2052 31-May-2023 15-Feb-2024 16-May-2024 17-May-2024 Every thing complete. All document complete View
2089 Bijnor LC INFRA 8360415 SABHACHANDPUR MOHAN (111972) GRAMPANCHAYAT WATER SUPPLY 1 1 1428 2022 2037 2052 29-Sep-2023 12-Dec-2023 12-Dec-2023 13-Dec-2023 Every thing completed Everything Completed View
2090 Ambedkar Nagar Vindhya-GAJA (JV) 20092792 SABITPUR Water Supply Scheme 3 3 2190 2023 2038 2053 26-Mar-2024 11-Jul-2025 12-Dec-2025 13-Dec-2025 Scheme completed and ready for O&M Scheme Completed View
2091 Ambedkar Nagar Vindhya-GAJA (JV) 20026153 SABNA WATER SUPPLY SCHEME 2 8 4620 2023 2038 2053 28-Sep-2023 20-Sep-2025 02-Jan-2026 03-Jan-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
2092 Bijnor LC INFRA 20095656 SADAKPUR VILLAGE WSS 1 1 2518 2022 2037 2052 03-Apr-2023 23-Oct-2024 23-Oct-2024 24-Oct-2024 Every thing complete. All document complete View
2093 Bijnor Vindhya-GAJA (JV) 20102317 SADANPUR WSS 1 1 1955 2023 2038 2053 06-Jul-2023 16-Dec-2024 16-Jun-2025 17-Jun-2025 Every thing complete. all document complete View
2094 Sultanpur Vindhya-GAJA (JV) 20089903 SADARPUR WATER SUPPLY SCHEME 1 1 2870 2023 2038 2053 23-Mar-2023 24-Mar-0205 31-Mar-2026 28-Apr-2026 All uploaded documents has been checked and found as per requirements. This is sending for further action All uploaded documents have been checked and verified, found as per requirements View
2095 Bijnor LC INFRA 20011786 Saddovar Bila Ahatmali Village Water Supply Scheme 2 1 3379 2022 2037 2052 09-Feb-2022 11-Dec-2023 09-Jun-2024 10-Jun-2024 every thing completed Everything Completed View
2096 Meerut Power Mech Projects Ltd 20067151 SADHARANPUR 1 1 3092 2023 2038 2053 31-Dec-2024 19-Jan-2025 15-Jun-2025 16-Jun-2025 Recommended for further Approvals. approved View
2097 Kanpur Dehat VSA 20094256 Sadhuapur 2 2 1986 2023 2038 2023 30-Apr-2023 31-Dec-2023 15-Apr-2024 16-Apr-2024 forward for further action and refer to our letter SWSM/BLG/TPI/KD/P-3/L-6759 DT.29-09-2025. Balance work complete within one week as assure by TKC representative . All work of scheme found satisfactory View
2098 Amethi Gayatri Projects LTD 20098293 SADIPUR WATER SUPPLY SCHEME 1 3 2882 2022 2037 2052 27-May-2025 07-Sep-2024 13-Dec-2024 15-Mar-2025 Hardcopy submitted and found okay as per the submitted documents.. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance... View
2099 Meerut Power Mech Projects Ltd 20012824 SADULLAPUR URF CHANDPURA 1 1 3061 2022 2037 2052 31-Dec-2024 19-Dec-2022 08-May-2023 26-Dec-2024 Recommended for further Approval approved View
2100 Kannauj GVPR 20066657 SAFIPUR JAPTI & GARHIYA KACHPURA GRAM PANCHAYAT WATER SUPPLY SCHEME 2 4 4898 2023 2038 2053 16-Aug-2024 24-Apr-2024 31-Jul-2024 01-Aug-2024 forwarded for further action. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
2101 Shahjahanpur NCC Ltd. 20019697 Saftyara 1 2 2740 2022 2037 2052 31-Aug-2023 31-Dec-2024 30-Nov-2023 16-Nov-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of SAFTYARA scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Saftyara scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2102 Ambedkar Nagar Vindhya-GAJA (JV) 20047661 SAHABUDDINPUR Water Supply Scheme 1 2 2310 2023 2038 2053 19-Sep-2023 21-Mar-2025 21-Mar-2025 22-Mar-2025 CHECKED AND FOUND OK Scheme completed View
2103 Bijnor LC INFRA 20087919 Sahapur Sukkha Village Water Supply Scheme 2 2 1578 2022 2037 2052 13-Mar-2023 18-Jul-2024 19-Oct-2024 20-Oct-2024 Every thing complete. Everything is Completed. View
2104 Shahjahanpur NCC Ltd. 20015013 SAHDEVPUR W/s 3 3 2303 2022 2037 2052 31-Dec-2024 29-Jun-2024 28-Sep-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of SAHDEVPUR scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of SAHDEVPUR W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2105 Ambedkar Nagar Vindhya-GAJA (JV) 20026097 SAHJANA HAMJAPUR WATER SUPPLY SCHEME 1 2 4320 2023 2038 2053 28-Sep-2023 14-Aug-2024 05-Dec-2024 06-Dec-2024 Checked and found ok SCHEME COMPLETED View
2106 Ambedkar Nagar Vindhya-GAJA (JV) 20033828 SAHNE MAU water Supply Scheme 4 12 5660 2023 2038 2053 21-Oct-2023 07-Aug-2025 07-Aug-2025 11-Aug-2025 Scheme completed and ready for O&M Scheme Completed View
2107 Shahjahanpur NCC Ltd. 20018013 Sahora 2 2 2910 2022 2037 2052 09-Aug-2023 31-Dec-2024 08-Nov-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sahora scheme have been checked and verified. The submitted records are recommended and forwarded for further All information on the portal for the completion certificate of Sahora scheme has been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2108 Bijnor Vindhya-GAJA (JV) 20021786 Sahrifpur Gram Panchayat Water Supply 3 3 2742 2023 2038 2053 06-Jul-2023 10-Oct-2024 10-Apr-2025 11-Apr-2025 Every thing complete. Everything complete View
2109 Kannauj GVPR 20077108 SAHROI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 5 2764 2023 2038 2053 08-Sep-2024 22-Apr-2024 26-Jul-2024 27-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2110 Amethi Welspun Kaveri Infraprojects JV 8360826 Saidpur 1 7 1930 2022 2037 2052 10-Apr-2023 11-Feb-2025 13-Aug-2024 14-May-2025 All things found satisfactory in the Scheme and finalized for Operation And Maintenance Approved View
2111 Etawah Indian Hume Pipe 20015031 Saidpur 2 5 2250 2022 2037 2052 12-Oct-2022 14-Jan-2024 17-Apr-2024 18-Apr-2024 Forwarded for further action. All work of scheme found satisfactory. View
2112 Ambedkar Nagar Vindhya-GAJA (JV) 20058740 SAIDPUR RASEEDPUR WSS 4 16 4420 2023 2038 2053 26-Dec-2023 28-Jun-2025 21-Oct-2025 22-Oct-2025 Scheme completed and ready for O&M Scheme Completed View
2113 Bijnor LC INFRA 20076114 SAIFPUR BANGAR WATER SUPPLY SCHEME 4 4 1605 2022 2037 2052 03-Feb-2023 16-Dec-2024 16-Dec-2024 17-Dec-2024 Every thing complete. Every thing is completed. View
2114 Shahjahanpur NCC Ltd. 20098286 SAIJANA GRAM PANCHAYAT SINGLE VILLAGE WATER SUPPLY SCHEME 1 1 1300 2022 2037 2052 31-Dec-2024 21-Apr-2024 21-Jul-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of SAIJANA WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of SAIJANA GRAM PANCHAYAT SINGLE VILLAGE WATER SUPPLY SCHEME have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2115 Sultanpur UNIVERSAL MEP 20066432 SAINI GRAM PANCHAYAT WATER SUPPLY SCHEME 3 5 3200 2023 2038 2053 12-Jan-2024 12-Jan-2024 02-Dec-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
2116 Kanpur Dehat Indian Hume Pipe 20012636 Saintha 1 4 4300 2022 2037 2052 13-Oct-2021 12-Oct-2022 31-Aug-2023 01-Sep-2023 Forward for further action All work of scheme found satisfactory View
2117 Farrukhabad Vindhya-GAJA (JV) 20092396 SAINTHARA MVS 1 2 2527 2023 2038 2053 30-May-2025 15-Jun-2024 15-Jun-2024 16-Jun-2024 All the parameters of scheme verified can take in O&M ok View
2118 Amethi Vindhya-GAJA (JV) 20085696 SAITHA WATER SUPPLY SCHEME 1 19 5011 2023 2038 2053 29-Apr-2024 30-Jun-2025 15-Mar-2025 16-Jun-2025 Hardcopy submitted and found okay as per the submitted documents.. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance.. View
2119 Gautam Buddha Nagar LC INFRA 20013504 SAITHALI W/S SCHEME 1 1 3799 2022 2037 2052 07-Feb-2024 01-Dec-2024 01-Sep-2024 01-Dec-2024 Project certificate is verified all work has been completed. View
2120 Kannauj GVPR 20036477 SAKARBABA & TILAK SARAI & BHAWANI SARAI 3 8 6110 2023 2038 2053 13-May-2024 25-Mar-2024 27-Jun-2024 28-Jun-2024 forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2121 Kannauj GVPR 20077097 SAKHAULI GRAM PANCHAYAT WATER SUPPLY SCHEME 2 2 2467 2023 2038 2053 08-Sep-2024 13-Apr-2024 16-Jul-2024 17-Jul-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2122 Bijnor LC INFRA 20011779 Saktalpur Milak Water Supply Scheme 2 2 2870 2022 2037 2052 10-Feb-2022 09-Aug-2024 09-Aug-2024 10-Aug-2024 Every thing completed Everything is completed View
2123 Ghaziabad LC INFRA 20096363 SAKURPUR VILLAGE WATER SUPPLY SCHEME 1 1 4120 2022 2037 2052 09-Feb-2022 30-Sep-2024 31-Jan-2025 01-Mar-2025 Satisfactory on the work. All civil works and E&M works are completed. All documents find satisfactory View
2124 Jalaun GVPR 8135513 Sala GOV 197 0 349313 2023 2038 2053 25-Nov-2022 15-Jul-2025 15-Jul-2025 14-Oct-2025 forwarded for further necessary action. compliance the observations given by u View
2125 Ambedkar Nagar Vindhya-GAJA (JV) 20100682 Salahuddinpur Water Supply Scheme 1 2 1610 2023 2038 2053 17-May-2024 24-Nov-2024 24-Feb-2025 25-Feb-2025 Scheme completed and ready for O&M Scheme completed View
2126 Bijnor LC INFRA 20051674 SALAIMPUR 1 1 2670 2022 2037 2052 03-Dec-2022 25-Mar-2025 25-Mar-2025 26-Mar-2025 Every thing complete. Everything Completed. View
2127 Auraiya GVPR 20025228 Salaiya PWS 3 2 3510 2023 2038 2053 26-Sep-2022 25-Sep-2023 08-Jun-2023 01-Nov-2024 Forwarded for further action. All work of scheme fond satisfactory. View
2128 Bijnor Vindhya-GAJA (JV) 20101256 Salarpur Safkatpur WSS 2 2 3743 2023 2038 2053 06-Jul-2023 22-Oct-2024 22-Apr-2025 23-Apr-2025 Every thing complete. Check Document View
2129 Ambedkar Nagar Vindhya-GAJA (JV) 20059385 SALARPUR Water Supply Scheme 2 3 2230 2023 2038 2053 26-Dec-2023 27-Nov-2024 27-Feb-2025 28-Feb-2025 checked and verified and found OK Scheme completed View
2130 Bijnor Vindhya-GAJA (JV) 20059256 SALAVA WATER SUPPLY SCHEME 2 2 2639 2023 2038 2052 06-Jul-2023 24-Jun-2024 25-Dec-2024 25-Dec-2024 Every thing complete. Check Document View
2131 Fatehpur Power Mech Projects Ltd 20102037 SALEMPUR 1 1 1240 2023 2038 2053 20-Sep-2024 27-Jan-2025 13-Jun-2025 14-Jun-2025 Trial & Run completed. It was initiated in the month of March (15.03.2025) and Regular water supply is given to the consumers. Verified View
2132 Shahjahanpur NCC Ltd. 8362103 SALEMPUR BUZURG GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 4 4 2000 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Salempur Buzurg scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Salempur Bujurg scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2133 Fatehpur Power Mech Projects Ltd 20099437 SALEMPUR GOLI 2 4 3407 2023 2038 2053 14-May-2024 30-Jun-2025 31-May-2025 01-Jun-2025 Trial & Run completed. It was initiated in the month of March (01.03.2025) and Regular water supply is given to the consumers. Verified View
2134 Kannauj GVPR 20067697 SALEMPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 2 2595 2023 2038 2053 15-Jun-2024 07-Apr-2024 11-Jul-2024 12-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2135 Kanpur Dehat GVPR 20053528 SALEMPUR MAHERA1 2 0 4201 2023 2038 2053 18-Nov-2023 22-Oct-2023 06-Mar-2024 07-Mar-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
2136 Auraiya Indian Hume Pipe 20033782 SALEMPUR NABAL SINGH PWS 2 2 1800 2022 2037 2052 22-Sep-2023 20-Jun-2023 04-Oct-2023 05-Oct-2023 Forwarded for further action. All work of scheme fond satisfactory. View
2137 Auraiya GVPR 20040107 Salempur PWS 1 2 2693 2023 2038 2053 06-Jan-2022 31-Dec-2024 23-Apr-2024 25-Apr-2024 Forwarded for further action. All work of scheme found satisfactory. View
2138 Kannauj GVPR 20036899 SALEMPUR RAUPALPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 6 3171 2023 2038 2053 15-Jun-2024 30-Apr-2024 03-Aug-2024 04-Aug-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2139 Kannauj GVPR 20050184 SALEMPUR TARA BANGER GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 2038 2023 2038 2053 15-Jun-2024 28-Mar-2024 30-Jun-2024 01-Jul-2024 forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2140 Gautam Buddha Nagar LC INFRA 20097860 SALEPUR VILLAGE WATER SUPPLY SCHEME 1 1 2401 2022 2037 2052 07-Feb-2024 15-Dec-2024 15-Sep-2024 15-Dec-2024 Project certificate is verified all work has been completed. View
2141 Auraiya Indian Hume Pipe 20055881 Salhoopur PWS 1 3 1760 2022 2037 2052 22-Sep-2023 15-Jul-2023 19-Jul-2024 20-Jul-2024 Forwarded for further action. All work of scheme fond satisfactory. View
2142 Ambedkar Nagar Vindhya-GAJA (JV) 20026155 SALLAHPUR AKBELPUR water Supply Scheme 2 15 4110 2023 2038 2053 28-Sep-2023 25-Jul-2025 16-Nov-2025 17-Nov-2025 CHECKED AND FOUND OK Scheme Completed View
2143 Shahjahanpur NCC Ltd. 20019652 SALLIA 2 2 3340 2022 2037 2052 31-Dec-2024 02-Sep-2024 02-Dec-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of SALLIA scheme have been checked and verified. The submitted records are recommended and forwarded for further. As per SWSM letter no. 3331/SE/QAP/2023-24, dated- 26.10.2023. Instead of Single curved sheet TKC has used twins sheets During erection of Zi-Al Tanks, replace the same with in 15 days. As per TKC undertaking letter no.NCC/DWSM/SHAHJAHANPUR /69/2025-26.TKC has assured the pendency of work will be completed by 15.09.25. All information on the portal for the completion certificate of Sallia scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2144 Farrukhabad Vindhya-GAJA (JV) 20081393 SAMAICHIPUR MAJRA ATHURIYA & UMMARAPUR MVS 2 4 2362 2023 2038 2053 30-May-2025 20-Jun-2024 20-Jun-2024 21-Jun-2024 All the parameters of scheme verified can take in O&M ok View
2145 Mau LC INFRA 20012740 SAMANPURA, GP-WATER SUPPLY SCHEME 2 6 2109 2022 2037 2052 20-Mar-2024 10-Jan-2025 09-Jan-2025 10-Jan-2025 Approved Approved.. View
2146 Meerut Power Mech Projects Ltd 8362752 SAMASPUR 1 1 2450 2022 2037 2052 31-Dec-2024 12-Feb-2024 21-Apr-2023 25-Oct-2024 Recommended for further Approvals. approved View
2147 Meerut Power Mech Projects Ltd 20020955 SAMASPUR (HASTINAPUR) 2 2 1723 2022 2037 2052 31-Dec-2024 15-Jun-2023 30-Jan-2023 30-Jan-2025 Recommended for further Approval approved View
2148 Etawah Indian Hume Pipe 20026407 Samaspur PWS 2 3 3935 2022 2037 2052 22-Sep-2023 15-Apr-2024 15-Apr-2024 16-Apr-2024 Forwarded for further action. All work of scheme found satisfactory. View
2149 Ghaziabad LC INFRA 20104991 SAMAYPUR VILLAGE WATER SUPPLY SCHEME 1 1 2131 2022 2033 2052 09-Feb-2022 30-Nov-2024 31-Mar-2025 01-Apr-2025 Satisfactory on the work. All Civil works and E&M works are completed. All Work Completed View
2150 Farrukhabad Vindhya-GAJA (JV) 20092906 SAMECHIPUR CHITAR & GUTAITI DAKHIN MVS 4 4 2667 2023 2038 2053 30-May-2025 25-May-2024 25-May-2024 26-May-2024 All the parameters of scheme verified can take in O&M. ok View
2151 Ambedkar Nagar Vindhya-GAJA (JV) 20058483 SAMOKHPUR Water Supply Scheme 1 2 2340 2023 2038 2053 26-Dec-2023 27-Apr-2026 27-Apr-2026 30-Apr-2026 Scheme completed and ready for O&M SCHEME COMPLETED View
2152 Meerut Power Mech Projects Ltd 20020246 SAMOLI SALEMPUR 1 1 5141 2022 2037 2052 04-Feb-2024 20-Sep-2024 06-Feb-2025 06-Apr-2025 Recommended for further Approval approved View
2153 Jaunpur Welspun Kaveri Infraprojects JV 20021188 Samopur 3 12 3028 2022 2037 2052 23-Sep-2023 18-Oct-2025 18-Oct-2025 19-Oct-2025 Checked and found ok. Ok View
2154 Jaunpur Welspun Kaveri Infraprojects JV 20009954 SAMRAHO 1 8 3320 2022 2037 2052 22-May-2023 28-Feb-2025 28-Feb-2025 01-Mar-2025 Checked and found ok. Ok View
2155 Amethi Vindhya-GAJA (JV) 20068050 SANAHA WATER SUPPLY SCHEME 1 2 2680 2023 2038 2053 01-Jun-2024 05-Nov-2024 09-Sep-2024 12-Aug-2024 Hardcopy submitted All Things Are Found Satisfactory , Scheme is Finalized For Operation and Maintenance View
2156 Kannauj GVPR 20036125 SANDA GRAMIN PEYJAY YOJNA 3 5 3403 2023 2038 2053 13-May-2024 25-Mar-2024 27-Jun-2024 28-Jun-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2157 Kanpur Dehat Indian Hume Pipe 20012576 Sangansiyapur 1 3 2880 2022 2037 2052 13-Oct-2021 12-Oct-2022 30-Sep-2023 01-Oct-2023 Forward for further action All work of scheme found satisfactory View
2158 Amethi Vindhya-GAJA (JV) 20068350 SANGRAMPUR & GOOJIPUR WATER SUPPLY SCHEME 3 18 5465 2023 2038 2053 23-Mar-2024 30-Jun-2025 12-Mar-2025 13-Jun-2025 Hardcopy submitted and found okay as per the submitted documents.. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance.. View
2159 Fatehpur Power Mech Projects Ltd 20095909 SANGRAMPUR,BHAKRANA 3 4 4670 2023 2038 2058 15-May-2023 30-Jun-2025 18-Dec-2024 19-Dec-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of September(19.09.2024) and Regular water supply is given to the consumers. Verified View
2160 Meerut Power Mech Projects Ltd 20031790 SANOTA - PINAI - KUNDA 3 3 6832 2023 2038 2053 31-Dec-2024 05-Sep-2024 22-Jan-2025 23-Jan-2025 Recommended for further Approvals. approved View
2161 Auraiya GVPR 20095107 Sanwaliya PWS 1 2 1643 2023 2038 2053 01-Jun-2024 06-Apr-2024 01-Mar-2024 19-Apr-2024 Forwarded for further action. All work of scheme found satisfactory. View
2162 Sultanpur UNIVERSAL MEP 20066727 SARAI & BAGGA & TAUDHIKPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 9 4510 2023 2038 2053 12-Jan-2024 31-Dec-2024 11-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
2163 Etawah Indian Hume Pipe 20026401 Sarai Bhagat PWS 2 5 1840 2022 2037 2052 22-Sep-2023 20-Feb-2024 10-Jun-2024 11-Jun-2024 Forwarded for further action. All work of scheme found satisfactory View
2164 Jaunpur Welspun Kaveri Infraprojects JV 20022191 Sarai Bikram 1 10 5480 2022 2037 2052 06-Jul-2023 18-Oct-2025 18-Oct-2025 19-Oct-2025 Checked and found ok. Okay View
2165 Fatehpur Power Mech Projects Ltd 20097755 SARAI IDRISH & LADLEPUR 2 4 3020 2023 2038 2058 14-May-2024 30-Jun-2025 11-Nov-2024 12-Nov-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of August(12.08.2024) and Regular water supply is given to the consumers. Verified View
2166 Etawah Indian Hume Pipe 20015016 Sarai Jalal 1 2 2440 2022 2037 2052 12-Oct-2022 02-Aug-2024 02-Aug-2024 03-Aug-2024 Forwarded for further action. All work of scheme found satisfactory View
2167 Kannauj VSA 20015712 SARAI KAYAM GRAMIN PEYJAL YOJNA 1 3 1940 2022 2037 2052 06-Jul-2023 04-Apr-2025 04-Aug-2025 05-Aug-2025 forwarded for further action. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
2168 Fatehpur Power Mech Projects Ltd 20097900 SARAI KHALIS 2 4 2940 2023 2038 2053 15-May-2023 14-May-2024 10-Jun-2025 11-Jun-2025 Trial & Run completed. It was initiated in the month of March (11.03.2025) and Regular water supply is given to the consumers. Verified View
2169 Balrampur Larsen & Toubro Ltd 20021254 Sarai Khas Water Supply Scheme 1 6 4814 2022 2037 2052 27-Feb-2023 16-Dec-2025 16-Mar-2026 16-Mar-2026 The work mentioned above is pending and needs to be addressed as a priority. The scheme can only be considered for commissioning and subsequent Operation & Maintenance (O&M) phase after all issues are resolved and compliance with DPR specifications is ensured. ok View
2170 Auraiya Indian Hume Pipe 20022758 Sarai Khati Water Supply Scheme 1 3 1280 2022 2037 2052 08-May-2023 28-Dec-2023 31-Mar-2024 01-Jan-2024 Forwarded for further action. All work of scheme found satisfactory. View
2171 Fatehpur Power Mech Projects Ltd 20044301 Sarai Langar 1 3 2760 2023 2038 2053 27-Nov-2023 15-Mar-2025 05-Aug-2025 06-Aug-2025 Trial & Run completed. It was initiated in the month of May (04.05.2025) and Regular water supply is given to the consumers. HGJ certificate not signed by Gram Pradhan. Verified View
2172 Auraiya GVPR 20091164 Sarai pratham PWS 1 3 3125 2023 2038 2053 01-Jun-2024 04-May-2025 03-May-2025 05-May-2025 Forwarded for further action. All work of scheme found satisfactory. View
2173 Kannauj GVPR 20036655 SARAI SUNDAR & KUNWARPUR JANU GRAMIN PEYJAL YOJNA 3 7 4118 2023 2038 2053 15-Mar-2024 10-Apr-2024 13-Jul-2024 14-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2174 Kannauj GVPR 20067284 SARAI THEKU GRAM PANCHAYAT WATER SUPPLY SCHEME 1 4 2658 2023 2038 2053 16-Aug-2024 22-Apr-2024 26-Jul-2024 27-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2175 Sultanpur UNIVERSAL MEP 20092665 SARAIYA & PALIYA GRAM PANCHAYAT WATER SUPPLY SCHEME 4 6 8040 2023 2038 2053 18-Jul-2024 22-Feb-2025 24-May-2025 01-Jul-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
2176 Sultanpur UNIVERSAL MEP 20066385 SARAIYA BHARTHI GRAM PANCHAYAT WATER SUPPLY SCHEME 3 13 2849 2023 2038 2053 12-Jan-2024 12-Jan-2024 01-Jul-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
2177 Gautam Buddha Nagar LC INFRA 20097856 SARAKPUR VILLAGE WATER SUPPLY SCHEME 1 1 1080 2022 2037 2052 07-Feb-2024 10-Jan-2025 10-Oct-2024 10-Jan-2025 Project certificate is verified all work has been completed. View
2178 Meerut Power Mech Projects Ltd 20037263 SARANPUR 2 2 2548 2022 2037 2052 31-Dec-2024 01-Feb-2024 19-Jun-2024 10-Oct-2024 Recommended for further Approvals. Approved View
2179 Sultanpur UNIVERSAL MEP 20066481 SARAV & MUDWA GRAM PANCHAYAT WATER SUPPLY SCHEME 5 14 5740 2023 2038 2053 12-Jan-2024 31-Dec-2024 31-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
2180 Fatehpur Power Mech Projects Ltd 20097905 Saray Mohan Salempur 3 3 2860 2023 2038 2053 20-Sep-2024 22-Oct-2024 22-Oct-2024 23-Oct-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of July (23.07.2024) and Regular water supply is given to the consumers. Verify View
2181 Hardoi NCC Ltd. 20021344 SARAYA 2 6 3740 2022 2037 2052 26-Jul-2023 12-Sep-2023 11-Dec-2023 25-Dec-2024 ok OK View
2182 Fatehpur Power Mech Projects Ltd 20089204 SARAYDHARAMPUR 1 3 3900 2023 2038 2053 13-Mar-2024 07-Feb-2025 25-Jun-2025 26-Jun-2025 Trial & Run completed. It was initiated in the month of March (26.03.2025) and Regular water supply is given to the consumers. HGJ certificate not signed by Gram pradhan and Panchayat secretary. Verified View
2183 Mau LC INFRA 20080874 SARBASPUR VILLAGE WATER SUPPLY SCHEME 4 9 3462 2022 2037 2052 08-Aug-2024 12-Dec-2024 11-Dec-2025 12-Dec-2025 Approved Approved View
2184 Kannauj GVPR 20036511 SARDA MAI & DHARNIDHARPUR NAGARIYA GRAMIN PEYJAL YOJNA 2 12 5170 2023 2038 2053 13-May-2024 25-Mar-2024 27-Jun-2024 28-Jun-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
2185 Kannauj GVPR 20077074 SARDAPUR & KUSKA GRAM PANCHAYAT WATER SUPPLY SCHEME 2 5 3156 2023 2038 2053 08-Sep-2024 22-Mar-2024 24-Jun-2024 25-Jun-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2186 Kanpur Dehat Indian Hume Pipe 20012964 Sardarpur 2 2 3425 2022 2037 2052 05-Feb-2022 04-Feb-2022 31-Mar-2024 01-Apr-2024 Forward for further action All work of scheme found satisfactory View
2187 Bijnor LC INFRA 20038598 Sardhani Banjar Gram Panchayat Water Supply 2 2 2537 2022 2037 2052 14-Nov-2022 25-Nov-2024 24-Feb-2025 25-Feb-2025 Every thing complete. All document complete View
2188 Bijnor LC INFRA 20025878 Sareefpur Malakpur Water Supply Scheme 3 3 2930 2022 2037 2052 18-Aug-2022 03-Mar-2024 04-Jun-2024 05-Jun-2024 Every thing complete. Every thing is completed. View
2189 Etawah Indian Hume Pipe 20015039 Sarekhipura 1 3 2130 2022 2037 2052 08-May-2023 03-Nov-2023 26-Mar-2024 25-Jun-2024 Forwarded for further action. All work of scheme found satisfactory View
2190 Kanpur Dehat Indian Hume Pipe 20025481 Sargaon Khurd 1 2 2750 2022 2037 2052 24-Aug-2022 31-Dec-2024 30-Oct-2024 01-Feb-2024 Forward for further action pls All work of scheme found satisfactory View
2191 Kannauj GVPR 20067403 SARGOLI & RAUNSA GRAM PANCHAYAT WATER SUPPLY SCHEME 4 6 3948 2023 2038 2053 16-Aug-2024 30-Apr-2024 03-Aug-2024 04-Aug-2024 FORWARDED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2192 Mau GA INFRA-VPL 20093521 SARHASA ZAMIN SARHASA, PAHARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 7 3550 2023 2038 2053 19-Mar-2025 19-Mar-2025 18-Mar-2025 19-Mar-2025 Approved Approved View
2193 Amethi Vindhya-GAJA (JV) 20070856 SARIYA DUBAAN WATER SUPPLY SCHEME 1 9 2190 2023 2033 2053 07-Feb-2024 23-Dec-2024 23-Mar-2025 09-Jun-2025 All things found satisfactory in the Scheme and finalized for Operation And Maintenance All things found satisfactory in the Scheme and finalized for Operation And Maintenance View
2194 Raebareli NCC Ltd. 20011086 Saroura GP Water Supply Scheme 1 3 2037 2022 2037 2052 16-Jul-2023 21-Jul-2024 08-Jan-2024 21-Nov-2024 Ok Ok View
2195 Farrukhabad Vindhya-GAJA (JV) 20075398 SARPARPUR, RASIDPUR TARAI & UGARPUR MVS 4 10 4735 2023 2038 2053 31-Mar-2025 02-Apr-2024 31-Jul-2024 01-Aug-2024 All the parameters of scheme verified can take in O&M. ok View
2196 Meerut Power Mech Projects Ltd 20020253 SARSWA 1 1 3773 2022 2037 2052 31-Dec-2024 25-Sep-2024 11-Feb-2025 12-Feb-2025 Recommended for further Approvals. approved View
2197 Fatehpur Power Mech Projects Ltd 20102039 SARWAL 1 1 1726 2023 2038 2053 21-Sep-2023 03-Jan-2025 24-May-2025 25-May-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of February(25.2.2025) and Regular water supply is given to the consumers. Verified View
2198 Sultanpur UNIVERSAL MEP 20067049 SATAHARI & BICHHAURA GRAM PANCHAYAT WATER SUPPLY SCHEME 3 8 4570 2023 2038 2053 18-Jul-2024 23-Feb-2025 27-May-2025 01-Jul-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
2199 Fatehpur Power Mech Projects Ltd 20097832 SATO JOGA 1 5 4900 2023 2038 2053 25-Oct-2024 16-Jan-2025 15-Jan-2025 16-Jan-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of October (16.10.2024) and Regular water supply is given to the consumers. Verified View
2200 Fatehpur Power Mech Projects Ltd 20097536 SATO PEET 1 3 2550 2023 2038 2053 20-Sep-2024 23-Apr-2025 23-Apr-2025 24-Apr-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of January ( 24.01.2025) and Regular water supply is given to the consumers. Verify View
2201 Kannauj GVPR 20067330 SATOURA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 5356 2023 2038 2053 16-Aug-2024 13-Apr-2024 16-Jul-2024 17-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2202 Ambedkar Nagar Vindhya-GAJA (JV) 20072736 SATRAHI WSS 1 4 2685 2023 2038 2053 22-Mar-2024 05-Apr-2025 05-Apr-2025 06-Apr-2025 Scheme completed and ready for O&M Scheme completed View
2203 Meerut Power Mech Projects Ltd 20010916 SATWAI 2 1 3992 2022 2037 2052 16-Jul-2023 14-Mar-2023 01-Aug-2023 13-Dec-2024 Recommended for further Approval approved View
2204 Shahjahanpur NCC Ltd. 20093770 SATWAN KHURD MULTI VILLAGE WSS 2 2 2430 2022 2037 2052 31-Dec-2024 12-Aug-2024 11-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Satwan Khurd scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of satwan khurd scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2205 Amethi Vindhya-GAJA (JV) 20066500 SAUNA WATER SUPPLY SCHEME 1 4 2965 2023 2038 2053 22-Dec-2023 29-Dec-2024 29-Mar-2025 30-Jun-2025 All things found satisfactory in the Scheme and finalized for Operation And Maintenance All things found satisfactory in the Scheme and finalized for Operation And Maintenance View
2206 Shahjahanpur NCC Ltd. 20016380 SAUNPHARI 2 2 3150 2022 2037 2052 31-Dec-2024 24-Jun-2024 23-Sep-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of SAUNPHARI scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of SAUNPHARI W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2207 Kannauj GVPR 20099738 SAURIKH DEHAT GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 3454 2023 2038 2053 16-Aug-2024 16-Apr-2024 19-Jul-2024 20-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2208 Meerut Power Mech Projects Ltd 20098091 SEENA 1 1 4128 2022 2037 2052 31-Dec-2024 03-May-2024 19-Sep-2024 07-Oct-2024 Recommended for Further Approval approved View
2209 Auraiya GVPR 20065273 Seganputta & jalupurPWS 3 5 821 2023 2038 2053 01-Jun-2024 18-Jan-2025 17-Jan-2025 20-Jan-2025 Forwarded for further action. All work of scheme found satisfactory. View
2210 Jaunpur Welspun Kaveri Infraprojects JV 20012953 Sehara 2 8 4156 2022 2037 2052 22-May-2023 22-Dec-2025 21-Mar-2026 22-Mar-2026 Checked and found ok...................... ok View
2211 Auraiya GVPR 20025511 SEHUDPUR PWS 2 2 4241 2023 2038 2053 01-Jun-2022 29-Jun-2024 30-Mar-2024 30-Jun-2024 Forwarded for further action. All work of scheme fond satisfactory. View
2212 Fatehpur Power Mech Projects Ltd 20095915 SEMARI 2 7 3840 2023 2038 2053 25-Sep-2024 30-Jun-0020 11-Nov-2024 12-Nov-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of August (12.08.2024) Verified View
2213 Fatehpur Power Mech Projects Ltd 20097759 SEMRA 2 2 3060 2023 2038 2053 23-Jan-2025 13-Aug-2025 12-Aug-2025 13-Aug-2025 Trial & Run completed. It was initiated in the month of May (13.05.2025) and Regular water supply is given to the consumers. Verified View
2214 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20008670 semra naserpur 2 8 4865 2022 2037 2052 22-May-2023 20-Jan-2026 16-Jul-2025 20-Feb-2026 Scheme completed and ready for O&M Scheme Completed View
2215 Bahraich PNC-SPML-JV 20020733 SEMRAUNA VISESHWARGANJ PWS 1 2 8653 2022 2037 2052 31-Dec-2025 21-Aug-2025 21-Aug-2025 22-Aug-2025 scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/08/1953 kindly complete it. SCHEME COMPLETED View
2216 Meerut Power Mech Projects Ltd 8362763 SET KUAN 1 1 1734 2022 2037 2052 31-Dec-2024 05-Jan-2023 24-May-2023 17-Dec-2024 Recommended for Further Approval approved View
2217 Ambedkar Nagar Vindhya-GAJA (JV) 20026061 SETHA KALA WATER SUPPLY SCHEME 2 7 4530 2023 2038 2053 28-Sep-2023 12-Feb-2024 30-Jun-2024 01-Jul-2024 Checked and found ok Scheme completed View
2218 Hardoi NCC Ltd. 20085610 SEVA 1 2 1710 2022 2037 2052 26-Jul-2023 28-Feb-2023 27-May-2023 24-Dec-2024 ok OK View
2219 Sultanpur UNIVERSAL MEP 20066347 SEWARA WATER SUPPLY SCHEME 3 21 4940 2023 2038 2053 12-Jan-2024 31-Dec-2024 11-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
2220 Sultanpur UNIVERSAL MEP 20064745 SHADIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 1 3640 2023 2038 2053 12-Jan-2024 12-Jan-2024 29-Mar-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
2221 Bijnor LC INFRA 8361240 SHADIPUR GRAMPANCHAYAT WATER SUPPLY SCHEME 2 2 5063 2022 2037 2052 24-Sep-2023 11-Feb-2024 10-Aug-2024 11-Aug-2024 Every thing complete. All Documents checked and verified View
2222 Bijnor LC INFRA 20012936 SHADIPUR KALAN WATER SUPPLY SCHEME 1 2 2359 2022 2037 2052 02-Nov-2023 18-Jan-2024 24-Jul-2024 25-Jul-2024 every thing completed. Everything Completed View
2223 Bijnor Vindhya-GAJA (JV) 20100154 SHAH ALIPUR UTTAMCHAND WSS 2 2 1640 2023 2038 2053 06-Jul-2023 19-May-2025 19-Nov-2025 20-Nov-2025 Every thing complete. check View
2224 Meerut Power Mech Projects Ltd 20031852 SHAH KULIPUR - MANPUR 2 2 4274 2023 2038 2053 31-Dec-2024 12-Mar-2024 30-Jul-2024 21-Apr-2025 Recommended for further Approval approved View
2225 Kannauj GVPR 20067689 SHAH NAGAR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 2762 2023 2038 2053 08-Sep-2024 13-Apr-2024 16-Jul-2024 17-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2226 Bijnor LC INFRA 20051664 SHAHABPURA 1 1 3563 2022 2037 2052 03-Dec-2022 16-Nov-2024 16-Nov-2024 17-Nov-2024 Every thing complete. Every thing is completed. View
2227 Bijnor LC INFRA 20087918 Shahabpura Ratan Singh Village Water Supply Scheme 3 3 6354 2022 2037 2052 13-Mar-2025 15-Apr-2024 23-Aug-2024 24-Aug-2024 every thing completed. Every thing is completed View
2228 Bijnor LC INFRA 8361855 SHAHADPUR GULAL VILLAGE WATER SCHEME 1 1 2282 2022 2037 2052 13-Apr-2023 08-Jul-2024 15-Jan-2025 16-Jan-2025 Everything Complete. Everything Complete. View
2229 Jaunpur AFCONS 20066917 SHAHAPUR VILLAGE WATER SUPPLY SCHEME 2 7 3190 2023 2038 2053 31-Dec-2026 10-Oct-2024 10-Oct-2024 10-Oct-2024 Checked and found ok. OK View
2230 Ayodhya UNIVERSAL MEP 20030398 SHAHBAZPUR & PHELSANDA GROUP OF GRAM PANCHAYATS WATER SUPPLY SCHEME 3 5 3220 2023 2038 2053 12-Oct-2023 20-Aug-2023 20-Aug-2023 15-Nov-2024 Found ok Found Correct View
2231 Kanpur Dehat GVPR 20070706 Shahi 1 3 1299 2023 2038 2053 17-Feb-2024 18-Dec-2023 23-Mar-2024 24-Apr-2024 Forward for further action All work of scheme found satisfactory View
2232 Fatehpur Power Mech Projects Ltd 20100816 SHAHIPUR 2 3 1820 2023 2038 2053 20-Sep-2024 25-Sep-2024 24-Sep-2024 25-Sep-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of June (25.06.2024) and Regular water supply is given to the consumers. Verified View
2233 Kannauj GVPR 20077128 SHAHJAHANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 1 2034 2023 2038 2053 08-Sep-2024 04-Apr-2024 07-Jul-2024 08-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2234 Bijnor LC INFRA 20011676 Shahkarampur Giladi Village Water Supply Scheme 1 2 2356 2022 2037 2052 09-Feb-2024 10-Aug-2024 11-Feb-2025 12-Feb-2025 Every thing complete. check View
2235 Bijnor LC INFRA 20087653 Shahlipur Abdul Sattar water supply scheme 1 1 2769 2022 2037 2052 30-Mar-2025 30-Mar-2025 30-Mar-2025 01-Apr-2025 Every thing completed Every thing completed View
2236 Jaunpur AFCONS 20069122 SHAHMAU VILLAGE WATER SUPPLY SCHEME 3 10 2178 2023 2038 2053 03-Feb-2024 16-Jan-2026 16-Jan-2026 16-Jan-2026 Cheked and found ok. ok View
2237 Ambedkar Nagar Vindhya-GAJA (JV) 20035277 SHAHPUR AURAM WSS 1 2 3320 2023 2038 2053 21-Oct-2023 27-Aug-2025 12-Dec-2025 13-Dec-2025 CHECKED AND FOUND OK Scheme Completed View
2238 Kanpur Dehat GVPR 20077347 shahpur derapur 2 5 3160 2023 2038 2053 17-Feb-2024 20-Dec-2023 04-May-2024 05-May-2024 Forward for further necessary action pls All work of scheme found satisfactory View
2239 Farrukhabad Vindhya-GAJA (JV) 20092881 SHAHPUR GANGPUR MVS 3 5 2688 2023 2038 2053 30-May-2025 09-Jul-2024 09-Jul-2024 10-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
2240 Fatehpur Power Mech Projects Ltd 20102044 SHAHPUR HARDASPUR 1 1 1830 2023 2038 2053 20-Sep-2024 20-Sep-2024 02-Sep-2024 03-Sep-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of June (03.06.2024) and Regular water supply is given to the consumers. Verify View
2241 Gautam Buddha Nagar LC INFRA 8361580 SHAHPUR KHURD GRAM PANCHAYAT WATER SUPPLY SCHEME 3 3 2615 2022 2019 2052 20-Sep-2021 20-Mar-2023 10-Apr-2023 11-Apr-2023 Actual Executed Cost Verified based on Approved Variation Statement. all work has been completed. View
2242 Ambedkar Nagar Vindhya-GAJA (JV) 20092966 SHAHPUR MAHMOODPUR Water Supply Scheme 3 6 2110 2023 2038 2053 17-May-2024 28-Oct-2025 18-Mar-2026 01-Apr-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
2243 Meerut Power Mech Projects Ltd 20020950 SHAHPUR PIRPUR 3 3 2652 2022 2037 2052 31-Dec-2024 13-Jun-2024 03-Nov-2024 04-Nov-2024 Recommended for further Approvals. Approved View
2244 Sultanpur UNIVERSAL MEP 20091194 SHAHPUR SARKANDE DIH GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 11490 2023 2038 2053 18-Jul-2024 02-Mar-2025 04-Jun-2025 01-Aug-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
2245 Meerut Power Mech Projects Ltd 20037269 SHAHPUR ZADID 1 1 2710 2022 2037 2052 31-Dec-2024 22-Feb-2024 30-Apr-2024 09-Nov-2024 Recommended for further Approvals. approved View
2246 Shahjahanpur NCC Ltd. 20023896 SHAHZADPUR 3 3 3030 2022 2037 2052 31-Dec-2024 04-Jan-2024 04-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Shahzadpur WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of SHAHZADPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2247 Ghaziabad LC INFRA 20018261 SHAKAR PULLA PWS SCHEME 1 1 3007 2022 2037 2052 27-Aug-0201 30-Nov-2024 31-Mar-2025 01-Apr-2025 Actual Executed Cost Verified based on approved variation statement. All work completed View
2248 Farrukhabad Vindhya-GAJA (JV) 20075758 SHAMASPUR BHIKHARI & HASANPUR & LALAUR RAJPUTAN MVS 3 5 5127 2023 2038 2053 30-May-2025 08-Aug-2024 21-Nov-2024 22-Nov-2024 All the parameters of scheme verified can take in O&M. ok View
2249 Bijnor LC INFRA 20017127 Shamsahbad Water Supply 3 3 2227 2022 2037 2052 30-Jun-2025 30-Oct-2024 31-Jan-2025 01-Feb-2025 Every thing complete Check Document View
2250 Hardoi NCC Ltd. 20011904 SHAMSPUR 1 2 5540 2022 2037 2052 14-Jun-2023 22-Mar-2023 21-Jun-2023 24-Dec-2024 ok Ok View
2251 Etawah Indian Hume Pipe 20101086 Shankarpur 1 4 1835 2022 2037 2052 15-Mar-2024 12-Nov-2023 12-Apr-2024 13-Apr-2024 Forwarded for further action All works are satisfactory. View
2252 Shahjahanpur NCC Ltd. 20015513 shankarpur pitrihai wss 1 1 4130 2022 2037 2052 31-Dec-2024 24-Sep-2023 24-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Shankarpur Pitrihai scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of shankarpur pitrihai wss scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2253 Farrukhabad Vindhya-GAJA (JV) 20093030 SHARFUDDIN PUR SVS 1 1 1867 2023 2038 2053 30-May-2025 01-May-2024 01-May-2024 02-May-2024 All the parameters of scheme verified can take in O&M. ok View
2254 Farrukhabad Vindhya-GAJA (JV) 20092604 SHARIFPUR CHHICHHNI MVS 2 5 3555 2023 2038 2053 30-May-2025 02-Jul-2024 02-Jul-2024 03-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
2255 Kannauj GVPR 20090109 SHARIFPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 2234 2023 2038 2053 08-Sep-2024 16-Apr-2024 19-Jul-2024 20-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2256 Meerut Power Mech Projects Ltd 20098128 SHAULANA (R.O) 1 1 4704 2023 2038 2053 31-Jan-2025 26-Oct-2024 14-Mar-2025 15-Mar-2025 d Recommended for further Approvals. approved View
2257 Auraiya GVPR 20084699 Shauri garhiya 1 4 2984 2023 2038 2053 01-Jun-2022 04-Mar-2025 01-Jun-2022 05-Mar-2025 Forwarded for further action. All work of scheme fond satisfactory. View
2258 Meerut Power Mech Projects Ltd 20031798 SHAZADPUR - LALPUR 2 2 2411 2023 2038 2053 31-Dec-2024 03-Jun-2024 20-Oct-2024 21-Oct-2024 Recommended for further Approvals. Approved View
2259 Bijnor LC INFRA 20097003 Sheh Village WSS 1 1 3476 2022 2037 2052 03-May-2025 10-Jun-2024 19-Dec-2024 20-Dec-2024 every thing completed Everything is completed View
2260 Bijnor LC INFRA 20012848 SHEKHPUR BHAWRA WATER SUPPLY SCHEME 0 0 2096 2022 2037 2052 08-Feb-2024 12-Dec-2023 10-Jun-2024 11-Jun-2024 Every thing complete. Check Document View
2261 Bijnor Vindhya-GAJA (JV) 20090458 SHEKHPUR GARHU WSS 2 2 2683 2023 2038 2053 06-Jul-2023 12-May-2025 12-Nov-0225 13-Nov-2025 Every thing complete. Check Document View
2262 Bijnor LC INFRA 20051715 SHEKHPUR LALA 2 2 3376 2022 2037 2052 03-Dec-2022 25-May-2025 25-May-2025 26-May-2025 Every thing complete. complete check View
2263 Ambedkar Nagar Vindhya-GAJA (JV) 20041828 SHEKHPUR MALPURA WSS 1 5 5980 2023 2038 2053 23-Nov-2023 23-Dec-2024 02-Apr-2025 03-Apr-2025 Scheme completed and ready for O&M Scheme completed View
2264 Amethi Welspun Kaveri Infraprojects JV 20013338 ShekhPur Water Supply Scheme 2 6 2436 2022 2037 2052 10-Apr-2023 23-Aug-2024 23-Aug-2024 27-Jun-2025 Hardcopy submitted and found okay as per the submitted documents.. Hardcopy submitted and found okay as per the submitted documents.. View
2265 Muzaffarnagar Gayatri Projects LTD 20098062 SHEKHPURA GP RO WSS 1 2 11818 2023 2038 2053 16-Sep-2022 07-Oct-2024 08-Jan-2025 09-Jan-2025 The details given by the contractor are correct at the time of approval. OK View
2266 Meerut Power Mech Projects Ltd 20011226 SHEKHPURI 1 1 1993 2022 2037 2052 31-Dec-2024 04-Jan-2023 25-May-2023 15-Nov-2024 Recommended for further Approvals.................. APPROVED View
2267 Bijnor LC INFRA 8388790 Shekhpuri Chaohad 1 2 2350 2022 2032 2052 29-Sep-2023 11-Dec-2023 09-Oct-2024 10-Oct-2024 Every thing completed. All document complete View
2268 Bijnor Vindhya-GAJA (JV) 20021778 Shekhupur Alam Gram Panchayat Water Supply 2 2 2683 2023 2038 2053 06-Jul-2023 12-May-2025 12-Nov-2025 13-Nov-2025 Every thing complete. Check Document View
2269 Bijnor LC INFRA 20015905 SHEKPURI MINA WATER SUPPLY 2 2 3556 2022 2037 2052 08-Feb-2024 12-Dec-2023 10-Jun-2024 11-Jun-2024 Every thing complete. Complete Check View
2270 Bijnor LC INFRA 20017093 Sher Nagar Naraini Water Supply 3 3 1428 2022 2037 2052 09-Feb-2024 09-Dec-2023 07-Jun-2024 08-Jun-2024 Every thing completed. Everything Completed View
2271 Bijnor LC INFRA 8388726 SHERGARH, BAHADAR NAGAR, TAIMOORABAD SAHALIPUR VILLAGE WATER SUPPLY SCHEME 4 4 3574 2022 2037 2052 30-Sep-2024 11-Dec-2023 09-Jun-2024 10-Jun-2024 Every thing complete. All document checked View
2272 Ghaziabad LC INFRA 8360448 SHERPUR 1 1 4120 2022 2037 2052 01-Mar-2023 30-Nov-2021 31-Mar-2025 01-Apr-2025 Actual Executed Cost Verified based on approved variation statement. Approvd View
2273 Bijnor LC INFRA 20017183 SHERPUR BALLA WATER SUPPLY SCHEME 1 1 2890 2022 2037 2052 10-Feb-2024 10-Dec-2023 08-Jun-2024 09-Jun-2024 Every thing complete. All document checked. View
2274 Sultanpur Vindhya-GAJA (JV) 20073749 SHERPUR PARS RAMPUR WATER SUPPLY SCHEME 2 2 1651 2023 2038 2053 05-Feb-2024 20-Dec-2024 25-Mar-2025 01-Aug-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
2275 Farrukhabad Vindhya-GAJA (JV) 20091728 SHERPUR SARAI MVS 2 4 2212 2023 2038 2053 31-Mar-2025 17-Dec-2024 30-Mar-2025 01-Apr-2025 All the parameters of scheme verified can take in O&M ok View
2276 Auraiya GVPR 20041743 Sherpur saraiya PWS 3 2 2796 2023 2038 2053 06-Jan-2022 28-Apr-2023 01-Feb-2024 19-Mar-2024 Forwarded for further action. All work of scheme found satisfactory. View
2277 Bijnor LC INFRA 20067974 SHERPUR WATER SUPPLY SCHEME 2 2 2135 2022 2037 2052 30-Jun-2025 01-Nov-2025 31-Jan-2026 01-Feb-2026 Every thing complete. Check Document View
2278 Shahjahanpur NCC Ltd. 20023878 Shibnagar Sindhauli 2 2 2250 2022 2037 2052 31-Dec-2024 01-Dec-2023 01-Mar-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the Shivnagar WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. SWSM/BLG/JJM/26-27/458 for further necessary action. All information on the portal for the completion certificate of Shibnagar Sindhauli W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2279 Farrukhabad Vindhya-GAJA (JV) 20092722 SHIBRAIMATH MVS 3 3 2634 2023 2038 2053 30-May-2025 01-Jul-2024 01-Jul-2024 02-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
2280 Ghaziabad LC INFRA 20021553 SHIKHAIDA HAJARI PWS SCHEME 1 1 2402 2022 2037 2052 09-Feb-2022 30-Sep-2024 31-Jan-2025 01-Feb-2025 Actual Executed Cost Verified based on approved variation statement. All work checked and recommended for O&M View
2281 Meerut Power Mech Projects Ltd 20072230 SHIKHERA, BHIRWARA & ACHI KALAN 3 3 5492 2023 2038 2053 31-Dec-2024 15-Aug-2024 08-Jan-2025 09-Jan-2025 Recommended for further Approval approved View
2282 Auraiya Indian Hume Pipe 8361893 SHIVPUR 1 7 3960 2022 2037 2052 14-Sep-2022 01-Jun-2023 14-Sep-2023 15-Sep-2023 Forwarded for further action. All work of scheme fond satisfactory. View
2283 Shahjahanpur NCC Ltd. 20015654 Shivpur kanji 3 3 2490 2022 2037 2052 31-Dec-2024 04-Jan-2024 04-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Shivpur Kanji scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Shivpuri Khanji scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2284 Fatehpur Power Mech Projects Ltd 20079109 Shivpuri Gram Panchayat Water Supply Scheme 1 1 3900 2023 2038 2053 14-Mar-2024 05-Dec-2024 13-Mar-2025 14-Mar-2025 Trial & Run completed. It was initiated in the month of December (13.12.2024) and Regular water supply is given to the consumers. Verified View
2285 Etawah Indian Hume Pipe 20026430 Shivpuri Timaruwa PWS 3 7 5460 2022 2037 2052 22-Sep-2023 15-Mar-2024 15-Mar-2024 16-Mar-2024 Forwarded for further action. All work of scheme found satisfactory View
2286 Hardoi NCC Ltd. 8388423 SHIVRI 1 1 1930 2022 2037 2052 05-Mar-2023 20-Apr-2023 19-Jul-2023 25-Dec-2024 ok OK View
2287 Meerut Power Mech Projects Ltd 20098532 SHODUTT-SHIVPURI 2 2 10245 2023 2038 2053 31-Jan-2025 24-Feb-2024 12-Jul-2024 10-Oct-2024 Recommended for further Approvals. approved View
2288 Shahjahanpur NCC Ltd. 20013801 Shrin nagar 1 2 2220 2022 2037 2052 31-Dec-2024 30-Sep-2023 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance of the Shri nagar WSS have been checked. The submitted records are found to be in order and are recommended for further processing. However, certain works are still pending at the site, and the same have been communicated vide Letter No. SWSM/BLG/JJM/26-27/446 for further necessary action. All information on the portal for the completion certificate of Shrin nagar W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2289 Muzaffarnagar Gayatri Projects LTD 20098066 SHUKRATAL GP RO WSS 2 2 24542 2023 2038 2053 16-Sep-2022 01-Oct-2024 31-Dec-2024 01-Jan-2025 The details given by the contractor are correct at the time of approval. OK View
2290 Bijnor Vindhya-GAJA (JV) 20079413 Shyami Wala Water Supply Scheme 1 1 4715 2023 2038 2053 06-Jul-2023 11-May-2025 11-Nov-2025 12-Nov-2025 Every thing complete. all document complete View
2291 Bahraich PNC-SPML-JV 20014678 SHYAMPUR NADAUNA CHITTAURA MVS PWS 2 6 6260 2022 2037 2052 30-Jun-2025 30-Apr-2025 30-Apr-2025 01-May-2025 Approved the as per TKC Contract Agreement. Scheme Completed View
2292 Bahraich GA INFRA-VPL 20098989 SIDARKHA KAISARGANJ (VPL) PWS 1 4 1800 2023 2038 2053 03-Oct-2024 15-Feb-2026 07-Feb-2026 15-Feb-2026 scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/02/0553. kindly complete it Scheme completed with observation View
2293 Gautam Buddha Nagar LC INFRA 8361578 SIDIPUR VILLAGE WATER SUPPLY SCHEME 1 1 4770 2022 2037 2052 20-Mar-2023 31-Mar-2024 31-Oct-2024 01-Nov-2024 Project certificate is verified verified View
2294 Fatehpur Power Mech Projects Ltd 20095919 SIHARI PATTI 2 3 2330 2023 2038 2053 13-Aug-2023 30-Jun-2025 07-Dec-2024 08-Dec-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of September (08.09.2024) and Regular water supply is given to the consumers. Verified View
2295 Auraiya GVPR 20091128 Sihauli PWS 1 3 1182 2023 2038 2053 06-Jan-2022 05-Mar-2024 30-Jan-2024 31-Jan-2024 Forwarded for further action. All work of scheme found satisfactory. View
2296 Jaunpur AFCONS 20078955 SIHAULI VILLAGE WATER SUPPLY SCHEME 4 13 4680 2023 2038 2053 10-Mar-2023 26-Feb-2025 26-Feb-2025 27-Feb-2025 Checked and found ok......... Ok View
2297 Kanpur Dehat Indian Hume Pipe 20064158 Sikahila 1 2 3005 2022 2037 2052 12-Jan-2023 31-Dec-2024 31-Mar-2024 01-Apr-2024 FORWARD FOR FURTHER NECESSARY ACTION PLS. All work of scheme found satisfactory View
2298 Hardoi NCC Ltd. 20013193 SIKANDAR PUR 3 6 2160 2022 2037 2052 14-Jun-2023 25-Mar-2023 24-Jun-2023 25-Dec-2024 forwarded for O&M OK View
2299 Meerut Power Mech Projects Ltd 20098180 SIKANDARPUR 1 1 745 2023 2038 2053 31-Dec-2024 24-Sep-2024 10-Feb-2025 11-Feb-2025 Recommended for Further Approval Approved View
2300 Farrukhabad Vindhya-GAJA (JV) 20076897 SIKANDARPUR AGU SVS 1 3 2825 2023 2038 2053 30-May-2025 21-Jun-2024 21-Jun-2024 22-Jun-2024 All the parameters of scheme verified can take in O&M ok View
2301 Hardoi NCC Ltd. 20011167 SIKANDARPUR BAZAR 1 2 3780 2022 2037 2052 26-Jul-2023 20-Sep-2023 23-Dec-2023 13-Dec-2024 ok OK View
2302 Bijnor LC INFRA 20029962 SIKANDARPUR LALMAN WATER SUPPLY SCHEME 1 2 2649 2022 2037 2052 09-Feb-2024 11-Dec-2023 09-Jun-2024 10-Jun-2024 Every thing complete. Check Document View
2303 Farrukhabad Vindhya-GAJA (JV) 20093070 SIKANDARPUR NAGLA BINAYK & PATYORA MVS 3 4 4297 2023 2038 2053 30-Jun-2027 19-Jul-2026 19-Jul-2026 01-Aug-2026 All the parameters of scheme verified can take in O&M. ok View
2304 Kanpur Dehat GVPR 20077295 Sikandrapur Bilhaur & Gadaipur 3 6 2565 2023 2038 2053 17-Feb-2024 25-Nov-2023 09-Apr-2024 10-Apr-2024 Forward for further necessary action pls All work of scheme found satisfactory View
2305 Bijnor Vindhya-GAJA (JV) 20089179 SIKRAUDA WATER SUPPLY SCHEME 1 1 2275 2023 2038 2053 06-Jul-2023 02-May-2025 02-Nov-2025 03-Nov-2025 Every thing completed. Check Document View
2306 Azamgarh LC INFRA 8359685 SIKRAURA GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME 1 3 5623 2022 2037 2052 24-Feb-2023 15-Nov-2023 18-Feb-2024 19-Feb-2024 OK OK View
2307 Bijnor LC INFRA 20014133 SIKRI WATER SUPPLY SCHEME 1 1 2127 2022 2037 2052 19-Nov-2025 01-May-2025 31-Jul-2025 01-Aug-2025 Every thing complete. Check document View
2308 Kannauj GVPR 20099301 SIKRORI GRAMM PANCHAYAT WATER SUPPLY SCHEME 1 1 1127 2023 2038 2053 14-Nov-2024 22-Apr-2024 26-Jul-2024 27-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2309 Kanpur Dehat Indian Hume Pipe 20031465 Silhaula Buzurg 3 3 2550 2022 2037 2052 23-Sep-2022 31-Dec-2024 19-Aug-2023 20-Aug-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
2310 Fatehpur Power Mech Projects Ltd 20095806 SILIMI GARAHWA 1 3 4860 2023 2038 2058 15-May-2023 30-Jun-2026 12-Apr-2025 12-Jul-2025 Trial & Run completed. It was initiated in the month of February (12.02.2025) and Regular water supply is given to the consumers. Verified View
2311 Shahjahanpur NCC Ltd. 20026200 SIMARIYA SAHASPUR 1 1 2460 2022 2037 2052 31-Dec-2024 03-Jan-2024 03-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of SIMARIYA SAHASPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of SIMARIYA SAHASPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2312 Kanpur Dehat Indian Hume Pipe 20050767 Simtamau 3 3 1880 2022 2037 2052 24-Nov-2022 31-Dec-2024 30-Jun-2023 01-Jul-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
2313 Farrukhabad Vindhya-GAJA (JV) 20091301 SINAURA PIRTHVI MVS 1 5 3521 2023 2038 2053 30-May-2025 11-Jun-2024 11-Jun-2024 12-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
2314 Kannauj GVPR 20090107 SINGARI GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 1369 2023 2038 2053 08-Sep-2024 10-Nov-2024 14-Feb-2025 15-Feb-2025 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2315 Bahraich PNC-SPML-JV 20099234 SINGARO PHAKARPUR RF PWS 1 5 2400 2022 2037 2052 31-Dec-2025 04-Oct-2025 04-Oct-2025 05-Oct-2025 Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/10/0460, kindly complete it. Scheme Completed with observation View
2316 Bahraich GA INFRA-VPL 20098954 SINGHA CHITTAURA (VPL) PWS 1 7 4500 2023 2038 2053 03-Oct-2024 20-Jan-2026 08-Jan-2026 20-Jan-2026 scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/01/0487 kindly complete it. scheme completed, observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/01/0487 kindly complete it. View
2317 Mau LC INFRA 20080877 SINGHASAN VILLAGE WATER SUPPLY SCHEME 2 4 2394 2022 2037 2052 26-Jan-2025 15-Jan-2025 14-Jan-2025 15-Jan-2025 Approved Approved. View
2318 Farrukhabad Vindhya-GAJA (JV) 20076877 SINGHIRAMPUR SVS 1 7 4184 2023 2038 2053 30-May-2025 17-Jul-2024 17-Jul-2024 18-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
2319 Kannauj GVPR 20090105 SINGHPUR & HARI NAGAR GRAM PANCHAYAT WATER SUPPLY SCHEME 3 3 3955 2023 2038 2053 08-Sep-2024 07-Apr-2024 11-Jul-2024 12-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2320 Kanpur Dehat Indian Hume Pipe 20096864 Singhpur Shioli 2 2 2080 2022 2037 2052 04-Mar-2023 31-Dec-2024 12-Sep-2023 13-Sep-2023 Forward for further necessary action pls. All work of scheme found satisfactory View
2321 Auraiya GVPR 20039030 SINGHPUR WAMANA PWS 1 4 4809 2023 2038 2053 01-Jun-2022 11-Apr-2025 10-Apr-2025 12-Apr-2025 Forwarded for further action. All work of scheme fond satisfactory. View
2322 Ambedkar Nagar Vindhya-GAJA (JV) 20062533 SINGHPUR WSS 2 3 1780 2023 2038 2053 26-Dec-2023 24-Sep-2025 17-Jan-2026 18-Jan-2026 Scheme completed and ready for O&M Scheme Completed View
2323 Amethi Vindhya-GAJA (JV) 20101943 SINGTHEE WATER SUPPLY SCHEME 1 4 1290 2023 2038 2053 04-Jul-2024 16-Jun-2024 16-Sep-2024 17-Dec-2024 Hardcopy submitted and found okay as per the submitted documents. Hardcopy submitted and found okay as per the submitted documents.. View
2324 Ambedkar Nagar Vindhya-GAJA (JV) 20035147 SINJHAULIYA WSS 1 1 2850 2023 2038 2053 21-Oct-2023 14-Jun-2025 30-Sep-2026 01-Oct-2026 Checked and found ok. Scheme completed and ready for O&M View
2325 Bijnor LC INFRA 8360412 SINKRI BUZURG VILLAGE WATER SCHEME 1 1 2215 2022 2037 2052 14-Nov-2022 15-Jan-2025 15-Jan-2025 16-Jan-2025 Every thing complete Every thing is completed. View
2326 Etawah Indian Hume Pipe 20026417 Sirhaul PWS 10 2 3340 2022 2037 2052 22-Sep-2023 21-Apr-2024 07-Aug-2024 08-Aug-2024 Forwarded for further action. All work of scheme found satisfactory. View
2327 Gautam Buddha Nagar LC INFRA 20090282 SIRSA MULTI VILLAGE WATER SUPPLY SCHEME 2 2 2386 2019 2037 2052 21-Feb-2023 21-Aug-2024 10-Sep-2024 11-Sep-2024 Actual Executed Cost Verified based on Approved Variation Statement. all work has been completed. View
2328 Azamgarh LC INFRA 20101017 sirwan water supply scheme 1 7 3263 2023 2038 2053 22-Nov-2024 25-Aug-2024 28-Aug-2024 29-Aug-2024 OK OK View
2329 Bijnor LC INFRA 20068005 SIRYAWALI WATER SUPPLY SCHEME 2 2 1204 2022 2037 2052 07-Nov-2025 01-Mar-2025 31-May-2025 01-Jun-2025 Every thing complete. Check Document View
2330 Kanpur Dehat GVPR 20053382 Sisahi 1 2 2264 2023 2038 2053 18-Nov-2023 05-Oct-2023 21-Feb-2024 22-Feb-2024 Forward for further necessary action pls All work of scheme found satisfactory View
2331 Ambedkar Nagar Vindhya-GAJA (JV) 20081306 SISANI AKHAIPUR WSS 1 3 2490 2023 2038 2053 08-Mar-2024 25-Mar-2026 25-Mar-2026 26-Mar-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
2332 Shahjahanpur NCC Ltd. 20014899 Sisnai W/s 1 1 2340 2022 2037 2052 31-Aug-2023 31-Dec-2024 30-Nov-2023 16-Nov-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sisnai scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Sisnai scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2333 Meerut Power Mech Projects Ltd 20010942 SISOLA KHURD 1 1 2944 2022 2037 2052 31-Dec-2024 21-Apr-2023 05-Sep-2023 14-Dec-2024 Recommended for Further Approval approved View
2334 Meerut Power Mech Projects Ltd 20019638 SISOLI 1 1 7240 2022 2037 2052 31-Dec-2024 23-May-2024 12-Oct-2024 13-Oct-2024 Recommended for further Approvals......... Approved View
2335 Shahjahanpur NCC Ltd. 20077485 SISORI WSS 1 4 3080 2022 2037 2052 31-Dec-2024 10-Aug-2024 09-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sisori scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Sisori scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2336 Kanpur Dehat GVPR 20077293 Sithau Matana 2 6 3408 2023 2038 2053 17-Feb-2024 05-Jan-2024 09-Apr-2024 10-Apr-2024 TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI KD/O&M/2025-26/6655 dt.29/07/2028 & SWSM/BLG/TPI/KD/O&M/2025-26/6657 DT.30.07.2025. we can go to O&M through conditional, TKC submit the require document within 15 day's. All work of scheme found satisfactory View
2337 Farrukhabad Vindhya-GAJA (JV) 20092474 SITHAUPUR KURMI MVS 2 2 1766 2023 2038 2053 30-May-2025 14-Jul-2024 14-Jul-2024 15-Jul-2024 All the parameters of scheme verified can take in O&M. ok View
2338 Fatehpur Power Mech Projects Ltd 20100789 SITHAURA 1 11 7310 2023 2038 2058 15-May-2023 30-Jun-2025 09-May-2025 10-May-2025 Trial & Run completed. It was initiated in the month of February (08.02.2025) and Regular water supply is given to the consumers. Verified View
2339 Meerut Power Mech Projects Ltd 20058321 SOHARKA & ANJAULI 2 2 2351 2023 2038 2053 31-Dec-2024 30-Mar-2024 17-Aug-2024 02-Mar-2025 Recommended for further Approval approved View
2340 Raebareli NCC Ltd. 8360964 Soitha 3 3 2334 2022 2037 2052 06-Mar-2023 12-Jul-2023 12-Jul-2023 09-Dec-2024 Ok Ok View
2341 Amethi Vindhya-GAJA (JV) 20065731 SONARI KALAN & AMTAHI WATER SUPPLY SCHEME 2 19 7074 2023 2038 2053 09-Jan-2024 07-Dec-2024 07-Mar-2025 08-Jun-2025 All things found satisfactory in the Scheme and finalized for Operation And Maintenance All things found satisfactory in the Scheme and finalized for Operation And Maintenance View
2342 Amethi Vindhya-GAJA (JV) 20067972 SONARI KANOO WATER SUPPLY SCHEME 2 18 2474 2023 2038 2053 08-Feb-2024 18-Jun-2024 18-Sep-2024 19-Dec-2024 d All things found satisfactory in the Scheme and finalized for Operation And Maintenance All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance.. View
2343 Sultanpur UNIVERSAL MEP 20071510 SONBARSA&TULSIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 4 9 5016 2023 2038 2053 18-Jul-2024 23-Feb-2025 28-May-2025 01-Jul-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
2344 Auraiya GVPR 20039855 Sondhemau PWS 2 5 4149 2023 2038 2053 31-Dec-2024 20-Mar-2025 19-Mar-2025 21-Mar-2025 Forwarded for further action. All work of scheme fond satisfactory. View
2345 Ambedkar Nagar Vindhya-GAJA (JV) 20058495 SONE GAON Water Supply Scheme 1 28 6710 2023 2038 2053 26-Dec-2023 09-Oct-2025 09-Oct-2025 12-Nov-2025 Checked and found OK Scheme Completed and Ready For O&M View
2346 Amethi Welspun Kaveri Infraprojects JV 20012683 Songara Water Supply Scheme 2 6 2571 2022 2037 2052 10-Apr-2023 10-Jan-2024 13-Aug-2024 27-Jun-2025 Hardcopy submitted and found okay as per the submitted documents.. Hardcopy submitted and found okay as per the submitted documents.. View
2347 Ambedkar Nagar Vindhya-GAJA (JV) 20058306 SONGAWN WSS 1 6 3260 2023 2038 2053 26-Dec-2023 26-Dec-2024 26-Mar-2025 27-Mar-2025 checked and found ok Scheme completed View
2348 Fatehpur Power Mech Projects Ltd 20097910 SONHI 2 2 3090 2023 2038 2053 20-Sep-2024 19-Jul-2025 18-Jul-2025 19-Jul-2025 Trial & Run completed. It was initiated in the month of April (19.04.2025) and Regular water supply is given to the consumers. Verified View
2349 Fatehpur Gayatri Projects LTD 20015194 SONVARSA 1 1 1718 2022 2037 2052 30-Jun-2025 26-Jun-2024 20-Sep-2024 21-Sep-2024 Trial & Run completed. It was initiated in the month of June (20.06.2024) and Regular water supply is given to the consumers. Verified View
2350 Balrampur Larsen & Toubro Ltd 20098092 SOWNAHWA & HARIHARPUR WATER SUPPLY SCHEME 1 1 2050 2022 2037 2052 31-Dec-2026 06-Sep-2025 06-Dec-2025 06-Dec-2025 ok OK View
2351 Ambedkar Nagar Vindhya-GAJA (JV) 20072514 SUBARPUR WSS 1 3 2180 2023 2038 2053 15-Mar-2024 30-Apr-2025 30-Apr-2025 01-May-2025 SCHEME COMPLETED AND READY FOR O&M Scheme completed View
2352 Farrukhabad Vindhya-GAJA (JV) 20080826 SUBHAN PUR SVS 1 1 2492 2023 2038 2053 31-Mar-2025 03-Feb-2025 03-Feb-2025 04-Feb-2025 All the parameters ok OK View
2353 Fatehpur Power Mech Projects Ltd 20100803 SUDANPUR 2 3 1640 2023 2038 2058 14-Aug-2023 30-Jun-2025 09-Sep-2024 12-Sep-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of September (09.09.2024) and Regular water supply is given to the consumers. Verified View
2354 Kanpur Dehat GVPR 20053434 SUDERPUR GAJEN 2 0 2623 2023 2038 2053 18-Nov-2023 01-Dec-2023 11-Mar-2024 12-Mar-2024 TKC unable to submit the calibration certificate and other report for O&M, Our letter No.SWSM/BLG/TPI/KD/O&M/2025-26/6655 dt.29/07/2028. we can go to O&M through conditional, TKC submit the require document within 15 day's. All work of scheme found satisfactory View
2355 Shahjahanpur NCC Ltd. 20016435 Sujatpur 1 1 2440 2022 2037 2052 09-Aug-2023 31-Dec-2024 09-Nov-2023 16-Nov-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sujatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Sujatpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2356 Jaunpur Welspun Kaveri Infraprojects JV 20011558 Sujiya Mau 4 20 5008 2022 2037 2052 23-Sep-2023 20-Jun-2025 20-Jun-2025 21-Jun-2025 Checked and found ok........... Ok View
2357 Bijnor Vindhya-GAJA (JV) 20101793 SULTAN NAGAR URF SADAKPUR WSS 1 1 2652 2023 2038 2053 06-Jul-2023 15-May-2025 15-Nov-2025 16-Nov-2025 Every thing complete. all document complete View
2358 Mau LC INFRA 20032906 SULTANIPUR GRAM PANCHAYAT RURAL WATER SUPPLY SCHEME 5 8 2880 2022 2037 2052 02-Nov-2023 25-Mar-2025 28-Aug-2024 25-Mar-2025 All Documents verified & Checked Approved.. View
2359 Varanasi Larsen & Toubro Ltd 20009677 SULTANPUR 1 4 2444 2022 2037 2052 09-May-2023 23-Jan-2024 30-Sep-2024 01-Oct-2024 Approve Approved View
2360 Bijnor LC INFRA 8388812 SULTANPUR KHADAR VILLAGE WATER SCHEME 2 2 2237 2022 2037 2052 30-Sep-2024 12-Dec-2023 10-Jun-2024 11-Jun-2024 Every thing completed. Everything Complete. View
2361 Bijnor Vindhya-GAJA (JV) 20067544 Sultanpur Sadat water supply scheme 2 2 1838 2023 2038 2053 06-Jul-2023 06-Jan-2025 06-Jul-2025 07-Jul-2025 Every thing complete. All document complete View
2362 Fatehpur Power Mech Projects Ltd 20097537 SULTANPUR SATO 1 3 1850 2023 2038 2053 20-Sep-2024 11-Oct-2024 11-Oct-2024 12-Oct-2024 Work has been completed. Trial & Run also completed. It was initiated in the month of July (12.07.2024) and Regular water supply is given to the consumers. Verify View
2363 Ambedkar Nagar Vindhya-GAJA (JV) 20060036 SULTANPUR WSS 1 5 2900 2023 2038 2052 17-Jan-2024 28-Mar-2026 28-Mar-2026 29-Mar-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
2364 Kannauj GVPR 20050204 SULTAPUR & SHANKARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 4 2960 2023 2038 2053 15-Jun-2024 10-Mar-2024 14-Jun-2024 15-Jun-2024 forwarded for further action. All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
2365 Shahjahanpur NCC Ltd. 20015832 Sunara Buzurg 3 3 2420 2022 2037 2052 31-Dec-2024 31-Aug-2023 30-Nov-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sunara Buzurg scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of sunaura Buzurg scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2366 Auraiya Indian Hume Pipe 20056127 Sundaripur PWS 2 2 2100 2022 2037 2052 22-Sep-2023 15-Jun-2024 24-Sep-2024 25-Sep-2024 Forwarded for further action. All work of scheme fond satisfactory. View
2367 Farrukhabad Vindhya-GAJA (JV) 20092998 SUNDERPUR MVS 1 9 1960 2023 2038 2053 30-May-2025 28-Feb-2024 12-Jun-2024 13-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
2368 Bijnor LC INFRA 20018328 Sungarpur Water Supply Scheme 1 1 2083 2022 2037 2052 10-Feb-2022 26-Apr-2024 07-Nov-2024 08-Nov-2024 Every thing complete. Every thing complete. View
2369 Kanpur Dehat Indian Hume Pipe 20034293 SURAJPUR 1 2 3885 2022 2037 2052 24-Nov-2022 31-Dec-2024 22-Nov-2023 23-Nov-2023 FORWARD FOR FURTHER NECESSARY ACTION PLS. All work of scheme found satisfactory View
2370 Auraiya GVPR 20025616 SURAJPUR AIRWA &BEELPUR AIRVA 4 2 4108 2023 2038 2053 01-Jun-2022 09-Jan-2024 24-Nov-2023 10-Jan-2024 Forwarded for further action. All work of scheme fond satisfactory. View
2371 Kanpur Dehat Indian Hume Pipe 20064924 Surasi 3 4 3430 2022 2037 2052 11-Jan-2024 31-Dec-2024 31-Aug-2023 01-Sep-2023 Forward for further necessary action pls All work of scheme found satisfactory View
2372 Shahjahanpur NCC Ltd. 20014020 SURJUPUR W/s 2 2 2910 2022 2037 2052 31-Dec-2024 31-Jul-2023 30-Oct-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Surjupur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Surjupur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2373 Ambedkar Nagar Vindhya-GAJA (JV) 20035148 SURJUPUR WSS 4 4 2910 2023 2038 2053 21-Oct-2023 08-Sep-2024 19-Mar-2025 20-Mar-2025 Checked and Veryfied Scheme completed View
2374 Hardoi NCC Ltd. 20014082 Sursaa 1 1 2620 2022 2037 2052 05-Mar-2023 01-Jan-2024 31-Mar-2024 25-Dec-2024 ok OK View
2375 Bahraich PNC-SPML-JV 20014669 SUSRAULI CHITTAURA PWS 1 4 3509 2022 2037 2052 28-Feb-2025 28-Jan-2025 30-Oct-2023 28-Jan-2025 ok Scheme completed ready for O&M View
2376 Shahjahanpur NCC Ltd. 20105023 SUTHA GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 2 2 2745 2022 2037 2052 30-Sep-2023 31-Dec-2024 30-Dec-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Sutha scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Sutha scheme has been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2377 Mau LC INFRA 20064779 Suwah Gram Panchayat Water Supply Scheme 2 3 1940 2022 2037 2052 29-Jun-2024 02-Apr-2025 01-Apr-2025 02-Apr-2025 Approved Approved. View
2378 Bijnor LC INFRA 20075940 SUWAHERI KHURD WATER SUPPLY SCHEME 1 1 1890 2022 2037 2052 22-Dec-2023 23-Dec-2022 15-Nov-2024 16-Nov-2024 Every thing completed ALL WORK COMPLETED View
2379 Shahjahanpur NCC Ltd. 20014655 Tah Khurd Kalan 3 3 4830 2022 2037 2052 31-Dec-2024 31-Aug-2023 30-Nov-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Tah Khurd Kalan scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Tah Khurd Kalan scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2380 Bijnor LC INFRA 20011753 Taharpur Gulam Imam Village Water Supply Scheme 1 1 2802 2022 2037 2052 09-Feb-2024 11-Dec-2023 09-Jun-2024 10-Jun-2024 Every thing complete. Complete Check View
2381 Bijnor Vindhya-GAJA (JV) 20058780 TAHARPUR ISHHAK WATER SUPPLY SCHEME 1 1 2896 2023 2038 2053 06-Jul-2023 19-Feb-2025 19-Aug-2025 20-Aug-2025 Every thing complete. Check Document View
2382 Bijnor LC INFRA 20011564 Taharpur Madad Imam Village Water Supply Scheme 1 3 1856 2022 2037 2052 10-Feb-2024 07-Dec-2023 10-Jun-2024 11-Jun-2024 All works completed Everything Completed View
2383 Kannauj GVPR 20077129 TAHSIPUR KANNAUJ GRAM PANCHAYAT WATER SUPPLY SCHEME 1 4 3968 2023 2038 2053 08-Sep-2024 28-Apr-2024 31-Jul-2024 01-Aug-2024 forwarded for further action All works of scheme found satisfactory,scheme finalized for operation & maintenance. View
2384 Bijnor LC INFRA 20097001 Taiyabpur Qazi Village WSS 1 1 4080 2022 2037 2052 08-Jun-2023 01-Dec-2025 28-Feb-2026 01-Mar-2026 Every thing complete. Check View
2385 Auraiya GVPR 20052334 Taiyapur &Amohar water supply scheme 1 4 4716 2023 0 0 01-Jun-2022 06-Nov-2024 05-Nov-2024 07-Nov-2024 Forwarded for further action. All work of scheme fond satisfactory. View
2386 Farrukhabad Vindhya-GAJA (JV) 20077864 TAJPUR & KUMHAULI MVS 2 4 3289 2023 2038 2053 30-May-2025 02-Mar-2024 15-Jun-2024 16-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
2387 Auraiya GVPR 20089658 Tajpur Chhonk PWS 1 1 2550 2023 2033 2053 06-Jan-2022 30-Aug-2023 13-Jul-2024 30-Aug-2024 Forwarded for further action. All work of scheme found satisfactory. View
2388 Mau LC INFRA 20064785 Tajpur Patila Village Water Supply Scheme 2 4 2525 2022 2037 2052 05-Jul-2024 24-Feb-2026 10-Feb-2026 24-Feb-2026 Approved Approved View
2389 Kanpur Dehat GVPR 20025234 TAJPUR TARSOLI 2 4 4377 2023 2038 2053 26-Sep-2023 12-Oct-2023 12-Mar-2024 13-Mar-2024 Forward for further action pls All work of scheme found satisfactory View
2390 Ambedkar Nagar Vindhya-GAJA (JV) 20067460 TAJPUR Water Supply Scheme 4 8 3460 2023 2038 2053 20-Feb-2024 25-Jan-2025 26-Apr-2025 27-Apr-2025 checked and verified and found OK Scheme completed View
2391 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20008861 Tajupur 2 7 3680 2022 2037 2052 07-Jul-2023 16-Dec-2025 10-Jan-2026 15-Jan-2026 Scheme completed and ready for O&M Scheme Completed View
2392 Sultanpur UNIVERSAL MEP 20066724 TAKARIYA & NONARA GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME 2 2 3310 2023 2038 2053 12-Jan-2024 31-Dec-2024 30-Jan-2025 01-Feb-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
2393 Meerut Power Mech Projects Ltd 20020942 TAKHAWALI 2 2 2733 2022 2037 2052 31-Dec-2024 14-Jan-2024 03-Jun-2024 20-Jan-2025 Recommended for further Approval approved View
2394 Ayodhya UNIVERSAL MEP 20030048 TALAGAON GRAM PANCHAYAT WATER SUPPLY SCHEME 1 2 3210 2023 2038 2053 12-Oct-2023 11-Sep-2023 11-Sep-2023 15-Nov-2024 Found ok Found Correct View
2395 Auraiya GVPR 20041713 Talehpur 3 4 3075 2023 2038 2053 06-Jan-2022 29-May-2024 28-May-2024 29-May-2024 Forwarded for further action. All work of scheme found satisfactory. View
2396 Farrukhabad Vindhya-GAJA (JV) 20091788 TANDA BAHRAMPUR MVS 3 3 2276 2023 2038 2053 30-May-2025 22-May-2024 22-May-2024 23-May-2024 All the parameters of scheme verified can take in O&M. ok View
2397 Ayodhya UNIVERSAL MEP 20030149 TANDA KHULASA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 1 2700 2023 2038 2053 12-Oct-2023 15-Oct-2023 15-Oct-2023 15-Nov-2024 Found ok Found Correct View
2398 Ambedkar Nagar Vindhya-GAJA (JV) 20067418 TARA KHURD Water Supply Scheme 1 11 6690 2023 2038 2053 15-Mar-2024 21-Jun-2026 21-Jun-2026 22-Jun-2026 scheme ready for o&m Scheme completed and ready for O&M View
2399 Amethi Vindhya-GAJA (JV) 20068083 TARA PUR WATER SUPPLY SCHEME 2 5 1719 2023 2038 2053 29-Apr-2024 07-Nov-2024 07-Feb-2025 09-May-2025 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
2400 Mau LC INFRA 20011928 TARAI DIH GP WATER SUPPLY SCHEME 3 8 1957 2022 2037 2052 20-Mar-2024 22-Jan-2025 22-Jan-2025 25-Jan-2025 Approved. Approved. View
2401 Mau LC INFRA 20098943 TARANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 1 1360 2022 2037 2052 26-Sep-2024 01-Apr-2025 01-Apr-2025 02-Apr-2025 Ok approve View
2402 Meerut Power Mech Projects Ltd 8362955 TARAPUR 3 3 4006 2022 2037 2052 31-Dec-2024 17-Jul-2023 03-Dec-2023 11-Apr-2025 Recommended for further Approval approved View
2403 Bahraich PNC-SPML-JV 20100941 TARAPUR KHURD TEJWAPUR RF PWS 1 8 6490 2022 2037 2052 31-Dec-2025 15-Oct-2025 14-Nov-2023 16-Oct-2025 Scheme completed, minnor observation is identified, kindly complete it. Scheme Completed with observation View
2404 Gautam Buddha Nagar LC INFRA 20013497 TATARPUR W/S SCHEME 1 1 2222 2022 2037 2052 20-Sep-2023 30-Oct-2023 31-Oct-2024 01-Nov-2024 Project certificate is verified Work completed. O&M Started View
2405 Farrukhabad Vindhya-GAJA (JV) 20097999 tatia nibal wss 2 3 1483 2023 2038 2053 31-Mar-2025 10-Feb-2025 25-May-2025 26-May-2025 All the parameters of scheme verified can take in O&M. ok View
2406 Meerut Power Mech Projects Ltd 20066787 TATINA 1 1 2444 2022 2037 2052 31-Dec-2024 20-Jun-2024 06-Nov-2024 21-Jan-2025 Recommended for further Approval approved View
2407 Meerut Power Mech Projects Ltd 20098116 TATINA SAINI 1 1 2101 2019 2038 2053 31-Dec-2024 28-Jun-2024 16-Nov-2024 01-Jan-2025 Recommended for further Approvals. Approved View
2408 Jaunpur Welspun Kaveri Infraprojects JV 20057198 Tazuddinpur 2 14 4518 2022 2037 2052 11-Jul-2024 21-Mar-2026 21-Mar-2026 22-Mar-2026 Checked and found ok. ok View
2409 Ayodhya UNIVERSAL MEP 20030397 TEEKAR AND SHAH PUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 3 2100 2023 2038 2053 12-Oct-2023 10-Oct-2023 10-Oct-2023 15-Nov-2024 Found ok Found Correct View
2410 Meerut Power Mech Projects Ltd 20020282 TEHRKI 1 1 4834 2023 2038 2053 31-Dec-2024 19-Nov-2024 07-Apr-2025 08-Apr-2025 Recommended for further Approvals. approved View
2411 Azamgarh LC INFRA 20066376 Tekmalpur water supply 2 4 2319 2023 2038 2053 03-Aug-2024 23-Jul-2024 26-Oct-2024 27-Oct-2024 OK OK View
2412 Fatehpur Power Mech Projects Ltd 20097916 TEKSARI BUJURG 2 2 4060 2023 2038 2053 25-Sep-2024 22-Dec-2024 14-May-2025 15-May-2025 Trial & Run completed. It was initiated in the month of February (15.02.2025) and Regular water supply is given to the consumers. Verified View
2413 Bijnor Vindhya-GAJA (JV) 20101715 TELIPARA WSS 1 1 1365 2023 2038 2053 06-Jul-2023 04-May-2025 04-Nov-2025 05-Nov-2025 Every thing complete. check View
2414 Balrampur Larsen & Toubro Ltd 20094052 TENDUA NAGAR WATER SUPPLY SCHEME 2 4 2000 2022 2037 2052 28-Apr-2023 06-Sep-2025 06-Dec-2025 06-Dec-2025 Vide letter no.Ceinsys/O PR/Devipatan/BlP / O &Ml/ UPJN / 2 02 6 -27 / 07 / 2 09 dated 21.07.2026 mentioning that the scheme is partially commissioned and operational, with FHTCs provided in some habitations; however, several critical deficiencies remain in distribution, civil works, O&M, and E&M/SCADA systems. Key issues include incomplete connectivity to the second revenue village due to pending forest permission, low tail-end pressure, incomplete FHTC works, non-functional/incomplete SCADA and chlorination interlocks, absence of required flow-metering and earthing provisions, and various defects in the pump house. Some FHTCs and other minor campus related works to be rectified. View
2415 Amethi Vindhya-GAJA (JV) 20098333 TENWASI Water Supply Scheme 1 5 1731 2023 2038 2053 24-Apr-2024 27-Dec-2024 27-Mar-2025 28-Jun-2025 All things found satisfactory in the Scheme and finalized for Operation And Maintenance All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance.. View
2416 Sultanpur Gayatri Projects LTD 20015265 TERAAYEN WATER SUPPLY SCHEME 3 3 4050 2022 2037 2052 02-Mar-2023 31-Mar-2025 31-May-2024 12-Aug-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action All uploaded documents have been checked and verified as per requirements View
2417 Hardoi NCC Ltd. 20011452 TERIA 1 1 2130 2022 2037 2052 26-Jul-2023 20-Mar-2023 20-Jul-2023 25-Nov-2024 OK OK View
2418 Fatehpur Power Mech Projects Ltd 20097484 TEUJA 1 1 2690 2023 2038 2053 13-Aug-2024 30-Jun-2025 12-Jan-2025 13-Jan-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of October (13.10.2024) Verified View
2419 Auraiya GVPR 20084727 Teurlal pur & babayan 1 9 3918 2023 2038 2053 06-Jan-2022 31-Dec-2024 31-Dec-2024 02-Jan-2025 Forwarded for further action. All work of scheme found satisfactory. View
2420 Auraiya Indian Hume Pipe 20014502 THAKUR GOAN 2 3 2950 2022 2037 2052 08-May-2023 25-Apr-2023 14-Aug-2023 01-Sep-2023 Forwarded for further action. All work of scheme found satisfactory. View
2421 Hardoi NCC Ltd. 20012132 THATHIYA NARAINMAU 2 5 3020 2022 2037 2052 14-Jun-2023 06-Jun-2024 05-Sep-2024 24-Dec-2024 ok OK View
2422 Ambedkar Nagar Vindhya-GAJA (JV) 20026062 THATTA WATER SUPPLY SCHEME 3 16 5040 2023 2038 2053 28-Sep-2023 23-Dec-2024 23-Mar-2025 24-Mar-2025 Scheme completed and ready for O&M CHECKED AND FOUND OK View
2423 Ambedkar Nagar Vindhya-GAJA (JV) 20099367 Thegipur Water Supply Scheme 5 6 2590 2023 2038 2053 26-Mar-2024 15-Aug-2025 15-Feb-2026 16-Feb-2026 scheme ready for o&m SCHEME COMPLETED View
2424 Kanpur Dehat GVPR 20099719 Thenamau 1 0 1069 2023 2038 2053 11-May-2024 01-Jan-2024 15-Apr-2024 16-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
2425 Meerut Power Mech Projects Ltd 20020261 THIROT 1 1 2185 2023 2037 2052 31-Dec-2024 05-Nov-2023 23-Mar-2024 20-Jan-2025 Recommended for further Approval approved View
2426 Etawah Indian Hume Pipe 20073777 Thulrai 1 6 2070 2022 2037 2052 15-Mar-2024 17-Jan-2025 17-Jan-2025 18-Jan-2025 Forwarded for further action. All work of scheme found satisfactory. View
2427 Bijnor LC INFRA 8360404 THURELA VILLAGE WATER SCHEME 1 1 2201 2022 2037 2052 30-Sep-2023 12-Dec-2023 10-Jun-2024 11-Jun-2024 Every thing complete Everything Completed. View
2428 Auraiya GVPR 20040095 Tidua PWS 1 4 3774 2023 0 0 01-Jun-2022 19-Apr-2024 02-Mar-2024 20-Apr-2024 Forwarded for further action. All work of scheme found satisfactory. View
2429 Shahjahanpur NCC Ltd. 20016387 TIHAR AJANPUR 3 3 3155 2022 2037 2052 09-Aug-2023 31-Dec-2024 08-Nov-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Tihar Ajanpur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Tihar Ajanpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2430 Auraiya Indian Hume Pipe 8362630 TIKAMPUR 1 5 3145 2022 2037 2052 22-Sep-2023 25-Oct-2024 31-Jan-2025 01-Feb-2025 Forwarded for further action. All work of scheme fond satisfactory. View
2431 Sultanpur Gayatri Projects LTD 20011984 Tikar 1 1 2820 2022 2037 2052 01-Sep-2024 12-Aug-2025 31-May-2024 12-Aug-2025 All uploaded documents has been checked and found as per requirements. This is sending for further action O&M started View
2432 Amethi Vindhya-GAJA (JV) 20098346 Tikariya Water Supply Scheme 1 13 2451 2023 2038 2053 16-May-2023 16-Dec-2024 16-Mar-2025 17-Jun-2025 Hardcopy submitted and found okay as per the submitted documents. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance.. View
2433 Meerut Power Mech Projects Ltd 20058255 TIKRI 1 1 3823 2022 2037 2052 31-Dec-2024 28-May-2025 14-Oct-2025 15-Oct-2025 Recommended for further Approvals. approved View
2434 Jhansi NCC Ltd. 8009966 Tilaitha GOV 25 6468 45923 2023 2038 2053 30-Jun-2022 30-Aug-2023 19-Nov-2024 20-Nov-2024 Checked Checked and Approved View
2435 Auraiya GVPR 20084719 Tilakpur Rajohapur PWS 1 2 2637 2023 2038 2053 06-Jan-2022 23-Jul-2024 07-Jun-2024 24-Jul-2024 Forwarded for further action. All work of scheme found satisfactory. View
2436 Auraiya GVPR 20091142 Tilakpur Sahar PWS 1 2 1313 2023 2038 2053 01-Jun-2022 24-Mar-2024 23-Mar-2024 25-Mar-2024 Forwarded for further action. All work of scheme found satisfactory. View
2437 Meerut Power Mech Projects Ltd 20098090 TIMAKIA 1 1 2208 2023 2038 2053 11-Jun-2025 11-Jun-2025 31-Oct-2025 01-Nov-2025 Recommended for further Approvals. approved View
2438 Kannauj GVPR 20036338 TIRAHIAPUR & NAZARAPUR GRAMIN PEYJAL YOJNA 4 7 6605 2023 2038 2053 13-May-2024 22-Apr-2024 26-Jul-2024 27-Jul-2024 FORWADED FOR FURTHER ACTION. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2439 Bijnor LC INFRA 8360413 TIRPURI VILLAGE WATER SCHEME 2 2 1447 2022 2037 2052 30-Sep-2023 11-Dec-2023 10-Jun-2024 11-Jun-2024 Every thing complete Every thing is completed. View
2440 Shahjahanpur NCC Ltd. 20015883 Tiulak 2 2 2820 2022 2037 2052 31-Dec-2024 14-Jul-2024 13-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Tiulak WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Tiulak WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2441 Kannauj GVPR 20067634 TIZALAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 1365 2023 2038 2053 16-Aug-2024 10-Apr-2024 13-Jul-2024 14-Jul-2024 FORWARDED FOR FURTHER ACTION All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2442 Amethi Gayatri Projects LTD 20085858 TRILOKPUR WATER SUPPLY SCHEME 2 7 3423 2023 2038 2053 13-Sep-2024 10-Apr-2024 20-Jul-2024 25-Nov-2024 Hardcopy submitted All things found satisfactory in the Scheme and finalized for Operation And Maintenance View
2443 Farrukhabad Vindhya-GAJA (JV) 20091718 TURKIPUR MVS 2 2 2719 2023 2038 2053 30-Nov-2024 05-Aug-2024 01-Dec-2024 02-Dec-2024 All the parameters of scheme verified can take in O&M ok View
2444 Auraiya GVPR 20084725 Turkpur Phaphoond PWS 2 3 2285 2023 2038 2053 01-Jun-2022 17-Apr-2025 16-Apr-2025 18-Apr-2025 Forwarded for further action. All work of scheme fond satisfactory. View
2445 Etawah Indian Hume Pipe 20026344 Turukpur Paharpur PWS 1 5 2735 2022 2037 2052 22-Sep-2023 07-Oct-2024 08-Jan-2025 09-Jan-2025 Forwarded for further action. All work of scheme found satisfactory View
2446 Jaunpur AFCONS 20058702 TUSAURI VILLAGE WATER SUPPLY SCHEME 2 6 2687 2023 2038 2053 31-Dec-2024 16-Jan-2024 10-Mar-2025 10-Mar-2025 Checked and Found Ok. ok View
2447 Kanpur Dehat VSA 20092630 Tutuapur 1 4 2370 2023 2038 2023 30-Apr-2023 02-Jan-2024 14-Apr-2024 15-Apr-2024 Forward for further necessary action pls. All work of scheme found atisfactory View
2448 Kanpur Dehat VSA 20094293 udaipur 2 2 1659 2023 2038 2023 01-Dec-2024 20-Dec-2024 01-Apr-2024 02-Apr-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
2449 Balrampur Larsen & Toubro Ltd 20016395 Udaipur water supply scheme 2 5 1627 2022 2037 2052 30-Dec-2024 06-Feb-2024 06-May-2024 07-May-2024 OK Ok...... View
2450 Kannauj GVPR 20077115 UDAITAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 2 2 2241 2023 2038 2053 08-Sep-2024 13-Apr-2024 16-Jul-2024 17-Jul-2024 forwarded for further action. All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2451 Etawah Indian Hume Pipe 20078881 udi 1 3 2200 2022 2037 2052 15-Mar-2024 25-Jun-2024 25-Jun-2024 26-Jun-2024 Forwarded for further action All work of scheme found satisfactory. View
2452 Shahjahanpur NCC Ltd. 20013465 UGANPUR 2 2 2480 2022 2037 2052 31-Dec-2024 04-Jan-2024 04-Apr-2024 06-Dec-0224 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Uganpur scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Uganpur scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2453 Sultanpur UNIVERSAL MEP 20064763 UGHARPUR GRAM PANCHAYAT WATER SUPPLY SCHEME 1 4 3460 2023 2038 2053 12-Jan-2024 12-Jan-2024 20-Jan-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements. View
2454 Farrukhabad Vindhya-GAJA (JV) 20076888 UJARAMAU NAYAGAON SVS 1 3 2744 2023 2038 2053 30-May-2025 10-Jun-2024 10-Jun-2024 11-Jun-2024 All the parameters of scheme verified can take in O&M. ok View
2455 Meerut Power Mech Projects Ltd 20082984 UKASIA 1 1 1617 2022 2037 2052 31-Dec-2024 30-May-2024 20-Oct-2024 25-Jan-2025 Recommended for further Approval approved View
2456 Shahjahanpur NCC Ltd. 20058543 UKHRI WSS 2 2 3327 2022 2037 2052 31-Dec-2024 20-Feb-2024 21-May-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Ukhri scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Ukhri scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2457 Ambedkar Nagar Vindhya-GAJA (JV) 20026103 UKRA WATER SUPPLY SCHEME 1 6 3152 2023 2038 2053 28-Sep-2023 01-Jan-2025 01-Jan-2025 02-Jan-2025 checked and verified Scheme completed View
2458 Meerut Power Mech Projects Ltd 20076657 ULDEYPUR 1 1 2511 2022 2037 2052 31-Dec-2024 07-Aug-2024 27-Dec-2024 28-Dec-2024 Recommended for further Approvals. approved View
2459 Fatehpur Power Mech Projects Ltd 20097485 UMARA 1 3 2360 2023 2038 2058 15-May-2023 30-Jun-2025 08-Dec-2024 09-Dec-0004 Work has been completed. Trial & Run also completed. It was initiated in the month of September (09.09.2024) and Regular water supply is given to the consumers. Verified View
2460 Ambedkar Nagar Vindhya-GAJA (JV) 20062527 UMARAPUR WSS 3 8 5910 2023 2038 2053 17-Dec-0024 01-Dec-2025 17-Mar-2026 18-Mar-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
2461 Ambedkar Nagar Welspun Kaveri Infraprojects JV 20023308 Umarawa 4 20 4744 2022 2037 2052 03-Mar-2024 28-Dec-2026 25-Dec-2025 28-Dec-2025 Scheme completed and ready for O&M Scheme completed and ready for O&M View
2462 Bahraich PNC-SPML-JV 20099237 UMARI DEHLO TEJWAPUR RF PWS 1 8 2120 2022 2037 2052 31-Dec-2025 13-Nov-2025 13-Nov-2025 14-Nov-2025 Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/12/0120, kindly complete it. Scheme completed, minnor observation according letter number Ceinsys/OPR/DVP_CL/BRK/All/2025-26/12/0120, kindly complete it. View
2463 Bijnor LC INFRA 20014092 UMARPUR WATER SUPPLY SCHEME 2 2 1941 2022 2037 2052 29-Sep-2023 11-Dec-2023 09-Jun-2024 10-Jun-2024 Every thing complete Every thing complete View
2464 Auraiya GVPR 20095133 Umarsana PWS 1 2 1588 2023 2038 2053 01-Jun-2022 04-May-2025 03-May-2025 05-May-2025 Forwarded for further action. All work of scheme fond satisfactory View
2465 Fatehpur GA INFRA - BABA (JV) 20099444 Umedpur (QA) 3 4 2278 2023 2038 2053 18-Jul-2023 17-Jul-2024 15-Jan-2026 16-Jan-2026 Trial & Run completed. It was initiated in the month of October (16.10.2025) and Regular water supply is given to the consumers. Verified View
2466 Fatehpur Power Mech Projects Ltd 20102041 UMRA 1 1 1670 2023 2038 2053 20-Sep-2024 23-Feb-2025 22-Feb-2025 23-Feb-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of November (23.11.2024) and Regular water supply is given to the consumers. Verified View
2467 Shahjahanpur NCC Ltd. 20015680 UMRAHA 1 1 2730 2022 2037 2052 09-Jan-2024 31-Dec-2024 09-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Umraha scheme have been checked and verified. The submitted records are recommended and forwarded for further. All information on the portal for the completion certificate of Umraha scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2468 Bijnor LC INFRA 8362910 UMRI GRAMPANCHAYAT WATER SUPPLY SCHEME 3 3 3993 2022 2037 2052 22-Sep-2023 11-Dec-2023 09-Jun-2024 10-Jun-2024 Every thing complete. All document complete View
2469 Shahjahanpur NCC Ltd. 20015055 Un Kalan Nigohi W/s 1 1 5270 2022 2037 2052 31-Dec-2024 04-Jan-2024 04-Apr-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Un Kalan WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Mahmadpur Un Kalan Nigohi W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2470 Gautam Buddha Nagar LC INFRA 20013521 UNCHA AMIRPUR W/S SCHEME 1 1 4017 2022 2037 2052 21-Mar-2022 21-Sep-2022 31-Dec-2023 01-Jan-2024 Actual Executed Cost Verified based on Approved Variation Statement. all work has been completed. View
2471 Ambedkar Nagar Vindhya-GAJA (JV) 20019819 Uphrauli 2 4 4730 2023 2038 2055 03-Aug-2023 03-Dec-2025 19-Mar-2026 01-Apr-2026 Scheme completed and ready for O&M Scheme completed and ready for O&M View
2472 Gautam Buddha Nagar LC INFRA 20102358 UPLARASI VILLAGE WATER SUPPLY SCHEME 1 1 1729 2019 2037 2052 28-Jul-2023 30-Jul-2024 30-Mar-2024 01-Apr-2024 Actual Executed Cost Verified based on Approved Variation Statement. all work has been completed. View
2473 Meerut Power Mech Projects Ltd 20098109 UPLEHRA 1 1 1990 2023 2038 2053 31-Dec-2024 23-Jan-2024 10-Jun-2024 07-Nov-2024 Recommended for further Approvals. approved View
2474 Fatehpur Power Mech Projects Ltd 20100795 URAULI 1 7 3338 2023 2038 2053 25-Sep-2024 30-Jun-2025 10-Jun-2025 11-Jun-2025 Trial & Run completed. It was initiated in the month of March (11.03.2025) and Regular water supply is given to the consumers. Verified View
2475 Auraiya GVPR 20087934 Urelalpur & Shahoopur PWS 2 5 3335 2023 2038 2053 06-Jan-2022 26-Mar-2024 25-Mar-2024 26-Mar-2024 Forwarded for further action. All work of scheme found satisfactory. View
2476 Kanpur Dehat Indian Hume Pipe 8361986 URSAN 1 2 4095 2022 2037 2052 15-Sep-2021 31-Dec-2024 31-Dec-2023 01-Jan-2024 Forward for further necessary action pls. All work of scheme found satisfactory View
2477 Auraiya GVPR 20099296 Usarari PWS 1 3 4568 2023 2038 2053 01-Jul-2021 14-Jun-2024 15-Mar-2024 13-Jun-2024 Forwarded for further action. All work of scheme fond satisfactory. View
2478 Mau LC INFRA 20011546 USARI KHURD GP WATER SUPPLY SCHEME 2 7 4732 2022 2037 2052 26-Apr-2023 11-Dec-2024 11-Dec-2024 12-Dec-2024 Approved.. approve View
2479 Shahjahanpur NCC Ltd. 20014690 USMANPUR TUSUI 2 2 2290 2022 2037 2052 31-Dec-2024 27-Jul-2023 26-Oct-2023 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of Usmanpur Tisui scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. All information on the portal for the completion certificate of Usmanpur Tisui scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2480 Auraiya Indian Hume Pipe 20022756 Usraha Village Water Supply Scheme 2 6 3960 2022 2037 2052 08-May-2023 14-Jan-2024 30-Apr-2024 04-May-2024 Forwarded for further action. All work of scheme fond satisfactory. View
2481 Mau LC INFRA 20085346 UTREJPUR PANCHAYAT WATER SUPPLY SCHEME 4 9 2870 2022 2037 2052 02-Sep-2024 03-Dec-2025 27-Nov-2025 03-Dec-2025 Approved Approved View
2482 Amethi Vindhya-GAJA (JV) 20066641 UTTARGAON WATER SUPPLY SCHEME 1 16 3726 2023 2038 2053 06-Jan-2024 15-Jun-2024 15-Sep-2024 16-Dec-2024 Hardcopy submitted and found okay as per the submitted documents.. All Things Found Satisfactory Scheme is Finalized for Operation and Maintenance View
2483 Sultanpur Gayatri Projects LTD 20015267 UTURI WATER SUPPLY SCHEME 1 5 4619 2022 2037 2052 02-Mar-2022 31-Oct-2025 06-Oct-2024 01-Jan-2026 All uploaded documents has been checked and found as per requirements. This is sending for further action All uploaded documents have been checked and verified, found as per requirements. View
2484 Shahjahanpur NCC Ltd. 20084165 VAISAF KALAN GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME 2 4 2350 2022 2037 2052 31-Dec-2024 26-Jul-2024 25-Oct-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of VAISAF KALAN scheme have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of Vaisaf Kalan W/s have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2485 Amethi Gayatri Projects LTD 20099387 VATIYA WATER SUPPLY SCHEME 1 1 2173 2022 2037 2052 27-Nov-2024 07-Jun-2024 11-Sep-2024 15-Jan-2025 Hardcopy submitted and found okay as per the submitted documents.. All things are found satisfactory in this Scheme , finalized for Operation And Maintenance View
2486 Farrukhabad Vindhya-GAJA (JV) 20092026 VEERPUR MVS 2 5 3139 2023 2038 2023 30-Nov-2024 09-May-2024 02-Sep-2024 03-Sep-2024 All the parameters of scheme verified can take in O&M ok View
2487 Fatehpur Power Mech Projects Ltd 20097538 VIJAYEPUR 1 6 6980 2023 2038 2058 26-Sep-2023 30-Jun-2025 10-Jun-2025 11-Jun-2025 Trial & Run completed. It was initiated in the month of March (11.03.2025) and Regular water supply is given to the consumers. Verified View
2488 Sultanpur UNIVERSAL MEP 20066606 VIKANA & SOMNABHAR GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME 2 8 6040 2023 2038 2053 12-Jan-2024 12-Jan-2024 19-Nov-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
2489 Sultanpur UNIVERSAL MEP 20066453 VINAYKPUR & KOTA GRAM PANCHAYAT WATER SUPPLY SCHEME 2 13 4340 2023 2038 2053 12-Jan-2024 12-Jan-2024 11-May-2024 01-Dec-2024 All uploaded documents has been checked and found as per requirements. This is sending for further action. All uploaded documents have been checked and verified as per requirements View
2490 Kannauj GVPR 20077111 VIRRA GRAM PANCHAYAT WATER SUPPLY SCHEME 1 3 1331 2023 2038 2053 08-Sep-2024 16-Apr-2024 19-Jul-2024 20-Jul-2024 forwarded for further action All works of scheme found satisfactory, scheme finalized for operation & maintenance. View
2491 Auraiya GVPR 20025561 VIZHAI PWS 1 4 3858 2023 0 0 01-Jun-2022 07-Jun-2024 06-Jun-2024 08-Jun-2024 Forwarded for further action. All work of scheme fond satisfactory. View
2492 Shahjahanpur NCC Ltd. 20058551 WAJIDPUR WSS 2 2 2310 2022 2037 2052 31-Dec-2024 20-Aug-2024 19-Nov-2024 06-Dec-2024 All documents uploaded on the portal for the Operation and Maintenance (O&M) of WAJIDPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions All information on the portal for the completion certificate of WAJIDPUR WSS have been checked and verified. The submitted records are recommended and forwarded for further necessary actions. View
2493 Auraiya GVPR 20089653 Walidadpur PWS 1 2 1340 2023 2038 2053 01-Jun-2022 29-Oct-2024 28-Oct-2024 30-Oct-2024 Forwarded for further action. All work of scheme fond satisfactory. View
2494 Meerut Power Mech Projects Ltd 20066751 WALIDPUR 1 1 3352 2023 2038 2053 07-Mar-2023 06-Jun-2024 22-Oct-2024 01-Dec-2024 Recommended for further Approvals. approved View
2495 Jaunpur Welspun Kaveri Infraprojects JV 20011203 WAZIDPUR 2 6 2610 2022 2037 2052 23-Sep-2023 13-Oct-2025 13-Oct-2025 14-Oct-2025 Checked and found ok..... OK View
2496 Fatehpur Power Mech Projects Ltd 20100818 YOHAN 2 4 2100 2023 2038 2053 13-Aug-2024 30-Jun-2025 07-Feb-2025 08-Feb-2025 Work has been completed. Trial & Run also completed. It was initiated in the month of November(08.11.2024) and Regular water supply is given to the consumers. Verified View
2497 Bijnor LC INFRA 20018243 Yusufpur Hamid Water supply Scheme 1 1 1961 2022 2037 2052 29-Oct-2021 07-May-2024 08-Aug-2024 09-Aug-2024 Every thing complete. Complete View
2498 Ghaziabad LC INFRA 20026210 YUSUFPUR ISHAPUR PWS SCHEME 1 1 3075 2022 2037 2052 08-Aug-2023 31-Oct-2024 28-Feb-2025 01-Mar-2025 Satisfactory on the work. All civil works and E&M works are completed. All Work Completed View
2499 Ghaziabad LC INFRA 20018174 YUSUFPUR NAGLABAIR PWS SCHEME 1 1 8875 2022 2037 2052 20-Sep-2021 01-May-2025 30-Jul-2025 01-Aug-2025 Actual Executed Cost Verified based on approved variation statement. all work has been completed. View
2500 Mau LC INFRA 20023719 YUSUPH PUR WATER SUPPLY SCHEME 2 5 2387 2022 2037 2052 25-Feb-2024 22-Apr-2025 22-Apr-2025 23-Apr-2025 Approved approve View
2501 Meerut Power Mech Projects Ltd 20011234 ZAFRABAD DURVESHPUR 1 1 2371 2022 2037 2052 31-Dec-2024 10-Dec-2022 20-Mar-2023 24-Nov-2024 recommended for Further approval approved View
2502 Jaunpur Welspun Kaveri Infraprojects JV 20015817 Zasopur 2 8 2554 2022 2037 2052 22-May-2023 30-Jul-2026 30-Jul-2026 31-Jul-2026 Checked and found ok........... ok View